REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 1Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
NORTHERN
REGION TOTAL 60544.53 929.00 979.15 65480.26 61764.29 11367.85
BBMB
STATE TOTAL 2884.30 31.39 45.32 1904.02 2463.46 387.40
CENTRAL SECTOR: 2884.30 31.39 45.32 1904.02 2463.46 387.40
2884.30 31.39 45.32 1904.02 2463.46 387.40HYDRO
BHAKRA H P S 1343.00 14.60 24.93 855.80 1079.99 108.00
DEHAR H P S 990.00 12.70 14.98 779.60 1097.36 165.00
GANGUWAL HPS 77.65 1.13 1.17 89.34 90.34 24.20
KOTLA HPS 77.65 1.13 1.24 90.34 95.53 24.20
PONG H P S 396.00 1.83 3.01 88.94 100.24 66.00
DELHI
STATE TOTAL 3048.40 27.85 24.74 2045.30 1762.28 648.00
STATE SECTOR: 2235.40 16.32 15.07 1270.76 1192.22 255.00
135.00 1.14 0.00 73.52 47.16 135.00THERMAL
RAJGHAT TPS 9135.00 1.14 0.00 73.52 47.16 135.00
1 67.50 0.57 0.00 28.26 5.96 67.50 08/05/2015 13:48 WATER WALL TUBE LEAKAGEUnit L
2 67.50 0.57 0.00 45.26 41.20 67.50 21/05/2015 10:20 COAL SHORTAGE/FEEDING PROBLEMUnit L
2100.40 15.18 15.07 1197.24 1145.06 120.00THER (GT)
I.P.CCPP 270.00 2.76 1.75 220.68 163.70 120.00
PRAGATI CCGT-III 1500.00 5.52 6.76 432.36 535.04
PRAGATI CCPP 330.40 6.90 6.56 544.20 446.32
PVT SECTOR: 108.00 0.00 0.00 0.00 0.00 108.00
108.00 0.00 0.00 0.00 0.00 108.00THER (GT)
RITHALA CCPP 108.00 0.00 0.00 0.00 0.00 108.00
CENTRAL SECTOR: 705.00 11.53 9.67 774.54 570.06 285.00
705.00 11.53 9.67 774.54 570.06 285.00THERMAL
BADARPUR TPS 70705.00 11.53 9.67 774.54 570.06 285.00
1 95.00 1.50 0.00 119.00 0.00 95.00 21/03/2015 23:55 RESERVE SHUT DOWNUnit L
2 95.00 1.60 0.00 92.80 25.21 95.00 11/05/2015 13:57 RESERVE SHUT DOWNUnit L
" ** " CAPACITY FIGURES ARE TAKEN FROM MONTHLY REPORT OF D.M.L.F. DIVISION AS ON THE LAST DAY OF THE PREVIOUS MONTH * UNIT SYNCHRONISED, P = PLANNED OUTAGE, L = LONG DURATION OUTAGE, S = SHORT DURATION OUTAGE
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 2Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
3 95.00 1.57 0.00 123.26 76.90 95.00 13/06/2015 20:34 RESERVE SHUT DOWNUnit S
4 210.00 3.43 4.58 271.74 315.01Unit
5 210.00 3.43 5.09 167.74 152.94Unit
HARYANA
STATE TOTAL 6411.59 77.46 65.35 5881.28 4090.43 3120.00
STATE SECTOR: 3160.00 35.37 19.93 2763.66 1303.04 1960.00
3160.00 35.37 19.93 2763.66 1303.04 1960.00THERMAL
PANIPAT TPS 551360.00 12.97 0.00 1068.46 214.45 1360.00
1 110.00 0.47 0.00 36.46 0.07 110.00 16/05/2015 23:59 RESERVE SHUT DOWNUnit L
2 110.00 0.47 0.00 34.46 5.12 110.00 13/05/2015 15:50 RESERVE SHUT DOWNUnit L
3 110.00 0.43 0.00 33.74 4.67 110.00 13/05/2015 15:35 RESERVE SHUT DOWNUnit L
4 110.00 0.47 0.00 35.46 2.06 110.00 11/05/2015 21:40 RESERVE SHUT DOWNUnit L
5 210.00 0.00 0.00 124.00 1.14 210.00 07/05/2015 01:58 BOILER FEED PUMP/MOTOR PROBLEMUnit L
6 210.00 2.03 0.00 86.54 39.56 210.00 15/05/2015 07:23 RESERVE SHUT DOWNUnit L
7 250.00 4.70 0.00 370.60 76.31 250.00 19/05/2015 18:17 RESERVE SHUT DOWNUnit L
8 250.00 4.40 0.00 347.20 85.52 250.00 19/05/2015 16:59 RESERVE SHUT DOWNUnit L
RAJIV GANDHI TPS 501200.00 14.66 6.98 1085.88 420.88 600.00
1 600.00 7.13 6.98 491.34 258.28 29/05/2015 03:08 18/06/201508:40
BOILER MISC. PROBLEMUnit *
2 600.00 7.53 0.00 594.54 162.60 600.00 13/06/2015 14:35 GRID FREQ. HIGH/LOWUnit S
YAMUNA NAGAR TPS 22600.00 7.74 12.95 609.32 667.71
1 300.00 3.87 6.47 304.66 349.11Unit
2 300.00 3.87 6.48 304.66 318.60Unit
PVT SECTOR: 1320.00 20.84 22.97 1449.12 1251.22 660.00
1320.00 20.84 22.97 1449.12 1251.22 660.00THERMAL
MAHATMA GANDHI TPS 331320.00 20.84 22.97 1449.12 1251.22 660.00
1 660.00 10.47 9.39 633.46 678.82 660.00 18/06/2015 18:32 WATER WALL TUBE LEAKAGEUnit S
2 660.00 10.37 13.58 815.66 572.40Unit
CENTRAL SECTOR: 1931.59 21.25 22.46 1668.50 1536.17 500.00
1500.00 17.86 18.06 1408.48 1300.41 500.00THERMAL
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 3Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
INDIRA GANDHI STPP 151500.00 17.86 18.06 1408.48 1300.41 500.00
1 500.00 6.13 9.05 483.34 651.30Unit
2 500.00 6.13 9.00 483.34 250.77Unit
3 500.00 5.60 0.00 441.80 398.34 500.00 18/05/2015 13:20 RESERVE SHUT DOWNUnit L
431.59 3.39 4.40 260.02 235.76THER (GT)
FARIDABAD CCPP 431.59 3.39 4.40 260.02 235.76
HIMACHAL PRADESH
STATE TOTAL 6397.02 109.89 129.41 5871.02 7623.64 532.00
STATE SECTOR: 366.00 4.40 4.52 255.20 343.53 42.00
366.00 4.40 4.52 255.20 343.53 42.00HYDRO
BASSI HPS 60.00 1.47 1.45 88.46 90.07
GIRI BATA HPS 60.00 0.13 0.18 10.34 35.46
KASHANG-I 0.00 0.00 0.00 0.00 0.00
LARJI HPS 126.00 2.80 2.89 156.40 218.00 42.00
SANJAY HPS 120.00 0.00 0.00 0.00 0.00
UHL-III HPS 0.00 0.00 0.00 0.00 0.00
PVT SECTOR: 1748.00 38.86 43.98 1782.48 2090.59 100.00
1748.00 38.86 43.98 1782.48 2090.59 100.00HYDRO
ALLAIN DUHANGAN HPS 192.00 4.33 4.28 149.94 204.68
BASPA HPS 300.00 6.80 7.91 288.40 338.35
BUDHIL HPS 70.00 1.03 0.15 38.54 33.68
KARCHAM WANGTOO HPS 1000.00 23.10 28.80 1139.80 1333.07
MALANA HPS 86.00 1.63 1.25 75.34 88.11
MALANA-II HPS 100.00 1.97 1.58 90.46 92.70 100.00
SORANG HPS 0.00 0.00 0.00 0.00 0.00
CENTRAL SECTOR: 4283.02 66.63 80.92 3833.34 5189.52 390.00
4283.02 66.63 80.92 3833.34 5189.52 390.00HYDRO
BAIRA SIUL HPS 180.00 2.70 2.77 235.60 280.26
CHAMERA- I HPS 540.00 10.83 9.75 683.94 960.95
CHAMERA- II HPS 300.00 6.50 7.44 428.00 530.32
CHAMERA-III HPS 231.00 4.50 5.68 299.00 388.70
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 4Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
KOLDAM 600.00 0.00 3.93 0.00 74.52
NATHPA JHAKRI HPS 1500.00 32.90 38.99 1697.20 2180.30
PARBATI-III HPS 520.00 3.87 3.29 183.66 172.51 390.00
RAMPUR HPS 412.02 5.33 9.06 305.94 601.96
JAMMU AND KASHMIR
STATE TOTAL 2844.00 53.64 56.60 3914.52 4133.66 212.00
STATE SECTOR: 835.00 14.57 14.59 1055.26 1106.28 70.00
175.00 0.00 0.00 0.00 0.00THER (GT)
PAMPORE GPS (Liq.) 175.00 0.00 0.00 0.00 0.00
660.00 14.57 14.59 1055.26 1106.28 70.00HYDRO
BAGLIHAR HPS 450.00 10.77 10.80 780.86 852.53
BAGLIHAR II HPS 0.00 0.00 0.00 0.00 0.00
LOWER JHELUM HPS 105.00 2.30 2.22 179.40 167.58
UPPER SINDH-II HPS 105.00 1.50 1.57 95.00 86.17 70.00
CENTRAL SECTOR: 2009.00 39.07 42.01 2859.26 3027.38 142.00
2009.00 39.07 42.01 2859.26 3027.38 142.00HYDRO
CHUTAK HPS 44.00 0.17 0.09 13.06 6.93 22.00
DULHASTI HPS 390.00 8.50 9.40 603.00 697.39
NIMBOO BAZDO HPS 45.00 0.20 0.20 16.60 16.74
SALAL HPS 690.00 14.60 16.12 946.80 1171.20
SEWA-II HPS 120.00 1.43 1.76 154.74 222.57
URI-I HPS 480.00 10.67 11.49 772.06 906.95
URI-II HPS 240.00 3.50 2.94 353.00 5.60 120.00
PUNJAB
STATE TOTAL 5731.00 90.31 110.96 5921.78 3969.07 325.00
STATE SECTOR: 3671.00 54.89 72.35 3728.02 2357.23 325.00
2620.00 40.33 57.57 2952.94 1570.38 110.00THERMAL
GH TPS (LEH.MOH.) 37920.00 14.46 21.46 1052.28 637.32
1 210.00 3.03 4.89 238.54 129.97Unit
2 210.00 3.03 4.93 238.54 149.69Unit
3 250.00 4.17 5.84 328.06 177.07Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 5Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
4 250.00 4.23 5.80 247.14 180.59Unit
GND TPS(BHATINDA) 46440.00 5.44 9.57 391.92 161.41 110.00
1 110.00 1.23 2.36 59.14 35.61Unit
2 110.00 1.17 1.84 95.06 15.59 110.00 06/04/2015 18:27 18/06/201504:30
RESERVE SHUT DOWNUnit *
3 110.00 1.97 2.70 154.46 92.34Unit
4 110.00 1.07 2.66 83.26 17.87Unit
ROPAR TPS 481260.00 20.43 26.54 1508.74 771.65
1 210.00 3.27 4.37 256.86 206.98Unit
2 210.00 3.43 4.28 270.74 199.67Unit
3 210.00 3.43 4.24 270.74 73.28Unit
4 210.00 3.33 4.53 161.94 123.71Unit
5 210.00 3.80 4.09 299.40 87.06Unit
6 210.00 3.17 5.04 249.06 80.95Unit
1051.00 14.56 14.78 775.08 786.85 215.00HYDRO
ANANDPUR SAHIB HPS 134.00 2.86 2.97 157.48 140.96
MUKERIAN HPS 207.00 2.23 2.71 58.14 73.59
RANJIT SAGAR HPS 600.00 6.90 6.46 380.20 416.16 150.00
SHANAN HPS 110.00 2.57 2.64 179.26 156.14 65.00
PVT SECTOR: 2060.00 35.42 38.61 2193.76 1611.84
2060.00 35.42 38.61 2193.76 1611.84THERMAL
GOINDWAL SAHIB 00.00 0.00 0.00 0.00 0.00
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
RAJPURA TPP 231400.00 26.79 28.17 1513.42 1304.52
1 700.00 17.76 14.04 843.88 460.88Unit
2 700.00 9.03 14.13 669.54 843.64Unit
TALWANDI SABO TPP 0660.00 8.63 10.44 680.34 307.32
1 0.00 8.63 0.00 680.34 0.00 UNIT NOT YET COMMISSIONEDUnit
2 660.00 0.00 10.44 0.00 307.32Unit
3 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
RAJASTHAN
STATE TOTAL 10454.13 164.78 141.58 12131.09 10344.36 3386.00
STATE SECTOR: 6204.80 82.71 77.14 6606.90 4839.61 2231.00
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 6Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
5190.00 77.23 73.38 6154.26 4429.13 2005.00THERMAL
CHHABRA TPP 211000.00 10.69 11.77 1098.10 1074.99 500.00
1 250.00 3.83 0.00 301.94 232.55 250.00 24/05/2015 22:02 GEN. TRANSORMER PROTECTIONRELAY OPERATION PROBLEM
Unit L
2 250.00 3.83 5.84 301.94 394.39Unit
3 250.00 0.00 0.00 255.68 144.00 250.00 10/06/2015 11:52 MILLING SYSTEM /RC FEEDER PROBLEMUnit S
4 250.00 3.03 5.93 238.54 304.05Unit
GIRAL TPS 0250.00 1.20 2.18 95.60 102.10 125.00
1 125.00 0.60 0.00 47.80 0.00 125.00 11/07/2014 08:20 ECONOMISER TUBE LEAKAGEUnit L
2 125.00 0.60 2.18 47.80 102.10Unit
KALISINDH TPS 01200.00 10.80 11.91 853.40 672.27 600.00
1 600.00 10.80 11.91 853.40 629.48Unit
2 600.00 0.00 0.00 0.00 42.79 600.00 11/06/2015 22:44 MISC. SHORT DURATION MAINTENANCEWORKS
Unit S
KOTA TPS 311240.00 28.23 21.26 1980.09 1422.80 530.00
1 110.00 2.47 2.59 142.41 176.01Unit
2 110.00 2.47 0.00 193.46 123.97 110.00 30/05/2015 14:42 CONDENSER LOW VACCUMUnit L
3 210.00 4.77 0.55 375.86 255.60 210.00 18/06/2015 02:04 18/06/201522:35
VARIOUS STEAM LEAKAGESUnit *
4 210.00 4.83 3.49 379.94 163.19 210.00 18/06/2015 16:33 WATER WALL TUBE LEAKAGEUnit S
5 210.00 4.83 4.60 380.94 272.14Unit
6 195.00 4.23 4.97 143.14 262.88Unit
7 195.00 4.63 5.06 364.34 169.01Unit
SURATGARH TPS 331500.00 26.31 26.26 2127.07 1156.97 250.00
1 250.00 5.33 5.81 308.94 85.65Unit
2 250.00 5.33 5.85 308.94 206.64Unit
3 250.00 5.08 4.82 305.96 182.48Unit
4 250.00 5.27 4.87 414.86 279.61Unit
5 250.00 5.30 0.00 416.40 279.57 250.00 03/06/2015 18:31 RESERVE SHUT DOWNUnit S
6 250.00 0.00 4.91 371.97 123.02Unit
603.80 5.48 3.37 432.64 399.96THER (GT)
DHOLPUR CCPP 330.00 2.61 1.98 205.98 99.07
RAMGARH CCPP 273.80 2.87 1.39 226.66 300.89
411.00 0.00 0.38 20.00 10.52 226.00HYDRO
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 7Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
JAWAHAR SAGAR HPS 99.00 0.00 0.21 0.00 3.37
MAHI BAJAJ HPS 140.00 0.00 0.00 20.00 5.87 140.00
R P SAGAR HPS 172.00 0.00 0.18 0.00 1.28 86.00
PVT SECTOR: 2400.00 52.40 32.40 3263.13 3257.21 930.00
2400.00 52.40 32.40 3263.13 3257.21 930.00THERMAL
JALIPA KAPURDI TPP 01080.00 20.60 18.15 1576.73 1479.46 270.00
1 135.00 2.97 3.11 202.46 179.38Unit
2 135.00 2.93 3.09 200.74 119.47Unit
3 135.00 2.92 0.00 211.04 167.04 135.00 16/06/2015 21:48 BOILER MISC. PROBLEMUnit S
4 135.00 2.93 3.22 230.74 215.91Unit
5 135.00 2.97 0.00 202.46 219.38 135.00 15/06/2015 03:15 BOILER MISC. PROBLEMUnit S
6 135.00 2.93 3.01 200.74 212.89Unit
7 135.00 2.95 2.55 143.55 197.31Unit
8 135.00 0.00 3.17 185.00 168.08Unit
KAWAI TPS 01320.00 31.80 14.26 1686.40 1777.75 660.00
1 660.00 16.80 0.00 503.40 750.83 660.00 31/05/2015 23:50 BOILER OVERHAUL/ ANNUALMAINTENANCE
Unit P
2 660.00 15.00 14.26 1183.00 1026.92Unit
CENTRAL SECTOR: 1849.33 29.67 32.04 2261.06 2247.54 225.00
250.00 4.60 2.55 291.80 260.86 125.00THERMAL
BARSINGSAR LIGNITE 0250.00 4.60 2.55 291.80 260.86 125.00
1 125.00 2.30 2.55 179.40 144.69Unit
2 125.00 2.30 0.00 112.40 116.17 125.00 28/05/2015 07:43 BOILER OVERHAUL/ ANNUALMAINTENANCE
Unit P
419.33 3.30 5.61 251.40 266.98THER (GT)
ANTA CCPP 419.33 3.30 5.61 251.40 266.98
1180.00 21.77 23.88 1717.86 1719.70 100.00NUCLEAR
DAE (RAJASTHAN) 100.00 0.00 0.00 0.00 0.00 100.00
1 100.00 0.00 0.00 0.00 0.00 100.00 09/10/2004 22:58 GENERATOR EARTH FAULTUnit L
RAJASTHAN A.P.S. 1080.00 21.77 23.88 1717.86 1719.70
2 200.00 3.97 3.67 313.46 223.43Unit
3 220.00 4.40 4.57 347.20 349.89Unit
4 220.00 4.50 5.31 355.00 381.15Unit
5 220.00 4.40 5.23 347.20 382.34Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 8Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
6 220.00 4.50 5.10 355.00 382.89Unit
UTTAR PRADESH
STATE TOTAL 19017.74 331.26 358.47 25234.69 24491.78 2418.00
STATE SECTOR: 5924.60 81.45 86.45 6360.10 6000.19 1408.00
5423.00 78.38 83.88 6198.84 5786.92 1258.00THERMAL
ANPARA TPS 132130.00 33.69 35.47 2662.42 2659.04 500.00
1 210.00 4.03 4.24 318.54 294.71Unit
2 210.00 4.03 4.05 318.54 312.90Unit
3 210.00 4.03 4.26 318.54 314.99Unit
4 500.00 10.80 11.31 853.40 818.41Unit
5 500.00 10.80 11.61 853.40 909.24Unit
6 500.00 0.00 0.00 0.00 8.79 500.00 07/06/2015 19:56 TURBINE MISC. PROBLEMUnit S
7 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
HARDUAGANJ TPS 31665.00 13.27 13.18 926.86 533.37 60.00
5 60.00 0.73 0.00 57.14 0.00 60.00 07/02/2015 20:40 BOILER FEED PUMP/MOTOR PROBLEMUnit L
7 105.00 2.00 1.43 36.00 6.55 18/06/2015 05:46 18/06/201513:25
SWITCH YARD/TRIPPING OFTRANSMISSION LINES/BUS BAR
Unit *
8 250.00 5.27 5.84 416.86 126.84Unit
9 250.00 5.27 5.91 416.86 399.98Unit
OBRA TPS 291278.00 12.15 10.44 961.70 883.96 588.00
1 40.00 0.73 0.64 58.14 46.14Unit
2 50.00 0.73 0.56 58.14 55.60Unit
7 94.00 0.00 0.00 0.00 0.00 94.00 26/06/2010 13:25 R AND M / REFURBISHMENT WORKSUnit P
8 94.00 0.00 0.00 0.00 0.00 94.00 21/06/2011 17:15 ESP PROBLEMUnit L
9 200.00 4.33 4.35 342.94 344.98Unit
10 200.00 0.00 0.00 0.00 0.00 200.00 22/03/2012 09:50 R AND M / REFURBISHMENT WORKSUnit P
11 200.00 0.00 0.00 0.00 0.00 200.00 10/07/2011 20:53 R AND M / REFURBISHMENT WORKSUnit P
12 200.00 3.23 1.95 255.14 217.01Unit
13 200.00 3.13 2.95 247.34 220.23Unit
PANKI TPS 37210.00 3.10 3.84 173.80 210.89
3 105.00 1.53 1.93 120.54 103.93Unit
4 105.00 1.57 1.91 53.26 106.96Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 9Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
PARICHHA TPS 61140.00 16.17 20.94 1474.06 1499.66 110.00
1 110.00 1.60 1.95 125.80 109.32Unit
2 110.00 0.00 0.00 0.00 0.00 110.00 07/03/2014 09:15 R AND M / REFURBISHMENT WORKSUnit P
3 210.00 4.03 4.19 318.54 254.90Unit
4 210.00 0.00 4.20 198.00 337.81Unit
5 250.00 5.27 5.05 416.86 388.13Unit
6 250.00 5.27 5.55 414.86 409.50Unit
501.60 3.07 2.57 161.26 213.27 150.00HYDRO
KHARA HPS 72.00 1.23 1.25 73.14 100.76
MATATILA HPS 30.60 0.00 0.00 0.00 5.63
OBRA HPS 99.00 0.47 0.46 22.46 29.93
RIHAND HPS 300.00 1.37 0.85 65.66 76.95 150.00
PVT SECTOR: 2850.00 61.56 65.59 4922.08 4354.80 300.00
2850.00 61.56 65.59 4922.08 4354.80 300.00THERMAL
ANPARA C TPS 71200.00 25.93 27.87 2041.74 1958.36
1 600.00 13.03 13.82 1024.54 986.99Unit
2 600.00 12.90 14.05 1017.20 971.37Unit
BARKHERA TPS 290.00 1.74 2.13 147.32 95.52
1 45.00 0.87 1.06 73.66 47.61Unit
2 45.00 0.87 1.07 73.66 47.91Unit
KHAMBARKHERA TPS 390.00 1.74 2.13 153.32 99.86
1 45.00 0.87 1.08 76.66 50.16Unit
2 45.00 0.87 1.05 76.66 49.70Unit
KUNDARKI TPS 290.00 1.74 2.13 153.32 104.31
1 45.00 0.87 1.07 76.66 52.06Unit
2 45.00 0.87 1.07 76.66 52.25Unit
LALITPUR TPS 00.00 0.00 0.00 0.00 0.00
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
MAQSOODPUR TPS 590.00 1.80 2.13 154.40 95.18
1 45.00 0.90 1.06 77.20 49.08Unit
2 45.00 0.90 1.06 77.20 46.10Unit
PRAYAGRAJ TPP 00.00 0.00 0.00 0.00 0.00
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 10Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
ROSA TPP Ph-I 461200.00 26.87 27.08 2118.66 1917.74 300.00
1 300.00 6.60 7.10 519.80 426.62Unit
2 300.00 7.00 5.89 552.00 482.53 300.00 18/06/2015 20:11 WATER WALL TUBE LEAKAGEUnit S
3 300.00 6.67 7.07 526.06 502.17Unit
4 300.00 6.60 7.01 520.80 506.42Unit
UTRAULA TPS 190.00 1.74 2.12 153.32 83.83
1 45.00 0.87 1.06 76.66 42.05Unit
2 45.00 0.87 1.06 76.66 41.78Unit
CENTRAL SECTOR: 10243.14 188.25 206.44 13952.51 14136.79 710.00
8310.00 168.70 182.53 12388.61 12415.06 710.00THERMAL
DADRI (NCTPP) 291820.00 36.76 39.07 2663.68 2424.07 210.00
1 210.00 4.23 0.62 144.14 160.54 210.00 13/06/2015 23:45 18/06/201519:07
RESERVE SHUT DOWNUnit *
2 210.00 4.30 5.07 340.40 302.25Unit
3 210.00 4.23 5.16 334.14 321.82Unit
4 210.00 4.23 5.14 334.14 317.51Unit
5 490.00 9.87 11.54 729.66 703.16Unit
6 490.00 9.90 11.54 781.20 618.79Unit
RIHAND STPS 213000.00 55.84 59.68 4150.12 4408.25 500.00
1 500.00 9.10 0.00 455.80 418.93 500.00 18/05/2015 03:30 BOILER OVERHAUL/ ANNUALMAINTENANCE
Unit P
2 500.00 9.27 11.30 730.86 803.86Unit
3 500.00 9.53 12.11 753.54 872.85Unit
4 500.00 9.70 12.27 767.60 597.16Unit
5 500.00 9.07 12.03 717.26 837.22Unit
6 500.00 9.17 11.97 725.06 878.23Unit
SINGRAULI STPS 162000.00 43.82 48.84 3242.77 3456.76
1 200.00 4.43 5.00 348.74 385.93Unit
2 200.00 4.33 5.01 234.95 272.35Unit
3 200.00 4.37 4.99 236.66 259.65Unit
4 200.00 4.43 5.05 348.74 380.41Unit
5 200.00 4.43 4.97 348.74 386.22Unit
6 500.00 10.83 11.80 854.94 894.54Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 11Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
7 500.00 11.00 12.02 870.00 877.66Unit
TANDA TPS 30440.00 9.51 9.98 694.18 748.63
1 110.00 2.37 2.55 129.66 183.47Unit
2 110.00 2.37 2.21 187.66 182.65Unit
3 110.00 2.37 2.60 186.66 191.88Unit
4 110.00 2.40 2.62 190.20 190.63Unit
UNCHAHAR TPS 441050.00 22.77 24.96 1637.86 1377.35
1 210.00 4.33 4.92 342.94 314.07Unit
2 210.00 4.40 5.06 348.20 311.44Unit
3 210.00 4.70 5.03 371.60 294.84Unit
4 210.00 4.67 4.97 369.06 298.46Unit
5 210.00 4.67 4.98 206.06 158.54Unit
1493.14 11.41 14.56 929.38 933.77THER (GT)
AURAIYA CCPP 663.36 5.04 6.59 414.72 335.75
DADRI CCPP 829.78 6.37 7.97 514.66 598.02
440.00 8.14 9.35 634.52 787.96NUCLEAR
NARORA A.P.S. 440.00 8.14 9.35 634.52 787.96
1 220.00 4.07 4.67 313.26 378.65Unit
2 220.00 4.07 4.67 321.26 409.31Unit
UTTARAKHAND
STATE TOTAL 3756.35 42.42 46.71 2576.56 2885.61 339.45
STATE SECTOR: 1252.15 15.93 17.78 1027.74 1094.43 208.05
1252.15 15.93 17.78 1027.74 1094.43 208.05HYDRO
CHIBRO (YAMUNA) HPS 240.00 2.53 3.05 160.54 231.34 60.00
CHILLA HPS 144.00 2.50 2.74 170.00 188.63
DHAKRANI HPS 33.75 0.43 0.50 27.74 40.57 11.25
DHALIPUR HPS 51.00 0.67 0.67 43.06 59.23 17.00
KHATIMA HPS 41.40 0.40 0.25 29.20 24.55 13.80
KHODRI HPS 120.00 1.17 1.44 76.06 109.48 30.00
KULHAL HPS 30.00 0.43 0.49 28.74 40.17
MANERI BHALI - I HPS 90.00 1.83 2.17 128.94 158.18
MANERI BHALI - II HPS 304.00 5.10 6.48 299.80 211.22 76.00
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 12Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
RAMGANGA HPS 198.00 0.87 0.00 63.66 31.06
PVT SECTOR: 730.00 12.86 10.60 497.48 520.60
730.00 12.86 10.60 497.48 520.60HYDRO
SRINAGAR HPS 330.00 3.73 0.00 67.14 0.00
VISHNU PRAYAG HPS 400.00 9.13 10.60 430.34 520.60
CENTRAL SECTOR: 1774.20 13.63 18.33 1051.34 1270.58 131.40
1774.20 13.63 18.33 1051.34 1270.58 131.40HYDRO
DHAULI GANGA HPS 280.00 4.33 6.36 212.94 277.70
KOTESHWAR HPS 400.00 3.07 3.55 261.26 288.58 100.00
TANAKPUR HPS 94.20 1.40 1.80 75.20 104.51 31.40
TEHRI ST-1 HPS 1000.00 4.83 6.62 501.94 599.79
WESTERN
REGION TOTAL 90223.41 1076.48 1033.83 89198.04 84546.42 26774.00
CHHATTISGARH
STATE TOTAL 17573.00 222.67 218.49 18990.63 16450.70 7253.00
STATE SECTOR: 2900.00 46.06 42.42 3917.08 3422.65 760.00
2780.00 45.73 41.95 3891.14 3382.33 760.00THERMAL
DSPM TPS 21500.00 11.07 10.53 877.26 877.23
1 250.00 5.37 5.72 425.66 424.58Unit
2 250.00 5.70 4.81 451.60 452.65 17/06/2015 22:10 18/06/201502:11
ROTOR/ ROTOR EARTH FAULTUnit *
KORBA-II 3200.00 3.12 2.35 246.16 179.55 50.00
1 50.00 0.78 0.00 62.04 44.96 50.00 14/06/2015 20:30 SUPER HEATER TUBE LEAKAGEUnit S
2 50.00 0.77 0.77 60.86 23.85Unit
3 50.00 0.77 0.79 60.86 47.80Unit
4 50.00 0.80 0.79 62.40 62.94Unit
KORBA-III 3240.00 3.90 3.83 308.20 318.67
1 120.00 1.90 1.91 149.20 150.91Unit
2 120.00 2.00 1.92 159.00 167.76Unit
KORBA-WEST TPS 61340.00 23.97 25.25 2170.46 2006.88 210.00
1 210.00 0.00 4.84 275.00 361.17Unit
2 210.00 4.50 4.77 356.00 370.80Unit
3 210.00 4.47 4.60 354.46 300.21Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 13Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
4 210.00 4.50 0.00 356.00 212.67 210.00 25/05/2015 17:50 FIRE IN CABLE GALLERY.Unit L
5 500.00 10.50 11.03 829.00 762.03Unit
MARWA TPS 0500.00 3.67 0.00 289.06 0.00 500.00
1 500.00 3.67 0.00 289.06 0.00 500.00 30/03/2014 01:35 NON STABLISED UNITUnit L
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
120.00 0.33 0.47 25.94 40.32HYDRO
HASDEOBANGO HPS 120.00 0.33 0.47 25.94 40.32
PVT SECTOR: 8593.00 57.31 44.24 5304.18 3483.24 5993.00
8593.00 57.31 44.24 5304.18 3483.24 5993.00THERMAL
AKALTARA TPS 01200.00 1.57 8.00 901.86 812.77 600.00
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
3 600.00 0.00 8.00 779.60 811.01Unit
4 600.00 1.57 0.00 122.26 1.76 600.00 26/08/2014 16:50 TRANSMISSION CONSTRAINTSUnit L
AVANTHA BHANDAR 0600.00 2.73 0.00 216.14 0.00 600.00
1 600.00 2.73 0.00 216.14 0.00 600.00 31/03/2014 02:24 NON STABLISED UNITUnit L
BALCO TPS 0300.00 0.00 0.00 0.00 0.00
1 300.00 0.00 0.00 0.00 0.00Unit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
BANDAKHAR TPP 00.00 0.00 0.00 0.00 0.00
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
BARADARHA TPS 01200.00 0.83 0.00 65.94 1.88 1200.00
1 600.00 0.83 0.00 65.94 1.88 600.00 06/04/2015 16:30 ELECTRICAL MISCELLANEOUSPROBLEMS
Unit L
2 600.00 0.00 0.00 0.00 0.00 600.00 24/03/2015 21:56 NON STABLISED UNITUnit L
BINJKOTE TPP 00.00 0.00 0.00 0.00 0.00
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
CHAKABURA TPP 030.00 0.57 0.72 43.26 45.49
1 30.00 0.57 0.72 43.26 45.49Unit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
KASAIPALLI TPP 0270.00 5.83 6.33 460.94 429.82
1 135.00 2.93 3.11 230.74 211.46Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 14Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
2 135.00 2.90 3.22 230.20 218.36Unit
KATGHORA TPP 035.00 0.00 0.00 0.00 0.00 35.00
1 35.00 0.00 0.00 0.00 0.00 35.00 15/10/2012 00:28 COAL SHORTAGE/FEEDING PROBLEMUnit L
OP JINDAL TPS 01000.00 23.69 10.75 1870.42 854.67 500.00
1 250.00 5.90 0.00 467.20 0.00 250.00 29/03/2015 12:01 AIR PREHEATERS PROBLEMUnit L
2 250.00 5.93 5.38 467.74 424.13Unit
3 250.00 5.93 5.37 467.74 430.54Unit
4 250.00 5.93 0.00 467.74 0.00 250.00 31/03/2015 23:59 GRID MISCELLANEOUSUnit L
PATHADI TPP 4600.00 6.63 6.81 524.34 465.69 300.00
1 300.00 6.63 6.81 524.34 465.69Unit
2 300.00 0.00 0.00 0.00 0.00 300.00 20/03/2014 16:13 NO FUEL SUPPLYUnit L
RAIKHEDA TPP 0685.00 0.00 0.00 0.00 51.05 685.00
1 685.00 0.00 0.00 0.00 51.05 685.00 03/05/2015 18:30 RESERVE SHUT DOWNUnit L
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
RATIJA TPS 050.00 0.83 0.00 65.94 25.48 50.00
1 50.00 0.83 0.00 65.94 25.48 50.00 25/05/2015 02:27 TURBINE VIBRATIONS HIGHUnit L
SALORA TPP 0135.00 0.40 0.00 32.20 0.00 135.00
1 135.00 0.40 0.00 32.20 0.00 135.00 19/10/2014 04:30 COAL SHORTAGEUnit L
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
SVPL TPP 063.00 0.00 0.00 0.00 0.00 63.00
1 63.00 0.00 0.00 0.00 0.00 63.00 23/10/2012 02:18 COAL SHORTAGE/FEEDING PROBLEMUnit L
SWASTIK KORBA TPP 025.00 0.00 0.00 0.00 0.00 25.00
1 25.00 0.00 0.00 0.00 0.00 25.00 01/04/2015 00:20 RESERVE SHUT DOWNUnit L
TAMNAR TPP 02400.00 14.23 11.63 1123.14 796.39 1800.00
1 600.00 7.10 0.00 560.80 583.56 600.00 06/06/2015 02:53 FURNACE FIRE OUT /FLAME FAILUREUnit S
2 600.00 7.13 11.63 562.34 212.83Unit
3 600.00 0.00 0.00 0.00 0.00 600.00 15/02/2015 00:47 COAL SHORTAGEUnit L
4 600.00 0.00 0.00 0.00 0.00 600.00 28/03/2015 06:36 FUEL SUPPLY & OTHER MISC.PROBLEMS
Unit L
TRN ENERGY TPP 00.00 0.00 0.00 0.00 0.00
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 15Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
UCHPINDA TPP 00.00 0.00 0.00 0.00 0.00
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
CENTRAL SECTOR: 6080.00 119.30 131.84 9769.37 9544.81 500.00
6080.00 119.30 131.84 9769.37 9544.81 500.00THERMAL
BHILAI TPS 34500.00 11.14 10.83 718.52 882.29
1 250.00 5.57 5.55 439.26 447.06Unit
2 250.00 5.57 5.28 279.26 435.23Unit
KORBA STPS 102600.00 46.17 50.47 4524.03 4312.86 500.00
1 200.00 4.40 4.82 345.20 366.95Unit
2 200.00 4.37 4.84 344.66 371.72Unit
3 200.00 4.43 4.86 349.74 383.99Unit
4 500.00 11.07 12.01 873.26 924.91Unit
5 500.00 10.87 11.86 858.66 844.49Unit
6 500.00 11.03 12.08 760.54 586.67Unit
7 500.00 0.00 0.00 991.97 834.13 500.00 10/06/2015 00:44 BOILER OVERHAUL/ ANNUALMAINTENANCE
Unit P
SIPAT STPS 222980.00 61.99 70.54 4526.82 4349.66
1 660.00 13.83 15.50 722.94 170.90Unit
2 660.00 14.03 15.68 1107.54 1185.74Unit
3 660.00 13.53 15.62 1068.54 1163.03Unit
4 500.00 10.43 11.86 824.74 900.38Unit
5 500.00 10.17 11.88 803.06 929.61Unit
GOA
STATE TOTAL 48.00 0.00 0.00 0.00 0.00
PVT SECTOR: 48.00 0.00 0.00 0.00 0.00
48.00 0.00 0.00 0.00 0.00THER (GT)
GOA CCPP (Liq.) 48.00 0.00 0.00 0.00 0.00
GUJARAT
STATE TOTAL 25687.41 308.89 305.65 24253.57 23813.73 3805.00
STATE SECTOR: 9031.82 81.76 62.18 6176.73 5695.02 1950.00
4720.00 72.67 54.30 5544.11 4892.16 1750.00THERMAL
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 16Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
AKRIMOTA LIG TPS 0250.00 4.40 4.49 347.20 338.07
1 125.00 2.07 2.24 163.26 163.35Unit
2 125.00 2.33 2.24 183.94 174.72Unit
BHAVNAGAR CFBC TPP 00.00 0.00 0.00 0.00 0.00
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
GANDHI NAGAR TPS 25870.00 10.55 8.14 805.90 810.97 450.00
1 120.00 0.00 0.00 0.00 0.00 120.00 04/05/2013 12:05 RESERVE SHUT DOWNUnit L
2 120.00 0.00 0.00 0.00 0.00 120.00 20/10/2014 05:58 RESERVE SHUT DOWNUnit L
3 210.00 2.67 3.92 210.06 286.45Unit
4 210.00 3.21 0.00 229.78 178.46 210.00 31/05/2015 23:15 RESERVE SHUT DOWNUnit L
5 210.00 4.67 4.21 366.06 346.06Unit
KUTCH LIG. TPS 0290.00 3.59 3.38 309.62 255.93 70.00
1 70.00 0.00 0.00 60.00 55.07 70.00 16/05/2015 00:55 BOILER OVERHAUL/ ANNUALMAINTENANCE
Unit P
2 70.00 1.43 1.33 114.74 46.21Unit
3 75.00 1.03 1.12 80.54 93.18Unit
4 75.00 1.13 0.93 54.34 61.47Unit
SIKKA REP. TPS 23490.00 1.94 2.08 152.92 248.34 370.00
1 120.00 0.97 0.00 76.46 89.35 120.00 14/05/2015 09:25 FIRE IN CABLE GALLERY.Unit L
2 120.00 0.97 2.08 76.46 141.70Unit
3 250.00 0.00 0.00 0.00 17.29 250.00 15/06/2015 11:25 WATER WALL TUBE LEAKAGEUnit S
UKAI TPS 111350.00 22.13 15.74 1747.34 1517.83 440.00
1 120.00 0.00 0.00 0.00 34.55 120.00 24/04/2015 20:41 RESERVE SHUT DOWNUnit L
2 120.00 0.00 0.00 0.00 0.00 120.00 04/10/2014 14:22 RESERVE SHUT DOWNUnit L
3 200.00 4.13 3.87 326.34 226.33Unit
4 200.00 4.07 0.00 320.26 296.42 200.00 13/06/2015 11:12 RESERVE SHUT DOWNUnit S
5 210.00 4.03 4.03 318.54 290.49Unit
6 500.00 9.90 7.85 782.20 670.04Unit
WANAKBORI TPS 291470.00 30.06 20.46 2181.13 1721.02 420.00
1 210.00 4.50 4.22 354.00 321.05Unit
2 210.00 4.60 4.28 362.80 320.15Unit
3 210.00 4.13 4.06 325.34 297.61Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 17Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
4 210.00 3.30 0.00 260.40 239.96 210.00 01/06/2015 16:47 RESERVE SHUT DOWNUnit L
5 210.00 4.20 0.00 330.60 205.81 210.00 01/06/2015 09:20 RESERVE SHUT DOWNUnit L
6 210.00 4.73 3.95 185.19 8.50Unit
7 210.00 4.60 3.95 362.80 327.94Unit
2321.82 1.19 1.81 76.42 236.90THER (GT)
DHUVARAN CCPP 594.72 0.59 1.74 35.62 77.90
HAZIRA CCPP 156.10 0.60 0.00 40.80 32.63
HAZIRA CCPP EXT 351.00 0.00 0.00 0.00 0.00
PIPAVAV CCPP 702.00 0.00 0.00 0.00 0.00
UTRAN CCPP 518.00 0.00 0.07 0.00 126.37
1990.00 7.90 6.07 556.20 565.96 200.00HYDRO
KADANA HPS 240.00 0.20 0.16 5.60 14.63
S SAROVAR CHPH HPS 250.00 1.27 0.97 94.86 81.49
S SAROVAR RBPH HPS 1200.00 5.10 4.94 351.80 349.37 200.00
UKAI HPS 300.00 1.33 0.00 103.94 120.47
PVT SECTOR: 14902.00 208.45 230.61 16911.60 16780.98 1855.00
10742.00 199.10 204.31 16171.30 15676.44 1585.00THERMAL
MUNDRA TPS 04620.00 82.01 103.14 7279.18 7602.83
1 330.00 6.37 7.68 500.66 298.38Unit
2 330.00 6.60 7.15 247.80 522.56Unit
3 330.00 6.37 7.06 500.66 536.70Unit
4 330.00 6.23 6.25 492.14 543.91Unit
5 660.00 14.47 14.80 1141.46 1142.27Unit
6 660.00 14.37 15.62 1133.66 1180.07Unit
7 660.00 13.80 14.97 1088.40 1130.19Unit
8 660.00 0.00 15.00 1086.00 1127.60Unit
9 660.00 13.80 14.61 1088.40 1121.15Unit
MUNDRA UMTPP 04000.00 74.81 76.58 6013.58 5443.45 800.00
1 800.00 18.67 18.91 834.06 1390.65Unit
2 800.00 0.00 19.25 1129.00 1314.97Unit
3 800.00 18.80 0.00 1467.40 1342.08 800.00 15/06/2015 23:48 REGENERATIVE SYSTEM PROBLEMUnit S
4 800.00 18.67 18.95 1264.06 485.06Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 18Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
5 800.00 18.67 19.47 1319.06 910.69Unit
SABARMATI (C STATION) 2360.00 1.17 0.00 92.06 52.93 60.00
15 30.00 0.60 0.00 45.80 26.20 30.00 01/06/2015 19:50 RESERVE SHUT DOWNUnit L
16 30.00 0.57 0.00 46.26 26.73 30.00 01/06/2015 19:50 RESERVE SHUT DOWNUnit L
SABARMATI (D-F STATIONS) 23362.00 9.23 7.09 729.14 587.64
1 120.00 3.03 2.30 239.54 192.45Unit
2 121.00 3.10 2.38 243.80 196.68Unit
3 121.00 3.10 2.41 245.80 198.51Unit
SALAYA TPP 01200.00 21.68 10.70 1253.74 1155.31 600.00
1 600.00 11.05 10.70 611.40 872.64Unit
2 600.00 10.63 0.00 642.34 282.67 600.00 16/06/2015 16:13 RESERVE SHUT DOWNUnit S
SURAT LIG. TPS 0500.00 10.20 6.80 803.60 834.28 125.00
1 125.00 2.47 2.73 195.46 211.33Unit
2 125.00 2.47 1.73 195.46 209.29 13/06/2015 11:33 18/06/201506:56
RESERVE SHUT DOWNUnit *
3 125.00 2.63 2.34 206.34 201.77Unit
4 125.00 2.63 0.00 206.34 211.89 125.00 11/06/2015 00:15 RESERVE SHUT DOWNUnit S
4160.00 9.35 26.30 740.30 1104.54 270.00THER (GT)
BARODA CCPP 160.00 0.10 0.00 9.80 1.90 160.00
DGEN MEGA CCPP 1200.00 0.00 0.00 0.00 180.06
ESSAR CCPP 515.00 0.00 0.00 0.00 0.00 110.00
GIPCL. GT IMP 0.00 0.40 0.40 35.20 29.58
PEGUTHAN CCPP 655.00 0.84 3.72 65.12 49.99
SUGEN CCPP 1147.50 8.01 15.50 630.18 725.65
UNOSUGEN CCPP 382.50 0.00 6.68 0.00 117.36
VATWA CCPP 100.00 0.00 0.00 0.00 0.00
CENTRAL SECTOR: 1753.59 18.68 12.86 1165.24 1337.73
1313.59 9.38 2.78 724.84 776.97THER (GT)
GANDHAR CCPP 657.39 4.66 0.00 348.88 344.19
KAWAS CCPP 656.20 4.72 2.78 375.96 432.78
440.00 9.30 10.08 440.40 560.76NUCLEAR
KAKRAPARA 440.00 9.30 10.08 440.40 560.76
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 19Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
1 220.00 4.83 5.27 86.94 195.99Unit
2 220.00 4.47 4.81 353.46 364.77Unit
MADHYA PRADESH
STATE TOTAL 18000.00 221.95 236.59 18460.68 18636.70 4595.00
STATE SECTOR: 5195.00 60.26 40.52 5030.68 4007.54 2100.00
4320.00 55.16 38.72 4620.88 3612.80 2100.00THERMAL
AMARKANTAK EXT TPS 29450.00 1.80 4.87 417.40 384.44 240.00
1 120.00 0.00 0.00 0.00 0.00 120.00 12/01/2015 00:25 MISC. FIRE HAZARDS / CABLE GALLERYUnit L
2 120.00 1.80 0.00 141.40 0.00 120.00 30/04/2014 11:13 TURBINE VIBRATIONS HIGHUnit L
3 210.00 0.00 4.87 276.00 384.44Unit
SANJAY GANDHI TPS 201340.00 23.83 9.26 1875.94 1264.27 840.00
1 210.00 3.53 0.00 276.54 192.25 210.00 29/05/2015 11:44 WATER WALL TUBE LEAKAGEUnit L
2 210.00 3.60 0.00 282.80 108.74 210.00 23/05/2015 10:47 RESERVE SHUT DOWNUnit L
3 210.00 3.60 0.00 282.80 191.32 210.00 23/05/2015 11:30 RESERVE SHUT DOWNUnit L
4 210.00 3.27 0.00 257.86 162.55 210.00 23/05/2015 12:00 RESERVE SHUT DOWNUnit L
5 500.00 9.83 9.26 775.94 609.41Unit
SATPURA TPS 91330.00 19.80 15.74 1560.40 1358.53 420.00
6 200.00 2.70 3.70 212.60 145.20Unit
7 210.00 2.70 3.70 212.60 211.91Unit
8 210.00 2.90 0.00 228.20 289.65 210.00 16/06/2015 00:00 RESERVE SHUT DOWNUnit S
9 210.00 2.70 0.00 212.60 180.46 210.00 23/05/2015 13:30 FIRE IN GEN. BUSHING/ BUSHINGFAILURE
Unit L
10 250.00 4.47 4.15 353.46 254.07Unit
11 250.00 4.33 4.19 340.94 277.24Unit
SHRI SINGHAJI TPP 141200.00 9.73 8.85 767.14 605.56 600.00
1 600.00 9.73 8.85 767.14 395.74Unit
2 600.00 0.00 0.00 0.00 209.82 600.00 14/06/2015 00:07 RESERVE SHUT DOWNUnit S
875.00 5.10 1.80 409.80 394.74HYDRO
BANSAGAR TONS-1 HPS 315.00 3.03 0.00 223.54 207.57
BANSAGAR TONS-II HPS 30.00 0.27 1.46 20.86 9.57
BANSAGAR TONS-III HPS 60.00 0.03 0.00 0.54 18.19
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 20Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
BARGI HPS 90.00 0.80 0.34 85.40 132.61
GANDHI SAGAR HPS 115.00 0.27 0.00 28.86 1.20
MADHIKHERA HPS 60.00 0.07 0.00 1.26 0.02
PENCH HPS 160.00 0.63 0.00 49.34 25.20
RAJGHAT HPS 45.00 0.00 0.00 0.00 0.38
PVT SECTOR: 7025.00 76.79 112.13 5995.62 7206.75 1805.00
7025.00 76.79 112.13 5995.62 7206.75 1805.00THERMAL
ANUPPUR TPP 0600.00 0.00 6.56 0.00 314.13
1 600.00 0.00 6.56 0.00 314.13Unit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
BINA TPS 80500.00 7.55 0.00 538.30 142.21 500.00
1 250.00 3.95 0.00 255.50 41.81 250.00 14/04/2015 09:21 RESERVE SHUT DOWNUnit L
2 250.00 3.60 0.00 282.80 100.40 250.00 28/04/2015 13:00 RESERVE SHUT DOWNUnit L
MAHAN TPP 0600.00 2.50 0.00 197.00 0.00 600.00
1 600.00 2.50 0.00 197.00 0.00 600.00 17/10/2014 17:16 GENERATOR BEARING PROBLEMUnit L
NIGRI TPP 01320.00 9.10 11.25 715.80 692.59 660.00
1 660.00 9.10 9.02 715.80 89.31Unit
2 660.00 0.00 2.23 0.00 603.28 660.00 18/06/2015 08:11 WATER WALL TUBE LEAKAGEUnit S
NIWARI TPP 045.00 1.10 0.00 85.80 38.36 45.00
1 45.00 1.10 0.00 85.80 38.36 45.00 13/06/2015 00:19 RESERVE SHUT DOWNUnit S
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
SASAN UMTPP 03960.00 56.54 94.32 4458.72 6019.46
1 660.00 11.97 15.71 943.46 1077.78Unit
2 660.00 11.97 15.72 943.46 1006.91Unit
3 660.00 12.30 15.81 970.40 931.78Unit
4 660.00 11.97 15.57 943.46 926.90Unit
5 660.00 8.33 15.78 657.94 1015.58Unit
6 660.00 0.00 15.72 0.00 1060.51Unit
SEIONI TPP 00.00 0.00 0.00 0.00 0.00
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
0.00 0.00 0.00 0.00 0.00HYDRO
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 21Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
MAHESHWAR HPS 0.00 0.00 0.00 0.00 0.00
CENTRAL SECTOR: 5780.00 84.90 83.94 7434.38 7422.41 690.00
4260.00 80.23 81.40 6895.32 6881.27 500.00THERMAL
VINDHYACHAL STPS 264260.00 80.23 81.40 6895.32 6881.27 500.00
1 210.00 4.53 4.24 328.54 327.08Unit
2 210.00 4.50 4.13 272.00 241.04Unit
3 210.00 4.86 4.16 266.72 268.69Unit
4 210.00 4.43 4.22 349.74 339.92Unit
5 210.00 4.50 4.06 355.00 346.65Unit
6 210.00 4.43 4.10 349.74 340.50Unit
7 500.00 0.00 0.00 791.94 751.25 500.00 12/06/2015 15:00 BOILER OVERHAUL/ ANNUALMAINTENANCE
Unit P
8 500.00 10.67 11.02 843.06 845.64Unit
9 500.00 10.70 11.51 843.60 847.24Unit
10 500.00 10.47 11.34 826.46 863.55Unit
11 500.00 10.97 11.29 865.46 857.74Unit
12 500.00 10.17 11.33 803.06 851.97Unit
13 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
1520.00 4.67 2.54 539.06 541.14 190.00HYDRO
INDIRA SAGAR HPS 1000.00 3.00 1.66 369.00 364.32 125.00
OMKARESHWAR HPS 520.00 1.67 0.87 170.06 176.82 65.00
MAHARASHTRA
STATE TOTAL 28915.00 322.97 273.10 27493.16 25645.29 11121.00
STATE SECTOR: 12638.00 125.39 120.67 12221.74 11424.80 3340.00
9560.00 106.10 110.68 10268.52 9477.84 3340.00THERMAL
BHUSAWAL TPS 271420.00 11.30 22.48 1712.44 1555.74 210.00
2 210.00 0.00 0.00 0.00 0.00 210.00 13/09/2014 12:43 WATER WALL TUBE LEAKAGEUnit L
3 210.00 2.73 4.10 245.14 102.38Unit
4 500.00 8.57 9.22 750.26 767.54Unit
5 500.00 0.00 9.16 717.04 685.82Unit
CHANDRAPUR(MAHARASHTRA) STPS 222840.00 32.14 27.28 3307.52 2809.55 1210.00
1 210.00 0.00 0.00 0.00 0.00 210.00 28/08/2014 07:15 RESERVE SHUT DOWNUnit L
2 210.00 4.00 3.38 316.00 221.30Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 22Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
3 210.00 3.67 3.72 289.06 331.04Unit
4 210.00 3.90 3.60 308.20 314.10Unit
5 500.00 10.87 8.84 857.66 622.95Unit
6 500.00 0.00 0.00 772.00 635.99 500.00 09/06/2015 23:58 CONDENSER TUBE LEAKAGE/ CLEANINGUnit S
7 500.00 9.70 7.74 764.60 684.17Unit
8 500.00 0.00 0.00 0.00 0.00 500.00 29/03/2015 18:26 RESERVE SHUT DOWNUnit L
9 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
KHAPARKHEDA TPS 41340.00 21.22 22.95 2040.96 1770.34
1 210.00 4.03 3.14 317.54 311.68Unit
2 210.00 4.03 3.51 317.54 196.86Unit
3 210.00 4.33 3.58 341.94 190.61Unit
4 210.00 0.00 3.72 332.00 308.23Unit
5 500.00 8.83 9.00 731.94 762.96Unit
KORADI TPS 161700.00 6.66 7.07 589.88 472.78 1290.00
1 105.00 0.00 0.00 0.00 0.00 105.00 07/01/2011 22:28 VINTAGE UNIT WITHDRAWN ANDCLOSED FOR OPERATION
Unit L
2 105.00 0.00 0.00 0.00 0.00 105.00 07/01/2011 22:11 VINTAGE UNIT WITHDRAWN ANDCLOSED FOR OPERATION
Unit L
3 105.00 0.00 0.00 0.00 0.00 105.00 07/01/2011 21:14 VINTAGE UNIT WITHDRAWN ANDCLOSED FOR OPERATION
Unit L
4 105.00 0.00 0.00 0.00 0.00 105.00 07/01/2011 22:06 VINTAGE UNIT WITHDRAWN ANDCLOSED FOR OPERATION
Unit L
5 200.00 0.00 3.36 0.00 233.97Unit
6 210.00 3.33 0.00 284.94 0.00 210.00 20/03/2015 01:02 I.D. FANS PROBLEMUnit L
7 210.00 3.33 3.71 304.94 238.81Unit
8 660.00 0.00 0.00 0.00 0.00 660.00 30/03/2015 08:17 GENERATOR PROTECTION RELAYOPERATION PROBLEM
Unit L
9 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
10 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
NASIK TPS 45630.00 12.30 8.81 947.40 995.90 210.00
3 210.00 4.10 4.40 342.80 338.30Unit
4 210.00 4.10 0.00 342.80 324.99 210.00 13/06/2015 22:05 TURBINE MISC.Unit S
5 210.00 4.10 4.41 261.80 332.61Unit
PARAS TPS 23500.00 9.46 9.21 808.28 735.83
3 250.00 4.73 4.74 404.14 361.33Unit
4 250.00 4.73 4.47 404.14 374.50Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 23Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
PARLI TPS 71130.00 13.02 12.88 862.04 1137.70 420.00
3 210.00 0.00 0.00 0.00 117.67 210.00 14/06/2015 12:58 COAL SHORTAGE/FEEDING PROBLEMUnit S
4 210.00 2.00 0.00 158.00 25.46 210.00 13/04/2015 11:27 TURBINE VIBRATIONS HIGHUnit L
5 210.00 2.10 3.62 111.80 238.54Unit
6 250.00 4.54 4.67 358.72 365.65Unit
7 250.00 4.38 4.59 233.52 390.38Unit
8 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
672.00 9.60 6.46 760.80 482.23THER (GT)
URAN CCPP 672.00 9.60 6.46 760.80 482.23
2406.00 9.69 3.53 1192.42 1464.73HYDRO
BHIRA TAIL RACE HPS 80.00 0.20 0.17 12.60 18.17
GHATGHAR PSS HPS 250.00 1.13 0.62 92.34 61.10
KOYNA DPH HPS 36.00 0.33 0.32 25.94 34.92
KOYNA-I HPS 280.00 1.93 0.98 256.74 202.02
KOYNA-II HPS 320.00 0.00 0.98 0.00 204.81
KOYNA-III HPS 320.00 1.33 0.45 167.94 227.76
KOYNA-IV HPS 1000.00 4.17 0.00 565.06 630.96
TILLARI HPS 60.00 0.27 0.00 20.86 21.44
VAITARNA HPS 60.00 0.33 0.00 50.94 63.55
PVT SECTOR: 11657.00 163.42 123.17 12366.54 11578.38 4901.00
10996.00 156.24 116.91 11802.30 11045.30 4901.00THERMAL
AMARAVATI TPS 41350.00 6.34 5.27 502.12 489.06 1080.00
1 270.00 3.17 5.21 251.06 114.79Unit
2 270.00 3.17 0.00 251.06 334.42 270.00 30/05/2015 06:50 COOLING TOWER PROBLEMUnit L
3 270.00 0.00 0.00 0.00 26.34 270.00 05/04/2015 22:01 A.V.R. PROBLEMUnit L
4 270.00 0.00 0.06 0.00 13.51 270.00 08/03/2015 05:22 18/06/201522:55
RESERVE SHUT DOWNUnit *
5 270.00 0.00 0.00 0.00 0.00 270.00 03/04/2015 14:22 TURBINE VIBRATIONS HIGHUnit L
BELA TPS 0270.00 0.00 0.00 0.00 0.00 270.00
1 270.00 0.00 0.00 0.00 0.00 270.00 22/03/2013 18:23 UNECONOMICAL OPERATIONUnit L
BUTIBORI TPP 26600.00 10.67 7.19 842.06 962.67 300.00
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 24Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
1 300.00 5.40 1.61 427.20 496.60 300.00 17/06/2015 20:31 18/06/201515:10
GEN. TRANSORMER PROTECTIONRELAY OPERATION PROBLEM
Unit *
2 300.00 5.27 5.58 414.86 466.07Unit
DAHANU TPS 56500.00 12.00 6.16 948.00 904.46
1 250.00 6.00 3.08 474.00 443.95Unit
2 250.00 6.00 3.08 474.00 460.51Unit
DHARIWAL TPP 0600.00 2.10 0.00 165.80 0.00 600.00
1 300.00 0.00 0.00 0.00 0.00 300.00 01/09/2014 00:00 TURBINE VIBRATIONS HIGHUnit L
2 300.00 2.10 0.00 165.80 0.00 300.00 21/12/2014 23:30 RESERVE SHUT DOWNUnit L
EMCO WARORA TPS 3600.00 11.13 11.48 879.34 777.66
1 300.00 5.53 5.72 436.54 412.45Unit
2 300.00 5.60 5.76 442.80 365.21Unit
GEPL TPP Ph-I 0120.00 0.00 0.00 0.00 0.00 120.00
1 60.00 0.00 0.00 0.00 0.00 60.00 29/06/2013 23:59 NO FUEL SUPPLYUnit L
2 60.00 0.00 0.00 0.00 0.00 60.00 20/06/2013 20:27 NO FUEL SUPPLYUnit L
JSW RATNAGIRI TPP 01200.00 23.71 15.17 1757.78 1555.87 300.00
1 300.00 6.17 0.00 452.06 278.90 300.00 14/05/2015 19:17 TURBINE BEARING PROBLEMUnit L
2 300.00 6.20 5.38 489.60 493.41Unit
3 300.00 5.67 5.57 368.06 408.52Unit
4 300.00 5.67 4.22 448.06 375.04Unit
MIHAN TPS 0246.00 0.00 0.00 0.00 0.00 246.00
1 61.50 0.00 0.00 0.00 0.00 61.50 10/01/2013 15:50 RESERVE SHUT DOWNUnit L
2 61.50 0.00 0.00 0.00 0.00 61.50 05/11/2013 11:53 COAL SHORTAGEUnit L
3 61.50 0.00 0.00 0.00 0.00 61.50 10/06/2013 18:00 CONDENSER TUBE LEAKAGE/ CLEANINGUnit L
4 61.50 0.00 0.00 0.00 0.00 61.50 20/08/2013 10:00 RESERVE SHUT DOWNUnit L
NASIK (P) TPS 0270.00 1.63 0.00 129.34 0.00 270.00
1 270.00 1.63 0.00 129.34 0.00 270.00 04/03/2014 18:10 COAL SHORTAGEUnit L
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
3 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
TIRORA TPS 63300.00 70.30 53.17 5113.38 4457.57 660.00
1 660.00 14.67 0.00 720.04 867.32 660.00 01/06/2015 01: BOILER OVERHAUL/ ANNUALMAINTENANCE
Unit P
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 25Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
45
2 660.00 13.83 14.22 1092.94 720.96Unit
3 660.00 14.40 14.17 1136.20 742.24Unit
4 660.00 13.83 12.46 1092.94 1127.05Unit
5 660.00 13.57 12.32 1071.26 1000.00Unit
TROMBAY TPS 01400.00 14.53 15.39 1163.54 1307.48 650.00
4 150.00 0.00 0.00 0.00 0.00 150.00 14/02/2012 00:00 UNECONOMICAL OPERATIONUnit L
5 500.00 9.30 9.95 743.40 825.87Unit
6 500.00 0.00 0.00 0.00 33.54 500.00 05/06/2015 05:59 RESERVE SHUT DOWNUnit S
8 250.00 5.23 5.44 420.14 448.07Unit
WARDHA WARORA TPP 1540.00 3.83 3.08 300.94 590.53 405.00
1 135.00 0.33 0.00 24.94 145.24 135.00 16/06/2015 00:00 MISC. SHORT DURATION MAINTENANCEWORKS
Unit S
2 135.00 0.33 0.00 24.94 114.50 135.00 16/06/2015 00:02 MISC. SHORT DURATION MAINTENANCEWORKS
Unit S
3 135.00 1.60 0.00 125.80 186.82 135.00 17/06/2015 00:00 MISC. SHORT DURATION MAINTENANCEWORKS
Unit S
4 135.00 1.57 3.08 125.26 143.97Unit
180.00 3.06 2.58 245.08 226.77THER (GT)
TROMBAY CCPP 180.00 3.06 2.58 245.08 226.77
481.00 4.12 3.68 319.16 306.31HYDRO
BHANDARDHARA HPS ST-II 34.00 0.13 0.00 7.34 19.76
BHIRA HPS 150.00 2.33 0.63 169.94 56.25
BHIRA PSS HPS 150.00 0.00 1.28 0.00 90.30
BHIVPURI HPS 75.00 0.83 1.21 76.94 74.81
KHOPOLI HPS 72.00 0.83 0.56 64.94 65.19
CENTRAL SECTOR: 4620.00 34.16 29.26 2904.88 2642.11 2880.00
1000.00 12.90 0.00 1018.20 461.60 1000.00THERMAL
MAUDA TPS 441000.00 12.90 0.00 1018.20 461.60 1000.00
1 500.00 6.70 0.00 528.60 292.01 500.00 01/06/2015 10:14 RESERVE SHUT DOWNUnit L
2 500.00 6.20 0.00 489.60 169.59 500.00 05/06/2015 19:00 RESERVE SHUT DOWNUnit S
2220.00 0.00 0.00 0.00 0.00 1720.00THER (GT)
RATNAGIRI CCPP I 740.00 0.00 0.00 0.00 0.00 740.00
RATNAGIRI CCPP II 740.00 0.00 0.00 0.00 0.00 740.00
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 26Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
RATNAGIRI CCPP III 740.00 0.00 0.00 0.00 0.00 240.00
1400.00 21.26 29.26 1886.68 2180.51 160.00NUCLEAR
TARAPUR 1400.00 21.26 29.26 1886.68 2180.51 160.00
1 160.00 0.00 0.00 28.00 0.00 160.00 12/10/2014 22:39 REACTOR MAINTENANCE WORKS.Unit L
2 160.00 0.00 3.26 176.00 261.54Unit
3 540.00 10.63 13.06 841.34 900.82Unit
4 540.00 10.63 12.94 841.34 1018.15Unit
SOUTHERN
REGION TOTAL 48083.02 590.39 554.08 50348.48 49426.31 5826.00
ANDHRA PRADESH
STATE TOTAL 12477.20 142.83 132.71 11273.58 10732.97 1859.40
STATE SECTOR: 5510.00 71.70 62.70 5741.60 5019.86 830.00
4410.00 70.03 61.77 5534.54 4908.58 800.00THERMAL
DAMODARAM SANJEEVAIAH TPS 01600.00 9.60 11.50 758.80 533.22 800.00
1 800.00 9.60 11.50 758.80 334.60Unit
2 800.00 0.00 0.00 0.00 198.62 800.00 11/06/2015 21:14 COAL SHORTAGE/FEEDING PROBLEMUnit S
Dr. N.TATA RAO TPS 111760.00 37.78 31.57 2983.04 2750.00
1 210.00 4.53 3.82 357.54 323.92Unit
2 210.00 4.33 3.80 341.94 327.54Unit
3 210.00 4.53 4.02 357.54 356.64Unit
4 210.00 4.53 4.09 358.54 350.58Unit
5 210.00 4.53 3.69 357.54 343.69Unit
6 210.00 4.53 3.75 357.54 330.81Unit
7 500.00 10.80 8.40 852.40 716.82Unit
RAYALASEEMA TPS 111050.00 22.65 18.70 1792.70 1625.36
1 210.00 4.53 3.82 358.54 325.81Unit
2 210.00 4.53 3.77 358.54 306.21Unit
3 210.00 4.53 3.75 358.54 335.50Unit
4 210.00 4.53 3.66 358.54 336.98Unit
5 210.00 4.53 3.70 358.54 320.86Unit
SINGARENI TPP 00.00 0.00 0.00 0.00 0.00
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
1100.00 1.67 0.93 207.06 111.28 30.00HYDRO
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 27Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
LOWER JURALA HPS 0.00 0.00 0.00 0.00 0.00
NAGARJUN SGR TPD 0.00 0.17 0.00 9.06 0.00
NAGARJUN SGR RBC HPS 90.00 0.00 0.00 2.00 0.00 30.00
NAGARJUN SGR RBC EXTN. HPS 0.00 0.00 0.00 0.00 0.00
PULICHINTALA HPS 0.00 0.00 0.00 0.00 0.00
SRISAILAM HPS 770.00 0.53 0.00 110.54 41.84
UPPER SILERU HPS 240.00 0.97 0.93 85.46 69.44
PVT SECTOR: 4967.20 29.40 36.37 2231.84 2599.11 1029.40
1560.00 22.89 28.29 1724.66 1744.75 150.00THERMAL
PAINAMPURAM TPP 0660.00 12.47 14.87 960.46 566.43
1 660.00 12.47 14.87 960.46 566.43Unit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
SIMHAPURI TPS 0600.00 5.32 10.96 377.40 827.28
1 150.00 1.77 2.74 118.86 190.24Unit
2 150.00 1.77 2.74 139.86 195.97Unit
3 150.00 1.78 2.74 118.68 211.69Unit
4 150.00 0.00 2.74 0.00 229.38Unit
THAMMINAPATNAM TPS 0300.00 5.10 2.46 386.80 351.04 150.00
1 150.00 2.50 0.00 180.00 190.59 150.00 14/06/2015 00:52 TURBINE MISC. PROBLEMSUnit S
2 150.00 2.60 2.46 206.80 160.45Unit
VIZAG TPP 00.00 0.00 0.00 0.00 0.00
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
3370.40 6.51 8.08 507.18 854.36 879.40THER (GT)
GAUTAMI CCPP 464.00 0.00 0.00 0.00 132.05 464.00
GMR Energy Ltd - Kakinada 220.00 0.00 0.00 0.00 0.00
GODAVARI CCPP 208.00 2.53 2.82 189.54 133.66 47.00
JEGURUPADU CCPP 455.40 0.52 2.49 42.36 171.52 235.40
KONASEEMA CCPP 445.00 0.00 0.00 0.00 0.00
KONDAPALLI EXTN CCPP . 366.00 1.40 0.00 111.20 0.00 133.00
KONDAPALLI CCPP 350.00 0.00 0.00 0.00 44.48
PEDDAPURAM CCPP 220.00 0.66 0.00 53.88 0.00
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 28Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
VEMAGIRI CCPP 370.00 0.00 0.00 0.00 174.40
VIJESWARAN CCPP 272.00 1.40 2.77 110.20 198.25
36.80 0.00 0.00 0.00 0.00THER (DG)
LVS POWER DG 36.80 0.00 0.00 0.00 0.00
CENTRAL SECTOR: 2000.00 41.73 33.64 3300.14 3114.00
2000.00 41.73 33.64 3300.14 3114.00THERMAL
SIMHADRI 192000.00 41.73 33.64 3300.14 3114.00
1 500.00 10.53 8.44 832.54 797.07Unit
2 500.00 10.33 8.42 816.94 788.61Unit
3 500.00 10.37 8.38 820.66 752.45Unit
4 500.00 10.50 8.40 830.00 775.87Unit
KARNATAKA
STATE TOTAL 9584.34 123.70 117.49 11093.60 11100.45 529.20
STATE SECTOR: 6505.32 66.86 58.32 6734.48 6247.33 529.20
2720.00 42.88 50.00 3882.84 4208.54 460.00THERMAL
BELLARY TPS 71000.00 17.70 19.49 1398.60 1462.99
1 500.00 9.00 9.86 711.00 712.45Unit
2 500.00 8.70 9.63 687.60 750.54Unit
3 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
RAICHUR TPS 51720.00 25.18 30.51 2484.24 2745.55 460.00
1 210.00 4.07 4.57 321.26 370.86Unit
2 210.00 0.00 4.05 248.00 329.67Unit
3 210.00 4.07 0.00 321.26 265.07 210.00 23/05/2015 15:58 ELECTRICAL MISCELLANEOUSPROBLEMS
Unit L
4 210.00 4.07 4.78 321.26 373.28Unit
5 210.00 4.07 4.32 321.26 341.75Unit
6 210.00 0.00 4.71 248.00 336.94Unit
7 210.00 4.07 4.80 321.26 356.24Unit
8 250.00 4.83 3.28 381.94 371.74 250.00 18/06/2015 16:38 BOILER OVERHAUL/ ANNUALMAINTENANCE
Unit P
YERMARUS TPP 00.00 0.00 0.00 0.00 0.00
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
127.92 0.00 0.00 0.00 0.00THER (DG)
YELHANKA (DG) 127.92 0.00 0.00 0.00 0.00
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 29Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
3657.40 23.98 8.32 2851.64 2038.79 69.20HYDRO
ALMATTI DPH HPS 290.00 0.00 0.00 2.00 0.77
BHADRA HPS 39.20 0.00 0.00 5.00 4.92 19.20
GERUSUPPA HPS 240.00 1.03 0.00 135.54 82.41
GHAT PRABHA HPS 32.00 0.00 0.00 2.00 8.61 32.00
HAMPI HPS 36.00 0.00 0.00 4.00 0.61
JOG HPS 139.20 0.63 0.96 43.34 83.20
KADRA HPS 150.00 0.63 0.49 76.34 47.50
KALINADI HPS 855.00 6.47 1.92 804.46 548.22
KALINADI SUPA HPS 100.00 0.90 0.00 86.20 97.64
KODASALI HPS 120.00 0.73 0.49 92.14 53.85
LIGANAMAKKI HPS 55.00 0.23 0.08 34.14 32.03
MUNIRABAD HPS 28.00 0.00 0.00 0.00 0.00
SHARAVATHI HPS 1035.00 10.00 2.82 1295.00 875.42
SIVASAMUNDRUM HPS 42.00 0.53 0.49 47.54 45.39
T B DAM HPS 36.00 0.00 0.00 0.00 0.61 18.00
VARAHI HPS 460.00 2.83 1.07 223.94 157.61
PVT SECTOR: 2199.02 38.70 36.94 3060.60 3141.44
2060.00 38.70 36.94 3060.60 3141.44THERMAL
TORANGALLU TPS(SBU-I) 0260.00 5.77 6.28 459.86 477.94
1 130.00 2.87 3.14 226.66 240.72Unit
2 130.00 2.90 3.14 233.20 237.22Unit
TORANGALLU TPS(SBU-II) 0600.00 13.60 10.32 1074.80 869.09
3 300.00 6.77 5.18 534.86 439.65Unit
4 300.00 6.83 5.14 539.94 429.44Unit
UDUPI TPP 01200.00 19.33 20.34 1525.94 1794.41
1 600.00 9.63 10.42 760.34 900.54Unit
2 600.00 9.70 9.92 765.60 893.87Unit
139.02 0.00 0.00 0.00 0.00THER (DG)
BELGAUM DG 113.82 0.00 0.00 0.00 0.00
BELLARY DG 25.20 0.00 0.00 0.00 0.00
CENTRAL SECTOR: 880.00 18.14 22.23 1298.52 1711.68
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 30Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
880.00 18.14 22.23 1298.52 1711.68NUCLEAR
KAIGA 880.00 18.14 22.23 1298.52 1711.68
1 220.00 4.60 5.49 362.80 406.58Unit
2 220.00 4.47 5.49 355.46 415.56Unit
3 220.00 4.47 5.64 355.46 446.31Unit
4 220.00 4.60 5.61 224.80 443.23Unit
KERALA
STATE TOTAL 2649.68 19.89 10.05 1668.02 1685.70 203.00
STATE SECTOR: 2116.10 18.34 10.05 1549.12 1685.70 203.00
234.60 1.51 0.81 116.18 53.87THER (DG)
BRAMHAPURAM DG 106.60 0.13 0.00 6.34 5.20
KOZHIKODE DG 128.00 1.38 0.81 109.84 48.67
1881.50 16.83 9.24 1432.94 1631.83 203.00HYDRO
IDAMALAYAR HPS. 75.00 0.67 0.21 73.06 89.56
IDUKKI HPS. 780.00 6.00 2.01 600.00 671.94 130.00
KAKKAD HPS. 50.00 0.53 0.29 49.54 53.11
KUTTIYADI HPS. 125.00 1.80 1.64 107.40 117.15
KUTTIYADI ADDL. EXTN. 100.00 0.00 0.00 0.00 0.00
LOWER PERIYAR HPS. 180.00 1.90 0.94 65.20 61.19
NARIAMANGLAM HPS 70.00 0.87 0.75 29.66 57.76
PALLIVASAL HPS. 37.50 0.63 0.66 46.34 46.03
PANNIAR HPS. 30.00 0.30 0.04 22.40 39.42 15.00
PORINGALKUTTU HPS. 32.00 0.50 0.20 23.00 23.13 8.00
SABARIGIRI HPS. 300.00 2.67 1.37 330.06 381.26 50.00
SENGULAM HPS. 48.00 0.43 0.58 26.74 27.89
SHOLAYAR HPS. 54.00 0.53 0.54 59.54 63.39
PVT SECTOR: 174.00 0.12 0.00 11.16 0.00
174.00 0.12 0.00 11.16 0.00THER (GT)
COCHIN CCPP (Liq.) 174.00 0.12 0.00 11.16 0.00
CENTRAL SECTOR: 359.58 1.43 0.00 107.74 0.00
359.58 1.43 0.00 107.74 0.00THER (GT)
R. GANDHI CCPP (Liq.) 359.58 1.43 0.00 107.74 0.00
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 31Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
PUDUCHERRY
STATE TOTAL 32.50 0.33 0.68 5.94 31.92
STATE SECTOR: 32.50 0.33 0.68 5.94 31.92
32.50 0.33 0.68 5.94 31.92THER (GT)
KARAIKAL CCPP 32.50 0.33 0.68 5.94 31.92
TAMIL NADU
STATE TOTAL 15960.20 202.99 212.94 17662.58 17822.16 1878.00
STATE SECTOR: 7465.40 101.90 88.15 7887.96 7500.41 828.00
4770.00 84.47 78.50 6753.22 6372.78 600.00THERMAL
ENNORE TPS 11450.00 1.77 1.03 141.86 181.09 390.00
1 60.00 0.43 0.54 33.74 35.05Unit
2 60.00 0.00 0.00 0.00 0.00 60.00 26/04/2014 11:33 TURB. AXIAL SHIFT/ THRUST PADUnit L
3 110.00 0.67 0.00 54.06 69.47 110.00 09/06/2015 23:26 SWITCH YARD/TRIPPING OFTRANSMISSION LINES/BUS BAR
Unit S
4 110.00 0.67 0.49 54.06 76.57 110.00 18/06/2015 06:20 18/06/201520:46
CONDENSER LOW VACCUMUnit *
5 110.00 0.00 0.00 0.00 0.00 110.00 06/03/2012 07:10 WATER WALL TUBE LEAKAGEUnit L
METTUR TPS 241440.00 23.13 24.11 1901.10 1910.64 210.00
1 210.00 0.00 0.00 245.00 239.88 210.00 31/05/2015 23:38 CAPITAL MAINTENANCEUnit P
2 210.00 4.33 5.04 362.94 347.61Unit
3 210.00 4.33 4.53 362.94 331.46Unit
4 210.00 4.33 4.08 362.94 356.27Unit
5 600.00 10.14 10.46 567.28 635.42Unit
NORTH CHENNAI TPS 41830.00 37.07 32.96 2930.26 2552.72
1 210.00 4.33 4.08 342.94 330.30Unit
2 210.00 4.33 5.04 342.94 388.94Unit
3 210.00 4.33 4.08 342.94 334.39Unit
4 600.00 12.03 9.88 950.54 668.57Unit
5 600.00 12.05 9.88 950.90 830.52Unit
TUTICORIN TPS 181050.00 22.50 20.40 1780.00 1728.33
1 210.00 4.50 4.08 356.00 352.35Unit
2 210.00 4.50 4.08 356.00 339.02Unit
3 210.00 4.50 4.08 356.00 330.10Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 32Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
4 210.00 4.50 4.08 356.00 349.45Unit
5 210.00 4.50 4.08 356.00 357.41Unit
513.20 5.21 5.03 425.78 384.61THER (GT)
BASIN BRIDGE GT (Liq.) 120.00 0.00 0.00 0.00 1.50
KOVIKALPAL CCPP 107.00 1.07 1.27 83.26 80.05
KUTTALAM CCPP 100.00 1.10 1.61 101.80 146.05
VALUTHUR CCPP 186.20 3.04 2.15 240.72 157.01
2182.20 12.22 4.62 708.96 743.02 228.00HYDRO
ALIYAR HPS. 60.00 0.33 0.00 15.94 16.96
BHAWANI BARRAGE III HPS 30.00 0.10 0.00 1.80 2.89
BHAWANI BARRAGE-II HPS 30.00 0.13 0.00 4.34 2.89
BHAWANI KATTAL 30.00 0.13 0.50 4.34 27.39
KADAMPARI HPS. 400.00 0.87 0.00 63.66 104.93 100.00
KODAYAR HPS. 100.00 0.27 0.13 19.86 32.72
KUNDAH HPS. 555.00 4.83 1.65 344.94 349.92
LOWER METTUR HPS. 120.00 0.53 0.09 18.54 16.22
METTUR DAM HPS. 50.00 0.20 0.10 12.60 22.50
METTUR TUNNEL HPS. 200.00 0.47 0.00 11.46 2.63 50.00
MOYAR HPS 36.00 0.50 0.26 33.00 32.21
PAPANASAM HPS. 32.00 0.43 0.43 13.74 11.82 8.00
PARSON`S VALLEY HPS. 30.00 0.13 0.00 8.34 1.79
PERIYAR HPS. 140.00 0.80 0.87 17.40 10.84 35.00
PYKARA HPS. 59.20 0.37 0.56 21.66 22.13
PYKARA ULTMATE HPS. 150.00 1.20 0.03 84.60 63.87
SARKARPATHY HPS. 30.00 0.00 0.00 0.00 8.54
SHOLAYAR HPS. 95.00 0.80 0.00 29.40 0.00 35.00
SURULIYAR HPS. 35.00 0.13 0.00 3.34 12.77
PVT SECTOR: 2064.80 12.83 24.91 1027.94 1925.90
1150.00 9.61 21.88 757.98 1658.51THERMAL
MUTHIARA TPP 0600.00 0.00 10.79 0.00 715.31
1 600.00 0.00 10.79 0.00 715.31Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 33Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
NEYVELI TPS(Z) 0250.00 5.07 4.07 400.26 388.62
1 250.00 5.07 4.07 400.26 388.62Unit
TUTICORIN (P) TPP 0300.00 4.54 7.02 357.72 554.58
1 150.00 2.27 4.46 178.86 352.34Unit
2 150.00 2.27 2.56 178.86 202.24Unit
503.10 2.50 3.03 199.00 264.58THER (GT)
KARUPPUR CCPP 119.80 1.10 1.87 105.80 171.06
P.NALLUR CCPP 330.50 0.30 0.00 24.40 31.86
VALANTARVY CCPP 52.80 1.10 1.16 68.80 61.66
411.70 0.72 0.00 70.96 2.81THER (DG)
B. BRIDGE D.G 200.00 0.12 0.00 26.16 1.45
SAMALPATTI DG 105.70 0.30 0.00 22.40 1.36
SAMAYANALLUR DG 106.00 0.30 0.00 22.40 0.00
CENTRAL SECTOR: 6430.00 88.26 99.88 8746.68 8395.85 1050.00
4990.00 80.09 77.46 6953.62 6343.75 1050.00THERMAL
NEYVELI ( EXT) TPS 0420.00 9.06 9.27 717.08 787.05
1 210.00 4.53 4.64 358.54 392.91Unit
2 210.00 4.53 4.63 358.54 394.14Unit
NEYVELI TPS- I 0600.00 10.66 10.81 901.88 886.90 50.00
1 50.00 0.97 0.99 76.46 80.12Unit
2 50.00 0.00 0.00 59.00 55.51 50.00 02/06/2015 00:34 BOILER OVERHAUL/ ANNUALMAINTENANCE
Unit P
3 50.00 0.95 0.93 76.10 71.73Unit
4 50.00 0.97 1.08 76.46 87.27Unit
5 50.00 0.97 1.10 76.46 83.91Unit
6 50.00 0.97 0.96 76.46 71.90Unit
7 100.00 1.97 1.68 155.46 127.41Unit
8 100.00 1.93 1.98 152.74 141.15Unit
9 100.00 1.93 2.09 152.74 167.90Unit
NEYVELI TPS-II 01470.00 30.43 30.88 2401.74 2601.35
1 210.00 4.37 4.48 344.66 366.21Unit
2 210.00 4.37 4.51 344.66 375.84Unit
3 210.00 4.37 4.42 344.66 366.00Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 34Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
4 210.00 4.33 4.34 341.94 371.58Unit
5 210.00 4.33 4.34 341.94 364.05Unit
6 210.00 4.33 4.39 341.94 384.76Unit
7 210.00 4.33 4.40 341.94 372.91Unit
NEYVELI TPS-II EXP 0500.00 7.34 0.00 579.12 144.02 500.00
1 250.00 3.67 0.00 289.06 0.00 250.00 13/03/2015 17:21 BOILER AUX. MISC. PROMLEMSUnit L
2 250.00 3.67 0.00 290.06 144.02 250.00 15/05/2015 23:30 BOILER MISC. PROBLEMUnit L
TUTICORIN (JV) TPP 0500.00 5.80 0.08 459.40 204.17 500.00
1 500.00 5.80 0.08 459.40 204.17 500.00 06/06/2015 15:47 18/06/201522:24
ASH HANDLING SYSTEM PROBLEMUnit *
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
VALLUR TPP 31500.00 16.80 26.42 1894.40 1720.26
1 500.00 8.40 9.51 665.20 588.24Unit
2 500.00 0.00 9.44 564.00 649.09Unit
3 500.00 8.40 7.47 665.20 482.93Unit
1440.00 8.17 22.42 1793.06 2052.10NUCLEAR
KUDANKULAM 1000.00 0.00 12.59 1147.00 1294.02
1 1000.00 0.00 12.59 1147.00 1294.02Unit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
MADRAS A.P.S. 440.00 8.17 9.83 646.06 758.08
1 220.00 4.07 5.39 321.26 417.32Unit
2 220.00 4.10 4.44 324.80 340.76Unit
TELANGANA
STATE TOTAL 7379.10 100.65 80.21 8644.76 8053.11 1356.40
STATE SECTOR: 4779.10 48.42 32.51 4197.56 3594.19 1356.40
2282.50 44.38 30.70 3786.84 3297.64 500.00THERMAL
KAKATIYA TPS 5500.00 10.80 9.40 853.40 758.14
1 500.00 10.80 9.40 853.40 758.14Unit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
KOTHAGUDEM TPS 16720.00 10.98 10.40 1148.64 1052.20
1 60.00 0.00 0.76 91.95 88.22Unit
2 60.00 1.23 0.74 97.14 94.57Unit
3 60.00 1.23 0.72 97.14 92.12Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 35Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
4 60.00 1.23 0.73 97.14 85.57Unit
5 120.00 2.43 1.75 192.74 162.01Unit
6 120.00 2.43 1.73 193.74 170.14Unit
7 120.00 2.43 1.97 192.74 182.63Unit
8 120.00 0.00 2.00 186.05 176.94Unit
KOTHAGUDEM TPS (NEW) 161000.00 21.60 9.60 1705.80 1437.67 500.00
1 250.00 5.40 4.86 427.20 435.16Unit
2 250.00 5.40 4.74 425.20 429.55Unit
3 500.00 10.80 0.00 853.40 572.96 500.00 07/06/2015 22:42 BOILER OVERHAUL/ ANNUALMAINTENANCE
Unit P
RAMAGUNDEM - B TPS 2162.50 1.00 1.30 79.00 49.63
1 62.50 1.00 1.30 79.00 49.63Unit
2496.60 4.04 1.81 410.72 296.55 856.40HYDRO
LOWER SILERU HPS 460.00 2.37 1.81 223.66 270.60
NAGARJUN SGR HPS 815.60 1.07 0.00 102.26 14.03 412.40
NAGARJUN SGR LBC HPS 60.00 0.00 0.00 1.00 0.00 60.00
POCHAMPAD HPS 27.00 0.00 0.00 2.00 0.00
PRIYADARSHNI JURALA HPS 234.00 0.17 0.00 3.06 0.00 234.00
SRISAILAM LB HPS 900.00 0.43 0.00 78.74 11.92 150.00
CENTRAL SECTOR: 2600.00 52.23 47.70 4447.20 4458.92
2600.00 52.23 47.70 4447.20 4458.92THERMAL
RAMAGUNDEM STPS 152600.00 52.23 47.70 4447.20 4458.92
1 200.00 4.33 3.71 341.94 350.10Unit
2 200.00 0.00 3.87 324.06 349.15Unit
3 200.00 4.33 4.20 342.94 358.45Unit
4 500.00 10.70 9.17 845.60 868.22Unit
5 500.00 10.87 9.04 857.66 875.20Unit
6 500.00 10.87 8.97 857.66 810.70Unit
7 500.00 11.13 8.74 877.34 847.10Unit
EASTERN
REGION TOTAL 36393.50 472.66 463.60 38144.63 37647.47 11022.00
ANDAMAN NICOBAR
STATE TOTAL 40.05 0.40 0.22 32.20 28.84
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 36Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
STATE SECTOR: 40.05 0.40 0.22 32.20 28.84
40.05 0.40 0.22 32.20 28.84THER (DG)
AND. NICOBAR DG 40.05 0.40 0.22 32.20 28.84
BIHAR
STATE TOTAL 4285.00 49.83 55.01 4065.94 4166.28 1495.00
STATE SECTOR: 210.00 0.00 0.00 0.00 0.00 210.00
210.00 0.00 0.00 0.00 0.00 210.00THERMAL
BARAUNI TPS 0210.00 0.00 0.00 0.00 0.00 210.00
6 105.00 0.00 0.00 0.00 0.00 105.00 17/03/2012 13:15 R AND M / REFURBISHMENT WORKSUnit P
7 105.00 0.00 0.00 0.00 0.00 105.00 23/08/2006 21:07 R AND M / REFURBISHMENT WORKSUnit P
8 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
CENTRAL SECTOR: 4075.00 49.83 55.01 4065.94 4166.28 1285.00
4075.00 49.83 55.01 4065.94 4166.28 1285.00THERMAL
BARH II 141320.00 7.67 11.69 605.06 621.51 660.00
4 660.00 7.67 11.69 605.06 621.51Unit
5 660.00 0.00 0.00 0.00 0.00 660.00 04/03/2015 22:19 DRUM LEVEL LOWUnit L
KAHALGAON TPS 242340.00 38.82 43.32 3196.76 3313.24 210.00
1 210.00 0.00 0.00 233.00 246.73 210.00 01/06/2015 03:12 BOILER OVERHAUL/ ANNUALMAINTENANCE
Unit P
2 210.00 3.73 4.75 296.14 336.56Unit
3 210.00 3.90 4.73 308.20 328.52Unit
4 210.00 3.80 4.70 198.40 195.54Unit
5 500.00 9.23 9.94 728.14 748.28Unit
6 500.00 8.93 9.30 704.74 712.54Unit
7 500.00 9.23 9.90 728.14 745.07Unit
MUZAFFARPUR TPS 0415.00 3.34 0.00 264.12 231.53 415.00
1 110.00 1.67 0.00 132.06 104.25 110.00 15/06/2015 23:00 COAL SHORTAGEUnit S
2 110.00 1.67 0.00 132.06 124.40 110.00 12/06/2015 20:00 COAL SHORTAGEUnit S
3 195.00 0.00 0.00 0.00 2.88 195.00 31/03/2015 19:43 COAL FEEDING SYSTEM NOT READYUnit L
4 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
NABI NAGAR TPP 00.00 0.00 0.00 0.00 0.00
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 37Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
DVC
STATE TOTAL 7033.20 83.18 73.75 6518.92 6525.65 3490.00
CENTRAL SECTOR: 7033.20 83.18 73.75 6518.92 6525.65 3490.00
6800.00 82.62 73.65 6497.84 6516.83 3360.00THERMAL
BOKARO TPS `A` EXP 00.00 0.00 0.00 0.00 0.00
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
BOKARO `B` TPS 28630.00 2.80 8.08 329.40 364.06 210.00
1 210.00 1.40 3.80 111.20 76.19Unit
2 210.00 0.00 4.28 107.00 245.20Unit
3 210.00 1.40 0.00 111.20 42.67 210.00 26/04/2015 09:09 CONDENSER TUBE LEAKAGE/ CLEANINGUnit L
CHANDRAPURA(DVC) TPS 29890.00 15.45 11.62 1220.10 1114.55 380.00
1 130.00 1.77 2.65 139.86 91.03Unit
2 130.00 1.77 2.80 139.86 197.57Unit
3 130.00 1.77 0.00 139.86 198.85 130.00 16/06/2015 05:20 ECONOMISER TUBE LEAKAGEUnit S
7 250.00 5.07 6.17 400.26 444.09Unit
8 250.00 5.07 0.00 400.26 183.01 250.00 11/06/2015 22:24 FURNACE DRAFT ABNORMALUnit S
DURGAPUR STEEL TPS 41000.00 12.74 19.34 1005.32 1293.48
1 500.00 6.37 9.59 502.66 782.60Unit
2 500.00 6.37 9.75 502.66 510.88Unit
DURGAPUR TPS 7340.00 4.20 3.49 331.60 288.86 210.00
3 130.00 1.67 2.39 132.06 159.86Unit
4 210.00 2.53 1.10 199.54 129.00 210.00 18/06/2015 09:30 COAL SHORTAGEUnit S
KODARMA TPP 241000.00 8.14 0.00 642.52 690.29 1000.00
1 500.00 4.07 0.00 321.26 0.00 500.00 11/11/2014 23:50 ASH HANDLING SYSTEM PROBLEMUnit L
2 500.00 4.07 0.00 321.26 690.29 500.00 11/06/2015 16:55 GOVERNING SYSTEM PROBLEMUnit S
MEJIA TPS 102340.00 39.29 31.12 2968.90 2720.86 960.00
1 210.00 3.37 5.03 266.66 124.43Unit
2 210.00 3.37 4.78 266.66 164.20Unit
3 210.00 3.38 5.06 197.52 273.77Unit
4 210.00 3.37 0.00 199.66 35.66 210.00 10/05/2015 00:45 SUPER HEATER TUBE LEAKAGEUnit L
5 250.00 4.03 0.00 318.54 313.04 250.00 01/06/2015 04: MISC. SHORT DURATION MAINTENANCEUnit L
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 38Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
12
6 250.00 4.03 5.15 318.54 414.32Unit
7 500.00 8.87 11.11 700.66 603.29Unit
8 500.00 8.87 0.00 700.66 792.15 500.00 16/06/2015 23:00 REHEATER TUBE LEAKAGEUnit S
RAGHUNATHPUR TPP 0600.00 0.00 0.00 0.00 44.73 600.00
1 600.00 0.00 0.00 0.00 44.73 600.00 24/04/2015 01:22 RESERVE SHUT DOWNUnit L
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
90.00 0.00 0.00 0.00 0.00 90.00THER (GT)
MAITHON GT (Liq.) 90.00 0.00 0.00 0.00 0.00 90.00
143.20 0.56 0.10 21.08 8.82 40.00HYDRO
MAITHON HPS. 63.20 0.23 0.02 12.14 7.17
PANCHET HPS. 80.00 0.33 0.08 8.94 1.65 40.00
JHARKHAND
STATE TOTAL 3270.00 38.79 38.20 3439.24 3137.00 1070.00
STATE SECTOR: 1320.00 6.44 7.94 818.94 724.68 680.00
1190.00 6.44 7.94 814.94 704.81 680.00THERMAL
PATRATU TPS 29770.00 3.17 0.82 252.06 188.27 680.00
1 40.00 0.00 0.00 0.00 0.00 40.00 11/10/2010 02:25 TURB. AXIAL SHIFT/ THRUST PADUnit L
2 40.00 0.00 0.00 0.00 0.00 40.00 10/03/2010 17:00 BOILER AUX. MISC. PROMLEMSUnit L
3 40.00 0.00 0.00 0.00 0.00 40.00 31/07/2003 02:05 MAJOR REPAIRS IN BOILERUnit L
4 40.00 0.60 0.00 48.80 0.00 40.00 11/04/2014 16:07 WATER WALL TUBE LEAKAGEUnit L
5 90.00 0.00 0.00 0.00 0.00 90.00 23/05/2004 16:55 BOILER AUX. MISC. PROMLEMSUnit L
6 90.00 0.57 0.82 46.26 54.93Unit
7 105.00 0.00 0.00 0.00 0.00 105.00 30/09/2010 09:55 STATOR/ STATOR EARTH FAULTUnit L
8 105.00 0.00 0.00 0.00 0.00 105.00 17/10/2005 14:05 TURBINE MISC. PROBLEMUnit L
9 110.00 0.00 0.00 0.00 0.00 110.00 10/08/2006 19:55 R AND M / REFURBISHMENT WORKSUnit P
10 110.00 2.00 0.00 157.00 133.34 110.00 16/06/2015 02:16 WATER WALL TUBE LEAKAGEUnit S
TENUGHAT TPS 8420.00 3.27 7.12 562.88 516.54
1 210.00 0.00 3.30 303.02 229.51Unit
2 210.00 3.27 3.82 259.86 287.03Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 39Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
130.00 0.00 0.00 4.00 19.87HYDRO
SUBERNREKHA HPS. 130.00 0.00 0.00 4.00 19.87
PVT SECTOR: 1950.00 32.35 30.27 2620.30 2412.32 390.00
1950.00 32.35 30.27 2620.30 2412.32 390.00THERMAL
JOJOBERA TPS 0360.00 7.09 4.44 559.62 443.30 120.00
1 120.00 2.33 0.00 181.94 70.05 120.00 08/03/2015 23:55 ELECTRICAL MISCELLANEOUSPROBLEMS
Unit L
2 120.00 2.43 1.92 192.74 181.84Unit
3 120.00 2.33 2.52 184.94 191.41Unit
MAHADEV PRASAD STPP 2540.00 6.86 5.14 541.48 426.42 270.00
1 270.00 3.43 0.00 270.74 322.59 270.00 28/05/2015 05:00 BOILER MISC. PROBLEMUnit L
2 270.00 3.43 5.14 270.74 103.83Unit
MAITHON RB TPP 331050.00 18.40 20.69 1519.20 1542.60
1 525.00 9.20 10.50 759.60 800.38Unit
2 525.00 9.20 10.19 759.60 742.22Unit
MAITRISHI USHA TPS 00.00 0.00 0.00 0.00 0.00
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
ORISSA
STATE TOTAL 10672.25 134.89 150.64 11744.07 12674.11 2045.50
STATE SECTOR: 2562.25 23.40 26.46 2130.20 1840.94 235.50
420.00 9.00 9.24 710.00 702.17THERMAL
IB VALLEY TPS 31420.00 9.00 9.24 710.00 702.17
1 210.00 4.50 4.85 355.00 351.68Unit
2 210.00 4.50 4.39 355.00 350.49Unit
2142.25 14.40 17.22 1420.20 1138.77 235.50HYDRO
BALIMELA HPS. 510.00 2.53 1.76 220.54 137.34 60.00
HIRAKUD HPS 347.50 1.40 1.36 167.20 113.14 99.00
MACHKUND HPS 114.75 1.10 0.71 103.80 56.47 76.50
RENGALI HPS. 250.00 0.97 3.03 90.46 106.91
UPPER INDRAVATI HPS. 600.00 5.53 8.15 611.54 544.61
UPPER KOLAB HPS. 320.00 2.87 2.21 226.66 180.30
PVT SECTOR: 4650.00 45.59 59.72 3602.62 4649.25 1200.00
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 40Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
4650.00 45.59 59.72 3602.62 4649.25 1200.00THERMAL
DERANG TPP 01200.00 5.50 12.63 434.00 1216.93 600.00
1 600.00 5.50 0.00 434.00 640.25 600.00 08/06/2015 23:50 RESERVE SHUT DOWNUnit S
2 600.00 0.00 12.63 0.00 576.68Unit
ICCL IMP 00.00 0.80 1.09 63.40 89.93
2 0.00 0.80 1.09 63.40 89.93Unit
IND BARATH TPP 00.00 0.00 0.00 0.00 0.00
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
2 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
KAMALANGA TPS 201050.00 15.67 16.62 1237.06 1132.64
1 350.00 5.30 5.17 417.40 360.76Unit
2 350.00 5.17 5.24 409.06 402.51Unit
3 350.00 5.20 6.21 410.60 369.37Unit
NALCO IMP 00.00 0.70 0.68 55.60 55.72
1 0.00 0.70 0.68 55.60 55.72Unit
STERLITE TPP 22400.00 22.92 28.70 1812.56 2154.03 600.00
1 600.00 5.73 0.00 453.14 0.00 600.00 22/11/2014 00:41 BOILER OVERHAUL/ ANNUALMAINTENANCE
Unit P
2 600.00 5.73 11.26 453.14 869.45Unit
3 600.00 5.73 6.98 453.14 576.32Unit
4 600.00 5.73 10.46 453.14 708.26Unit
CENTRAL SECTOR: 3460.00 65.90 64.46 6011.25 6183.92 610.00
3460.00 65.90 64.46 6011.25 6183.92 610.00THERMAL
TALCHER (OLD) TPS 25460.00 10.06 9.08 790.08 867.27 110.00
1 60.00 1.33 1.50 103.94 117.97Unit
2 60.00 1.33 1.44 103.94 114.63Unit
3 60.00 1.33 1.50 103.94 115.74Unit
4 60.00 1.33 1.48 103.94 115.21Unit
5 110.00 2.37 2.63 187.66 198.13Unit
6 110.00 2.37 0.53 186.66 205.59 110.00 18/06/2015 05:03 WATER WALL TUBE LEAKAGEUnit S
TALCHER STPS 193000.00 55.84 55.38 5221.17 5316.65 500.00
1 500.00 11.20 11.46 885.60 872.20Unit
2 500.00 11.30 12.29 892.40 899.37Unit
3 500.00 11.80 10.44 932.40 879.87Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 41Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
4 500.00 0.00 0.00 811.05 785.34 500.00 06/06/2015 05:43 BOILER OVERHAUL/ ANNUALMAINTENANCE
Unit P
5 500.00 10.77 10.54 849.86 938.46Unit
6 500.00 10.77 10.65 849.86 941.41Unit
SIKKIM
STATE TOTAL 669.00 14.00 14.46 761.00 722.56
PVT SECTOR: 99.00 2.00 0.30 71.00 51.42
99.00 2.00 0.30 71.00 51.42HYDRO
CHUZACHEN HPS 99.00 2.00 0.30 71.00 31.89
JORETHANG LOOP 0.00 0.00 0.00 0.00 0.00
TEESTA-III HPS 0.00 0.00 0.00 0.00 19.53
CENTRAL SECTOR: 570.00 12.00 14.15 690.00 671.14
570.00 12.00 14.15 690.00 671.14HYDRO
RANGIT HPS 60.00 1.30 1.48 64.40 69.98
TEESTA V HPS 510.00 10.70 12.68 625.60 601.16
WEST BENGAL
STATE TOTAL 10424.00 151.57 131.32 11583.26 10393.03 2921.50
STATE SECTOR: 6277.00 79.22 68.34 6204.96 5317.26 1961.50
5220.00 74.39 64.68 5877.02 5073.52 1860.00THERMAL
BAKRESWAR TPS 71050.00 21.23 17.41 1675.14 1604.55 210.00
1 210.00 4.33 0.00 341.94 270.82 210.00 06/06/2015 14:01 FURNACE DRAFT ABNORMALUnit S
2 210.00 4.03 4.19 318.54 328.95Unit
3 210.00 4.03 4.20 318.54 307.20Unit
4 210.00 4.27 4.53 336.86 351.78Unit
5 210.00 4.57 4.50 359.26 345.80Unit
BANDEL TPS 28450.00 4.56 1.72 360.08 203.64 330.00
1 60.00 0.83 0.00 65.94 31.14 60.00 09/06/2015 00:06 MILLING SYSTEM /RC FEEDER PROBLEMUnit S
2 60.00 0.83 0.96 65.94 61.45Unit
3 60.00 0.87 0.00 68.66 62.76 60.00 17/06/2015 11:50 ECONOMISER TUBE LEAKAGEUnit S
4 60.00 0.63 0.76 50.34 48.29Unit
5 210.00 1.40 0.00 109.20 0.00 210.00 16/11/2013 13:03 R AND M / REFURBISHMENT WORKSUnit P
D.P.L. TPS 13880.00 5.13 9.88 405.34 441.91 330.00
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 42Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
3 70.00 0.00 0.00 0.00 0.00 70.00 28/09/2013 16:36 GENERATOR MISCLLANEOUSMAINTENANCE
Unit L
4 75.00 0.00 0.00 0.00 0.00 75.00 26/02/2014 13:23 SUPER HEATER TUBE LEAKAGEUnit L
5 75.00 0.00 0.00 0.00 0.00 75.00 14/11/2013 00:50 SUPER HEATER TUBE LEAKAGEUnit L
6 110.00 0.00 0.00 0.00 0.00 110.00 24/12/2013 11:20 BOILER AUX. MISC. PROMLEMSUnit L
7 300.00 3.43 5.34 270.74 317.23Unit
8 250.00 1.70 4.54 134.60 124.68Unit
KOLAGHAT TPS 151260.00 20.51 17.51 1621.18 1401.17 210.00
1 210.00 3.07 3.13 242.26 190.33Unit
2 210.00 3.47 0.00 274.46 199.66 210.00 01/06/2015 00:01 BOILER MISC. PROBLEMUnit L
3 210.00 3.47 3.17 274.46 221.29Unit
4 210.00 3.57 2.78 282.26 206.09 18/06/2015 02:37 18/06/201507:52
UNIT AUX. TRANSFORMER PROBLEMUnit *
5 210.00 3.33 4.21 262.94 310.33Unit
6 210.00 3.60 4.22 284.80 273.47Unit
SAGARDIGHI TPS 7600.00 13.03 6.62 1030.54 603.66 300.00
1 300.00 6.40 5.67 505.20 419.54Unit
2 300.00 6.63 0.96 525.34 184.12 300.00 08/06/2015 01:55 18/06/201512:51
CONDENSER TUBE LEAKAGE/ CLEANINGUnit *
3 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
4 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
SANTALDIH TPS 10980.00 9.93 11.53 784.74 818.59 480.00
1 120.00 0.00 0.00 0.00 0.00 120.00 18/03/2015 13:11 TURBINE MISC. PROBLEMSUnit L
2 120.00 0.00 0.00 0.00 0.00 120.00 04/10/2009 04:26 MILLING SYSTEM /RC FEEDER PROBLEMUnit L
3 120.00 0.00 0.00 0.00 0.00 120.00 04/10/2009 04:26 MILLING SYSTEM /RC FEEDER PROBLEMUnit L
4 120.00 0.00 0.00 0.00 0.00 120.00 07/10/2008 19:05 HYDROGEN PRESSURE PROBLEMUnit L
5 250.00 4.93 5.74 389.74 441.95Unit
6 250.00 5.00 5.79 395.00 376.64Unit
80.00 0.00 0.00 0.00 0.00 80.00THER (GT)
HALDIA GT (Liq.) 40.00 0.00 0.00 0.00 0.00 40.00
KASBA GT (Liq.) 40.00 0.00 0.00 0.00 0.00 40.00
977.00 4.83 3.65 327.94 243.74 21.50HYDRO
JALDHAKA HPS ST-I 27.00 0.70 0.54 36.60 42.88 9.00
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 43Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
PURULIA PSS HPS. 900.00 3.20 2.17 249.60 162.04
RAMMAM HPS. 50.00 0.93 0.95 41.74 38.82 12.50
PVT SECTOR: 1915.00 31.16 31.42 2450.88 2317.05 460.00
1915.00 31.16 31.42 2450.88 2317.05 460.00THERMAL
BUDGE BUDGE TPS 24750.00 17.16 17.18 1353.88 1410.16
1 250.00 5.70 5.66 450.60 467.55Unit
2 250.00 5.73 5.43 451.14 471.50Unit
3 250.00 5.73 6.10 452.14 471.11Unit
CHINAKURI TPS 030.00 0.00 0.00 0.00 0.00
1 10.00 0.00 0.00 0.00 0.00Unit
2 10.00 0.00 0.00 0.00 0.00Unit
3 10.00 0.00 0.00 0.00 0.00Unit
HALDIA TPP 17600.00 5.90 6.40 467.20 509.35 300.00
1 300.00 3.57 3.20 283.26 386.21Unit
2 300.00 2.33 3.20 183.94 123.14 300.00 18/06/2015 07:19 FIRE IN CABLE GALLERY.Unit S
NEW COSSIPORE TPS 0160.00 0.00 0.00 0.00 0.00 160.00
1 30.00 0.00 0.00 0.00 0.00 30.00 28/01/2015 23:55 ELECTRICAL MISCELLANEOUSPROBLEMS
Unit L
2 30.00 0.00 0.00 0.00 0.00 30.00 28/01/2015 23:58 ELECTRICAL MISCELLANEOUSPROBLEMS
Unit L
3 50.00 0.00 0.00 0.00 0.00 50.00 08/11/2014 13:11 RESERVE SHUT DOWNUnit L
4 50.00 0.00 0.00 0.00 0.00 50.00 29/11/2014 06:33 RESERVE SHUT DOWNUnit L
SOUTHERN REPL. TPS 20135.00 2.66 2.82 209.88 151.78
1 67.50 1.33 1.44 105.94 74.97Unit
2 67.50 1.33 1.39 103.94 76.81Unit
TITAGARH TPS 13240.00 5.44 5.02 419.92 245.76
1 60.00 1.33 1.19 103.94 70.59Unit
2 60.00 1.37 1.26 105.66 53.99Unit
3 60.00 1.37 1.24 105.66 55.40Unit
4 60.00 1.37 1.32 104.66 65.78Unit
CENTRAL SECTOR: 2232.00 41.19 31.56 2927.42 2758.72 500.00
2100.00 39.36 31.35 2826.48 2643.73 500.00THERMAL
FARAKKA STPS 142100.00 39.36 31.35 2826.48 2643.73 500.00
1 200.00 3.83 4.05 301.94 297.02Unit
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 44Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
2 200.00 3.67 4.31 290.06 292.89Unit
3 200.00 3.83 4.14 301.94 296.59Unit
4 500.00 9.03 0.00 715.54 651.83 500.00 14/06/2015 03:37 PIPES and VALVES BOILER SIDEUnit S
5 500.00 9.57 9.64 754.26 696.63Unit
6 500.00 9.43 9.21 462.74 408.77Unit
132.00 1.83 0.21 100.94 114.99HYDRO
TEESTA LOW DAM-III HPS 132.00 1.83 0.21 100.94 114.99
TEESTA LOW DAM-IV HPS 0.00 0.00 0.00 0.00 0.00
NORTH EASTERN
REGION TOTAL 2976.20 40.53 38.19 2489.54 2236.00 176.00
ARUNACHAL PRADESH
STATE TOTAL 405.00 4.33 5.99 232.94 279.76
CENTRAL SECTOR: 405.00 4.33 5.99 232.94 279.76
405.00 4.33 5.99 232.94 279.76HYDRO
RANGANADI HPS. 405.00 4.33 5.99 232.94 279.76
ASSAM
STATE TOTAL 952.20 12.86 14.35 831.48 861.71 130.00
STATE SECTOR: 436.20 4.95 6.66 362.10 397.80 80.00
60.00 0.00 0.00 0.00 0.00 60.00THERMAL
CHANDRAPUR(ASSAM) TPS 060.00 0.00 0.00 0.00 0.00 60.00
1 30.00 0.00 0.00 0.00 0.00 30.00 07/05/1999 07:00 UNECONOMICAL OPERATIONUnit L
2 30.00 0.00 0.00 0.00 0.00 30.00 16/06/1999 23:20 UNECONOMICAL OPERATIONUnit L
276.20 3.45 4.26 307.10 325.73 20.00THER (GT)
LAKWA GT 157.20 2.16 2.68 178.88 207.72 20.00
NAMRUP CCPP 95.00 1.19 1.40 118.42 102.77
NAMRUP ST 24.00 0.10 0.19 9.80 15.24
100.00 1.50 2.39 55.00 72.07HYDRO
KARBI LANGPI HPS. 100.00 1.50 2.39 55.00 72.07
CENTRAL SECTOR: 516.00 7.91 7.69 469.38 463.91 50.00
0.00 0.00 0.00 0.00 0.00THERMAL
BONGAIGAON TPP 00.00 0.00 0.00 0.00 0.00
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 45Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
1 0.00 0.00 0.00 0.00 0.00 UNIT NOT YET COMMISSIONEDUnit
291.00 4.88 4.41 352.84 354.35THER (GT)
KATHALGURI CCPP 291.00 4.88 4.41 352.84 354.35
225.00 3.03 3.28 116.54 109.56 50.00HYDRO
KOPILI HPS. 225.00 3.03 3.28 116.54 109.56 50.00
MANIPUR
STATE TOTAL 141.00 1.40 0.32 74.20 24.88
STATE SECTOR: 36.00 0.00 0.00 0.00 0.00
36.00 0.00 0.00 0.00 0.00THER (DG)
LEIMAKHONG DG 36.00 0.00 0.00 0.00 0.00
CENTRAL SECTOR: 105.00 1.40 0.32 74.20 24.88
105.00 1.40 0.32 74.20 24.88HYDRO
LOKTAK HPS. 105.00 1.40 0.32 74.20 24.88
MEGHALAYA
STATE TOTAL 332.00 3.48 4.64 165.64 164.03 30.00
STATE SECTOR: 282.00 2.81 3.60 139.58 130.17 30.00
282.00 2.81 3.60 139.58 130.17 30.00HYDRO
KYRDEMKULAI HPS. 60.00 0.27 0.23 17.86 20.82 30.00
MYNTDU(LESHKA) St-1 HPS 126.00 2.00 2.90 84.00 74.03
NEW UMTRU 0.00 0.00 0.00 0.00 0.00
UMIAM HPS ST-I 36.00 0.17 0.17 12.06 15.08
UMIAM HPS ST-IV 60.00 0.37 0.31 25.66 20.24
CENTRAL SECTOR: 50.00 0.67 1.04 26.06 33.86
50.00 0.67 1.04 26.06 33.86HYDRO
KHONDONG HPS. 50.00 0.67 1.04 26.06 33.86
NAGALAND
STATE TOTAL 75.00 0.60 0.06 21.80 8.27
CENTRAL SECTOR: 75.00 0.60 0.06 21.80 8.27
75.00 0.60 0.06 21.80 8.27HYDRO
DOYANG HPS. 75.00 0.60 0.06 21.80 8.27
TRIPURA
REGION WISE, STATE WISE, SECTOR WISE, TYPE WISE, STATION WISE, UNIT WISE GENERATION REPORT FOR 18-Jun-2015 46Sub-Report 2/Page/
POWER STATIONMONITORED
CAP.(MW)
TODAY'SPROGRAM
GENERATION (MU)
TODAY'SACTUAL
PROG. ACTUAL
COALSTOCKIN DAYS
CAP. UNDEROUTAGE
(MW)OUTAGE DATE(DD/MM/YYYY
HH24:MI)
EXPECTEDDATE /
SYNC. DATEREMARKS
18-JUN-2015
APRIL 1 TILL DATE (2015-16)
STATE TOTAL 1071.00 17.86 12.84 1163.48 897.35 16.00
STATE SECTOR: 169.50 2.06 2.06 146.08 148.51 16.00
169.50 2.06 2.06 146.08 148.51 16.00THER (GT)
BARAMURA GT 58.50 0.93 0.67 66.74 51.98
ROKHIA GT 111.00 1.13 1.39 79.34 96.53 16.00
CENTRAL SECTOR: 901.50 15.80 10.78 1017.40 748.84
901.50 15.80 10.78 1017.40 748.84THER (GT)
AGARTALA GT 109.50 1.80 2.47 134.40 147.54
MONARCHAK CCPP 65.40 0.00 0.12 0.00 8.62
TRIPURA CCPP 726.60 14.00 8.18 883.00 592.68