13
Regional Planning Meetings Regional Planning Meetings 2005 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner

Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner

Embed Size (px)

Citation preview

Page 1: Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner

Regional Planning Meetings Regional Planning Meetings 20052005

Oklahoma Airport System Plan

Presented by:

Dr. George Dresser, System Planner

Page 2: Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner

Oklahoma Administrative Code Oklahoma Administrative Code Title 25Title 25

Establishes airport planning requirementsEstablishes airport planning requirements Establishes requirements for grant programEstablishes requirements for grant program Establishes OAC administrative proceduresEstablishes OAC administrative procedures

Title 25 - Oklahoma Aeronautics Commission

Chapter 1 Commission OperationsChapter 1 Commission Operations Chapter 10 Airport Zoning Act [Revoked]Chapter 10 Airport Zoning Act [Revoked] Chapter 15 OAC Grant ProgramChapter 15 OAC Grant Program Chapter 20 Aircraft Excise Tax Credit ProgramChapter 20 Aircraft Excise Tax Credit Program

Page 3: Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner

Oklahoma Airport System Plan Oklahoma Airport System Plan (OASP)(OASP)

Adopted in December Adopted in December

1999 and amended in 1999 and amended in

February 2005February 2005

Guides state policy and Guides state policy and

fundingfunding

Guides FAA policy and Guides FAA policy and

fundingfunding

Guides development of Guides development of

CIPCIP

Guides airport sponsorsGuides airport sponsors

Guides classification of Guides classification of

system airportssystem airports

Page 4: Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner

Continuous Continuous Airport Planning Airport Planning

ProcessProcess

Maintaining inventoriesMaintaining inventories

Forecasting aviation Forecasting aviation

activityactivity

Classifying airportsClassifying airports

Conducting public Conducting public

participation programsparticipation programs

Identifying capital Identifying capital

improvement needsimprovement needs

Preparing annual CIPPreparing annual CIP

Page 5: Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner

Regional Business AirportRegional Business Airport

Serves multiple Serves multiple

communitiescommunities

Provides all weather Provides all weather

accessaccess

Provides access for Provides access for

business jetsbusiness jets

Provides full servicesProvides full services

Page 6: Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner

District AirportDistrict Airport

Provides access for an Provides access for an

area not served well by area not served well by

a regional business a regional business

airportairport

Provides some servicesProvides some services

Financially capable Financially capable

airport sponsorairport sponsor

Page 7: Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner

Community AirportCommunity Airport

Serves a small Serves a small

communitycommunity

Provides few or no Provides few or no

servicesservices

Financially limited Financially limited

airport sponsorairport sponsor

Page 8: Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner

Airport Reference Code (ARC) Airport Reference Code (ARC) DefinitionsDefinitions

Relates airplane Relates airplane

approach speed approach speed

(operational (operational

characteristic) andcharacteristic) and

Relates airplane Relates airplane

wingspan (physical wingspan (physical

characteristic) tocharacteristic) to

An airport’s design and An airport’s design and

dimensional standardsdimensional standards

Page 9: Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner

Identification of Critical Identification of Critical AircraftAircraft

What types of aircraft What types of aircraft

needs to come to your needs to come to your

airport?airport?

How often do they How often do they

need to come?need to come?

What services need to What services need to

be provided?be provided?

What is the ARC for the What is the ARC for the

most critical aircraft?most critical aircraft?

Page 10: Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner

Airport Development WorksheetAirport Development Worksheet

Prepared by sponsor Prepared by sponsor

and OAC staffand OAC staff

Shows airport Shows airport

classificationsclassifications

Identifies Identifies

deficiencies from deficiencies from

standardsstandards

Identifies needed Identifies needed

capital capital

improvementsimprovements

Page 11: Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner

Regional Business Airport Project Regional Business Airport Project EligibilityEligibility

Runway extension to Runway extension to

5,000 ft5,000 ft

Full parallel taxiwayFull parallel taxiway

Runway, taxiway, and Runway, taxiway, and

apron construction, apron construction,

reconstruction, or overlayreconstruction, or overlay

Lighting, beacon, Lighting, beacon,

approach aids, wind cone, approach aids, wind cone,

segmented circle, AWOSsegmented circle, AWOS

Page 12: Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner

District Airport Project EligibilityDistrict Airport Project Eligibility

Runway extension to 4,000 Runway extension to 4,000

ftft

Partial or full parallel Partial or full parallel

taxiway based on activitytaxiway based on activity

Runway, taxiway, and Runway, taxiway, and

apron construction, apron construction,

reconstruction, or overlayreconstruction, or overlay

Lighting, beacon, approach Lighting, beacon, approach

aids, wind cone, and aids, wind cone, and

segmented circlesegmented circle

Page 13: Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner

Community Community Airport Project Airport Project

EligibilityEligibility

Runway extension to 3,200 Runway extension to 3,200

ftft

Stub taxiwayStub taxiway

Runway, taxiway, and Runway, taxiway, and

apron crack seal, slurry apron crack seal, slurry

seal, and markingseal, and marking

Lighting, beacon, wind Lighting, beacon, wind

cone, and segmented circlecone, and segmented circle