1 Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment, Forest and Climate Change Government of India Indira Paryavaran Bhawan, Jorbagh Road, Aliganj, New Delhi-110003 Kind Attention: Director, Impact Assessment (Industry-1) Subject: Expansion of Kamanda Steel Plant located at village Kamanda in District Sundergarh of Odisha by M/s Rungta Mines Limited Reference: Online Proposal No IA/OA/IND/151729/2020 Dear Sir, This is with reference to the Essential Details Sought (EDS) online dated 21.04.2020 regarding the proposal cited under reference. In the matter, we are submitting our Point wise response hereunder along with required information/ documents for your kind consideration: Point No 1: Form 2 S.No 15: Actual surface water requirement is 62304 KLD, whereas permission is only available for 9371 KLD. Source for the remaining water requirement and the permission for the water drawl shall be furnished. Response: The water required for the plant is being sourced from Karo River. The State Government has permitted withdrawal of 9371 KLD from river Karo. Rungta Mines Limited has made an agreement on 22.11.2019 with Sundargarh Irrigation Division, copy of which is uploaded at Sl. 15 of Form 2. Remaining water requirement will be met from the Karo river & Kurarhi river for which IPICOL has recommended 14.35 cusec (35,105 cum/day) of water to Department of Water Resources for existing & proposed expansion of Kamanda Steel Plant. In-principle approval letter is also uploaded at Sl. 15 of Form 2. The water consumption has also been reviewed in view of the detailed designing and talks with vendors which are under progress and the revised water consumption shall now be 35,103 KLD compared to 62,304 KLD earlier. The break up of the revised water requirement for enhancement is given in Table 30 of Revised Pre-feasibility Report uploaded at Sl No. 39(a) of Form 2. Point No 2: Addendum to the EIA report: Material & Energy balance including Gas volume calculations, Pollution load in a process flow diagram with balance sheet for the entire process units shall be furnished. Response: Details of Material & Energy balance had been covered in detail in the Prefeasibility Report as follows:

Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

1

Ref: RML/KSP-585/21/20-21 Dated 04.05.2020

To,

Ministry of Environment, Forest and Climate ChangeGovernment of IndiaIndira Paryavaran Bhawan,Jorbagh Road, Aliganj,New Delhi-110003

Kind Attention: Director, Impact Assessment (Industry-1)

Subject: Expansion of Kamanda Steel Plant located at village Kamanda in DistrictSundergarh of Odisha by M/s Rungta Mines Limited

Reference: Online Proposal No IA/OA/IND/151729/2020

Dear Sir,

This is with reference to the Essential Details Sought (EDS) online dated 21.04.2020regarding the proposal cited under reference. In the matter, we are submitting our Point wiseresponse hereunder along with required information/ documents for your kind consideration:

Point No 1: Form 2 S.No 15: Actual surface water requirement is 62304 KLD, whereaspermission is only available for 9371 KLD. Source for the remainingwater requirement and the permission for the water drawl shall befurnished.

Response: The water required for the plant is being sourced from Karo River. The StateGovernment has permitted withdrawal of 9371 KLD from river Karo. RungtaMines Limited has made an agreement on 22.11.2019 with SundargarhIrrigation Division, copy of which is uploaded at Sl. 15 of Form 2. Remainingwater requirement will be met from the Karo river & Kurarhi river for whichIPICOL has recommended 14.35 cusec (35,105 cum/day) of water toDepartment of Water Resources for existing & proposed expansion ofKamanda Steel Plant. In-principle approval letter is also uploaded at Sl. 15 ofForm 2. The water consumption has also been reviewed in view of the detaileddesigning and talks with vendors which are under progress and the revisedwater consumption shall now be 35,103 KLD compared to 62,304 KLD earlier.The break up of the revised water requirement for enhancement is given inTable 30 of Revised Pre-feasibility Report uploaded at Sl No. 39(a) of Form 2.

Point No 2: Addendum to the EIA report: Material & Energy balance including Gasvolume calculations, Pollution load in a process flow diagram withbalance sheet for the entire process units shall be furnished.

Response: Details of Material & Energy balance had been covered in detail in thePrefeasibility Report as follows:

Page 2: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

2

SL Facilities Table no. of PFR1 Mini Blast furnace 102 Sinter plant 133 DRI 154 SMS 175 CCM 196 Rolling mill 217 Pellet plant 248 Oxygen plant 27

Gas volume calculation of each stacks are given in Addendum EIA at Table 3.Pollution load for the entire plant has been assessed in Table 5 due to processthrough Stacks and Table 6 for fugitive emissions. The cumulative resultantGLC is given in Table 8.

Point no 3: Air quality prediction modeling shall be revised by incorporating terrainfeatures of the study area with geo referencing of all the process stacks.

Response: Revised Air quality prediction modeling incorporating terrain features of thestudy area with geo referencing of all the process stacks has been carried outand given in Enclosure-A to Addendum EIA and summarised in Table 5.

We hope you will find above information/ document is in order. We request you to kindlyconsider our application for presentation before EAC for grant of enhancement with changein configuration under clause 7(II) of EIA Notifications, 2006

For Rungta Mines Limited(Kamanda Steel Plant)

P. DeoSr. General Manager (Commercial)

Page 3: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

1

Ref: RML/KSP-585/04/20-21-Rev Dated 17.04.2020

To,Ministry of Environment, Forest and Climate ChangeGovernment of IndiaIndira Paryavaran Bhawan,Jorbagh Road, Aliganj,New Delhi-110003.

Kind Attention: Director, Impact Assessment (Industry-1)

Subject: Expansion of Kamanda Steel Plant located at village Kamanda in DistrictSundergarh of Odisha by M/s Rungta Mines Limited.

Dear Sir,

This is with reference to the above mentioned subject, we would like to submit that Ministry ofEnvironment, Forest and Climate Change, Government of India had accorded EnvironmentalClearance vide letter no. J-11011/434/2009-IA.II.(I) dated 06.11.2017 and amendment dated08.03.2019 & 19.07.2019 for Kamanda Steel Plant. The consolidated summary of the sanctionedfacilities is given in Table 1.

TABLE 1: UNITS SANCTIONED IN EC LETTER DATED 06.11.2017, 08.03.2019 &19.07.2019Sl. No. Facility Total capacity

1 Beneficiation Plant 1,200,0002 Pellet Plant-1 600,000

Pellet plant-2 2,640,000Sub Total 3,240,000

3 Coal Washery 924,0004 DRI Plant

6X100 TPD 273,0001X300 TPD 136,5003X350 TPD 441,0002X500TPD 420,000

Sub total 1,270,5005 Sinter Plant -2x24 sqm 532,2246 Mini Blast Furnace

2X262 CUM 458,5001X260 CUM 227,500

Sub-total 686,0007 Coke Oven (2 batteries of 70,000 TPA) 140,0008 SMS

4X15T IF, 2x20 LRF 277,2009 X15T IF, 3x35T LRF 623,700

Sub total 900,9009 Billet/ Slab/ Bloom Caster

Caster I 271,656Caster II 271,656Caster III 339,570

Sub total 882,882

Page 4: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

2

Sl. No. Facility Total capacity10 Flat/ Round/ Wire Rod/ Structural Mill/

othersMill -1 260,790Mill-2 260,790Mill -3 325,987

Sub total 847,56711 Ferro Alloy Plant (1x9 MVA + 1x18 MVA)

Ferro Manganese OR 9 MVA= 18,000, 18 MVA=36,000Silico Manganese OR 9 MVA= 14,400, 18 MVA=28,800

Ferro Chrome OR 9 MVA= 14,400, 18 MVA=28,800Ferro Silicon 9 MVA= 6,400, 18 MVA=12,800Briquette Plant for ferro chrome 88,320Briquette Plant for ferro manganese 111,360

12 Captive Power Plant 198 MWWHRB 87 MWAFBC / CFBC (1x20 MW+ 2x45.5 MW) 111 MW

We wish to submit that presently following facilities are under operation as given in Table 2.

TABLE 2: FACILITIES UNDER OPERATIONS.L Facilities Configuration Production1 Sponge Iron plant 6x100 TPD 2,73,000 TPA

1x300 TPD 136,500 TPA1x350 TPD 147,000 TPA

Total 556,500 TPA2 SMS comprising IF along with CCM 4X15 T 277,200 TPA3 Rolling mill TPA 260,790 TPA4 Captive Power Plant

WHRB 28 MW 28 MWAFBC/ CFBC 20 MW 20 MW

Further, we wish to submit that facilities under implementation is given in Table 3.

TABLE 3: FACILITIES UNDER IMPLEMENTATIONSl. No. Facilities Production Status as on 17.03.2020

1 Pelletisation Plant 2,640,000 TPA Under construction2 WHRB based TG 20 MW Under construction

Now Rungta Mines Limited (Kamanda Steel Plant) proposes to seek amendment inconfiguration of LRF, MBF & Sinter plant as proposed in Table 4.

TABLE 4: FACILITIES PROPOSED FOR AMENDMENT IN CONFIGURATIONReference of EC letter dated Sanctioned capacity as per EC dated

06.11.2017, 08.03.2019 & 19.07.2019Proposed

amendmentFacilities Configuration Revised

ConfigurationSl. No. (i) given in Table under para 6B EC dated 08.03.2019

LRFSMS I 2x20 T 3x20 T

Sl. No. 6 given in Table under para 4, MBF 2x262 cum 1x350 cum

Page 5: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

3

Reference of EC letter dated Sanctioned capacity as per EC dated06.11.2017, 08.03.2019 & 19.07.2019

Proposedamendment

Facilities Configuration RevisedConfiguration

EC dated 07.11.2017 MBF 1x260 cum 1x434 cumSl. No. 5 given in Table under para 4,EC dated 07.11.2017

Sinter plant 2x24 sq.m. 1x48 sqm

A separate application with Form 4 has been submitted parallely for the above amendment inconfiguration.

In addition to the amendments, Rungta Mines Limited (Kamanda Steel Plant) seeks capacityenhancement of (i) DRI, (ii) SMS, (iii) Billets/Slab/Bloom Caster, (iv) TMT/Round/Wire Rod/Flat/Structural/ others, (v) Pelletisation Plant and installation of a new Oxygen plant.

There will be no change in the (i) Beneficiation plant, (ii) Coal Washery, (iii) Coke oven plant, (iv)Captive power plant (WHRB & AFBC/CFBC) and (v) Ferro Alloy Plant.

The increase in production of DRI will be due to improvement of coal quality & consequentincrease in feed of Iron ore/ Pellet, which will increase capacities of the forward & backwardintegrated units in the Kamanda Steel Plant. Therefore, an enhancement in DRI, SMS, Billetscaster, Rolling Mill, and Pelletization Plant is being sought as given in Table 5.

TABLE 5: PROPOSED ENHANCEMENT WITH CHANGE IN CONFIGURATION OFMANUFACTURING FACILITIES AS PER ECs

Reference of ECletter dated19.07.2019

Facilities Units Sanctionedcapacity as

per EC

Additional Proposedproduction

(TPA)Sl. No. 4 given inTable 1 under para 3

DRI (6X100 TPD) TPA 273,000 35,850 308850DRI (1X300 TPD) TPA 136,500 25,025 161525DRI (1x350 TPD) TPA 147,000 19,850 166850DRI (2X350 TPD) TPA 294000 No change 294000DRI (2x500 TPD) TPA 420,000 No change 420000Total TPA 1,270,500 80,725 1,351,225

Sl. No. 8 given inTable 1 under para 3

SMS (I) IF 4X15 T,LRF 3x20 T*

TPA 277,200 69300 346,500

SMS (II) IF 9X15T,LRF 3x35 T

TPA 623,700 No change 623,700

Total TPA 900,900 69,300 970,200Sl. No. 9 given inTable 1 under para 3

Billets /slab/bloomcaster - CCM all 4strandBillet caster (I) TPA 271,656 67,914 339,570Billets caster (II) TPA 271,656 No change 271,656Billets caster (III) TPA 339,570 No change 339,570Total TPA 882,882 67,914 950,796

Sl. No. 10 given inTable 1 under para 3

Rolling mill (TMT/flat/ Round/ wire rod/structural mill/others)Rolling mill (I) TPA 260,790 65,198 325,988

Page 6: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

4

Reference of ECletter dated19.07.2019

Facilities Units Sanctionedcapacity as

per EC

Additional Proposedproduction

(TPA)Rolling mill (II) TPA 260,790 No change 260,790Rolling mill III TPA 325,987 No change 325,987Total TPA 847,567 65,198 912765

Sl. No. 2 given inTable 1 under para 3

Pellet Plant -1 TPA 600,000 300,000 900,000Pellet Plant -2 TPA 2640,000 360,000 3,000,000

Total TPA 3,240,000 660,000 3,900,000Not there Oxygen plant TPD - 150 150

*proposed amendment in configuration

There is no oxygen plant in present configuration and it is proposed to install an oxygen Plant of150 TPD, which will have the following advantages:

Reduces the Electricity consumption Reduces considerable tap to tap time Increasing productivity

We wish to submit that company will take the following additional steps for minimization of impact:(1) Installation of advanced bag filter controllers to improve the efficiency of all bag filters(2) Solar lighting for all streets and parking area(3) Fixed water sprinklers will be increased from 300 to 400 nos.(4) ESP shall be modified to reduce PM below 50 mg/Nm3

Accordingly, please find uploaded & enclosed the following:

Enclosure 1: Copy of Environmental Clearances from MOEF&CC vide letter no. J-11011/305/2012-IA.II.(I) dated 06.11.2017 and its amendments dt. 08.03.2019&19.06.2019

Enclosure 2: Form 2 along with Annexures (including addendum EIA, Form-1 & PFR. The PFRhas been prepared integrated for both amendment in configuration andenhancement of capacity). List of Attachments to Form 2 are as follows:

Attachment No. DescriptionI Authorization LetterII Site on Topo SheetIII Certified Compliance ReportIV Consent to operateV Linkage for Raw MaterialVI Surface water withdrawal permissionVII Wildlife Conservation PlanVIII Approval letter from PCCF for Wildlife Conservation PlanIX Final Layout with Green Belt PlanX HC Permission to EIA consultant to prepare & presentXI Revised Pre -Feasibility ReportXII Addendum EIA with AnnexuresXIII Form 1 with Annexures

Page 7: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

5

We hope you will find the above in order and process our case for grant of EnvironmentalClearance under clause 7(ii) of EIA Notification 2006.

Thanking you,Yours Faithfully,

For Rungta Mines Limited(Kamanda Steel Plant)

P. DeoSr. General Manager (Commercial)

Enclosed: as above

Page 8: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1

Page 9: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 10: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 11: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 12: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 13: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 14: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 15: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 16: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 17: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 18: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 19: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 20: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 21: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 22: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 23: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 24: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 25: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 26: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 27: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..

Page 28: Ref: RML/KSP-585/21/20-21 Dated 04.05environmentclearance.nic.in/writereaddata/online/EC/060520204TDR… · Ref: RML/KSP-585/21/20-21 Dated 04.05.2020 To, Ministry of Environment,

ENCLOSURE : 1 Contd..