Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem
Works Plans
November 2017
!(
!(
KC
0 2 41
Kilometres
ZF SE
CheckedDrawn Approved
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
PROPOSED 132 kV UNDERGROUNDCABLE
!( SUBSTATION
DescriptionDateRev
Works Plan13/11/20171
Scheme Name:
Title:
REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM
LOCATION PLAN
Scale: Rev:Sheet Size:Sheet:SHEET 1 of 1 11:50,000 A1 (594 mm x 841 mm)
COVENTRY
STOKE-ON-TRENT
SHEFFIELD
LEEDS
HUDDERSFIELD
CA
MB
RI
AN
MO
UN
TA
IN
S
A N G L E SE Y / Y N
Y S M O N
LIVERPOOL
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan_Location_Plan.mxd
LOCATION PLAN
KEY
°
NOTES
This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.
Shropshire Council
WrexhamCouncil
PowysCouncil
OSWESTRY SUBSTATION WEM
SUBSTATION
MANCHESTER
CARDIGAN BAY / BAE
CEREDIGION BIRMINGHAM
GLOUCESTER
CHELTENHAM
WORCESTER
TELFORD
DERBY
YORK
PRESTON
!(
!(
KC
0 1 20.5
Kilometres
ZF SE
CheckedDrawn Approved
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
PROPOSED 132 kV UNDERGROUNDCABLE
!( SUBSTATION
DescriptionDateRev
Works Plan13/11/20171
Scheme Name:
Title:
REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM
WORKS PLANSHEET KEY PLAN
Scale: Rev:Sheet Size:Sheet:SHEET 1 of 1 11:30,000 A1 (594 mm x 841 mm)
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan_Key_Plan.mxd
LOCATION PLAN
KEY
°
NOTES
This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.
SHEET 01SHEET 02 SHEET 03 SHEET 04
SHEET 05SHEET 06
SHEET 07
SHEET 08SHEET 09 SHEET 10
SHEET 11
SHEET 12
SHEET 13
Wrexham
Shropshire
WALES
ENGLAND
1 2 3 4 5 6 7 871
2
18
63
12
11
10
1
79
92
71
15
9
1 11
67
11 5a
23
5
81
2
16
87
11
37
2
31
11
10
111
11
5
17
14
47
20
21
60
2
2
26
25
35
1a
3
1
15
27
12
12
5
7
78
40
11
Oakfield
Cott
5
2 6
1
TheHollies
19
60
20
19
5
11
86
16
59
12
Greenacres
152
178
715
30
70
l ll
28
1
83
5
3
22
2
20
30
1
11
20
12
26
80
61
21
4
24
16
22
9
16
2824
26
88
11
15
25
37
39
53
6
1
2
5
5878
2
66
11
37
16
20
14
17
4
3a
2
33
10
3
1
4
8
2
11
29
11
32
3l
38
37
68
48
44
2
3
375
15 5
18
8
332 36 1
2
4238
16
78
15
77
2b
29
72
85
12
48
15
84
68
3
12
18
11
62
2
302
10
14
1
2
163
1
147
26
143101115
24
2
100
129
18
171
29
7
l03
7
158
23
15
9
153
l0l
144
114
132
108
1
11
2
90
164
3
94
20
12
174
11l
160
14
121
127
113
14
137
145
79
4
26
Top HouseFarm
Cabin HouseFarm
36
9 7
34
45
1115
44
1
46
41
24
5553
47
56
6 810
2
4
1
180178
7
9
14
7
4
6
14
2
3
6664
2
1
101
97
3
1
7
84
514
7
1926
20
1a
El SubSta
16
22
CO
NTI
NU
ES O
N S
HEE
T 2
KC
0 100 20050
Metres
ZF SE
CheckedDrawn Approved
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUNDCABLE
SPEN 11 kV OVERHEAD LINE
SPEN 33 kV OVERHEAD LINE
SPEN 132 kV OVERHEAD LINE
NATIONAL GRID 400 kV OVERHEAD LINE
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
DescriptionDateRev
Works Plan13/11/20171
Scheme Name:
Title:
REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM
WORKS PLANSHEET 1 of 13
Scale: Rev:Sheet Size:Sheet:SHEET 1 of 13 11:2,500 A1 (594 mm x 841 mm)
2 3 4 5 6 78 9 10
11 1213
1
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd
LOCATION PLAN
KEY
°
NOTES
This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.
7 8
9
1011
12
13
14
15
16
17
18
19
20
21
16
BellaVista
Heniarth
NewBungalow
The Oaks
Goodison
FieldsFarm
Broadway
Roseway
PennwoodCottage
Shelter
Jasmine
TheBreiddens
WalnutCottage
TheCroft
8
6
31
LaurelBank
20
20
1
17
2
Wesley Cottage
Hawthorn
Cottage
25
22
8
Crown
Dugdale
1
Rose
36
10
SweetBriar
24
4
OakfieldHouse
Fairview
PoultryHouse
The OldChurch
Bryn-y-plentyn
Farm
CoppiceHouse
FieldCorner
RoseCottage
VineCottage
CO
NTI
NU
ES O
N S
HEE
T 1
CO
NTI
NU
ES O
N S
HEE
T 3
KC
0 100 20050
Metres
ZF SE
CheckedDrawn Approved
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUNDCABLE
SPEN 11 kV OVERHEAD LINE
SPEN 33 kV OVERHEAD LINE
SPEN 132 kV OVERHEAD LINE
NATIONAL GRID 400 kV OVERHEAD LINE
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
DescriptionDateRev
Works Plan13/11/20171
Scheme Name:
Title:
REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM
WORKS PLANSHEET 2 of 13
Scale: Rev:Sheet Size:Sheet:SHEET 2 of 13 11:2,500 A1 (594 mm x 841 mm)
1 3 4 5 6 78 9 10
11 1213
2
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd
LOCATION PLAN
KEY
°
NOTES
This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.
20
21
2223
2425
26
27
28
29 30 31 32 33 34
The Oaks
BabbinswoodFarm
PerrymoorFarm
PerryFarm
DecoyFarm
CO
NTI
NU
ES O
N S
HEE
T 2
CO
NTI
NU
ES O
N S
HEE
T 4
KC
0 100 20050
Metres
ZF SE
CheckedDrawn Approved
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUNDCABLE
SPEN 11 kV OVERHEAD LINE
SPEN 33 kV OVERHEAD LINE
SPEN 132 kV OVERHEAD LINE
NATIONAL GRID 400 kV OVERHEAD LINE
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
DescriptionDateRev
Works Plan13/11/20171
Scheme Name:
Title:
REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM
WORKS PLANSHEET 3 of 13
Scale: Rev:Sheet Size:Sheet:SHEET 3 of 13 11:2,500 A1 (594 mm x 841 mm)
1 2 4 5 6 78 9 10
11 1213
3
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd
LOCATION PLAN
KEY
°
NOTES
This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.
33 34 35 36 37 38 39 40 41 4243
4445
46
47
Berrywood
WoodhouseHall
WoodhouseBungalow
WoodhouseFarm
CO
NTI
NU
ES O
N S
HEE
T 3
CO
NTI
NU
ES O
N S
HEE
T 5
KC
0 100 20050
Metres
ZF SE
CheckedDrawn Approved
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUNDCABLE
SPEN 11 kV OVERHEAD LINE
SPEN 33 kV OVERHEAD LINE
SPEN 132 kV OVERHEAD LINE
NATIONAL GRID 400 kV OVERHEAD LINE
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
DescriptionDateRev
Works Plan13/11/20171
Scheme Name:
Title:
REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM
WORKS PLANSHEET 4 of 13
Scale: Rev:Sheet Size:Sheet:SHEET 4 of 13 11:2,500 A1 (594 mm x 841 mm)
1 2 3 5 6 78 9 10
11 1213
4
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd
LOCATION PLAN
KEY
°
NOTES
This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.
46
4748
49
5051
5253
54 55 56 57 58 59 60 61 62 63
LowerLees
Hawkswood
RednalMill
MistyMeadows
RednalMillCottage
MillBarn
195
196
LeesBungalow
The Lees
200
205
199
CO
NTI
NU
ES O
N S
HEE
T 6
CO
NTI
NU
ES O
N S
HEE
T 4
KC
0 100 20050
Metres
ZF SE
CheckedDrawn Approved
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUNDCABLE
SPEN 11 kV OVERHEAD LINE
SPEN 33 kV OVERHEAD LINE
SPEN 132 kV OVERHEAD LINE
NATIONAL GRID 400 kV OVERHEAD LINE
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
DescriptionDateRev
Works Plan13/11/20171
Scheme Name:
Title:
REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM
WORKS PLANSHEET 5 of 13
Scale: Rev:Sheet Size:Sheet:SHEET 5 of 13 11:2,500 A1 (594 mm x 841 mm)
1 2 3 4 6 78 9 10
11 1213
5
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd
LOCATION PLAN
KEY
°
NOTES
This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.
61 62 63 64
65
66
67
68
6970 71 72
73
74
75
76
SycamoreCottages
3
1
SycamoreFarm House
SchoolHouse
6
Hall2
10
Dandyford
SchoolBungalow 4
5
1
1
SycamoreView
1
HordleyCottages
ChestnutSpinney
Bethanylou
SmithyCottage
Farm
Tank
Red House
CO
NTI
NU
ES O
N S
HEE
T 7
CO
NTIN
UES O
N SH
EET 5
KC
0 100 20050
Metres
ZF SE
CheckedDrawn Approved
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUNDCABLE
SPEN 11 kV OVERHEAD LINE
SPEN 33 kV OVERHEAD LINE
SPEN 132 kV OVERHEAD LINE
NATIONAL GRID 400 kV OVERHEAD LINE
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
DescriptionDateRev
Works Plan13/11/20171
Scheme Name:
Title:
REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM
WORKS PLANSHEET 6 of 13
Scale: Rev:Sheet Size:Sheet:SHEET 6 of 13 11:2,500 A1 (594 mm x 841 mm)
1 2 3 4 5 78 9 10
11 1213
6
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd
LOCATION PLAN
KEY
°
NOTES
This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.
76
77
78
79
80
81
82
83
84
85
86
87
88
The Nook
Reynold's
Springfields
KenwickWood
CouncilHouses
14
ParkHouse
TopHouse
KenwickOak
CO
NTI
NU
ES O
N S
HEE
T 6
CONTINUES ON SHEET 8
KC
0 100 20050
Metres
ZF SE
CheckedDrawn Approved
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUNDCABLE
SPEN 11 kV OVERHEAD LINE
SPEN 33 kV OVERHEAD LINE
SPEN 132 kV OVERHEAD LINE
NATIONAL GRID 400 kV OVERHEAD LINE
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
DescriptionDateRev
Works Plan13/11/20171
Scheme Name:
Title:
REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM
WORKS PLANSHEET 7 of 13
Scale: Rev:Sheet Size:Sheet:SHEET 7 of 13 11:2,500 A1 (594 mm x 841 mm)
1 2 3 4 5 6
8 9 1011 12
137
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd
LOCATION PLAN
KEY
°
NOTES
This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.
84
85
86
87
88
89
90
91
92
93
94
95
96
9798
99
ShadeOak
The Oaks
FerneyHough
TopHouse
KenwickLodge
KenwickOak
CO
NTI
NU
ES O
N S
HEE
T 7
CONTINUESON SHEET 9
KC
0 100 20050
Metres
ZF SE
CheckedDrawn Approved
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUNDCABLE
SPEN 11 kV OVERHEAD LINE
SPEN 33 kV OVERHEAD LINE
SPEN 132 kV OVERHEAD LINE
NATIONAL GRID 400 kV OVERHEAD LINE
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
DescriptionDateRev
Works Plan13/11/20171
Scheme Name:
Title:
REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM
WORKS PLANSHEET 8 of 13
Scale: Rev:Sheet Size:Sheet:SHEET 8 of 13 11:2,500 A1 (594 mm x 841 mm)
1 2 3 4 5 6 7
9 1011 12
138
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd
LOCATION PLAN
KEY
°
NOTES
This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.
99
100101
102103
104105 106 107 108 109 110
Highfields
Glendower
ChapelHouseFarm
StanwardineGrange
2
ChapelHouse
MeadowView
1
ExchangeMeadowgate
LowGrove
Tasker
Tyneholm
26
FairView
Stonehill
Chape
l
Gates
WestLeasow
View
1
2
Oakfield
TheGranary
Heronstone
StanwardineHouse
StanwardineHall
The HayBarnC
ON
TIN
UES
ON
SH
EET
8
CO
NTI
NU
ES O
N S
HEE
T 10
KC
0 100 20050
Metres
ZF SE
CheckedDrawn Approved
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUNDCABLE
SPEN 11 kV OVERHEAD LINE
SPEN 33 kV OVERHEAD LINE
SPEN 132 kV OVERHEAD LINE
NATIONAL GRID 400 kV OVERHEAD LINE
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
DescriptionDateRev
Works Plan13/11/20171
Scheme Name:
Title:
REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM
WORKS PLANSHEET 9 of 13
Scale: Rev:Sheet Size:Sheet:SHEET 9 of 13 11:2,500 A1 (594 mm x 841 mm)
1 2 3 4 5 6 78 10
11 1213
9
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd
LOCATION PLAN
KEY
°
NOTES
This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.
110 111
112
113
114
115
116
117
118
119
120
121
122
123
WackleyLodge
The WoodMaltKilnFarm
RunnersRest
WoodFarm
CO
NTI
NU
ES O
N S
HEE
T 11
CO
NTIN
UES O
N SH
EET 9
KC
0 100 20050
Metres
ZF SE
CheckedDrawn Approved
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUNDCABLE
SPEN 11 kV OVERHEAD LINE
SPEN 33 kV OVERHEAD LINE
SPEN 132 kV OVERHEAD LINE
NATIONAL GRID 400 kV OVERHEAD LINE
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
DescriptionDateRev
Works Plan13/11/20171
Scheme Name:
Title:
REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM
WORKS PLANSHEET 10 of 13
Scale: Rev:Sheet Size:Sheet:SHEET 10 of 13 11:2,500 A1 (594 mm x 841 mm)
1 2 3 4 5 6 78 9 11 12
1310
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd
LOCATION PLAN
KEY
°
NOTES
This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.
123
124125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
MillFarm
BurltonGrange
Silo
MillBrook
Silo
MoorHouseFarm
TheFields
Woodfields
CoppiceFarm
BentleyFarm
CO
NTI
NU
ESO
N S
HEE
T 12
CO
NTI
NU
ES O
N S
HEE
T 10
KC
0 100 20050
Metres
ZF SE
CheckedDrawn Approved
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUNDCABLE
SPEN 11 kV OVERHEAD LINE
SPEN 33 kV OVERHEAD LINE
SPEN 132 kV OVERHEAD LINE
NATIONAL GRID 400 kV OVERHEAD LINE
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
DescriptionDateRev
Works Plan13/11/20171
Scheme Name:
Title:
REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM
WORKS PLANSHEET 11 of 13
Scale: Rev:Sheet Size:Sheet:SHEET 11 of 13 11:2,500 A1 (594 mm x 841 mm)
1 2 3 4 5 6 78 9 10 12
1311
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd
LOCATION PLAN
KEY
°
NOTES
This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.
139
140
141
142
143
144
145
146
147
148 149 150 151 152 153 154 155 156 157 158
159
160
2HallCottages
Smithy
GraftonFarm
1
ForrestersFarm
WillowTreeCottage
ManorCottage
The
PearlFarm
WeaversLoft
CommonwoodFarm
ManorFarm
HopeCottage
Primrose
NoneleyHall Farm
ShayesFarm
ChapelHouse
TheHollies
Yew TreeCottage
The Firs
New Farm
1
Barns
56
3
2
4
SaltersStables
StoneGables
NoneleyGrange
CO
NTI
NU
ES O
N S
HEE
T 13
CO
NTI
NU
ES O
N S
HEE
T 11
KC
0 100 20050
Metres
ZF SE
CheckedDrawn Approved
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUNDCABLE
SPEN 11 kV OVERHEAD LINE
SPEN 33 kV OVERHEAD LINE
SPEN 132 kV OVERHEAD LINE
NATIONAL GRID 400 kV OVERHEAD LINE
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
DescriptionDateRev
Works Plan13/11/20171
Scheme Name:
Title:
REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM
WORKS PLANSHEET 12 of 13
Scale: Rev:Sheet Size:Sheet:SHEET 12 of 13 11:2,500 A1 (594 mm x 841 mm)
1 2 3 4 5 6 78 9 10
1113
12
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd
LOCATION PLAN
KEY
°
NOTES
This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
Factory
BelleVueThe
DitchesHall
The GateHouse
Oakdene
Overfields
HarleyHouse
Sherfield
Avondale
Pearl Farm
WeaversLoft
CommonwoodFarm
HopeCottage
PoolsFarm
CO
NTIN
UES O
N SH
EET 12
KC
0 100 20050
Metres
ZF SE
CheckedDrawn Approved
PROPOSED 132 kV POLE POSITIONS
PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)
CONSTRUCTION AND OPERATIONSCORRIDOR
40m CONSULTATION BOUNDARY
PROPOSED 132 kV UNDERGROUNDCABLE
SPEN 11 kV OVERHEAD LINE
SPEN 33 kV OVERHEAD LINE
SPEN 132 kV OVERHEAD LINE
NATIONAL GRID 400 kV OVERHEAD LINE
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED
EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT
PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED
PROPOSED TEMPORARY ACCESS
PROPOSED TEMPORARY LAYDOWNAREAS
The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.
The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.
DescriptionDateRev
Works Plan13/11/20171
Scheme Name:
Title:
REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:
132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM
WORKS PLANSHEET 13 of 13
Scale: Rev:Sheet Size:Sheet:SHEET 13 of 13 11:2,500 A1 (594 mm x 841 mm)
1 2 3 4 5 6 78 9 10
11 1213
BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY
PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.
CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.
Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd
LOCATION PLAN
KEY
°
NOTES
This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.