BLANK REKAPITULASI PENAWARAN KONTRAK PEKERJAAN : PERBAIKAN & CLEANING BOILER 940-B-5 DI PT. PERTAMINA RU II DUMAI A. MATERIAL = Rp. 2,259,777,782. B. UPAH = Rp. 1,067,336,380. C. ALAT = R p. 380,000,000 D. SUB TOTAL (A+B+C) = Rp. 3,707,114,162 E. KEUNTUNGAN & RESIKO (10% dari D) = R p. 370,711,416 F. TOTAL (D+E) = Rp. 4,077,825,578 TOTAL = Rp. 4,100,000,000 DIBULATKAN = Rp. 4,100,000,000 TERBILANG :Empat milyard seratus juta rupiah NOTE :

Rekap Estimasi Perbaikan & Cleaning Boiler

Embed Size (px)

DESCRIPTION

qewe

Citation preview

Page 1: Rekap Estimasi Perbaikan & Cleaning Boiler

BLANK REKAPITULASI PENAWARAN KONTRAK

PEKERJAAN : PERBAIKAN & CLEANING BOILER 940-B-5 DI PT.PERTAMINA RU II DUMAI

A. MATERIAL = Rp. 2,259,777,782.

B. UPAH = Rp. 1,067,336,380.

C. ALAT = Rp. 380,000,000

D. SUB TOTAL (A+B+C) = Rp. 3,707,114,162

E. KEUNTUNGAN & RESIKO (10% dari D) = Rp. 370,711,416

F. TOTAL (D+E) = Rp. 4,077,825,578

TOTAL = Rp. 4,100,000,000

DIBULATKAN = Rp. 4,100,000,000

TERBILANG :Empat milyard seratus juta rupiah

NOTE :

Pekanbaru,25 Januari 2016DIBUAT OLEH : PT. Boilertech Indonesia

( Hendri Lubis ) Branch Manager