Regional perspectives of the
Romanian-Hungarian interconnector
Three seas initiative
06/06/2019
Szabolcs I. Ferencz
5800 km pipeline The current network
ROHU phase I:
• 0.75 bcma capacity from 2019.10.01.
• 1.75 bcma capacity from the beginning of 2020
ROHU phase II:
• Open Season deadline prolonged until 2019.10.01.
• 4.4 bcm from 2022.10.01.
Świnoujście LNG terminal
Black Sea gas project KRK LNG terminal
Świnoujście LNG terminal
Black Sea gas project KRK LNG terminal
Świnoujście LNG terminal
Black Sea gas project KRK LNG terminal
fgsz.hu
What do we need?
Three Seas & new sources!
Thank you for your attention!