3
Drg No Rev Designed Checked Authorised spiire.com.au ABN 55 050 029 635 Rev Amendments Approved Date Date any use or reliance by third party on the content of this document. responsibility or liability whatsoever to any third party arising out of retainer. Spiire Australia Pty Ltd does not and shall not assume any benefit of and use by the client in accordance with the terms of the This document is produced by Spiire Australia Pty Ltd solely for the Spiire Australia Pty Ltd All Rights Reserved © R. WEINBER VILLAWOOD PROPERTIES HUME CITY COUNCIL REDSTONE ESTATE PRELIMINARY A FIRST ISSUE M.L M. LETSON STAGE 3 31/03/20 31/03/20 D.CAMERON B M.L 20/04/20 B STAGE BOUNDARY AMENDED - ORIGIN CIRCUIT STAGE 1 STAGE 2 3 STAGE STAGE 4 STAGE 11 STAGE 12 STAGE 10 STAGE 5 STAGE 7 1A STAGE VILLAWOOD PROPERTIES DESCRIPTION EXISTING PROPOSED WATER MAIN, VALVE AND HYDRANT WATER RECYCLED UNDERGROUND ELECTRICITY OVERHEAD ELECTRICITY & POLE TELECOMMUNICATIONS & SERVICE PIT OPTIC FIBRE OVERHEAD TELECOMMUNICATIONS GAS MAIN BRANCH SEWER & MAINTENANCE STRUCTURE SEWER & MAINTENANCE STRUCTURE SEWER RISING MAIN CENTRAL INVERT COUNCIL STORMWATER DRAIN AND PIT STORM WATER DRAINAGE PROPERTY INLETS COUNCIL STORM WATER PITS HOUSE DRAIN AG DRAIN AND FLUSHER MWC STORM WATER DRAIN & PIT MWC STORM WATER PITS STORM WATER DRAINAGE PIT NUMBER GAS & WATER CONDUITS CONCRETE VEHICLE CROSSING RIDGE / CHANGE OF GRADE LINE SURFACE CONTOUR MINOR SURFACE CONTOUR MAJOR SURFACE LEVEL E123.45 F124.68 BATTER LEVEL (TOP / TOE) T124.80 T124.80 RETAINING WALL LEVEL (TOP/BOTTOM) TW112.76 TW128.50 BW126.74 EARTHWORKS GRADE SIGN AND POST LIGHT & POLE (BY OTHERS) STREET SIGN PERMANENT SURVEY MARK TEMPORARY BENCH MARK BOLLARD ROAD CHAINAGES LOT CHAINAGES CH20.06 CH20.06 SETOUT POINT LIMIT OF WORKS BATTER EXCAVATION GREATER THAN 0.20m FILLING GREATER THAN 0.20m ROCK BEACHING RETAINING WALL FENCE - TREE PROTECTION FENCE - VEHICLE EXCLUSION FENCES GUARD RAIL TREE (& SURVEYED CANOPY) TO BE RETAINED TREE TO BE PROTECTED TREE TO BE REMOVED VEGETATION LINE FOOTPATH TACTILE GROUND SURFACE INDICATOR KERB TRANSITION H H GW GW 169.00 169.00 168.90 168.90 1 in 150 CH116.57 (L/R)TP CH116.57 CH116.57 (L/R)TP CH116.57 B2 SM2 1 A2 PAVEMENT SAWCUT LINE SAWCUT 1 LEGEND WARNING BEWARE OF UNDERGROUND/OVERHEAD SERVICES UNDER OVERHEAD ELECTRICITY TRANSMISSION LINES. SHOULD BE GIVEN TO CONSTRUCTION PROCEDURES SERVICES ARE SHOWN.SPECIAL CONSIDERATION SITE. NO GUARANTEE IS GIVEN THAT ALL EXISTING AND THEIR EXACT POSITION SHOULD BE PROVEN ON THE LOCATION OF SERVICES ARE APPROXIMATE ONLY Vertical Horizontal 0 0 1:4000,A1 40 80 120 160 200 40 80 120 160 200 LOCALITY PLAN GDA2020 1. ALL WORKS TO BE CARRIED OUT IN ACCORDANCE WITH V.P.A. AND HUME CITY COUNCIL STANDARD DRAWINGS, SPECIFICATIONS, APPROVED PLANS AND TO THE SATISFACTION OF THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE. 2. COUNCIL TO BE NOTIFIED SEVEN (7) CLEAR WORKING DAYS PRIOR TO THE COMMENCEMENT OF WORKS WITH A PRE-COMMENCEMENT MEETING BEING HELD BETWEEN HUME CITY COUNCIL, THE CONSULTANT AND THE CONTRACTOR BEFORE WORKS COMMENCE. A SITE MANAGEMENT PLAN IS TO BE SUBMITTED PRIOR TO COMMENCEMENT OF WORKS AND PRIOR TO AN ONSITE PRE-COMMENCEMENT MEETING. 3. PRIOR TO COMMENCEMENT OF THE WORKS, THE CONTRACTOR SHALL PROVIDE THE FOLLOWING INFORMATION: a. SOURCE OF QUARRY MATERIAL. b. N.A.T.A. APPROVED TESTS RESULTS FOR THE F.C.R. THAT IS TO BE USED. c. IF THE SOURCE OF THE QUARRY MATERIAL IS CHANGED DURING THE COURSE OF THE WORKS, THEN NEW TEST RESULTS SHALL BE PROVIDED. 4. PRIOR TO COMMENCEMENT OF WORKS ON SITE, THE CONTRACTOR MUST ENSURE THAT ALL MATTERS RELATING TO THE OCCUPATIONAL HEALTH AND SAFETY ACT 2004 AND O.H.S. REGULATIONS 2007 HAVE BEEN AND WILL BE COMPLIED WITH. 5. ON COMMENCEMENT OF CONSTRUCTION WORKS, THE CONTRACTOR MUST COMPLY WITH THE RECOMMENDATIONS OF THE ENVIRONMENT PROTECTION AUTHORITY PUBLICATION "CONSTRUCTION TECHNIQUES FOR SEDIMENT POLLUTION CONTROL." APPROPRIATE SILTATION CONTROL IS TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION AND MAINTENANCE PERIOD OF THE WORKS. 6. THE DISPOSAL SITE FOR SPOIL REMOVAL FROM SITE AND TRUCK ROUTE IS TO BE SUBMITTED TO AND APPROVED BY THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE IN WRITING PRIOR TO THE COMMENCEMENT OF ANY WORKS. 7. WHERE WORKS ARE IN THE VICINITY OF EXISTING SERVICES, THESE SERVICES ARE TO BE LOCATED AND EXPOSED/PROVED PRIOR TO COMMENCEMENT OF WORKS, AND THE RELEVANT AUTHORITIES NOTIFIED SEVEN (7) CLEAR DAYS PRIOR TO THE COMMENCEMENT OF THE WORKS. 8. ALL DIMENSIONS ARE IN METRES UNLESS NOTED OTHERWISE. 9. ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM (A.H.D.). 10. 11. THE CONTRACTOR MUST ARRANGE THE REQUISITE INSPECTIONS OF THE WORKS WITH THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE AS PER THE HOLD POINTS IN THE V.P.A. MANUAL AND HUME CITY COUNCIL SPECIFICATIONS. 12. FILL AREAS TO BE STRIPPED OF TOPSOIL, FILLED AND TOPSOIL REPLACED TO OBTAIN FINAL FILL LEVELS AS SHOWN ON PLAN. FILLING IS TO BE CLEAN CLAY COMPACTED TO A DENSITY NOT LESS THAN 95% OF THE MAXIMUM DRY DENSITY VALUE DETERMINED BY THE STANDARD COMPACTION TEST IN ACCORDANCE WITH A.S.1289.5.1.1-2003. 13. FILLING TO COMPLY WITH A.S.3798-2007, LEVEL 1 UNLESS SPECIFIED OTHERWISE. 14. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL IMPORTED FILL MATERIAL, INCLUDING TOPSOIL, SATISFIES THE DESCRIPTION FOR CLEAN FILL MATERIAL IN EPA BULLETIN PUBLICATION NO 448 (SEPT '95) AND SUBSEQUENT REVISIONS. THE CONTRACTOR SHALL IF REQUIRED PROVIDE VERIFICATION INCLUDING TEST CERTIFICATES TO THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE. 15. WHERE, AS A CONDITION OF THE PLANNING PERMIT OR AS A RESULT OF THE PRE-CONSTRUCTION MEETING, FENCING OF AREAS CONTAINING TREES, NATIVE GRASSES AND SHRUBS IS REQUIRED, A THREE STRAND STAR PICKET AND WIRE FENCE SHALL BE CONSTRUCTED. 16. NO TREE OR NATIVE VEGETATION IS TO BE DISTURBED OR REMOVED WITHOUT PRIOR APPROVAL FROM COUNCILS SUSTAINABLE ENVIRONMENT DEPARTMENT. ANY TREES REMOVED, VEGETATION OR OTHER MATERIALS ARE NOT TO BE BURNT ON SITE. 17. BEFORE COMMENCING WORK ON TRENCHES IN EXCESS OF 1.5m DEEP, NOTICE OF SUCH PROPOSAL IS TO BE FORWARDED BY THE CONTRACTOR TO WORKSAFE VICTORIA. 18. THE CONTRACTOR IS TO OBTAIN A BUILDING PERMIT FOR ANY STRUCTURES / FENCES AND FOR ANY RETAINING WALLS OVER 1.0m IN HEIGHT. 19. ANY INFRASTRUCTURE DAMAGE DURING THE DEFECTS LIABILITY PERIOD IS THE RESPONSIBILITY OF THE DEVELOPER OR HIS REPRESENTATIVE AND IS TO BE REINSTATED TO THE SATISFACTION OF THE CHIEF EXECUTIVE OFFICER OR HIS REPRESENTATIVE. 20. PRIOR TO STATEMENT OF COMPLIANCE ALL DISTURBED AREAS (INCLUDING NATURE STRIPS, BATTERS, ALLOTMENTS WITH GRADES OF 1:5 AND GREATER, AND RESERVES) ARE TO BE REINSTATED TO A CLEAN, TIDY CONDITION, TOP DRESSED (100MM LOAMY TOP SOIL FREE OF RUBBISH, DEBRIS, CLUMPS, SODS AND CLAY LUMPS), LIGHTLY COMPACTED AND HYDRO MULCHED. HYDROMULCH AND SEED MIX TO BE: · 40KG/HA KIKUYU · 200KG/HA TURF TYPE PERENNIAL RYE · 100KG/HA CREEPING RED FESCUE · 1,500KG/HA OF CELLULOSE FIBRE · SOIL BINDER, SPECIFICALLY MANUFACTURED FOR HYDROMULCHING, USED AT MANUFACTURERS RECOMMENDED RATES. (E.G. ORGANIC GAUR TACKIFIERS @ 20 - 30 KG/HA, BASED ON, SITE CONDITIONS). NOTE: BITUMEN BINDERS ARE NOT ACCEPTED BY COUNCIL. GRASS IS TO BE ESTABLISHED PRIOR TO THE END OF THE MAINTENANCE PERIOD, UNLESS OTHERWISE AGREED IN WRITING. 21. FOOTPATHS ARE TO BE 50mm OFFSET FROM TITLE BOUNDARIES UNLESS NOTED OTHERWISE. VEHICLE CROSSING ALIGNMENTS ARE GENERALLY TO BE PARALLEL TO THE SIDE BOUNDARY. 22. ALL NEW CONCRETE WORKS SHALL BE JOINED INTO ABUTTING EXISTING CONCRETE WITH 450mm LONG Y20 DOWEL BARS @ 600 CENTRES, UNLESS OTHERWISE SPECIFIED. 23. ANY EXPOSED AGGREGATE CONCRETE WORKS TO BE ACHIEVED BY SAND-BLASTING ONLY. WASHING AGGREGATE OFF WITH WATER IS NOT PERMITTED. 24. ALL SERVICE CONDUITS TRENCHES UNDER ROAD PAVEMENTS ARE TO BE BACKFILLED WITH 20mm 3% CEMENT TREATED CLASS 3 CRUSHED ROCK COMPACTED TO A DENSITY NOT LESS THAN 95% OF THE MAXIMUM DRY DENSITY VALUE DETERMINED BY THE MODIFIED COMPACTION TEST IN ACCORDANCE WITH A.S.1289.5.2.1-2003. ALL SERVICE CONDUITS TRENCHES UNDER FOOTPATH, VEHICULAR CROSSINGS, PARKING BAYS AND WITHIN 750MM OF PARKING BAYS TO BE BACKFILLED WITH CLASS 3 CRUSHED ROCK. 25. ALL STORMWATER DRAINS ARE TO BE CLASS 2 R.C. OR RIGID F.R.C PIPES WITH ADCOL FLEXIBLE COLLARS UNLESS NOTED OTHERWISE. ALL PIPES UP TO AND INCLUDING 750mm DIAMETER ARE TO BE RUBBER RING JOINTED. INTERLOCKING / FLUSH JOINTS WITH EXTERNAL BANDS CAN ONLY BE USED ON PIPE SIZES OVER 750mm DIAMETER. 26. WHERE NEW ASPHALT, CONCRETE KERB & CHANNEL, PATHS AND DRIVEWAYS MATCH INTO EXISTING, THE EXISTING SURFACE IS TO BE SAW CUT AND MATCHED NEATLY. 27. ALL REDUNDANT ASSETS ARE TO BE REMOVED AND DISPOSED OFF SITE. 28. ALL TREES AND SHRUBS ARE TO BE RETAINED UNLESS OTHERWISE SHOWN OR DIRECTED BY THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE. 29. AT THE COMPLETION OF ALL WORKS, ALL RUBBISH, DEBRIS AND SURPLUS SPOIL SHALL BE REMOVED AND THE SITE SHALL BE CLEARED TO THE SATISFACTION OF THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE. 30. ALL DRAINS BEHIND KERB AND CHANNEL SHALL BE BACKFILLED TO MATCH PAVEMENT SUBGRADE LEVEL WITH 20mm CLASS 3 F.C.R. COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY VALUE DETERMINED BY THE MODIFIED COMPACTION TEST IN ACCORDANCE WITH A.S. 1289.5.2.1-2003. ALL DRAINS, SEWERS, GAS & WATER MAINS LAID THROUGH THE ROAD PAVEMENT (EXCEPT CONDUITS) ARE TO BE BACKFILLED WITH 20mm CLASS 2 FCR COMPACTED TO 98% OF THE MAXIMUM DRY DENSITY VALUE DETERMINED BY THE MODIFIED COMPACTION TEST IN ACCORDANCE WITH A.S.1289.5.2.1-2003. 31. PAVEMENT DEPTH SPECIFIED IS A MINIMUM DEPTH AND MAY BE VARIED BY THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE. SOFT SPOTS SHALL BE EXCAVATED TO A PROOF ROLLED BASE AND BACKFILLED WITH APPROVED MATERIAL COMPACTED IN 150mm LAYERS TO ACHIEVE TO A DENSITY NOT LESS THAN 95% OF THE MAXIMUM DRY DENSITY VALUE DETERMINED BY THE STANDARD COMPACTION TEST IN ACCORDANCE WITH A.S.1289.5.1.1-2003. HUME CITY COUNCIL GENERAL NOTES: ALL COORDINATES ARE TO MAP GRID OF AUSTRALIA 2020 (GDA 2020). 32. ALL EXISTING ASSETS AFFECTED BY THE WORKS; E.G. SIGNS, VEHICLE CROSSINGS, FOOTPATHS, KERB AND LINEMARKING SHALL BE REINSTATED BY THE CONTRACTOR PRIOR TO THE COMPLETION OF THE WORKS TO THE SATISFACTION OF THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE. 33. ALL FIRE HYDRANTS ARE TO BE MARKED IN ACCORDANCE WITH "IDENTIFICATION OF STREET HYDRANTS FOR FIREFIGHTING PURPOSES" PUBLICATION (DEVELOPED BY C.F.A, M.F.E.S.B & N.R.E). MARKINGS TO BE VIA BLUE PAVEMENT MARKER AND A (RED TOPPED) WHITE POST. 34. AGRICULTURAL DRAINS ARE TO BE PLACED BEHIND ALL KERB AND CHANNEL, KERB ONLY AND EDGE STRIPS IN ACCORDANCE WITH COUNCIL STANDARD DRAWING SD282. 35. ALL TABLE DRAINS AND VERGES ARE TO BE REINSTATED UPON COMPLETION OF WORKS TO THE SATISFACTION OF THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE. 36. ALL TRAFFIC CONTROL MEASURES, SIGNS AND LINEMARKING SHALL BE IN ACCORDANCE WITH A.S.1742 - 1, 2 & 3. STREET NAME SIGNS ARE TO BE IN ACCORDANCE WITH COUNCIL STANDARD DRAWING SD408. 37. ALL LINEMARKING PAINT SHALL BE LONG LIFE TYPE IN ACCORDANCE WITH SECTION 95C OF THE HUME CITY COUNCIL SPECIFICATIONS. LATERAL WORKS AND ARROWS BEING COLD APPLIED PLASTIC TROWELLED INTO PLACE (MATERIAL DEGADUR PLASTELINE) AND LONGITUDINAL LINES BEING EXTRUDED THERMOPLASTIC MATERIAL. 38. ALL SIGNS TO BE CLASS 1 HIGH INTENSITY TYPE AND TO COMPLY WITH THE REQUIREMENTS OF A.S.1743 -2001. 39. HOUSE DRAIN CONNECTIONS TO 150mm DIAMETER PIPES TO BE VIA A MANUFACTURED JUNCTION PIECE. 150mm DIAMETER STORMWATER PIPES ARE TO BE HEAVY DUTY SEWER GRADE. PVC PIPES SHALL BE BACKFILLED WITH 10mm MINUS F.C.R. TO 150mm ABOVE TOP OF PIPE IN ALL LOCATIONS. 40. PROPERTY INLETS 1.0m FROM THE LOW CORNER OF THE LOT UNLESS OTHERWISE SHOWN. 41. BLASTING GENERALLY IS NOT ENCOURAGED, HOWEVER BLASTING MAY BE REQUIRED AS A LAST RESORT DEPENDING ON GROUND CONDITIONS. COUNCIL IS TO BE NOTIFIED IN WRITING IF ANY BLASTING IS NECESSARY. RESIDENTS LIKELY TO BE AFFECTED BY THE BLASTING AND ALL SERVICE AUTHORITIES SHALL BE NOTIFIED IN WRITING PRIOR TO WORKS COMMENCING. COPIES OF THESE NOTIFICATIONS ARE TO BE SUBMITTED TO COUNCIL. RESIDENT NOTIFICATION LETTER IS TO INCLUDE BLASTING GUIDELINES, FIRING AND MISFIRE PROCEDURES AND CONTRACTOR AND CONSULTANT CONTACT NAMES AND PHONE NUMBERS. ALL BLASTING IS TO BE WITHIN THE LIMITS FOR AIR AND GROUND VIBRATION LEVELS AS SET DOWN IN A.S.2187.2-1993. ALL BLASTS SHALL BE MONITORED FOR AIR AND NOISE VIBRATION AT POTENTIALLY AFFECTED RESIDENCES. "FORM A" FROM A.S. 2187.2-1993, AND WAVE TRACE COPIES ARE TO BE SUBMITTED TO COUNCIL FOR EACH BLAST. BLASTING IS TO BE RESTRICTED TO BETWEEN 9:00am AND 3:30pm. BLASTING IS NOT TO OCCUR ON WEEKENDS OR PUBLIC HOLIDAYS. BLASTING AREA SIGNS ARE TO BE PLACED AT ALL ENTRANCES TO THE SITE. 42. ALL EXISTING SURFACE LEVELS SHOWN ON THE ENGINEERING DRAWINGS HAVE BEEN INTERPOLATED FROM A DIGITAL TERRAIN MODEL. THESE LEVELS HAVE BEEN USED AS THE BASIS FOR ALL ENGINEERING DESIGN AND DETERMINATION OF QUANTITIES AND ARE ACCURATE TO WITHIN ±0.05m. 43. ANY EXISTING SERVICES SHOWN ON THESE DRAWINGS ARE OFFERED AS A GUIDE ONLY AND ARE NOT GUARANTEED AS CORRECT. 44. WHERE REQUIRED ANY BUILDINGS, TROUGHS, FENCES AND OTHER STRUCTURES ON SITE ARE TO BE REMOVED AS DIRECTED BY THE ENGINEER. THE COST OF REMOVAL IS TO BE INCLUDED IN THE OVERALL EARTHWORKS FIGURE UNLESS A SPECIFIC ITEM FOR REMOVAL IS DENOTED IN THE SCHEDULE. 45. ALL FILLING ON LOTS AND WITHIN ROAD RESERVES GREATER THAN 200mm IS TO BE UNDERTAKEN USING LEVEL 1 SUPERVISION AND BE COMPLETED IN ACCORDANCE WITH A.S.3798-2007. FILLING MATERIAL IS TO BE IN ACCORDANCE WITH THE SPECIFICATION, A.S.3798-2007 & TO THE SATISFACTION OF COUNCIL AND THE SUPERINTENDENT. 46. 47. NO FILL OR STOCKPILING OF MATERIAL IS TO BE PLACED ON ANY RESERVE FOR PUBLIC OPEN SPACE UNLESS OTHERWISE DIRECTED OR APPROVED BY THE SUPERINTENDENT. 48. T.B.M.'S TO BE RE-ESTABLISHED BY THE LICENSED SURVEYOR IF FOUND TO BE MISSING AT THE COMMENCEMENT OF CONSTRUCTION. THE CONTRACTOR WILL BE RESPONSIBLE FOR CARE AND MAINTENANCE OF T.B.M.'S THEREAFTER. WHERE REQUIRED, ALL EXISTING DAMS, DEPRESSIONS AND DRAINS ARE TO BE BREACHED, DRAINED, DE-SLUDGED AND SHALL BE EXCAVATED TO A CLEAN FIRM BASE. THE SURFACE SHALL BE INSPECTED, APPROVED AND LEVELLED BY THE ENGINEER PRIOR TO COMMENCEMENT OF FILLING. THE FILL SHALL BE APPROVED SELECTED ON SITE MATERIAL OR APPROVED IMPORTED MATERIAL. THE FILL SHALL BE PLACED UNDER CONTROLLED MOISTURE CONDITIONS IN ACCORDANCE WITH THE SPECIFICATION. GAS AND WATER CONDUITS SIZES ARE AS FOLLOWS: Ø50mm CLASS 12 P.V.C. - SINGLE SERVICE Ø100mm CLASS 12 P.V.C. - DUAL SERVICE (DRINKING AND NON DRINKING WATER) WITH THE FOLLOWING MINIMUM COVER TO FINISHED SURFACE LEVELS: ROAD PAVEMENT - 0.80m VERGE & FOOTPATHS - 0.45m WHERE CURVED PIPE ALIGNMENTS ARE SHOWN ON THE FACE PLANS THEY ARE TO BE LAID PARALLEL TO THE BACK OF KERB, EXCEPT WHERE A RADIUS HAS BEEN SPECIFICALLY NOMINATED. CURVED PIPES ARE TO BE APPROVED BY COUNCIL AND IN ACCORDANCE WITH THE MANUFACTURERS SPECIFICATIONS. ALL WORKS TO BE CARRIED OUT IN ACCORDANCE WITH AS2124-1992 GENERAL CONDITIONS OF CONTRACT. WHERE PAVEMENT IS CONSTRUCTED ON FILLING, FILL MATERIAL IS TO BE APPROVED BY THE SUPERINTENDENT AND COUNCIL. FILLING TO BE CONSTRUCTED IN LAYERS 150mm THICK WITH COMPACTION ACHIEVING 95% AUSTRALIAN STANDARD DENSITY. WHEN PAVEMENT EXCAVATION IS IN ROCK, ALL LOOSE MATERIAL (INCLUDING ROCKS AND CLAY) MUST BE REMOVED. THE SUB-GRADE MUST THEN BE REGULATED WITH COUNCIL APPROVED MATERIAL. ALL TEMPORARY WARNING SIGNS USED DURING CONSTRUCTION SHALL BE SUPPLIED AND MAINTAINED IN ACCORDANCE WITH A.S.1742-3. SPIIRE GENERAL NOTES: CONTRACTOR TO ENSURE SEWER MANHOLE COVERS ARE WHOLLY LOCATED IN PROPOSED FOOTPATHS. 49. 50. 51. 52. 53. 54. 55. 56. 100mm HOUSE DRAIN CONNECTIONS TO BE LAID AT AN OFFSET OF 5.5m FROM THE LOW SIDE TITLE BOUNDARY AND ALL BATTERS SHALL BE 1 IN 5, UNLESS OTHERWISE SHOWN. 305914-SK01 DRAWING DESCRIPTION SHEET No. REVISION DRAWING SCHEDULE 1 B 2 FACE SHEET 305914-SK01 305914-SK02 B FACE SHEET 2 305914-SK02 B FINISHED LEVEL PLAN SHEET 1 FINISHED LEVEL PLAN SHEET 2 REDSTONE ESTATE STAGE 3

REDSTONE ESTATE STAGE 3 VILLAWOOD PROPERTIES€¦ · 31/03/20 31/03/20 d.cameron b b stage boundary amended - origin circuit m.l 20/04/20 stage 1 stage 2 3 stage stage 4 stage 11

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: REDSTONE ESTATE STAGE 3 VILLAWOOD PROPERTIES€¦ · 31/03/20 31/03/20 d.cameron b b stage boundary amended - origin circuit m.l 20/04/20 stage 1 stage 2 3 stage stage 4 stage 11

Drg No Rev

Designed Checked

Authorised

spiire.com.au ABN 55 050 029 635Rev Amendments Approved Date

Date

any use or reliance by third party on the content of this document.

responsibility or liability whatsoever to any third party arising out of

retainer.  Spiire Australia Pty Ltd does not and shall not assume any

benefit of and use by the client in accordance with the terms of the

This document is produced by Spiire Australia Pty Ltd solely for the

Spiire Australia Pty Ltd All Rights Reserved©

R. WEINBER

VILLAWOOD PROPERTIES

HUME CITY COUNCIL

REDSTONE ESTATE

PRELIMINARYA FIRST ISSUE M.L

M. LETSON

STAGE 3

31/03/2031/03/20

D.CAMERON

B

M.L 20/04/20B STAGE BOUNDARY AMENDED - ORIGIN CIRCUIT

STAGE 1

STAGE 2

3STAGE

STAGE 4

STAGE 11

STAGE 12

STAGE 10

STAGE 5

STAGE 7

1ASTAGE

VILLAWOOD PROPERTIESDESCRIPTION EXISTING PROPOSED

WATER MAIN, VALVE AND HYDRANT

WATER RECYCLED

UNDERGROUND ELECTRICITY

OVERHEAD ELECTRICITY & POLE

TELECOMMUNICATIONS & SERVICE PIT

OPTIC FIBRE

OVERHEAD TELECOMMUNICATIONS

GAS MAIN

BRANCH SEWER & MAINTENANCE STRUCTURE

SEWER & MAINTENANCE STRUCTURE

SEWER RISING MAIN

CENTRAL INVERT

COUNCIL STORMWATER DRAIN AND PIT

STORM WATER DRAINAGE PROPERTY INLETS

COUNCIL STORM WATER PITS

HOUSE DRAIN

AG DRAIN AND FLUSHER

MWC STORM WATER DRAIN & PIT

MWC STORM WATER PITS

STORM WATER DRAINAGE PIT NUMBER

GAS & WATER CONDUITS

CONCRETE VEHICLE CROSSING

RIDGE / CHANGE OF GRADE LINE

SURFACE CONTOUR MINOR

SURFACE CONTOUR MAJOR

SURFACE LEVEL E123.45 F124.68

BATTER LEVEL (TOP / TOE) T124.80 T124.80

RETAINING WALL LEVEL (TOP/BOTTOM) TW112.76 TW128.50 BW126.74

EARTHWORKS GRADE

SIGN AND POST

LIGHT & POLE (BY OTHERS)

STREET SIGN

PERMANENT SURVEY MARK

TEMPORARY BENCH MARK

BOLLARD

ROAD CHAINAGES

LOT CHAINAGES CH20.06 CH20.06

SETOUT POINT

LIMIT OF WORKS

BATTER

EXCAVATION GREATER THAN 0.20m

FILLING GREATER THAN 0.20m

ROCK BEACHING

RETAINING WALL

FENCE - TREE PROTECTION

FENCE - VEHICLE EXCLUSION

FENCES

GUARD RAIL

TREE (& SURVEYED CANOPY) TO BE RETAINED

TREE TO BE PROTECTED

TREE TO BE REMOVED

VEGETATION LINE

FOOTPATH

TACTILE GROUND SURFACE INDICATOR

KERB TRANSITION

H H

GW GW

169.00 169.00

168.90 168.90

1 in 150

CH116.57

(L/R)TPCH116.57

CH116.57

(L/R)TPCH116.57

B2 SM2

1

A2

PAVEMENT SAWCUT LINE SAWCUT

1

LEGEND

WARNINGBEWARE OF UNDERGROUND/OVERHEAD SERVICES

UNDER OVERHEAD ELECTRICITY TRANSMISSION LINES.

SHOULD BE GIVEN TO CONSTRUCTION PROCEDURES

SERVICES ARE SHOWN.SPECIAL CONSIDERATION

SITE. NO GUARANTEE IS GIVEN THAT ALL EXISTING

AND THEIR EXACT POSITION SHOULD BE PROVEN ON

THE LOCATION OF SERVICES ARE APPROXIMATE ONLY

Vertical

Horizontal 0

0

1:4000,A1

40 80 120 160 200

40 80 120 160 200

LOCALITY PLAN

GDA2020

1. ALL WORKS TO BE CARRIED OUT IN ACCORDANCE WITH V.P.A. AND HUME CITY COUNCIL STANDARD DRAWINGS,

SPECIFICATIONS, APPROVED PLANS AND TO THE SATISFACTION OF THE CHIEF EXECUTIVE OFFICER AND/OR THEIR

REPRESENTATIVE.

2. COUNCIL TO BE NOTIFIED SEVEN (7) CLEAR WORKING DAYS PRIOR TO THE COMMENCEMENT OF WORKS WITH A

PRE-COMMENCEMENT MEETING BEING HELD BETWEEN HUME CITY COUNCIL, THE CONSULTANT AND THE CONTRACTOR

BEFORE WORKS COMMENCE. A SITE MANAGEMENT PLAN IS TO BE SUBMITTED PRIOR TO COMMENCEMENT OF WORKS

AND PRIOR TO AN ONSITE PRE-COMMENCEMENT MEETING.

3. PRIOR TO COMMENCEMENT OF THE WORKS, THE CONTRACTOR SHALL PROVIDE THE FOLLOWING INFORMATION:

a. SOURCE OF QUARRY MATERIAL.

b. N.A.T.A. APPROVED TESTS RESULTS FOR THE F.C.R. THAT IS TO BE USED.

c. IF THE SOURCE OF THE QUARRY MATERIAL IS CHANGED DURING THE COURSE OF THE WORKS, THEN NEW TEST

RESULTS SHALL BE PROVIDED.

4. PRIOR TO COMMENCEMENT OF WORKS ON SITE, THE CONTRACTOR MUST ENSURE THAT ALL MATTERS RELATING TO

THE OCCUPATIONAL HEALTH AND SAFETY ACT 2004 AND O.H.S. REGULATIONS 2007 HAVE BEEN AND WILL BE

COMPLIED WITH.

5. ON COMMENCEMENT OF CONSTRUCTION WORKS, THE CONTRACTOR MUST COMPLY WITH THE RECOMMENDATIONS OF

THE ENVIRONMENT PROTECTION AUTHORITY PUBLICATION "CONSTRUCTION TECHNIQUES FOR SEDIMENT POLLUTION

CONTROL." APPROPRIATE SILTATION CONTROL IS TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION AND

MAINTENANCE PERIOD OF THE WORKS.

6. THE DISPOSAL SITE FOR SPOIL REMOVAL FROM SITE AND TRUCK ROUTE IS TO BE SUBMITTED TO AND APPROVED BY

THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE IN WRITING PRIOR TO THE COMMENCEMENT OF ANY

WORKS.

7. WHERE WORKS ARE IN THE VICINITY OF EXISTING SERVICES, THESE SERVICES ARE TO BE LOCATED AND

EXPOSED/PROVED PRIOR TO COMMENCEMENT OF WORKS, AND THE RELEVANT AUTHORITIES NOTIFIED SEVEN (7)

CLEAR DAYS PRIOR TO THE COMMENCEMENT OF THE WORKS.

8. ALL DIMENSIONS ARE IN METRES UNLESS NOTED OTHERWISE.

9. ALL LEVELS ARE TO AUSTRALIAN HEIGHT DATUM (A.H.D.).

10.

11. THE CONTRACTOR MUST ARRANGE THE REQUISITE INSPECTIONS OF THE WORKS WITH THE CHIEF EXECUTIVE OFFICER

AND/OR THEIR REPRESENTATIVE AS PER THE HOLD POINTS IN THE V.P.A. MANUAL AND HUME CITY COUNCIL

SPECIFICATIONS.

12. FILL AREAS TO BE STRIPPED OF TOPSOIL, FILLED AND TOPSOIL REPLACED TO OBTAIN FINAL FILL LEVELS AS SHOWN

ON PLAN. FILLING IS TO BE CLEAN CLAY COMPACTED TO A DENSITY NOT LESS THAN 95% OF THE MAXIMUM DRY

DENSITY VALUE DETERMINED BY THE STANDARD COMPACTION TEST IN ACCORDANCE WITH A.S.1289.5.1.1-2003.

13. FILLING TO COMPLY WITH A.S.3798-2007, LEVEL 1 UNLESS SPECIFIED OTHERWISE.

14. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL IMPORTED FILL MATERIAL, INCLUDING TOPSOIL,

SATISFIES THE DESCRIPTION FOR CLEAN FILL MATERIAL IN EPA BULLETIN PUBLICATION NO 448 (SEPT '95) AND

SUBSEQUENT REVISIONS. THE CONTRACTOR SHALL IF REQUIRED PROVIDE VERIFICATION INCLUDING TEST

CERTIFICATES TO THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE.

15. WHERE, AS A CONDITION OF THE PLANNING PERMIT OR AS A RESULT OF THE PRE-CONSTRUCTION MEETING, FENCING

OF AREAS CONTAINING TREES, NATIVE GRASSES AND SHRUBS IS REQUIRED, A THREE STRAND STAR PICKET AND

WIRE FENCE SHALL BE CONSTRUCTED.

16. NO TREE OR NATIVE VEGETATION IS TO BE DISTURBED OR REMOVED WITHOUT PRIOR APPROVAL FROM COUNCILS

SUSTAINABLE ENVIRONMENT DEPARTMENT. ANY TREES REMOVED, VEGETATION OR OTHER MATERIALS ARE NOT TO

BE BURNT ON SITE.

17. BEFORE COMMENCING WORK ON TRENCHES IN EXCESS OF 1.5m DEEP, NOTICE OF SUCH PROPOSAL IS TO BE

FORWARDED BY THE CONTRACTOR TO WORKSAFE VICTORIA.

18. THE CONTRACTOR IS TO OBTAIN A BUILDING PERMIT FOR ANY STRUCTURES / FENCES AND FOR ANY RETAINING

WALLS OVER 1.0m IN HEIGHT.

19. ANY INFRASTRUCTURE DAMAGE DURING THE DEFECTS LIABILITY PERIOD IS THE RESPONSIBILITY OF THE DEVELOPER

OR HIS REPRESENTATIVE AND IS TO BE REINSTATED TO THE SATISFACTION OF THE CHIEF EXECUTIVE OFFICER OR HIS

REPRESENTATIVE.

20. PRIOR TO STATEMENT OF COMPLIANCE ALL DISTURBED AREAS (INCLUDING NATURE STRIPS, BATTERS, ALLOTMENTS

WITH GRADES OF 1:5 AND GREATER, AND RESERVES) ARE TO BE REINSTATED TO A CLEAN, TIDY CONDITION, TOP

DRESSED (100MM LOAMY TOP SOIL FREE OF RUBBISH, DEBRIS, CLUMPS, SODS AND CLAY LUMPS), LIGHTLY

COMPACTED AND HYDRO MULCHED.

HYDROMULCH AND SEED MIX TO BE:

· 40KG/HA KIKUYU

· 200KG/HA TURF TYPE PERENNIAL RYE

· 100KG/HA CREEPING RED FESCUE

· 1,500KG/HA OF CELLULOSE FIBRE

· SOIL BINDER, SPECIFICALLY MANUFACTURED FOR HYDROMULCHING, USED AT MANUFACTURERS RECOMMENDED

RATES. (E.G. ORGANIC GAUR TACKIFIERS @ 20 - 30 KG/HA, BASED ON, SITE CONDITIONS).

NOTE: BITUMEN BINDERS ARE NOT ACCEPTED BY COUNCIL. GRASS IS TO BE ESTABLISHED PRIOR TO THE END OF THE

MAINTENANCE PERIOD, UNLESS OTHERWISE AGREED IN WRITING.

21. FOOTPATHS ARE TO BE 50mm OFFSET FROM TITLE BOUNDARIES UNLESS NOTED OTHERWISE. VEHICLE CROSSING

ALIGNMENTS ARE GENERALLY TO BE PARALLEL TO THE SIDE BOUNDARY.

22. ALL NEW CONCRETE WORKS SHALL BE JOINED INTO ABUTTING EXISTING CONCRETE WITH 450mm LONG Y20 DOWEL

BARS @ 600 CENTRES, UNLESS OTHERWISE SPECIFIED.

23. ANY EXPOSED AGGREGATE CONCRETE WORKS TO BE ACHIEVED BY SAND-BLASTING ONLY. WASHING AGGREGATE

OFF WITH WATER IS NOT PERMITTED.

24. ALL SERVICE CONDUITS TRENCHES UNDER ROAD PAVEMENTS ARE TO BE BACKFILLED WITH 20mm 3% CEMENT

TREATED CLASS 3 CRUSHED ROCK COMPACTED TO A DENSITY NOT LESS THAN 95% OF THE MAXIMUM DRY DENSITY

VALUE DETERMINED BY THE MODIFIED COMPACTION TEST IN ACCORDANCE WITH A.S.1289.5.2.1-2003. ALL SERVICE

CONDUITS TRENCHES UNDER FOOTPATH, VEHICULAR CROSSINGS, PARKING BAYS AND WITHIN 750MM OF PARKING

BAYS TO BE BACKFILLED WITH CLASS 3 CRUSHED ROCK.

25. ALL STORMWATER DRAINS ARE TO BE CLASS 2 R.C. OR RIGID F.R.C PIPES WITH ADCOL FLEXIBLE COLLARS UNLESS

NOTED OTHERWISE. ALL PIPES UP TO AND INCLUDING 750mm DIAMETER ARE TO BE RUBBER RING JOINTED.

INTERLOCKING / FLUSH JOINTS WITH EXTERNAL BANDS CAN ONLY BE USED ON PIPE SIZES OVER 750mm DIAMETER.

26. WHERE NEW ASPHALT, CONCRETE KERB & CHANNEL, PATHS AND DRIVEWAYS MATCH INTO EXISTING, THE EXISTING

SURFACE IS TO BE SAW CUT AND MATCHED NEATLY.

27. ALL REDUNDANT ASSETS ARE TO BE REMOVED AND DISPOSED OFF SITE.

28. ALL TREES AND SHRUBS ARE TO BE RETAINED UNLESS OTHERWISE SHOWN OR DIRECTED BY THE CHIEF EXECUTIVE

OFFICER AND/OR THEIR REPRESENTATIVE.

29. AT THE COMPLETION OF ALL WORKS, ALL RUBBISH, DEBRIS AND SURPLUS SPOIL SHALL BE REMOVED AND THE SITE

SHALL BE CLEARED TO THE SATISFACTION OF THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE.

30. ALL DRAINS BEHIND KERB AND CHANNEL SHALL BE BACKFILLED TO MATCH PAVEMENT SUBGRADE LEVEL WITH 20mm

CLASS 3 F.C.R. COMPACTED TO 95% OF THE MAXIMUM DRY DENSITY VALUE DETERMINED BY THE MODIFIED

COMPACTION TEST IN ACCORDANCE WITH A.S. 1289.5.2.1-2003. ALL DRAINS, SEWERS, GAS & WATER MAINS LAID

THROUGH THE ROAD PAVEMENT (EXCEPT CONDUITS) ARE TO BE BACKFILLED WITH 20mm CLASS 2 FCR COMPACTED

TO 98% OF THE MAXIMUM DRY DENSITY VALUE DETERMINED BY THE MODIFIED COMPACTION TEST IN ACCORDANCE

WITH A.S.1289.5.2.1-2003.

31. PAVEMENT DEPTH SPECIFIED IS A MINIMUM DEPTH AND MAY BE VARIED BY THE CHIEF EXECUTIVE OFFICER AND/OR

THEIR REPRESENTATIVE. SOFT SPOTS SHALL BE EXCAVATED TO A PROOF ROLLED BASE AND BACKFILLED WITH

APPROVED MATERIAL COMPACTED IN 150mm LAYERS TO ACHIEVE TO A DENSITY NOT LESS THAN 95% OF THE

MAXIMUM DRY DENSITY VALUE DETERMINED BY THE STANDARD COMPACTION TEST IN ACCORDANCE WITH

A.S.1289.5.1.1-2003.

HUME CITY COUNCIL GENERAL NOTES:

ALL COORDINATES ARE TO MAP GRID OF AUSTRALIA 2020 (GDA 2020).

32. ALL EXISTING ASSETS AFFECTED BY THE WORKS; E.G. SIGNS, VEHICLE CROSSINGS, FOOTPATHS, KERB AND

LINEMARKING SHALL BE REINSTATED BY THE CONTRACTOR PRIOR TO THE COMPLETION OF THE WORKS TO THE

SATISFACTION OF THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE.

33. ALL FIRE HYDRANTS ARE TO BE MARKED IN ACCORDANCE WITH "IDENTIFICATION OF STREET HYDRANTS FOR

FIREFIGHTING PURPOSES" PUBLICATION (DEVELOPED BY C.F.A, M.F.E.S.B & N.R.E). MARKINGS TO BE VIA BLUE

PAVEMENT MARKER AND A (RED TOPPED) WHITE POST.

34. AGRICULTURAL DRAINS ARE TO BE PLACED BEHIND ALL KERB AND CHANNEL, KERB ONLY AND EDGE STRIPS IN

ACCORDANCE WITH COUNCIL STANDARD DRAWING SD282.

35. ALL TABLE DRAINS AND VERGES ARE TO BE REINSTATED UPON COMPLETION OF WORKS TO THE SATISFACTION OF

THE CHIEF EXECUTIVE OFFICER AND/OR THEIR REPRESENTATIVE.

36. ALL TRAFFIC CONTROL MEASURES, SIGNS AND LINEMARKING SHALL BE IN ACCORDANCE WITH A.S.1742 - 1, 2 & 3.

STREET NAME SIGNS ARE TO BE IN ACCORDANCE WITH COUNCIL STANDARD DRAWING SD408.

37. ALL LINEMARKING PAINT SHALL BE LONG LIFE TYPE IN ACCORDANCE WITH SECTION 95C OF THE HUME CITY COUNCIL

SPECIFICATIONS. LATERAL WORKS AND ARROWS BEING COLD APPLIED PLASTIC TROWELLED INTO PLACE (MATERIAL

DEGADUR PLASTELINE) AND LONGITUDINAL LINES BEING EXTRUDED THERMOPLASTIC MATERIAL.

38. ALL SIGNS TO BE CLASS 1 HIGH INTENSITY TYPE AND TO COMPLY WITH THE REQUIREMENTS OF A.S.1743 -2001.

39. HOUSE DRAIN CONNECTIONS TO 150mm DIAMETER PIPES TO BE VIA A MANUFACTURED JUNCTION PIECE. 150mm

DIAMETER STORMWATER PIPES ARE TO BE HEAVY DUTY SEWER GRADE. PVC PIPES SHALL BE BACKFILLED WITH

10mm MINUS F.C.R. TO 150mm ABOVE TOP OF PIPE IN ALL LOCATIONS.

40.

PROPERTY INLETS 1.0m FROM THE LOW CORNER OF THE LOT UNLESS OTHERWISE SHOWN.

41. BLASTING GENERALLY IS NOT ENCOURAGED, HOWEVER BLASTING MAY BE REQUIRED AS A LAST RESORT DEPENDING

ON GROUND CONDITIONS. COUNCIL IS TO BE NOTIFIED IN WRITING IF ANY BLASTING IS NECESSARY. RESIDENTS

LIKELY TO BE AFFECTED BY THE BLASTING AND ALL SERVICE AUTHORITIES SHALL BE NOTIFIED IN WRITING PRIOR TO

WORKS COMMENCING. COPIES OF THESE NOTIFICATIONS ARE TO BE SUBMITTED TO COUNCIL.

RESIDENT NOTIFICATION LETTER IS TO INCLUDE BLASTING GUIDELINES, FIRING AND MISFIRE PROCEDURES AND

CONTRACTOR AND CONSULTANT CONTACT NAMES AND PHONE NUMBERS.

ALL BLASTING IS TO BE WITHIN THE LIMITS FOR AIR AND GROUND VIBRATION LEVELS AS SET DOWN IN

A.S.2187.2-1993.

ALL BLASTS SHALL BE MONITORED FOR AIR AND NOISE VIBRATION AT POTENTIALLY AFFECTED RESIDENCES. "FORM

A" FROM A.S. 2187.2-1993, AND WAVE TRACE COPIES ARE TO BE SUBMITTED TO COUNCIL FOR EACH BLAST.

BLASTING IS TO BE RESTRICTED TO BETWEEN 9:00am AND 3:30pm.

BLASTING IS NOT TO OCCUR ON WEEKENDS OR PUBLIC HOLIDAYS.

BLASTING AREA SIGNS ARE TO BE PLACED AT ALL ENTRANCES TO THE SITE.

42. ALL EXISTING SURFACE LEVELS SHOWN ON THE ENGINEERING DRAWINGS HAVE BEEN INTERPOLATED FROM A DIGITAL

TERRAIN MODEL. THESE LEVELS HAVE BEEN USED AS THE BASIS FOR ALL ENGINEERING DESIGN AND DETERMINATION

OF QUANTITIES AND ARE ACCURATE TO WITHIN ±0.05m.

43. ANY EXISTING SERVICES SHOWN ON THESE DRAWINGS ARE OFFERED AS A GUIDE ONLY AND ARE NOT GUARANTEED

AS CORRECT.

44. WHERE REQUIRED ANY BUILDINGS, TROUGHS, FENCES AND OTHER STRUCTURES ON SITE ARE TO BE REMOVED AS

DIRECTED BY THE ENGINEER. THE COST OF REMOVAL IS TO BE INCLUDED IN THE OVERALL EARTHWORKS FIGURE

UNLESS A SPECIFIC ITEM FOR REMOVAL IS DENOTED IN THE SCHEDULE.

45. ALL FILLING ON LOTS AND WITHIN ROAD RESERVES GREATER THAN 200mm IS TO BE UNDERTAKEN USING LEVEL 1

SUPERVISION AND BE COMPLETED IN ACCORDANCE WITH A.S.3798-2007. FILLING MATERIAL IS TO BE IN ACCORDANCE

WITH THE SPECIFICATION, A.S.3798-2007 & TO THE SATISFACTION OF COUNCIL AND THE SUPERINTENDENT.

46.

47. NO FILL OR STOCKPILING OF MATERIAL IS TO BE PLACED ON ANY RESERVE FOR PUBLIC OPEN SPACE UNLESS

OTHERWISE DIRECTED OR APPROVED BY THE SUPERINTENDENT.

48. T.B.M.'S TO BE RE-ESTABLISHED BY THE LICENSED SURVEYOR IF FOUND TO BE MISSING AT THE COMMENCEMENT OF

CONSTRUCTION. THE CONTRACTOR WILL BE RESPONSIBLE FOR CARE AND MAINTENANCE OF T.B.M.'S THEREAFTER.

WHERE REQUIRED, ALL EXISTING DAMS, DEPRESSIONS AND DRAINS ARE TO BE BREACHED, DRAINED, DE-SLUDGED

AND SHALL BE EXCAVATED TO A CLEAN FIRM BASE. THE SURFACE SHALL BE INSPECTED, APPROVED AND

LEVELLED BY THE ENGINEER PRIOR TO COMMENCEMENT OF FILLING. THE FILL SHALL BE APPROVED SELECTED ON SITE

MATERIAL OR APPROVED IMPORTED MATERIAL. THE FILL SHALL BE PLACED UNDER CONTROLLED MOISTURE

CONDITIONS IN ACCORDANCE WITH THE SPECIFICATION.

GAS AND WATER CONDUITS SIZES ARE AS FOLLOWS:

Ø50mm CLASS 12 P.V.C. - SINGLE SERVICE

Ø100mm CLASS 12 P.V.C. - DUAL SERVICE (DRINKING AND NON DRINKING WATER)

WITH THE FOLLOWING MINIMUM COVER TO FINISHED SURFACE LEVELS:

ROAD PAVEMENT - 0.80m

VERGE & FOOTPATHS - 0.45m

WHERE CURVED PIPE ALIGNMENTS ARE SHOWN ON THE FACE PLANS THEY ARE TO BE LAID PARALLEL TO THE BACK

OF KERB, EXCEPT WHERE A RADIUS HAS BEEN SPECIFICALLY NOMINATED. CURVED PIPES ARE TO BE APPROVED BY

COUNCIL AND IN ACCORDANCE WITH THE MANUFACTURERS SPECIFICATIONS.

ALL WORKS TO BE CARRIED OUT IN ACCORDANCE WITH AS2124-1992 GENERAL CONDITIONS OF CONTRACT.

WHERE PAVEMENT IS CONSTRUCTED ON FILLING, FILL MATERIAL IS TO BE APPROVED BY THE SUPERINTENDENT AND

COUNCIL. FILLING TO BE CONSTRUCTED IN LAYERS 150mm THICK WITH COMPACTION ACHIEVING 95% AUSTRALIAN

STANDARD DENSITY.

WHEN PAVEMENT EXCAVATION IS IN ROCK, ALL LOOSE MATERIAL (INCLUDING ROCKS AND CLAY) MUST BE REMOVED.

THE SUB-GRADE MUST THEN BE REGULATED WITH COUNCIL APPROVED MATERIAL.

ALL TEMPORARY WARNING SIGNS USED DURING CONSTRUCTION SHALL BE SUPPLIED AND MAINTAINED IN

ACCORDANCE WITH A.S.1742-3.

SPIIRE GENERAL NOTES:

CONTRACTOR TO ENSURE SEWER MANHOLE COVERS ARE WHOLLY LOCATED IN PROPOSED FOOTPATHS.

49.

50.

51.

52.

53.

54.

55.

56.

100mm HOUSE DRAIN CONNECTIONS TO BE LAID AT AN OFFSET OF 5.5m FROM THE LOW SIDE TITLE BOUNDARY AND

ALL BATTERS SHALL BE 1 IN 5, UNLESS OTHERWISE SHOWN.

305914-SK01

DRAWING DESCRIPTION SHEET No. REVISION

DRAWING SCHEDULE

1 B

2

FACE SHEET305914-SK01

305914-SK02 B

FACE SHEET

2305914-SK02 B

FINISHED LEVEL PLAN SHEET 1

FINISHED LEVEL PLAN SHEET 2

REDSTONE ESTATE STAGE 3

Page 2: REDSTONE ESTATE STAGE 3 VILLAWOOD PROPERTIES€¦ · 31/03/20 31/03/20 d.cameron b b stage boundary amended - origin circuit m.l 20/04/20 stage 1 stage 2 3 stage stage 4 stage 11

2

0

5.

5

5

20

5

.32

20

5

.40

205.61

2

05.26

20

5

.32

2

05.42

205.

5

5

20

5

.

5

7

2

05

.

66

2

05

.

8

1

2

05

.

4

7

20

5

.

9

6

2

05.

8

9

206.13

2

0

6

.

3

2

2

05

.

6

4

20

5

.

7

5

205.8

0

205.9

8

2

05

.

9

1

206

.

0

0

2

0

6

.

1

0

2

05

.

7

9

2

0

6

.

52

2

0

5

.

97

2

0

6

.

02

2

0

6

.

0

4

206.

2

2

206.

8

8

2

06

.

8

8

SV

SV

2

0

6

.

76

2

0

5

.

6

8

2

0

6

.

07

2

0

5.63

20

6

.7

2

ES

EP

2

0

6.

6

2

205.

6

6

205.97

SV

206.9

7

206.4

7

20

5

.

4

8

2

05

.

8

5

2

05

.

5

8

2

05

.

5

9

20

6

.

1

9

2

05

.

66

2

05

.

69

206

.

37

206.

2

9

2

0

6.22

206.43

2

0

6.60

206.63

2

0

6.51

TP

SV

SV

SV

20

6

.25

20

6

.

0

8

2

06

.

0

8

206.01

2

0

5.99

20

5

.

7

7

20

5

.

7

5

205.6

3

2

05.2

620

5

.

4

6 2

0

5.45

205.5

4

2

0

5.

4

8

2

0

5.56

2

05

.

27

206.01

2

0

5.

9

5205

.

95

20

6

.02

206.4

6

EP

20

5

.42

205.

1

2

20

5

.51

205.42

2

06.0

6

20

5

.

5

7

2

05.37

20

5

.47

20

5

.57

2

0

6.91

2

06

.

80

2

07.1

7

2

0

7

.

2

2

2

0

7

.

30

20

7

.

0

2

20

6

.99

207.

2

1

20

7

.47

207

.

5

5

2

0

7

.

4

6

20

7

.

6

7

2

08

.

04

208.01

20

7

.

8

6

2

0

8.

60

20

8

.3

5

BUILDING

GALVANISED

BUILDING

GALVANISED

BUILDING

GALVANISED

BRICK BUILDING

VERANDAH

NOT FENCED

2

05.9

5

GRAVEL DRIVE

WAY

CONCRETE

POST AND

WIRE FENCE

POST AND WIRE FENCE

EDGE OF BITUMEN

EDGE OF BITUMEN

IL 205.43

DIA 300

IL 205.24

DIA 300

WIRE MESH FENCE

POST AND WIRE FENCE

CONCRETE

2

06

.

0

5

2

0

5

.

99

205.

9

0

2

0

5.

7

7

2

0

5.50

2

0

5

.50

2

05.41

SUNBU

RY R

OA

D

Photo 24

Photo 25

Photo 26

Photo 27

Photo 28

Photo 29

Photo 30

Photo 31

Photo 32

311°46'40"

140.42

205.98

2

0

5

.

70

RL 205.98

(STEEL, BLUE

WRAPPED)

TOP OF PIPE

RL 205.70

(STEEL, GREEN

WRAPPED)

TOP OF PIPE

DERIVED FROM MOCS

WATER MAIN (AC)

PHOTO 41

PHOTO 42

(DIA

M 450mm VIDE

WESTERN

WATER RECORDS)

APPROX PIPE ALIGN

MENT

(DIA

M 375mm VIDE

WESTERN

WATER RECORDS)

APPROX PIPE ALIGN

MENT

(DIA

M 150mm VIDE

WESTERN

WATER RECORDS)

APPROX PIPE ALIGN

MENT

(DIA

M 150mm VIDE

WESTERN

WATER RECORDS)

APPROX PIPE ALIGN

MENT

2

08

.

6

3

2

0

8

.65

2

08

.

7

7

20

8

.

88

21

0

.68

2

10.

8

9

2

1

1

.07

2

1

0

.73

208

.

06

2

0

8.

1

2

2

0

8.

1

5

2

08.10

2

08.02

2

0

7.

9

7

2

0

7

.9

6

2

0

8.

0

3

2

08

.

0

4

207.

7

6

2

07.99

20

7

.

7

9

2

0

7

.

63

20

7

.54

20

7

.

8

0

208.2

4

20

8

.26

2

0

8

.

27

2

0

8

.2

6

2

0

8.

2

3

2

08

.

142

08.24

2

0

8.

2

5

2

08

.

27

20

8

.

4

2

2

0

8

.4

5

2

08

.

49

20

7

.7

3

2

0

7

.

73

20

7

.74

2

0

7

.7

2

2

0

7.60

2

0

7.60

207.54

2

0

7.

7

5

2

07

.

5

4

207.58

2

07

.

6

1

20

7.

7

5

2

07

.

7

5

2

07

.

4

4

2

0

7

.4

0

206

.

9

4

20

6

.9

8

20

7

.

5

0

20

7

.

5

9

20

7.

5

8

2

08

.

14

2

08.

0

6

20

8.

17

2

08.

2

6

2

08

.

36

2

0

7

.

75

207

.88

2

07

.

8

7207

.

8

8

2

0

7

.

87

20

7

.

7

7

2

07

.

852

0

7

.

80

2

0

7

.

80

2

07.74

2

0

8

.3

8

2

08

.

30

2

0

8.

28

20

8

.43

2

08

.4

6

20

8

.

4

6

20

8.4

1

2

0

8.

2

9

20

8

.

34

2

0

8.

3

7

2

0

8.

0

2

2

0

8

.

10

2

0

8.

18

2

0

8.

30

208.

0

5 20

7

.8

0

2

07

.

7

8

2

07

.

4

6

2

07

.

4

62

07.46

2

0

7.

4

5

EP

20

7

.

1

8

2

0

7

.19

20

7

.08

20

7

.7

2

20

7

.6

6 2

0

7.

5

3

20

8.

4

2

2

08

.

4

7

2

08

.4

8

2

08

.5

6

2

0

8

.

5

5

2

0

8

.

5

5

20

8

.

51

2

08

.

40

20

8.

42

2

08

.5

7

2

08

.4

7

2

0

8.

8

9

2

0

8.

9

7

20

8.

92

20

8

.2

9

2

08

.6

9

20

8.

64

2

08

.

63

2

08

.

6

8

2

0

8.7

1

2

0

8.

81

20

9

.5

4

2

10

.

6

9

2

1

1

.15

2

06

.

25

20

7

.44

2

0

6

.92

2

0

6

.

96

2

07

.

0

3

208

.

71

2

08

.

81

2

0

8

.7

0

2

0

8

.8

2

2

08

.

7

9

2

08

.6

6

2

0

8

.6

5

20

8.

4

8

2

0

8

.

41

2

0

8

.

22

2

0

7.98

208.15

2

0

8

.1

4

20

8

.6

0

20

8.

5

7

2

0

8.

65

208

.

5

2

2

0

8.

6

4

20

8

.87

2

08

.

95

2

0

9.

0

3

2

0

9.

6

2

2

10

.

0

2

21

0

.

4

2

2

1

0.7

6

2

11.36

2

1

1

.

8

7

212

.

33

20

6

.

4

8

2

0

6

.

60

2

0

6.77

2

0

6.71

206

.

96

2

0

7.11

EP

2

0

7.

3

2

20

7

.

4

4

2

0

7

.

53

207.09

20

6

.94

20

6

.66

CONCRETE SLAB

RE

MAINS OF

BUILDING

GALVANISED

BUILDING

GALVANISED

CONCRETE SLAB

RE

MAINS OF

BUILDING

GALVANISED

BUILDING

GALVANISED

CONCRETE SLAB

RE

MAINS OF

WIRE MESH FENCE

WIRE MESH FENCE

WIRE

MESH FENCE

WIRE MESH FENCE

WIRE

MESH FENCE

WIRE

MESH FENCE

WIRE

MESH FENCE

WIRE MESH FENCE

WIRE MESH FENCE

WIRE

MESH FENCE

WIRE

MESH FENCE

WIRE

MESH FENCE

WI

RE

MES

H FE

NCE

POST

& R

AIL FE

NCE

POST

& R

AIL FE

NCE

POST

& RAIL FENCE

POST

& R

AIL FE

NCE

(I

NTER

NAL FE

NCI

NG

NOT S

HO

WN)

ST

OC

K

YAR

DS

(I

NTER

NAL FE

NCI

NG

NOT S

HO

WN)

ST

OC

K

YAR

DS

TANK

STAND

TANK

MILL

WIND

GALV IRON FENCE

POST AND WIRE FENCE

POST & RAIL FENCE

POST & RAIL FENCE

POST & RAIL FENCE

POST & RAIL FENCE

POST & RAIL FENCE

POST & RAIL FENCE

POST & RAIL FENCE

POST & RAIL FENCE

(INTERNAL FENCING NOT SHOWN)

STOCK YARDS

TANK BASE

CONCRETE

BUILDING

WEATHER BOARD

BITUMEN

DRIVEWAY

POST AND

WIRE FENCE

BUILDING

WEATHER BOARD

SINGLE STOREY

BLUESTONE BUILDING

SINGLE STOREY

2

08

.

14

B

L*

9

11

2

0

7.

9

9

B

L

*

9

14

311°46'40"

140.42

40°19'20"

242.67

DRIP LINE

DRIP LINE

CYPRESS HEDGE

TOP OF BANK

TOE OF BANK

LINE MARKING

LINE MARKING

LINE MARKING

CHANGE OF GRADE

CHANGE OF GRADE

TOP OF BANK

TOE OF BANK

208.73

208.47

208.26 207.67

208.02 207.48

207.83

207.66

207.31

207.4

8

207.03

207.29

207.68

210.68

210.75

210.10211.14

210.83

210.53

210.21

209.84

209.49

209.20

208.49

208.84

209.08

209.35

209.71

209.83

209.84

209.48

209.31

209.16

209.02

208.84

208.58

208.51

208.38207.88

207.85

207.69

207.61

207.80

207.88

208.03

208.20

208.86

209.2

7

209.04

208.83

208.66

208.64

208.49

208.48

208.34

208.33

208.22

208.21

208.17

208.10

208.05208.03

208.4

2

3m D&SE

3m D&SE

3m D

&SE

H

H

H

H

H

H

H

H

H

H

H

H

H

H

H

3m D&SE

H

3m D&SE

H

2.5

m S

E

2.5m SE

2.5m SE

2.5m SE

2.5

m S

E2.5

m S

E

2.5m SE

2m D

E2

m D

E2

m D

E

201

202

203

204

205

206

207208

209

210

211

212

213

214

215

216

217

218

219

220

221

222

223

224

225

226

227

228

229

2m D

E

2m DE

2m D

E

3m D

&SE

3m D

&SE

LO

RY

CIR

CUIT

FLYCATCHER WAY

LO

RY

CIR

CUIT

209.4

1

209.31

209.32

209.39

210.4

3

210.77

210.50

211.50 210.78

211.86 211.09

212.25 211.46

212.65 211.81

212.93 212.08

213.29 212.35

213.60 212.57

213.86 212.83

214.15 213.16212.63

212.19

211.5

6

211.14

210.75

211.84 210.83

210.49211.47

211.06 210.17

209.80210.70

210.36 209.49

209.20

210.00

209.58

209.20

208.78

208.4

9208.09

208.08

208.13

208.4

6

208.69

208.92

209.08

207.68

207.54

207.52 207.37 207.16

207.18

207.25207.69

207.85

208.03

208.38

D&

SE

D&

SE

3m

D&

SE

3m

3m D&SE

HH

HHHH

H

H

H

H

H

H

H

H

H

H

H

H

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

SUNBURY ROAD

FUTURE DRAINAGE OUTFALL

DRAWINGSON WETLAND LANDSCAPE LOCATION TO BE CONFIRMED

308

309

310

307

332

336

333

334

335

337

331

338339

312

316

313

311

314

315

318

317

319

304

305

306

329

330

328

207.88

207.40

207.38

208.05

Ch21.28

Ch35.28

FS207.40

Ch49.28

H

H5.00

GW

GW

GW

301

302

303

FS212.53

FS212.29

FS212.02

FS211.73

FS211.47

FS211.19

FS210.90

FS210.61

FS210.30

FS209.23

FS209.13

FS209.13

FS209.27

FS212.78

FS212.31

FS212.00

FS211.63

FS211.26

FS210.89

FS210.55

FS210.09

FS208.4

2FS207.80

FS207.64

FS207.77

FS208.13

FS208.50

FS208.89

FS209.20

FS208.39

FS208.11

FS207.80

FS207.60

FS207.38

FS207.37 FS207.42

FS207.33

FS207.33

FS207.86

FS207.96

FS207.47

T212.89

T212.61

T212.41

T212.15

T211.85

T211.50

T211.12

T210.80

T210.51

T209.4

5

T209.35

T209.36T209.4

2

T212.60

T212.16

T211.81

T211.44

T211.02

T210.67

T210.34

T209.9

9T209.07

T208.92

T208.72

T208.53

T208.18

T208.10

T208.10

T208.4

9

T207.67

T207.55

T207.54

211.17

FS209.89210.13

T210.15

T213.22

H

PROPOSED WETLAND

FLYCATCHER WAY

FLYCATCHERWAY

FLYC

ATC

HER

WA

Y

Drg No Rev

Designed Checked

Authorised

spiire.com.au ABN 55 050 029 635Rev Amendments Approved Date

Date

any use or reliance by third party on the content of this document.

responsibility or liability whatsoever to any third party arising out of

retainer.  Spiire Australia Pty Ltd does not and shall not assume any

benefit of and use by the client in accordance with the terms of the

This document is produced by Spiire Australia Pty Ltd solely for the

Spiire Australia Pty Ltd All Rights Reserved©

R. WEINBER

VILLAWOOD PROPERTIES

HUME CITY COUNCIL

REDSTONE ESTATE

PRELIMINARYA FIRST ISSUE M.L

M. LETSON

STAGE 3

31/03/2031/03/20

D.CAMERON

B

M.L 20/04/20B STAGE BOUNDARY AMENDED - ORIGIN CIRCUIT205.00

210.00

210.00

210.00

206.00

206.00

206.00

206.00

207.00

207.00

207.00

207.00

208.00

208.00

208.00

208.00

209.00

209.00

209.00

211.00

211.0

0

212.00

212.00

213.00

213.00

Vertical

Horizontal 0

0

5 10 15 20 25

5 10 15 20 25

1:500,A1

GDA2020

Vertical

Horizontal 0

0

5 10 15 20 25

5 10 15 20 25

1:500,A1

Vertical

Horizontal 0

0

5 10 15 20 25

5 10 15 20 25

1:500,A1

DATUM GDA2020

(SEE SHEET 3 FOR DETAILS)THRESHOLD TREATMENTEXPOSED AGGREGATE

PRELIMINARY ONLYLOT LEVELS ARE

NOT TO BE USED FOR CONSTRUCTION

STAGE 2EXISTING

STAGE 7FUTURE

305914-SK02

WARNINGBEWARE OF UNDERGROUND/OVERHEAD SERVICES

UNDER OVERHEAD ELECTRICITY TRANSMISSION LINES.

SHOULD BE GIVEN TO CONSTRUCTION PROCEDURES

SERVICES ARE SHOWN.SPECIAL CONSIDERATION

SITE. NO GUARANTEE IS GIVEN THAT ALL EXISTING

AND THEIR EXACT POSITION SHOULD BE PROVEN ON

THE LOCATION OF SERVICES ARE APPROXIMATE ONLY

FINISHED LEVEL PLAN - SHEET 1

FOR CONTINUATION REFER SHEET 3

Page 3: REDSTONE ESTATE STAGE 3 VILLAWOOD PROPERTIES€¦ · 31/03/20 31/03/20 d.cameron b b stage boundary amended - origin circuit m.l 20/04/20 stage 1 stage 2 3 stage stage 4 stage 11

210.68

210.89

211.07

210.73

212.70

213.09

213.31

213.02

215.38

215.18

215.28

215.63

209.19

212.09

212.29

212.15

211.88

209.54

209.02

209.03

210.69

211.15

211.84

212.01

211.21

212.04

213.01

213.01

212.99

216.48

216.60

216.60

216.55

216.79

217.01

216.81

217.10

216.21

216.43

212.95

214.11

213.38

215.23

215.69

217.02

217.62

218.42

219.06

220.00

217.08

216.46

211.21

209.20

BUILDING

GALVANISED

BUILDING

GALVANISED

BUILDING

GALVANISED

TANK TANK

POST AND

WIRE FENCE

WIRE MESH FENCE

WIRE MESH FENCE

WIRE MESH FENCE

WIRE MESH FENCE

WIRE MESH FENCE

WIRE MESH FENCE

WIRE MESH FENCE

WIRE MESH FENCE

WIRE

MESH FENCE

WIRE

MESH FENCE

WIRE

MESH FENCE

WIRE

MESH FENCE

WIRE

MESH FENCE

WIRE

MESH FENCE

WIRE

MESH FENCE

WIRE

MESH FENCE

WIRE

MESH FENCE

WIRE

MESH FENCE

WIRE

MESH FENCE

POST AND

WIRE FENCE

POST AND

WIRE FENCE

POST AND

WIRE FENCE

POST AND

WIRE FENCE

POST AND WIRE FENCE

POST AND WIRE FENCE

108

109

110

111

133

H

H

211.5

5LTP

214.68

LTP

208.85

209.25

209.25

209.72

209.70

210.24

210.16

209.96

209.3

0

209.23

H

2.5m

SE

210.16

210.62

209.96

212.03

211.6

6

211.0

5

210.78

210.24

209.45

209.11

208.77

211.4

7

211.15

210.79

210.26

209.79

209.32

208.99

208.73

208.47

208.26

208.02

211.3

6

210.68

210.75

210.10211.14

210.83209.83

210.33

209.84

209.48

208.86

209.2

7

209.04

208.83

208.66

208.4

2

210.23

3m D&SE

H

H

3m D&SE

H

H

H

H

H

2.5m

SE

HH H

3m D&SE

H

2.5m SE

2.5

m S

E

2.5m SE

2.5m SE

2.5m SE

2m D

E

201

202

214

215

216

217

218 227

228

229

230

231

232

233

234

235

236

242

243

241

240

238

237

239

H211.10

H H

H

3m D

&SE

H

2.5m SE

212.06

211.7

3

211.3

8

211.15

212.4

6 212.09

211.8

2

210.46

210.76

210.74

210.04

209.65

209.23

210.35

211.19

211.33

211.68

212.07

212.05

244

3m D

&SE

LORY CIRCUIT

LO

RY

212.35

213.60 212.57

213.86 212.83

214.15 213.16

214.4

3

213.89

213.53

213.38

215.05

214.13

214.66

214.20

213.54

213.10

213.54

212.9

8

212.45

212.38

212.4

7211.8

7

211.76

211.3

6

211.7

1

212.27

212.63

212.19

211.5

6

211.14

210.75

211.84 210.83

3m D&SE

3m

D&SE

3m

D&

SE

212.60

H

H

H

H

H

H

H

H

GWG

W

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

GW

STATION SITEELECTRICAL SUB

316

318

317

319

329

330

328

327

326

324

325

323

322

321

320

ORIGIN CIRCUIT

H

GW

GW

LO

RY

CIR

CUIT

FS212.35

FS212.11

FS212.08

FS212.67

FS211.3

3

FS211.61

FS211.9

9

FS212.72

FS213.15

FS212.79

FS212.33

FS212.16

FS213.37

FS213.08

FS212.79

FS212.53

FS212.29

FS212.02

FS211.6

7

FS212.11

FS212.56

FS212.88

FS212.78

FS212.31

FS212.00

T212.4

5

T212.4

4T211.8

6

T211.71

T213.02

T212.4

3

T214.14

T213.55

T213.14

T213.56

T213.4

3

T212.89

T212.61

T211.3

3

T211.6

9

T212.25

T212.55

T212.60

T212.16

T211.4

8

FS213.04

212.80

T212.76

FS212.73212.75

T212.69

FS213.08

213.4

1T213.4

7

213.54T213.59

FS213.9

4

213.87

T213.86

213.34

211.4

7

212.06

212.03

212.4

6

T213.22

FS214.9

6

FS216.01

FS216.34

FS216.34

FS216.27

FS216.58

FS216.33

FS216.35

FS216.69

FS216.33

FS214.4

5

ORIGIN

CIRCUIT

215.33

215.12

214.93

214.68

214.35

213.86

215.49

215.86

216.13

216.35

214.27

214.70

216.19

216.36

216.71

216.67

217.12

217.09

217.66

3m D&

SE

3m D

&SE

H

FS213.43

FS216.12

T214.25

T214.68

T215.40

T215.77

T216.08

T216.34

T217.26

T216.79

T216.79

FUTURE RESERVE

346

345

344

343

342

341

340

SPIN

EBILL

STR

EET

Drg No Rev

Designed Checked

Authorised

spiire.com.au ABN 55 050 029 635Rev Amendments Approved Date

Date

any use or reliance by third party on the content of this document.

responsibility or liability whatsoever to any third party arising out of

retainer.  Spiire Australia Pty Ltd does not and shall not assume any

benefit of and use by the client in accordance with the terms of the

This document is produced by Spiire Australia Pty Ltd solely for the

Spiire Australia Pty Ltd All Rights Reserved©

R. WEINBER

VILLAWOOD PROPERTIES

HUME CITY COUNCIL

REDSTONE ESTATE

PRELIMINARYA FIRST ISSUE M.L

M. LETSON

STAGE 3

31/03/2031/03/20

D.CAMERON

B

M.L 20/04/20B STAGE BOUNDARY AMENDED - ORIGIN CIRCUIT

210.00

210.00

215.00

215.00

209.00

211.00

211.00

211.00

212.00

212.00

212.00

213.00

213.00

213.00

214.00

214.00

216.00

216.00

216.00

217.00

217.00

217.00

218.00

218.00

219.00

Vertical

Horizontal 0

0

5 10 15 20 25

5 10 15 20 25

1:500,A1

GDA2020

Vertical

Horizontal 0

0

5 10 15 20 25

5 10 15 20 25

1:500,A1

Vertical

Horizontal 0

0

5 10 15 20 25

5 10 15 20 25

1:500,A1

DATUM GDA2020

(SEE SHEET 3 FOR DETAILS)THRESHOLD TREATMENTEXPOSED AGGREGATE

PRELIMINARY ONLYLOT LEVELS ARE

NOT TO BE USED FOR CONSTRUCTION

WARNINGBEWARE OF UNDERGROUND/OVERHEAD SERVICES

UNDER OVERHEAD ELECTRICITY TRANSMISSION LINES.

SHOULD BE GIVEN TO CONSTRUCTION PROCEDURES

SERVICES ARE SHOWN.SPECIAL CONSIDERATION

SITE. NO GUARANTEE IS GIVEN THAT ALL EXISTING

AND THEIR EXACT POSITION SHOULD BE PROVEN ON

THE LOCATION OF SERVICES ARE APPROXIMATE ONLY

STAGE 2EXISTING

STAGE 7FUTURE

STAGE 6FUTURE

305914-SK03

FINISHED LEVEL PLAN - SHEET 2

FOR CONTINUATION REFER SHEET 2