1
SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in
RANGE OF SERVICES
We offer services in
Engineering, Designing, Fabrication, Erection, Testing,
Commissioning, Operation & Maintenance of
Refineries
Petrochemicals
Fertilizers
Thermal Power Plants up to 800 MW
Fabrication Shops (Pressure Parts, Structures)
Note:
We work under the inspection of Boiler Inspectors / Lloyds / EIL / TPI thereby strictly
following quality norms of IBR regulations,EIL, TPI & Lloyds Quality Policy.
2
SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in
Operation & Maintenance, Mechanical, Electrical and C & I, Field operations of Power Plants Consisting of
Switchyards, Switchgears, Boilers, Turbines, BOP, AHP, CHP, Water Management System of Thermal Power plants.
Sr. No
Description of Works Plant / Client Name
Duration Status
1.
Mechanical Maintenance of rotary parts on round the clock basis for PNC at IOCL (Refineries Division) Panipat Naphtha Cracker, Panipat, Haryana.
IOCL 24 Months Continue…
2.
AMC for Rotary Equipment maintenance & Workshop Mechanical Maintenance at ISRL petrochemical Complex, Panipat, Haryana
ISRL 36+24 Months
Continue...
3.
Operation and maintenance of Boiler, Turbine generator including BOP of 165 MW combined cycle based power plant at HMEL, Bathinda Refinery (Punjab).
STEAG/HMEL 24 months Completed
4. Operation & Maintenance and Electrical and C&I of Ore Beneficiation Plant of Zinc of 4.7 million MT of Hindustan Zinc limited, Zawar Mines, Udaipur Rajasthan.
Hindustan Zinc Limited
36 Months Continue…
5.
Operation & Maintenance services of 1X108 MW Gas based Power Plant at TATA POWER-Rithala Plant, Delhi
TATA-TPDDDL 24 Months Continue...
6.
Composite Electrical works in upcoming Oil Refinery including Erection, Testing & commissioning of Transformers, LT/ HT Bus bars, HT/LT Motors, Laying HT/LT Cables & installation of C&I system at Dangote Refinery Nigeria.
Dangote Refinery 18 Months Continue…
7.
Mechanical Field Works at IIR Butyl Rubber Plant-Structural Steel Fabrication & Erection, Equipment Erection (Static & Rotary), ABG Piping, Bolt Torqueing etc…
Reliance Sibur Elastomers
Private Limited 12 Months Continue…
8. Under Ground Piping Works
Reliance Sibur Elastomers
Private Limited 8 Months Continue…
9.
Structural, Piping and Equipment(Static & Rotary) Installation Works 5000 MT at Reliance Industries, Jamnagar, SEZ 1 and SEZ 2 Steam Supper Heater Project
Reliance/ Linde Engineering India
Ltd 09 Months Completed
3
SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in
10.
Piping & Structural Steel works of Mechanical Contract for Additive Dosing tank In DTA RTF.(30000 IND)
Reliance
Jamnagar
Refinery 06 Months Completed
11. Stack Height Increase, CFN Piping and Flue Gas Duct jobs at SEZ-FCCU Reliance Industries Limited Jamnagar Gujarat.
Reliance Jamnagar Refinery
2.5 Month Completed
12
IBR Related Piping Modification/ Inspection Jobs at SEZ-FCCU Area Reliance Industries Limited Jamnagar Gujarat.
Reliance
Jamnagar
Refinery 1.5 Month Completed
11. Service contract for ‘Rotary & Static Equipment Maintenance’ at ISRL petrochemical Complex, Rubber plant, Panipat, Haryana.
ISRL Panipat
36 Months Continue...
12.
Fabrication, Erection, Testing and Commissioning of Piping along with Rotating Equipment’s includes CS,AS,SS,P91, 904L, LTCS, Rubber Line, Jacketed piping, Cast Iron (5,10,000 Inch Meter) of 2 Million Tonne Capacity Di Ammonia Phosphate Fertilizer Plant at OCFL Paradeep Orissa
OCFL 24 Months Completed
13.
Fabrication, Erection, Testing and commission of piping (Executed Qty: - 74000 INM which includes P-91, P-11, 22, SS- 304L, 316L, 310 L,CS) of combined cycle of 72 MW including commissioning of HRSG, GTG and STG at OMPL (Petrochemical Complex) at Mangalore, Karnataka.
OMPL/TOYO/ THERMAX
12 Months Completed
14.
Erection, testing & commissioning of complete sulphur furnace package with burners, Boiler drum, furnaces, IBR & NIBR piping at IOCL, Panipat Refinery.
IOCL/ISGEC 06
Months Completed
15.
Structural Steel Fabrication/ Mechanical and other related Works at SFS- SEZ, RIL- Jamnagar J3 Project
Reliance
Jamnagar
Refinery 30 Months Completed
16. Structural Erection works-MEG area
Reliance
Jamnagar 08 Months Completed
16. Mechanical structural erection at SEZ PCG area Reliance
Jamnagar 01 Year Completed
4
SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in
17. Circular Platform Erection works SEZ-MEG area Reliance
Jamnagar 02 Months Completed
18. Turn around Maintenance of SAP & PAP at 01 MT capacity at ICS-Senegal (International). Includes Piping, Equipment’s(rotary +Static)
ICS Senegal 06 Months Completed
19. Assembly and Erection of steel stack along with Platforms of 74 Mtrs height of 72MW at OMPL, Mangalore, Karnataka (QTY -02 No. stacks).
OMPL/TOYO/ THERMAX
03 Months Completed
20.
Assembly, Erection, Testing and Commissioning of Static and Rotating Equipments(Total Weight 19000 MT) of 02 Million Tonne Capacity Di Ammonia Phosphate Fertilizer Plant at OCFL, Paradeep, Orissa
OCFL 22 Months Completed
21. Fabrication of Pressure Vessels and Evaporators. Y’NAGAR/ ISGEC 1.5 Years Completed
22. Fabrication, Assembly, Welding, Pre/Post Weld Treatment and Hydro Testing of Headers.
Y’NAGAR/ ISGEC 36 Months Completed
23. Inspection and correction of turbine bearing no. 01 to 09, alignment of MOP & Bearing gear at 1x 300 MW MCCPL, Bandhakhar, Chhattisgarh.
MCCPL, CG 01 Months Completed
24.
Annual Overhauling of Turbine & Auxiliaries of Unit 1 & 2 at 2x135 MW, ACBIL, Kasaipali, Chhattisgarh
ACBIL 01 Month Completed
25. Services for erection & commissioning of the Drum Belt at KFCL, JAIPRAKASH ASSOCIATES LIMITED.
KFCL, Kanpur 2 Month Completed
26. Triennial Maintenance (Running Maintenance, Breakdown Works) Contract of Boiler, Turbine, Air Compressors and AC of Stage-I (3 X 800 MW) Units at NTPC Kudgi, Karnataka
NTPC Limited, Kudgi
36 Month Continue…
27.
Triennial Maintenance (Running Maintenance, Breakdown Works) Contract of Balance of Plant (BOP) of Stage-I (2 X 800 MW) Units at NTPC Gadarwara
NTPC Limited
Gadarwara
36 Month
Continue…
28.
Providing Complete mechanical maintenance Service including preventive maintenance, regular maintenance & break down maintenance of Boiler & its Auxiliaries (including ESP), Turbine & its Auxiliaries and BOP and Boiler tubes weld joints repair for Unit-I & II, Kawai Thermal Power Plant, Rajasthan
Adani Power Rajasthan Ltd.
24 Month
Continue…
5
SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in
29.
Operation & Maintenance of Ore Beneficiation Plant of Zinc of 2.7 mm MT of Hindustan Zinc limited, Zawar Mines, Udaipur Rajasthan.
Hindustan Zinc Limited
36 Months Continue…
30.
Operations Support Services in Ash Handling Plant (AHP) of 5X800 MW Costal Gujarat Power Limited (CGPL), Mundra Gujarat.
CGPL Gujarat 24 Months
Continue…
31.
Operation & Maintenance Services of Ash Handling Plant (AHP), Mill Reject System (MRS) and Recovery system WRS at 2X700 MW Nabha Power Limited.
L&T Nabha Power
12 + 24 Months
Continue…
32.
Annual Mechanical Maintenance Contract for Boiler & its Auxiliaries, TG & its Auxiliaries, Balance of Plant, Operation Assistance in Water Treatment Plant including material handling and Housekeeping of 3x660MW Super Critical Power Plant of M/S Talwandi Sabo Power Limited,Vill. Banwala, Dist. Mansa, Punjab for Five Years.
STEAG/TSPL
60
Months
Continue…
33.
Operation and maintenance of Boiler, Ash Handling & its Auxiliaries of 3x660 MW Super Critical Thermal Power Plant at Talwandi Sabo, Mansa Punjab.
TSPL/Vedanta Group
36 Months Completed
34.
Routine, Preventive, Predictive Maintenance of Boiler, Turbine and Auxiliaries, All Pumps, DM water plant, Fans of Cooling Towers, Fans, Compressors, HFO system, Ash Handling & BOP etc. of 2x600 MW at LANCO Anpara Power Corporation Ltd, Uttar Pradesh.
LANCO 36 + 36 Months
Continue…
35.
Commissioning Support for Complete Power Plant for Mechanical, Electrical and C&I for BTG, BOP Equipment, Associated Piping, CHP & AHP of 2x600 MW DBPL BADAHARA, Chhattisgarh
DB POWER 24 Months Completed
36.
Complete Maintenance (Routine, Breakdown, Preventive) of Boilers along with its auxiliaries of 4 x 600MW Boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda
SEL IPP/ EESI 52 Months Completed
37.
Maintenance for the housekeeping and material management of 4 x 600 MW boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda
SEL IPP/ EESI 36 Months Completed
38.
Field Operations of BOP of 4 x 600 MW Boilers at Evonik Energy Service(India) Pvt. Limited Jharsuguda
SEL IPP/ EESI 42 Months Completed
39.
Annual Maintenance Contract of Boiler, Mill & its Auxiliaries of 4x300 MW KPI Based Rosa Thermal Power Plant , Rosa , Uttar Pradesh.
Reliance Rosa 36 Months Continue…
40.
AMC for Preventive, Running, Predictive and Breakdown Maintenance of Boiler, Turbine
LANCO-Amarkantak
36 Months Continue...
6
SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in
Generator with its auxiliaries, Balance of Plant and Ash Handlin Plant of 2X300 MW LANCO Amarkantak Ltd.
41.
AMC for Preventive, Running, Predictive and Breakdown Maintenance of Boiler, Turbine Generator with its auxiliaries, Balance of Plant and Ash Handlin Plant of 2X300 MW LANCO Amarkantak Ltd.
UPCL
24 Months Completed
42.
Operation & Maintenance of Ash Handling Plant CPP Unit 3 & 4 (4X300 MW) at JSW Energy Limited, Bellary, Karnataka.
JSW
36 Month
Continue...
43.
Annual Maintenance, Preventive Maintenance & Breakdown Maintenance of Boiler, Turbine and its Auxiliaries CPP- I,II,III,IV & SBU- I,II at 1690 MW JSW Energy Limited, Bellary Karnataka.
JSW
36 Month
Continue...
44.
AMC for Mechanical Preventive Maintenance & Misc. Services of Boiler and Auxiliaries of SBU 2 and CPP3&4 units Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka.
JSW 24 + 12 Months
Completed
45.
AMC for Mechanical Breakdown Maintenance & Misc. Services of Boiler, CHP and Auxiliaries of SUB2 and CPP3&4 Three Units (4X300 MW) at JSW Energy Limited, Bellary, Karnataka.
JSW 24 + 12 Months
Completed
46.
Maintenance Contract of BTG & Mill Reject System at 2X300 MW TRN Energy Private Limited,Vill-Bhengari, Po- Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)
TRN Energy Limited
36 Months Continue…
47.
Maintenance Work For Electrical and C & I at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)
TRN Energy Limited
36 Months Continue…
48.
Annual Service Contract for Maintenance of Main Plant and Plant Water System at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)
TRN Energy Limited
12 Months Completed
7
SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in
49.
Operation & Maintenance of Ash Handling Plant at 2 X 300 MW TRN Energy Pvt.Ltd, Vill-Bhengari, Po-Nawarpara(Tenda), Tehsil-Gharghoda, Raigarh (C.G.)
TRN Energy Limited
12 Months Completed
50.
Maintenance work for Electrical and Control & Instrumentation of 1x300 MW Thermal Power Plant.
Maruthi Clean & Coal power Ltd
12 Months Completed
51.
Complete Operation & Maintenance Services for BTG, BOP, Switch Yard, Electrical and C&I and Auxiliaries including housekeeping for unit-1 &2 at 2 x 270 MW Power Plant at Goindwal Sahib, Punjab.
GVK 36 Months Continue...
52.
Field operations of Boiler, Coal Mills, Fans, DM Plant, FOPH, CW/ RW / FF / SW / PW/ ETP/ STP, Turbine & its Auxiliaries, ESP, Ash Handling Plant, Switch Yard, Switch Gears including HT / LT System etc. of 2 x 270 MW Power Plant at Goindwal Sahib, Punjab.
GVK 36 Months Completed
53.
Annual Mechanical Maintenance & Operations of Boiler Turbine Generator & BOP of 4x135 MW power plants at DCPP of JSPL at Dongamuha, Raigarh.
JSPL 12 Months Continue...
54.
Annual Contract for Operation & Maintenance of Boiler & its auxiliaries, Turbine auxiliaries, CHP, AHP, WTP and BOP at 2x50MW Spectrum Coal & power limited, Chhattisgarh.
ACB-Spectrum Coal & Power
12 + 12 Months
Completed
55.
Operation & Maintenance of 1 X 18 MW solar Power Plant of KEC International at Jalaun, Uttar Pradesh.
KEC International 36 Months Completed
56.
Operation & Maintenance of 5 MW solar Photovoltaic Power Plant at IOCL, Rawra Rajasthan
IOCL 36 Months Continue...
8
SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in
57.
Operation and Maintenance of complete Coal Handling Plant – II of 2x210 MW, PTPS-HPGCL, Panipat Haryana
PTPS / TECPRO 07 Months Completed
58.
Operation & Maintenance of Routine/Breakdown/Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Coal handling Plant – III of 2x250 MW, PTPS-HPGCL, Panipat Haryana
PTPS / TECPRO 07 Months Completed
59.
Maintenance of all Equipment’s of Conveyor System (Routine & Breakdown) & Heavy Equipment’s of Coal Handling Plant – II of 2 x 210 MW PTPS-HPGCL, Panipat Haryana
PTPS / HPGCL 07 Months Completed
60.
Complete Mechanical Maintenance of Equipment’s of Conveyor System of Coal Handling Plant-I of 4 x 110 MW Boilers.
PTPS/ HPGCL 24 Months Completed
61.
Complete Mechanical Maintenance of Crusher, RDM, Wagon Tippler, Motors, and other Allied Equipment’s installed at CHP-II of 2 x210 MW PTPS-HPGCL, Panipat Haryana.
PTPS/ HPGCL 15 Months Completed
62.
Renovation & Modernization of Conveyor Belts by replacing existing Toughing Idlers frame with Rollers, Flat Return Idlers, Toughing Training Idlers, Return Training Idlers & Impact Idlers of 20 Toughing Angle with 35 Toughing Angle Idlers & replacement of Vibrating Feeders, Flap Gates, Transfer Chutes of Coal Handling Plant – I of 4 x 110 MW, PTPS-HPGCL, Panipat Haryana.
PTPS/ RMEC 06 Months Completed
63. Complete Maintenance of Tube Coal Mills, RC Feeders & Vibrators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 6
PTPS/ HPGCL 15 Months Completed
64.
Complete Maintenance of Coal Mills, RC Feeders, PF Piping and O&M of Tramp Iron Gates of 2 x 110 MW at Unit – 1 & 2.
PTPS / HPGCL 15 Months Completed
65.
Complete Maintenance of Coal Mills, RC Feeders of 2 x 600 MW Boiler at Unit–1&2
RGTPP/ 15 Months Completed
9
SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in
66.
Complete Maintenance of Coal Mills, RC Feeders & Variators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5
PTPS 15 Months Completed
67.
Complete Maintenance of Coal Mills, RC Feeders & Variators & miscellaneous Boiler Works of 210 MW Boiler at Unit – 5
PTPS/ HPGCL 15 Months Completed
68.
Complete Maintenance of Coal Mills, RC Feeders and PF Piping of 2x300 MW at Unit – 1&2.
DCRTPP/ HPGCL 15 Months Completed
69.
Complete Maintenance of Coal Mills, RC Feeders, PF Piping and O&M of Tramp Iron Gates of 2 x 110 MW at Unit 1 & 2.
PTPS/ HPGCL 15 Months Completed
70.
Complete Maintenance of Coal Mills, RC Feeders and PF Piping of 2x300 MW at Unit – 1&2.
DCRTPP/ HPGCL 15 Months Completed
71.
Routine/Breakdown/Capital Maintenance of all Electrical & Electronics (C&I) Equipment’s of Unit – 7&8
PTPS/ HPGCL 15 Months Completed
72.
Routine, Breakdown & Capital Maintenance of all Electrical & Electronics (C&I) Equipment’s in CHP-II of 2 x 210 MW Boilers.
PTPS/ RMEC 15 Months Completed
73.
Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Unit 2x250 MW – 7&8
PTPS/ HPGCL 15 Months Completed
74.
Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of Coal Handling Plant – III of 2x250 MW
PTPS/ RMEC 15 Months Completed
75. Routine/Breakdown/ Capital Maintenance of all Electrical & Electronics (C&I) Equipment of CHP-II of 2x210 MW Boilers
PTPS/ HPGCL 07 Months Completed
76. Maintenance / Replacement of Fabric / Conveyor Belt Compensators over existing Metallic Expansion Joints of Boiler of 110 MW at Unit -2
PTPS / HPGCL 04 Months Completed
10
SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in
Annual Overhauling Works
S. No. Description of Works Plant / Client Name
Duration Status
1. Annual overhauling of Boiler Pressure Part, APH, FAN, Coal Burner, Safety valves 2X600 MW Essar Power M.P Limited ,
Bandhora, Waidhan , M.P
Essar Power M.P Limited
01 Month Continue…
2. Annual Overhauling of Boiler Pressure Part, APH, Fans, ESP &
Coal burner of Unit 1 & 3 of 4x300 MW KPI Based Rosa Thermal Power Plant , Rosa , Uttar Pradesh.
Reliance Rosa 01 Month Continue…
3. Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab.
TSPL, Punjab 01 Month Continue…
4. Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab.
TSPL, Punjab 01 Month Completed
5. Annual Overhauling of Boiler Pressure Part, Esp Duct & Dampers, APH & Fans of Unit 2 of 3X660 MW, Talwandi Sabu Power Plant (TSPL), Mansa, Punjab.
TSPL, Punjab 01 Month Completed
9. Annual Overhauling of Boiler & its auxiliaries of U #50 at Costal Gujarat Power Limited (TATA POWER-5X800 MW), Mundra.
TATA POWER -CGPL
02 Months Completed
10. Annual Overhauling of Boiler & its auxiliaries of Unit #40 at Costal Gujarat Power Limited (TATA POWER-5X800 MW), Mundra
TATA POWER -CGPL
02 Months Completed
11. Annual Overhauling of Pressure Parts of Boiler unit #1 and Unit #2 at 2x600 MW CLP Jhajjar- Haryana
CLP 2 Months Completed
12. Annual Overhauling of APH & Fans of unit #1 at 2x600 MW CLP Jhajjar- Haryana
CLP 01 Month Completed
13. Misc. work During Overhauling including Vortex Plate & APH tube replacement in 4 x135 MW JSPL, Korba, CG
JSPL 01 Month Completed
14. Annual Overhauling of ESP, APH of SBU #2, CPP3 at 4X300 MW JSW Energy, Bellary
JSW 02 Month Completed
15. Annual Overhauling of Boiler and Turbine with auxiliaries at 4X300 MW JSW Energy, Bellary
JSW 02 Months Completed
16. Annual Overhauling of LT Motors at 4X300 MW JSW Energy, Bellary
JSW 02 Months Completed
17. Annual Overhauling of Boiler & it’s auxiliaries at 4X135 MW JSPL, Raighar.
JSPL 02 Months Completed
18. Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of SBU 2, 2x300 MW
JSW/Bellary 09 Days Completed
19. Annual Overhaul activities of Boiler, Burner, Valve, Pressure Parts ,ESP, Mills, Ducts and Dampers, APH & Fans of CPP3, 2x300 MW
JSW/Bellary 45 days Completed
20. Capital Overhauling of Pressure Parts, Burners, Pent & Dog SEL IPP/ EESI 01 Completed
11
SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in
House, Fans – (ID/FD/PA/SA), Valves, Ducting, Pumps, Compressors, Gates and Dampers etc. of 2 x 600 MW Power Plants at Jharsuguda.
Month
21. Annual Overhauling of Turbine, Boiler and its Auxiliaries, APH & Fans with auxiliaries at CPP 2 at JSW Energy, Bellary
JSW Energy Limited
01 Months Completed
22. Annual turbine, Generator overhauling of Unit -II & IV at Guru Gobind Sinagh Thermal Power Station , Rupnagar, Punjab.
GGSSTTP 01 Months Completed
23. Capital Overhauling of ESP & Bag Filters of 2 x 600 MW Power Plants at Jharsuguda.
SEL IPP/ EESI 01 Month Completed
24. Capital Overhauling of Coal Mills, Gates & Dampers of 2 x 600 MW Power Plants at Jharsuguda.
SEL IPP/ EESI 01 Month Completed
25. Capital Overhauling of Air Pre Heaters of 2 x 600 MW Power Plants at Jharsuguda.
SEL IPP/ EESI 01 Month Completed
26. Replacement of Support/Guide Bearing of APH of 2 x 600 MW at Hisar.
HPGCL/REL 01 Month Completed
27. Capital overhauling of unit-3 of 110Mw at PTPS Panipat complete pressure parts.
PTPS 1.5 Months Completed
28. Commissioning Support for Mechanical Maintenance Work of Power Plant Equipment’s, Piping, Valves etc. at 2x700 MW NPL Rajpura, Punjab
NPL 06 Months Completed
29. Annual Overhauling of Boiler- Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc. For 135 MW Power Plant at Angul, Orissa.
JSPL 1.5 Months Completed
30. Annual Overhauling of Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc. For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh.
JSPL 01 Month Completed
30. Annual Overhauling and Annual Maintenance of Boiler, Boiler Pressure Parts, IBR HP Valve, BED Nozzles etc. For4x 135 MW Captive Power Plant at Dongamahua, Tamnar, Raigadh.
JSPL 01 Month Completed
31. Capital Overhauling of Pressure Parts (First pass & Second Pass ) of Unit # 5 of 210 MW capacity at PTPS, Panipat
PTPS /HPGCL 01 Month Completed
32. Capital Overhauling of Pressure Parts (First pass & Second Pass ) of Unit # 4 of 110 MW capacity at PTPS, Panipat
PTPS / HPGCL 01 Month Completed
33. Capital Overhauling of Pressure Parts, Burner, RAH, Pent House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler at Unit – 2
PSEB/ ALSTOM 01 Month Completed
34. Capital Overhauling of Pressure Parts, Burner, RAH, Pent House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler at Unit – 2
PSEB/ ALSTOM 01 Month Completed
35. Capital Overhauling of Pressure Parts, Burner, RAH, Pent House, Ducting, Scaffolding in the Furnace, of 210 MW Boiler at Unit – 3
PSEB/ ALSTOM 01 Month Completed
36. Mini Overhauling of the Pressure Parts, Burner, RAH, Pent House, Ducting, Erection of the Sky Climber, ESP at Unit -4
PSEB/ PCP 01 Month Completed
37. Mini Overhauling of the Pressure Parts, Burner, RAH, Pent House, Ducting, Erection of the Sky Climber, ESP at Unit 5
PSEB/ PCP 01 Month Completed
12
SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in
38. Capital Overhauling of RAH, ESP, Dampers & Gates & Ducting of 210 MW Boiler at Unit-6
PTPS / HPGCL 01 Month Completed
39. Overhauling of RAH, ESP, Dampers & Gates & Ducting of 210 MW Boiler at Unit-6
PTPS/ RMEC 01 Month Completed
40. Overhauling of complete Pressure Parts, Pent House, APH of 110 MW Boiler at Unit-2
PTPS/ HPGCL 01 Month Completed
41. Overhauling of Pressure Parts, Cleaning, Washing & Repairing of the Pent House of 110 MW Boiler at Unit – 3
PTPS/ HPGCL 01 Month Completed
42. Overhauling of RAH, ESP, Gates & Dampers, various Ducts of 210 MW Boiler at Unit-5
PTPS/ HPGCL 01 Month Completed
43. Repair/Rectification of 6 Nos. Damaged ESP Fields / ESP Structure along with Replacement of the Slide Bearing of 210 MW Boiler at Unit-6
PTPS/ HPGCL 01 Month Completed
44. Overhauling of Instrument Air Compressor of 110 MW Boiler at Unit-2
PTPS/ HPGCL 01 Month Completed
45. Overhauling Work of Repairing of Pent House, Boiler Drum Internals, Inspection and Repairing of Hangers of 110 MW of Unit -3.
PTPS / HPGCL 01 Month Completed. Doing from last 7 years
13
SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in
Major Experience of Electrical and C & I jobs in Power Plant, Refinery or Petro Chemicals
Sr. No
Description of Works Plant / Client Name
Duration Status
1. Composite Electrical works in upcoming Oil Refinery including Erection, Testing & commissioning of Transformers, LT/ HT Bus bars, HT/LT Motors, Laying HT/LT Cables & installation of C&I system at Dangote Refinery Nigeria.
Dangote Refinery
18 Months
Continue…
2. Assembly Erection, Testing & Commissioning of H&M Equipment’s for Kano Hydro Electric Project for Skipper Nigeria Limited, at Tiga Site, Nigeria
Skipper Nigeria Limited
8 Months Continue…
3. Complete Operation & Maintenance Services for BTG, BOP, Switch Yard, Electrical and C&I and Auxiliaries including housekeeping for unit-1 &2 at 2 x 270 MW Power Plant at GOINDWAL Sahib, Punjab.
GVK 36 Months
Continue...
4. Maintenance Work For Electrical and C & I at 2X300 MW TRN Energy Private Limited, Vill-Bhengari, Po-Nawarpara (Tenda), Tehsil-Gharghoda, Raigarh (C.G.)
TRN Energy Limited
36 Months
Continue…
6. Commissioning Support for Complete Power Plant for Mechanical, Electrical and C&I for BTG, BOP Equipment, Associated Piping, CHP & AHP of 2x600 MW DBPL BADAHARA, Chhattisgarh
DB POWER 24 Months
Completed
7. Operation & Maintenance of 5 MW solar Photovoltaic Power Plant at IOCL, Rawra Rajasthan
IOCL 36 Months
Continue...
8. Maintenance Work for Electrical and Control & Instrumentation of 1x300 MW Thermal Power Plant.
Maruti Clean & Coal power Ltd
12 Months
Completed
9. Operation and maintenance of Boiler, Turbine generator including BOP & Electrical and C&I of 165 MW combined cycle based power plant at HMEL, Bathinda (Punjab).
STEAG/HMEL 24 months
Completed
10. Operation & Maintenance of 1 X 18 MW solar Power Plant of KEC International at Jalaun, Uttar Pradesh.
KEC International
36 Months
Completed
11. Annual Maintenance Contract for Electrical and C&I System and Technical Support Services including Module Cleaning of 3X25 MW Solar Power Plant of Hindustan Power
Hindustan Power
36 Months
Completed
14
SIMAR INFRASTRUCTURES LIMITED 218, Simar House, Virat Nagar Panipat-132 103 (Haryana) Tel: +91-1804013599 [email protected] –www.simar.co.in
CONTACT DETAILS
Registered Office:
208, Virat Nagar Panipat, Haryana
Corporate Office:
218, Virat Nagar Panipat, Haryana
Contact Person:
1. Harsimran Singh
Mob:+91-9355650017
Email: [email protected]
2. Amar Kumar Singh- DGM Contracts
Mob:+91-8684000421
Email: [email protected]
Registered Office:
Suite 106, National Engineering Centre
CBD, Abuja, FCT
Corporate Office:
4, Amore Street off Toyin Street, Ikeja, Lagos
State
Contact Person:
1. Mr. Amandeep Singh
Mob: +234 8180 382 394
Email: [email protected]
2. Mr. PN Gopa Kumar
Mob: +234 7084 905 677
Email:[email protected]