34
Recharge Zone Exception Request FOR Babcock Road and UTSA Boulevard San Antonio, Texas Prepared For: City of San Antonio, Texas Prepared By: Poznecki Camarillo, Inc. TBPE Registration #483 5835 Callaghan Road, Suite 200 San Antonio, Texas 78228 Voice: (210)349 3273 Fax: (210) 349 4395 June 2020

Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

 

 

    

 

 

RechargeZoneExceptionRequest

FOR

BabcockRoadandUTSABoulevard

SanAntonio,Texas 

   

Prepared For: City of San Antonio, Texas 

 Prepared By: 

Poznecki‐Camarillo, Inc. TBPE  Registration  #483  

5835 Callaghan Road, Suite  200 San Antonio, Texas 78228 Voice:  (210)349‐3273 Fax:  (210) 349‐4395 

  

June 2020

Page 2: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

TCEQ-20705 (Rev. 02-17-17) 1 of 4

Texas Commission on Environmental Quality

Edwards Aquifer Application Cover Page

Our Review of Your Application

The Edwards Aquifer Program staff conducts an administrative and technical review of all applications. The turnaround time for administrative review can be up to 30 days as outlined in 30 TAC 213.4(e). Generally administrative completeness is determined during the intake meeting or within a few days of receipt. The turnaround time for technical review of an administratively complete Edwards Aquifer application is 90 days as outlined in 30 TAC 213.4(e). Please know that the review and approval time is directly impacted by the quality and completeness of the initial application that is received. In order to conduct a timely review, it is imperative that the information provided in an Edwards Aquifer application include final plans, be accurate, complete, and in compliance with 30 TAC 213.

Administrative Review

1. Edwards Aquifer applications must be deemed administratively complete before a technical review can begin. To be considered administratively complete, the application must contain completed forms and attachments, provide the requested information, and meet all the site plan requirements. The submitted application and plan sheets should be final plans. Please submit one full-size set of plan sheets with the original application, and half-size sets with the additional copies.

To ensure that all applicable documents are included in the application, the program has developed tools to guide you and web pages to provide all forms, checklists, and guidance. Please visit the below website for assistance: http://www.tceq.texas.gov/field/eapp.

2. This Edwards Aquifer Application Cover Page form (certified by the applicant or agent) must be included in the application and brought to the administrative review meeting.

3. Administrative reviews are scheduled with program staff who will conduct the review. Applicants or their authorized agent should call the appropriate regional office, according to the county in which the project is located, to schedule a review. The average meeting time is one hour.

4. In the meeting, the application is examined for administrative completeness. Deficiencies will be noted by staff and emailed or faxed to the applicant and authorized agent at the end of the meeting, or shortly after. Administrative deficiencies will cause the application to be deemed incomplete and returned.

An appointment should be made to resubmit the application. The application is re-examined to ensure all deficiencies are resolved. The application will only be deemed administratively complete when all administrative deficiencies are addressed.

5. If an application is received by mail, courier service, or otherwise submitted without a review meeting, the administrative review will be conducted within 30 days. The applicant and agent will be contacted with the results of the administrative review. If the application is found to be administratively incomplete, it can be retrieved from the regional office or returned by regular mail. If returned by mail, the regional office may require arrangements for return shipping.

6. If the geologic assessment was completed before October 1, 2004 and the site contains “possibly sensitive” features, the assessment must be updated in accordance with the Instructions to Geologists (TCEQ-0585 Instructions).

Technical Review

1. When an application is deemed administratively complete, the technical review period begins. The regional office will distribute copies of the application to the identified affected city, county, and groundwater conservation district whose jurisdiction includes the subject site. These entities and the public have 30 days to provide comments on the application to the regional office. All comments received are reviewed by TCEQ.

2. A site assessment is usually conducted as part of the technical review, to evaluate the geologic assessment and observe existing site conditions. The site must be accessible to our staff. The site boundaries should be

Page 3: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

TCEQ-20705 (Rev. 02-17-17) 2 of 4

clearly marked, features identified in the geologic assessment should be flagged, roadways marked and the alignment of the Sewage Collection System and manholes should be staked at the time the application is submitted. If the site is not marked the application may be returned.

3. We evaluate the application for technical completeness and contact the applicant and agent via Notice of Deficiency (NOD) to request additional information and identify technical deficiencies. There are two deficiency response periods available to the applicant. There are 14 days to resolve deficiencies noted in the first NOD. If a second NOD is issued, there is an additional 14 days to resolve deficiencies. If the response to the second notice is not received, is incomplete or inadequate, or provides new information that is incomplete or inadequate, the application must be withdrawn or will be denied. Please note that because the technical review is underway, whether the application is withdrawn or denied the application fee will be forfeited.

4. The program has 90 calendar days to complete the technical review of the application. If the application is technically adequate, such that it complies with the Edwards Aquifer rules, and is protective of the Edwards Aquifer during and after construction, an approval letter will be issued. Construction or other regulated activity may not begin until an approval is issued.

Mid-Review Modifications

It is important to have final site plans prior to beginning the permitting process with TCEQ to avoid delays.

Occasionally, circumstances arise where you may have significant design and/or site plan changes after your Edwards Aquifer application has been deemed administratively complete by TCEQ. This is considered a “Mid-Review Modification”. Mid-Review Modifications may require redistribution of an application that includes the proposed modifications for public comment.

If you are proposing a Mid-Review Modification, two options are available:

If the technical review has begun your application can be denied/withdrawn, your fees will be forfeited, and the plan will have to be resubmitted.

TCEQ can continue the technical review of the application as it was submitted, and a modification application can be submitted at a later time.

If the application is denied/withdrawn, the resubmitted application will be subject to the administrative and technical review processes and will be treated as a new application. The application will be redistributed to the affected jurisdictions.

Please contact the regional office if you have questions. If your project is located in Williamson, Travis, or Hays County, contact TCEQ’s Austin Regional Office at 512-339-2929. If your project is in Comal, Bexar, Medina, Uvalde, or Kinney County, contact TCEQ’s San Antonio Regional Office at 210-490-3096

Please fill out all required fields below and submit with your application.

1. Regulated Entity Name: Babcock Road and UTSA Boulevard

2. Regulated Entity No.:

3. Customer Name: City of San Antonio, Texas 4. Customer No.: 600130652

5. Project Type: (Please circle/check one)

New Modification Extension Exception

6. Plan Type: (Please circle/check one) WPAP CZP SCS UST AST EXP EXT Technical

Clarification Optional Enhanced Measures

7. Land Use: (Please circle/check one)

Residential Non-residential 8. Site (acres): 0.02

9. Application Fee: $500.00 10. Permanent BMP(s): Vegetative filter strip

11. SCS (Linear Ft.): NA 12. AST/UST (No. Tanks): NA

13. County: Bexar 14. Watershed: Maverick Creek

Page 4: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

TCEQ-20705 (Rev. 02-17-17) 3 of 4

Application Distribution Instructions: Use the table below to determine the number of applications required. One original and one copy of the application, plus additional copies (as needed) for each affected incorporated city, county, and groundwater conservation district are required. Linear projects or large projects, which cross into multiple jurisdictions, can require additional copies. Refer to the “Texas Groundwater Conservation Districts within the EAPP Boundaries” map found at:

http://www.tceq.texas.gov/assets/public/compliance/field_ops/eapp/EAPP%20GWCD%20map.pdf

For more detailed boundaries, please contact the conservation district directly.

Austin Region

County: Hays Travis Williamson

Original (1 req.) __ __ __

Region (1 req.) __ __ __

County(ies) __ __ __

Groundwater Conservation District(s)

__Edwards Aquifer Authority

__Barton Springs/ Edwards Aquifer

__Hays Trinity

__Plum Creek

__Barton Springs/ Edwards Aquifer

NA

City(ies) Jurisdiction

__Austin

__Buda

__Dripping Springs

__Kyle

__Mountain City

__San Marcos

__Wimberley

__Woodcreek

__Austin __Bee Cave

__Pflugerville

__Rollingwood

__Round Rock

__Sunset Valley

__West Lake Hills

__Austin

__Cedar Park

__Florence

__Georgetown

__Jerrell

__Leander

__Liberty Hill

__Pflugerville

__Round Rock

San Antonio Region

County: Bexar Comal Kinney Medina Uvalde

Original (1 req.) __ __ __ __ __

Region (1 req.) __ __ __ __ __

County(ies) __ __ __ __ __

Groundwater Conservation

District(s)

__ Edwards Aquifer Authority

__Trinity-Glen Rose

__Edwards Aquifer Authority __Kinney __EAA

__Medina __EAA __Uvalde

City(ies) Jurisdiction

__Castle Hills

__Fair Oaks Ranch

__Helotes

__Hill Country Village

__Hollywood Park

__San Antonio (SAWS)

__Shavano Park

__Bulverde

__Fair Oaks Ranch

__Garden Ridge __New Braunfels __Schertz

NA __San Antonio ETJ (SAWS)

NA

X

X

X

X

X

Page 5: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

:J-O

I certify that to the best of my knowledge, that the application is complete and accurate. Thisapplication is hereby submitted to TCEQ for administrative review and technical review.

City of San Antonio, Texas / Crystal Benavides, P.E.

Print Name of Customer/ Authorized Agent

Date

**FORTCEQ INTERNAL USE ONLY**Date(s)Reviewed: Date Administratively Complete: IReceived From: Correct Number of Copies:Received By: Distribution Date:EAPP File Number: Complex:Admin. Review(s) (No.): No. AR Rounds:

Delinquent Fees (y/N): Review Time Spent:

Lat./Long. Verified: SOSCustomer Verification:

Agent Authorization Payable to TCEQ (YIN):Complete/Notarized (Y/N): FeeCore Data Form Complete (y/N): Check: Signed (YIN):Core Data Form Incomplete Nos.: Less than 90 days old (Y/N):

TCEQ-20705 (Rev. 02-17-17) 4of4

Page 6: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

General Information FormTexas Commission on Environmental Quality

For Regulated Activities on the Edwards Aquifer Recharge and Transition Zones and Relating to30 TAC §213.4(b) & §213.5(b)(2)(A), (B) Effective June 1, 1999

To ensure that the application is administratively complete, confirm that all fields in the formare complete, verify that all requested information is provided, consistently reference thesame site and contact person in all forms in the application, and ensure forms are signed bythe appropriate party.

Note: Including all the information requested in the form and attachments contributes tomore streamlined technical reviews.

SignatureTo the best of my knowledge, the responses to this form accurately reflect all information

requested concerning the proposed regulated activities and methods to protect the Edwards

Aquifer. This General Information Form is hereby submitted for TCEQreview. The application

was prepared by:

Print Name of Customer/Agent: Crystal Benavides. P.E.

Date: 6/15/2020

Signature of Customer/Agent:

~'1zPR.~Project Information1. Regulated Entity Name: Babcock Road and UTSABoulevard

2. County: Bexar

3. Stream Basin: Maverick Creek

4. Groundwater Conservation District (If applicable): Edwards Aquifer Authority

5. Edwards Aquifer Zone:

[2J Recharge ZoneoTransition Zone

6. Plan Type:

OWPAP

OSCSo Modification

OAST

OUST[2J Exception Request

1 of 4TCEQ-0587 (Rev. 02-11-15)

Page 7: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

2 of 4 TCEQ-0587 (Rev. 02-11-15)

7. Customer (Applicant): 

Contact Person: Sean D. Strong, P.E. Entity: City of San Antonio Mailing Address: P.O. Box 839966City, State: San Antonio, TX  Zip: 78283‐3966Telephone: (210) 207‐8037  FAX:          Email Address: [email protected] 

8. Agent/Representative (If any): 

Contact Person: Crystal Benavides, P.E. Entity: Poznecki‐Camarillo, Inc. Mailing Address: 5835 Callaghan Rd, Suite 200City, State: San Antonio, TX  Zip:  78228Telephone: (210) 349‐3273  FAX: (210) 349‐4395Email Address: [email protected] 

9. Project Location: 

 The project site is located inside the city limits of San Antonio.  The project site is located outside the city limits but inside the ETJ (extra‐territorial jurisdiction) of           .  The project site is not located within any city’s limits or ETJ. 

10.  The location of the project site is described below.  The description provides sufficient detail and clarity so that the TCEQ’s Regional staff can easily locate the project and site boundaries for a field investigation.  

In northwest San Antonio along Babcock Road at the northwest corner of the intersection with UTSA Boulevard 

11.  Attachment A – Road Map.  A road map showing directions to and the location of the project site is attached. The project location and site boundaries are clearly shown on the map. 

12.  Attachment B ‐ USGS / Edwards Recharge Zone Map.  A copy of the official 7 ½ minute USGS Quadrangle Map (Scale: 1" = 2000') of the Edwards Recharge Zone is attached.  The map(s) clearly show: 

 Project site boundaries.  USGS Quadrangle Name(s).  Boundaries of the Recharge Zone (and Transition Zone, if applicable).  Drainage path from the project site to the boundary of the Recharge Zone. 

13.  The TCEQ must be able to inspect the project site or the application will be returned.  Sufficient survey staking is provided on the project to allow TCEQ regional staff to locate the boundaries and alignment of the regulated activities and the geologic or manmade features noted in the Geologic Assessment.   

Page 8: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

3 of 4 TCEQ-0587 (Rev. 02-11-15)

 Survey staking will be completed by this date:            

14.  Attachment C – Project Description.  Attached at the end of this form is a detailed narrative description of the proposed project.  The project description is consistent throughout the application and contains, at a minimum, the following details: 

 Area of the site  Offsite areas  Impervious cover  Permanent BMP(s)  Proposed site use  Site history  Previous development  Area(s) to be demolished 

15. Existing project site conditions are noted below:   

 Existing commercial site  Existing industrial site  Existing residential site  Existing paved and/or unpaved roads  Undeveloped (Cleared)  Undeveloped (Undisturbed/Uncleared)  Other:            

Prohibited Activities 16.  I am aware that the following activities are prohibited on the Recharge Zone and are not 

proposed for this project: 

(1) Waste disposal wells regulated under 30 TAC Chapter 331 of this title (relating to Underground Injection Control); 

(2) New feedlot/concentrated animal feeding operations, as defined in 30 TAC §213.3; 

(3) Land disposal of Class I wastes, as defined in 30 TAC §335.1; 

(4) The use of sewage holding tanks as parts of organized collection systems; and 

(5) New municipal solid waste landfill facilities required to meet and comply with Type I standards which are defined in §330.41(b), (c), and (d) of this title (relating to Types of Municipal Solid Waste Facilities). 

(6) New municipal and industrial wastewater discharges into or adjacent to water in the state that would create additional pollutant loading. 

17.  I am aware that the following activities are prohibited on the Transition Zone and are not proposed for this project: 

(1) Waste disposal wells regulated under 30 TAC Chapter 331 (relating to Underground Injection Control); 

Page 9: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

4 of 4 TCEQ-0587 (Rev. 02-11-15)

(2) Land disposal of Class I wastes, as defined in 30 TAC §335.1; and 

(3) New municipal solid waste landfill facilities required to meet and comply with Type I standards which are defined in §330.41 (b), (c), and (d) of this title. 

Administrative Information 18. The fee for the plan(s) is based on: 

 For a Water Pollution Abatement Plan or Modification, the total acreage of the site where regulated activities will occur.  For an Organized Sewage Collection System Plan or Modification, the total linear footage of all collection system lines.  For a UST Facility Plan or Modification or an AST Facility Plan or Modification, the total number of tanks or piping systems.  A request for an exception to any substantive portion of the regulations related to the protection of water quality.  A request for an extension to a previously approved plan. 

19.  Application fees are due and payable at the time the application is filed.  If the correct fee is not submitted, the TCEQ is not required to consider the application until the correct fee is submitted.  Both the fee and the Edwards Aquifer Fee Form have been sent to the Commission's: 

 TCEQ cashier  Austin Regional Office (for projects in Hays, Travis, and Williamson Counties)  San Antonio Regional Office (for projects in Bexar, Comal, Kinney, Medina, and Uvalde Counties) 

20.  Submit one (1) original and one (1) copy of the application, plus additional copies as needed for each affected incorporated city, groundwater conservation district, and county in which the project will be located.  The TCEQ will distribute the additional copies to these jurisdictions.  The copies must be submitted to the appropriate regional office. 

21.  No person shall commence any regulated activity until the Edwards Aquifer Protection Plan(s) for the activity has been filed with and approved by the Executive Director.  

Page 10: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

^

SL 16

04

Bab

cock

HAUSMA

UTSA

KY

LE

SE

AL

E

IH 10

LA C

ANTE

RA

FM 1560

DE ZAVALA

JV B

aco

n

SONOMA PKWY

DO

E LN

AU

TU

MN

VIS

WO

LLE

R R

D

CHASE HILL BLVD

HU

NT

SM

AN

WILD EAGLE RD

CAN

DELAR

IA

GREEN GLEN DR VA

LER

O W

AY

CEDAR PARK

SPRING TIME DR

TALL H

TS

S H

AU

SM

AN

RD

SA

M B

AR

SH

OP

UTSA BLVD

BAMBERGER TRL

OLD

BA

BC

OC

K R

D

FEATHER TRL

BLU

ES

TON

E

MA

PLE

PA

RK

DR

GR

EY

FO

X T

ER

WA

LTE

R B

RE

NA

N

LUN

A R

DG SE

EK

ER

S S

T

HA

RT C

LIFFW

ES

TE

RN

OA

K

LENDELL DR

E CAMPUS DR

ROCK MIST M

OO

NLI

T PA

RK

SP

RIN

G R

AIN

DR

EN

GE

LM

AN

N

AS

BU

RY

VIS

CAMP BULLIS RD

AMBER OAK

LOS

T L

AK

E

STA

BL

E P

AS

S

CO

GB

UR

N

BR

IST

LEW

OO

D

SECO CRK

RA

NC

HW

EL

L C

V

OL

D F

RE

DE

RIC

KS

BU

RG

RD

JAM

ES

BA

UE

RLE

VIA LA CANTERA

CHISOM CREEK DR

RIO RANCHO

WAY

SO

NO

RA B

ND

FRE

D C

OO

K

JUBILEE WAY

SPRING HAVEN

RE

GE

NC

Y T

RL

ELK P

ARK

ES

SE

N F

OR

ES

T

MA

GD

ALE

NA R

UN

CLUB OAKSW

GO

LD

EN

LN

OAK GROVE DR

MO

SS

FOR

D

WA

TE

RW

AY

RD

G

PE

CA

N G

LAD

E

LITT

LE W

RE

N LN

RE

GE

NC

Y F

OR

ES

T

ROCKY CEDAR

CO

UN

TR

Y S

PG

CALDERWOOD

SL 1604

IH 1

0

FM 1560

SL 1604

SL 1604

SL

1604

IH 1

0

SL 1604 SL 1604

SL 16

04

SL 16

04

^BEXAR

Babcock Road and UTSA BoulevardBexar County, Texas

0 1,500 3,000 4,500 6,000750Feet

Road Map

SITE

±1 inch = 2,500 feet

Page 11: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

^

Leon

Cre

ekHuesta Creek

^BEXAR

USGS Quadrangles: Helotes and Castle HillsBabcock Road and UTSA Boulevard

Bexar County, Texas

0 1,500 3,000 4,500 6,000750Feet

LegendNHD Streams

Edwards Aquifer Zones

RECHARGE ZONE

Edwards Aquifer Recharge Zone Map

Hue

sta Cree

k T

ributary A

Leon Creek

SITE

CONTRIBUTING ZONEWITHIN THE TRANSITION ZONE

TRANSITION ZONE

±1 inch = 2,000 feet

Ma

verick Cree

k

Limits of Construction

E

E

E E E

E

E

E

E

(inset map)

Ma

verick Cree

k

E

E

E

E

E

E

E

E

EE

Page 12: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

June 2020  Pg. 1 of 1

   

TCEQ‐0587 General Information Form 

   

AttachmentC‐ProjectDescription

The City of San Antonio proposes to improve the VIA bus stop and repair adjacent rutting along 

the edge of Babcock Road at the intersection with UTSA Boulevard. The existing conditions 

include a 4‐ft sidewalk separated from the edge of pavement by a grassy sloped strip. Due to lack 

of a curb, bus traffic has created a deep rut in the grassy slope by stopping in front of the VIA 

bench. The proposed improvements include a concrete curb to preserve the grassy strip adjacent 

to the sidewalk, thus mitigating the soil disturbance currently caused by the vehicular rutting. 

 The site is approximately 60 feet long and 15 feet wide, resulting in a total site area of 900 square 

feet (0.02 acres).  Offsite flow comes from an area of less than 1 acre of the adjacent parcel 

consisting of a level mowed grassy lawn of Bethany Primitive Baptist Church.  Existing impervious 

cover associated with the site includes 240 square feet of existing 4‐ft sidewalk, of which 110 

square feet is to be demolished and reconstructed.  The proposed increase in impervious cover is 

from construction of a 5‐ft wide wheelchair pad, an 18‐ft by 3‐ft bus stop pad, and a triangle of 

concrete riprap.  The proposed impervious cover area is 334 square feet.  The increase in 

impervious cover is 94 square feet.  

The proposed permanent BMP is a strip of proposed topsoil and sod approximately 6 feet to 8 

feet wide between the sidewalk and the curb of Babcock Road.  

Babcock Road at UTSA Boulevard is an existing secondary arterial street which has been recently 

improved by the City of San Antonio.  A storm sewer system collecting site runoff and conveying 

into Maverick Creek was recently constructed under the permit WPAP 13‐15020502 (RN 

107789737, UTSA Blvd. from Babcock Rd. to Edward Ximenes). The proposed site is within 

Drainage Area A‐1 of the recent improvement’s construction plans.   

Page 13: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

Recharge and Transition Zone ExceptionRequest FormTexas Commission on Environmental Quality30 TAC §213.9 Effective June 1, 1999

To ensure that the application is administratively complete, confirm that all fields in the formare complete, verify that all requested information is provided, consistently reference thesame site and contact person in all forms in the application, and ensure forms are signed bythe appropriate party.Note: Including all the information requested in the form and attachments contributes tomore streamlined technical reviews.

SignatureTo the best of my knowledge, the responses to this form accurately reflect all information

requested concerning the proposed regulated activities and methods to protect the Edwards

Aquifer. This Recharge and Transition Zone Exception Request Form is hereby submitted for

TCEQreview and executive director approval. The request was prepared by:

Print Name of Customer/Agent: City of SanAntonio, Texas / Crystal Benavides, P.E.

Date:~/7/:to~Signature of Customer/Agent:

~~

Regulated Entity Name: Babcock Road and UTSABoulevard

Exception Request1. ~ Attachment A - Nature of Exception. A narrative description of the nature of each

exception requested is attached. All provisions of 30 TAC §213 Subchapter A for which

an exception is being requested have been identified in the description.

2. ~ Attachment B - Documentation of Equivalent Water Quality Protection.

Documentation demonstrating equivalent water quality protection for the Edwards

Aquifer is attached.

Administrative Information3. ~ Submit one (1) original and one (1) copy of the application, plus additional copies as

needed for each affected incorporated city, groundwater conservation district, and

county in which the project will be located. The TCEQwill distribute the additional

copies to these jurisdictions. The copies must be submitted to the appropriate regional

office.

4. ~ The applicant understands that no exception will be granted for a prohibited activity in

Chapter 213.

5. ~ The applicant understands that prior approval under this section must be obtained from

the executive director for the exception to be authorized.

1of 1TCEQ-0628 (Rev. 03-13-15)

Page 14: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

June 2020  Pg. 1 of 1

   

TCEQ‐0628 Recharge and Transition Zone Exception Request Form 

   

AttachmentA‐NatureofException

 

The City of San Antonio is requesting an exception from submitting a Water Pollution Abatement 

Plan because the site has been developed before, and the proposed construction would add a 

negligible increase in impervious cover. The proposed increase in impervious cover is 94 square 

feet (0.00 acres).  Because the project will not change the runoff’s paths from the preconstruction 

flow patterns, permanent and temporary measures are proposed to protect water quality, and no 

sensitive features were observed, the increase of impervious cover of 94 square feet can be 

considered negligible.  Additionally, the proposed improvements will mitigate the existing soil 

disturbance from rutting along the wheel path at the bus stop. 

Page 15: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

June 2020  Pg. 1 of 1

   

TCEQ‐0628 Recharge and Transition Zone Exception Request Form 

   

AttachmentB‐DocumentationofEquivalentWaterQualityProtection

 

Temporary BMP in the form of curb inlet gravel filter bags will treat runoff before it enters the 

storm drain inlets into Maverick Creek.  Permanent BMP for upgradient and onsite stormwater 

are proposed in the form of topsoil and sod to create a grassy filter strip between the sidewalk 

and the curb of Babcock Road.    

 

A licensed geologist pedestrian survey documented no geologic features.   

 

The construction documents contain TCEQ WPAP General Construction Notes which will be 

provided to the contractor and all subcontractors.   

 

The geologic survey and construction documents are attached at the end of this form. 

 

Page 16: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

 

 

 TCEQ‐0628 Recharge and Transition Zone Exception Request Form 

Attachment B – Documentation of Equivalent Water Quality Protection           

   

 

 

GeologicPedestrianSurvey

 

   

Page 17: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

ENGINEERING SURVEYING ENVIRONMENTAL PUBL IC INVOLVEMENT

PAGE 1

5835 Callaghan Rd. Ste 200 San Antonio, TX 78228 Tel (210) 349-3273 Fax (210)349-4395 www.pozcam.com

April 30, 2020 Texas Commission on Environmental Quality 14250 Judson Road San Antonio, Texas 78233 Re: Babcock Road and UTSA Boulevard Water Pollution Abatement Plan (WPAP)

Exception – Geological Assessment (GA) To Whom it May Concern, Poznecki-Camarillo, Inc. (PCI) on behalf of the City of San Antonio (CoSA) is requesting a WPAP exception in support of bus stop and curb renovations located at the northwest corner of the intersection of Babcock Road and UTSA Boulevard. A licensed PCI geologist conducted a survey for geologic features at the site of the proposed renovations; this letter summarizes the survey findings and geologic setting at the site. Geologic Setting The entirety of the site is located within the Edwards Aquifer Recharge Zone (EARZ) and is underlain by Quaternary-age alluvial deposits (Qal) associated with Maverick Creek, which is located approximately 290 feet east of the site (Bureau of Economic Geology, 1992). The Qal unit consists of floodplain deposits of clay, silt, sand and gravel; these unconsolidated deposits are not associated with the formation of karst features. The site is also located within the Balcones fault zone trend, but no faults are mapped within site boundaries; the nearest fault to the site is a normal fault located approximately 1,275 feet to the southeast. Site Survey A pedestrian survey was conducted on April 27, 2020 by a licensed geologist, which documented no geologic features. The pedestrian survey was completed by walking parallel transects spaced approximately 10 feet apart, complying with the minimum 50 feet apart or smaller identified in the Instructions to Geologists for Geologic Assessments on the Edwards Aquifer Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is a constant possibility throughout the recharge zone. Only those karst features that exhibit some sort of surface expression were identified within the scope of this survey, which conforms to TCEQ’s Instructions to Geologists (document 0585). If a sensitive feature is encountered during construction activities, compliance with the Edwards Aquifer Rules (30 TAC 213.5) would be adhered to, including halting construction activities until TCEQ has reviewed and approved methods proposed to protect the feature and the Edwards Aquifer.

Page 18: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

ENGINEERING SURVEYING ENVIRONMENTAL PUBL IC INVOLVEMENT

PAGE 2

5835 Callaghan Rd. Ste 200 San Antonio, TX 78228 Tel (210) 349-3273 Fax (210)349-4395 www.pozcam.com

This letter is signed and sealed to signify that this work has been performed by or directly supervised by the following professional geologist who takes full responsibility for this work. April 30, 2020 Warren Brown, Texas Professional Geoscientist No. 11280

Page 19: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

 

 

 TCEQ‐0628 Recharge and Transition Zone Exception Request Form 

Attachment B – Documentation of Equivalent Water Quality Protection           

   

 

 

ConstructionDocuments

 

   

Page 20: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

PROJECT INFORMATIONPROJECT LENGTH: 648 FT. OR 0.12 MILES

1

DESCRIPTION

GENERAL SHEETS

INDEX OF SHEETS

SHEET NO.

TYPICAL SECTIONS

N

LOCATION MAP

TITLE & INDEX OF SHEET

PROJECT MAP

PROJECT LAYOUT

EPIC

STORM WATER POLLUTION PLAN (1 of 3)

STORM WATER POLLUTION PLAN (2 of 3)

SW3P STANDARDS

6

22

23

24

PROJECT CONTROL 4-5

ESTIMATED QUANTITIES & GENERAL NOTES 7

9-12TRAFFIC CONTROL PLAN

15-17

CONSTRUCTION STANDARDS 20

LOCATIONSPROJECT

8COSA GENERAL NOTES

STORM WATER POLLUTION PLAN (3 of 3) 25

COSA PROJECT NO.: 40-00447A(SIDEWALK AT UTSA AND BABCOCK RD)

(MEDIAN AT XIMENES AND BAUERLE)UTSA BOULEVARD

COSA BARRICADE & CONSTRUCTION STANDARDS 13

2-3

26

CONCRETE MEDIAN DETAIL 21

DEMOLITION PLAN 14

CITY OF SAN ANTONIO

N

AS T

E

C

ITY

RTATISE

BIL

BULA

ANUC

X

AO

S

O

NIO

TNA

F

18

19COSA SIGN DETAILS

SIGN REMOVAL LOCATIONS

27WPAP NOTES

PUBLIC WORKS DEPARTMENT

72755

RAUL H. GARCIA, JR.

PR

OF

ESSIONAL EN

GI

NE

ER

S

TATE OF TEX

A

S

ICENSEDL

06/09/2020

CITY OF SAN ANTONIO

Through innovation and dedication, we build and maintain San Antonio's infrastructure

PUBLIC WORKS DEPARTMENT

Page 21: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

N

0

05

3

UTS

A B

LV

D

(2 of 2)

BABCOCK ROAD

10 20

10

BABCOCK ROAD

UTS

A B

LV

D

N

005 10

052.5

EXISTING 4' SIDEWALK

01+29.90-29.19' LT

EXIST. CONC. CURBTIE INTO

PROPOSED CURB

ADA LANDING AREAPROPOSED 5'X8'

PROJECT MAPVIA BUS STOP

968.52 (TC)967.94 (G)01+64.03

-22.51' LT

968.57 (TC)967.99 (G)01+69.03

-22.53' LT

968.62ELEV. 968.67

ELEV.

CONC CURBPROP

01+29.90-29.19' LT

CONC. CURBEXIST.

TIE INTO

968.68ELEV.

01+64.01-32.65' LT 968.86

ELEV.01+82.01-33.02

968.52 (TC)967.94 (G)01+64.03

-22.51' LT

968.92ELEV.

968.86ELEV.

01+82.01-33.02

968.74ELEV.

968.68ELEV.

01+64.01-32.65' LT

968.13(G)01+82.03

-22.57' LTCONC. PADINTO EXIST.

TAPER CURB DOWN

2% MAX SLOPE

968.80ELEV.

968.67ELEV.

ELEV. 968.74-35.65' LT

STA 01+64.01ELEV. 968.92-36.02' LT

STA. 01+82.01

ELEV. 969.05STA 01+87.01

TIE INTO EXIST SW

4' SIDEWALKEXISTING

ELEV. 969.00STA 01+87.09

TIE INTO EXIST SW

ELEV. 968.69STA 01+59.09

TIE INTO EXIST SW

ELEV. 968.74STA 01+59.01

TIE INTO EXIST SW

PROP. SOD

PROP. SOD

968.13(G)01+82.03

-22.57' LTCONC. PADINTO EXIST.

TAPER CURB DOWN

PROPOSED RIPRAP

PROP. RIPRAP

BY VIATO BE REMOVED

EXIST. VIA BENCH

BY VIATO BE REMOVED

EXIST. VIA BENCH

407 W. RHAPSODY, SAN ANTONIO, TX., 78216

REGISTRATION NO. F-1802

(210)349-5253 (210)349-0715 WWW.GARCIAWRIGHT.COM

CITY OF SAN ANTONIO

DSGN. BY: RHG Jr CHKD. BY: RHG Jr

GARCIA & WRIGHT CONSULTING ENGINEERS,INC.

DATE: 10-15-19

DRWN. BY: ALT

ROADWAY MEDIAN PLACEMENTS

UTSA BLVD MEDIANS

PROJECT NO.: 40-00447A

SHT NO.: OF 27

100% SUBMITTAL

PUBLIC WORKS DEPARTMENT

1+00

2+00

3+00

3+24

1+25

1+50

1+75

2+25

2+50

2+75

GU

Y

PB

PB

PP

TS

P

TS

P

W

CONCRETE LANE

2+00

1+25

1+50

1+75

GU

Y

PB

PB

PP

TS

P

TS

P

72755

RAUL H. GARCIA, JR.

PR

OF

ESSIONAL EN

GI

NE

ER

S

TATE OF TEX

A

S

ICENSEDL

06/09/2020

1.7

5%

1.7

5%

PROPOSED IMPROVEMENTS

Page 22: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

GENERAL NOTES

TREE PROTECTION AND PRESERVATION GENERAL NOTES

ACCESSIBILITY REQUIREMENTS

13. THE CONTRACTOR SHALL NOT PLACE ANY WASTE MATERIAL IN THE 100-YEAR FLOOD PLAIN

1. ALL CONSTRUCTION SHALL CONFORM TO THE CITY OF SAN ANTONIO STANDARD SPECIFICATIONS

FOR CONSTRUCTION JUNE 2008, OR LATEST.

2. NO EXTRA PAYMENT SHALL BE ALLOWED FOR WORK CALLED FOR ON THE PLANS, BUT NOT

INCLUDED IN THE BID PROPOSAL. THIS INCIDENTAL WORK WILL BE REQUIRED AND SHALL BE

INCLUDED IN THE PAY ITEM TO WHICH IT RELATES.

3. THE CONTRACTOR SHALL PROVIDE ACCESS FOR THE DELIVERY OF MAIL BY THE U.S. POSTAL

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESTORING TO ITS ORIGINAL OR BETTER CONDITION

5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO SEE THAT ALL SIGNS AND BARRICADES ARE

SERVICE.

ANY DAMAGE DONE TO EXISTING FENCES, CONCRETE ISLANDS, STREET PAVING, CURBS, SHRUBS,

BUSHES OR DRIVEWAYS. (NO SEPARATE PAY ITEM).

PROPERLY INSTALLED AND MAINTAINED. ALL LOCATIONS AND DISTANCES WILL BE DECIDED

UPON IN THE FIELD BY THE CONTRACTOR, USING THE "TEXAS MANUAL ON UNIFORM TRAFFIC

CONTROL DEVICES". THE CITY'S CONSTRUCTION INSPECTOR AND TRAFFIC ENGINEERING

REPRESENTATIVE WILL ONLY BE RESPONSIBLE TO INSPECT BARRICADES AND SIGNS. IF,

IN THE OPINION OF THE TRAFFIC ENGINEERING REPRESENTATIVE AND THE CONSTRUCTION

INSPECTOR, THE BARRICADES AND SIGNS DO NOT CONFORM TO ESTABLISHED STANDARDS OR

ARE INCORRECTLY PLACED OR ARE INSUFFICIENT IN QUANTITY TO PROTECT THE GENERAL

PUBLIC, THE CONSTRUCTION INSPECTOR SHALL HAVE THE OPTION TO STOP OPERATIONS

UNTIL SUCH TIME AS THE CONDITIONS ARE CORRECTED.

BY THE TRAFFIC ENGINEERING REPRESENTATIVE AT THE CONTRACTOR'S EXPENSE.

6. IF THE NEED ARISES, ADDITIONAL BARRICADES AND DIRECTIONAL DEVICES MAY BE ORDERED

7. DUE TO FEDERAL REGULATIONS TITLE 49, PART 192.171 C.P.S. MUST MAINTAIN ACCESS TO

GAS VALVES AT ALL TIMES. THE CONTRACTOR MUST PROTECT AND WORK AROUND ANY GAS

VALVES THAT ARE IN THE PROJECT AREA.

8. CONTRACTOR SHALL NOTIFY THE CITY INSPECTOR TWENTY FOUR (24) HOURS PRIOR TO BACKFILL OF

DESTROYED OR REMOVED BY THE CONTRACTOR OR HIS EMPLOYEES, THEY SHALL BE

REPLACED AT THE CONTRACTOR'S EXPENSE.

9. CONTRACTOR SHALL PRESERVE ALL CONSTRUCTION STAKES, MARKS, ETC. IF ANY ARE

10. CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES PRIOR TO CONSTRUCTION TO DETERMINE

THE LOCATION OF EXISTING UTILITIES. CONTRACTOR SHALL NOTIFY THE FOLLOWING AT

LEAST FORTY-EIGHT (48) HOURS PRIOR TO EXCAVATION OPERATION:

- TIME WARNER

- AT&T

- MCI

COSA DRAINAGE 207-8048

TEXAS STATE WIDE ONE CALL LOCATOR 1-800-344-8377

BEXAR METROPOLITAN WATER DISTRICT (BEXAR MET) 354-6538 / 357-5741

COSA SIGNAL OPERATIONS 207-7720 / 207-7765

SAN ANTONIO WATER SYSTEM (SAWS) 233-2010

TAKEN FROM AVAILABLE RECORDS AND ARE NOT GUARANTEED, BUT SHALL BE INVESTIGATED

AND VERIFIED BY THE CONTRACTOR BEFORE STARTING WORK. THE CONTRACTOR SHALL BE

HELD RESPONSIBLE FOR ANY DAMAGE TO AND FOR THE MAINTENANCE AND PROTECTION OF

THE EXISTING UTILITIES EVEN IF THEY ARE NOT SHOWN ON THE PLANS. LOCATION AND

DEPTH OF EXISTING UTILITIES SHOWN HERE ARE APPROXIMATE ONLY. ACTUAL LOCATIONS

AND DEPTHS MUST BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION AND HE

SHALL BE RESPONSIBLE FOR PROTECTION OF SAME DURING CONSTRUCTION.

11. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITIES INDICATED ON THE PLANS ARE

12. ALL WASTE MATERIAL SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE HIS SOLE

ARTIFICIAL OR NATURAL DRAINAGE.

REPONSIBILITY TO DISPOSE OF THIS MATERIAL OFF THE LIMITS OF THE PROJECT. NO WASTE MATE-

RIAL SHALL BE PLACED IN EXISTING LOWS THAT WILL BLOCK OR ALTER FLOW LIMITS OF EXISTING

WITHOUT FIRST OBTAINING AN APPROVED FLOOD PLAIN DEVELOPMENT PERMIT.

14. THE CONTRACTOR SHALL MAINTAIN ALL ADJOINING STREETS AND TRAVELED ROUTES FREE FROM

SPILLED AND / OR TRACKED CONSTRUCTION MATERIALS AND / OR DEBRIS.

15. IF THE CONTRACTOR ENCOUNTERS ANY ARCHAEOLOGICAL DEPOSITS DURING CONSTRUCTION

OPERATIONS, THE CONTRACTOR MUST STOP EXCAVATION IMMEDIATELY, CONTACT THE CITY

WITHOUT WRITTEN PERMISSION FROM THE CITY.

INSPECTOR, AND CALL THE CITY HISTORIC PRESERVATION OFFICE AT 207-7306 OR 207-3327 FOR

AN ARCHAEOLOGICAL INVESTIGATION. THE CONTRACTOR CANNOT BEGIN EXCAVATION AGAIN

AND WEEKENDS) AND IF THE CONTRACTOR IS UNABLE TO WORK IN OTHER AREAS, THEN THE

CONTRACTOR WILL BE ALLOWED TO NEGOTIATE FOR ADDITIONAL CONSTRUCTION TIME UPON

WRITTEN REQUEST WITHIN TEN (10) DAYS AFTER THE FIRST NOTICE TO THE CITY OF

ARCHAEOLOGICAL INVESTIGATION FOR EACH EVENT.

IF MORE THAN THREE (3) DAYS ARE REQUIRED FOR INVESTIGATION (NOT INCLUDING HOLIDAY

IF THE TIME REQUIRED FOR INVESTIGATION IS LESS THAN OR EQUAL TO THREE (3) DAYS FOR

EACH EVENT, CONTRACT DURATION WILL NOT BE EXTENDED.

17. CONTRACTOR IS TO INCLUDE A MAILBOX POST BLOCKOUT FOR VACANT LOTS AND ALL

RESIDENCES WHICH DO NOT HAVE MAILBOXES AT THE CURB. BLOCKOUTS ARE PROVIDED

FOR FUTURE USE BY THE POST OFFICE.

1. NO UTILITY OR STREET EXCAVATION WORK SHALL BEGIN IN AREAS WHERE TREE PRESERVATION

AND TREATMENT MEASURES HAVE NOT BEEN COMPLETED AND APPROVED.

16. IF SUSPECTED CONTAMINATION IS ENCOUNTERED DURING CONSTRUCTION OPERATIONS, C.O.S.A.

SHALL BE NOTIFIED IMMEDIATELY WHEN CONTAMINATED SOILS AND / OR GROUNDWATER ARE

ENCOUNTERED AT LOCATIONS NOT IDENTIFIED IN THE PLANS. THE NOTIFICATION SHOULD

INCLUDE THE STATION NUMBER, TYPE OF CONTAMINATED MEDIA, EVIDENCE OF CONTAMINATION

AND MEASURES TAKEN TO CONTAIN THE CONTAMINATED MEDIA AND PREVENT PUBLIC ACCESS.

THE CONTAMINATED SOIL AND / OR GROUNDWATER SHALL NOT BE REMOVED FROM THE

LOCATION WITHOUT PRIOR C.O.S.A. APPROVAL.

INSPECTOR. THE CONTRACTOR CANNOT BEGIN EXCAVATION ACTIVITIES WITHOUT WRITTEN

PERMISSION FROM THE CITY.

THE CONTRACTOR MUST STOP THE EXCAVATION IMMEDIATELY AND CONTACT THE C.O.S.A.

2. TREE PROTECTION FENCING SHALL BE REQUIRED. TREE PROTECTION FENCING SHALL BE

INSTALLED, MAINTAINED AND REPAIRED BY THE CONTRACTOR DURING SITE CONSTRUCTION.

DURING CONSTRUCTION ACTIVITY, AT LEAST A SIX-INCH LAYER OF COARSE MULCH SHALL BE

PLACED AND MAINTAINED OVER THE ROOT PROTECTION ZONE (NO SEPARATE PAY ITEM).

3. THE CONTRACTOR SHALL AVOID CUTTING ROOTS LARGER THAN ONE INCH IN DIAMETER WHEN

EXCAVATING NEAR EXISTING TREES. EXCAVATION IN THE VICINITY OF TREES SHALL PROCEED

WITH CAUTION. THE CONTRACTOR SHALL CONTACT THE CITY INSPECTOR FOR GUIDANCE.

COVERING WITH SOIL, MULCH, OR WET BURLAP.

6. EXPOSED ROOTS SHALL BE COVERED AT THE END OF THE DAY USING TECHNIQUES SUCH AS

ROAD CONSTRUCTION EQUIPMENT.

4. ROOTS WILL BE CUT WITH A ROCK SAW OR BY HAND, NOT BY AN EXCAVATOR OR OTHER

5. ALL CURB AND SIDEWALK WORK SHALL USE ALTERNATIVE CONSTRUCTION METHODS TO

MINIMIZE EXTENSIVE ROOT DAMAGE TO TREES (REFER TO DETAILS).

8. SAPLINGS, SHRUBS OR BUSHES TO BE CLEARED FROM THE PROTECTED ROOT ZONE AREA

OF A LARGE TREE SHALL BE REMOVED BY HAND AS DESIGNATED BY THE INSPECTOR.

7. NO EQUIPMENT, VEHICLES OR MATERIALS SHALL OPERATE OR BE STORED WITHIN THE ROOT

10 FOOT RADIUS ROOT PROTECTION ZONE AROUND THE TREE. ROOTS OR BRANCHES IN

CONFLICT WITH THE CONSTRUCTION SHALL BE CUT CLEANLY ACCORDING TO PROPER

OAK WILT.

PRUNING METHODS. OAK WOUNDS SHALL BE PAINTED OVER WITHIN 30 MINUTES TO PREVENT

OF RADIUS PER INCH OF TREE'S DIAMETER. A 10-INCH DIAMETER TREE WOULD HAVE A

9. NO WIRES, NAILS OR OTHER MATERIAL MAY BE ATTACHED TO PROTECTED TREES.

PROTECTION ZONE OF ANY TREE NEAR THE PROJECT. ROOT PROTECTION ZONE IS 1 FOOT

10. TREES, TREE LIMBS, BUSHES AND SHRUBS LOCATED IN THE CITY STREET OR ALLEY

RIGHT-OF-WAY OR PERMANENT EASEMENTS WHICH INTERFERE WITH PROPOSED

CONSTRUCTION ACTIVITIES SHALL BE PROPERLY PRUNED FOLLOWING THE ANSI A-300

AFTER APPROVAL FROM THE CAPITAL PROJECTS MANAGEMENT THROUGH THE INSPECTOR.

STANDARDS FOR PRUNING. ALL TREE PRUNING SHALL BE COMPLETED BY A CITY OF SAN

ANTONIO TREE MAINTENANCE LICENSED CONTRACTOR (ARTICLE 21-171, CITY CODE) ONLY

11. NO EXCESSIVE TREE TRIMMING WILL BE PERMITTED.

SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF PROPERLY

12. ALL DEBRIS GENERATED BY THE PRUNING AND TRIMMING OF THE TREES AND / OR BUSHES

(NO SEPARATE PAY ITEM).

13. TREES MUST BE MAINTAINED IN GOOD HEALTH THROUGHOUT THE CONSTRUCTION PROCESS.

MAINTENANCE MAY INCLUDE, BUT NOT LIMITED TO: WATERING THE ROOT PROTECTION ZONE,

WASHING FOLIAGE, FERTILIZATION, PRUNING, ADDITIONAL MULCH APPLICATIONS AND OTHER

MAINTENANCE AS NEEDED ON THE PROJECT.

14. ANY TREE REMOVAL SHALL BE APPROVED BY THE CITY ARBORIST. (207-0278)

15. TREES WHICH ARE DAMAGED OR LOST DUE TO THE CONTRACTOR'S NEGLIGENCE DURING

CONSTRUCTION SHALL BE MITIGATED TO THE CITY'S SATISFACTION.

16. TREE PLANTING FOR MITIGATION OR ENHANCEMENT: ALL PLANTED TREES SHALL BE

MAINTAINED IN A HEALTHY CONDITION AT ALL TIMES. THIS INCLUDES IRRIGATION, FERTILIZING,

PRUNING AND OTHER MAINTENANCE AS NEEDED ON THE PROJECT. TREES THAT DIE WITHIN

TWELVE (12) MONTHS SHALL BE REPLACED WITH A TREE OF EQUAL SIZE AND SPECIES.

DRIVEWAY SHALL REMAIN OPEN WHILE THE OTHER NEW DRIVEWAY APPROACHES

2. WHEN THE WORK REQUIRES THE EXCAVATION OF THE STREET AND THE

3. PRIOR TO INITIATING THE CONSTRUCTION OF NEW DRIVEWAY APPROACHES,

REMOVAL OF THE EXISTING DRIVEWAY APPROACHES AND SIDEWALKS,

THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TEMPORARY

BASE OR GRAVEL MATERIAL AT NO SEPARATE COST TO THE CITY.

THE CONTRACTOR SHALL GIVE ADVANCE WARNING IN PERSON, OR IN

BY THE RESIDENTS.

ARE CONSTRUCTED. FOR BUSINESSES WITH ONLY ONE DRIVEWAY, THE NEW

DRIVEWAY APPROACH SHALL BE CONSTRUCTED IN HALF WIDTHS, UNLESS A

TEMPORARY ASPHALT DRIVEWAY IS FIRST INSTALLED AT NO SEPARATE COST

TO THE CITY.

PEDESTRIAN ACCESS AT ALL TIMES TO LOCAL RESIDENCES AND BUSINESSES.

1. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN VEHICULAR AND

ALL-WEATHER ACCESS TO THE BUSINESSES AND RESIDENCES. THE

TEMPORARY DRIVEWAY APPROACHES SHALL BE CONSTRUCTED WITH FLEXIBLE

WRITING, OF AT LEAST 48 HOURS TO EACH RESIDENCE THAT WILL BE

IMMEDIATELY AFFECTED, SO THAT ALTERNATE PLANS MAY BE MADE

4. FOR BUSINESSES WITH MORE THAN ONE DRIVEWAY, AT LEAST ONE

- CITY PUBLIC SERVICE ENERGY

ANY UTILITY TRENCHES TO SCHEDULE FOR DENSITY TEST AS REQUIRED.

BE RESPONSIBLE FOR PROTECTING VIA FACILITIES IF ADJACENT TO WORK AREA.

OF EXECUTING THE CONTRACT UNLESS OTHERWISE NOTED BY VIA. THE CONTRACTOR WILL

TRACTOR IS REQUIRED TO REPLACE ALL FLATWORK REMOVED OR DAMAGED IN THE COURSE

OR WILL BE LIABLE FOR ANY DAMAGES TO VIA FACILITIES NOT REMOVED BY VIA. THE CON-

FOR SHELTER REMOVAL (TELEPHONE NOS: (210) 362-2155 OR (210) 362-2096). THE CONTRACT-

OTHER VIA FACILITIES THAT MAY BE PRESENT. PLEASE PROVIDE THIRTY DAYS PRIOR NOTICE

CONTACT VIA FOURTEEN DAYS PRIOR, FOR THE REMOVAL OF BENCHES, STOP POLES OR ANY

18. CONTRACTOR SHALL NOT REMOVE OR ADJUST ANY VIA FACILITIES. THE CONTRACTOR MUST

CITY OF SAN ANTONIO

GENERAL NOTESCITY OF SAN ANTONIO

EXCESS SOIL DISPOSAL GENERAL NOTES:

TO THE FOLLOWING REQUIREMENTS:

AND COMMUNICATION PLAN. CONTRACTOR SHALL ADHERE

CAPITAL IMPROVEMENTS' SOIL RELOCATION POLICY

SOILS IN ACCORDANCE WITH TRANSPORTATION

CITY TO MANAGE AND DOCUMENT THE DISPOSAL OF

HEREIN ARE SOLEY DUE TO A DESIRE BY THE

SITE LOCATION, ETC. THE CONDITIONS SET FORTH

APPRAISAL INFORMATION, FLOODPLAIN MAP SHOWING

MAP LOCaTION, PHYSICAL ADDRESS, BEXAR COUNTY

EXCESS FILL MATERIAL. SUBMITTAL INCLUDES A SITE

COMMENCMENT OF HAULING OFF ANY EXCAVED AND/OR

DISPOSAL SITE TO THE CITY 14 DAYS PRIOR TO

1. CONTRACTOR SHALL PROVIDE A SUBMITTAL REGARDING

PROVIDED BY THE CITY'S ENGINEER OR HIS/HER DESIGNEE.

HAULING TO THIS NEW SITE UNTIL WRITTEN APPROVAL IS

HAULING ACTIVITIES. CONTRACTOR SHALL NOT BEGIN

UTILIZING THE ADDITIONAL LOCATION AND PRIOR TO

ENGINEER A MINIMUM OF 14 DAYS IN ADVANCE OF

LOCATION AND PROVIDE WRITTEN DOCUMENTATION TO CITY'S

TO NOTIFY CITY IN WRITING OF ITS NEW DISPOSAL

DISPOSAL LOCATION IS NEEDED, CONTRACTOR IS REQUIRED

DISPOSAL LOCATION TO THE CITY AND AN ADDITIONAL

G. IN THE EVENT CONTRACTOR ONLY PROVIDES ONE

DESIGNEE PROVIDES WRITTEN AUTHORIZATION.

DISPOSAL SITES UNTIL CITY ENGINEER OR HIS/HER

OF EXCAVATED OR EXCESS SOILS TO THE DESIGNATED

F. CONTRACTOR SHALL NOT BEGIN HAULING ACTIVITIES

THIS DOCUMENTATION.

SITE. THE CITY RESERVES THE RIGHT TO REQUEST

ETC FOR ALL TRANSPORTED SOIL TO EACH APPROVED

SUCH AS TRIP TICKETS, BILL OF LADING RECEIPTS,

TRACKING EXCESS SOIL LOADS THROUGH DOCUMENTATION

AREAS. CONTRACTOR SHALL BE RESPONSIBLE FOR

EXCESS SOIL DISPOSAL TO APPROVED DESIGNATED

E. CONTRACTOR SHALL BE RESPONSIBLE FOR TRACKING

REQUIREMENTS, AS APPLICABLE.

TEXAS POLLUTANT DISCHARGE ELIMINATION SYSTEM (TPDES)

PLAN IS DEVELOPED AND IMPLEMENTED IN ACCORDANCE WITH

ENSURE AN APPROPRIATE STORM WATER POLLUTION PREVENTION

TRANSPORTATION, AS APPLICABLE. CONTRACTOR SHALL

IMPLEMENTATION OF THE REUSE PLAN PRIOR TO SOIL

AGENCIES REQUIREMENTS FOR PROPER AND LEGAL

D. CONTRACTOR AGREES TO COMPLY WITH OTHER REGULATORY

AND THE CONTRACTOR.

COPY OF THE AGREEMENT BETWEEN THE LANDOWNER

CITY. THE CITY RESERVES THE RIGHT TO REQUEST A

CONTRACTOR'S FINAL PAYMENT AS DETERMINED BY THE

CONSIDERED AND MAY BE DEDUCTED FROM THE

INCURS LEGITIMATE LANDOWNER CONCERNS WILL BE

PRIOR TO PLACEMENT, AND THAT ANY COSTS THE CITY

OBTAIN WRITTEN APPROVAL FROM THE LANDOWNER(S)

SITE(S). IT IS THE CONTRACTORS RESPONSIBILITY TO

RESTORATION AND EROSION CONTROL MEASURES OF THE

INCLUDING THOSE RELATED TO PLACEMENT, COMPACTION,

WRITTEN CONDITIONS IN LANDOWNER AGREEMENTS

C. CONTRACTOR AGREES TO ABIDE BY THE LANDOWNERS

ISSUE AREA.

FLOODPLAIN AND KNOWN SUPERFUND OR ENVIRONMENTAL

DISPOSAL AREAS ARE WITHIN OR ADJACENT TO THE

B. CONTRACTOR SHALL VERIFY AND CONFIRM THAT NO

DISPOSAL SITE DOES NOT EXCEED THREE (3) SITES.

A. CONTRACTOR MUST ASSURE THAT THE NUMBER OF SOIL

100% SUBMITTAL

CHKD. BY:______DRWN. BY:___ DSGN. BY:___ SHEET NO.:08 OF 27

DATE:01/21/2020PROJECT NO.:40-00447A

PUBLIC WORKS DEPARTMENT

Page 23: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

N

0 10

052.5

05

LEGEND

GM

MB

SS

PP

TPW

G

W

SS

EJ

FHIP

LP

MON

SH

T

MB

WATER METER

GAS METER

STREET SIGN

WATER VALVE

GAS VALVE

POWER POLE

SANITARY SEWER MANHOLE

TELEPHONE PEDESTAL

ELECTRIC JUNCTION BOX

FIRE HYDRANT

GUY WIRE

LIGHT POLE

TELEPHONE MANHOLE

IRON PIN

MONUMENT

SPRINKLER HEAD

MAIL BOX

MASONARY MAIL BOX

& REPLACED ACCORDING TO NOTESTO BE DEMOLISHED OR REMOVEDALL ITEMS HIGHLETED RED ARE

UTSA BLVD

BA

BC

OC

K R

D

14

EXIS

TIN

G

SID

EW

AL

K

-28.63' LTSTA. 01+59.09

BEGIN CURB DEMO

-29.19' LTSTA. 01+87.09

END SIDEWALK DEMO

TOP OF BASEASPHALT PAVEMENT TOSAW CUT AND REMOVE EXIST.

BY VIATO BE RELOCATEDEXISTING VIA SIGN

DEMOLITION PLAN

407 W. RHAPSODY, SAN ANTONIO, TX., 78216

REGISTRATION NO. F-1802

(210)349-5253 (210)349-0715 WWW.GARCIAWRIGHT.COM

CITY OF SAN ANTONIO

DSGN. BY: RHG Jr CHKD. BY: RHG Jr

GARCIA & WRIGHT CONSULTING ENGINEERS,INC.

DATE: 10-15-19

DRWN. BY: ALT

ROADWAY MEDIAN PLACEMENTS

UTSA BLVD MEDIANS

PROJECT NO.: 40-00447A

SHT NO.: OF 27

100% SUBMITTAL

PUBLIC WORKS DEPARTMENT

BM

CP

GUY

PB

PB

PP

TSP

TSP1+25

1+50

1+75

GUY

PB

PB

PP

TSP

TSP

72755

RAUL H. GARCIA, JR.

PR

OF

ESSIONAL EN

GI

NE

ER

S

TATE OF TEX

A

S

ICENSEDL

06/09/2020

Page 24: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

N

0 10

05

05A

METER TO GRADEADJUST EXISTING WATER

SANITARY SEWER MANHOLE

WATER METER

GAS METER

MAIL BOX

MASONARY MAIL BOX

STREET SIGN

FIRE HYDRANT

WATER VALVE

GAS VALVE

TELEPHONE MANHOLE

TELEPHONE PEDESTAL

POWER POLE

ELECTRIC JUNCTION BOX

GUY WIRE

LIGHT POLE

IRON PIN

MONUMENT

SPRINKLER HEAD

CHAIN LINK FENCE

GUARD RAIL

BARB WIRE FENCE

WOODEN FENCE

EDGE OF ASPHALT

EDGE OF GRAVEL

EDGE OF CONCRETE

GM

MB

SS

PP

TP

W

G

W

EJ

FH

IP

LP

MON

SH

T

MB

SS

TRAFFIC FLOW

17

UTS

A B

LV

D

BABCOCK ROAD

VIA STOP PLANVIEWPROPOSED CURB &

(3 OF 3)

VIA BENCHEXISTING

EXISTING CONCRETE LANE

PROP. VIA PAD

-29.23' LTSTA. 01+29.45

CONC. CURBTIE INTO EXIST

-23.26' LTSTA. 01+64.03

BEGIN CONC. PAD

-23.28' LTSTA. 01+69.03

END CONC. PAD

-33.02' LTSTA. 01+82.03

END CONC. PAD

-32.65' LTSTA. 01+64.01

BEGIN CONC. PAD

2.5

ADA PADPROP. 5'X8'

(74 SQ. FT.)INTO EXISTING ELEVATIONS

WITH TOPSOIL AND SOD TO TIECONTRACTOR TO FILL IN AREA

ELEV. 969.05STA. 01+87.01

TIE INTO EXIST SIDEWALK

ELEV. 969.00STA. 01+87.09

TIE INTO EXIST SIDEWALK

DOWN AT END45 DEGREE TAPER

-22.57' LTSTA. 01+82.03

END CONC. CURB

(137 SQ. FT.)INTO EXISTING ELEVATIONS

WITH TOPSOIL AND SOD TO TIECONTRACTOR TO FILL IN AREA

PROP. CONC. CURB

ELEV. 968.69STA. 01+59.09

TIE INTO EXIST SIDEWALK

ELEV. 968.74STA. 01+59.01

TIE INTO EXIST SIDEWALK

EXISTING 4' SIDEWALK

4'

4'

18'

3'

4. EXISTING VIA SIGN TO BE REMOVED BY VIA.

#4 BARS AT 12" IN CENTER

3. CONTRACTOR TO CONSTRUCT CONCRETE CURB WITH

CONSTRUCTION

2. CONTRACTOR TO PROTECT EXISTING TREES DURING

THE PROJECT ENGINEER AND COSA STAFF.

ACCORDANCE WITH COSA STANDARDS AND AS DIRECTED BY

1. THE CONTRACTOR SHALL INSTALL SW3P MEASURES IN

NOTE:

ON TOP OF EXISTING ASPHALTWITH 2" CONCRETE EMBANKMENT

PROP. 5" RIPRAP

407 W. RHAPSODY, SAN ANTONIO, TX., 78216

REGISTRATION NO. F-1802

(210)349-5253 (210)349-0715 WWW.GARCIAWRIGHT.COM

CITY OF SAN ANTONIO

DSGN. BY: RHG Jr CHKD. BY: RHG Jr

GARCIA & WRIGHT CONSULTING ENGINEERS,INC.

DATE: 10-15-19

DRWN. BY: ALT

ROADWAY MEDIAN PLACEMENTS

UTSA BLVD MEDIANS

PROJECT NO.: 40-00447A

SHT NO.: OF 27

100% SUBMITTAL

PUBLIC WORKS DEPARTMENT

GU

Y

PB

PB

PP

TS

P

TS

P

W

PROPOSED VIA PAD

ADA PADPROP

PROP. CONC. CURB

PROPOSED IMPROVEMENTS

LEGEND

1+00

2+00

1+25

1+50

1+75

2+25

GU

Y

PB

PB

PP

TS

P

TS

P

72755

RAUL H. GARCIA, JR.

PR

OF

ESSIONAL EN

GI

NE

ER

S

TATE OF TEX

A

S

ICENSEDL

06/09/2020

Page 25: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

Texas Department of Transportation

C TxDOT

of this standard to other for

mats or for incorrect results or da

mages resulting fro

m its use.

kind is

made by

Tx

DO

T for any purpose

whatsoever.

Tx

DO

T assu

mes no responsibility for the conversion

The use of this standard is governed by the "

Texas

Engineering

Practice

Act".

No

warranty of any

DI

SC

LAI

ME

R:

TxDOT

I. STORMWATER POLLUTION PREVENTION-CLEAN WATER ACT SECTION 402

Nationwide Permit 14 - PCN Required

No (No further action required)

ACT SECTIONS 401 AND 404

II. WORK IN OR NEAR STREAMS, WATERBODIES AND WETLANDS CLEAN WATER

Nationwide Permit (NWP) 14 - Pre-construction Notice (PCN) not Required

sedimentation and post-project total suspended solids (TSS).

and check Best Management Practices (BMPs) planned to control erosion,

Required Actions: List waters of the US permit applies to, location in project

1.following requirements:

Schedule construction activities as needed to meet theMIGRATORY BIRD NESTS:

2.

BWTxDOT

the following permit(s):

The Contractor shall adhere to all of the terms and conditions associated with

401 Best Management Practices: (Not applicable if no USACE permit)

GAG

4. NOI required: Yes No

Note: If amount of soil disturbance changes, permit requirements may change.

epic 2015-10-09 SAT.dgn

such as, rivers, creeks, streams, or wetlands.

excavating or other work in any potential USACE jurisdictional water,

US Army Corps of Engineers (USACE) Permit required for filling, dredging,

Sedimentation Chambers

erosion and sedimentation in accordance with Item 540.

or more acres distrubed soil. Projects with any disturbed soil must protect for

Discharge Permit or Construction General Permit (CGP) required for projects with 1

Texas Pollutant Discharge Elimination System (TPDES) TXR 150000: Stormwater

Grassy Swales

beneficial landscaping, and tree/brush removal commitments.

730, 751, 752 in order to comply with requirements for invasive species,

to Construction Specification Requirements Specs 162,164, 192, 193, 506,

Preserve native vegetation to the extent practical. Contractor must adhere

Does the project involve the demolition of a span bridge?

provided with personal protective equipment appropiate for any hazardous materials used.

making workers aware of potential hazards in the workplace. Ensure that all workers are

hazardous materials by conducting safety meetings prior to beginning construction and

Comply with the Hazard Communication Act (the Act) for personnel who will be working with

OCTOBER 2015

DN: CK: DW: CK:FILE:

JOBSECT

DIST

REVISIONS

HIGHWAY

SHEET NO.

CONT

EPIC

ENVIRONMENTAL PERMITS,

ISSUES AND COMMITMENTS

1.

2.

3.

4.

Temporary Vegetation

Blankets/Matting

Mulch

Sodding

Interceptor Swale

Diversion Dike

Erosion Control Compost

Mulch Filter Berm and Socks

Compost Filter Berm and Socks

Erosion Control Compost

Mulch Filter Berm and Socks

Compost Filter Berm and Socks

Silt Fence

Rock Berm

Triangular Filter Dike

Sand Bag Berm

Straw Bale Dike

Brush Berms

Stone Outlet Sediment Traps

Sediment Basins

Vegetative Filter Strips

Retention/Irrigation Systems

Extended Detention Basin

Constructed Wetlands

Wet Basin

Erosion Control Compost

Mulch Filter Berm and Socks

Compost Filter Berm and Socks

Vegetation Lined Ditches

Sand Filter Systems

Action No.

No Action Required Required Action

III. CULTURAL RESOURCES

No Permit Required

Individual 404 Permit Required

Other Nationwide Permit Required: NWP#

Erosion Sedimentation Post-Construction TSS

VI. HAZARDOUS MATERIALS OR CONTAMINATION ISSUES

General (applies to all projects):

AND MIGRATORY BIRDS.

CRITICAL HABITAT, STATE LISTED SPECIES, CANDIDATE SPECIES

V. FEDERAL LISTED, PROPOSED THREATENED, ENDANGERED SPECIES,

No Action Required Required Action

Action No.

3.

4.

IV. VEGETATION RESOURCES

No Action Required Required Action

Action No.

No Action Required Required Action

Action No.

1.

2.

3.

4.

products which may be hazardous. Maintain product labelling as required by the Act.

compounds or additives. Provide protected storage, off bare ground and covered, for

Paints, acids, solvents, asphalt products, chemical additives, fuels and concrete curing

used on the project, which may include, but are not limited to the following categories:

Obtain and keep on-site Material Safety Data Sheets (MSDS) for all hazardous products

(includes regional issues such as Edwards Aquifer District, etc.)

Action No.

1.

No Action Required Required Action

VII. OTHER ENVIRONMENTAL ISSUES

Yes

Archeologist (210-207-5421) notified and/or the SHPO.

activities should be immediately stopped in the vicinity and the City

unidentified archeological site is encountered during construction work,

National Historic Preservation Act, as amended in 1966. If a previously

Cultural resources fall under the Antiquities Code of Texas and/or the

project, if required.

1. Ensure that a tree permit is in place for this

Arborist at 207-0278, before any work begins.

questions or concerns, please contact the City

provided in the design plan set. If there are any

2. Follow the tree preservation/mitigation plan

or before February 15.

Deterrent material should be placed (and maintained) after October 1

operations outside of the preferred nesting season.

through October 1. When practicable, schedule construction

The preferred nesting season for migratory birds is from February 15

COSA Inspector immediately.

are discovered, cease work in the immediated area, and contact the

nesting season of the birds associated with the nests. If caves or sinkholes

The work may not remove active nests from bridges and other structures during

do not disturb species or habitat and contact the COSA Inspector immediately.

If any of the listed species are observed, cease work in the immediate area,

of all product spills.

The Contractor shall be responsible for the proper containment and cleanup

in accordance with safe work practices, and contact the COSA Inspector immediately.

In the event of a spill, take actions to mitigate the spill as indicated in the MSDS,

Maintain an adequate supply of on-site spill response materials, as indicated in the MSDS.

Contact the COSA Inspector if any of the follwing are detected:

* Evidence of leaching or seepage of substances

* Undesirable smells or odors

* Trash piles, drums, canister, barrels, etc.

* Dead or distressed vegetation (not identified as normal)

with the notification.

calendar days prior to the demolition of the bridges(s) on the project to assist

of State Health Services. The contractor shall contact the Project Engineer 25

If "Yes", a pre- demolition notification must be submitted to the Texas Department

approval has been received.

feature will not be allowed to proceed until USFWS

and work within the immediate vicinity of the sensitive

the void space, consultations with the USFWS will commence

that endangered species or their habitat is present within

habitat or listed endangered species. If it is determined

permitted biologist has assessed the site for evidence of

not proceed until a US Fish and Wildlife Service (USFWS)

The construction activities near the sensitive feature may

of any sensitive features encountered during construction.

The Construction Inspector shall be immediately notified

near the sensitive feature must be suspended immediately.

discovered during construction, all construction activities

If any sensitive feature (caves, subsurface voids, etc) is

any active nests, they shall not be removed until the nests become inactive.

containing eggs and/or flightless birds) at any time of year. If there are

A. Do not remove or destroy any active migratory bird nests (nests

the structures to prevent future nest building.

and/or before nest activity begins, deterrent materials may be applied to

removed until all nests become inactive. After inactive nests are removed

B. On/in structures, if there are any active nests, they shall not be

PROJ. NO.

22 OF 2740-00447A

the COSA Inspector.

acres or more, Contractor shall submit Notice of Intent (NOI) to TCEQ and

When contractor specific locations (PSL's) increase disturbed soil are to 53.

inspector [see Ordinance No. 2014-06-19-0472, Sec. 34-805 (q)]

SW3P inspections shall be conducted by a P.E. or a certified stormwater2.

SAWS and the Engineer.

1 acre or more, Contractor shall submit Construction Site Notices (CSN) to

When Contractor project specific locations increase disturbed soil area to1.

Action No.

1.

2.

No Action Required Required Action

Hazardous Materials or Contamination Issues Specific to this Project:

2.

sidewalk work.

Contractor to refer to the WPAP notes for the UTSA/Babcock

72755

RAUL H. GARCIA, JR.

PR

OF

ESSIONAL EN

GI

NE

ER

S

TATE OF TEX

A

S

ICENSEDL

06/09/2020

November 2019(Edward Ximenes & Bauerle)

UTSA MEDIANS

Page 26: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

FLOW DIRECTION

S.W.P.P.P. GENERAL NOTES

LEGEND

PREVENTION PLANSTORM WATER POLLUTION

N

0 10

05

05

25

UTSA BLVD

(3 OF 3)

BA

BC

OC

K R

OA

D

18.0 LF. TOTAL

GRAVEL FILTER BAGS

VEHICULAR TRAFFIC THROUGH AND ACROSS THE CONSTRUCTION SITE.

TO REMOVE SEDIMENT WHICH HAS ACCUMULATED ON THE ROADWAY DUE TO STORM WATER FLOWS AND

3. THE CONTRACTOR SHALL CLEAN PAVED SURFACES (ADJACENT TO THE CONSTRUCTION AREAS) AS NECESSARY

CAPACITY.

AS SOON AS PRACTICABLE. REMOVE SILT, CLEAN AND REPLACE CONTROL MEASURES AT 50% OF THEIR DESIGN

DETERMINE THE CONDITION OF THE CONTROL MEASURES. SEDIMENT WILL BE REMOVED AND DEVICES REPAIRED

2. THE CONTRACTOR AND INSPECTOR WILL CONDUCT REGULAR INSPECTIONS OF THE ENTIRE PROJECT TO

CONSTRUCTION PERIODS.

TO ASSURE EFFECTIVE AND CONTINUOUS WATER POLLUTION CONTROL DURING CONSTRUCTION AND POST

SHALL BE INSTALLED AND MAINTAINED THROUGHOUT THE CONSTRUCTION CONTRACT

PROJECTS WITH GROUND DISTURBANCE OF LESS THAN 1 ACRE. THE CONTROL MEASURES CONTAINED HEREON

AND ITEM 540. COVERAGE UNDER TPDES GENERAL CONSTRUCTION PERMIT TXR150000 DOES NOT APPLY TO

DISTURBED SOIL MUST PROTECT FOR EROSION AND SEDIMENTATION IN ACCORDANCE WITH COSA ORDINANCE

1. THE AREA OF GROUND DISTURBANCE FOR THE PROJECT IS LESS THAN 1 ACRE. PROJECTS WITH ANY

6. SUBMITTAL OF A NOI AND CONSTRUCTION SITE NOTICE WILL NOT BE REQUIRED.

PROPERLY.

INSTALLATION, THE PERMANENT EROSION CONTROL MEASURES MUST CORRECT OR REDESIGN TO FUNCTION

CITY. IN THE EVENT THAT THE PERMANENT EROSION CONTROL IS INADEQUATE DUE TO IMPROPER DESIGN OR

A FINAL EROSION CONTROL INSPECTION WILL BE PERFORMED AS PART OF ACCEPTANCE OF THE PROJECT BY THE

5. UPON COMPLETION OF CONSTRUCTION AND THE INSTALLATION OF PERMANENT EROSION CONTROL METHODS,

CONTRACTOR.

(INCLUDING ENGINEERING) COSTS WILL BE DEDUCTED FROM ANY MONEYS DUE TO OR TO BECOME DUE TO THE

OUTSIDE ASSISTANCE OR USE CITY FORCES TO PROVIDE THE NECESSARY CORRECTIVE MEASURES. ALL COSTS

AND WATER POLLUTION WHICH MAY DEGRADE RECEIVING WATERS, THE ENGINEER RESERVES THE RIGHT TO EMPLOY

4. IN CASE OF FAILURE ON THE PART OF THE CONTRACTOR TO PREVENT AND CONTROL SOIL EROSION, SEDIMENTATION

2.5

(10 LF)GRAVEL FILTER BAGS

(8 LF)GRAVEL FILTER BAGS

407 W. RHAPSODY, SAN ANTONIO, TX., 78216

REGISTRATION NO. F-1802

(210)349-5253 (210)349-0715 WWW.GARCIAWRIGHT.COM

CITY OF SAN ANTONIO

DSGN. BY: RHG Jr CHKD. BY: RHG Jr

GARCIA & WRIGHT CONSULTING ENGINEERS,INC.

DATE: 10-15-19

DRWN. BY: ALT

ROADWAY MEDIAN PLACEMENTS

UTSA BLVD MEDIANS

PROJECT NO.: 40-00447A

SHT NO.: OF 27

100% SUBMITTAL

PUBLIC WORKS DEPARTMENT

GUY

PB

PB

PP

TSP

TSP

W

PROPOSED IMPROVEMENTS

1+00

2+00

1+25

1+50

1+75

2+25

GUY

PB

PB

PP

TSP

TSP

GUY

PB

PB

PP

TSP

TSP

969

969

72755

RAUL H. GARCIA, JR.

PR

OF

ESSIONAL EN

GI

NE

ER

S

TATE OF TEX

A

S

ICENSEDL

06/09/2020

Page 27: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

GENERAL NOTES

2. THE COARSE AGGREGATE SHOULD BE OPEN GRADED WITH A SIZE OF 4" TO 8". GENERAL NOTES

GENERAL NOTES

GENERAL NOTES

SEDIMENT CONTROL FENCE USAGE GUIDELINES

STABILIZED

DRIVEWAY

R.O.W. LINE

PAVED ROADWAY

SEE NOTE 2

SCALE : 1" = 20'

16 PENNY NAILS @ 1' ON CENTERS

SCALE : 1" = 2'

DISTURBED SOIL

FLOW

FLOW

2"

90o

SCALE : 1" = 2'

2"

90o

6"

FLOW

SCALE : 1" = 2'

SCALE : 1" = 6'

SCALE : 1" = 6'

50' MINIMUM

14'

MI

NI

MU

M

COARSE AGGREGATE

4' MINIMUM50' MINIMUM

4' MINIMUM

6 : 1 MAXIMUM6 : 1 MAXIMUM

8"

MI

NI

MU

M

RU

NO

FF

SCALE : 1" = 5'

SCALE : 1" = 5'

2' MAX.

VARIES WITH INLET LENGTH

SCALE : 1" = 5'SCALE : 1" = 5'

RUNOFF

OVERFLOW

PAVEMENT

FILTERED RUNOFF

50' MINIMUM

10" MINIMUM

10" MINIMUM

14'

MI

NI

MU

M

SCALE : 1" = 6'

4' MINIMUM50' MINIMUM

4' MINIMUM

6 : 1 MAXIMUM 6 : 1 MAXIMUM

SCALE : 1" = 6' PLANS, BUT NOT LESS THAN 50'.

1. THE LENGTH OF THE TYPE 1 CONSTRUCTION EXIT SHALL BE AS INDICATED ON THE

AS DIRECTED BY THE ENGINEER.

3. THE APPROACH TRANSITIONS SHOULD BE NO STEEPER THAN 6 : 1 AND CONSTRUCTED

ENGINEER.

CONCRETE, PORTLAND CEMENT CONCRETE OR OTHER MATERIAL AS APPROVED BY THE

4. THE CONSTRUCTION EXIT FOUNDATION COURSE SHALL BE FLEXIBLE BASE, BITUMINOUS

TRAPPING DEVICE.

5. THE CONSTRUCTION EXIT SHALL BE GRADED TO ALLOW DRAINAGE TO A SEDIMENT

BY THE ENGINEER.

6. THE GUIDELINES SHOWN HEREON ARE SUGGESTIONS ONLY AND MAY BE MODIFIED

PLANS, BUT NOT LESS THAN 50'.

1. THE LENGTH OF THE TYPE 2 CONSTRUCTION EXIT SHALL BE AS INDICATED ON THE

ENGINEER.

1 / 2" x 6" MIN. LAG BOLTS. OTHER FASTENERS MAY BE USED AS APPROVED BY THE

2. THE TREATED TIMBER PLANKS SHALL BE ATTACHED TO THE RAILROAD TIES WITH

LARGE AND LOOSE KNOTS.

3. THE TREATED TIMBER PLANKS SHALL BE #2 GRADE MIN., AND SHOULD BE FREE FROM

AS DIRECTED BY THE ENGINEER.

4. THE APPROACH TRANSITIONS SHOULD BE NO STEEPER THAN 6 : 1 AND CONSTRUCTED

BY THE ENGINEER.

7. THE GUIDELINES SHOWN HEREON ARE SUGGESTIONS ONLY AND MAY BE MODIFIED

ENGINEER.

CONCRETE, PORTLAND CEMENT CONCRETE OR OTHER MATERIAL AS APPROVED BY THE

5. THE CONSTRUCTION EXIT FOUNDATION COURSE SHALL BE FLEXIBLE BASE, BITUMINOUS

TRAPPING DEVICE.

6. THE CONSTRUCTION EXIT SHOULD BE GRADED TO ALLOW DRAINAGE TO A SEDIMENT

LARGE AND LOOSE KNOTS.

3. THE TREATED TIMBER PLANKS SHALL BE #2 GRADE MIN., AND SHOULD BE FREE FROM

BY THE ENGINEER.

4. THE GUIDELINES SHOWN HEREON ARE SUGGESTIONS ONLY AND MAY BE MODIFIED

PLANS, OR AS DIRECTED BY THE ENGINEER.

1. THE LENGTH OF THE TYPE 3 CONSTRUCTION EXIT SHALL BE AS INDICATED ON THE

LIMITS SHOWN ON THE PLANS.

STONE WITH A SIZE OF 2 TO 4 INCHES SPREAD A MINIMUM OF 4 INCHES THICK TO THE

2. THE TYPE 3 CONSTRUCTION EXIT MAY BE CONSTRUCTED FROM OPEN GRADED CRUSHED

BY THE ENGINEER.

1. THE GUIDELINES SHOWN HEREON ARE SUGGESTIONS ONLY AND MAY BE MODIFIED

FILTERED.

OFF. A 2 YEAR STORM FREQUENCY MAY BE USED TO CALCULATE THE FLOW RATE TO BE

OF A DISTURBED AREA ALONG A CONTOUR TO INTERCEPT SEDIMENT FROM OVERLAND RUN-

A SEDIMENT CONTROL FENCE MAY BE CONSTRUCTED NEAR THE DOWNSTREAM PERIMETER

EROSION FROM A DRAINAGE AREA LARGER THAN 2 ACRES.

100 GPM / FT SQUARED. SEDIMENT CONTROL FENCE IS NOT RECOMMENDED TO CONTROL

SEDIMENT CONTROL FENCE SHOULD BE SIZED TO FILTER A MAXIMUM FLOW THRU RATE OF

SOIL AREA

DISTURBED

ENDS OF WOOD SHEETS

NAILED ONTO ABUTTED

2" x 8" TREATED TIMBERS

WAFER BOARD SHEETS

PLYWOOD OR PRESSED

1 / 2" MINIMUM THICKNESS

ENDS OF WOOD SHEETS

NAILED ONTO ABUTTED

2" x 8" TREATED TIMBERS

WAFER BOARD SHEETS

PLYWOOD OR PRESSED

1 / 2" MINIMUM THICKNESS

3' MINIMUM WIDTH

FILTER FABRIC

HAND TAMP

BACKFILL &

IF IN ROCK

MINIMUM OR ANCHOR

EMBED POSTS 18"

FABRIC

WOVEN FILTER

A MINIMUM OF 6 TIMES WITH HOG RINGS.

REINFORCEMENT SHEETS OR ROLLS

CONNECT THE ENDS OF SUCCESSIVE

OPENING SIZE SHALL BE 2" x 4"

(12.5 GAUGE MINIMUM). MAXIMUM

GALVINIZED WELDED WIRE MESH

SPACING OF 15".

RINGS OR CORD AT A MAXIMUM

WELDED WIRE MESH (W.W.M.) BY HOG

FASTEN FABRIC TO TOP STRAND OF

POSTS SHALL HAVE A MINIMUM CROSS SECTION OF 1.5" x 1.5".

POSTS SHALL BE 3" MINIMUM DIAMETER OR NOMINAL 2" x 4". HARDWOOD

4' MINIMUM STEEL OR WOOD POSTS SPACED AT 6' TO 8'. SOFTWOOD

BACKFILL AND HAND TAMP.

DIRECTION. MINIMUM TRENCH SIZE SHALL BE 6" SQUARE.

APPROXIMATELY 2" ACROSS TRENCH BOTTOM IN UPSTREAM

PLACE 4" TO 6" OF FABRIC AGAINST THE TRENCH SIDE AND

T-CLIPS OR SEWN VERTICAL POCKETS FOR STEEL POSTS).

4 EVENLY SPACED STAPLES FOR WOODEN POSTS (OR 4

ATTACH THE W.W.M. AND FABRIC ON END POSTS USING

OUTSIDE EDGE OF BAG CONFIGURATION.

SIGN DETAILS. PLACE FLASHING LIGHTS AWAY FROM GUTTER, FLUSH WITH

WITH TYPE "A" FLASHING WARNING LIGHT. SEE BARRICADE CONSTRUCTION

STRADDLE GRAVEL FILTER BAGS WITH TYPE 1 BARRICADES MOUNTED

NOTE:

ON PAVEMENT OR BARE GROUND.

GRAVEL FILTERS CAN BE USED

NOTE:

DEVICE

TRAPPING

SEDIMENT

DRAIN TO

DEVICE

TRAPPING

SEDIMENT

DRAIN TO

6" MINIMUM

FOUNDATION COURSE

TRANSITION

APPROACH

TRANSITION

APPROACH

RU

NO

FF

FI

LT

ER

ED

SO THAT NO GAPS ARE EVIDENT

PLACE GRAVEL FILTER BAGS

AND 6" HIGH

(1 / 8" MESH) APPROX. 24" LONG, 12" WIDE

BURLAP BAGS OR SYNTHETIC NET BAGS

3 / 4" GRAVEL CONTAINED IN PERVIOUS

4' MAXIMUM

FACE OF CURB

DISTANCE FROM

PERPENDICULAR

(6" x 8" x 16")

CONCRETE BLOCKS

GAPS ARE EVIDENT

BAGS SO THAT NO

PLACE GRAVEL FILTER

HEIGHT) HIGH.

12" WIDE AND 6" (I.E. BLOCK

(1 / 8" MESH) APPROX. 24" LONG,

PERVIOUS SYNTHETIC NET BAGS

3 / 4" GRAVEL CONTAINED IN

AS EXPLAINED IN SPECIFICATIONS

OR AROUND ENTIRE PERIMETER

WHERE NO CURB IS IN PLACE

INSTALL END BLOCKS / BAGS

CONCRETE BLOCKS

STUD EXTENDED INTO

2" x 4" TREATED WOOD

WOOD STUD

2" x 4" TREATED

DEVICE

TRAPPING

SEDIMENT

DRAIN TO

TIMBER PLANK

2" x 10" TREATED

TIMBER PLANK

2" x 10" TREATED

8" x 10" x 8'

TYPICAL DIMENSIONS

RAILROAD TIES

6" MINIMUM

FOUNDATION COURSE

TRANSITION

APPROACH TRANSITION

APPROACH

DRWN. BY:V.VASQUEZ 26

MEASURES STANDARDS 1

WATER POLLUTION CONTROL

TEMPORARY EROSION, SEDIMENT &

CITY OF SAN ANTONIO

100% SUBMITTAL

DSGN. BY:

CONSTRUCTION EXIT - TYPE 1

CONSTRUCTION EXIT - TYPE 2

CONSTRUCTION EXIT - TYPE 3

TEMPORARY SEDIMENT CONTROL FENCE

PLAN

SECTION A-A

A A

C

C

SECTION C-C

ISOMETRIC VIEW

GRAVEL FILTER BAGS CURB INLET GRAVEL FILTER

PROFILE

PLAN

ELEVATION

PLAN

PLAN

G

G

SECTION G-G

PLAN

PROFILE

SHT NO.: OF 27RHG Jr CHKD.BY:RHG Jr

DATE:10-24-19PROJECT NO.: 40-00447A

PUBLIC WORKS DEPARTMENT

Page 28: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

27

WPAP NOTES

407 W. RHAPSODY, SAN ANTONIO, TX., 78216

REGISTRATION NO. F-1802

(210)349-5253 (210)349-0715 WWW.GARCIAWRIGHT.COM

CITY OF SAN ANTONIO

DSGN. BY: RHG Jr CHKD. BY: RHG Jr

GARCIA & WRIGHT CONSULTING ENGINEERS,INC.

DATE: 10-15-19

DRWN. BY: ALT

ROADWAY MEDIAN PLACEMENTS

UTSA BLVD MEDIANS

PROJECT NO.: 40-00447A

SHT NO.: OF 27

100% SUBMITTAL

PUBLIC WORKS DEPARTMENT72755

RAUL H. GARCIA, JR.

PR

OF

ESSIONAL EN

GI

NE

ER

S

TATE OF TEX

A

S

ICENSEDL

06/09/2020

Page 29: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is
Page 30: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is
Page 31: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

Application Fee FormTexas Commission on Environmental Quality

Name of Proposed Regulated Entity: Babcock Road and UTSA Boulevard

Regulated Entity location: NW Corner of intersection at Babcock Rd. and UTSA Blvd.Name of Customer: City of San Antonio. Texas

Contact Person: Crystal Benavides. P.E. Phone: (210) 349-3273

Customer Reference Number (if issued):CN 600130652

Regulated Entity Reference Number (if issued):RN __

Austin Regional Office (3373)

DHaysSan Antonio Regional Office (3362)

IK] BexarDComal

DTravis D Williamson

D Medina

D Kinney

D Uvalde

Application fees must be paid by check, certified check, or money order, payable to the Texas

Commission on Environmental Quality. Your canceled check will serve as your receipt. This

form must be submitted with your fee payment. This payment is being submitted to:

o Austin Regional Office 00 San Antonio Regional Officeo Mailed to: TCEQ- Cashier 0 Overnight Delivery to: TCEQ- Cashier

Revenues Section

Mail Code 214

P.O. Box 13088

Austin, TX 78711-3088

Site Location (Check All That Apply):

12100 Park 35 Circle

Building A, 3rd Floor

Austin, TX 78753

(512)239-0357

00 Recharge Zone o Contributing Zone D Transition Zone

Typeo/Plan Size Fee DueWater Pollution Abatement Plan, Contributing Zone

Plan: One Single Family Residential Dwelling Acres $Water Pollution Abatement Plan, Contributing Zone

Plan: Multiple Single Family Residential and Parks $.

Acres

Water Pollution Abatement Plan, Contributing Zone

Plan: Non-residential Acres $Sewage Collection System l.F. $lift Stations without sewer lines Acres $Underground or Aboveground Storage Tank Facility Tanks $Piping System(s)(only) Each $Exception 1 Each $ 500.00Extension of Time Each $

Signature: ~i.Q {~~~ Date: {p._/ 1-:;LO d-.D

1 of 2TCEQ-0574 (Rev. 02-24-15)

Page 32: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

2 of 2TCEQ-0574 (Rev. 02-24-15)

Application Fee ScheduleTexas Commission on Environmental Quality Edwards Aquifer Protection Program 30 TAC Chapter 213 (effective 05/01/2008) Water Pollution Abatement Plans and ModificationsContributing Zone Plans and Modifications

Project Project Area in

Acres Fee One Single Family Residential Dwelling < 5 $650

Multiple Single Family Residential and Parks < 5 5 < 10

10 < 40 40 < 100

100 < 500

$1,500 $3,000 $4,000 $6,500 $8,000

$10,000 Non-residential (Commercial, industrial, institutional, multi-family residential, schools, and other sites where regulated activities will occur)

< 1 1 < 5

5 < 10 10 < 40

40 < 100

$3,000 $4,000 $5,000 $6,500 $8,000

$10,000 Organized Sewage Collection Systems and Modifications

Project Cost per Linear

Foot Minimum Fee-Maximum Fee

Sewage Collection Systems $0.50 $650 - $6,500

Underground and Aboveground Storage Tank System Facility Plans and Modifications

Project Cost per Tank or

Piping System Minimum Fee-Maximum Fee

Underground and Aboveground Storage Tank Facility $650 $650 - $6,500

Exception RequestsProject Fee

Exception Request $500

Extension of Time RequestsProject Fee

Extension of Time Request $150

Page 33: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

TCEQ-10400 (04/20) Page 1 of 2

TCEQ Core Data Form

For detailed instructions regarding completion of this form, please read the Core Data Form Instructions or call 512-239-5175. SECTION I: General Information

1. Reason for Submission (If other is checked please describe in space provided.) New Permit, Registration or Authorization (Core Data Form should be submitted with the program application.)

Renewal (Core Data Form should be submitted with the renewal form) Other 2. Customer Reference Number (if issued) Follow this link to search

for CN or RN numbers in Central Registry**

3. Regulated Entity Reference Number (if issued)

CN 600130652 RN

SECTION II: Customer Information

4. General Customer Information 5. Effective Date for Customer Information Updates (mm/dd/yyyy)

New Customer Update to Customer Information Change in Regulated Entity Ownership Change in Legal Name (Verifiable with the Texas Secretary of State or Texas Comptroller of Public Accounts)

The Customer Name submitted here may be updated automatically based on what is current and active with the Texas Secretary of State (SOS) or Texas Comptroller of Public Accounts (CPA).

6. Customer Legal Name (If an individual, print last name first: eg: Doe, John) If new Customer, enter previous Customer below:

City of San Antonio 7. TX SOS/CPA Filing Number

8. TX State Tax ID (11 digits)

9. Federal Tax ID (9 digits)

10. DUNS Number (if applicable)

11. Type of Customer: Corporation Individual Partnership: General Limited

Government: City County Federal State Other Sole Proprietorship Other:

12. Number of Employees 0-20 21-100 101-250 251-500 501 and higher

13. Independently Owned and Operated? Yes No

14. Customer Role (Proposed or Actual) – as it relates to the Regulated Entity listed on this form. Please check one of the following

Owner Operator Owner & Operator Occupational Licensee Responsible Party Voluntary Cleanup Applicant

Other:

15. Mailing Address:

City State ZIP ZIP + 4

16. Country Mailing Information (if outside USA) 17. E-Mail Address (if applicable) 18. Telephone Number 19. Extension or Code 20. Fax Number (if applicable)

( ) - ( ) -

SECTION III: Regulated Entity Information

21. General Regulated Entity Information (If ‘New Regulated Entity” is selected below this form should be accompanied by a permit application)

New Regulated Entity Update to Regulated Entity Name Update to Regulated Entity Information

The Regulated Entity Name submitted may be updated in order to meet TCEQ Agency Data Standards (removal of organizational endings such as Inc, LP, or LLC). 22. Regulated Entity Name (Enter name of the site where the regulated action is taking place.)

Babcock Road and UTSA Boulevard

TCEQ Use Only

Page 34: Recharge Zone Exception Request · Recharge/Transition Zones (TCEQ, 2004). It is possible that a hidden karst feature could become exposed during construction activity, but this is

23. Street Address ofthe Regulated Entity:(No PO Boxes!

1 1State 1 1 ZIP 1 I ZIP+4 1City

24. County Bexarn er lyslca oca Ion escrrp"on I no s ree a ress ISprovl e .

25. Description to Along northwest corner of Babcock Rd. and UTSA Blvd. intersectionPhysical Location:

26. Nearest City State Nearest ZIP Code

San Antonio ITX 17824927. Latitude (N) In Decimal: 129.5775 28. Longitude (W) In Decimal: 198.6319Degrees Minutes Seconds Degrees Minutes Seconds

29 34' 39" 98 37' 55"

29. Primary SICCode (4 digits) 30. Secondary SICCode (4 digits)31. Primary NAICSCode 32. Secondary NAICSCode

. (5 or 6 digits) (5 or 6 digits)

1611 / /237310 I33.What is the Primary Business of this entity? (Do not repeat the StC or NAtCS description.)

Municipal Government, Public RoadP.O. Box 839966

34. Mailing

Address:City 1 San Antonio 1 State 1 TX I ZIP J 78283 I ZIP+4 1 3966

35. E·Maii Address: I36. Telephone Number 37. Extension or Code 38. Fax Number (if applicable)

(210) 207·8037 1 1 ( ) .

E t Ph . I L f 0 . f 'f t t dd 'd d

39. TCEQPrograms and 10 Numbers Check all Programs and write in the permits/registration numbers that will be affected by the updates submitted on thisform. See the Core Data Form instructions for additional guidance.

o Dam Safely o Districts ~ Edwards Aquifer o Emissions Inventory Air o Industrial Hazardous Waste

13-15020502o Municipal Solid Waste o New Source Review Air DOSSF o Petroleum Storage Tank Dpws

o Sludge o Storm Water o TitieVAir o Tires o Used Oil

o Voluntary Cleanup o Waste Water o Wastewater Agriculture o Water Rights o Other:

SECTION IV' Prenarer Information.~~me: 1Crystal Benavides, P .E. 141. Title: 1Agent42. Telephone Number 43. Ext./Code 44. Fax Number 45. E·Mail Address

(210) 349-3273 I I (210) 349-4395 I [email protected]

SECTION V: Authorized Signature46. By my signature below, I certify, to the best of my knowledge, that the information provided in this form is true and complete, and that I havesignature authority to submit this form on behalf of the entity specified in Section II, Field 6 and/or as required for the updates to the ID numbersidentified in field 39.

Company: City of San Antonio I Job Title: I Agent

Name (In Print): Crystal Benavides, P.E. Phone: ( 210 ) 349- 3273

Signature: (/tu77iJ) -1<_( ~<4.A - b -.;25"- ;tc:;LO- Date:

() -TCEQ-10400 (04/20) Page2 of2