Reliability Perspectives on

Clean Power Plan Implications NERC Reliability Assessments

John Moura

Director, Reliability Assessment and System Analysis

June 22, U.S. Energy Association

Page 2: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 2

About NERC: Mission

• Develop and enforce reliability standards

• Assess current and future reliability

• Analyze system events and recommend improved practices

• Encourage active participation by all stakeholders

• Accountable as ERO to regulators in the United States (FERC) and Canada (NEB and provincial governments)

To ensure the reliability of the North American bulk power system

Page 3: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 3

NERC Reliability Assessments

• Reliability – Resource Adequacy

– Operating Reliability

• Transmission adequacy

• Demand forecasts

• Demand-Side Resources

• Regional coordination

• Awareness and certainty

• Key issues - emerging trends Technical challenges

Evolving market practices

System elements/dynamics

Potential legislation/regulation

Page 4: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 4

NERC Assessment Areas

Page 5: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 5

• Retirement/displacement of conventional generation Variable energy resources

Rapid penetration of electronically-coupled resources

• Essential Reliability Services Reduced inertia

Frequency Response

Voltage Support

Ramping and flexibility needs

• Rapid penetration of new loads

• System controls and protection coordination

• Modeling and simulation constraints

• Increasing interface with distribution-centric resources

System Dynamic Character is Changing

Page 6: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 6

CPP Overview

• The final rule extended compliance to

2022 from 2020

• Increased total reduction from 30% to

32% of 2005 levels

• Envisions Significant Increase in Renewables and Energy Efficiency – Clean Energy Incentive Plan

• Trading is projected by EPA to be a large mitigating factor for attainment of compliance goals

Page 7: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 7

Example of Envisioned Glide Slope

Example: Arizona

CEIP early

reductions

2020-2021

1st Interim

Period

2022-2024

2nd Interim

Period

2025-2027

3rd Interim

Period

2028-2029

1st Compliance

Period

2030-2031

Proposed 2030 Goal = 702 lb/MWh

Final 2030 Goal = 1,031 lb/MWh

Source: Salt River Project

Page 8: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 8

Example of Envisioned Glide Slope

Example: Kentucky

CEIP early

reductions

2020-2021

1st Interim

Period

2022-2024

2nd Interim

Period

2025-2027

3rd Interim

Period

2028-2029

1st Compliance

Period

2030-2031

Proposed 2030 Goal = 1,918 lb/MWh

Final 2030 Goal = 1,286 lb/MWh

Page 9: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 9

Reliability Provisions

•States required to demonstrate its consideration of reliability

•Mechanism for states to seek a revision to its plan for unanticipated and significant reliability challenges

•Reliability safety valve to address unanticipated or other extraordinary circumstances

Page 10: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 10

NERC CPP Phase II

• Assessment looking at potential reliability impacts of CPP Final Rule

• Developed through collaboration with stakeholders to inform policy discussions and highlight potential risks to BPS reliability

• Provides range of resource adequacy evaluations based on several potential cases using different models

• Provides framework for more granular studies at the state and regional level

Page 11: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 11

• Formed to advise NERC on assessment scope and goals

• Representation All NERC Regions

ISO\RTOs and Planning Coordinators

IPPs and Renewable Energy Producers

Trade Organizations

Power Marketers

Consultants

Canadian Representation

• Sub-group formed to author the recommendations document

• Work with modelers to develop scenarios and assumptions

Planning Committee Advisory Group

Page 12: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 12

CPP Phase II Scenarios

• No CPP Reference Case

• Intrastate trading develops, interstate constrained

Constrained Interstate Trading

• Full intrastate and interstate trading Full Trading

• High penetration of renewables High Renewables

• Accelerated retirement of nuclear units Nuclear

retirements

Page 13: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 13

lllllllllllllll

Emissions Reductions by State

Page 14: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 14

Expected Coal Capacity Decline

Coal capacity decline by up to 27 GWs

Page 15: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 15

Coal Generation (TWh) Declines

Page 16: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 16

Large Amount of Renewable Integration

Tax credits and renewable portfolio standards drive renewables

-

20

40

60

80

100

120

140

160

180

20

16

20

17

20

18

20

19

20

20

20

21

20

22

20

23

20

24

20

25

20

26

20

27

20

28

20

29

20

30

20

16

20

17

20

18

20

19

20

20

20

21

20

22

20

23

20

24

20

25

20

26

20

27

20

28

20

29

20

30

Wind Solar

GW

Reference Case

CPP Base Case

Page 17: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 17

Demand Growth

Annual energy demand growth is expected to flatten

Page 18: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 18

National Trading Impacts Coal Retirements and Gas Additions

CCGT Capacity

Coal Capacity

Page 19: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 19

Scenario Cases Compared to Reference Case

CCGT Capacity

Coal Capacity

Page 20: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 20

Planning

Planning should already be under way due to the need for new transmission and natural gas pipeline infrastructure

Page 21: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 21

Need for Transmission

High levels of variable generation will require significant

transmission additions and reinforcements.

• Interconnect variable

energy resources in remote

areas

• Smooth the variable

generation output across a

broad geographical region

• Deliver ramping capability

and ancillary services

• Construct/site/permit

transmission to deliver

power across long

distances

Legend

Demand Centers High Wind

Availability

Page 22: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 22

• “Building blocks” of physical capabilities

• Accentuated by resource changes

• Not all MWs are equal

• Some partly covered through ancillary services

• Inherently provided by synchronous/conventional generation, but can be synthetically provided by DR, batteries, and inverters

Essential Reliability Services: Fundamentals

Resource Adequacy

Essential Reliability Services

Reliability

Page 23: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 23

Frequency Excursion – Interconnection-wide Phenomena

Page 24: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 24

Proactively Resolve Reliability Concerns

As an electric system approaches a significant penetration in variable resources:

Essential reliability services will be strained

Technical aspects of the evolving resource mix must be given due consideration at state, federal, and provincial level

Solution sets for maintaining reliability can come from:

o Market tools and rules

o New technology integration

o Standards or requirements

Unresolved cost implications can impede solutions from materializing

Page 25: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 25

• Address roles and responsibilities of planning agencies and reliability authorities NERC Planning Coordinators and Transmission Planners

• Maintain adequate Essential Reliability Services Needed for the reliability operation of the Bulk-Power System

• Address future characteristics of resources Cycling, availability, environmentally constrained dispatch, etc

• Early identification of additional infrastructure needs for natural gas transportation and assurance

• Identify changes to Reserve Margins needed for supply adequacy

Recommendations and Guidance to State Plan Developers

Page 26: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 26

• Emphasize implications of the reliability assurance provisions

• Lessons learned from other systems that have experienced significant resource shifts (e.g., Ontario)

• Address implications of increased distributed resources and control challenges

• Discuss potential options for solutions, including technologies that can support reliability

Recommendations and Guidance to State Plan Developers

Page 27: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 27

2015LTRA #3: Reliability Trends and Emerging Issues

Reliability Finding #3: Operators and planners face uncertainty with increased levels of distributed energy resources and new technologies

Cumulative Solar Installed Capacity in U.S. Since 2010

compared to Total Installed Capacity

Distributed energy resources (DERs) are contributing to changing characteristics and control strategies in grid operations.

NERC has established a task force focused on examination of reliability impacts of large amounts of DER on the BPS.

Page 28: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 28

The Future is Now

Page 28

0

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

11,000

13,000

15,000

17,000

19,000

21,000

23,000

25,000

27,000

29,000

0:0

0

1:0

0

2:0

0

3:0

0

4:0

0

5:0

0

6:0

0

7:0

0

8:0

0

9:0

0

10:0

0

11:0

0

12:0

0

13:0

0

14:0

0

15:0

0

16:0

0

17:0

0

18:0

0

19:0

0

20:0

0

21:0

0

22:0

0

23:0

0

Win

d &

So

lar

(MW

)

Lo

ad

& N

et

Lo

ad

(M

W)

Load, Net Load, Wind & Solar --- 05/15/2016

Load NetLoad Wind Solar

Wind/Solar

displaced approx. 22

500 MW combined

cycle resources

On May 15, 2016 the

net-load dropped to

11,663 MW, which is

four years ahead of

the original “duck

curve” estimate

Page 29: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 29

Aliso Canyon: LA Basin Power Supply

Page 30: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 30

Remaining Uncertainties

• What will the Federal Plan look like?

• Mass versus Rate

• Parallels to previous regulations?

• Uncertainty with neighboring state plans and available transfers

• Energy efficiency expectations

• Timing and location of retirements

• Robustness of trading

• Legal impediments

• Transmission-level impacts

• Market sensitive information sharing

Page 31: Reliability Perspectives on Clean Power Plan Implications · Reliability Perspectives on Clean Power Plan Implications NERC Reliability Assessments John Moura Director, Reliability

RELIABILITY | ACCOUNTABILITY 31

• Profound changes occurring on the BPS—resources and policies

• Lots of uncertainty in the future nuclear, carbon, natural gas, climate trends, transmission

• New system behaviors and characteristics require new measurements for reliability

• Emerging reliability issues bring new technical (and political) challenges

• Must carefully balance costs and benefits

• Changes occurring irrespective of CPP

• NERC is well positioned to study, evaluate, and assess the reliability of the Bulk Power System

Closing Remarks