Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
IUSGBC-IGEM 2017
Finance and Green Buildings Stream
Reconciling Sustainability into
Sustainable Business StrategySharif James Zainal AzizCorporate Sustainability, SQM Department,Sime Darby Property11 October 2017
SUSTAINABILITY:DOING THE RIGHT THINGS, FOR THE RIGHT REASONS
SIME DARBY CORPORATE PROFILE - Summary
2
Who We Are
Sime Darby Group in a Snapshot
3
A global company headquartered in Kuala Lumpur, Malaysia
Incorporated in 1910 to develop 500 acres of rubber
Businesses in 25 countries and 4 territories
More than 120,000 global employees
Leader in sustainability
Operations segmented into 5 divisions
Our Global Footprint
Sime Darby Group is in more than 25 Countries & 4 Territories
4
Europe and Africa▪ Germany▪ Liberia▪ South Africa▪ The Netherlands▪ United Kingdom
Americas▪ United States of America
Asia Pacific▪ Australia▪ Brunei▪ China▪ Christmas Island▪ Hong Kong SAR▪ India▪ Indonesia▪ Japan▪ Macau SAR▪ Malaysia▪ Maldives▪ New Caledonia
▪ New Zealand▪ Singapore▪ Solomon Islands▪ South Korea▪ Sri Lanka▪ Taiwan▪ Thailand▪ Pakistan▪ Papua New Guinea▪ Philippines▪ Vietnam
SIME DARBY PROPERTY CORPORATE OVERVIEW
5
5 Divisions
Missions
To be a high performance distributor of Caterpillar products and allied solutions
To be a leading integrated global plantation company
To be the No.1 Sustainable Property Developer in Malaysia and Beyond
To be a leading automotive player in the Asia Pacific region
Core business in power engineering services, ports & logistic and water management
Sime Darby Property
Malaysia’s largest community developer with over 23 townships in 40 years,gross development value of RM120 billion and 28,000 acres of land bank.
An established integrated property group with overseas presence, focusedon becoming the leading developer of sustainable communities, in line withSime Darby’s brand positioning of developing sustainable futures.
Property related interests in 5 countries; Malaysia, Singapore, Vietnam,Australia and the United Kingdom.
Our Property Development Business
17,200ac
DEVELOPABLE AREA (NET) CURRENTLY
OWNED
28,000ac
TOTAL DEVELOPABLE AREA (NET)
O u r A c t i v e T o w n s h i p s
H i g h - r i s e / I n t e g r a t e d / J V D e v e l o p m e n t s
RECONCILING SUSTAINABILITY:
FROM UNDERSTANDING, TO VISION, TO STRATEGY, TO EXECUTION
9
10
Universal goals, applying to countries at all stages of development• 12 SDGs directly relate
United Nations Sustainable Development Goals
11
Paris Agreement• Long term goal to limit global temperature increase to below 2°C and pursue 1.5°C• Countries prepare comprehensive national climate action plans• Malaysia has committed to 40% reduction of intensity against GDP (unconditional) and
45% reduction against GDP (conditional)
United Nations Framework Convention on Climate Change (UNFCCC)• Adopted at the Rio Earth Summit in 1992• Ratified by 196 States and 1 regional economic organization (197)• Ratified by Malaysia in 1994• Entered into force in 1994• Purpose was for countries to work together to limit global warming and to cope with
Climate Change impacts• Commitments were only binding to Developed States
• Lead to the Kyoto Protocol (the extension under the Doha Amendment about the end) and then the Paris Agreement (enters into force in 2020)
Climate Change-related Natural Hazards• Becoming more frequent• Becoming more extreme and unpredictable• Climate patterns appear to be changing• A great number of risks to humanity and the planet’s ecosystems due to CC
Climate Change - Context
Key trends for future considerationClimate mitigation
& adaptation
Population
growth
Land use
pressures
Rising energy
prices
Changing homeowner
expectations
Changing tenant
expectations
Changing
consumer attitudes
Decreasing housing
affordability
Increasing connectivity
& transparency
Matters to be considered by developers and
Policy Makers
• “Global Warming” (the Greenhouse effect)
• “Ocean Acidification” (more carbon in oceans)
• Now this year Scientists have noted another global
phenomena – “Stilling” (atmospheric stilling)
• What do these all mean?
• Human activity – our anthropogenic impact is global
13
OUR VISION
To be the No.1 Sustainable Property
Developer in Malaysia and Beyond
OUR PURPOSE
14NATION BUILDING
1515
We’ve made strides in Green Building Innovation and R&D
A quick summary of our Green Buildings!
SIME DARBY IDEA HOUSE
Townships
Innovation Blueprint & Roadmap 5 years Roll out Plan
Branding & value enhancement
Roll out initiatives
Adoption of Features
1
2
3Completed June
2010
Translated into :
Idea House Features Roll-out50 sustainable features from Idea Housewere identified and adopted in SDP’sproducts.
PublicationsPatentAwareness through guided tours
Awards & Certification
• LEED – Leadership in Energy and Environmental Design (US)• BCA Green Mark – Building & Construction Authority Green Accreditor Singapore• GBI – Green Building Index Malaysia
Plantation Corporate
Tower,Ara Damansara
LEED for Core and Shell
Gold (2012)
SIME DARBYGreen Certified Projects
PropertyCorporate
Tower, Ara Damansara
LEED for Core and Shell
Silver (2012)
Mosque, Ara Damansara
GBIGold (2013)
CantaraResidences,
Ara Damansara
Target GBIGold
QuarzaResidences,
KL East
Target BCA Green MarkCertified
JendelaResidences,
Alya
Target BCA Green MarkCertified
SIME DARBY PROPERTY
Battersea Power Station, UK
Seri Pilmoor Residences, Ara Damansara
SEA Property Awards 2013 Best Villa Development (Malaysia)PAM Award 2013Multiple Residential, Low Rise Category
The Glades (The Residences),
Putra Heights
International Emirates Glass Leading European Architecture Forum (LEAF) Award 2015Developer of the Year
SEA Property Awards 2012Best Villa Development (Malaysia)
Green Projects
SIME DARBY PROPERTY
ELMINA EAST,Phase EV680 units
ELMINA WEST,Phase EV2309 units
To be completed in 2018
ELMINA WEST,Phase EV1341 units
To be completed in 2019To be completed in 2018
Collaboration with Building Sector Energy Efficiency Project (BSEEP) to Improve Energy Efficiency in Residential Projects
PAST, PRESENT AND FUTURE TRENDS
Buildings
20
Built to last –pre 1970s
Iconic Building(1980s-1990s)
Green Buildings
(2000s onward)
Integrated & lifestyle
Developments(includes TOD/TAD)
Fully self-sufficient
Integrated Development
(future)
• Smart Grid – (Solar etc)
• Onsite water harvesting and treatment
• Onsite sewage treatment and composting
• Waste to energy
• Urban farming
• Integrated and low carbon mass transport
• Zero waste
• All major amenities, facilities and recreational services within 1km
• Employment location within development
•IOT and High Speed internet enabled
•Rich in flora and fauna
•Enterprise and entrepreneurship friendly
•Natural disaster risk mitigated
•Inclusive
•Vertical living
In effect, a fully functioning self-sufficient urban ecosystem
2121
Sustainability at Sime Darby Property
• Making it relevant to property development
Sustainable Development Goals(17 SDGs) & Governance
Corporate Core ValuesIntegrity, Respect & Responsibility, Enterprise, Excellence
Sustainability BeliefsDisclose, Engage, Enhance, Protect, Empower, Respect
KPIs
TOOLS/TEMPLATES
ROADMAPS
Sustainability PurposeContribute to a Better Society, Minimise Environmental Harm, Deliver
Sustainable Development
Sustainability GoalPursue Sustainability in a Way that Creates Value to the Organisation
POLICIES
Planning township - BLUEPRINTS(10 – 25 years)
Sets intent aligned to the Vision
Provides core focus
Taken to heart –corporate culture
Sustainability interpretation of core values
Triple bottom line (balance)
Steps in maturity -excelling in sustainability
Accountability
Instruments to embed sustainability
Sime Darby Property Strategic Sustainability Framework
Contribute to a Better Society
OptimiseEnvironmental Performance
Deliver Sustainable
Development
Business
Protect
Disclose
EnhanceEngage
Empower
Respect
Sustainability Purpose,Focus & Approach
Sime Darby Property Sustainability Model
Traditional Model to ours
Note: also integrates elements of CSR Models
24
Planet/Environment• Green Buildings• IUCN, ERT Tree Program – Selangor Living
Collection at CoE, ERT Guide• BSEEP EE Grant from UNEP via JKR• Community Recycling Scheme – 6 months BBR• Water conservation fittings, green cert.• Landscape Plans, Carbon Sequestration Project
• In planning phase• Palm Oil Biomass pelleting – circular economy
People/Society• Urban Gardening Schemes• YSA• Leftover Food Project – SDCC for Orphans• Rising Star Juniors – TPC, CSR
Prosperity• Upcycling - BBR• PRIME Program• Community Development Program
• (improving livelihood)
Translating Model Into Practice - Communities(including Low Carbon)
25
Initiatives 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
Sustainability Blueprint & Goals
Group Sustainability Report
Carbon Footprint Project
Sustainability Index (SUSDEX)
Tree-to-tree Project & Program
ISO50001 Energy Management
Sustainability Culture Assessment
Sustainability Visibility Program
Young Sustainability Ambassador (YSA) Programme
Sustainability Performance Index (SPI) Scorecard
Property Sustainability Report
Water & Waste Mgmt. Program
Sustainability Marketing
Human Rights Program
Biodiversity Program
SPI
Sustainability Programs – 2009-2017 Journey
Sustainability Score KPI Base Targets
26
Sustainability Score (1.0) – sub KPIs Target for Base Score (3) Remarks for FY17/18
1.1 SUSDEX Average Score between 75 - 77.5% Average score covering OD, MD and ND township developments
2.1 Carbon PD – Infra Works 96.19 tCO2-e/RM mil of contract value 10% of 2022 5% carbon Intensity reduction target
2.2 Carbon PD – Construction Works 11.18 tCO2-e/ RM mil of contract value Or 0.01897 tCO2-e/m2 of built up area
10% of 2022 5% carbon Intensity reduction target
2.3 Carbon Asset Management 0.01445 tCO2-e/m2 of built up area 10% of 2022 5% carbon Intensity reduction target
2.4 Carbon H&L 0.01792 tCO2-e/m2 of built up area Or0.10496 tCO2-e/RM mil of revenue
10% of 2022 5% carbon Intensity reduction target
3.1 Water – Property Development 257.942 m3/RM mil of contract value Or0.731 m3/m2 of built up area
10% of 2022 10% water Intensity reduction target
3.2 Water – Asset Management 0.5695 m3/m2 of built up area 10% of 2022 10% water Intensity reduction target
3.3 Water – H&L 3.9008 m3/RM mil of revenue 10% of 2022 10% water Intensity reduction target
4.1 Waste PD – Infra Works 1,776.23 kg/RM mil of contract value 10% of 2022 10% water Intensity reduction target
4.2 Waste PD – Construction 7,116.24 kg/ RM mil of contract Or15.99 kg/m2 of Built Up Area
10% of 2022 10% water Intensity reduction target
4.3 Waste – H&L 2.218 kg/capita Or13.98 kg/RM mil of revenue
10% of 2022 10% water Intensity reduction target
4.4 Waste – Asset Management 0.723 kg/m2 of Built Up Area 10% of 2022 10% water Intensity reduction target
5.1 Biodiversity 1,000 IUCN Red List Trees planted by Property Development
20,000 additional IUCN Red List Native Trees Planted by 2022. Baseline is 17,846 IUCN Tree planted as of Dec 2016.
Sustainability Performance Index for Scorecards
27
FRAMEWORK
• Based on GRI, GBI, LEED, Greenmark& CPTED
• 3 spheres, 12 categories, 37 aspects,85 indicators. Breakdown:
Prosperity – 30 indicatorsPlanet – 25 indicatorsPeople – 30 indicators
• Document Review + Calibration SiteVisit
Development Life Span
Applicable for Township starting fromvision plan to hand-over.
OD/MD RATINGS
ND RATINGS
Note: ND Townships are assigned an actual and a forecast score.
• 50% – 65% : Provisional SUSDEX-rated• >65 – 75% : Provisional Silver-rated• >75% - 85%: Provisional Gold-rated• >85% : Provisional Platinum-rated
• 50% – 65% : SUSDEX-rated• >65 – 75% : Silver-rated• >75% - 85%: Gold-rated• >85% : Platinum-rated
SUSDEX V4.0
SUSDEXPlus Documentation Review Structure (70%)
• Documentation Review 70% of Score• Calibration Site Visit 30% of Score
29
Sphere Category Aspect SDGs No. ofIndicators
Total
Prosperity 1. Direct & Indirect GDV 1. Economic Performance G8 7
30
2. Innovative Design & Construction 2. Monetary Benefit G8 2
3. Risk Management 3. EES Risk4. Economic Risk Management Strategy
G13G9
11
4. Local Economic Impact 5. Procurement Practices6. Market Presence7. Public Infrastructure8. Urban Economy
G12G8
G11, G9G8
1222
5. Business Excellence 9. Strategic Business Planning & Marketing10. Supply Chain Network Planning & Management11. Stakeholder Management
G8G12
-
521
6. Product Responsibility 12. Customer Relationship Management13. Regulatory & Compliance14. Customer Privacy15. Product Quality
---
G9
1111
Planet 7. Green Design & Construction 16. Material17. Carbon & Energy Factors18. Water
G12G7G6
443
258. Biodiversity & Climate Change 19. Biodiversity G15 3
9. Environmental Impact 20. Environmental Impact Mitigation G6 11
People 10. Labour Practice & Decent Work 21. Employment22. Labour Management23. Occupational Health & Safety24. Training & Education25. Equal Remuneration for Women and Men26. Labour Practices and Grievance Mechanism
G8G8G3G8
G5, G10G8
315312
30
11. Society & Security 27. Society28. Anti-Corruption29. Anti-Competitive Behaviour/Competition Law30. Compliance31. Crime Prevention Through Environmental Design32. Product Stewardship33. Physical Mobility Access
G11G16G16
-G11G11G11
1111231
12. Human Rights 34. Investment & Procurement Practices35. Non- Discrimination36. Child Labour37. Security Practices
G8G10G10G16
2111
Overall 12 Categories 37 Aspects 14/17 85 Indicators
SUSDEXPlus STRUCTURE (70% of Overall Score)
30
SUSDEXPlus SCORING GUIDELINE PROSPERITY
Indicator’s IntentThis indicator measure Township performance on profit before interest and tax (PBIT) and Gross Profit Margin. Astrong financial performance will ensure sustainability of the company.
SubmitterTownship
Potential Evidence1. Approved GPM by Mgt.2. Monthly Township Development Report (submitted to PMO)3. Township Profitability SDPB Approved Budget
Scoring CriteriaAs stated in table above.
Note:1. Base GPM for townships is X%.2. % is based on criteria sets in Township Development Status Report developed by PMO.
Direct & Indirect GDV Economic Performance
Category Aspect
CO
DE
INDI-CATOR T
YP
E
SCORE -3 SCORE -2 SCORE -1 SCORE 0 SCORE 1 SCORE 2 SCORE 3
EC1 Gross Profit
Margin (GPM)ND <-15% <-15 to 10% <-10 to 5% <-5 to 0%
Achieved Base Target
Exceed target by up to 5%
Exceed target by more than
5%
CO
DE
INDI-CATOR T
YP
E
SCORE -3 SCORE -2 SCORE -1 SCORE 0 SCORE 1 SCORE 2 SCORE 3
EC1 Profit before
Interest & Tax (PBIT)
OD&
MD<-15% <-15 to 10% <-10 to 5% <-5 to 0%
Achieved Base Target
Exceed target by up to 5%
Exceed target by more than
5%
SAMPLE
31
SUSDEXPlus SCORING GUIDELINE PLANET
Indicator’s IntentEnergy intensity expresses the energy required per unit of activity, output, or any other organization-specific metric.An organization’s ability to use energy efficiently can be revealed by its reductions in energy consumption. Energyconsumption has a direct effect on the environmental footprint of the organization, its operational costs, and exposureto fluctuations in energy supply and prices.
SubmitterTownship
Potential Evidence1. Carbon footprint data2. List of action plans to reduce carbon and energy intensity
Scoring CriteriaAs stated in table above
CODE INDICATOR TYPE SCORE 1 SCORE 2 SCORE 3
EN5Carbon and Energy Management
ND
Sustainability strategy for carbon and energy managementcited
1) Sustainability strategy for carbon and energy managementcited2) Draft contract documents include clauses for provision of carbon data for carbon disclosure
1) Sustainability strategy for carbon and energy management cited2) AND Final contract/tender documents include clauses for provision of carbon data for carbon disclosure
OD&
MD
1) Submission of accurate and on-time CFP data2) AND Supporting documents submitted
1) Submission of accurate and on-time CFP data2) AND Supporting documents submitted3) AND All main and sub-contracts as relevant have clauses for the provision of carbon data for carbon disclosure4) AND Strategy on reducing carbon and energy intensity
1) Submission of accurate and on-time CFP data2) AND Supporting documents submitted3) AND All main and sub-contracts as relevant have clauses for the provision of carbon data for carbon disclosure4) AND Strategy on reducing carbon and energy intensity5) AND Carbon and energy intensity reduction achieved
Green Design & Construction Carbon and Energy Factors
Category Aspect
SAMPLE
32
SUSDEXPlus SCORING GUIDELINE PEOPLE
Indicator’s IntentThis indicator encourages a moral and regulatory approach to ensuring that product stewardship places a high priority onensuring our Townships are recognised as leaders in fire safety mitigation and avoidance.
SubmitterTownshipProduct Development & InnovationSQM
Potential EvidenceProject proposal
Scoring CriteriaScore(s) is awarded for adoption/ provision of ANY health & safety elements below:1. Bomba Certification2. Fire Extinguisher3. Evacuation Plan4. Smoke Detectors5. Fire retardant building material6. Fire Safety Certification (to check if such certification exist)7. Certified wiring or fittings by SIRIM or equivalent8. Product safety audit by ESH9. CCC
InterpretationThere is no tolerance for building and selling products where fire safety could be a concern or be compromised. This indicator is purposefully separate from product stewardship due to the potential for significant adverse outcome if fire safety standard and principals are not sufficiently integrated into all product design, construction and maintenance. This indicator isstructured intentionally to be applicable to all products. This indicator exclude galleries and operation offices. Products are defined as residential, commercial and industrial buildings.
CODE INDICATOR TYPE SCORE 1 SCORE 2 SCORE 3
SO24 Product fire safety
ND
2 elements/ active phase 5 elements/ active phase 8 elements/ active phaseOD&
MD
Category Aspect
Society & Security Product Stewardship
SAMPLE
33
Accessibility
CalibrationSite Visit
Security
Drainage
Authorities& Utilities
Environment
HealthSafety
Community & Civic
Amenities
Sustainable Marketing
Exceptional Features
General Cleanliness & Maintenance
OVERVIEW
• Method: On-site inspection
• Every active township after the documentation review.
• Range of score: 0 - 3
• 11 categories, 32 aspects, 44 indicators.
• Covers whole Township e.g. select completed phases (handed over) & construction phases.
• A necessary check and balance to verify documentation review findings.
• Only applies to OD & MD townships.
*Overview of site visit categories
SUSDEXPlus Calibration Site Visit (30%)
Gold PlatinumSilver
• Year on year scoring improvement (±4.82% of improvement)• Average score across the Division is 79.2%• Planning townships also get assessed and given a provisional rating.
SUSDEX Assessment Results 7 Years TrendFor 17 OD/MD Townships
51.1
51.1
50.6
50.6
50.9
51.1
51.1
51.9
51.9
51.8
57.2
57.2
57.9
57.9
56.7
56.3
57.4
57.3
57.7
56.2
75.1
66.5
66.5
78.3
64.7
79.8
64.7
78.7
64
75.1
63.1 65
.4
62.6
77.4
64.3
65.0
52.9
70.8
65.7
65.7
67 67
81.2
69.4
83.0
68.8
66.6 70
.2
85.3
69.3
69.3
79.5
79.5
78.1
78.1
77.4
71.8 73
.7
74.6
81.3 83
.0
77.7
77.7
76.5
76.5
75.6 77
.5
75.3
72.9
81.4
87.0
74
.2
74
.5 78
.4 81
.0
81
.4 83
.6
83
.8
85
.2
85
.6 87
.9
0
10
20
30
40
50
60
70
80
90
100
FY10/11 FY11/12 FY12/13 FY13/14 FY14/15 FY15/16 FY16/17
Sco
re (
%)
35
Operational Eco-Efficiency Programme
Carbon Management• Aims to set a carbon baseline, track and monitor SDP carbon emissions,
and identify and execute key emissions reduction opportunities in SDP• Provides an account of a SDP’s carbon emissions, i.e. quantity and
breakdown of emissions by source and type
Waste Management• Aims to track and monitor operational waste, and to identify and
execute tangible waste reduction opportunities.• Waste Management Programme comprises of 2 main activities,
which are:• Monthly waste generation tracking and monitoring• Waste reduction initiative
Water Management• Aims to track and monitor operational water use, and identify and
execute tangible and operationally-beneficial methods to reduce the use of water.
• Current focus is on potable water consumption.
Sime Darby Property
36
Eco-Efficiency Programme – Carbon, Water & Waste
Overall Water Consumption Pattern (m3)FY16/17
Property Development Asset Management Hospitality & Leisure
26%
36%
38% 28%
64%
8%
Property Division - Waste ContributorsFY16/17
Domestic Waste (Aiv) Site Construction Waste (Ai) Site Food Waste (Aii) Site
- FY16/17
1.38
1.64
1.12
1.64
2.14
1.62
0.50
1.50
2.50
2009 2010 2011 2012 2013 2014
Emis
sio
n in
ten
sity
tC
O2
-e/
10
0 m
2
Reporting Year
Emission intensity tCO2-e/ 100 m2 Target
Property Division Overall(tCO2-e/ 100 m2 built up area)
Sime Darby Property
37
Biodiversity Conservation
Published Tool - Threatened Tree Guideline by SDPKey Summary
• Culmination of 6-7 years R&D – a practitioners tool
• Contributors includes, experts in the field, UPM, ILAM, FRIM and more.
• Covers I.D and Environmental Requirements of 74 IUCN and FRIM Red List Tree Species for planting in urban environments.
• Available FOC online at:• SDP, FRIM, ILAM, UPM,
TRCRC, LM, YSD
38
Biodiversity Conservation
Tree-to-tree projectKey Summary• Tracking of all tree planting since 2011 with focus also on IUCN Red List Trees (ERT Trees)• 18,300 plus ERT Trees planted across 14 townships• Target an additional 20,000 by 2022• Why?
• Adds value to urban landscapes/townships in many ways• Urban landscapes provide a seed repository for these species and opportunity for ERT Conservation• Supports Malaysia’s commitment to CBD and The National Policy On Biodiversity 2016-2025• Contributes to an urban landscape carbon sink (carbon sequestration)
0 0
34
2
0
14
89
83
2
0 0
27
3
0 0
15
1 27
5
051
0 0 32 10
0
15
22
0 0
31
5
40
0
90
62
00 39
20 1
75 30
4
0 0
88
9
16
3
88
0 0 00
88
9
0 0 0 0
97
7
0 19
0 0 0 0 0
0
500
1000
1500
2000
2500
No. of ERT Trees Planted(2011-Aug 2017)
2011-2012 2013 2014 2015 2016 2017
39
Young Sustainability Ambassador Programme
Engaging the Future Generation about Sustainability
Key Summary• Began in March 2013 with
100 members – over 600• Based on experiential (out
of class room) learning model
• Teaching sustainability living
• Members 7 – 17 years old• Members from our staff
and from our townships• Frequent event
collaboration with institutions, e.g., Bank Negara, FRIM, NGOs
• About 30 events to date
Junior Culinary Challenge at Putra Heights
Visit to Orphanage
Sleeping with the Sharks
Biodiversity Site Visit
4040
City of Elmina – a new standard in sustainable community development
Select elements overview
SPIRITUAL WELLNESS
EMOTIONAL WELLNESS
PHYSICAL WELLNESS
OCCUPATIONAL WELLNESS
FAMILY WELLNESS
INTELLECTUAL WELLNESS
ENVIRONMENTAL WELLNESS
SOCIAL WELLNESS
| DESIGNED, PLANNED AND DEVELOPED AROUND 8 WELLNESS PRINCIPLES |
• SVC is a Special AreaPlan envisioned andapproved by MPFN in2007.
• DASH highway willfurther improveaccessibility.
• MRT is in the vicinity.
• SVC will be the next sought after development growth corridor.
SDP Land bank
Primary Highway
Supporting Highway
Proposed Highway
MRT Line
Regional Centre
Sub regional Centre
LEGENDSUBANG JAYA
SHAH ALAM
PUCHONG
PETALING JAYA
BANGSAR
KLANG
SG BULOH
SELAYANG
SG BESI
CHERAS
SERI KEMBANGAN
BATU CAVES
MELAWATI
AMPANG
CITY OF ELMINA
42
| LOCATION MAP – SELANGOR VISION CITY AND CITY OF ELMINA |
150,000 Population in City of Elmina
36,600 Homes
43
210,000 projected job creation
20 mil total sqft of GFA
300 acres of Elmina City Centre
27,200 projected job creation
3.5 mil total sqft of GFA
42 Acres Wellness Cluster
44
45
Education City of ElminaPrimary School 11
Secondary School 5
Integrated School 6
Education Hub 1
Library 1
AmenitiesCommunity Hall & Kindergarten 26
Sports Complex 4
Community Centre 8
Mosque 6
Surau 14
Religious Land 7
Football Field 6
Cemetery 2
ConnectivityTOD (Transit Oriented Development) 1
90km cycling and jogging track
HealthHospital 1
Health Clinics 3
Wellness Cluster 1
SecurityBalai Polis 3
Balai Bomba 3
Integrated Operation Centre 1
Anxillury Police Centre 1
45 km (NEIGHBOURHOOD TRACK)
INTRA-COMMUNITY tracks connecting residents to local centres and facilities
45 km (CITY-WIDE TRACK)
INTER-COMMUNITY tracks connecting the whole of City of Elmina
To MRT in RRI
To KTM in Kuang
To SaujanaUtama
ELMINA CIRCUIT
90 kmCOMBINED JOGGING & CYCLING TRACK
CYCLING AND JOGGING TRACK
• Open Space will be used for flood mitigation measure
Q 1000 FLOOD EVENT
• Elmina River will be used for flood mitigation measure
Q 1OO FLOOD EVENT
• Landscape Ponds will be used for flood mitigation measure
Q 1000 FLOOD EVENT
WATERWAYS IN ELMINA CENTRAL PARKFlood Mitigation Measure
AFTER (Temporary Water Spillover)
CYCLING AND JOGGING TRACKS
MEDIAN
TNB
STREET LIGHTING
SEWERAGE RESERVE
TELEKOM RESERVE
BIO - SWALE
ROAD CROSS SECTION50m, 40m, 30m Roads
300 acres of Elmina Central Park
480 acres of local parks
210,000 trees and many are Endangered, Rare &
Threatened (ERT) species
2,700 acres of Tasik Subang Dam Forest Reserve
3,480 acres green space in total
49
SG BULOH
SG SUBANG
SG PELAMPAS
FOREST PARK CULTURAL PARK URBAN PARK
• Reforestation with TRCRC
• Wetland rehabilitation
• Viewing Deck
• Picnic Area
• Arboretum
• Plaza
• Mosque Plaza
• Wetland rehabilitation
• Open Spaces
• Alfresco F&B
• Water activities
• Amphitheater
• Wetland rehabilitation
• Public Art
• Alfresco F&B
• Boardwalks
• Boulevard
COMMUNITY PARK
• Amphitheater
• Wetland rehabilitation• Playgrounds
• Community Garden
• Community Hall
• Picnic and Event Area
• Community Orchard
| ELMINA CENTRAL PARK – 5 PRECINCT PARKS |
• Sporting fields
• Velodrome
• Recreational pond
• Mosque park
• Multi-sports court
SPORTS PARK
Sime Darby Property together with Tropical Rainforest Conservation & Research Centre and
Jabatan Perhutanan Hulu Selangor
| FOREST RESERVE SEED COLLECTION RECCE WITH TRCRC & JAB PERHUTANAN |
| COMMUNITY PARK, ELMINA 300 ACRE CENTRAL PARK |
| MORNING VIEW AT ELMINA EAST PARK, ELMINA 300 ACRE CENTRAL PARK |
SUSTAINABILITY: “DOING THE RIGHT THINGS, FOR THE RIGHT REASONS”
Product Take up rate (%)
G6 - Tiana 100%
G3B - Viana 90%
EV3A (20x60) 94%
EV3B (22x75) 94%
EV3B (24x75) 82%
EV4A 99%
Elmina sales results:
Note: data regularly updated
Product Take up rate (%)
EV4B 98%
EV1A 95%
EV1B 97%
EV2A 98%
EV2B 92%
55
Thank You
Contact:
Sharif James Zainal Aziz
Corporate Sustainability
Sustainability and Quality Management Department
Sime Darby Property Berhad (15631-P)
Tel: +603 7849-5000, DL: +603 7849-5350, Mob: +6 019-2811-481, Fax: +603 7849-5677