40
REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP) DOLE-Regional Office No. 5 July 2018 Page 1 of 40 No. Company Name and Address Project Name Project Owner Date Approved 1 ZAREPATH CONSTRUCTION & SUPPLY Brgy. 55 Estanza (Brgy. 53) Legazpi City, Albay Construction of Academic Building (Agricultural & Biosystems Engineering Building) DEBEMSCAT Cabitan, Mandaon, Masbate DepEd-Region V, Division of Legazpi City 6/26/2018 2 ZAREPATH CONSTRUCTION & SUPPLY Brgy. 55 Estanza (Brgy. 53) Legazpi City, Albay : Construction of Academic Building (Animal Science Building) DEBEMSCAT , Cabitan, Mandaon, Masbate DepEd-Region V, Division of Legazpi City 6/26/2018 3 AVZ CONSTRUCTION AND SUPPLY Purok Atis, Gubat, Daet, Camarines Norte Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018 4 AVZ CONSTRUCTION AND SUPPLY Purok Atis, Gubat, Daet, Camarines Norte Construction of Barangay Road-Barangay Napaod- Benit, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018 5 ANTONIO DY PRIETO Roxas Avenue, Naga City Proposed 3 Storey Commercial / Residential Building-Roxas Avenue, Naga City Antonio Dy Prieto 6/26/2018 6 AJAN JEADA INC. Lakandula Drive, Gogon, Legazpi City 2018 (I)-002 Rehabilitation / Improvement / Concreting of Roads in the Province of Albay Provincial Capitol of Albay 6/26/2018 7 SEVEN “R” CONSTRUCTION & SUPPLY Tigbi, Tiwi, Albay Construction of Standard Type “A” Two (2) Storey Concrete Police Station Building w/ Roofdeck & Roofing of Daraga Municipal Police Station -Tagas, Daraga, Albay PNP- Police Regional Office V 6/26/2018 8 SEVEN “R” CONSTRUCTION & SUPPLY Tigbi, Tiwi, Albay Construction of Standard Type “B/C” Two (2) Storey Concrete Police Station Building w/ Roofdeck & Roofing of Daraga Municipal Police Station -Poblacion, Tigaon, Camarines Sur PNP- Police Regional Office V 6/26/2018 9 4DOVE BUILDERS CORP. Tinago, Ligao City Construction of MP Hall (Dome Type) Nasisi, Ligao City City Government of Ligao 6/26/2018 10 DOMINGO T. MONASTERIO Pugay, San Jose, Camarines Sur Two-Unit Poultry House-Pugay, San Jose, Camarines Sur Domingo T. Monasterio 6/26/2018 11 CPR Construction & Supply Manzanilla Street, Basud Polangui, Albay Construction of Diversion of Agos CIP, Bato,Camarines Sur Under CY 2018 Fund-Bato, Camarines Sur National Irrigation Administration ROV, Naga City 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

  • Upload
    others

  • View
    13

  • Download
    1

Embed Size (px)

Citation preview

Page 1: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 1 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

1

ZAREPATH CONSTRUCTION & SUPPLY Brgy. 55 Estanza (Brgy. 53) Legazpi City, Albay

Construction of Academic Building (Agricultural & Biosystems Engineering Building) DEBEMSCAT Cabitan, Mandaon, Masbate

DepEd-Region V, Division of Legazpi City

6/26/2018

2

ZAREPATH CONSTRUCTION & SUPPLY Brgy. 55 Estanza (Brgy. 53) Legazpi City, Albay

: Construction of Academic Building (Animal Science Building) DEBEMSCAT , Cabitan, Mandaon, Masbate

DepEd-Region V, Division of Legazpi City

6/26/2018

3 AVZ CONSTRUCTION AND SUPPLY Purok Atis, Gubat, Daet, Camarines Norte

Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte

Provincial Government of Camarines Norte

6/26/2018

4 AVZ CONSTRUCTION AND SUPPLY Purok Atis, Gubat, Daet, Camarines Norte

Construction of Barangay Road-Barangay Napaod-Benit, Labo, Camarines Norte

Provincial Government of Camarines Norte

6/26/2018

5 ANTONIO DY PRIETO Roxas Avenue, Naga City

Proposed 3 Storey Commercial / Residential Building-Roxas Avenue, Naga City

Antonio Dy Prieto 6/26/2018

6 AJAN JEADA INC. Lakandula Drive, Gogon, Legazpi City

2018 (I)-002 Rehabilitation / Improvement / Concreting of Roads in the Province of Albay

Provincial Capitol of Albay 6/26/2018

7 SEVEN “R” CONSTRUCTION & SUPPLY Tigbi, Tiwi, Albay

Construction of Standard Type “A” Two (2) Storey Concrete Police Station Building w/ Roofdeck & Roofing of Daraga Municipal Police Station -Tagas, Daraga, Albay

PNP- Police Regional Office V 6/26/2018

8 SEVEN “R” CONSTRUCTION & SUPPLY Tigbi, Tiwi, Albay

Construction of Standard Type “B/C” Two (2) Storey Concrete Police Station Building w/ Roofdeck & Roofing of Daraga Municipal Police Station -Poblacion, Tigaon, Camarines Sur

PNP- Police Regional Office V 6/26/2018

9 4DOVE BUILDERS CORP. Tinago, Ligao City

Construction of MP Hall (Dome Type) Nasisi, Ligao City

City Government of Ligao 6/26/2018

10 DOMINGO T. MONASTERIO Pugay, San Jose, Camarines Sur

Two-Unit Poultry House-Pugay, San Jose, Camarines Sur

Domingo T. Monasterio 6/26/2018

11 CPR Construction & Supply Manzanilla Street, Basud Polangui, Albay

Construction of Diversion of Agos CIP, Bato,Camarines Sur Under CY 2018 Fund-Bato, Camarines Sur

National Irrigation Administration ROV, Naga City

6/26/2018

Page 2: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 2 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

12 ZKR CONSTRUCTION AND SUPPLY Blk 3 Lot 4 Purok 5 Tanchuling Subd., Rawis, Legazpi City

CY 2018 BEFF-Conservation & Restoration of Gabaldon Building- Sta. Cruz Elementary School, Sta. Cruz, Naga City

Department of Education Division of Naga City

6/27/2018

13 128 DRAGON F. Pimentel Ave. Brgy. VIII Daet, Camarines Norte

Repair / Rehab. of Existing of Nabua Communal Irrigation System (CIS)-San Vicente, Camarines Norte

National Irrigation Administration 6/27/2018

14 SPS. RENE & EDITA GRONA Lot 4 Blk 1 Green St. Sunrise Subd. Brgy. Cruzada, Legazpi City

Proposed Grona Residence-Lot 4 Blk 1 Green St. Sunrise Subdivision Brgy. Cruzada, Legazpi City, Albay

SPS. Rene & Edita Grona 6/27/2018

15 CENTRAL BICOL STATE UNIVERSITY Impig, Sipocot, Camarines Sur

Renovation of Garage-Impig, Sipocot, Camarines Sur

CBSUA-Sipocot, Camarines Sur 6/28/2018

16 LPS CONSTRUCTION GROUP, INC. Lot 4 S. Lazaro Compound 3048, F. Bautista St. Ugong, Valenzuela City

China Bank Savings-Imperial Street, Bitano, Legazpi City

Baldwin Aguilar 6/28/2018

17 Belmor L. Barado Sigma St. Concepcion Grande Naga city

Proposed Two (2) Storey Residential Bldg. with Roof deck-Block 20, Lot 2, Jardin Real De Naga Phase III, Concepcion Grande, Naga city

Belmor L. Barado 6/28/2018

18 E.A. SANCHO CONSTRUCTION, INC. Midem Street, North Centro, Sipocot

: CY 2018 BEFF-Conservation & Restoration of Gabaldon Building (Batch 1) Lot 3-Tinago, Naga city

DepEd-Naga City, Roxas Avenue, Triangulo, Naga city

6/28/2018

19 JCM CONSTRUCTION & SUPPLY Basud, Polangui , Albay

Construction of Evacuation Facility ( Brgy. San Vicente)-Ocampo, Camarines Sur

LGU Ocampo, Camarines Sur 6/28/2018

20 GOLDEN EGG BUILDER Purok 5, Magang, Daet, Camarines Norte

Repair/ Rehab of Existing Mataque Communal Irrigation System (CIS), Capalonga, Camarines Norte

National Irrigation Administration 6/29/2018

21 AGROMA CONSTRUCTION & SUPPLY CORP. Ponso, Polangui, Albay

Upgrading of Culliat Road To GMA Highway,Cullat Ligao City

City Government of Ligao 6/29/2018

22 JOEPEN CONSTRUCTION AND SUPPLY Zone 5, Tuburan, Ligao City

Repair of Covered Court at Herrera, Ligao City City of Ligao, Albay 6/29/2018

Page 3: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 3 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

23 Sharmaine B. Florida Brgy.08, Bacacay,Albay

Proposed Two (2)-Storey Commercial Building- Barangay 08, Bacacay,Albay

Sharmaine B. Florida 6/29/2018

24

Manuel D. Pineda Segovia Compound, Tagas Daraga, Albay

Proposed Two (2)-Storey Commercial Building- Barangay 08, Bacacay,Albay

Manuel D. Pineda 6/29/2018

25 IRA CONSTRUCTION and SUPPLY Purok 4 Kinale, Polangui, Albay

Construction of Grouted Riprap at Balayan Creek Phase 1-Camarines Sur Polytechnic Colleges, Nabua, Camarines Sur

Camarines Sur Polytechnic Colleges, Nabua, Camarines Sur

6/29/2018

26 CRISTY TUMALAD Tugos, Sorsogon City

Proposed 5-Unit Two-Storey Apartment CRISTY TUMALAD 7/3/2018

27 GOLDEN EGG BUILDERS Purok 5 Brgy. Magang, Daet,Camarines Norte

Repair/ Rehab of Existing Matogdon River Irrigation System (CIS), National Irrigation System (NIS), Vinzons & Labo, Camarines Norte

National Irrigation Administration 7/3/2018

28

ZAREPATH CONSTRUCTION & SUPPLY Brgy. 55 Estanza (Brgy. 53) Legazpi City, Albay

Furnishing of Materials, Labor and Equipment For the Concreting of Road at Pandan (Sitio Cadlum)-Macalidong (Sitio Mabigao)-Oma Oma ( Sitio, Tigbao), Ligao City Contract ID; Infra-2018-013

Local Government Unit of Ligao City

7/3/2018

29 MGT BUILDERS AND SUPPLY Imperial Ridgeview Subdivision, Buragwis, Legazpi City

Providing Labor, Materials and Equipment for the Repair/ Rehabilitation of Diversion Road & Canals of Pili RIS, Castilla, Sorsogon under RREIS CY 2018

National Irrigation Administration -Region V, Naga City

7/3/2018

30 AL NIÑO CONSTRUCTION & SUPPLY 165 Quezon Avenue, Oro Site, Legazpi City

Providing Labor, Materials and Equipment For The Construction of Canal Structures, Canals & Access Roads of Ibingan Srip P-6, Prieto Diaz, Sorsogon Under Srip CY 2018 Fund

National Irrigation Administration Panganiban Drive, Naga City

7/3/2018

31 Romeo J. Aluzan San Isidro St., Goa, Camarines Sur

Construction of Warehouse and Feed Mill,Zone 7, Salogon, San Jose, Camarines Sur

Romeo J. Aluzan 7/3/2018

32 Wendel Manaba 658 C Palacas, St. Brgy. 647, Quiapo, Manila

Proposed Urstore Store, C2 3008-14 SM City Legazpi, Imelda Roces Ave Legazpi City

Hona Hao 7/3/2018

Page 4: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 4 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

33

ZAREPATH CONSTRUCTION & SUPPLY Brgy. 55 Estanza (Brgy. 53) Legazpi City, Albay

Construction of National Child Development Center at Bacacay, Albay

Municipality of Bacacay, Albay 7/3/2018

34 KATHRYN MAY Y. LEVINA Polangui Roof Center, Alternate Road

Proposed Fence and Gates, Sweet Homes St. Brgy. Cruzada, Leg. City

Kathryn May Y. Levina 7/3/2018

35 GANE TEKNO BUILDERS Guinobatan, Albay

Concreting of Irrigation Service Road at Sition Labao, Guilid, Ligao City

LGU Ligao 7/3/2018

36 AMEG Construction and Supply Purok 4, Barriada, Brgy. Gogon, Legazpi City

Proposed Purok 3, Paulba Streetlighting Services (Phase 1), Paulba, Ligao City

AMEG CONSTRUCTION & SUPPLY

7/3/2018

37 EDUFAME CORPORATION Cleto Commercical Building, 480 Ubaliw, Polangui, Albay

Conservation & Restoration of Gabaldon Building, Lot 1, Bacacay East Central School, Bacacay, Albay

DepEd Division of Albay 7/4/2018

38 Mrs. Roliza O. Cañada OLV Bibingkahan, Sorsogon City

Propsed 3- Storey Boarding House-Lot 3, Blk 1, Brgy. Salog, East District, Sorsogon City

Mrs. Roliza O. Cañada 7/4/2018

39 DUAMON CONSTRUCTION & SUPPLY J. Reyes Street, Bitan-o, Sorsogon City

INFRA-PB-18-006-Construction of Potable Water System Level (Level II) at Brgy. Malinao, Donsol, Sorsogon

LGU-Donsol Sorsogon 7/4/2018

40 NJNY CONSTRUCTION & SUPPLY Diversion Road, Cabid-An, Sorsogon City

Concreting Paving of Gogon-San Rafael Road (Ulag Section, Prieto Diaz, Sorsogon)

LGU-Prieto Diaz, Sorsogon 7/4/2018

41 HEXAGRAM BUILDERS 4th St. Villa Sorabella Subd. Concepcion Grande, Naga City

Concreting the Pavement, 6th St. Villa Sorabella Subd., Concepcion Grande Naga City

LGU Naga City 7/9/2018

42 Harold Brian Diamante Prieto Diaz St. Zone 4, Bulan, Sorsogon

Two Storey BC Commercial Stall-Prieto Diaz St. Zone 4, Bulan, Sorsogon

Harold Brian Diamante 7/5/2018

43 AB OPEÑA BUILDERS 4th Street, Parkview Village, San Felipe, Naga City

School Playground at Various Public Elementary Schools, Naga City

LGU Naga City 7/9/2018

44 TOPSPIN CONSTRUCTION San Vicente, Bulan, Sorsogon

PR8766- Construction of Core Local Roads at Brgy. Casil, Gubat, Sorsogon

LGU-Gubat, Manook, Gubat, Sorsogon

7/9/2018

Page 5: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 5 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

45 HEXAGRAM BUILDERS 4th St. Villa Sorabella Subd. Concepcion Grande, Naga City

Concreting the Pavement, 6th St. Villa Sorabella Subd., Concepcion Grande Naga City

LGU Naga City 7/9/2018

46 STICKS AND STRINGS Centro,Naga City

Interior Finishing Works at 3/F SM City Legazpi, Tahao Rd. Legazpi City

Francia M. Bienvenuto 7/9/2018

47 AB OPEÑA BUILDERS 4th Street, Parkview Village, San Felipe, Naga City

School Playground at Various Public Elementary Schools, Naga City

LGU Naga City 7/9/2018

48 TOPSPIN CONSTRUCTION San Vicente, Bulan, Sorsogon

PR8766- Construction of Core Local Roads at Brgy. Casil, Gubat, Sorsogon

LGU-Gubat, Manook, Gubat, Sorsogon

7/9/2018

49 CPR Construction & Supply Manzanilla Street, Basud Polangui, Albay

Repair/ Rehabilitation of Diversion Canal Structures & Canals of Oco & Panganiban CIS,Viga & Panganiban, Catanduanes

National Irrigation Administration ROV, Naga City

7/10/2018

50 AE BELLEZA BUILDERS 102 Sto. Tomas, Magarao, Camarines Sur

Lined Canal at Balatas Creek Near AMA,Brgy. Balatas, Naga City

City Government of Naga 7/10/2018

51 Golden Fleece Construction and Supply, Inc. Manzanilla St., Basud, Polangui, Albay

Repair/ Rehabilitation, Canal Structures & Canals of Baniaga & San Roque CISs, Bato, Catanduanes

National Irrigation Administration ROV, Naga City

7/10/2018

52

MAEMAR CONSTRUCTION AND SUPPLY Lourdes Bldg. A. Mabini St., Poblacion, Guinobatan, Albay

Construction of Multi-Purpose Hall Brgy. Muladbucad Pequeño, Guinobatan, Albay

LGU Guinobatan 7/10/2018

53 CPR Construction & Supply Manzanilla Street, Basud, Polangui, Albay

Repair/ Rehabilitation of Diversion and Canals of Burgos, San Jose, Soboc, & Bugao CIS, Viga & Panganiban, Catanduanes

National Irrigation Administration ROV, Naga City

7/10/2018

54 EMIRAM CONSTRUCTION AND SUPPLY MLQ St. Sta Cruz, Ligao City

: Concreting of Purok 5 To Sitio Boundary Road at Balanac, Ligao City

Local Government Unit of Ligao City

7/10/2018

55 EMIRAM CONSTRUCTION AND SUPPLY MLQ St. Sta Cruz, Ligao City

Repair and Reconstruction of Protective Dike at Pinamaniquihan, Ligao City

Local Government Unit of Ligao City

7/10/2018

Page 6: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 6 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

56 MAEMAR CONSTRUCTION AND SUPPLY Lourdes Bldg. A. Mabini St.

Rehab/ Development / Concreting of Roads Upper and Lower Binogsacan Access Road, Brgy. Lower Binogsacan, Guinobatan, Albay

LGU Guinobatan 7/10/2018

57

S.L Development Construction Corporation 2F, Rusland Building, 1932 F. Agoncillo Street, Malate, Manila 1004 Philippines

Supply and Erection / Installation of Virac-San Miguel 69 KVTL Project, Municipalities of Virac, Bato and San Miguel, Catanduanes

National Power Corporation 7/10/2018

58

S.L. DEVELOPMENT CONSTRUCTION CORPORATION 2F, Rusland Building, 1932 F. Agoncillo Street, Malate, Manila 1004 Philippines

Supply and Erection / Installation of Virac-San Miguel 69 KVTL Project, Municipalities of Virac, Bato and San Miguel, Catanduanes

National Power Corporation 7/10/2018

59

RIDESCORNER Construction & General Mdse. P2 Pimentel Ave., Brgy II, Daet, Camarines Norte

Repair/ Rehabilitation of Existing Irrigation System of Cabuluan II Communal Irrigation System ( CIS), Sta. Elena, Camarines Norte

NIA-Camarines Norte 6/26/2018

60

ST. BERNARDINE CONSTRUCTION AND ENTERPRISES 0677 Zone 5, Maleniza Compound, Brgy. San Felipe, Naga City, Camarines Sur

006151-2018-01 Repainting of JMR Coliseum, CBD II, Brgy. Triangulo, Naga City

LGU-Naga City 7/10/2018

61 LOURBEL CONSTRUCTION AND SUPPLY Pag-asa, Brgy. 42, Rawis, Legazpi City

Repair of Engineering & Planning Unit (EPU)-Building at Legazpi Airport Legazpi City, Albay

Civil Aviation Authority of the Philippines

7/10/2018

62 ALHADRAX CONSTRUCTION & SUPPLY Maningcay De Oro, Prieto Diaz, Sorsogon

Repair of Classrooms Under CY 2018 Basic Education Facilities Fund (Batch 1) Cluster 1 for Lot 17 Paco ES, Buenavista ES, Rizal ES and Bagacay NHS, Gubat, Sorsogon

DepEd, Schools Division of Sorsogon (Province)

7/10/2018

63 ALHADRAX CONSTRUCTION & SUPPLY Maningcay De Oro, Prieto Diaz, Sorsogon

18-05-002- Conservation and Restoration of Gabaldon School Building Under CY 2018 Basic Education Facilities Fund (Batch 2) Jose Alindogan Central School, Juban, Sorsogon

DepEd, Schools Division of Sorsogon (Province)

7/10/2018

Page 7: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 7 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

64 Rising Sun Food Corporation F & S Velasco Bldg. Corner Imperial Rizal St. Tinago, Legazpi City

Dunkin Donuts SM Legazpi, Ground Floor SM Legazpi, Imelda Roces Avenue, Bitano, Legazpi City

Rising Sun Food Corporation 7/10/2018

65 Felipe Carting Brgy 16, Legazpi City

Three Storey Apartment Residential Building-Brgy. East Washington, Legazpi City

Felipe B. Carting 7/11/2018

66 Maricel Apuli Tumonong Purok 6, Brgy. 49, Bigaa, Legazpi City

2 Storey Bed and Breakfast- Purok 6, Brgy 49, Bigaa, Legazpi City

Maricel Apuli Tumonong 7/11/2018

67 ARCDI Microfinance ARCDI Corporate Building, San Roque, Virac, Catanduanes, 4800

ARCDI Corporate Building 2- San Roque Virac, Catanduanes

ARCDI Microfinance, Incorporated 7/11/2018

68 MJ Builders and Construction Supply Manzanilla, Basud, Polangui, Albay

“Repair/ Rehab. of Canal Structures & Canals of Lanipga PIS, Bula, Camarines Sur

National Irrigation Administration Region V, Naga City

7/12/2018

69 WILBERT LEE Magsaysay Cor. Rizal St., Sorsogon City

Alteration of Four Storey Commercial Building (Dormitory Building)-Magsaysay Cor. Rizal St., Sorsogon City

Wilbert Lee 7/12/2018

70 SAVORY FASTFOOD INC. 84 Sto. Domingo Street Cor N.S Quezon City, Philippines, 1104

Savory Fast food Inc.-2nd Floor SM City Legazpi, Tahao Road, Legazpi City

Ramon C. Tan 7/12/2018

71 PHOTOLINE ENTERPRISES CORPORATION 15 Catmon St., Talayan Village, Quezon

Photo Line Enterprises Corp.-3F Unit 3011, SM City, Legazpi City

Ramon C. Tan 7/12/2018

72 JUDERO BUILDERS & SUPPLY P-2 Binitayan, Daraga, Albay

Extension / Rehabilitation of Main Power Plant and other Works at Legazpi Airport (2nd Public Bidding)-Civil Aviation Authority of the Philippines , Legazpi Airport Site

Civil Aviation Authority of The Philippines, Area V

7/12/2018

73 Golden Fleece Construction and Supply, Inc. Manzanilla St., Basud, Polangui, Albay

Repair/ Rehabilitation of Canals of LAHONG CIS, Bulan, Sorsogon Under RREIS CY 2018 Fund” -Bulan, Sorsogon

National Irrigation Administration Regional Office No. V, Naga City

7/12/2018

74 Jessica Samantha D. Acleta J.S Reyes Street Bitan-o, Sorsogon City

Proposed Three Storey Commercial Building - J.S Reyes Street, Bitan-o, Sorsogon City

Jessica Samantha D. Acleta 7/12/2018

Page 8: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 8 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

75 Manuel C. Baltasar Sikatuna St. Albay District Legazpi City

3-Storey Hotel-Sikatuna St. Albay District, Legazpi City

Manuel C. Baltasar 7/12/2018

76 Jocelyn A. Arbo 424 Zone 6, Francia, Iriga City Camarines Sur

Two-Storey Residential House-424 Zone 6, Francia, Iriga City Camarines Sur

Jocelyn A. Arbo 7/12/2018

77 Red Diamond Construction Diversion Road, Kinamaligan, Masbate City

CY 2018 BEFF (Repair & Rehabilitation of 21 Classroom School Buildings): B. Titong ES, Bagumbayan ES, Tugbo ES

DepEd Masbate City 7/12/2018

78 Red Diamond Construction Diversion Road, Kinamaligan, Masbate City

Continuation of Improvement of Perimeter Fence at Masbate Airport-Airport Road, Masbate City, Masbate

Civil Aviation Authority of the Philippines

7/12/2018

79 R.R.A REQUILLAS CONSTRUCTION AND SUPPLY Purok 5 , Mayao, Oas, Albay

Rehabilitation of Municipal Frontage-Municipal Office, Oas, Albay

LGU-Oas, Albay 7/12/2018

80 EMIRAM CONSTRUCTION AND SUPPLY MLQ St. Sta Cruz, Ligao City

Road Concreting of Bonga Pandan Irrigation Service Road-Bonga Section, Bonga, Ligao

Local Government Unit of Ligao City

7/12/2018

81 AMEG Construction and Supply Purok 4, Barriada, Brgy. Gogon, Legazpi City

Construction / Installation of Street Lighting Services (Phase II), Paulba, Ligao City

Local Government Unit of Ligao City

7/12/2018

82 Rose Anne A. Atanante 0379 Narra St., Pag-Asa, Rawis, Legazpi City

Bonchon Restaurant-Unit 2064-2066, 2/F SM City Legazpi, Tahao Road, Legazpi City

Rose Ann A. Atanante 7/12/2018

83 Marabe General Construction and Supply 186 Danao St. Barangay Espinosa, Masbate City

IAEBNo. 2018-009: Construction of Facilititative Academic Building (Stuent Servies Building)- Cabitan, Mandaon, Masbate

DEBESMSCAT 7/13/2018

84

Richard Dy 3rd Floor, Crown Park Hotel, Elias Angeles Cor. P. Burgos STS., San Francisco, Naga City

3rd Floor, Crown Park Hotel, Elias Angeles Cor. P. Burgos STS., San Francisco, Naga City

Richard Dy 7/16/2018

Page 9: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 9 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

85 Hexagram Builders 4th Street Villa Subd., Concepcion Grande, Naga City, Cam. Sur

Proposed Food Park, Brgy. Abella and Brgy. Igualdad Naga City

Isarog Prime Inc. 7/16/2018

86 Hexagram Builders 4th Street Villa Subd., Concepcion Grande, Naga City, Cam. Sur

Proposed Computer Shop, Ateneo Avenue, Naga City, Cam. Sur

Erick John Paul P. Saysay 7/16/2018

87 Hexagram Builders 4th Street Villa Subd., Concepcion Grande, Naga City, Cam. Sur

Proposed RXJ Trading, Zone 6, San Felipe, Naga City, Cam. Sur

Anna Fe. I. Ranara 7/16/2018

88 Hexagram Builders 4th Street Villa Subd., Concepcion Grande, Naga City, Cam. Sur

Proposed Laundry Shop, Sta. Cruz Proper, Naga City, Cam. Sur

Sheryl C. Enciso 7/16/2018

89 Hexagram Builders 4th Street Villa Subd., Concepcion Grande, Naga City, Cam. Sur

Proposed Additional 3rd Floor, KM4, Concepcion Grande, Naga City, Cam. Sur

Annaliza Mariano 7/16/2018

90 Annaliza P. Zulueta B9 LII Metrocor B Las Piñas City

I PLAY N RIDE, Unit 3007 – 3009 3rd Floor SM City Legazpi

Annaliza P. Zulueta 7/16/2018

91 DEVEX INC. 29 Pilar St. Addition Hills, San Juan City

Star Appliance Center INC., SM City Legazpi City SM APPLIANCE CENTER 7/16/2018

92 DEVEX INC. 29 Pilar St. Addition Hills, San Juan City

SM City Legazpi – SM Super- SM City Legazpi City SM Value Inc. 7/16/2018

93

Margie Maynes Bautista Lot 13 & Lot 14, Block 13, Louisana St., St. James Subdivision Concepcion Grande, Naga City

Proposed Two-Storey Residential Building-Lot 13 & Lot 14, Block 13, Louisana St., St. James Subdivision Concepcion Grande, Naga City

Margie Maynes Bautista 7/16/2018

94 EN Daduya Construction and Supplies 10 Queborac, Bagumbayan Sur, City of Naga, Philippines 4400

Drainage and Road Widening at J. Miranda Ave., Brgy. Concepcion, Pequeña, Naga City

City Government of Naga

7/16/2018

95 Victor T. Villacorte Purok 5, Taysan, Legazpi City

Two- Storey Commercial Building-Purok 5, Taysan, Legazpi City

Victor T. Villacorte 7/17/2018

96 Chester C. Sta. Rosa Lot 1311-B1-B3

Proposed Two- Storey Dormitory-Lot 1311-B1-B3 Brgy. Sta. Cruz, Naga City

Chester C. Sta. Rosa 7/17/2018

Page 10: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 10 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

Brgy. Sta. Cruz, Naga City

97

William Chia 41 New Jersey St. Barangay Mariana New Manila, Quezon City

Proposed Dickies Store-Unit 2097 Second Floor SM City Legazpi

William Chia 7/17/2018

98 AB OPEÑA BUILDERS 4th Street, Parkview Village, San Felipe, Naga City

Proposed Two-Storey with Roof Deck, Naga City Gemma T. Arevalo 7/17/2018

99 HERBANA BUILDERS AND SUPPLY 31-11 Jose L. Lee St., Oro Site, Legazpi City

Rehabilitation and Conservation of Tabaco South Central Elementary School Gabaldon Building, Tabaco City

Department of Education (DepEd) Tabaco City Division-San Lorenzo, Tabaco City

7/17/2018

100

Equator Energy Corporation 2F Amber Place, 67 Bayani Road, AFPOVAL, Fort Bonifacio, Taguig City

Construction of Solar Street Lights (86 Units at least 30 Watts)-Municipality of Gubat, Sorsogon

LGU Gubat, Sorsogon 7/17/2018

101 CISCO KVF Construction L8B3 Parkiew Executive Townhomes Subd., San Felipe, Naga City

: INFRA-PB 18-008-Construction of Potable Water System (Level II)-San Ramon, Donsol, Sorsogon

LGU Donsol, Sorsogon 7/17/2018

102

Hairsalon Wonders Inc. 5th Floor, DSI Building, No.1251 Cardona St. Barangay Poblacion, Makati City

Interior Construction of David’s Salon-3rd Floor 3060, SM City Legazpi, Tahao Road, Barangay 37-Bitano, Legazpi City, Albay

David B. Charlton 7/17/2018

103 CAMSUR BICOL TRADING INC. Brgy. Banawan, Pioduran, Albay

Repainting of The Roofing of The Hall of Justice Legazpi City, Albay-Regional Government Center Rawis, Legazpi City

Supreme Court of The Philippines 7/17/2018

104 AVZ CONSTRUCTION AND SUPPLY Purok Atis, Gubat, Daet, Camarines Norte

Construction of Barangay Road-Barangay Laniton, San Lorenzo Ruiz, Camarines Norte

Provincial Government of Camarines Norte

7/17/2018

105 DENVIN CONSTRUCTION 8th St. Villa Sorabella Subd. Concepcion Grande, Naga City

BDO SM City Legazpi Branch (Interior Construction)-Unit 1045, 1046 & 1047 Ground Floor SM City Legaspi, Tahao Rd. Legaspi City

BDO Unibank, Inc. 7/17/2018

Page 11: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 11 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

106 R.R.A Requillas Construction and Supply P5, Mayao, Oas, Albay

Rehabilitation of Old Barangay Hall at Calzada, Ligao, Albay

LGU- Ligao City 7/17/2018

107 R.R.A Requillas Construction and Supply P5, Mayao, Oas, Albay

Construction of Multi-Purpose Hall (Dome Type) At Maonon ES, Ligao City

: LGU- Ligao City 7/17/2018

108 R.R.A Requillas Construction and Supply P5, Mayao, Oas, Albay

Concreting of Sitio Gaya - Paulba - Allang Road-Paulba, Ligao City

LGU-Ligao City 7/17/2018

109 R.A Mendiola Construction and Developer 9044 Ilang-Ilang St. Zaballero Subd. Gulang-Gulang, Lucena City

Sanitary Landfill (SLF) Embankment at Brgy. San Isidro, Naga City, Camarines Sur

City Government of Naga City 7/17/2018

110 Joepen Construction and Supply Ricemill Installation and Operation at Brgy. Sinungtan, Guinobatan, Albay

LGU-Guinobatan, Albay 7/17/2018

111 DELPAR CONSTRUCTION AND SUPPLY San Roque, Camaligan, Camarines Sur

Completion of Entrance Road and Drainage- Isarog Heights Resettlement, Sitio Caromatig, Brgy Carolina, Naga City

LGU-Naga 7/18/2018

112 Jonas R. Bañadera D5, NEA Bldg. CBD2, Naga City

Kuya J’s Restaurant-2028-2029 SM City, Legazpi City

Jonas R. Bañadera 7/19/2018

113 Ivyn E. Villanueva Em’s BO, Legazpi City

Proposed Three Storey Commercial Building, Em's BO, Legazpi City

Ivyn E. Villanueva 7/19/2018

114 Steven J. Dy Brgy. Rawis, Legazpi City

Proposed Two-Storey Office Building-Brgy. Rawis, Legazpi City

Steven J. Dy 7/19/2018

115 Victor Cosay San Roque, Legazpi City Albay

Proposed Demolition (Bicol Produce)-Brgy. San Roque, Legazpi City, Albay

Victor Cosay 7/20/2018

116 ALRO CONSTRUCTION & DEVELOPMENT CORPORATION Washington Drive, Legazpi City

Two-Storey Commercial Bldg. -Brgy. Rawis, Legazpi City

Alro Construction & Development Corporation

7/20/2018

117 Rose Marie L. Lorayes Concepcion, Virac, Catanduanes

Construction of Additional Four Storey Building-Concepcion, Virac, Catanduanes

Rose Marie L. Lorayes 7/20/2018

Page 12: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 12 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

118 LIM GENERAL CONTRACTOR CORPORATION Pinamarbuhan, Mobo, Masbate

CARP-MS-018-18-Repair/ Rehabilitation of Canal Structures of Pili CIS, Places, Masbate-Brgy. Pili, Placer, Masbate

National Irrigation Administration (NIA)

7/20/2018

119 Great Wall Engineering 249 P3 Cobangbang, Daet, Camarines Norte

Construction of Barangay Road, Brgy. Malasugui, Labo, Camarines Norte

Provincial Capitol, Daet, Camarines Norte

7/23/2018

120 Marcia N. Moico Brgy. Bogtong, Legazpi City

Proposed Jesus is Lord Church-Brgy. Bogtong, Legazpi City

Marcia N. Moico 7/23/2018

121 Raul A. Dy-Cok Poblacion, Caramoan, Camarines Sur

Proposed Commercial and Tourist Inn-Poblacion, Caramoan, Camarines Sur

Raul A. Dy-Cok 7/23/2018

122 Honeyville Construction San Isidro,Magarao,Camarines Sur

RRENIS-LC-032-18-Repair/ Rehabilitation of Canal Structure, Canals & Service Road for LCPIS, Libmanan and Cabusao, Camarines Sur

National Irrigation Administration Region V

7/23/2018

123 IRA CONSTRUCTION AND SUPPLY Purok 4, Kinale, Polangui, Albay

Construction of Barangay Health Center-Brgy. Talisayan, Prieto Diaz, Sorsogon

Local Government Unit of Prieto Diaz

7/23/2018

124 Carina Caguioa-Quijano 417 Jasmin St. Bombon, Tabaco City

Proposed Two-Storey School Building-417 Jasmin St. Bombon, Tabaco City

Carina Caguioa-Quijano 7/23/2018

125 Great Wall Engineering 249 P3 Cobangbang, Daet, Camarines Norte

Construction of Evacuation Center-Brgy. Pangpang, Labo, Camarines Norte

Provincial Capitol, Daet, Camarines Norte

7/23/2018

126 Medbien Corporation 2nd Floor SM City, Bitano, Legazpi City

Interior Finishing Works, Kenny Rogers Restaurant-2nd Floor SM City Legazpi, Bitano, Legazpi City

Medbien Corporation 7/23/2018

127 Belle La Peau Services And Trading Corporation No.1 Lakeview Drive, Pasig City

Belle La Peau (Interior Renovation Works)-Unit 3047, SM City Legazpi, Bitano, Legazpi City

Zenaida E. Palisoc 7/23/2018

128 Dermcare Total Wellness Corporation No.1 Lakeview Drive, Pasig City

Dermcare(Interior Renovation )-Unit 3046, SM City Legazpi, Bitano, Legazpi City

Zenaida E. Palisoc 7/23/2018

129 R.R.A REQUILLAS CONSTRUCTION AND SUPPLY

Riprapping of San Ramon-Maporong Flood Erosion Control Project Flood Control System-Oas,

LGU-Oas, Albay 7/23/2018

Page 13: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 13 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

Purok 5 , Mayao, Oas, Albay Albay

130 R.R.A REQUILLAS CONSTRUCTION AND SUPPLY Purok 5 , Mayao, Oas, Albay

Construction of Community Fish Landing Center-Nagas, Oas, Albay

LGU-Oas, Albay 7/23/2018

131 R.R.A REQUILLAS CONSTRUCTION AND SUPPLY Purok 5 , Mayao, Oas, Albay

Concreting and Riprapping & Installation of Street Lighting System at Maporong-Clazada Oas, Albay

LGU-Oas, Albay 7/23/2018

132 AMEG Construction and Supply Purok 4, Barriada, Brgy. Gogon, Legazpi City

Construction / Installation of Street Lighting Services at Pandan, Ligao City

LGU-Ligao City, Albay 7/23/2018

133

RIDERSCORNER Construction & General Mdse. P2 Pimentel Ave., Brgy II, Daet, Camarines Norte

CY 2018 Conservation and Restoration of Gabaldon Building (Lot 1) at Labo, Camarines Norte

DepEd- Camarines Norte 7/24/2018

134

RIDERSCORNER Construction & General Mdse. P2 Pimentel Ave., Brgy II, Daet, Camarines Norte

Repair and Improvement of Basud Fire Station at Basud, Camarines Norte

BFP Region V 7/24/2018

135 Bulan Ice Plant & Marine Development Corporation Padre Diaz St., Zone 7, Bulan, Sorsogon

25 Tons Ice Plant- Padre Diaz St. Zone 7, Bulan, Sorsogon

Bulan Ice Plant & Marine Development Corporation

7/24/2018

136 Joepen Construcion and Supply Zone 5, Brgy. Tuburan, Ligao City

2018 (1)-008 Rehabilitation / Improvement of San Rafael-Maipon-Masarawag (Guinobatan Dona Tomasa-Muladbucad G. Nabonton (Ligao)-Nasisi-Herrera-Busay -Balogo (Oas)-Balinad-Napo (Polangui)-Ponso-Albay-Magurang-Polangui (Poblacion), (Polangui-Nasisi-Guinobatan Road), Guinobatan, Ligao, Oas and Polangui, Albay-Location: Guinobatan, Ligao, Oas,and Polangui,

Province of Albay 7/24/2018

Page 14: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 14 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

Albay

137 Beawmont Distribution, Inc. DSL Bldg.,380 Del Monte Avenue, Quezon City

Renovation of Time Depot Outlet-SM City Legazpi, Bitano, Legazpi City

Richmond S. Lim 7/24/2018

138 Florante A. Lejarde Inorogan, Sto. Domingo , Iriga City

Proposed 2 Storey 3 Bedroom Residential Building-Inorogan, Sto. Domingo

Florantye A. Lejarde 7/25/2018

139 Sanrho Builders, Inc. Phase IV, Velasco St., Doña Maria Subd. Tagas, Daraga, Albay

SIP-AL-081-81, Construction of Diversion, Canal Structures& Canals of Tanagbega & Sagpan Kan Banwa CIPs, Tiwi and Malinao, Albay

National Irrigation Administration-Regional Office V (NIA-ROV)

7/25/2018

140 Sanrho Builders, Inc. Phase IV, Velasco St., Doña Maria Subd. Tagas, Daraga, Albay

EXT/SIP-AL-080-18, Construction of Diversion,Canal Structures, Canals & Protection Works of San Francisco RIS & Guinobat CIP, Tabaco City and Malinao, Albay

National Irrigation Administration-Regional Office V (NIA-ROV)

7/25/2018

141 JCM CONSTRUCTION & SUPPLY Basud, Polangui , Albay

Construction Diversion Works, Canal Structures and Canals of Mancao CIP, Rapu-Rapu, Albay

National Irrigation Administration, ROV, Naga City

7/25/2018

142 Red Maple Leaf Co. (Remaco) Inc. Pacific Mall, Legazpi City

Proposed Shakey’s Restaurant (Shakey’s SM City Legazpi - Level 1, Unit 1078-1080, SM City Legazpi, Bitano, Legazpi City

Danny R. Chua 7/25/2018

143 NUMERICAL GATE CONSTRUCTION & SUPPLY CORP 25 San Juan St., Centro Oriental

18FB0054- Construction / Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Anoling -Cabangan-Salvacion Flood Control System, Cabangan Section, Camalig, Albay

DPWH Albay 2nd District Engineering Office

6/27/2018

144 NUMERICAL GATE CONSTRUCTION & SUPPLY CORP 25 San Juan St., Centro Oriental

18FB0082: Camalig Tourism Circuit Leading to Sumlang Lake , Quitinday Hills, Quituinan Japanese Tunnel and Hoyop-Hoyopan Cave Site, Camalig, Albay

DPWH Albay 2nd District Engineering Office

6/27/2018

145

NUMERICAL GATE CONSTRUCTION & SUPPLY CORP. #25 San Juan St., Centro Oriental, Polangui, Albay

18FB0048 : construction / Maintenance of Flood Mitigation Structures and Drainage Systems- Construction of Cagsawa Ruins Protection Dike, Sta. 0=000-Sta.0=145 ( Tributary E), Brgy, Budiao,

DPWH - Albay 2nd District Engineering Office

6/27/2018

Page 15: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 15 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

Daraga, Albay

146

NUMERICAL GATE CONSTRUCTION & SUPPLY CORP. #25 San Juan St., Centro Oriental, Polangui, Albay

18FB0078: Construction / Maintenance of Flood Mitigation Structures and Drainage Systems-Construction / Rehabilitation of Brgy.2 Drainage System, Camalig, Albay

DPWH - Albay 2nd District Engineering Office

6/27/2018

147 SUNWEST Construction & Development Corporation Diversion Rd., Bogtong, Leg. City

18FO0077- Construction of Tandadora-Maipon Flood Control System, Guinobatan, Albay

DPWH Albay 3rd District Engineering Office

6/28/2018

148 SUNWEST Construction & Development Corporation Diversion Rd., Bogtong, Leg. City

18FO0078- Construction of Flood Control System Along Cabilogan River, Guinobatan, Albay

DPWH Albay 3rd District Engineering Office

6/28/2018

149 SUNWEST Construction & Development Corporation Diversion Rd., Bogtong, Leg. City

18FO0076-Construction of Maninila Flood Control System, Guinobatan, Albay

DPWH Albay 3rd District Engineering Office

6/28/2018

150 SUNWEST Construction & Development Corporation Diversion Rd., Bogtong, Leg. City

18FO0074: Construction / Rehabilitation / Improvement of San Jose- Malabiga Road- Libon, Albay

DPWH Albay 3rd District Engineering Office

6/28/2018

151 E. GARCIA CONSTRUCTION CORP ( EGCC) Del Rosario, Naga City

18F00061- Construction / Repair/ rehabilitation / Improvement of Various Infrastractures Including Local Projects- Food Control and Drainage- Flood Control Structures Facilities, Construction of Flood Control Project , Barangay Lower Sta. Cruz, Ragay, Camarines Sur 1st Legislative District

DPWH Regional Office No. V 6/28/2018

152 BICOL GOLDROCK CONSTRUCTION CORPORATION La Purisima, Pili, Camarines Sur

18FF0064 FY 2018 Network Development Program, Construction of Missing Link/ New Roads, Construction of Mangnag ( Tigaon -Goa-San Jose-Lagonoy-Guijalo via San Vicente Road)- Himanag Road, Sta. )+000.00- Sta.1 + 000.00

DPWH Camarines Sur 3rd District Engineering Office

6/28/2018

153 LIMCORE CONSTRUCTION AND SUPPLY Talojongon Construction and Supply

18FF0093- Concreting of Pugay Farm to Market Road 9 (FMR) Section 1: Sta. 0+000.00-Sta.0 +071.80, Section 2:

DPWH Camarines Sur 3rd District Engineering Office

6/29/2018

Page 16: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 16 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

Sta.0 + 257.40-Sta )+573.00- Barangay Pugay, San Jose, Camarines Sur

154 KCS CONSTRUCTION AND SUPPLY 31 Blumentritt St. Tinago

18FF0041 FY-2018 Network Development -Off- Carriageway Improvement inlcuding Drainage Along Pili-Tigaon-Albay-Bdry. Road, (May ana Mabca Section ) KO481 + 000- KO482 + 282-May-Anao, Tiagon and Mabca , Sagñay , Camarines Sur

DPWH Camarines Sur 3rd District Engineering Office

6/29/2018

155 SUNWEST Construction & Development Corporation Diversion Rd., Bogtong, Leg. City

18FK0068-Flood Management Program -Construction / Maintenance of Flood Mitigation Structures and Drainage System-Construction of Vinisitahan Seawall-Donsol, Sorsogon

DPWH Sorsogon 1st District Engineering Office

7/2/2018

156 SUNWEST Construction & Development Corporation Diversion Rd., Bogtong, Leg. City

18FO0049- Construction / Rehabilitation / Improvement of San Jose-Malabiga Road, Libon, Albay

DPWH Albay 3rd District Engineering Office

7/2/2018

157 SUNWEST Construction & Development Corporation Diversion Rd., Bogtong, Leg. City

18FO0075-Construction of By-Pass Road, San Jose to Pantao Port, Libon, Albay-Libon, Albay

DPWH Albay 3rd District Engineering Office

7/2/2018

158 A.A Pahati Construction & Supply Tpaz St., Filloville Subd. Liboton, Naga city

18FE0085-Concreting of Sagrada-La Purisima FMR, Brgy. Sagrada and Brgy. La Purisima- Pili, Camarines Sur

DPWH Camarines Sur 2nd District Engineering Office

7/2/2018

159 Athena Const. and Dev't 239 Arellano Ext., Sagpon, Daraga, Albay

18F00080-Sustainability Program On Road Maintenanceand Bridge Maintenance After Completion of Jica-Tcp Lii, repair of Begonia Bridge (B00063cn)- Virac, Catanduanes

DPWH V Regional District Office 6/29/2018

160 Athena Const. and Dev't 239 Arellano Ext., Sagpon, Daraga, Albay

18FB0075: Construction of Maopi Road, Daraga, Albay

DPWH Abay 2nd District Engineering Office

6/29/2018

161 AE Belleza Builders 102 Sto. Tomas, Magarao, Camarines Sur

18FE0096-Construction of (3) Three Storey Building with One (1) Regular (GF), One (1) ICT (SF) and One Science (TF) Laboratory Units School Building (under DepEd CY-2018 BEFF)- Concepcion Pequeña National Highshool, Naga

DPWH Camarines Sur 2nd District Engineering Office

6/29/2018

Page 17: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 17 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

City ( Site 1)

162 AE Belleza Builders 102 Sto. Tomas, Magarao, Camarines Sur

18FE0101- Construction of three (3) Storey Building with One (1) Regular (GF) One (1) ICT (SF) and One Science (TF) Laboratory Units School Building ( Under DepEd CY-2018 BEFF)-Concepcion Pequeña National High School (Site 2)

DPWH Camarines Sur 2nd District Engineering Office

6/29/2018

163 AMEG Construction and Supply Purok 4, Barriada, Brgy. Gogon, Legazpi City

18FB0103: Construction / Maintenance of Flood Mitigation Structures and Drainage Systems-Construction / Improvement of Buyo Riover Flood Control System, Manito, Albay

DPWH Albay 2nd District Engineering Office

6/29/2018

164 Next Generation Construction & Supply Corporation Orogo St., Brgy 1, Pio Duran

17FB0171: Completion of Elementary and Secondary Classrooms 3STY15CL, Anislag National High School , Anislag, Daraga, Albay

DPWH Albay 2nd District Engineering Office

6/29/2018

165 AMEG Construction and Supply Purok 4, Barriada, Brgy. Gogon, Legazpi City

18FB0030: Construction / Rehabilitation of Yawa Flood Control Structure, La Playa Section , Sta. 0+268-Sta.0+446, Bonot, Legazpi City, Albay

DPWH Albay 2nd District Engineering Office

6/29/2018

166 S&RV Construction and Supply Lorevilla St., San felipe, Naga City

18FF0075-FY-2018 Local InfrastractureProgram Construction of Water Supplies- Cabacongan/ Colongcogong, Caramoan, Camarines Sur

DPWH Camarines Sur 3rd District Engineering Office

6/29/2018

167

St. Bernardine Construction and Enterprises 0677 Zone 5, Maleniza Compound , Brgy. San Felipe, Naga City, Camrines Sur

18FE0051 Construction of Multi-Purpose Building (Livelihood Center)-Brgy.Pacol, Naga City, Camarines Sur

DPWH Camarines Sur 2nd District Engineering Office

6/29/2018

168 BICOL GOLDROCK CONSTRUCTION CORPORATION La Purisima, Pili, Camarines Sur

18FD0037- Construction of Flood Control Structures/ River Wall Along Bicol river, Brgy. Malbong, Gainza , Camarines Sur

DPWH Camarines Sur 1st District Engineering Office

7/4/2018

169 HGG BUILDERS and SUPPLY, Paraňaque City St. Gimenez Subd. Naga City

18FC0069-Flood Management Program: Construction / Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Daet River Control Structure ( Mantagbac

DPWH-Camarines Norte District Engineering Office

7/4/2018

Page 18: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 18 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

Section), Daet, Camarines Norte

170 ELKANKONSTRAK DEVELOPMENT CORPORATION Gogon, Legazpi City

18FM0022- Concreting of Mac-Arthur - Sto. Niño to market Road, Barangay Mac-Arthur & Barangay Sto. Niño Monreal, Masbate

DPWH Masbate 3rd District Engineering Office

7/2/2018

171 GOLDEN EGG BUILDER Purok 5, Magang, Daet, Camarines Norte

18FC0018-Construction ( Completion) of Multi-Purpose Building-Brgy. Basiad, Sta. Elena, Camarines Norte

DPWH Camarines Norte District Engineering Office

7/2/2018

172 128 DRAGON F. Pimentel Ave. Brgy. VIII Daet, Camarines Norte

18FC0162-Construction of Multi-Purpose Building, Brgy.Pamorangon, Daet, Camarines Norte

DPWH Camarines Norte District Engineering Office

7/2/2018

173 128 DRAGON F. Pimentel Ave. Brgy. VIII Daet, Camarines Norte

18FC0163-Construction of Multi-Purpose Building (Covered Court) Gregorio Pimentel Memorial School, Daet, Camarines Norte

DPWH Camarines Norte District Engineering Office

7/2/2018

174 128 DRAGON F. Pimentel Ave. Brgy. VIII Daet, Camarines Norte

18FC0164- Construction of Multi-Purpose Building ( Senior Citizen Center) Daet,Camarines Norte

DPWH Camarines Norte District Engineering Office

7/2/2018

175 128 DRAGON F. Pimentel Ave. Brgy. VIII Daet, Camarines Norte

18FC0152-Repair/ Maintenance of River Control, Parang Section, Brgy. Parang, Jose Panganiban, Camarines Norte

DPWH Camarines Norte District Engineering Office

7/2/2018

176 VERZONTAL BUILDERS INCORPORATED Purok 3, Bagumbayan, Daraga, Albay

18FE0072-Construction of Two(2) Storey Four Classroom Building (under DepEd CY-2018 BEFF) Pinit Elementary School-Pinit Elementary School, Ocampo, Camarines Sur

DPWH Camarines Sur 5th District Engineering Office

7/2/2018

177 NFH CONSTRUCTION & SUPPLY 135 San Vicente, Milaor, Camarines Sur

18FC0145-Concreting of Malacbang FMR Brgy. Malacbang, Paracale, Camarines Norte

DPWH Camarines Norte District Engineering Office

7/2/2018

178 RAMARPLUS INC., Ubaliw, Polangui, Albay

18F00066-OO2-Protect Lives and Properties Against Major Floods-Flood Management Programs-Construction / Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Flood Control Structures Along Cadacan River, Sto. Domingo Section,

DPWH Regional Office No. V 7/2/2018

Page 19: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 19 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

Sta.28+889.33-Sta.29+862.29 with exceptions Right Side , Irosin, Sorsogon 2nd Legislative District- Sorsogon 2nd Legislative District

179 RKX ODIAMAR CONSTRUCTION R. Sobrepeña St., Monte Cielo De Naga, Del Rosario

18FD0060- Construction of Classrooms ( Batch 1) Juan F. Triviño (formerly Pasacao School of Fisheries), Pasacao, Camarines Sur

DPWH Camarines Sur 1st District Engineering Office

7/4/2018

180 Al Niño Construction and Supply 165 Quezon Avenue, Brgy. 34, Oro site, Legapi City

18FD0068- Concreting of Cambolidio FMR, Brgy.Cambalidio, Libmanan, Camarines Sur

DPWH Camarines Sur 1st District Engineering Office

7/4/2018

181 Al Niño Construction and Supply 165 Quezon Avenue, Brgy. 34, Oro site, Legapi City

18FD0071- Construction of Classrooms Batch 1, Villa Socorro Elementary School , Libmanan, Camarines Sur

DPWH Camarines Sur 1st District Engineering Office

7/4/2018

182 Al Niño Construction and Supply 165 Quezon Avenue, Brgy. 34, Oro site, Legapi City

18FD0070-Construction of Classrooms Batch 1, Lupi National High School, San Fernando, Camarines Sur

DPWH Camarines Sur 1st District Engineering Office

7/4/2018

183 Al Niño Construction and Supply 165 Quezon Avenue, Brgy. 34, Oro site, Legapi City

18FD0062-Construction of Classrooms (Batch 1), Dr. Nelson A. Mejia HS, Libmanan, Camarines Sur

DPWH Camarines Sur 1st District Engineering Office

7/4/2018

184 Al Niño Construction and Supply 165 Quezon Avenue, Brgy. 34, Oro site, Legapi City

18FD0061-Construction of Classrooms (Batch 1), Eduardo V. Agomaa National High School, Libmanan, Camarines Sur

DPWH Camarines Sur 1st District Engineering Office

7/4/2018

185 ROLA CONSTRUCTION 22 Lomeda Subdivision, Naga City

18FN0004 - Rehabilitation of Barangay Road, Brgy., South Centro, Sipocot, Camarines Sur

DPWH Camarines Sur 5th District Engineering Office

7/3/2018

186 S & RV Construction and Supply Lorevilla St., San Fellipe, Naga City

18FN0038 - Rehabilitation of Barangay Road, Andaya Highway Junction, Brgy., Comadogcadog to Brgy. Kinalangan, Del Gallego, Camarines

DPWH Camarines Sur 2nd District Engineering Office

7/3/2018

187 128 DRAGON F. Pimentel Ave. Brgy. VIII Daet, Camarines Norte

18FD0056 - Concreting of Sitio Balatas, Brgy., Viejo FMR, Brgy. Baliuag Viejo, Minalabac, Camarines Sur

DPWH Camarines Sur 1st District Engineering Office

7/5/2018

188 CL CARANDANG ENTERPRISES #002 Nursery Street, Masbate City

18FJ0034 - Construction of Multi Purpose Covered Court at Brgy. R.M. Magbalon, Cawayan, Masbate

DPWH Masbate 2nd District Engineering Office

7/5/2018

Page 20: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 20 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

189 CL CARANDANG ENTERPRISES #002 Nursery Street, Masbate City

18FJ0032 - Construction of Multi Purpose Covered Court at Brgy. Libertad, Cawayan, Masbate

DPWH Masbate 2nd District Engineering Office

7/5/2018

190 CL CARANDANG ENTERPRISES #002 Nursery Street, Masbate City

18FJ0031 - Construction of Multi-Purpose Covered Court at Brgy. Calumpang, Cawayan, Masbate

DPWH Masbate 2nd District Engineering Office

7/5/2018

191 CL CARANDANG ENTERPRISES #002 Nursery Street, Masbate City

18FJ0030 - Construction of Multi-Purpose Covered Court at Brgy. Cabingahan, Cawayan, Masbate

DPWH Masbate 2nd District Engineering Office

7/5/2018

192

WATERTON CONSTRUCTION AND REALTY DEVELOPMENT CORPORATION 42 Anzon St., Doña Maria Subdivision Tagas, Daraga, Albay

18FO0061-Construction of Multi-Purpose Gym-Barangay Matacon, Polangui, Albay

DPWH Albay 3rd District Engineering Office

7/5/2018

193

WATERTON CONSTRUCTION AND REALTY DEVELOPMENT CORPORATION 42 Anzon St., Doña Maria Subdivision Tagas, Daraga, Albay

18FO0063: Construction of Multi-Purpose Building ( Livelihood Center), Barangay Sta. Cruz, Libon, Albay

DPWH Albay 3rd District Engineering Office

7/5/2018

194 TR CONSTRUCTION CORP./ KM 14 INC. (JV) Brgy. Binanuahan, Legazpi City

18F00070-OO1-Ensure Safe and Reliable National Road System, Network Development program, Road Widening, Primary Roads, Daang Maharlika (LZ) KO 618 +320-KO 624+320 with exeptions, Sorsogon 2nd Legislative District-Prieto Diaz, Sorsogon

DPWH Regional Office No. V 7/6/2018

195 TR CONSTRUCTION CORP./ KM 14 INC. (JV) Brgy. Binanuahan, Legazpi City

18F00080-Construction of Diamante-Perlas Coastal Road and Shore Protection , Prieto Diaz, Sorsogon

DPWH Regional Office No. V 7/6/2018

196 SUNWEST Construction & Development Corporation Diversion Rd., Bogtong, Leg. City

18FM0024- Construction of San Jacinto Shore Protection , Sitio Cagas, Barangay Calipat-An- San Jacinto, Masbate

DPWH Masbate 3rd District Engineering Office

7/10/2018

197 SUNWEST Construction & Development Corporation Diversion Rd., Bogtong, Leg. City

18FM0023- Construction of San Jacinto Shore Protection , Sitio Puro , Barangay Calipat-An- San Jacinto, Masbate

DPWH Masbate 3rd District Engineering Office

7/6/2018

Page 21: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 21 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

198

WATERTON CONSTRUCTION AND REALTY DEVELOPMENT CORPORATION 42 Anzon St., Doña Maria Subdivision Tagas, Daraga, Albay

18FB0179: Construction and Completion of School Buildings in the Elementary and Seondary Classrooms, Caguiba National High School-Camalig, Albay

DPWH Albay 2nd District Engineering Office

7/6/2018

199 Next Generation Construction & Supply Corporation Orogo St., Brgy 1, Pio Duran

17FB0128: Cluster 2- Construction / Rehabilitaion of Water Supply / Septage and Sewerage / Rainwater Collectors- Rain Water Collection System

DPWH Albay 2nd District Engineering Office

7/6/2018

200

DN'D CONSTRUCTION AND DEVELOPMENT Brgy. 38,, Imeda C. Roces Ave., Gogon, Legazpi City, Albay

18FB0180: Construction and Completion of School Building in the Elementary and Secondary Classrooms, Villahermosa Elementary School, Daraga (Locsin) (9.5 m x 32.00 m)

DPWH Albay 2nd District Engineering Office

7/6/2018

201 IMS CONSTRUCTION Centro, Polangui, Albay

16FB0118: Construction / Repair/Rehabilitation / Improvement of Various Infrastracture Including Local Projects -Day Care Center, Manito, Albay

DPWH Albay 2nd District Engineering Office

7/6/2018

202 MUNTOPAR BUILDERS Prieto Diaz, Sorsogon

18FB0146: Construction / Repair/ Rehabilitation/ Improvement of Various Infrastracture Including Local Projects : Concreting / Rehabilitation

DPWH Albay 2nd District Engineering Office

7/6/2018

203

STRONGBORN CONSTRUCTION and SUPPLY Lot 7 & 9 A. Florida St. Jardin Real De Naga Subd., Concepcion Pequeňa, Naga City

18FN0069- Construction of Two (2) Storey, Two (2) Regular Workshop Building , GRS National High School - Ragay, Camarines Sur

DPWH Camarines Sur 5th District Engineering Office

7/6/2018

204 Welex Construction Incorporated Purok 1 Brgy.40 Airport Site, Cruzada, Legazpi City

18F00068 -OO1- Ensure Safe and Reliable National Road System, Network Development Program , Off-Carriageway Improvement , Tertiary Roads; Junction Putiao-Pilar-Donsol Road, Sorsogon 1st Legislative District

DPWH Regional Office No. V 7/6/2018

205 ELPOS Construction and Supply Brgy. Layon, Liogao City, Albay

18FB0186: Construction of Classrooms 2STY6CL, Buyoan Elementary School, Legazpi City, Albay

DPWH-Albay 2nd District Engineering Office

7/5/2018

Page 22: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 22 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

206 128 DRAGON F. Pimentel Ave. Brgy. VIII Daet, Camarines Norte

18FF0047 - FY 2018 Local Infrastructure Program - Rehabilitation of Tinambac - Siruma Road, K0538+660.00 - K0538+778.40, K0548+520.00-K0548.00+550.00 Tinambac and Siruma, Camarines Sur

DPWH - Camarines Sur 3rd District Engineering Office

7/12/2018

207 TNB BUILDERS Purok 7, Binitayan, Daraga, Albay

17FH0143 - Concreting Of Paniquihan - Putsan Farm to Market Road, Barangay Paniquihan-Putsan, Baras, Catanduanes

DPWH - Catanduanes District Engineering Office

7/10/2018

208 AL NIÑO CONSTRUCTION & SUPPLY 165 Quezon Avenue, Oro Site, Legazpi City

18FK0045 - CLUSTER XI - Const./Repair/Rehab./Impvt. Of Various Infrastructure Including Local Project - Local Roads & Bridges - Local Roads - Constructionof Calongay- Lumbang Road Including Drainage, Const. of Calpi-Malbog Road Including Drainage and Const. of Palanas-Lungib Road Including Drainage

DPWH - Sorsogon 1st District Engineering Office

7/10/2018

209 AL NIÑO CONSTRUCTION & SUPPLY 165 Quezon Avenue, Oro Site, Legazpi City

18FK0046 - CLUSTER XII - Const./Repair/Impvt. Of Various Infrastructure Including Local Projects - Local Roads & Bridges - Local Roads - Const. of Bantayan - Pangpang Road Including Drainage, Const. Of Palanas-Malbog Road Including Drainage, Construction of Pangpang-Palans Road Including Drainage, Const. of Pineda-San Rafael Road Including Drainage and Const. of Sacnangan- Del Rosario Including Drainage, Pilar, Sorsogon

DPWH - Sorsogon 1st District Engineering Office

7/10/2018

210 Marcant Construction and Supply Guevarra Subd., Barangay 15, Ilawod East, Legaspi City, Albay

17FB0176 - Construction of Classrooms 2STY4CL, Bariw ES, Camalig, Albay

DPWH - Albay 2nd District Engineering Office

7/10/2018

211 Next Generation Construction & Supply Corporation Orogo St., Brgy 1, Pio Duran

18FB0070 - Local Infrastructure Program, Rehab. Of Multi-Purpose Building (Covered Court), Brgy., Pigcale, Legazpi City

DPWH - Albay 2nd District Engineering Office

7/10/2018

Page 23: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 23 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

212 A.C. RIVERO DEVELOPMENT CORP. 2929 Burgos Ext., Brgy. Villamonte, Bacolod City

18FF0082 - FY 2018 - Construction/Maint. of Flood Mitigation Structures and Drainage System - Construction/Improvement of Flood Control Structure Along Sagñay, Camarines Sur

DPWH - Camarines Sur 3rd District Engineering Office

7/10/2018

213 VERZONTAL BUILDERS INCORPORATED Purok 3, Bagumbayan, Daraga, Albay

18F00087- OO2: Protect Lives and Properties Against Major Floods: Rehabilitation / Improvement of Kamanitohan River Control, Sta. 2+ 372.00-Sta. 3+002.20, Poblacion It-Ba, Manito, Albay

DPWH Regional Office V 7/10/2018

214 VERZONTAL BUILDERS INCORPORATED Purok 3, Bagumbayan, Daraga, Albay

18F00079- OO2: Protect Lives and Properties Against Major Floods Construction / Maintenance of Sitio Buco, Buyo, Flood Control Structure, Sta. 0+217.00- Sta. 0+932.68 Buyo, Manito, Albay

DPWH Regional Office V 7/10/2018

215 PARTIDO CONSTRUCTION and SUPPLY, Matacla, Goa, Camarines Sur

18FF0086-FY 2018 Local Infrastracture Program-Rehabilitation of Abo Sports Complex-Brgy. Abo, Tigaon, Camarines Sur

DPWH Camarines Sur 3rd District Engineering Office

7/10/2018

216 PARTIDO CONSTRUCTION and SUPPLY, Matacla, Goa, Camarines Sur

18FF0087- Concreting of Salvacion -Libod Farm To Market Road (FMR) Section 1: Brgy. Salvacion ) Sta. 0+000.00-Sta. 0+428.00, Section 2: (Brgy. Libod) Sta. )+000.00-Sta.0+428.00- Brgy. Salvacion and Libod, Tigaon, Camarines Sur

DPWH Camarines Sur 3rd District Engineering Office

7/10/2018

217 PARTIDO CONSTRUCTION and SUPPLY, Matacla, Goa, Camarines Sur

18FF0088- Concreting of Cagaycay Farm to Market Road (FMR) Sta.0+000.00-Sta.0+260.00- Brgy. Cagaycay, Goa, Camarines Sur

DPWH Camarines Sur 3rd District Engineering Office

7/10/2018

218 NQA Construction & Supply Sta. Cruz, Virac, Catanduanes

18FH0026 - Off - Carriageway Improvement Tertiary Roads Baras Gigmoto-Viga Road, K0030+000-K0031+038.50, Baras, Catanduanes

DPWH Catanduanes District Engineering Office

7/10/2018

219 NQA Construction & Supply Sta. Cruz, Virac, Catanduanes

18FH0092 - Construction/Improvement of Access Roads Leading To Declared Tourism Destination Virac-Bato-Pananaogan Road Leading to Bitaogan Beach, Bato, Catanduanes

DPWH Catanduanes District Engineering Office

7/10/2018

220 MJ APIN BUILDERS Zone 8, San Vicente, Canaman,

18FE0034 - Organizational Outcome 2: Ensure Safe & Reliable National Road System Network

DPWH Camarines Sur 2nd District Engineering Office

7/12/2018

Page 24: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 24 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

Camarines Sur Development Program Widening Primary Roads Daang Maharlika (LZ) K0434+(-037)-K0434+852, Naga City, Camarines Sur

221

VERZONTAL BUILDERS INCORPORATED/ HI-TONE CONSTRUCTION & DEV'T 3CORP (JV) Purok 3, Bagumbayan, Daraga, Albay

18FO0064 - Protect Lives and Properties Against Major Floods: Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Flood Control Structure Along Casini Section, Sta 22+067.00 - Sta, 22+918.00, Sorsogon 2nd Legislative District

DPWH Regional Office No. V 7/10/2018

222 VERZONTAL BUILDERS INC./B.C. CUERPO CONST. CORP (JV) Purok 3 Bagumbayan, Legazpi City

18FO0072 - Ensure Safe and Reliable National Road System, Network Development Program, Construction of By-Pass and Diversion Roads, Daraga, Albay Diversion Road, Albay

DPWH Regional Office No. V 7/10/2018

223

VERZONTAL BUILDERS INCORPORATED/ HI-TONE CONSTRUCTION & DEV'T 3CORP (JV) Purok 3, Bagumbayan, Daraga, Albay

18FO0062 - Protect Lives and Properties Against Major Floods: Flood Management Program - Construction/Maint. of Flood Mitigation Structures and Drainage Systems: Construction of Flood Control Structure along Downstream of Rangas Bridge both Sides, Sta. 0+425.00 - Sta. 2+034.57 with exceptions, Irosin Sorsogon

DPWH Regional Office No. V 7/10/2018

224

VERZONTAL BUILDERS INCORPORATED/ HI-TONE CONSTRUCTION & DEV'T 3CORP (JV) Purok 3, Bagumbayan, Daraga, Albay

18FO0065 - Protect Lives and Properties Against Major Floods: Flood Management Program - Construction/Maint. of Flood Mitigation Structures and Drainage Systems: Construction of Flood Control Structure along Downstream of Magsaysay Bridge, Sta. 9+480.00 - Sta 9+950.30, Bulan, Sorsogon

DPWH Regional Office No. V 7/10/2018

225 301 Engineers 264 Pagatpat, Calabanga, Camarines Sur

18FE0098 - Construction of Two (2) Storey six (6) Classroom School Building (Under DepEd CY-2018 BEFF) Sta. Cruz Elementary School, Naga City, Camarines Sur

DPWH Camarines Sur 2nd District Engineering Office

7/12/2018

Page 25: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 25 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

226 CTC Builders & Supplies, INC.

18FH0035 - Const./Maint. of Flood Mitigation Structures and Drainage System, Const. of Brgy. Gogon Protection Wall, Gogon, Virac, Catanduanes

DPWH Catanduanes District Engineering Office

7/12/2018

227 NQA Construction & Supply Sta. Cruz, Virac, Catanduanes

18FH0225 - Const. of New Permanent Bridges, Datag Bridge along Catanduanes Circumferencial Road, Datag, San Andres, Catanduanes

DPWH Catanduanes District Engineering Office

7/10/2018

228 STA CRUZ CONST. Paolbo, Calabanga, Camarines Sur

18FE0084 - Concreting of Brgy. Burabod - Quinale FMR Brgy. Burabod and Quinale, Calabanga, Camarines Sur

DPWH Camarines Sur 2nd District Engineering Office

7/10/2018

229 CTC Builders & Supplies, INC. 18FL0075 - Construction of Encinas Pavillion (Phase II), Gubat, Sorsogon

DPWH Sorsogon 2nd District Engineering Office

7/12/2018

230 SANRHO BUILDERS INC. Phase IV, Velasco St. Doña Maria Subd., Tagas, Daraga, Albay

18FA0041 - Cluster 20-Concreting of Farm to Market Roads in the First District of Albay

DPWH Albay 1st District Engineering Office

7/12/2018

231 Alpha & Omega Gen. Contractor & Development Corp. #35 Tatco, Brgy. Malinao, Pasig City

18FE0089 - Construction of Three (3) Storey nine (9) Classroom School Building (Under DepEd CY-2018 BEEF) Hanawan National High School, Ocampo, Camarines Sur

DPWH Camarines Sur 2nd District Engineering Office

7/6/2018

232 Alpha & Omega Gen. Contractor & Development Corp. #35 Tatco, Brgy. Malinao, Pasig City

18FE0073 - Construction of two (2) Storey Four (4) Classroom School Building (Under DepEd CY - 2018 BEEF) Curry Elem. School, Pili, Camarines Sur

DPWH Camarines Sur 2nd District Engineering Office

7/6/2018

233 Alpha & Omega Gen. Contractor & Development Corp. #35 Tatco, Brgy. Malinao, Pasig City

18FE0081 - Construction of Two (2) Storey six (6) Classroom Senior High Building (Under DepEd CY - 2018 BEEF) Curry Elementary School, Pili, Camarines Sur

DPWH Camarines Sur 2nd District Engineering Office

7/6/2018

234 AA PAHATI CONSTRUCTION & SUPPLY Topaz St., Filloville Subd. Liboton, Naga City

18FE0076 - Organizational Outcome 2 : Protect Lives and Properties Against Major Floods - Flood Management Program Construction/Rehab./Improvement of Naga City Flood Control, Brgy. Pacol, Naga City, Cam. Sur

DPWH Camarines Sur 2nd District Engineering Office

7/13/2018

Page 26: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 26 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

235 Next Generation Construction & Supply Corporation Orogo St., Brgy 1, Pio Duran

18FO0045 - Construction of Multi-Purpose Building, Matacon, Polangui, Albay

DPWH Albay 3rd District Engineering Office

7/13/2018

236 CTC Builders & Supplies, INC. 18FK0071- Local Roads-Construction of Lourdes-Porena Road Including Drainage-Donsol, Sorsogon

DPWH Sorsogon 1st District Engineering Office

7/13/2018

237 CTC Builders & Supplies, INC. 18FK0073-Local Roads-Construction of Girawan- Sugian-Bandi-Juan Adre Road Including Drainage-Donsol , Sorsogon

DPWH -Sorsogon 1st District Engineering Office

7/13/2018

238 TR CONSTRUCTION CORP. Brgy. Binanuahan, Legazpi City

18FK0042- Network Development Program - Road Widening with Off-Carriageway Improvement -Primary Roads-Daang Maharlika (LZ) K0559+ 485 - K0599+ 573, K0544+786-K0545+013, K0545+076-K0545+267+K0564+203-K0564+403, K0584+940-K0585+125, K0585+157-K0585+350, K0599+294-K0599+751

DPWH -Sorsogon 1st District Engineering Office

7/13/2018

239 Katha Builders & Supplies 171 Luwasan , Guyong , Sta. Maria, Bulacan

18FK0008- asset Preservation -Rehab./ Reconst./ Upgrading of Damaged Paved Roads- Secondary Roads-Jct.. Bacon-Manito Road, Bacon District , Sorsgon City k0594 + 941-K0595+636, K0595+747-K0595+902-Bacon District, Sorsogon City

DPWH Sorsogon 1st District Engineering Office

7/13/2018

240 A.V. Laynes Trading & Construction Concepcion, Virac, Catanduanes

18FH0128 - Concreting of San Pedro FMR, Brgy. San Pedro, Bato, Catanduanes

DPWH Catanduanes District Engineering Office

7/13/2018

241 A.V. Laynes Trading & Construction Concepcion, Virac, Catanduanes

18FH0105 - Road Opening of Barangay Porot to Brgy. San Isidro Road, Pandan, Catanduanes

DPWH Catanduanes District Engineering Office

7/13/2018

242 A.V. Laynes Trading & Construction Concepcion, Virac, Catanduanes

18FH0125 - Concreting of Porot FMR, Brgy. Porot, Pandan, Catanduanes

DPWH Catanduanes District Engineering Office

7/13/2018

243 Welex Construction Incorporated Purok 1 Brgy.40 Airport Site, Cruzada, Legazpi City

18FL0072: Construction of Sta. Teresita River Control , Brgy. Sta. Teresita, Bulan, Sorsgon

DPWH Sorsogon 2nd District Engineering Office

7/17/2018

Page 27: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 27 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

244 Marabe General Construction and Supply 186 Danao St. Barangay Espinosa, Masbate City

18FI0049-Cluster I-Construction of Rainwater Collection System (RWCS) at Masbate City a.) Mapina Elementary School, Brgy. Mapina, Masbate City

DPWH Masbate 1st District Engineering Office

7/17/2018

245 Marabe General Construction and Supply 186 Danao St. Barangay Espinosa, Masbate City

18FI0051-Cluster III-construction of Rain Water Collection System (RWCS) At Milagros, Masbate a.) Masbate School of Fisheries, Brgy. Cayabon, b.) Serafin C. Rosero Memorial High School , Brgy . Narangasan, c.) Narangasan Elementary School, Brgy. Narangasan, d.) Paraiso Elementary School, Brgy.Paraiso,e.) John Miller Elementary School, Brgy. Bangad

DPWH Masbate 1st District Engineering Office

7/17/2018

246 Marabe General Construction and Supply 186 Danao St. Barangay Espinosa, Masbate City

18FI0050-Cluster II-Construction of Rainwater Colletion System (RWCS) at Mobo, Masbate a.) Umabay Interior Elementary School, Brgy. Umabay Interior, Mobo , Masbateb.) Cristeta Bagano Memorial High School

DPWH Masbate 1st District Engineering Office

7/17/2018

247 RMH CONSTRUCTION AND SUPPLY OLV, Pangpang, Sor. City

18FL0083 - Construction/Rehab. of Reinforced Concrete Box Culvert, Brgy. Montecalvario, Bulan, Sorsogon - CLUSTER XXIX

DPWH Sorsogon 2nd District Engineering Office

7/17/2018

248 VERZONTAL BUILDERS INCORPORATED Purok 3, Bagumbayan, Daraga, Albay

18FE0099 - Construction of Two (2) Storey (6) Classroom Senior High School Building (Under DepEd CY-2018 BEFF) May-Ogob Elementary School

DPWH Camarines Sur 2nd District Engineering Office

7/17/2018

249 VERZONTAL BUILDERS INCORPORATED Purok 3, Bagumbayan, Daraga, Albay

18FE0095 - Construction of Two (2) Storey Building with One ICT (GF) and One ICT (SF) Laboratory Units School Building (Under DepEd CY - 2018 BEEF), Ocampo, Cam. Sur

DPWH Camarines Sur 2nd District Engineering Office

7/17/2018

250

R.A. Mendiola Construction & Development 9044 Ilang Ilang St., Zaballero Subd., Gulang - Gulang Lucena City

18FE0094 - Construction of two (2) Storey six (6) Classroom School Building (Under DepEd CY-2018 BEFF) @ San Jose South Elementary School, San Jose, Pili Cam. Sur

DPWH Camarines Sur 2nd District Engineering Office

7/17/2018

Page 28: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 28 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

251

R.A. Mendiola Construction & Development 9044 Ilang Ilang St., Zaballero Subd., Gulang - Gulang Lucena City

18FE0097 - Construction of two (2) Strorey four (4) Classroom School Building Guillermo Azanes Elem. School, Calabanga, Cam. Sur

DPWH Camarines Sur 2nd District Engineering Office

7/17/2018

252 JAEJR ELECTRICAL, CONSTRUCTION AND SUPPLY/EUS CONSTRUCTION Brgy. Lag-On, Daet, Camarines Norte

18FC0098 - Rehab./Reconstruct of Roadswith Slips, Slope Collapse and Landslide Tertiary Roads; Bagong-Silang-Capalonga Road, K0301+086-K0301+110,K0302+196,K0308+172-K0308+185,K308+750-K0308+790,K0309+007-K0309+032,K0309+590-K0309+622,K309+865-K0309+885,K0309+980-K0309+1004;K0309+1135-K0309+1148, Bagong Silang-Capalonga Road, Cam. Norte

DPWH Camarines Norte District Engineering Office

7/17/2018

253 MUNTOPAR BUILDERS Prieto Diaz, Sorsogon

18FL0074 - Construction of BJMP in Gubat, Sorsogon

DPWH Sorsogon 2nd District Engineering Office

7/17/2018

254 BICOL GOLDROCK CONSTRUCTION CORPORATION La Purisima, Pili, Camarines Sur

18FD0012 - Off-Carriageway Improvement - Secondary Roads - Danao-Pasacao Rd - K0420+800-K0421+180, Pamplona, Cam. Sur

DPWH Camarines Sur 1st District Engineering Office

7/17/2018

255 MUNTOPAR BUILDERS Prieto Diaz, Sorsogon

18FL0086 - Construction of Barcelona Municipal Hall, Barcelona, Sor.

DPWH Sorsogon 2nd District Engineering Office

7/17/2018

256 ZKR CONSTRUCTION AND SUPPLY Blk 3 Lot 4 Purok 5 Tanchuling Subd., Rawis, Legazpi City

18FO0058 - Construction of School Building, Libon Community College, Libon, Albay

DPWH Albay 3rd District Engineering Office

7/17/2018

257 ZKR CONSTRUCTION AND SUPPLY Blk 3 Lot 4 Purok 5 Tanchuling Subd., Rawis, Legazpi City

18FO0056 - Construction of Multi-Purpose Building (Livelihood Center) Barangay Agos, Polangui, Albay

DPWH Albay 3rd District Engineering Office

7/17/2018

258 Welex Construction Incorporated Purok 1 Brgy.40 Airport Site, Cruzada, Legazpi City

18FO0076 - Construction of Luna Candol - Balud Del Sur Coastal Road and Shore Protection, Gubat, Sorsogon 2nd Legislative District

DPWH Regional Office No. V 7/17/2018

259 Welex Construction Incorporated Purok 1 Brgy.40 Airport Site, Cruzada, Legazpi City

18FO0085 - Construction of Zone 2-Sabang-San Vincente Coastal road with Shore Protection, Bulan, Sorsogon 2nd Legislative District

DPWH Regional Office No. V 7/17/2018

Page 29: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 29 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

260 Welex Construction Incorporated Purok 1 Brgy.40 Airport Site, Cruzada, Legazpi City

18FO0081 - Construction of Caloocan-Tabunan-Panghuliran Coastal Road with Shore Protectoion, Matnog, Sorsogon 2nd Legislative District

DPWH Regional Office No. V 7/17/2018

261 EGLIN SIA CONSTRUCTION/PARTIDO CONST. & SUPPLY JOINT VENTURE (JV)

18FJ0078 - Local Infrastructure Program, Local Road and Bridges - Local Roads Concreting of Esperanza - Placer Road Leading to Pasiagon Beach Front, Balay na Bato and Esperanza Seaport, Masbate, Sta. 0+000- Sta. 2+000

DPWH Masbate 2nd District Engineering Office

7/17/2018

262 PEU Construction and Supply 813 San Juan Street, Pili, Cam. Sur

18FE0070 - Construction of two (2) Storey Four (4) Classroom School Building (Under DepEd CY 2018 BEFF) Pili, Central School, Pili, Cam. Sur

DPWH Camarines Sur 2nd District Engineering Office

7/17/2018

263 PEU Construction and Supply 813 San Juan Street, Pili, Cam. Sur

18FE0067 - Construction of two (2) Storey Four (4) Classroom School Building (Under DepEd CY 2018 BEEF) Del Rosario Elementary School, Pili, Cam. Sur

DPWH Camarines Sur 2nd District Engineering Office

7/17/2018

264

SULVIR ENGINEERING & CONSTRUCTION PVLB Bldg. 6, Room 307, Peñaranda St., Legazpi City

18FO0054: Construction of Multi-Purpose Hall Building for Ligao City Public Market Extension, Barangay, Nasisi, Ligao City

DPWH Albay 3rd District Engineering Office

7/17/2018

265

SULVIR ENGINEERING & CONSTRUCTION PVLB Bldg. 6, Room 307, Peñaranda St., Legazpi City

18FO0055 - Construction of Multi-Purpose Building (Livelihood Center) Barangay Tula-Tula, Ligao City, Albay

DPWH Albay 3rd District Engineering Office

7/17/2018

266 Welex Construction Incorporated Purok 1 Brgy.40 Airport Site, Cruzada, Legazpi City

18FO0082 - Rehab/Construction of Tabunan Protection Wall, Matnog, Sor.

DPWH Sorsogon 2nd District Engineering Office

7/17/2018

267 RGE Construction & Supply Madlawon, Bulusan, Sorsogon

18FL0068: Concreting of Farm-to- Market Road (CLUSTER I)- Bulan, Sorsogon

DPWH Sorsogon 2nd District Engineering Office

7/10/2018

268 RMH CONSTRUCTION AND SUPPLY OLV, Pangpang, Sor. City

18FL0069: Concreting of Farm-to- Market Road (CLUSTER II) -Sta. Magdalena and Gubat, Sorsogon

DPWH Sorsogon 2nd District Engineering Office

7/10/2018

Page 30: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 30 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

269 RMH CONSTRUCTION AND SUPPLY OLV, Pangpang, Sor. City

18FL0070: Concreting of Farm-To-Market Road (Cluster III) -Juban, Sorsogon

DPWH Sorsogon 2nd District Engineering Office

7/10/2018

270 TRI- EX COMPANY , INC. 75. Gen. Ordoñez Street Marikina Heights

18FH0115- Repair/ Maintenance of Sto. Domingo Revetment, Sto. Domingo, Virac, Catanduanes

DPWH Catanduanes District Engineering Office

7/17/2018

271 TRI- EX COMPANY , INC. 75. Gen. Ordoñez Street Marikina Heights

18FH0117-Repair/ Maintenance of Caramoan Flood Control, Baybay, Caramoran, Catanduanes-Caramoran, Catanduanes

DPWH Catanduanes District Engineering Office

7/17/2018

272 TRI- EX COMPANY , INC. 75. Gen. Ordoñez Street Marikina Heights

18FH0116 - Repair/Maint. of Belmonte Revetment, Belmonte, San Andres, Catanduanes

DPWH Catanduanes District Engineering Office

7/18/2018

273 TRI- EX COMPANY , INC. 75. Gen. Ordoñez Street Marikina Heights

18FH0118 - Repair/Maint. of Dariao Revetment, Dariao, Caramoran, Catanduanes

DPWH Catanduanes District Engineering Office

7/17/2018

274 Athena Const. and Dev't 239 Arellano Ext., Sagpon, Daraga, Albay

18FA0042 - Rehab/Restoration of Roads along Mataas Spillway, Brgy. Mataas, Bacacay, Albay

DPWH Albay 1st District Engineering Office

7/18/2018

275 Rolco Const. and Dev't Corp. 239 Arellano Ext. Sagpon, Daraga, Albay

18FA0043 - Rehab/Restoration of Roads along Mataas Spillway, Brgy. Mataas, Bacacay, Albay

DPWH Albay 1st District Engineering Office

7/18/2018

276 Athena Const. and Dev't 239 Arellano Ext., Sagpon, Daraga, Albay

18FA0039 - Construction of Rainwater Collection System (RWCS) at Various School in the First District of Albay

DPWH Albay 1st District Engineering Office

7/18/2018

277

LOURBEL CONSTRUCTION AND SUPPLY/ E.A. Sancho Const. & Supply (J.V.) Pag-asa, Brgy. 42, Rawis, Legazpi City

17FB0190 - Const. of Flood Mitigation System Along Taysan River (Sta. 0+000 - Sta. 0+350 B/S) Downstream Legazpi City

DPWH Albay 2nd District Engineering Office

7/18/2018

278

LOURBEL CONSTRUCTION AND SUPPLY/ ALRO Const. & Dev't Corp. (J.V.) Pag-asa, Brgy. 42, Rawis, Legazpi City

17FB0189 - Construction of Purok 6 Bariw Flood Control System (Sta. 0+240 Sta. 0+652 B/S) Bariw, Camalig, Albay

DPWH Albay 2nd District Engineering Office

7/18/2018

279 CBC Construction and Supply Brgy. 40 P-7, Cruzada, Legazpi City, Albay

18FB0143 - Construction of Classrooms 2STY4CL, Arimbay Elementary School, Leg. City (9.50m x 23.00m)

DPWH Albay 2nd District Engineering Office

7/18/2018

280 CBC Construction and Supply Brgy. 40 P-7, Cruzada, Legazpi City,

18FB0162 : Construction of Classrooms 2STY4CL, Banquerohan Elementary School, Leg. City (9.50m

DPWH Albay 2nd District Engineering Office

7/18/2018

Page 31: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 31 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

Albay x 23.00m)

281 ROLA CONSTRUCTION 22 Lomeda Subdivision, Naga City

18FE0092 Repair/ Maintenance of DPWH Multi-Purpose Building-Baras, Canaman, Camarines Sur

DPWH Camarines Sur 2nd District Engineering Office

7/18/2018

282 Precious Construction 136 Zone 3 Horma St. San Isidro Magarao, Camarines Sur

18F00048: Ensure Safe and Reliable National Road System, Network Development Program, Road Widening-Secondary Roads: Iriga City-Sa Isidro-Sagrada-San Ramon-Hanawan Road, Camarines Sur

DPWH Regional Office V 7/18/2018

283

Wind River Court Const. and Development 44 Jaucian St. Doña Maria Subd. Tagas, Daraga, Albay

18FO0057: Construction of Multi-Purpose Building, Travesia, Guinobatan, Albay

DPWH Albay 3rd District Engineering Office

7/18/2018

284 Honeyville construction San isidro,magarao,camarines sur

18FO0083-001: Ensure safe reliable national road system, network development program, construction by-pass and diversion roads-Barcelona-Casiguran diversion road (Barcelona section)-Sorsogon 2nd legislative district

DPWH-Regional office No.V 7/18/2018

285

SULVIR ENGINEERING & CONSTRUCTION PVLB Bldg. 6, Room 307, Peñaranda St., Legazpi City

18FB0024: Local Infrastracture Program: Construction of Multi-Purpose Building, Brgy. Estanza, Legazpi City-Legazpi City, Albay

DPWH -Albay 2nd District Engineering Office

7/18/2018

286 C.T Leoncio Construction & Trading 71 Luwasan , Guyong, Sta. Maria, Bulacan

17FH0205: Construction / Maintenance of Flood Mitigation Structures and Drainage System, Construction of Flood Control Structures at Brgy. Gogon, Sta. 0=000-Sta.0+600 along Gogon River, Virac, Catanduanes

DPWH Catanduanes District Engineering Office

7/18/2018

287 AMEG Construction and Supply Purok 4, Barriada, Brgy. Gogon, Legazpi City

18FB0174: Widening / Improvement of Pinaric -Estanza Road, Legazpi City

DPWH Albay 2nd Distric Engineering Office

7/18/2018

288 AB OPEÑA BUILDERS 4th Street, Parkview Village, San Felipe,

18FN0066 Construction of Two (2) STY, Two (2) Science Laboratory Bldg.-Haluban National Highg

DPWH Camarines Sur 5th District Engineering Office

7/18/2018

Page 32: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 32 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

Naga City Shool , Lupi, Camarines Sur

289 AB OPEÑA BUILDERS 4th Street, Parkview Village, San Felipe, Naga City

18FN0065 : Reehabilitation of Multi Purpose Buildign (Cultural Building)- Brgy.Poblacion Ilaod, Ragay, Camarines Sur

DPWH Camarines Sur 5th District Engineering Office

7/18/2018

290 SUNWEST Construction & Development Corporation Diversion Rd., Bogtong, Leg. City

18FB0172: Construction / Maintenance of Flood Mitighation Structures and Drainage Syustems-- Contruction of Flood Mitigation of Bonga River, Legazpi City

DPWH Albay 2nd District Engineering Office

7/18/2018

291 SUNWEST Construction & Development Corporation Diversion Rd., Bogtong, Leg. City

18FB0176: Construction of Lagundi-Bogtong Dapdap Road, Rapu-Rapu, Albay

DPWH Albay 2nd District Engineering Office

7/18/2018

292 SUNWEST Construction & Development Corporation Diversion Rd., Bogtong, Leg. City

18FB0173: Construction / Rehabilitation of Salvacion -Budiao-Matnog-Mabinit Road, Daraga, Albay/ Legazpi City- Daraga, Albay / Legazpi City

DPWH Albay 2nd District Engineering Office

7/18/2018

293 SUNWEST Construction & Development Corporation Diversion Rd., Bogtong, Leg. City

18FB0183: Construction of Access Road to Buenavista Causeway, Legazpi City

DPWH Albay 2nd District Engineering Office

7/18/2018

294 C.T Leoncio Construction & Trading 71 Luwasan , Guyong, Sta. Maria, Bulacan

17FH0028-Construction / Maintenance of Flood Mitigation Structures and Drainage System, Construction of Flood Control Structure Along Sibanhan River (Sta. 0+000-Sta.0+952)Sibanhan, Virac, Catanduanes

DPWH Albay 2nd District Engineering Office

7/18/2018

295 SUNWEST Construction & Development Corporation Diversion Rd., Bogtong, Leg. City

18FB0182: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems-Construction of Lamba Flood Control System, Legazpi City

DPWH Albay 2nd District Engineering Office

7/18/2018

296 Marcant Construction and Supply Guevarra Subd., Barangay 15, Ilawod East, Legaspi City, Albay

18FB0006: Local Infrastracture Program: Construction of Multi-Purpose Building Barangay Buyuan, Legazpi City, Albay

DPWH Albay 2nd District Engineering Office

7/18/2018

297 AB OPEÑA BUILDERS 4th Street, Parkview Village, San Felipe,

18FN0064: Rehabilitation of Multi-Purpose Building ( SK Building) -Brgy. Poblacion Iraya, Ragay,

DPPWH 5th District Engineering Office

7/18/2018

Page 33: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 33 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

Naga City Camarines Sur

298 Precious Construction 136 Zone 3 Horma St. San Isidro Magarao, Camarines Sur

18FH0004-Construction Upgrading / Rehabilitation of Drainage Along National Roads, Catanduanes, Circumferential Road KO121-000-KO122+000, KO0122+540, Caramoran, Catanduanes

DPWH Catanduanes District Engineering Office

7/18/2018

299 Jejan Construction and Supply Marquez St., Brgy.56, Taysan, Legazpi City

18FB0198: Construction and Completion of School Building in the Elementary and Secondry Classrooms STY4CL, Bilbao National High School (9.50m x 23.00m) Rapu-Rapu-Albay

DPWH Albay 2nd District Engineering Office

7/20/2018

300 Rolco Const. and Dev't Corp. 239 Arellano Ext. Sagpon, Daraga, Albay

18FO0088 - Construction of Classrooms (2-Storey 8- Classroom School Building, 4 Regular Workshop) at Masarawag National High School

DPWH Albay 3rd District Engineering Office

7/20/2018

301 Rolco Const. and Dev't Corp. 239 Arellano Ext. Sagpon, Daraga, Albay

18FO0089 - Construction of Classrooms (2-Storey Building, 2 ICT Workshop and 2 Science Workshop) at Masarawag National High School

DPWH Albay 3rd District Engineering Office

7/20/2018

302 TOPSPIN CONSTRUCTION San Vicente, Bulan, Sorsogon

18FL0063 - Repair/Maint. of Flood Control System along Monbon River, Monbon, Irosin Sorsogon (Sta. 0+000- Sta. 0+058 LS Downstream)

DPWH Sorsogon 2nd District Engineering Office

7/20/2018

303 Brentmin Roofing Enterprises Vinzons, Ave., Brgy Gahonon Daet, Camarines Norte

18FC0151 - Repair/Maint. of Labo River Control, Matogdon Section, Brgy Taisan and Pinagwarasan Basud, Camarines Norte

DPWH Camarines Norte District Engineering Office

7/20/2018

304 EUS Construction Purok 5, Poblacion 1, Basud, Camarines Norte

18FB0181 - Concreting of Gabawan FMR, Brgy. Gabawan, Daraga, Albay

DPWH Albay 2nd District Engineering Office

7/20/2018

305 Welex Construction Incorporated Purok 1 Brgy.40 Airport Site, Cruzada, Legazpi City

18F00076-Construction of Luna Candol-Balud Del Sur Coastal Road and Shore Protection , Gubat, Sorsogon 2nd Legislative District

DPWH Regional Office No. V 7/17/2018

306 Welex Construction Incorporated Purok 1 Brgy.40 Airport Site, Cruzada, Legazpi City

18FL0082: Rehab/ Construction of Tabunan Protection Wall, Matnog, Sorsogon

DPWH Sorsogon 2nd District Engineering Office

7/17/2018

Page 34: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 34 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

307 JAEJR ELECTRICAL, CONSTRUCTION AND SUPPLY/EUS CONSTRUCTION Brgy. Lag-On, Daet, Camarines Norte

18FC0070: Organizational Outcome 1: Bridge Program; Replacement of Permanent Weak Bridges; Malacbang Bridge (B00497LZ) Along Talobatib-Jose Panganiban Pb. Port Road

DPWH Camarines Norte District Engineering Office

7/17/2018

308 AE BELLEZA BUILDERS 102 Sto. Tomas, Magarao, Camarines Sur

18FE0078-Construction of Two (2) Storey Six (6) Classroom School Building

DPWH Camarines Sur 2nd District Engineering Office

7/20/2018

309 Welex Construction Incorporated Purok 1 Brgy.40 Airport Site, Cruzada, Legazpi City

18F00103-Local Roads, Const. of Paghuliran-Poropandan Coastal Road and Shore -Matnog, Sorsogon

DPWH Regional Office No. V Rawis, Legazpi City

7/20/2018

310 Welex Construction Incorporated Purok 1 Brgy.40 Airport Site, Cruzada, Legazpi City

18F00102-Local Roads , Construction of Poropandan-Culasi Coastal Road and Shore Protection, Matnog, Sorsogon

DPWH Regional Office No. V Rawis, Legazpi City

7/20/2018

311 Welex Construction Incorporated Purok 1 Brgy.40 Airport Site, Cruzada, Legazpi City

18F00077-Construction of Balud Del Norte-Cota Na Daco-Cogon Coastal Road and Shore Protetction , Gubat, Sorsogon

DPWH Regional Office No. V Rawis, Legazpi City

7/20/2018

312 Welex Construction Incorporated Purok 1 Brgy.40 Airport Site, Cruzada, Legazpi City

18F00086-Construction of San Rafael Coastal Road and Shore Protection , Bulan, Sorsogon

DPWH Regional Office No. V Rawis, Legazpi City

7/20/2018

313 Grelips Construction and Development Washington Drive, Brgy 8, Legazpi City

18FK0064-Local Program-Construction / Repair/ Rehab. / Improvement of Various Infrastracture Including Local Projects-Local Roads-Concreting of Ginangra Barangay Road-Magallanes, Sorsogon

DPWH Sorsogon 1st District Engineering Office

7/20/2018

314

SULVIR ENGINEERING & CONSTRUCTION PVLB Bldg. 6, Room 307, Peñaranda St., Legazpi City

17FO0096: Rehabilitation / Repair/ Improvement/ Restoration / Upgrading of Guinobatan Rural Health Unit (RHU) & Guinobatan Municipal Hall

DPWH Albay 3rd District Engineering Office

7/20/2018

315 ZKR CONSTRUCTION AND SUPPLY Blk 3 Lot 4 Purok 5 Tanchuling Subd., Rawis, Legazpi City

17FO0095: Cluster XVII-2017: Construction of Ramay-Mayag & San Jose-Tobgon Farm-to-Market Roads-Oas, Albay

DPWH Albay 3rd District Engineering Office

7/20/2018

316 C.T Leoncio Construction & Trading 71 Luwasan , Guyong, Sta. Maria,

18FK0060-Construction of Casiguran Hospital Phase II-Casiguran, Sorsogon

DPWH Sorsogon 1st District Engineering Office

7/20/2018

Page 35: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 35 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

Bulacan

317 TR CONSTRUCTION CORP. Brgy. Binanuahan, Legazpi City

18FK0043-Cluster IX-Network Development Program-Off Carriageway Improvement Primary Roads K0543+556, K0544+697, K0548+174, K0548+773,K0552+510, K0553+044,K0553+686,K0553+910,K0544+960, K0559+490,K0562+519, K0566+668,K0574+335, K0574+335, K0574+769, K0575+612, K0577 +145, K0582+362, K0582+981, K0585+192, K0588+200, K0596+390, K0598+473 & Off Carriageway Improvement - Primary Roads-Daang Maharlika (LZ) , Pilar,Sorsgon K0541+976-K0542+078, K0542+122-K0542+726-Pilar, Sorsogon

DPWH Sorsogon 1st District Engineering Office

7/20/2018

318 Katha Builders & Supplies 171 Luwasan , Guyong , Sta. Maria, Bulacan

18FK0062-Local Infrastracture Program -Local Roads and Bridges -Local Bridges-Construction / Rehabilitation of Anilao Road

DPWH Sorsogon 1st District Engineering Office

7/20/2018

319 NIDA BUILDERS AND SUPPLIES Danicop, Virac, Catanduanes

18FH0032- Construction of Multi-Purpose Building , Balite, Elementary School, Virac, Catanduanes

DPWH Catanduanes District Engineering Office

7/20/2018

320 MUNTOPAR BUILDERS Prieto Diaz, Sorsogon

18FB0140: Construction of 3STY6CL , School Building, Bogtong Elementary School, Bogtong Legazpi City (9.5m x 23.00m)- Bogtong, Legazpi City

DPWH Albay 2nd District Engineering Office

7/24/2018

321 Steven Construction and Supply Lot 6 , Blk 1, Central City Subd., Tahao Rd., Legazpi City,Albay

18FB0200: Construction and Completion of School Building in the Elementary and Secondary Classroom 2-2STY4CL Mancao National High School Bdlg. 1& 2 (9.5m x 23.00m)- Mancao, Rapu-Rapu, Albay

DPWH Albay 2nd District Engineering Office

7/24/2018

322 RKX ODIAMAR CONSTRUCTION R. Sobrepeña St., Monte Cielo De Naga, Del Rosario

18FD0051-Construction of Multi-Purpose Building (Covered Court), Brgy.Cabugao, Milaor, Camarines Sur-Milaor, Camarines Sur

DPWH Camarines Sur 1st District Engineering Office

7/24/2018

Page 36: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 36 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

323 RKX ODIAMAR CONSTRUCTION R. Sobrepeña St., Monte Cielo De Naga, Del Rosario

18FD0063-Construction of Classrooms (Bacth 1), Cagbibi National High School, Pamplona, Camarines Sur-Milaor, Camarines Sur

DPWH Camarines Sur 1st District Engineering Office

7/24/2018

324 AL NIÑO CONSTRUCTION & SUPPLY 165 Quezon Avenue, Oro Site, Legazpi City

18FD0064 - Construction of Classrooms (Batch 1), Villamayor HS, Minalabac, Camarines Sur

DPWH Camarines Sur 1st District Engineering Office

7/20/2018

325 AL NIÑO CONSTRUCTION & SUPPLY 165 Quezon Avenue, Oro Site, Legazpi City

18FD0067 - Concreting of Alianza FMR, Brgy. Alianza, San Fernando, Camarines Sur

DPWH Camarines Sur 1st District Engineering Office

7/20/2018

326 NUMERICAL GATE CONSTRUCTION & SUPPLY CORP 25 San Juan St., Centro Oriental

18FB0046 - Construction of Multi-Purpose Building, Brgy. Maroroy, Daraga, Albay

DPWH Albay 2nd District Engineering Office

7/24/2018

327 NUMERICAL GATE CONSTRUCTION & SUPPLY CORP 25 San Juan St., Centro Oriental

18FB0022 - Local Infrastructure Program: Construction of Multi-Purpose Building, Brgy. Alcala, Daraga, Albay

DPWH Albay 2nd District Engineering Office

7/24/2018

328 NUMERICAL GATE CONSTRUCTION & SUPPLY CORP 25 San Juan St., Centro Oriental

18FB0039 - Local Infrastructure Program: Construction of Multi-Purpose Building, Brgy. Panoypoy, Camalig, Albay

DPWH Albay 2nd District Engineering Office

7/24/2018

329 CLKM Interstate Builders Corp. Perete Bldg., Maharlika Highway, Daraga, Albay

18FH0094- Construction / Maintenance of Flood Mitigating Structures and Drainage Systems, Construction of Flood Control in Brgy. Oga, Pandan, Catanduanes

DPWH Catanduanes District Engineering Office

7/24/2018

330 Bemkar Construction Brgy. Lag-On, Daet, Camarine Norte

18FC0102-Organizational Outcome 1; Bridge Program; Widening of Permanent Bridges; Laniton Bridge (B04506LZ) Along Daang Maharlika-Basud , Camarines Norte

DPWH Camarines Norte District Engineering Office

7/24/2018

331 V.C Varin & Hardware Supply Doña Eusebia St., Labo, Camarines Norte

17FC0345: Construction of Two(2) Storey Four (4) Classroom (Science & ICT Laboratory)- Pambuhan NHS, Mercedes, Camarines Norte

DPWH Camarines Norte District Engineering Office

7/24/2018

332 V.C Varin & Hardware Supply Doña Eusebia St., Labo, Camarines Norte

17FC0346: Construction of Two (2) Storey Four (4) Regular Workshop Building- Pambuhan NHS, Mercedes, Camarines Norte

DPWH Camarines Norte District Engineering Office

7/24/2018

Page 37: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 37 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

333 SPRINGSTAR CONST. AND SUPPLY 143-C Balagtas St., Malate, Manila

18FI0047 - Concreting of Junction National Road, Tinaclipan FMR, Milagros, Masbate, Sta. 0+071-0+921

DPWH Masbate 1st District Engineering Office

7/25/2018

334 SPRINGSTAR CONST. AND SUPPLY 143-C Balagtas St., Malate, Manila

18FI0048 - Concreting of Ubongan Dacu-Magdalena FMR, Brgy. Ubongan Dacu and Brgy. Magdalena,m Masbate City, Sta. 1+220-Sta. 1+680

DPWH Masbate 1st District Engineering Office

7/25/2018

335 A.C. RIVERO DEVELOPMENT CORP. 2929 Burgos Ext., Brgy. Villamonte, Bacolod City

18FI0025 - Network Development Program, Construction of Missing Links/New Roads, Mandaon-Dayhagan Road, Masbate, Sta. 0+000- Sta. 1+050, 2.100 lane km. (1.050 km)

DPWH Masbate 1st District Engineering Office

7/25/2018

336 Honeyville construction San isidro,magarao,camarines sur

18FF0088 - Construction of Three (3) Storey Nine (9) Classroom School Building (Under DepEd CY-2018 BEFF), Carolina Elementary School, Naga City, Camarines Sur

DPWH Camarines Sur 2nd District Engineering Office

7/24/2018

337 Precious Construction 136 Zone 3 Horma St. San Isidro Magarao, Camarines Sur

18FE0090 - Construction of Three (3) Storey Bldg. w/ Two (2) Reg. (GF) Two (2) ICT (TF) & Two (2) Science (TF) Laboratory (Under DepEd CY - 2018 BEFF) Leon Q. Mercado High School, Naga City, Camarines Sur

DPWH Camarines Sur 2nd District Engineering Office

7/25/2018

338 Hi-Tone Construction & Development Corporation Lidong Sto. Domingo, Albay

18FH0098 - Construction/Maint. of Flood Mitigation Structures and Drainage Systems, Construction of River Protection, Brgy. San Nicolas Panganiban, Catanduanes

DPWH Catanduanes District Engineering Office

7/25/2018

339 Law-An Builders & Supplies Block 6, Lot 13, 1st St. OLV Bitano, Legazpi City

17F00094- Land Improvement and Other Structures and Facilities of BLGF Region V, Government Regional Center, Rawis, Legazpi City

DPWH RegionalOffice V 7/25/2018

340 TRC Corporation Brgy.21, Binanuahan West, Legazpi City

18F00104-Local roads, Construction of Poblacion Norte, Central and Sur Coastal Road and Shore Protection, Barcelona, Sorsogon

DPWH RegionalOffice V 7/25/2018

341 E. GARCIA CONSTRUCTION CORP ( EGCC)

18F00090-001: Ensure and Reliable Naion Road System-Network Development Road Widening-

DPWH Regiona lOffice V 7/25/2018

Page 38: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 38 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

Del Rosario, Naga City Tertiary Roads, Sipocot-Cabusao Road, K0395 + 200.00-K0398 + 140.00, Camarines Sur-Camarines Sur

342 E. GARCIA CONSTRUCTION CORP ( EGCC) Del Rosario, Naga City

18F00095-001: Ensure and Reliable Nation Road System-Network Development Road Widening-Primary Roads, Rolando A. Andaya Highway K0288+ 513, 10-K0290+720, Camarines Sur

DPWH Regional Office V 7/25/2018

343 GEMELLUS BUILDERS & GENERAL SUPPLY Sagpon, Daraga, Albay

18FF0099-DepEd's CY-2018 Basic Educational Facilities Fund (Batch 1, Construction of Two (2) Storey Six (6) Classroom School Building, Sagñay Central School

DPWH Camarines Sur 3rd District Engineering Office

7/25/2018

344 CL CARANDANG ENTERPRISES #002 Nursery Street, Masbate City

18FI0091- Construction of 1-Unit-2 Storey 2-ICT Building (9.50m x 23.00m) at Melchor B. Buriaos Memorial School

DPWH , Masbate 1st District Engineering Office

7/25/2018

345 CL CARANDANG ENTERPRISES #002 Nursery Street, Masbate City

18FI0094: Construction of 1-Unit 2- Storey 2-Science Laboratory Building (9.50 m x 23.00) at Jamorawon National High School, Milagros, Masbate

DPWH , Masbate 1st District Engineering Office

7/25/2018

346 CL CARANDANG ENTERPRISES #002 Nursery Street, Masbate City

18FI0093: Construction of 1-Unit 2-Storey 2 ICT Building (9.50m x 23.00m) at Jamorawon National School, Milagros, Masbate

DPWH , Masbate 1st District Engineering Office

7/25/2018

347 CL CARANDANG ENTERPRISES #002 Nursery Street, Masbate City

18F0092: Construction of 1-Unit 2-Storey 2-Science Laboratory Building (9.50m x 23.00 m) at Melchor B. Buriaos Memorial School, Milagros, Masbate

DPWH , Masbate 1st District Engineering Office

7/25/2018

348 RGE Construction & Supply Madlawon, Bulusan, Sorsogon

18FL0080: Construction of San Francisco-Jamorawon Road, Sta. 0+000-Sta.1 + 500 with exception, Bulan, Sorsogon

DPWH Sorsogon 2nd District Engineering Office

7/24/2018

349 EA-EC Construction and Supply Pinaglabanan St., San Agustin, Iriga City

18FG0057-Concreting of Sitio Dumanog Road, Brgy. La Purisima, Nabua, Camarines Sur

DPWH Camarines Sur 4th District Engineering Office

7/24/2018

350 RKX ODIAMAR CONSTRUCTION R. Sobrepeña St., Monte Cielo De Naga,

18FG0065: Construction of Various Rainwater Collection System ( Plastics and Stainless Storage

DPWH Camarines Sur 4th District Engineering Office

7/24/2018

Page 39: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 39 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

Del Rosario Water Tank)- DPWH Camarines Sur 4th District Engineering Office

351 MAKAPA CORPORATION South Road 1 Benny Imperial St. Legazpi City

18F00060-Cluster 1: Convergence and Special Support Program: Construction / Improvement of Access Roads Leding to Declared Tourism Destinations: Ligao-Pioduran-Donsol Road Leading to Butandig Site, Albay and Construction/ Improvement of Access Roads Leading to Trades, Industries and Economic Zone-Brgy.1 Road Connecting Ligao-Pioduran Road in Support to Agribusiness (Food Resource Based Processing) Pio Duran

DPWH Albay 3rd District Engineering Office

7/24/2018

352 Legaspi Premium Development Corporation Cabangan, Legaspi City

18FL0067: Construction of Ponod Bridge, Bulan, Sorsogon

DPWH Sorsogon 2nd District Engineering Office

7/24/2018

353 R.D. Mandanas Construction Block 30, Lot 5, Progress Homes Subdivision, Canaman, Camarines Sur

Construction of Three (3) Storey Building with Two (2) Reg. (GF) Two (2) ICT (SF) and Two (2) Science (TF) Laboratory (Under Deped CY-2018 BEFF)

DPWH Camarines Sur 2nd District Engineering

7/24/2018

354 JMLD Construction 126-1 Bagumbayan Norte, Naga City

18FN0070-Cluster : Repair/ Maintenance of Flood Control/Drainage Structures-Cabusao and Ragay, Camarines Sur

DPWH Camarines Sur 5th District Engineering

7/27/2018

355 JMLD Construction 126-1 Bagumbayan Norte, Naga City

18FN0067-Construction of Two (2) Storey , Two (2) ICT Laboratory Building-Haluban Natinal High School, Lupi, Camarines Sur

DPWH Camarines Sur 5th District Engineering

7/27/2018

356

M.G Salazar Const. Corp./ R.A Mendiola Construction and Supply 9044 Ilang-Ilang St. Zaballero Subd. Gulang-Gulang, Lucena City

18FF0091- FY-2018 Construction / Maintenance of flood Mitigation Structures and Drainage System Construction/ Improvement / Rehabilitation of Flood Control Structure Section 1; Sta. 0+000.00 - Sta. 0+064.79, Section 2; Sta. 0+072.80-Sta. 0+096.19, Section 3; Sta. 0+101.18- Sta. 0+223.00, Section 4; Sta. 0+000.00-Sta. 0+091.18,

DPWH Camarines Sur 3rd District Engineering Office

7/24/2018

Page 40: REGIONAL REPORT ON THE APPROVED/CONCURRED ......Construction of Multi-Purpose Hall-Barangay Tulay na Lupa, Labo, Camarines Norte Provincial Government of Camarines Norte 6/26/2018

REGIONAL REPORT ON THE APPROVED/CONCURRED CONSTRUCTION SAFETY & HEALTH PROGRAM (CSHP)

DOLE-Regional Office No. 5 July 2018

Page 40 of 40

No. Company Name and Address Project Name Project Owner Date

Approved

Section 5; Sta. 0+000.00- Sta. 0+010.00, Section 6; Sta. 0+000.00- Sta. 0+250.00- Sagñay, Camarines Sur

357 AL NIÑO CONSTRUCTION & SUPPLY 165 Quezon Avenue, Oro Site, Legazpi City

18FK0016: Flood Management Program-Const./ Maintenance of Flood Mitigations Structure and Drainage Systems-Const. Malbog River Control-Castilla, Sorsogon

DPWH Sorsogon 1st District Engineering Office

7/27/2018

358 CTC Builders & Supplies, INC. 18FK0083-Multi-Purpose Facilities-Construction of Multi-Purpose Building-Donsol, Sorsogon

DPWH Sorsogon 1st District Engineering Office

7/27/2018

359 A.C. RIVERO DEVELOPMENT CORP. 2929 Burgos Ext., Brgy. Villamonte, Bacolod City

18FK0054-Construction of Bureau of Jail Management and Penology-Sorsogon City

DPWH Sorsogon 1st District Engineering Office

7/27/2018

360 ALJON CONSTRUCTION & SUPPLY Sipi, Bato, Catanduanes

18FH0119 - Replacement of Permanent Weak Bridges, Pilot Bridge (B00018CN) Along Catanduanes Circumferential Road, Viga, Catanduanes

DPWH Catanduanes District Engineering Office

7/31/2018