128
A Halliburton Company D-31-9-4-5 DRAFT MI-4L-RI/FS-D(3)-III REMEDIAL INVESTIGATION/ FEASIBILITY STUDY REPORT VOLUME III APPENDICES MILLCREEK SITE ERIE COUNTY, PENNSYLVANIA EPA WORK ASSIGNMENT NUMBER 60-3L60 CONTRACT NUMBER 68-01-6699 NUS PROJECT NUMBER S778 AUGUST 1985

REMEDIAL INVESTIGATION/ VOLUME III APPENDICES MILLCREEK SITE … · volume iii appendices millcreek site erie county. pennsylvania epa work assignment number 60-3l60 contract number

  • Upload
    doandat

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

A Halliburton Company

D-31-9-4-5DRAFTMI-4L-RI/FS-D(3)-III

REMEDIAL INVESTIGATION/FEASIBILITY STUDY REPORT

VOLUME III

APPENDICES

MILLCREEK SITEERIE COUNTY, PENNSYLVANIA

EPA WORK ASSIGNMENTNUMBER 60-3L60

CONTRACT NUMBER 68-01-6699

NUS PROJECT NUMBER S778

AUGUST 1985

IMUSCCPRPORATTON

REMEDIAL INVESTIGATION/FEASIBILITY STUDY REPORT

VOLUME III

APPENDICES

MILLCREEK SITEERIE COUNTY. PENNSYLVANIA

EPA WORK ASSIGNMENTNUMBER 60-3L60

CONTRACT NUMBER 68-01-6699

NUS PROJECT NUMBER S778

AUGUST 1985

SUBMITTED FOR NUS BY: APPROVED:

Park West TwoCliff Mine Road

D-31-9-4-5DRAFTMI-*t-RI/FS-D(3)-lll

CATHERINE D. CHAMBERS DAVID E. MaclNTYREPROJECT MANAGER REGIONAL MANAGER

REGION III

as^3A Halliburton Company _

LMI35

DRAFT

CONTENTS

APPENDICES TAB

A PHYSICAL PROPERTIES OF THE TILL A

B MONITORING WELL BORING LOGS B

C MONITORING WELL CONSTRUCTION LOGS C

D HYDRAULIC CONDUCTIVITY TEST RESULTS D

E TEST PIT LOGS E

F DATA OBTAINED FROM PREVIOUS SITE INVESTIGATIONS F(SECTION 6.0 OF NUS WORK PLANPREVIOUSLY SUBMITTED IN NOVEMBER 1983)

G WELL LOCATION, SCREEN SETTING, TEST PIT LOCATIONS, GAND SAMPLE LOCATION RATIONALE

H CHEMICAL ANALYTICAL RESULTS H

I TENTATIVELY IDENTIFIED COMPOUNDS DETECTED IAT THE MILLCREEK SITE

J SPECIFIC POSITIVE TOXICITY TESTS JCONDUCTED ON THE CONTAMINANTS OF CONCERN(ALL DATA FROM RTECS, USDHHS, 1984)

L

'/<.'.".''•<?/

RR000396

APPENDIX A

PHYSICAL PROPERTIES OF THE TILL

DRAFT

0397

COen

CD

CO

UJNCO

a:(9

iHOOM A8 H3SOTOC 1N33 «Uo s s s s s s e s s i

•r

gS

IeSIsi<Is9 <•

«

S

r6-

= »

m

-

-

" .

-

-•„-

-_M»

-

^

-

\

i

1

I-t-

i=f7'J/

//.. ,

/

f/

Y**x*

/•/V

i/4-

1

I1 _ _fc..

8 * s e s s » « s s1H30M U UNU 1N33 «34

T 1

i

L_

J

3e

§

s

§

5

1** 9

-i

s

s

g

e

•5

1

Sii

I

X

2

I

i

PROJECT:

NUS

Corporation

1

Z

j

-i

if

z

oIk.M•<UW

Z

woco

III

w

I

6XHIg

c••*.ua>accr—^•r*S

vo

VOt— <

roCO•-H

ini— i

s:

ininCM

iinroCM

r— I

O

CO1$

T

>1;:)>3

PRESCRIPTION

IF>

Si

lt with

Sand

«3-Lf5CM-00

ioo

S

SRW ASSOCIATES

INC.

WD 00

GRAI

N SIZE DISTRIBUTION ANALYSIS

1 «

[

MUMOKOAH

K

9|

Hi OB M

isI*1*1 -•4 ~*=io

w

!•*•

|-*•+>S

=*•

8

1H9I3M AS S3SWOO 1N33 H34

e > 2 ! 5 S 3 S S S 8 8 i : =

1T/n

/

-

i/

///

?~* —

r~" +*x

— 1

jr,s•r•*j

i

fm~

<>^ ,

i s s a i a a sitem ta IQNU 1N33 MM

f

\

\

oO

§

O

8

OS

0.C IN MUtMCTf

RS

-3u

SIUORCUY

i

iii^

jiii

3

PROJECT:

NUS

Corporation

1

C

*

-

*i

CLASSIFICATION

iaiii

iHI.j

ii

iI

cc•*+b0H^Cc(.1"p"•f2

CO

in

CO*

cr>

*

inCNJCMio

CO•8

CO

•8

»)CM

7M

J

rjL)

e.uj•j•

•o10to•M*2•M

to

Xo

No

If)CM«3-CO

O3:o

UJ58i

)0399

COCO_J

2 |-——————t5A=t"'—""~~ s ' ~" ffl— ls=~ — — — — — — — "••—~f~~—I— —"~— — — — i - j . ^2 $s—— — n—————y—~———~—ii—-~*li -1 = <g I T" 8CO §-. / ^T~ * a H y,

u IE———M—————————— 1 i ^_ _———————/-————————— ———————————— ————i I 8 E srCO

LtO

ATO Sim NUMKM

HYDROMETER

120 30 40

tO

I0q 140 200

|

§2

a o

Z

r3.

1H93M At M3SWCO 1N33 «U

D 2 S S S S 3 S S S t l s

-

•»

-

••»

IB

/..

i

1-^X

J

//'/

Jf'

fj

//*

a s s e s s e s1H9OM Afl IONU 1M33 K3ri

-1 *9

_ /ft

^

^

_...

4—

fr

1

——

o

rt

o

§

0.}

0.1E IN MN.UMEICIU

-a

4*»

s

s

8

R

SILT OH CUV

!i

ii

I

i8 2 s *

cc•*•4-K

CS.OC_J

to

PROJECT:

Ml

s

-i

j

f*

i

CLASSIFICATION

EkUo

Suu

sHI

1

6

Ml

B

Cf4-Vai--*aas.<jr-•S

1

0.

Z

to

oCMin

oCO*

in«B

<CCOCM

1

9

))I

i

1

p-bESCMIPTION «

-.

,.

-.

..

.-

,

1fc>

Silty

Sand with

Gravel

i™*

1

ffinCM*rCO

Oa

GRAI

N SIZE DISTRIBUTION ANALYSIS

AMD IIEVt NUMICRS

HYWOMETER

1M 30 40

(O

100 140 200

|

|s

--Mi

__

MB

-

-

-

_

— /•iIT®_j§

=•« -

_ 1

-d-,

f

/i._

1H9I1M AS »3Stn03 1N33 8U

^/

r'--*

-IT

1

-»•***

Jt

y•

<

8.8 S S 9 SX 8JH9I3M US M3NU IKK MM

v ——

t- *

——~.

"4

/

I

L

————— j ——————

"

—— ) ———

_, J

o

g

0

§

OS

01E IN MUMETERS

-3

»

1

R

k.

»I

-

Ii

o Oi«

CC•M<O

0aoo</iz

1OKa.

£

*

-

z

CLASSIFICATION

ELMl>C

II

6EMlJ

1

1

>

Ml>X

C•4-U9

aacr-f—•TE.

CD

envo

CM

CftoCt-H

_J

1

in

eni

inCMco

en

a

2

r>>i'iii»

•M

-oC

C(0IU_J

o

1 01

inCMco

oo

NUS CORPORATIONMILL CREEK TESTINGSRW PROJECT 84254

PERMEABILITY TEST RESULTS

Boring Depth (ft.) Coefficient of Permeability (cm/sec)23/S 23.5 - 25.5 7.7 x 10-7

aSfr-i A 32.5 - 34.5 4.6 x 10-7

SHELBY TUBE DENSITY

Water Wet UnitBoring Depth (ft.) Dry Unit Wt. (pcf) Content (%) Wt. (pcf)

23/ffi 23.5 - 25.5 94.6 • 15.4 109.1

S3* 32.5 - 34.5 100.0 19.9 119.9

DRAFT

APPENDIX B

MONITORING WELL BORING LOGS

L_' i- l iua PROJEi j CXDRPORATCN PROJE

Q A Halliburton Company ELEV/FIELD

SAMPLE NO .TYPE *

a DEPTH ((I)

-"',/. S"

s-z.T. »'-i. f

5-3/I-*"'

/s-.o-/i.S"

<-£*is.a'-•2 .3"'

i\ L^iVI AA 1

BLOWS/SIX INCHES

OR RQD(%)

3-<H-

9

'" A

Z-2-•9

"/e

SAMPLE

RECOVERY/

SAMPLE LENGTH (fl)

'•fT.r

••.r

*7 s-

'•%r

'•%r

MATERIAL MOISTURE

a WATER DEPTH

(fl)

M

*.,«•

r

**s™i

»Cr

•CT .r 'LLct.ee*'iCTNCVT10NGEOL

> r~-7!?.'-7Ti£*. £"9'

nfii. T J£"'- Cfey«j

MATERIAL DESCRIPTION

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

0 /oseT———————

"'riui*

f-VCO.

isosr

VfgtfT

COLOR

**»**Ci<_A<4r

SR O

C*8l*0SuACX

SCACX

fiftD-M

«-**v

'y' ""

SORIMfi /£"/4

DATF & /£/ - i t/T •/ ^^.VOT"

*

... .mMATERIAL

CLASSIFICATION

f S/LTV sx>iob, so .ff «oerr, P/CL

^ 2.0'

r,*>G 5*^b,-m/ic£- » >;e/.%ir/t«.

r* r/A*r s/j-ob. soMf *i«/iu«. , -ne/»c«rs«.*n /t.*.

/V.«' ,r r fl.01

r/<oc T6 rtfb. 5x»yot;-r«^f s r

S'f". "T~R.A?f ^/>«Ob

V 'i/

3K9 MO OV/-1 ^r«D/^G-S /»flo-/C- e/»OC fi.*0t**oto

*SEE LEGEND ON BACK

Al

uses OR

ROCK BROKENNESS

SK

SP

SAT

*H

r«_

REMARKS

/sjoti/Jtxty s'1''''GVH. Si /3X<S-ȣ.C>

41V,,

ff-Jl, 6/Vi /US

ISfb u £PARP / OF I^^

rviusPROJECT NO. &7~r* '• _____. BORING if A

A Halliburton Company ELEVATION—7*g-*"?'—————— DATE* " HELD GEOLOGIST.

St

:.NO.

. *

1 a DEPTH ((1)

j

; -Co

zt.s"

30.1'-•?;.£•'

Lt_£i

*";.*'-

•'°,,-c a1

BLOWS/SIX INCHES

OR RQO(%)

r"7?

'*"•«•

IT"*

££

z -rr

SAMPLE RECOVERY/

SAMPLE LENQTH(fl)

'•X.r

'•#.s-

''f/.s

'•%«/

'•°/.o

(MATERIAL MOISTURE

a WATER DEPTH

(fl|

uJer

HOiST

\ 1

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

/VrW

b£»sr\J i

rt tfAfth

> r

a

I

frftAV

fr«Ay

&«*y

^ ^

MATERIAL

CLASSIFICATION

CiAvev */cn w/.r' 5/t.rv cL/»y *2«

S<UT"SAM

57..O' >/

iAlO

I* CU<*Y 3O.O-3O.M'

p >i

ay s»cr, r*A<r<

^ 3T.»O'k

',K*»CL.(TtU

S<CT; "Tfl CC" ffAiJtJ TltACf GfLAVfL( T*f d"

\

>

/ i

-

f

USCS OR

ROCK GROKENNESS

' ML

SP> •

Ht-StJ

HL

.r

REMARKS

CStAVfL. ****!«.«

TO «mjkR/»»sl*U.l-/»t.

«.«« r<w* r

.

\ r

*SEE LEGEND ON BACK " ' PAGE.

4-.D£^A

S,

£NO. *

a DEPTH (fl)

"<b.Z4..5"

-

30.0'-3/, 5*'

-

•35

-

-

'?0'-, 5"

1.0'-

-• *V'

-

-

/O'.4-4.d*

-

;.

iVILJfiS PROJECTCXJR=O=!AnaN PROJECTHalliburton Company ELEVATIC

RELD GE

BLOWS/SIX INCHES

OR RQD(%)

5--?-?

'*'%'

11 -11-

Z*£°4

z-y-s-r

SAMPLE RECOVERY/

SAMPLE LENGTH (fi)

'•X.r

'•.y

''.5-

'•%«/

'•%o

MATERIAL MOISTURE

a WATER DEPTH (fl)

lyjft 7

g*Y*

MOiST

\ ,-

HlLLC

NC)N£01

v £>-X.ffX'77S , (7

72r-.r?'.OGIS'r Jf^ /e/4

BORIWR /r^

DATE 6>/ZZ/trAJT

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

Sff/sff

lifi"MS£"

\t

*\ WAftb

,f

IG-*AV

a.«*y

o«*y

i ^

MATERIAL

CLASSIFICATION

CiAVffV •Slt-T'i i*»/.5*' SIUTV £.LA*f A 2S.S

S<<-T>iSAN>

? .» O' >/

V

SAM

k, TTt Cff Grlt,A*JfL

1 \/

ay sicr r-rt g- c

' 3Z» o't

>*/««/tfv:Yr/

> , ^

S/CTTT'MCC' SAfi & , TK.ACS <S><t/«/fi"C£ TV <.£."}

\f \ r

?K?5 No dx/M rt£V,b/,oa.s S6 5-eau'•

* ———— i

uses OR

ROCK BROKENNESS

' ML

SPV

ML-SW

ML.

\

w^

REMARKS

.l ur >»A.*«cy»«

T10 .IXR AM<tU.L/*«,

«..«* PAA< «>jJ

V

^ m.m—

r

f cyifgs H*SEE LEGEND ON BACK

"*

PROJECT NO. 0773./T______ .BORING.A Halliburton Company ELEVATION^______ DATE £/?z - */a 3

FIELD

E NC

DEPTH

S )BLOWS/SIX

INOR RQD

E E AL MOISTURE

R DEPTH (fl)

RMATE

a WA

SITY/

ENCY

ONESS

DEN

SIST OR HAR

SOIL CK

MATERIAL DESCRIPTION' </>win5 iO Ulin X

o:

uMATERIAL

CLASSIFICATION

uROCK

REMARKS

(fsu*i+nTt>

V. 8«.

•SEE LEGEND ON BACK ' PAGE

PR°JECTCORPORATION PROJECT NO. a"nt.fy______.BORING.

A Halliburton Company ELEVATION——7l7tff—————— DATE,RELD

• NO

DEPTH

/SIX INCHES

RQD(%)

ORBL

E RECOVERY

E LENGTH

(fl

MATERIAL MOISTURE

a WATER DEPTH

(f 1) MATERIAL DESCRIPTION'

/ Y S

>^U OT£z $<o w aiS« §QS °

ROCK

MATERIAL

CLASSIFICATION

SS

p uj

i REMARKS

I.I//I. 5"»*~ * • — -/. t IV .. . . ** , ^ < « m >j^ji.i&.^... ^ &

LfiUl.SV oty >=•/»>€• SP

S"- JO-/O-*

T-a CH

3-3-7.S"- •ns

.«'51 tr,

'•*',.* •SATU.H.

CH

5P =t'•''/l.

SA^Ct -

•_-<=»11. «'-

7-S-la

3-^''/.S OUAV

'.a '- r.,- .f//l.ff.f

I-*/ \' \M^i_fi_!_________\' i-y.aj-iatsr

a.0'-

r-s- '*/,.*I?-

/«•"' • ' " STlPP ML-SW

•Z.Z-31- /•5VS"- MOIST

s-n4.9 Heisr

-..MARKS

SEE LEGEND ON BACK PAGE _ L. OF_2_

*"i

oUJ

05

^!A

1 a DEPTH (ft)

rz-s5"-IS

2.7-0'

.$....r 'S — tfl

•?a. S"' -1.2.

1. O'S-Z.T

^ 0'

- 2-S*.a'—7. r1

I-Ztit.e*

». a':0 01'-'O* 2T"•- T.?

:f"o-Uil\.S"

•30Mi.

<JSTf-. o'

'. o'~>..$"

i-2Z

"4-.';. ;*?.- t.3'.«.£•'-

VIAF

IkW

|\|IJ3 PROJECTCORPORATION PROJECTHalliburton Company ELEVATI

FIELD G

BLOWS/SIX INCHES

OR RQD(%)

13-13-

>710 -(4-

19

lf-%

5

r

1 4-«4/f*

3'«"ti-3w.

Z3io-tl-

i -tr-7

12-33-•31.

3r-ro-31

37

ir- ;

7s/4^ j

SAMPLE RECOVERY/

SAMPLE LENGTH (fl

)

lff/l.f

*'%r

'*/*•Vs-

•*/.s-'s/.f

'•V.r-'* r

'%•'"Xs-

'•Kr'•%•

'•f.r'•r/.r

•v.*•3/fy• *'/. *V

MATERIAL MOISTURE

a WATER DEPTH

(fl)

uer

eT

.liic

\

H.,.r

5/tTtf<t"Tf

*

rr

rrtvtf-rW6"T

MlLLfUff*' ''••;•

•NCON£01

•> iJ-7-!

-OGIST

MATERIAL

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

OfA/Sf

\

"i HARt

^V£**y

l ff'/OSf

\ i*/ffc4bffMSf

tif (OSC

or/oscv "/?y fcCAJ S"

e

.«/»yv p

frKAY

GRAY

>a-ftAy

^ f

^^A Y

r ( A*t*

6-«AV

&rt/»y

2.17

7.5T'JT /e- d«

RnRINR ;6/4 'S

HATE i/?6-4/a7/3W

DESCRIPTION*

MATERIAL

CLASSIFICATION

F)AJff Tfl COAHtC 5*M

28,3' \jf iSitTi'a *' SAfJfc. Tft.

6V A«<rsfc*AVr<"

J s.-s'ACtr* O*AVfi.

SILT, i«/-

\rtfft. Ta

<r w-^TftAte a-* eu r/t^

' _>_~_^' '514-T

•<[_

<ltT, T«.«vif/ty *•5ff*M«aey^___J

** Si(_T- 1. •«.'

vff^y P,I-C^^,S««C s/trSA- 6, »H 5/ti; r»>fcr a-/tx. rt

f/M£"TS Ca/*itfC 5*'y'C , S3f*f 3n/"-Vf_

?K<;1

SEE LEGEND ON BACK

uses OR

ROCK BROKENNESS

sw\ I

Him

MC

A

1

r

5uJ

i^SP

SP

SP

C'.*J

3<l

PAGE-

REMARKS

tf-«AVff<. A^UL^ft

TO Sixd A wa.u.i_ (VR.,•

(?o«.«r rftA«j.MC«Jrs

-rVJ6 &/ 24

\ f

GrftAVCL A*&UU»r.

"Tb Six<»«.a<j.fote'ti

N^

«./i-vrt Af^u-^fTO SUrl 1 .01x 0 Qg-Ji

ff}f«5^nQ^ n? 3

NUS PROJECT _£PROJECT NO. 077 . IT______ .BORING.

A Halliburton Company ELEVATION——1'7-fr*—————— DATgRELO flPni.n«fiT Jfrr

si-s03

-3r

- :V34,

SI.S".

" 171.0'.

5-5-

/

~(Zu

.5"'38.<"-

t

!.tM**

,

^

X/0^

I

BLOWS/SIX INCHES 1

OR RQD(%) ' j

***{*

2.9-36-(.a

ZO-S3-5-7

ftft

i(%£j

0*f6

"Z.L ii.«'

37?;

r SAMPLE

RECOVERY/ 1

SAMPLE LENGTH (fl

) J

•*/.*l-%s-'•y,.s•«/.«

5-'/ff.i

i.o

MATERIAL MOISTURE

Ia WATER DEPTH (fl

) j

SutZei.

7:0.44.0'

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

h< fl «•&

\ 1

SoprSoPr

\ r

o

• AY

1 r

^<AV

.££AV_

f

MATERIAL

CLASSIFICATION

SVi-T", T"7CACf flAw^, *T" /IC . &(l,A\JffL» 7 / O

-

UJ/ Pff'UJ /AJT fXl jffl O'? fc AM<lVU, LA ft,

fi.wi.iirfcsfu To.vs-'*t

s-9. jJ-s" ^ fi.rr-

SHALf. tfitaK AJ, tf/»TWtfVCCb

5UA(-C, vJ>/ SA/O&V 5T«.«rA<S , SftaXtf'Aj,

UrAT««-««-^ £***** AtO^A

S£*b^i»>V V.A/sl«-J f W0/t,f%A«OT'/lC\

,

&C..01 1 >f 44.0'

'

uses OR

ROCK BROKENNESS

Mi-

a«.^

vf

REMARKS

CrrwfL. A/o wuvft

T5 Sue Aiv3*tAWAft,,

f?»t«< Pw.*<vM Ajr<f

M X o/2iT

— i•

v

\

SEE LEGEND ON BACK PAGE—J__ OR-3.

CORPORATION PROJECT NO. '6~m.n______ . BORING.Halliburton Company ELEVATION——717.44.'————— DATE_

FIELD GEOLOGIST_aL£££_&£u

IS

E NC

E *

a DEPTH (fl

) j

5- 1' It_0

9

BLOWS/SIX INCHES 1

OR RQD(%) I

<m-H-•*_

-

SAMPLE RECOVERY/

1

SAMPLE LENGTH (fl

) 1

«•*.*

MATERIAL MOISTURE

1a WATER DEPTH (fl

) 1

u)e~r

.2-s-.vfe/*Vf

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

£.o»s«r

!o

SLACIX-s£?U*j

MATERIAL

CLASSIFICATION

S€"£* Sd*/io* c.c<s. ^ A r«*brTAicrb UTMdcaov

v f vf

r ff ra <:oA«.s<r A/J , 7*eA<.«- <£CAy ATGsTre** . PJt-L <f-ro <;tAy <.Ayr«.>

'

££•£ (2o/«./*J<i. uaa- (4 A PA A

&^TA/c«r& C(T-w«caft.y

^ >^

uses

OR

1ROCK BROKENNESS

1

5P

REMARKS

rAXfAJ ?6*

AAJA«.y«<5'

MC-SS-Ot

\

ABBORING

SEE LEGEND ON BACK PAGE—L_ OF_JL

CORPORATION PROJECT NO. Q77*.f7______ BORINGA Halliburton Company ELEVATION——717- *<t'—————— DATE_

FIELD

Si E NO

*1

a DEPTH ((I)

j

~z£'-•31.1'

BLOWS/SIX INCHES 1

OR RQO(%) 1

-7e-KX»-S"«Xl

SAMPLE RECOVERY/

SAMPLE LENGTH (ft)

'•Xi

MATERIAL MOISTURE

B WATER DEPTH (fl)

HOIST

Tfe. ,31. r

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

^ H*«0•

e

I

6eAY

MATERIAL

CLASSIFICATION

> i >flLTt T(Z.A&g f*/>Jt} , TKAC&

f

' a-AAvfz.

.

uses OR

ROCK BROKENNESS

MC.

REMARKS

Tfi*£ r««ffr A/*HfJA TlOfJ

——— \

SEE LEGEND ON BACK PAGE

CORPORATION PROJECT NO. d7-yg.<-?______. BORING.A Halliburton Company ELEVATION——-719.70*————— DATE.J

FIELD GEOLOGIST_*L£££.

-EN

a DEPT

S/SIX INCHES

RQO(%)

OR

Y (flO G

SAMPLE

RE

SAMPLE LEN

IAL MOISTURE

ER DEPTH

(fl)

R TMATE

a WA

Y/ Y SS

NC E

NSI

CONSISTE

ORCK HAR

OIL

DEN

SIST OR

MATERIAL DESCRIPTION1«

MATERIAL

CLASSIFICATION

Suses OR

BROKEN

REMARKS

. 7.0- MOIST

A-'C-'S-

JL2.

¥-8- SP San.

.o'Ki.

.a'-0-3- Tes

i fi. Pi^-r.c/

'* - /v 6***

^ PC?

"S£E LEGEND ON BACK . PAGE

NUS PROJECT. " • • - - - - - -CORPORATION PROJECT NO. tfT-yg.rr_______ . BORING

A Halliburton Company ELEVATION __2Iiils:______ DATg 7/r«RELD GEOLOGIST

il

.a

,.EN

O. .. j •

a DEPTH

(fl)

I

-. 1 -

II3». a-u -r"

'"r.'h-.r'

' -(3

T. 0

_«.3-: =• . i"

J. ;, ... '

," /6r. »-••. r'

C*If' iff'-S™<3« 0 '

v/

BLOWS/SIX INCHES 1

OR RQD(%) 1

JNl-T/AJM '•

7~'>V

""•?4"

a- -7

?r-<

*•%-

3fc-«2j;

u?

£*•

SAMPLE RECOVERY/

1

SAMPLE LENGTH (fl)

r&i

''%*

'••V/.-r

'•'/l.f

1 •*//.<*

's/.s-

•v,

'••*XJ.r

fc-VsJ

| MATERIAL MOISTURE |

_,

1 a WATER DEPTH (f

SAP

Mai

>

-l*/>-

sr.MTtf

t

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS *

« «£•£>•

DfA/S "

/Loose*

WAlttl

5o?r

o

<S-«Ay

k

<5-« Ay

C'KA'i

MATERIAL

CLASSIFICATION

f»ir" SK-fj .^r1 ir/wc '^ iztnze r»Mii i/uIIT-O»-» oic :/•,-(»•.-•>

V«ty f/A fi" M6 TRA<^ **«.T. uH****

Al' K/»*t

^

-.,

, &*MV SII.T AT 8»TTi»«

^

i>Nti

t Af Wfl^tC^

»

F'V«- Uft^TRAdr siii.

-Sir* —— ,SILT «

^

o/ £" rAMO, TRACe*T"/ Z_

^ >

; rst"v<s.« A •/&-<:.

5l£.Tj TUTUS' SAN6. T«A«.f ?>«AV«-L. Tl t L

5>/<«ce-

uses OR

ROCK BROKENNESS

3P

^

ML

^

A1

REMARKS

•• • • - • • mTILL -ifi-Pas-TG.ii*vei. Ai>J4UiLf-n.-a ra^^ouwoeft•W ^ 6/l.tU/U*\"* 5" ^ 7/r*i '

J

V.Q&.

{Pterjfc.yra («•««Pass i a t£ T"PST)/oa.>

b«/j.u*)fi. •£x**A?t4ft.l' *i*ltt>-

T*,** Co A.*,*

uJAs

'SEE LEGEND ON BACK - - PAGE_ii_ OF.

PROJECTCORPORATION PROJECT NO. 0*778.17______.BORING

kA Halliburton Company ELEVATION——7f?-??'—————— PATE 7//*/*•/FIELD GEOLOGIST _J f.

1

Sr,m, u-ENO,.

,,•£ * ,

a DEPTH (fl )

1

A

oaRS"fSur*}

•z.&.&'.

*r.o-

V

^^— .

BLOWS/SIX INCHES

IOR RQO(%) 1

T*

SAMPLE RECOVERY/

1

SAMPLE LENGTH (fl)

j

S.e/fA

MATERIAL MOISTURE

1a WATER DEPTH

(fl)

1

T.O..^^ A *fS.O

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

ropr

e38

£**y

MATERIAL

CLASSIFICATION

SMfltfi*, i-)/ So fi1 fAtJ^ STKfflKZ

*/f/Z.~f fii<o<«C»O - fiiCeWari A«.OA^& er^bi«J«

PtM«ic's « aft.i*e»j'r»<_Ns

fjf.a' > v 5-r.o'

uses

OR

1ROCK BROKENNESS 1

V. 8R.

REMARKS

- MARKS i>>£-LL IT A ffter*LLet /M g* ft •**",.________________^.RQOOU I 5_________________________________________ BORING /7A

'SEE LEGEND ON BACK PAGE 3 OF_3_

tec

f.'

CORPORAnON PROJECT NO. Q-77-g.(7______ .BORINGA Halliburton Company ELEVATION__2i2i±«J_____ DATg 7////8V

RELO GEOLOGIST --L

1

- -

BLOWS/SIX INCHES

OR RQD(%)

SAMPLE RECOVERY/

SAMPLE LENGTH

(fl)

MATERIAL MOISTURE

a WATER DEPTH

(fl)

9 '7/"/«V

T. &./V.o

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

g MATERIAL

CLASSIFICATION

Sf£- so«.(,oa, uaa. t7A Faa.bfiT/»»C£-fe ' t_l-r«OCO<3.V

yV.p' \f ^ I*.G'uses OR

ROCK BROKENNESS

REMARKS

=*

176

SEE LEGEND ON BACK

i 4A

•*01

CO

• -1C »'-,.£"

•v. 2.

-Y"

'- ,3T-,£• '

rf£.o'-' 1.5"

%vS-.r

: 7.0'->.£'

t/.t-zz.s"

$:<?&.• MAP

SEE

NUSHalliburton Company

BLOWS/SIX INCHES

OR RQO(%)

*~"*7

/-/-z

Ir.j.--

"X

"V

1-1-

0-1- 1

/r-«-

,'4,-ia-

S-' ZO

SAMPLE RECOVERY/

SAMPLE LENGTH (f 1)

i.y,.T

'-tf.r

*s/£r

'•f/,.s-

'•//.f

'•Vi.r

'•.r

'••/.f

''.5-

1 MATERIAL MOISTURE

1 a WATER DEPTH (fl)

»<Y

'^

Jrr^7//V«*

^ r

* f ^ f ffT G* ^

r*r

iHat

i

J<"T«r

?K<-?

r&"

f»T

ru«-<ro

PROJECTPROJECTELEVATIFIELD G

H'C-L<C/

NCONEOt

V 0-7-7

-OGIST

MATERIAL

SOIL DENSITY/

!

CONSISTENCY

IO

RROCK HARDNESS

"i&se

te.*-

T/

jr"

r.

M sc

wtiO$ «

xV | ^

-t-

DffAJ

fi<s*

CS

I

s<x«-

£££££

Tt^

gltOUM

s'si

<***

ioe

^Ay

f

AV

z.'11

£*<£-/ *

?.«7 nr-./v ru.

:FCT

i?y/,.

>IWR 1-8 A '^

•E 7//-2./S*

DESCRIPTION*

MATERIAL

CLASSIFICATION

&«€**«*.*.**• He,-3 *>.«„*F«A M'«-»JT» ( .f gr ir FILL-

*/t.TV //o<r y/,Nb / r uJea^ !•**«.F/<L /

y. ff' «t' \k ^ f.f

CLA^e-y siLr--<+>£.A«G.e *i r**rr«<r**rNAT>iA<5AL Soli.1 "" ^

f~/*J£ TO £oAR±g f^VC, " A fFlfig' Sit,-— y sttUb »f

Sie~f /.«'

vr«y P' - */**• s &. r s-.rf./ ' SICT /A* Sa -r-s<-«. o^ — /if- fttf"}

-

lt.01 >

*/«.-?: r

,

f \

tt/»Ctf S/flA/

r it.af

y * •Mr6.ra ccAejr g c,,* , cxo^vcc

LEGEND ON BACK

uses OR

ROCK BROKENNESS

SP

*

ML.

SUJ

:•••

vML.,

.

>f

SUJ

*»!«PAGE-

REMARKS

0 a ZT.O rPM/».j "-if i* !*>(? -*V '.•/.' i A"*" .SA** (

-rbaM^v SAM^£-2. TA ffJ £•*!*

fiHfi ',1

H4-SS,6M

-

f-ufve^ svkg./•JO-U _X»f<. 7 3

lOffl'?/ OF 3

0&

J

1 SniwruENO.iirt * |

f-

IA

1 a DEPTH (fl

) 1

-9 f

7/oa-

wt . f'

30-o-T/, S"

*»"»

r u. .

.0-

.S'

' - 11i i.O —

-r.f

„? o."•>, S"

uz..o—*"*t '

"yV"iiT

= MAF

IMUCORPOFVHalliburton Co

BLOWS/SIX INCHES

OR RQD(%)

O,»J-<AJ

n-ii-t

'7s-l3"

/S3 a"

29 «"

11 -»t-

3°- J

7 i"

SAMPLE RECOVERY/

SAMPLE LENGTH (fl)

Kra^

''%f

l'*%.s

\.-iAf

*•*"/,.?

''Yt.f

•V,et

•%f

1 ^IJjJ PROJESTTON PROJEmpany ELEV>

FIELD

(MATERIAL MOISTURE

B WATER DEPTH (fl)

H«»r

,*r

£rT

v

/HOIST

"CT MlLLCft.fe'J*1

:CTNC;TIONGE01

v 0773.177/7. /v'

OfSlST J^TA- O«

f

f

3C:/3FITMNft ;g AE 7/12. - ;

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

H*«&

UAA*

t

|

|•J/

HAftl^

r " *J

/W/>*b

tf>»«.ft

,,

I

6IMV

<i«Ay

**Ay

<s/?Ay

<S-*MV

<5.«*y

otAy

, '

MATERIAL

CLASSIFICATION

,T_^.s/tr.*1.

, 17.1'

"^/ A tf " Td /**T (5*& S A *^ 0 * *^ '

\f \F"*J TO CA***-JC J*IC*T" . "T**c. <T *<

r"rji-i* !* |C"" *° ' f7'774' -

3A*>

* ———— **^

7*ft>l«# S»£_*"

34.*' >S»i.T SdHg" f+f

\"*A«ff

A.

4 ——————

*

5 i. 5"1

ftRA e'i-vjf.3' LC"*JS ar s>«iD, T«e>x:€- 6-RAUft.

~TIL.I-

5/»*Jt>v SILT. T•*A<:ff G-» *V«TL

5-U.T. TVRACr *«AV£-i. -r/5/.ce- 5-AVb

.5 f 4-1*1 So C' SA*M S. 7" / C€* O- ^ Ct.

1 ' \

?K«;

Af<

-/

53

^

MU

-•<-.'

• ','

« '

1 ROCK BROKENNESS

r

-5A

H6-JUJ

1>J

ML.

REMARKS

&RML AHtoL**.

*n ftouAjofti

J.«•7"/ .tL-

<j-ft*Ufl_j><0/5-_l(_A.rt. Tfl

^ta^^+K

r*JD T// 2 /*«

\t

_ gfj

fflflRlNfih » / 5?^ jKJLo o o H- 18 "" P

*SEE LEGEND ON BACK • PAGE_JL__ OR.

CORPORATOSI PROJECT NO. e-J7*.i-y______ .BORINGA Halliburton Company ELEVATION——7'7>/^/—————— DATE

RELO

1S...... ..ENO...

..J. * .

a DEPTH

(fl)

1

-1-8

TO- f

,rr!2--y

,Lr

M Kr

BLOWS/SIX INCHES

1OR RQD(%)

**>

*Xz

SAMPLE RECOVERY/

SAMPLE LENGTH

(fl)

••£>

•Vi

••.a

1 MATERIAL MOISTURE

I1 a WATER DEPTH

(fl) 1

^'

Tb

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

UfiR.K^

SOPT

, t

tCrRAy

—— 4L^^Ay

\ r

MATERIAL

CLASSIFICATION

SltTT s*rf ***.&. Tfc-fir fiftAMa-t.

SS.V

DUALS'

Tlt-L '

.

,u«TM*-/arft. grt^_CSLV

r-o. ***Xfc

S.&1

uses OR

ROCK BROKENNESS

M L

.

V.flfc.

REMARKS

G.tKiSL AAICUI-**

TO Sa<» is-.«*i />*fe:rt

Vre-y ;;A*ISft«/i.OA»&.~«*0

/- /vu r TAta&ga. f r~-*r

-

1"SEE LEGEND ON BACK PAGE-2— OF.JL

« . . /-U o o o f /

IMUS PROJECT(ZORPORATTON PROJECT NO. o 'g • '7______ .BORING IS S

A Halliburton Company FI FVATIOM 71 l.f 7'_____ DATgRELD figninfflfiT

S EN

O • *

a DEPTH (fl)

j

-/

ulo'

BLOWS/SIX INCHES

OR RQD(%)

;-/-j

SAMPLE RECOVERY/

SAMPLE LENGTH (fl

)

'•*fcr

MATERIAL MOISTURE

1a WATER DEPTH (fl)

*£?•*'l fT

T.t>.is y

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

SOPT

cr

I

Vetcau

MATERIAL

CLASSIFICATION

ser<e- fia/*.//o6. L&Cr is A ForvbfiT l cTfS LlTHQLQG-V

SicT} Sane ct,A-yl -r A<.e s**Jb

1-8.0' fS.a'

uses OR

ROCK BROKENNESS

ML

REMARKS

fze~rAi*jeh F"oa.ArJAi.*f3is

He-ss-d

^

SEE LEGEND ON BACK PAGE

I .

CXDRPO ATDN PROJECT NO. OT78. H____ . BORINGkA Halliburton Company ELEVATION———T'-S"-"7^'———— DATE

RELD GEOLOGIST_

-:NO

a DEPTH

s

/SIX INCHES

R RQD(%)

BL SAMPLE

RECOVERY

SAMPLE LENGTH (II

MATERIAL MOISTURE

a WATER DEPTH (fl) MATERIAL DESCRIPTION

NSITY/

TENCY SS

DEN

SIST OR HAR

SSI

ROCK H

MATERIAL

CLASSIFICATION

SSes OR

OKEN

eus BR

REMARKS

- « * -- — STITrTZ.OO1S., i

MOIST BLK 'SaMfc SJur,TE/k-£.

•5*5———W-UL

7 >TO SlUT, SOM£ ]/.Flve> TO ptO -

QftRK.

WETIUQ_____1L£.

; v-•tT S-

^ •) -~ T"

1-5-7

1 -

1-2.--li. 5

V,F»NC TO F/NC SflfOfc

CSP

TX SS: . Sem; 75.f iAPKgTlD ftAdfcCgQUK^ 0-0.3 ppm

BC

SEE LEGEND ON BACK PAGE—L_ OF.

PROJECT_PROJECT NO. ft"77ft . 17______ . BORING.

A Halliburton Company ELEVATION——7T.7&'—————— DATE 7- /£-' FIELD GEOLOGIST.

: NO

a DEPTH

Si

S/SIX INCHES

OR RQD(%)

BL

E

1 MATERIAL MOISTURE

a WA

DEPTH

(fl)

TER

MATERIAL DESCRIPTION

^5 %tz |co u aSSgsa ta iS

MATERIAL

CLASS! RCATION

SSE

ses OR

BROK REMARKS

- iOi 2Z Masr

! TT30. «•3/.0

Sit-T, Some TOTJJMCE V.

^ 13x 3-

TO F/<we ww u. sowe s/w,

; ffr'•3-

V-_______^______s_______73___^_____^___g^/g^. c r/ .

rfYMsr

ho/sr (ML

J-.V1ARKS———————————————————————————————————————————_ , q .______________________________________________ BORING ' I "_____________________________

• ——————————————————————————————————— 2.SEE LEGEND ON BACK PAGE—TL, OF.

CORPORATION PROJECT NO. 0778-0_____ . BORINGHalliburton Company ELEVATION——-rtf.n______, DATE.

RELD flFm ftfflgT TJAAJt^L P.

Nf THE

« sf to co 3 (fl «,

HEOWS/SIX I

NS

OR RQD(%)

BL

IAL MOISTURE

ER DEPTH

(fl)

R TATE A

MATERIAL DESCRIPTION*

L DENSITY/

NSISTENCY

ORROCK

HARDNESS

Iu MATERIAL

CLASSIFICATION

NESS

OR ENuses

K

REMARKS

-(-o- I.O//I.I.O

y. 5n*-p TO bu

TO

/IARKS.

SEE LEGEND ON BACK - PAGE.

'-€i?A

' S* i NO

"1

a DEPTH (fl)

: i/. s*"*

3-a -• • <•'

•-•3

, <Y• 3 -

r*1' ' *-'

" 0 ~f

7o -9. f

•w2-Z /*

'i'.-. f

IMUCORPORx:Halliburton Co

BLOWS'/SIX INCHES .

OR RQO(%)

*-%-

3-6-

Z~31

'"7w

/«i»

'T-t

";*'t

/-/-v

I-3-//

SAMPLE RECOVERY/

SAMPLE LENGTH (fl

)

'-YI.S-

'•i.s-

'-y.s•

''f//.r

'"%r

''f.r

''Vi.r'

'•y/,5-

N7//.r

CTION PROJECTmpany ELEVATK

RELD GJ1 MATERIAL MOISTURE

a WATER DEPTH (fl)

bW

\ -MOIST

A^CO

s 1

H01VP]S>TUlt-Arr^

f

*7* / y / /O £*,£* &l^ I / fan l— v— »^ ™ G. ^

NCDN•01

V Q778.-/7

719. 1-2'nftKST l^ryS- cO/i/^

BD•A-

. ':"*•>,<•>>nRIWG 2.0 A

ATE T//7/W-/ 4

"" ' ,>„>..,....»..,. ^

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

M%OSff

L.aos€"

-1-vdd3 "r

\ f

Mrbr*jSe

^

^i f p/S

,,H*fe»oj«-

Leo if

H*t'e*se

COLOR

•CACJf,seo oi.t suun.

ftiwwrajSKObwv)

»

&•* — T

i pI A Q JfJ

^,r&A *r

-i-

^

MATERIAL

CLASSIFICATION

P/Air S b.T/tACr G. V<Ti.. P.L.L.

1VS-RV F' £" XAiub. SOMS SO.T.IslATUCAC 4fttC

,» . >

r/Ajrra ra. SAWO

fv vr/ s D.-ne -

»i-.af '

r

SILT, u*»»(r<«?*«

r/t,T* S6*\f V. P>A/<? i A

1*. '

^la,

' £»*A» 'i

' uTld*ntAff CLAV

i

V€*eV PV/Oe1 S/»N«i, fAAtf

2S".a' ' ^

5K9 Nb OVM ^Api^JfrS />tf e* A/JCKctAawcAM

3EE LEGEND ON BACK

.,5^A»fi

2.S-.0'

_

uses OR

ROCK BROKENNESS

SP

-' ———Ht.

-a•S'p

^ r

f^P

^^»/

MM-WJ,

s

[_SP

v ,

BORIM<

PAGE.

REMARKS

TtAX^AJ fffltA/U X»UYSl j/N»£»SS-<lci

——————————————— \__-, ——————— -J

ft nrflflj ° {l 4liUU u *i •- * n/ OP S

PROJECT NO. <>778.n______ .BORINGA Halliburton Company ELEVATION——7'?-'3/—————— DATE 7/,7 -

FIELD GEOLOGIST-

NO.

THS™... a

S )BLOWS/SIX IN

OR RQO

> s «s i i —— • • •— • «y£ tr x>. «? 2

RECOV

LENGT

E ES S

RE fl)

MATERIAL MOIST

B WATER DEPTH

MATERIAL DESCRIPTION

/NCY SS

DENSI

SISTE

OR HAR

Seo MATERIAL

CLASSIFICATION

o ujCO K

u2

K BR

REMARKS

10JAM & sw

. 3 M»i If "-T

•Hsa. a3a-1

rtoisr(SV6*TtI HL

WVihftt P*

J.U

noar orwsr

/Vr-0 -

Mo»jr"TJLL

SILT

ML

1= MARKS

*SEE LEGEND ON BACK PAGE-^

. f

*FS. ....._£ NO .....J*

a DEPTH (fl

)

•'7i.a -

. •• 7

fff.9.

i ,«"?"""

"2fi:f

IMUSCXDRPORAnONHalliburton Company

BLOWS/SIX INCHES

OR RQD(%)

«f-J%

*&*.

0°/0

SAMPLE RECOVERY/

SAMPLE LENGTH (fl)

«7/7

• ^

r' 0

1 MATERIAL MOISTURE

1 a WATER DEPTH (fl)

rr>.

ISOI

L DENSITY/

CONSISTENCY

PROJECTPROJECTELEVATRELD G

ORROCK HARDNESS

H*«t>

>

^

f

t

5o rr

T H/ccOte

TNCON£01

•e*s • f''-' f J,f, <y

V 0-T7*.rr RTIDINft 2.0 A

7/9./3' DATE -;//«? /8V ^.OGIST.

MATERIAL

X

u

<r«AV

,i

G-

t

A/H

^ ^

Je-/?e a^/cr/oT

DESCRIPTION*

MATERIAL

CLASSIFICATION

sicr so r s 6, T- XC - ^ Awfft.

?.A' >j'

SMAtr

r >l /

. v/cT<*y USA-rHf*ff A ^ ey-* jS flfi fe.PfeA

*" "*a**™"1 -a

re.a'

SeTkj G«.«*rtJ

^ S WdA«>*

( •• •••••MMIHVB BMHM

iCO

i

V

1 ROCK BROKENNESS

«<-\/ iI

v.an

__a =3=

REMARKS

TtLL.-

G-(tA\fft, AlJ&jUl*-

T* ju«s*ouAJcet>

|=l

'SEE LEGEND ON BACK ' PAGE_^

PROJECT NO. Q-7-7 *. f7____ .BORING 2-QA Halliburton Company ELEVATION——7'*-?7'————— PATF. 7/ze/gy

FIELD

S, E NO : » '

a DEPTH (fl

) 1

j K~

- (•"*•>.«,

BLOWS/SIX INCHES 1

OR RQO(%)

1

IV.BM MWI M

! .i __

3-r-4

SAMPLE RECOVERY/

1

SAMPLE LENGTH

(fl)

1

MMM ^ B

—— ——

'•Xr

MATERIAL MOISTURE

a WATER DEPTH

(fl)

*.

SAru.«.-ATCO

TL.<r.

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

/1€"Obfi-KJ5«T

OSI

<S-"«AY

MATERIAL ,

CLASSIFICATION

5£V -Sdrt-' *1 Ld«S- 20 A b/C.Q rxv/ 'O i./T a<;a<5.y

,

/ /AJg1

^ 1

TT» /-f<f6. 5/»/oo , -r»/*ca:

#

Sll-T

.

uses

OR

IROCK BROKENNESS 1

SP

*

REMARKS

SEE LEGEND ON BACK • PAGE—L_ OR

IMUS PROJECTCORPORATION PROJECT NO. 3775- /7 ____ BORING

, A Halliburton Company ELEVATION——7<7.afe'_____ DATE _2_Zill?iFIELD ftPni'hfflgT *DAA/j£L ft..

NO THm a WS

/SIX

INCHES

OR RQD(%)

P «r <r ^

BL

Y (flE REC

E LENGTH

S

ERIAL MOISTURE

ATER DEPTH

(fl)

M a SOIL DENSITY/

CONSISTENCY

ORROCK

HARDNESS

MATERIAL DESCRIPTION'COCOUJ

zUJ*oMATERIAL

CLASSIFICATION

ses

BRO

uROCK

REMARKS

-10». a- Y-iTf-

^ 2f.

say (ML

•-..«t

14do.5

5 -1

-5 /O

4,5-a •—SfC7" Sor fi 5u&hHt(sLfi*- 79———-^—— — —————————

TILL

SOFT

: ;MARKS.

kSEE LEGEND ON BACK • PAGE-Jk- OF.

SS3 • - - -

PROJECTL CORPORATION PROJECT NO. a"7-73.17______ BORING "2-'z-A Halliburton Company ELEVATION __1/£ ±L!_____ DATg 7/2j/g

FIELD

*LLl

(OW4

< 3 —

..S"

3.0'-'y. .S"'

5-3

•: 5"2..0-'3. f'

"' -~<£ ~gt

*-7

• i"

: "8z.i.i"

Lw'l-

BLOWS/SIX INCHES

OR RQD(%)

lo-n-7

V-7-

2-H-7

Z-7-/a

/e>

'"6/9

r'w T

37-?f-

SAMPLE

RECOVERY/

SAMPLE LENGTH (fl)

/-//.

/' 5'

'••.•j.

''s-

;< r

<4<'f

•%-

'•••v?.r

••.t

MATERIAL MOISTURE

a WATER DEPTH (fl

)

DCV

J.*"

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

nfb Sf

brAJsf

/ico.

Looif

netf»sf

"•so'bei**s

"tense-

" bevse

*i7»sf

COLOR

8ft~*

C^RA-Y

G.HAV

^ i

3-AAV

GrftAV

^ r

G-*«V

MATERIAL

CLASSIFICATION

S.L.TV SA fe Sa«^ OAAVjrc Vc .

F"/N»C Ttt «:6 + ft.f.f SAoJO

'

' ;}-»*•. TR.ac.ff SK.T

^ MATUft.<4c_ raiL.'

VffrtV -*- *AMN /u/J»ra/t \

ra.a1 i t >..y' 6rWAv/cL . So^e AH

y*^ *r ™

t 1 3.0'b

mm!'mm.r TM.%»«T.-» !•• j i' mmjV/ff«V PfAJf SAAJb

.5-. '

Y*XY FtHC• T>a <r«/»*s«• SA/vJb. TTtAe "<xtAv«rc

\.aa'

.sn-r Jtrtc vc<*-f r/*if• -

\ t *fttJff T& C.6*&Sf S'/AJb

^a

«.2«/•A O

te «•«/> <Jfi.

uses OR

ROCK BROKENNESS

S

su

SP

V ^

d>U)

SP

^ J

v >

SuJ J

REMARKS

TAxrrxJ r /t/AMJSf.VilS —

rfc-ss-d<?teJ«e

O A S'L ftOuMtebU A TO 1 " ifc

£.*/»</«.>/.*' A.2'

SHE LEGEND ON BACK ' PAGE—L_ OF.

PROJECTCORPORATION PROJECT NO. 37T8. <7______ BORING.

A Halliburton Company ELEVATION——-y/4.?*'—————— DATE_FIELD

NOa DEPTHE

s, BLOWS/SIX INCHES

OR RQD(%)

E ES

IAL MOISTURE

ER DEPTH

(fl)

R TMATE

B WA

/ Y S

NSITY

STENCY S

DE SIS O

NS

ROCK HAR

MATERIAL DESCRIPTION*COCOUJ

X MATERIAL

CLASSIFICATION

USCS OR E

K

REMARKS

' •' — T.I ' ~f. • /^oia~r k_.i«<- xr««*j <JL*Jt\

4 Ta

Aer

c. -

i/.O'

rrsr0/0

rft-

22 A

- _____ BORIN

SEE LEGEND ON BACK PAGE_2__ OF_=L

PROJECTCORPORAnON PROJECT NO. 0773./7______ . BORINGHalliburton Company FI FVATIOM 7/4. ?r'_____ DATE 7/Ws«/

' RELD firm QfligT

a5 «** V

C C

PI: a0

BLOWS/SIX INCHES

OR RQD(%)

SAMPLE RECOVERY/

SAMPLE LENGTH

(fl)

MATERIAL MOISTURE

a WATER DEPTH

(fl)

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

O MATERIAL

CLASSIFICATION

33«o' >r ii 33.0'TCfc.. "VS.©'

uses OR

ROCK BROKENNESS

j

REMARKS

ugtic zz fe IHSTAL<-e~b /»*

LEGEND ON BACK PAGE- _ OF_JL

PROJECT NO. 0^78.17_____ _BORING 23A;A Halliburton Company ELEVATION———7/¥.ai'_____ DATg 7-23-34-

-RELD ftgr" nfflgT TflfvJlCL "P

-: NO

a DEPTH

s

S/SIX INCHES

RQD(%)

BLOWOR

E COVERY/

E LENGTH

(fl)

RESA SA

TURE

H (fl

)S T

IAL MOI

ER DEP

R TMATE

a WA

MATERIAL DESCRIPTION*

S

IL DENSITY

CONSISTENCY

ORCK HARDNES

MATERIAL

CLASSIFICATION

USCS OR

BROKENNESS

REMARKS

3 IL_—i.S

moisr T56MSE &£££» SM

3- A3-0' 3- Loose

6.0

- 5U&T

TO

ttr*-n- F(N£ SAW^y T72PCG SILT

HC.-SS-H

RoouofeO PlNCGftfri&L,

13.0"Rj

TO

> V.ST/FF SILT TPftCS 3GftflA)6oLA£. TOa-s

•y -, peflgfvvS^TS TfZ Cg V.

: o•L.V1ARKS.

SEE LEGEND ON BACK PAGE.

)004-37

(. j ^T\| J£) PROJECTCORPORAnON PROJECT NO. Q"77SJ7______. BORING.

A Halliburton Company ELEVATION———7/«/.*•*'——.—.. DATEFIELD

uE N

a DEPTH

>-g «•»R HE RECOVE

E LENGT

S S MATERIAL MOIST

a WATER DEPTH

MATERIAL DESCRIPTION*

/ YDENSITY

SISTENC

OR HARDNESS

SOIL

ROCK

OR MATERIAL

CLASSIFICATION

ENNESS

uses OR

BROK

K

REMARKS

.0

i nS o- ''7i.O inoiST

. STIFF5»l.O TOp -

3 /3,* -O

"IS.oVIARKS__________________________________________——-—•—

___________________________________________ BORING 23nftROD0537

LEGEND ON BACK PAGE.

•if,'.

PROJECT _ 'v' " "CORF=CJP?AnaN PROJECT NO. Q"778.f7______.BORING

A Halliburton Company FI PVATIHM -7/3.£7' DATE JiFIELD

LLE N

ij£ * j

a DEPTH (fl)

j

;-a.?I.O-:

03-3 -

7.5

-

1 BLOWS/SIX INCHES

jOR RQD(%) 1

'*•%•

'"'i

SAMPLE RECOVERY/

1

SAMPLE LENGTH (fl)

1

i-*h.5

\-1\.s

MATERIAL MOISTURE

a WATER DEPTH (fl

)

M5I5T

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

Y.snfsP

5ri?r

I

&R.y

6Ay

MATERIAL

CLASSIFICATION

• Si'-fc., 4o«\£ ft*J£ AOt?,TCAcrS su6 / €o'tft<i "TO wowMPSPgit«Vte«- |

v \yTO 37-5 FT

uses

OR

1ROCK BROKENNESS j

(Mfr)

HL

REMARKS

T-to se. TSsT5?.0-5UOPT

I /1ARKS

bc'E LEGEND ON BACK ' . PAGE

I 1

|\IUS PROJECTCORPORAT1C1N PROJECT NO. O77&./7______ BORING

A Halliburton Company ELEVATION——7Mj**e* ^ DATERELD " -.-.-..-.

PEN TH

BLOWS/SIX INCHES

OR RQD(%)

Y (flR HPLE RECOV

NGT

EE

MATERI

MOISTURE

a WATER DEPTH (fl)

AL

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

i

MATERIAL DESCRIPTION* tn<nUJ

glo uj" ollMATERIAL

CLASSIFICATIONREMARKS

R-l2 7F

0% S«u7", Sorre oaflese TO FtkC.70

u - say.*. o 70

TtLJ—sSTV.TT""/s TO

3 .5

-" v. 8'5 Somg feet F0~ig s

LEGEND ON BACK Ci€«*//WG 10*0* #***} 0*r* 1* 99.o?r pAGE_g

• rr-— t PROJECT

CORPORATION PROJECT NO. Q77«.i7______. BORING ^i A Halliburton Company ELEVATION——7'f-*?'—————— DATg g/a/

RELD figni-QfasT Jr"r

. »

S/i

.iNO *

a DEPTH (fl)

1

• 12.'.O-

<-i.S"

2/ . **

*?'*

IS"

- /. S"

Wtv<s-i"

*l!J-> f-

S-/I

•/*_.. f

••<«?•."t-J"

BLOWS/SIX INCHES

OR RQO(%)

y-Vy

'*V7S"

<f-6-

"72"

•7-10-/V

6"2w2"

7 to"

*-&•-

SAMPLE RECOVERY/

SAMPLE LENGTH (fl

)

'•.5-

'•34.r

•%r

'•%*-

''-r

'•r

'• '/i.f

'*'%.*•

\ MATERIAL MOISTURE

1\

a WATER DEPTH (fl) 1

vJ€

>

Hf>

T

t

1*1-

r

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

jf*f6~>D*fc*? *XiS *"

"«T rjr

5r//= r

v,.,-

xr

HfiflA

fe«N>sr

V<r1r /*'

I

<JA^V

<t«/»y

V

*« y

( f

<s«*y

l5rtAV

MATERIAL

CLASSIFICATION

/«" y P'*Je S'/»i«Ja. TX eF 'SK.TT T5?/K ea 'O*'5»r »0 t <>* V J_

.SU.TT s. «- ve-*v P - 5Awlfcli

^ ' >t

s/c

>

r

• j *) O '~fc» r

V*iar"al r-nt.*«* S. T-

ve«y /*J<- *ih r*x» s/«.r

uses OR

ROCK BROKENNESS 1

S£s5£l

*c

^

Hi.

\ r

Ht-SP

S*

SP

REMARKS

£&*»£(. ,** S-H

£Jl?'*™*£*»<.

J / 4,^ /*O • 1 ' C/ fliT

U/Ji tf /t,H, S *J^

r'SEE LEGEND ON BACK R4GE_3±_ OF_

CORPORATION PROJECT NO. o77?.>-y______.BORING, A Halliburton Company ELEVATION——7'*-1-*?7————— DATE

RELD GEOLOGIST.

S E NO £ *

a DEPTH (fl

) J

: z.?

-s.f-""t Jf

s-"]5°..S"

^ B-

i 27.

"7 . /

BLOWS/SIX

INCHES

1OR RQO(%)

37"%

**-£-

J7*lr"

**/.

SAMPLE RECOVERY/

SAMPLE LENGTH (fl)

•V.9

'•.s-

'• r.jT

'•V.i

-'/.I

MATERIAL MOISTURE

a WATER DEPTH (fl)

wff-r

Mo,sr

?7*f'

MATERIAL DESCRIPTION*

SOIL DENSITY/

CONSISTENCY

ORROCK HARDNESS

HP Kb

,,

V*22oar

,,

•SUr

>'

e

<S.«AV

.GrAfA^

i f

C.*AV

^f

&«/»>/

MATERIAL

CLASSIFICATION

SA*oy sitr -nt/kcr AAA^rt £-r.t_«A

F^c-m «„«€• -^Mft, *«*!«• a.*4 f t.7" ^ •*) c_i_\

^ • •/

y y r ^ .T ^ 3

«7.o' ,

p

«</«-t . •nrs/»«*'

•n» ca^»«ie

t \ f7.e«sw«c«r

.

uses OR

ROCK BROKENNESS

ML- ?*

> f

SM-^vJr

^^\

SP-tH

S/

REMARKS

2. Jfl/"ti <f&T

<j-O.AVfL, A,t*G**

T* iUL«*ou«J6S-6

r.Jh 9/-i.

' r

2. J^ft^ A^^AT

^

Sft-tiOtLK fJOf

R.r.,,..>fJ-,Al_

YAK. i , -"> /avd/^

PA--S-/O-T.A / Mr«

SEE LEGEND ON BACK ~ PAGE-JrL. OF

DRAFT

APPENDIX C

MONITORING WELL CONSTRUCTION LOGS

VELL LOG SHEET

N*. /£ A PROJECTNa. 077%.17 ' PROJECT NAME rttLLCitf-f*» «l« MB B B«»*« ^ BI»««l« ^ « «l « «««B» B««»«« Bl™ " ^ ™™« " "»«»»l ™ "™« ^ W«"«" " »«™""«W"*"™ ^ ^ ™B«««»«l»»«B« B «B««*iW» B BM*»

C AT10N ij,.) •sirvtf' GEOLOGIST <JfFF ^fiiffJT

RILLiNQ DATE &/ZL- &/Z7/1* DRILLING CONTRACTOR p/fl. brtJUJAJfr Ca.

f .UN6 METHOD H«CCOU> £T£-M /*u&.e«T DRILLER fc . fcOA&ftexfc. INSTAULATION DATE 73

//"*ER LEVEL BEFORE INSTAU-ATION / .r'o«-S WATER LEVEL AFTER INSTALLATION 7. ' ai_ s

L.ELOPMgNT METHOD f*m-1P«VJ « fi/UttAJd- GROUND ELEVATION 7/7..rr'

LITHOLOGY ««* ••««-•OESCRIf ON

(•*•«. rTAii. ^ SYMBOLCONSTRUCTION DETAILS

DESCRIPTION DEPTH

<t.4- n.o-

SlfcT, -/

V SILT*

JILT,

va.

•ft

'£-'.

_*j-

a-HAt^- r».ff-<*.«'.

rfi. 44.<J'

VEIL LOG SHEET

^^ MS. if £ PROJECTNft. 017^,17 PROJECT NAME H 1 L L l/LS X

.C AT10N- 5 girf GEOLOGIST jff/f Ofi/f^r

1RILUNG DATE f/f „ 7//o/t ,/ DRILLING CONTRACTOR pA f D&II.U** CA .

)f -UNO METHOD fJO(mLou* STfcVf *<*£,£** ORIU-ER /?. tJ A 66 44 INSTALLATION DATE 7//a/

V«-^ER LEVEL BEFORE INSTALLATION /d. ,» at, WATER LEVEL AFTER INSTALLATION ^^/ S£<s

)L.ELOPMENT METHOD Pur1flitf6, f ffjiTuAJ* " " GROUND ELEVATION 7, ?.,o«• iTurti n/-v 5AT 3AA// <r LAC*lr!I,H.9.L9G.,I /7/i rot ftrrnf<LroDESCRIPTION urn&iM4f

•e.o'- isr.e'

if.o'~i8.o'

, SH. **/ S***b *• &*AvrL(VlfcU ——

SYMBOL

X.'y•./r• y*//•ry * *

2v.- •

* * v'

;x>* r •V'

"-•HIIHl-€

CONSTRUCTION DETAILSDESCRIPTION DEPTH

5T1rT

M

/•

r

*

••••

• m

MMB

*

T *r,t * iff

*

V

r

4Mi**

f*

^

*

•;*** «

*f,i • *

» *•

f*> *

*•w«i

•Nrf

" <?d*r«o

o.e'- m.o'

•* J fm A.L &., .. A. A *

" • «*"*, ,«-»a suaT; i/c wjr*tSmffd ZM.O'— 7><.a'

tT.o'- Xfe.o'

A""°»jir« •- 3«.f '

'I'fc.a'-jy.e'

AB 000^53

''ELL LOG SHEET

Btf./** PROJECTNfl. Q17S.I7 PROJECT NAME Ml^c/LffMf

TmON 5uO S'nr GEOLOGIST jr,P o/t/ff/UT

*LUNGOATE7//2.7//3/ DRILLING CONTRACTOR pA. fc*, , Co.

' UN<3 METHOD 6v /fi HflCCOuJ 51W ^^ DRILLER &, M*bffUlm INSTALLATION DATE 7//4/*V

ATER LEVEL BEFORE INSTALLATION ^ . g^j WATER LEVEL AFTER INSTALLATION ^i gc5

E.ILOPMENT METHOD fr*»t>tfQGr GROUND ELEVATION in. I*'

L1THOLOGY s*"r a4**** "*DESCRIPTION 4(rwa(w

j> 6,w/ntr, p/tt ————————a.a'-r.a*

5-.r'-*.<9'

S/i/oti, „-/ SK.T— ————— - —————_g <•<»'- '*-a'

r/cy; -/s^wft — • — • —— • ——It.a'-Z .a'

ZM.«' -17- 1*

gy r .v. . '

S/MJb, JT/47J f OAAtftft —————————it. a'- 24. r'

SILT, uv s*wt t fi.RAvr<. TifccVic.r'- rr.x'

H*«.r —————————— -• «-. a' -*«.*'

r&.6a.&' ————————— ——

»5

SYMBOL

....• ./

'V *r* •' '/*• s.* . •

Ay&y ' 'f\ •://• '• •> >•/•/.•'* •• • *

{///y//. . a

>V.»/U-

^/?Xfv

?xx^x-— —__ __~" —

CONSTRUCTION DETAILS. - DESCRIPTION DEPTH

4

r7<^<^><>vV*w

• .

*•p •

«M

.

jm_

^

=

W Mtf

*~> • .^^ *

. . v

~ . -. ~.• **~* *t •

*»- **/•NJ

. '~rf *S* -*

~*

— ———— STtCKu^ l."? 1

——— C.£*fur/drfiTo»tTfStu*«.s o.d'-zo-o'

i " , SCH. «6 PVC Hff*.|.7S'-2l.O'

ia.»'- iZ.o'— : —— S*Hb/6f*tn*nrrv «»w

2.1.0'- 17. «'

J.7.«' - l .a1————— *H30 Si (.1C* S**Jb

x<?.<3'- a*. y'——— "( .oza scat; PVC. vJC(.(_

sete-,r<o 3(.o'-34.o'— —— • g£>JT&M»T«r pctt-era

?4.r'- 39.a'

- —— i'/ b/Sf-wTfewiTV M;X3t.o'-rv.a'

« r*\TnfJiTr AFL(..(?TS~ rv.«s'- 4a.z'4

2 ——— rb- R-OQOtj55rf» t V w w *r W W

LOG SHEET

Nfl. [£jfl PROJECTS. Q77S, H______PROJECT NAME MtLL.CRECK

.C VTION GEOLOGIST

WILLING DATE -}.. J £, - S4» DRILLING CONTRACTOR '"flq T gJCL/AjG CO.

)F .UNG METHOD )Q X/< HoUaiOSTOA f L tTy"*11-1-151* " l?Ai«C GGUJHU£ INSTALLATION DATE 7. /7-

V/'-rER LEVEL BEFORE INSTALLATION . <T FT daStA WATER LEVEL AFTER INSTALLATION

2E..ELOPMENT METHOD 'PumPlKVS GROUND ELEVATION 7/r.74'

'ELL LOG SHEET

"*-26& PROJECTS. s-772,,7

ON X T*-* of s,rdr

ilLUNG DATE /-g /g DRILLING CONTR

Ml ,1NG METHOD^ rj\ L/ / ,J STf/A Au&€*

VTER LfiVEL BEFORE INSTALLATION $, r' 8ts

:\ LOPMENT METHOD paK,B/Ajtf

LITHOLOGY ««•«• ooa/ * to<sDESCRIPTION t»r//ouofry

5*M*fl'j?ir***1"' F'4t —0

x

ACTOR

DRILLS

SYMBOL

•o' •

0* '

•*o * *

• ' * *

*f

* * ^t '*

PROJECT NAME HlLLCft.CeX

GEOLOGIST j£-/?c Clf./<£- r

PA. k(L'LL>fJ6 C.&.

* /StXSi uJ/*ODfi"i.L ""S™-1-*111101*1 OA75 7/ZO/ V

WATER LEVEL AFTER I STALLfl• ON 7./' 5 5

GROUND ELEVATION 7(3.TV

CONSTRUCTION DETAILSDESCRIPTION DEPTH

___*j •• ————— ST»C*UP 1.17'

, 7

< ^ jrcu«.ty a.*'- 4.0'

* ^ •

• ^ *

AB000^59

VELL LOG SHEET

B N». Z|& PROJECT!*. 077S.I?^D VT10N

BILLING DATE 7-Jo-"2>4 DRILLING CONTR

•? LJNG METHOD " UotiouJSiCfA fAlJ lS.

a R LEVEL BEFORE INSTALLATION 7tQi

£..ILOPMENT METHOD ""PyNYptfOG

LITHOLOGYDESCRIPTION

(f\LL,}

Q <2A VE j tw /Sj WO ——

/

0

ACTOR

DRILLS

SYMBOL

"S ™1*//

**-m*m*mmm

0 .0

. 0•_ • oo. .

PROJECT NAME K |tLCJ2EEf(

GEOLOGIST tJflfOjEL "R. HflfOtL.

T/ "O(2.lLLllw?6 C*O,

R"3CS|Ul£ fiOtUf/0 INSTALLATION DATE 7. 2O"S4-

WATER LEVEL AFTER INSTALLATION -7. £><

GROUND ELEVATION 7/7. jz«

CONSTRUCTION DETAILSDESCRIPTION DEPTH

L LCEMew/sfiUTowiTE ** <-|o/ird) SotaTUoLC

f1B fci |t I V*l ^

i • IL

:;zr. —11 5'S*wp • ~ - -4 > .oio soiT PvC

• . * ***

AROOO^S 1

/ELL LOG SHEET

A»* ^ fi PROJECTNa. m9mt- PROJECT NAME rl/LfcC/^X'

K TION TV-*.*,* fl*tt*«* *»**.** t*-r GEOLOGIST j£W 3 ^

BILLING DATE 7/3a/ft/ DRILLING CONTRACTOR ^ f , , CO.

* -^METHOD Hocuw STr ^ DRILLER j,M Vt rt/ INSTALLATION DATE 7/3//f4/

ATPR LEVEL BEFORE INSTALLATION -^y tfLS WATER LEVEL AFTER INSTALLATION j.-j- 44l5

r .LOPMENT METHOD Pu. p, ^ GROUND ELEVATION 7/4. f<s-'

LITHOLOGYDESCRIPTION

r«.rv s*«Jft «-V <nw rt ————CF/tCi o.o'-j.v

3.W- /!.«•

l-J.o'. »*•.*'

^ ^ if.f'- IX. 3'

S/cr, *>/ SAHI ——————————— .i"4.V-i«<.0'

•w.«'-3J.o'

K3

SYMBOL

• 9 *y *4V/• A. f%• —

• •« • •• •

* • •

• • •* *• • •• * •• •.« . t• <)•

v. /•/•/,•».•?•>. y» ./'/ y•/•/•.'.'.*/. v

CONSTRUCTION DETAILSDESCRIPTION DEPTH

3 —— srttxur LIZ'/fl" tA*£X£i-£

*-/.tl'-ZT.a'

O.A'- t<.r»

s: s ———— 4rwra»jiTir wtwprr£ ~ *'.«"- ii.«"

/ -«4JO SU./CA S*A(6/ — / ii.r'-37.o'

*. ~ . z-7.a'-3i.o'' ' ' .'I ————— -rt>. 3-2.0'

r.__WELL LOG SHEET

N». 23 A PROJECT NB. O773.|7 PROJECT NAME /v)|LLC!2£6K

TION GEOLOGIST

DRILLING DATE ~~l - 1A' Q r DRILLING CONTRACTOR *p "DR.|LLl\j<o

C LUNG METHOD p fo oU-0mj gl&<\ ftu(5£frS PULLER <e£ig \E. £QUJ Qg'NSTALLATION DATE "7-

WfiTER LEVEL BEFORE-INSTSLLATION 8. OFT" WATER LEVEL AFTER INSTALLATION <%„(.

C_/ELOPMENT METHOD "PUNlf06 GROUND ELEVATION 7/*/.a*i

L1THOLOGY""""""""""""""""""*"""* SYM U.DESCRIPTION ornwju

CONSTRUCTION DETAILSDESCRIPTION DEPTH

SrtOD w/Slt3* C4-0 ^

• a . .-

'f-.V

37.0

41.0 'Haufts4 .o-

C&VVELnu. mix

/v" /v

Srrcjfuf Z. ni?

A>L7A

61-

FeuXTS ^SEAmS — ^

___________________ ~7_._____TS-7 /I/M

^ pVC SHO80

10

-4l 5y

* \W€LL£CP££AJ- 4.0-*

VLL LOG SHEET

2-4- A PROJECTN8. QTTS.n PROJECTMAME MlLL£££E.K

OPTION GEOLOGIST fttf £L,

R UNG DATE -] -3O-84- D*11-1-'*8 CONTRACTOR "T fl *0(2.l LLl N/S CO -

METHOD £. INSTALLATION DATE "7 —

it -R LEVEL BEFORE INSTALLATION 3 . 3 Fl WATER LEVEL AFTER INSTALLATION 3.3 FT

EVELOPMENT METHOD " Mf 'D iMf^i GROUND ELEVATION

»/!/•*

VELL LOG SHEET

fe N«. 25*6 PROJECTNft. C779.I7

^ TION bA»rJ'C6S' fZtTStbg-+J<.f Si£<r V4/i

SILLING DATE «/S/SY DRILLING CONTR

•i UNG METHOD HdCCdeU Sr«"M X5U6.4-/4

ATER LEVEL BEFORE INSTALLATION ,3 . s

E iLOPMENT METHOD Pm p/ j

1 iTHril ORY S*" &°*-i*><' *-**"LITHOLOGY 2r A 6 *«•»«.**DESCRIPTION L/r-vafcdCrV

5Aw6a w/ 5^r j <Srt/n/ri.C*"'<-O <9.a'_*.o'

5 /06, w/ ,t7- ^ o-AA ei• 5.a'-2o.a'

PS

t&

ACTOR

DRILLS

SYMBOL

• x;«• •.°. ..«». .• -e

x-.;V.'•

PROJECT NAME f4 !L!.C&fT<?X

GEOLOGIST jerr OKif/vr

PA. b/t'LLf+iCg £a.

* rt.u.S.s uJ**fceLL INSTALLATION DATE 2/3/9V

WATER LEVEL AFTER INSTALLATION /& i ff

GROUND ELEVATION 7"*.f3'

CONSTRUCTION DETAILSDESCRIPTION DEPTH

: ————— "a"* Saifxatjf<; ; . ————— CrfV»»<nsrr/S£X»raiOi rr SL U**7 < a.«'-*.o'

< -J """*' ,.S,-f tl* *-"-*•S 5S — ——— atfxiTo**>T«- ff(j.t-rs• r t.o'-«.d'• .

•3: . 9.«'-zo.o*"• '; = .* 3c«crA< ?.7r'- /r?r'

I I

DRAFT

APPENDIX D

HYDRAULIC CONDUCTIVITY TEST RESULTS

' I

AKo 06*71

fe

H"

</l

OUJtr{flUJ

UJtrenenUJcrQ.

(Vufl

ksiw1c

IaCCO

"rv>

Uli

uJiu5

CDf-r-O

e

l>N

«0

3aucX

IUO

1

"a

iuo§

r-F

t

u;

!i5S

5.c

1i 1-•§i-»

fi

5. a

§V|VJ

8

5go1VJ

23

A

*5

VI

IiU

1 <i> — *•

C

Ul&&eu

1

3sa

iM

r2Ul

Vi*n

^uoM

UJUl

a:u

la.jU

,4

v\xa.uo*

Iui01Ul*•

«s:aoSa.^

•s.

Jin

ieUli0!crue

o

a

. £KUU

Iu.

K

1

ee .iu.MUl

cV>3-

5U!Sau|a

«C

Vuaau

c

V«o

8usUlfev<Q

!IUl

!e

1i5/x

11ia.

liliUf

Q

S!

5-g5i

rq£-J'

55

XOtONIS 41)

|W"

ik

IPoU>UI 4

SI1Ul

<1U.UI

at

cnW

Ul

<§U.

iiiU.UIceaUlUJ Ul

Ul

u.

05*5

Ul

!'*

oo

^

V

1o-*

oo

»•<

>.

19 —

TT•

Ot

o*

v,o

1Vi

o6

•]

i

,PV«

Vl

n

0

-

0

Vi

v,0

|

0

o

o<A

v.

— •••MiMH^

J

M

O

"*

0rJ

Vj

^

VI

v,

v>

Vi^

0M

O

*

ViIN

Vn

0r*

v;0t

^Vj

^

*

O

^ari

*

Vi

Vi*

Ofj

Nl

0

c*V,

Vi

0pi

V,

ri

o"o>

v,

5

*in«

Vi

0

vi

V,M

V,

fl

*

v.

1

OV)

v.

^

M

o

ViT

VV

QVi

^

v,

*

Vv'

*«,V)VVr

i>IM1*4

t— 1<h 1M, "* °° S

*"•> ui S

5 o <o» o »-

>J

o

3

O

v3

\

* Q

I5 0

r-

1V,*>s 5

1

V,2

« S

S , «« 3 w1 SK Ia u_ <ac >-ul OE U.

OS7

o01

usM ®5 99

1 1Ule . —

0)b

(flee

1

^ Vt v;W (0

aScc *•

w

b

00 0 75

—* fit UJu 1 a.S G «s^ - _,. » O >-°. x

3

Ul O

K J Mui < 3 »i. ft. -5" •« • cri

Ul

COed

Ul

2 S = 31*Z IE « ^5 °=i§i i!

m

en

L'u !T£2ui 55i <o S.Ai'0{V

w£e a.

Q. SS.

«-*-.CO

n wg Xis

M SS.

o „,,.,.oa*3

_ ui ee5 > ui^ ui — .sUl U.? 2Ul

§35^O £

.uj

s*•rUl

ilU.UJ

I

oo

S

in

f

8

vn

in

Ift

0N

8

rJIA

B. 8 i J!

inN

IA

88. "8**<

s

vn

CO

V1

CD

\fCO 04

(VJ

CO

ui u.B *S '

£ O? srr——r-r r-r « oo

U)

«n

?

QPO

in

» . . .——........... m

COo O

XsUls

OUle

fUl

n

s o a g5 .o ^ o g2 3t — uui oe ix.

or

U) g<o £*«i 0)

Uan ->x oj

res

01wso

AT A

L.c

C

I J

NUS Page——— of

CORPORATION DATE ———

CLIENT——————————————_____ FILE NO. _______________ BYSUBJECT ___________ Checked By.

-**- Le

HROQ01&79

NUS

/./

Page——— of

CORPORATION ' DArE

CLIENT_________________ FILE NO. ______________ BY.SUBJECT ___________________________________. Checked By.

*A

J* * * **

0^80

Si*'

NUS

2.0

30.0

.07

Page —— of

CORPORATION DAfE.

CLIENT___________________ FILE NO. ________________BY.

SUBJECT ___________________________________ Checked By.

A/-kK- _M-_ CTT

.70

.4

.-o

A.O «?.v; . 7 ./r7-0 f. 7 .7' .//•8.0 f.*!f? .5-0 •«<?f.d /0.03 .35" .OS"

NUS

7.

- .012-3 -f//-,,-.

Page——— of

CORPORATION DArE

CLIENT_________________ FILE NO. ______________ BY.SUBJECT ____________________________________ Checked By.

L* )L.i iZ-t.

10__9...8.—.7...

6__,

2__.

9...8...7...6...

5...

3— .

2...

1

-,,€>A).

9 .8.7.6.

5.

4.

3.,

2.

1.

NUS

2.J7.

.ff 1.71

7't~r i7-39 /.-7.T7 .7?

.7-* •?'/<>

Page—— of

CORPORATION ' DAfE

CLIENT_______________ FILE NO. _______________ BY.

SUBJECT _____________________________________ Checked By.

.-"•"T-K!

?.37 .15" .06f. i .10 .«r

.("7 . «

3.0 S.SV .// .03.1 .ei

NUS

ZLT

Page—— of

CORPORATION DArE

CLIENT___________________ FILE NO. _______________ BY.

SUBJECT ____________________________________ Checked By

17*

- M

66

10 __9. __8 __7.6 __

5 '

4 __

t

_, !___

7

6__

-V n 4—3.,

ir- 9E? 8..

' 7,

== 6.

5.

4,.

3.

2.

1-

. ...

—————

| ——— ._

\

1 >—— l ——

—————

L

"\

\i \JLi" \

f

—— ' --•"• -- -- -

',

(

i

\\\\N

N; ——

—— i, _ ——\ —~^ -

I ——— ... — ,

i

1

I

1

;

i<i

——————————————— \ ——————— ; ———————

r -- - • -

[

»==_:r.=-.™ ——— — .

1 ———— ~~£ — : ~ — "™

—— >^

i

—— 1—— ~~= —— --.H

i

-7r-..~~-.-.- -.-r-"—-.-. --~ •••:>-..' -:\: --

—————————

———— . ———— ,

'

11

1

i

t

, —————————— 4 ——————————————————————

, a-n ti nnii

I00t»7

NUS Page ___ of

CORPORATION DAFE ———

CLIENT————————————————__ FILE NO. _______________BY_____

SUBJECT ——————————————————————————————————__ checked By.

fJA rT-rr MCTMeb - fALLl C, HfA^ U.SIH&

'STATIC. WATS-*. -ffv«r.-7-7/' P/C£«_ui£- r/t/»A»so«A--A •*• AOf \+>A,T£it. ~

T/Hg .<eg*&'**> /4 -u ^ -H.0 3.79 3. a 3/71..as- «•** 3.07 .7?.'e £"•'( t.ti ,££.fs- r-' - -.2.0 j

.iur 4

.3d <.•o i.1??.7? 7. 7I. o 7.V? .« <0<§/•zr 7.5 ,/5 .03/.r ?-**/ .«7 .011-* 7 •'•! .OH .01i.r 7.--7 .0¥ ,o«3.o 7.6?

NUS 'Page_i_ of

CORPORATION DArE ———

CLIENT_____________________ FILE NO. _______________ BY_____

SUBJECT _____________________________________ Checked By.

n a

/. / ^ I'l *.3 £.27-50

3.o/-" 17- *?7'

.34.5" *• .

3__.

2__.

5 i-<o 9,

8.

.k/ 7-Xi-H.e.5...

9.8.7..

2.

1-

____|_

NUS Page——— of

CORPORATION DAfE

CLIENT__________________ FILE NO. _______________ BY.

SUBJECT ____________________________________ Checked By.

7 & 7TT-»r rieTHAb- pAULlfiJC, l4£-Ab} U.S/*J6. A

~ H

14 - kV) M -

1

.77

2.07

/.«-? . .S-7

17 ^7? ..V

..'3

.0?

NUSCORPORATION

Page——— of

DAfE _____

CLIENT_________________ FILE NO. ______________ BY —————SUBJECT .__________ - -_________________• Checked By.

2.0V. o

-8.0

CB & TfST

K ft*-fc, «.K, s L.

'2.0 3.r_ .*i- T: ./r.o 3. » .10a.o i.fcic ,zo s 3

1.1 •I III H.^ •• •• ^ ^

Page___ ofNUS

?•->"

•20.0 g.&).33

CORPORATION • DA1"E

CLIENT_________________ FILE NO. ______________ BY.SUBJECT _____________________________________ Checked By.

,PafftfA, /4/0. A Pt* f> TO

I?. *f"J (Z.33 -.* 7'-""

4.7.** f.-t * .00_T2>t

/.2-5

'.08 •«• «l .7* /O*7r.49

1 -i———r—i—i B. •• mm mm mmmm.

Page—— ofNUSCORPORATION DATE

CLIENT___________________ FILE NO. _______________ BY.

SUBJECT __________________________________ Checked By

UeLL Ate. l<? Afit PoPPeTfc fi*>b Af Pur-tfi "TO

. 71

= .000(37 /-

? 7. o "

NUS Page——— of

CORPORATION DArE

CLIENT___________________ FILE NO. _______________ BY.

/r.o

SUBJECT __________________________________ Checked By.

•2.0 tl.74' 2.?.l.r 7-33' /.73.0 7.7"?' /.37

ACeSVCC- <J>. IZ' V G-AU H^Q f.

*•

_L

*/.o t?.Z7'*/.r ?.*<0' .43 , .00308r:o y.fto* .ra6.0 3.8/'7.o f.fi"'

za*9__,8__.7__

4

3...

2 __

7__.

5__.

4__.

3—.

9.8.7,

6,

5,

4.

2.

rtflggGsygi.

S_l

I ,

IXILJS Page—ofCORPORATION DATE ———

3.e2. r

&

urvec-7.16'

4.0 r.fV ..|

«s.o .7?T.Of' .88

CLIENT ————————————————— FILE NO. ______________ BYSUBJECT _________________________________ Checked By.

C*Ab.iu.srfL

r.rr.iv5. f^«r»c \^fHt/^.\ 4. u j z

.o* v. t v*T./f '

+ -£i* t*Vc £.< c*

t____'•' 4- 4 —

t-57

* ——I—— 8 '•«?.n».rr

3...

2...

5 i-vO 9.* 8.

7.6.

".S-?

53 8.» 7.

si 6.3SI 5'— 4.

3.

2.

1..! i

NUS

Mo. _/ A

" /."*• U^e/rJ

i.t

Page—— of

CORPORATION DATE

CLIENT_________________ FILE NO. —————————————— BY.SUBJECT __________________________________ Checked By.

CORPORATION - DAI:E

ri IFMT 6 r fr__________ FILE NO. O^/ Q • >7____ BY_SUBJECT KlMU£ lAffi-D TE-Sr_________________ Checked By.

Of2- TEST - <1

\O

8-7°6>8 .

irA£ _ _ "K£prpitoG v. "_.."_."_ . "!_'. 1' "... 23.42. P-T /4J6

2_f . 38 FT )*+.\TL..___________._____.._...___. ____I&r.l>3 FT" /<?,27

[5. % Z FT a_..._„ _ ...__. 13- 7 5 FT <

. ... . . VI- 3o PT :____________ u. 4.3 pr

'03 FT /.77

i I __Page——— ofNUS

CORPORATION

S3

A- *?,/£,'

.£ 14

J.

2.72.

DATE

CLIENT_________________ FILE NO. ______________ BY

SUBJECT _____________________________________ Checked By.

-2.1 a

CORPORATION DArE

HI iFMT OT"_____________ FILE NO. 0778- I

SUBJECT "Ris' 6 H£AP -resr

OF -nssr- 5:4.3B- a.i(3

\5-55

Z. | b FT'\ .7 S T"1 ;-3'f rT"

«|<f.-Z,2. FT

/ 7 PT/ F"7"/5 FT5 /3-T*

Checked By

\3-55 FT43^5r£. 44

NUSCORPORATION

L+7.S" 7* .25*

2-L.r;

•2.75-

•r: 3.3 x '£*

Page—— of

DATE ____

CLIENT_________________ FILE NO. ______________ BY.SUBJECT ________________________________________ Checked By .

10.9.__18 __ -7.

6.

5 __

4 __ .

i3 __

2 __ .

3_ f i

VD 9...o ___

7 ..

-U 6...

-K»5

4...

3..

^*" ." =

3 i . ..

-: 9— • _i— J» C

J

0 7.

i 5--**»— ' 4,.

3.

2.

K* 1-

i[

^ .r— • ———

t ——————— \-

\

E

————— - ————————————————

>

1- ——————— . ———————

t

; '

1 ——————

i

1t

i

————— »—

-^

——— j —— —iiiii

——— i ———i

— ——— • — • ———— ~

t

i\

< •

1If •

1

ii'

~ -•—— ————— —

—————— l ——————

t1

1_

i

E

—————————— , —— ————— ..

i

1

i

—————

—— s ii ft

\

iF

1 ——————— i ———————

,. ........

___________

"~-" —— r* ft fi ——i i 1 1 ) if i 4t 2 f J t>'\J J

1 ————— I —————

IMUS

./r

TfST

/.«7 3.7- 3.7?2.*?2.4?

Page——— of

CORPORATION DATE

CLIENT___________________ FILE NO. _______________ BY.

SUBJECT _______________________;____________ Checked By.

To

TlH£ freAMtie, 14 -k. M ~

.30

.ro

.75"

z.r2.0

•3.«<?3.47

y.79

</.-?5-«f.srv.rr

1.19.71

.04

.aT

0

o6

• f?.//

• J

« " j

WOODS 10

|\ILJS page—ofCORPORATION DA1"E ———

CLIENT.——————— RL£NQ

SUBJECT __________Checked By.

I I

4 _

2__

7__,6._.

5._.

62__.

6.

•I 5-*

4.

3..

2.

1.

10 ___ z-z.5 -nr-r 39__

tf

NUS

4.6 Z.tf1

9.- 3.r/ /./e.b ?. 68 1.R.o 2.17 /.

1*

Page——— of

CORPORATION DAfE

CLIENT___________________ FILE NO. _______________ BY.

SUBJECT _________________________________________ Checked By.

4s/w

/.r* /. fi 7.&T .11/.?r uis* j. r .741.6 f-3? 3.6/ .73i.r /--I 3. it .41

J.e /.«' l.<? .AS*?.r Z.ttZ Z.11 .61

V.o -.ta z.r .3*7

/f.O «{.JTE .¥7 .07

e.8 V-43 .37 .67

13

NUSCORPORATION

X"' r? /

I./

Page'——— of

DATE ____

CLIENT____________• FILE NO. ______________ BY _____SUBJECT _____________________________________ Checked By.

A R 00 05 I

Page —— of

CORPORATION . DArE

CLIENT___________________ FILE NO. ______________ BY.SUBJECT_____________________________________ Checked By.

T*0

1.77

t. /o . 7<i

/.

,/r*

. 2.4

.2.2./*/

77

«•>

- f. 3

17

1090

p;

S 10

76

5t» ( ' ~r~j

4

f3

? 2

' i

i!13 -qis s

il ei :;% 3

2

,i

• .

• - - - - - - -

: : . i • '•

• •:::.:

• . . :

: r :-:.• • :

:

• •: •'

- •

"*-<j \' : ^^

- : :.--: - : :

.';':'•• :• • • •

:::-

• :

,

: •

. *•

: : ' '

.

... ...._

........ , —- ——

___.: :

. . I .; • • ' ~

'. . '. '.*'

-• ' . I

^^ ' •

- — --; ; ; :: . .

: : •--:

~J———— 1

•-: :

— i4-r : -

' !

: • •, . .

. ._...,.: :

|

. . .

: .•

. . . . .

: '

• : '

I :• •

;

, ••

/

: : , :

. . . ' . '

. . .•

.._..,

! ; ; • ! : : : :[ • : : : ••• : : :: : :-.: .

k . .. .

1 i • : ;.: -.-.

~- ; -~Svj ; :i ;>s.

'•• \ = i ! :

. . .

. . . .

I

: : : .• :

.

ri

;: \ '. .: ;

1'

; , •

>

, 1 . 1

. . . . : _ .

;.• i

:

' " :•

. . . ! . . . .. . 1 . .

••- : : : :

44- — — \: : :-. '.:..:

M1! !'-

ir"7>,.i-: : - * : ! : : : :

. : . ; ::

.. ....

_.;___..-

.._..........,.,..

I . .:

:

't

• :

: •

— — -

: :

. '

• = : '

7 , . : r : : :

.

:

- - - -

_. ....

.

.

: • ;3 u

.

. . . .

• : ;: : . :

; - ; .: i : :: : :

: ; ; •'•• • '•

'•••':

• • •

: -.'• • • :

• • : • :: . :

: : . :': : ; •

:

. . : .

l

.

. ; . . .

. . . , . . - . .• • . • : • :

•_ t ; _ •

::::::: i.~ ::

-;:1 : -ii: : . •. : : .:

. . . . . - .-

. :

" \ :

,

».•:

; ;

.

: ' :.. .... .

....... . .

- - - - - -

i . .t

C

.... . . ,

.

:

'

1

i

; ft 1 00 &5 18-:',

4

NUS Page—L of __/_•*i 7 —CORPORATION DATE -

CLIENT——————.,.-. RLE NQ ^^

SUBJECT ________________'——————-————————._____.———.————i checked By.

. S7

-° (0-30J^8.0

(5-0

NUS Page ___ of

CORPORATION DATE

CLIENT_________________ FILE NO. ______________ BY.SUBJECT _____________________________________ Checked By.

7"£"/TA PdPfiC *•*>£> fi, Pur-t0 TO

77 -I

17.

/.J2

.4

9. __8. _76 __ .

5 __

4 __

•' 3.__.

2 __ .

3n_? I---vo 9 _' 8..

1 ...6...

5..

4

3..

7

^

,- 1" z

1 ...;- 9 .

E? 8.

7.

^ 6..!ns

1 5-

•~ 4..

3.

2-

^ 1-

y

— V—————— Xj

————————

——— : ————

'., V.

=

i

p=\

' ', .V^

^

_[_

i —{ •

1 —————

=

.,«

1

-.-..- —— •

1

' — — •- — -- -

1 ————

-• —— ."=-

!

———————

— =.-.-— rr.

fc= ————— =

, ————————

1 ———————

———————— j

^ —————

"

...

ft iZl J

r*i * * w

;

._- _- i .,-- f- .- - — — --

1

, _______ f --

: ——————————

imftfr-.—i .

1 i •1

(O (f lar

NUS'.'f..

Page——— of —————————— , -

CORPORATION DATE

CLIENT_________________ FILE NO. ______________ BY.SUBJECT ____________________________________ Checked By.

T<trs~r

^T

.S* /?.*<6 //.O

/.O (?.*/< /O.P' . » s /V-// Hs. .11 t f

2.. S* /7.303.o /7.6J3-r /4.6«

4.0•'•o /V.IO f.f * . 000/1 /V /*-,-»..

«.o »3.rr r. if«^« if ~

^522

IMUS Page——— of

CORPORATION - . DATE

CLIENT_________________ FILE NO. ______________ BY.

Z.o /7-03. r3.o

r.o

tf.fS

/f.O

SUBJECT _———————————————————————————————_____ checked By.

/Jo. zv A r<r$r rier/~ac> -PU/M.P 4-

I T/ A C

/-/ ,

10

J

NUS Pa9e— of ——CORPORATION DATE

CLIENT_________________ FILE NO. ______________ BY.SUBJECT ,_____________________________________ Checked By.

T"£*sr

L£"U£± - l-i.S")

f£=./r4 L^f-S' -, =AdJUsrzATIME• r -2N7-i.e z&.ni'f H.072..2C /8.2.C3.0 /7.70 r.M •» .&2H-3 /?

.o /'sr.o r4.r <,«.« /(0.0 l> __

/?.- /4."J"J 3.8"/r.o <4.-?«/ i g'2 6.0 It-16 3.41

NUS Page——— of

CORPORATION DATE

CLIENT _________________ FILE NO. _______________ BY

SUBJECT _____________________________________ Checked By .

. -ZS" -S TfST r«t-M T£( LftfL 'It. 19* PC

3.0

. r* /z.?i.o ' .41 ./r

.07

s "2.. /

DRAFT

APPENDIX E

TEST PIT LOGS

DRAFT

APPENDIX ETEST PIT LOGSMILLCREEK SITE

TEST PIT #1 9/18/84

0.9'-8.0'-

• Black sand, gravel, and cobbles-Foundry Sand, with few metal scraps• Drums filled with foundry waste found @ 3.0, 3.25, 6.0• Sample taken @ 7.0, MC-TP-001, 3 jars• OVA Readings to 40 ppm

8.0/-9.5'

• Gray sandy silt, trace clay-natural soil

TD 10.5'

TEST PIT #2 9/18/84

O.O'-S.O'

• Black silty sand, trace gravel, trace cobbles, with construction debris• Mixture of foundry sand, natural fill, & debris (metal bands, timbers)• OVA Reading @ 3.0' - 20 ppm

3.0'-10.5'

• Black silty sand, with construction debris - foundry sand and debris• Drum with foundry waste found at 3.5'

E-l

DRAFT

• Oily odor common• Sample taken @ 8.0, MC-TP-002, 3 jars

TD 10.5'

• Stopped excavation due to elevated OVA readings in the breathing zone -did not reach natural ground

TEST PIT #3 9/18/84

0.0'-10.0

• Brown and black sand, gravel, and cobbles - foundry sand

• Pit contained few light brown chunks of sand (molds) up to 10" indiameter, and some debris (metal bands, garbage), especially @ 8.5'

• Drum with foundry waste found @ 9.0', with OVA reading of 50 ppm

• Sample taken at 9.0', MC-TP-003, 3 jars

TD.10.0'

• Pit discontinued due to elevated OVA readings in the breathing zone,without reaching natural ground.

E-2

DRAFT

TEST PIT #4 9/18/84

0.0'-14.5'

• Brown and black sand, some gravel and cobbles and construction debris-foundry sand

• High OVA readings @ 2.0' (100 ppm)

• Garbage zone from 2.5'-3.5'

• Sample taken @ 3.0', MC-TP-004, 3 Jars

• Natural soil (fill) from 3.5'-6.5'

• Wood scraps common from 6.5' down

• Noticeable organic odor throughout digging, low OVA readings at greaterdepths

14.5'-15.0'

• Gray silty clay, some sand, trace gravel-natural soil

TD 15.0'

TEST PIT #4A 9/18/84

0.0'-4.5'

• Brown and black sand, some gravel-foundry sand.• OVA readings up to 400 ppm in the depth range of 2.5'-4.5'

E-3

DRAFT

TD. 4,5'

• Stopped pit after finding shallow zone of high organic readings

TEST PIT #5 9/18/84

0.0'-5.0'

• Brown and black sand, some gravel-foundry sand• Some garbage and construction debris mixed in« OVA readings over 1000 ppm at 3.25'• Sample taken at 3.25;, MC-TP-005, 3 jars

T.D.5.0'

• Stopped pit below zone of high organic readings

TEST PIT #6 9/18/84

• Black sand, some gravel, trace cobbles-foundry sand• Lumber fragments mixed in with fill• OVA readings to about 100 ppm, hydrocarbon odor

• Gray mottled clay, some silt-natural soil• Sample taken at 11.5; MC-TP-006, 3 jars

T.D. 12.0'

53*1

DRAFT

TEST PIT #7 9/18/84

0.0'- 1.0'

• Brown sand - foundry sand

• Black oily sludge, strong odor, sample taken at 2.5', MC-TP-007, 3 jars

3.4f-4.0'

• Gray silty very fine sand-natural soil

T.D. 4.0'

TEST PIT #8 9/19/84

0.0'-4.5'

• Black sand, some gravel-Foundry sand• Construction debris and garbage mixed throughout the fill• High OVA readings, >1000 ppm• Sample taken at 1.3', MC-TP-008, 3 jars

T.D. 4.5'

• Pit discontinued due to high OVA readings

E-5

DRAFT

TEST PIT #8A 9/19/84

0.0'-3.0'

• Black sand, some gravel-Foundry sand, with construction debris mixed in• Drum filled with foundry wastes found at 2.0'

T.D. 3.0'

• Pit discontinued due to high (>1000 ppm) OVA readings

TEST PIT #9 9/19/84

0.0'-11.0'

• Black silty sand, some gravel-Foundry sand• Construction debris and gravel mixed in• Pocket of blue slag at 2.0'• Occasional slag drums found throughout the fill from 2.5' down• Sample taken at 2.5, MC-TP-009, 3 jars

11.0'-11.5'

• Gray mottled silt, some clay, some sand-natural soil• Groundwater at 11.0'

T.D. 11.5'

E-6 S1000536

DRAFT

TEST PIT #10 9/19/84

0.0<-4.5'

• Black sand, some gravel-foundry sand, with some construction debrismixed in (wood, steel bars, etc.)

• High OVA readings, especially between 1.0'-2.0' (>1000 ppm)

• Sample taken from 1.0-2.0' interval, MC-TP-Q1Q, 3 jars

T.D.4.5'

• Pit discontinued as nearby pit (T.P. #9) reached natural ground

TEST PIT # 10A 9/19/84

0.0'-9.0'

• Black sand, some gravel-foundry sand, with construction debris and a fewslag drums mixed in.

• Hydrocarbon odor common

• Water at 7.3'

9.0'-9.75'

• Gray mottled silty sand, trace clay-natural soil

T.D.9.75'

AROQ0537E-7

DRAFT

TEST PIT #11 9/19/84

0.0—6.5'

• Brown and black sand, some gravel-foundry sand, with some constructiondebris (bricks, wood, pipe, metal bands)

• Sample taken at 2.0; MC-TP-011, 3 jars (Duplicate also taken,MC-TP-011A)

• Few slag drums found within fill

T.D.6.5'

• Pit discontinued due to difficult digging conditions

TEST PIT #12 9/19/84

0.0'-7.5'

• Black sand, some gravel-foundry sand, with a few slag drums andconstruction debris mixed in.

• OVA readings up to 200 ppm

• Sample taken at 2.5'; MC-TP-12, 3 jars

• Groundwater encountered at 6.25'

&R600538E-8

DRAFT

7.5'-8.0'

* Gray mottled sandy silt, trace clay-natural soil

T.D.8.0'

TEST PIT #13 9/19/84

0.0'-5.0'

• Black and brown sand, trace gravel-foundry sand, with buried brush andgarbage; OVA readings up to 200 ppm near surface.

• Sample taken at 1.0', MC-TP-013, 3 jars

• Patch of white powdery material at 2.5'

• Groundwater at 4.5'

5.0'-6.0'

• Gray and yellow-green mottled silty clay, trace sand-natural soil

T.D. 6.0'

SR000539E-9

DRAFT

TEST PIT #14 9/19/84

0.0'-5.5'

• Black silty sand, some gravel-foundry sand, with a few slag barrels mixedin.

• OVA readings up to >1000 ppm, typically 50 ppm - hydrocarbon odor.

• Sample taken at 1.5', MC-TP-015, 3 jars

5.5'-6.0'

• Gray mottled sandy silt, trace clay-natural soil

T.D.6.0'

TEST PIT #15 9/19/84

0.0'-5.0'

• Bricks, slag chunks, foundry sand-demolition debris• Very hard digging• Groundwater at 4.2'

5.0'-5.7'

• Gray sandy silt, some clay-natural ground• Sample taken at 5.0', MC-TP-015, 3 jars

T.D.5.7'

E-10

DRAFT

TEST PIT #16 9/20/84

0.0'-6.0'

• Brown and black sand, some gravel and cobbles-foundry sand• Sample taken at 5.5', MC-TP-016, 3 jars

6.0'-6.5'

• Gray mottled silt, some clay, trace sand-natural soil

T.D.6.5'

TEST PIT #17 9/20/84

0.0'-5.5'

• Brown and black sand, some gravel and cobbles• foundry sand, with a few wood scraps and slag barrels mixed in• Samples taken at 4.5; MC-TP-017, 3 jars

5.5'-6.0'

• Gray mottled silt, trace clay, trace sand-natural soil

T.D.6.0'

TEST PIT #18 9/20/84

0.0'-4.6'

• Brown and black sand, some gravel-foundry sand• Small pockets (1-2* diameter) of orange-red soil

E-11

DRAFT

• No OVA readings above background• Sample taken at 4.3', MC-TP-018, 3 jars

4.6'-5.0'

• Stiff gray clay, natural soil

T.D.5.0'

E-12