8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
1/105
To:
From:
Submitted by:
Subject:
CITY OF CARMEL-BY-THE-SEA
Council Report
December 3, 2013
Honorable Mayor and Members of the City Council
Jason Stilwell, City Administrator
Sharon Friedrichsen, Public Services Director
Receive and file the 2013 Pavement Management Program UpdateReport
Recommendation s): Receive and file the 2013 Pavement Management Program Update
Report.
Executive Summary: The City has retained Nichols Consulting Engineers to complete an update
of the City's pavement management system, which was last assessed in
2007. The purpose of the updated report is to provide objectiveinformation regarding the condition of the City's maintained road s;
determining the impact of different funding scenarios on the condition of
the City's roads over the next fifteen ye ars and identifying option s to
implement a multi-year road rehabilitation and preventative
maintenance program . It is intended that the recommendations included
w ithin the report will be utilized by City staff when developing road
project s to be included within the City' s capital improvement program
and annual operating budget.
Analysis/Discussion: The City's pavement network include s nearly 27 miles of st ree t s,
including about 17 miles of re sidential streets . The industry standard is
to measure the pavement grade or condition using the Pavement
Cond it ion Index ( PCI ), which ranges from 0 to 100 . A newly
con structed road would have a PCI of 100 while a failed road would have
a PCI of 25 or les s The average Pavement Condition Index ( PCI ) for th e
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
2/105
iscal Impact:
Budgeted {yes/no
replacement value for the City's network is estimated to be nearly $38
million.
In fiscal year 2013-14, $826,200 was allocated to streets and roadprojects, including sidewalk and concrete curb repairs whereas the
capital improvement plan calls for $634,000 annually going forward.Ongoing maintenance is much less expensive than deferring
maintenance. As noted in the report, several budget scenarios were
developed to determine the amount of funding needed to either
maintain or improve the City's pavement network,as
summarized below:1 Current City Funding level: Maintain funding at $634,000 each
year from 2014 until 2022 when Measure D funds are authorizedthen decrease funding to $200,000 per year from 2022-2028. The
anticipated outcome results in the PCI being maintained in the
low 60s until 2024, then declining PCI to 52 in 2028. Some 41% of
the network would be in very poor condition by 2028.Unfunded backlog of $22.7 mill ion by 2028 .
2. Maintain the Current PCI: Tota l funding of $12.2 million requiredby 2028, with recommended funding levels in the $800,000 range
in 2015 and 2016. The anticipated outcome results in ma intainingthe PCI at 63 and the network remaining in a fair condition each
year . Unfunded backlog of $16.5 million by 2028.
3. Unconstrained Funding: Total funding of $18.4 million required by
2028, with an annual budget of approximately $1.2 million each
year . The anticipated outcome results in improving the PCI each
year , with a PCI of 85 by 2025. Almost the entire network is in agood condition and there is no unfunded backlog.
Funding Source {general fund, g rant, stateYes cost of study ($11,000) General Fund- Outside labor (76050)
Previous Council
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
3/105
eviewed by
City d m i n i s t r t o r City Attorney Admin istrative Services DAsst City Admin D Dir o CP D Dir o Public Svcs DPublic Safety Dir D Library Dir D Other D
City Engineer D
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
4/105
ity ofCarmel by the Sea
Pavement anagementProgram Update
in a Report
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
5/105
ity ofCarmel by the Sea
Pavement ManagementProgram Updatein a I Report
Submitted to
City of Carmel-by-the-SeaP O Box CC
Carmel-by-the-Sea, CA 93921
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
6/105
City o f Carmel by the Sea2013 Pavement Manag ement Pr ogram
Update
Table o Contents
Background .......................... ....................................... ....... ............. ......... ........ ........... ...... ...... .... 1
Study Objectives ..... ... .. ............. .... .. ......... ............ ........... .... .. .......................... ........ .... ..... . 2
Project Approach .................... . .................. ........ ........ . ....... ....... .... ....... ........ ....... ....... ..... ........ 3
Pavement Network and Current Condition ............ ................................................ ...... .... .............. 3Current Budget and Main tenance Practices ...... ......... .... ............ . . .................... ........... ...... .... . 8
Pay Now or Pay MORE Later .... ...... ....... ........... ................................................................. ..... 8
Budget Needs ..................................................... ... .................... ...... .... ......................... .......... .... 10
Budget Scenarios .................... .... ......... ... ....... . ........... . ....... .. ....... ...... ... ..... ....... . ........ ......... 12
Scenario 1: Current City Funding Leve l ...... ................ . ..... .. ........ ........ ............. ..... .......... 13
Scenario 2: Maintain the Current PCI ...... ................ .... ........................... ...... ......................... 15
Sce nario 3: Unconstrained ........ ...... ........................ .................... ...................... .......... ... ....... . 17
Summary ..... . ....... ...................... ...... ...... ... .................. .... ....................................... .... .......... 19
Conclusions ...... .................... ........... ...... ......................... . ..... . .................................................... 22
App e ndix ASection Description Inventory
Section PCI Listin g Sorted by Street NameSection PCI Listing - Sorte d by De sce nding PCI
Appen d ix 8:Prev en tive Maintenance and Rehabilitation (M&R) De cis ion Tree
Appendix CBudget Need s- Projected PCI/Cost Summary ReportBudget Needs - Preventive M a intenance Treatment/Cost Summary ReportBudget Need s Rehabilitation Treatment/Cost Summary R e portScenar io s 1-3:
Cost Summary Report
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
7/105
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
8/105
ackground
City of Carmel-by-the-Sea2013 Pavement Management Program
Update
Nichol s Consulting Engineers, Chtd. NCE) was se lected by the City of Carmel-by-the-Sea(Carmel) in 2013 to perform an update of its pav eme nt management system PMS), which waslast updated in 2007. The data on the street network is therefore approxima tely five years old,but the City has indicated that cond it ions have not changed significantly, and that a fieldassessment is not necessary for the purposes of this report. The goa l of th is project was toupgrade to the latest StreetSaver software, update the databas e with new unit costs, andupdat e the p ave me nt management re port .
Thi s report constitutes a summary of the update for Carmel.
Broadly , a ... p vement management [program] sys tem is de sig ned to provide objective
information nd usef ul data for analysis so th t managers can make more consistent, cost-effective, and defensible decisions related to the preservation of a pavement network.
In other words , a PMS is de signe d to assist cities answer typical question s such as:
What does the City's roa d network consist of? How many miles of roads are eligib le forfederal, sta t e or other funds? How many are sub jected to t raffic from buses or heavytrucks?
What is the existing condition of the City's maintained road s? Is this an acceptable levelfor the City? If not, what is an acceptable level? How much additional funding is neededto achieve an acceptabl e level?
Are th e re roads in specif ic areas that are much worse than others, and if so, how muchwo r se?
ow will the condition of the City's maintained roads respond over time under exist ingfunding level s?
What maintenance a nd rehabilitation strategies exist to improve current roadconditions? What maintenance activities or treatments have occurred in the past on an ygiven road?
What impact would either additional funding or a decre ase in funding, have on thecondition o the overall pavement network?
What is the b ack log of maintenance and rehabilitative work that shou ld be done? Wh at
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
9/105
City of Carmel-by-the-Sea2013 Pavement Management Program
Update
In order to answer the questions above, the City util izes the StreetSaver pavem entmanagement system . StreetSaver is a program dev e loped by the Metropolitan TransportationCommission (MTC) and is the most widely used PMS in California.
There are some unique characteristics within Carmel that need to be considered whenassessing the pavement network condition. Like many coastal cities, the p aveme nt network
here is subj ect to high traffic volumes from visitors .
tudy Object es
The main goals of this study were:
1 Updating historical maintenance data
2 Upd ating the maintenance and rehabilita t ion (M R) decision tree and associated un itcosts.
3 Performing budg etary analysis and determining the fund ing needs .
The purpose of this report is to assist decis ion makers in utilizing the results of the StreetSaverPMS Specifically, this report links the recommen d ed repair p rogram costs to Carmel ' s currentand projected budget alternatives to improv e overall maintenance and rehabi litation str ategies.This report assesses the adequacy of existing revenues to meet the maintenance needs
recommended, a nd maximize s the return from expenditures by :
Impl eme nting a multi-year road rehabilitation a nd maintenance program. Developing a preventative maintenance program. Selecting st reet s for the most cost effective repairs.
It determines th e overall condition of the City's maintained roads a nd highli ghts options for
impro ving them. These options are developed by conducting what -if analyses using theStreetSaver p rogram. By varying the budget amounts available for pavement maintenance andrepair, one can s how how diff erent fun din g s tra teg ies can impact the City's ro ads over the nextfifteen years.
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
10/105
Project Approach
City of Carmel-by-the-Sea2013 Pavement Management Program
Update
The scope of work included updating all maintenance and rehabilitation (M&R) historical andplanned treatments in the database since the last update in 2007. This included any overlays,recon structions and any surface sea ls that m ay have occurred. While updating the M&R h istory,some street sections had to be split, or subdivided, because the M&R projects did not alwaysalign properly with existing stree t sec tions in the database.
The next step would normally be to discuss appropriate M&R strategies for future proje cts andcreate a corresponding M&R Decision Tree. This includes the recommendation and selection ofappropriate treatments such as sl urry seals or overlays, and the determination of treatmentunit costs. However, as the City has not changed any maintenance policies, the existing M&Rdecision tree was used for the ana lysis . The only changes to the decision tree were t o update
the associated unit costs for each alternative based on recent bid tabs. With these updated unitcosts, a more acc urate budgeta ry analysis can be performed. The unit costs include:
All related construction costs such as mobil iza tion, traff ic control , base repairs, paving,st riping, rai sing monuments etc.
Engineering and design costs which include design, construction, inspections andmaterial testing etc .
NCE next performed a budget needs analy sis using an analysis period of 15 years with aninflation rate of 5 . This identified M&R requirement s for eac h street sect ion and determinedthe total maintenance and rehabilitation req uirement s over the analysis period und er differentfund ing leve ls.
Pavement etwork and Current Condition
The City is responsible for the repair and maintenance of approximately 26.8 centerline miles ofstreets o f which 4.47 miles are arterials, 3.68 mile s are collectors, 16.71 miles areres idential/local stree ts, an d 1.95 miles are listed as other. As can be seen, the majority of thestreet network is comprised of residential/local roads. Streets or pavements are one of theCity's most valuable assets, and the replacement value for the entire network is estimated tobe approximately 37.6 million . Note th at this doe s not include any improvements (e.g.
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
11/105
1 . Alligator {fatigue cracking2 Block cracking3 Distortions4. Longitudinal and tran sverse cracking5 Patching and utility cut patching6 . Rutting and depre ssi ons
7 . Weathering and raveling
City of Carmel-by-the-Sea2013 Pavement Management Program
Update
A more d eta iled description of each distress ty p e is a va ilable in the MTC distre ss manual 2
Figure 1 illustrates the d efinitions of the pavement condition categories . The fair categoryinclude s road s with both non-load related {weath e ring and raveling and load related {e g.alligator cracking distresse s Since these distr e sses are markedly different, the treatment sassigned are also correspondingly different, and the costs associated with them . Gen e rally ,road s w ith load -r elated will requi re h igher costs for repairs . The two categories are identifiedby II {non -load related and Ill {load related . The StreetS ave r program will assign theappropriat e treatments and co sts to roads id e ntified with each category . Best mana ge mentpractice s for the maintenance of a pavement network typically includ e ma intaining th e overallPCI in the high 70 s to mid 80 s. How ever these va lue s can vary by jurisdiction due to prevailingloca l conditions a nd the availability of sufficient long -te r m f undin g.
Condition Category
11 111
IV
I
Pavement Condition
Poor
PCI Category100
70
5
25
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
12/105
City of Carmel-by-the-Sea2013 Pavement Management Program
Update
The photos in Figure 2 illustrate roads with a range of PCis.
Figure 2. Examples of Roads with Different PCis
The City's average PCI is 63 and this is considered to be a network that is in Fair condition . Inthe 2007 PMP Update the PCI was 74, meaning the average PCI has lowered about 2 points peryear, which is expected if no significant funding was available in the intervening six years .
However, the a verage PCI does not completely describe the road network ; Table 1 is a summaryof the PCI by functional class . The most important roadways, arterials and collectors, both havea PCI of 67. If adequate funding is provided to these roadways, their PCI s may rise over 70 tothe Good category, reducing the need for costly rehabilitat ion later on.
Table 1. Pavement Network and Condition Summary (2013)I
Functional Centerline LaneNo. of of the
Class Miles MilesManagement Network Average PCI
Sections (by area)
Arterial 4 .47 10.20 31 23 .6 67
Collector 3 .68 7.35 29 13.7 67
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
13/105
City of Carmel-by-the-Sea2013 Pavement anagement Program
Update
Table 2 shows the distribution of pavements by functional cl ss and cond it ion category . Almostn inety percent (88.4%) are in fair to good condition , with the remainder in poor to very poorcondition. Since the largest percentage of pavement sections {61.9%) are in the Fair category,the network h s the ability to drastically improve if adequate funding brings up the se sectionsto the Good category.
70 100 1 .0 3 .2 9 .4 3 .8 26.5
50 -69 11.1 1 .0 37.8 3.0 61 .9
25 49 2.4 0.5 3.5 0 . 7 7 .1
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
14/105
City of Carmel-by-the-Sea2013 Pavement Management Program
Update
Figure 3 presents the same information as Table 2 but in a graphical format . This betterillustrates the fact that residentials comprise the majority of the road system .
Appendix A contains the PCI listing for all streets in the City, listed by Street Name and bycurrent PCI descending} .
60
so -- -
;; 40II
Very Poor V)ctc
II
EII
30c.
Poor IV)
Fair 11/111)
20 Good I)
1
0.7
0rter ia ls Collector s Resi den ti a ls O t her
Functional Classification
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
15/105
Maintenance Practices
City of Carmel-by-the-Sea2013 Pavement anagement Program
Update
Historically, the City has not utilized a preventive maintenance program such as crack seals orslurry seals when the pavements are in good condition . However, when the pavementcondition deteriorates to poor conditions, overlays and reconstruction have been performed .These are considered rehabilitation or reconstruction. In addition, base repairs are commonly
used as preparatory work prior to overlays .
In this report, the analysis assumes that the City will be implement ing a preventivemaintenance program . The decision tree in the StreetSaver program provides for the mosteffective and realistic maintenance treatments for each group of roads by functional class andcondition category and is shown in Appendix B
Pay Now or Pay MORE Later
Figure 4 illustrates that pavem ent maintenance follows the old colloquial saying of pay now orpay more late r. History has shown that it costs much less to m aintain roads in good conditionthan to repair roads that have failed. By allowing pavements to deteriorate, roads that oncecost $3.50/square yard to slu r ry seal may soon cost as much as $67 .00/square yard toreconstruct. In other words, delays in repairs can result in costs increa sing as much as 19-fold .The costs shown in the chart below are actual da ta from recent bid tabs from the City as well as
those from surrounding cities .
The pavement deterioration curve shown by the red line describes how pavements deteriorateover time. In general, arterials will be expected to have a service life o f 20 years, while those forresidential roads may exceed 30 years . This will be longer for the few PCC pavement sections inCarmel.
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
16/105
Pavement Condition
Excellent
Good
Fair
Poor
Very Poor
City of Carmel by the Sea2013 Pavement Management Program
Update
of Pavement Life
Figure 4. Costs of Maintaining Pavements over Time
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
17/105
Budget Needs
City of Carmel-by-the-Sea2013 Pavement Management Program
Update
Once the pavement condition has been determined, and the appropriate maintenancetreatments assigned in the decision tree, then it is possible to determine the funding needs forthe City's maintained roads . Simplistically, the StreetSaver program seeks to answer thequestions :
If funding is not a constraint, how much money is needed to bring the pavement conditionto a state of good repair? And maintain it at that level over the next 15 years?
Therefore , based on the principle that it costs less to mainta in roads in good condition thanthose in bad condition, StreetSaver will develop a maintenance strategy that will improve theoverall condition of the ro ads and then maintain it at that level. The condition of each roaddetermines the appropriate maintenance and rehabilitation treatment and cost from thedecision tree . For example, if Ocean Ave has a PCI of 45, and the appropriate treatment is anoverlay, then the area of the pavement section is multiplied by the unit cost and the totaltreatment cost determined. Additional maintenance treatments over the next 15 years will alsobe applied (e .g. slurry or rubberized crack seal) to preserve it .
Using this process , the entire road network for the City was evaluated in this fashion and
summed. This results in maintenance needs of approximately 16.9 million over the next fifteenyear s . An annual 5 inflation factor was as sumed . If the City of Carmel-by -the-Sea follows thefunding strategy recommended by the program , the average PCI will increase to the high 80 sby the end of 15 years . The results of the budget needs analysis are summarized in Table 3 .
In essence , the funding level or maintenance needs determin ed illustrates the level ofexpenditures required to raise the pavement condition to a network PCI in the high 80's andalso eliminates the maintenance backlog . Of the 16.9 million in maintenance needs,
approximately 5.2 mill ion (about 31%) is programmed for preventive maintenance, while therest is a llocated for more costly rehabilitation and reconstruction treatments . Again, preventivemaintenance inclu de s treatments such as slurry seals while reh abilitation includes overlays andreconstruct ion .
N h i hi l i h l f di d d i f l d d i i l i
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
18/105
8 3
Table 3. Resu lts of Funding NeedsBudget ( -Thousands) 3 718 9 16 771 592
Rehabi litation ( -Thousands) 3 563 859 720 523
Preventive Maintenan ce
( -Thou sands)155 I 57 I 51 I 69 I
Treated PCI 74 74 75 75
Un treated PCI 6 59 56 52
Rehabil ita t ion ( -Thou san ds) 669 1 789 1 270 120
Preventive Mai nt enance
( -Tho usan d s782 347 252 I 503 I
Treated PC I
I80
I85
I88
I87
Intreat ed PC I 36 33 30 28
Nichols onsulting Engineers , Chtd
City of Carmel-by-the-Sea2013 Pavement Management Program Update
1 217 I 562 I 653 I 456
650 I 384 I 486 I 294
567 I 178 I 67 I 162
77 77 77 77
49 46 43 39
40 315 0 I 682
796 I 539 I 610 I 5 23 5
8 7
I87
I87
25 21 18
11
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
19/105
Budget Scenarios
City of Carmel-by-the-Sea2013 Pavement Management Program Update
Having determined the 15-year maintenance needs of the City's street network, the next stepin developing a cost-effective maintenance and rehab ilitation strategy is to conduct several
what-if analyses . Using the StreetSaver budget scenario module, the impacts of various
budget scenari os can be evaluated. Simplistically, this module seeks to answer the followingquestions :
If we have funding constraints, what is the most cost-effective way to spend the fundsavailable? What are the consequences on the PCI and unfunded backlog? What streets will
be prioritized for repairs? When will they be repaired?
The program determines the effects of the different funding scenarios on pavement conditionindex {PCI and deferred maintenance {unfunded backlog). By examining the effects on theseperformance measures, the advantages and disadvantages of different funding levels andmaintenance strategies become clear. The following scenarios were performed :
Scenario 1: Current City Funding Level This scenario shows the consequences to the streetnetwork at the current funding level {$634,000 per year and $200,000 per year after 2022). The
City's current budget of $634,000 is sufficient to maintain the PCI in the low 60's for the next 9years. However, after 2022 when the budget decreases to $200,000, the PCI begins a rapid dropevery year until reaching a low of 52 by the year 2028. The unfunded backlog will grow to $22.7million, or six time s what it is now.
Scenario : Maintain the Current PC A t a funding level of $12.2 mi llion over 15 years, thisscenario shows the funding required to maintain the average network PCI condition (currently63} so that the pavement network does not deteriorate any further as a whole. In addition, thedeferred maintenance or unfunded backlog will increase from $3.7 million today to $16.5million by 2028, a more moderate 4.5 -f old increase .
Scenario 3: Unconstrained Funding The City will require approximately $17.1 million over 15years to improve the pavement network to its optimal PCI of 85, and eliminate any deferred
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
20/105
8 5
Scenario : Current City Funding Level
City of Carmel by the Sea2013 Pavement anagement Program Update
The current City budget is $634,000 per year until the year 2022, and $200,000 thereafter for a total budget of $6.9 million. The loss ofMeasure D funding after 2022 results in the pavement network's dramatic decline in PCI from the low 60 s to 52 by 2028. Of the totalbudget available, approximately $5.5 million is required for rehabil it ation. By 2028, 41.3% of the network will be in the Very Poor condition category (currently 4.4%), requiring expensive reconstruction to re habilitate . Additionally, the unfunded backlog will increaseover six-fold from $3.7 million to $22.7 m illion by 2028 , shown below in Table 4 & Figure 5.
Budget ($-Tho usands) 634 634 634 634 634 634 634 634
Rehabilitation ($-Thousands) 511 539 576 560 502 498 485 49 9
Preventive Maintenance($-Thou sands)
123 95 58 74 132 136 149 135
Deferred Maintenance
( -Thou sa nds)2 862 3 173 3 248 3 3 69 I 4 479 I 4 567 I 4 671 I 4 722
Overall PCI 65 64 64 63 I 64 I 64 I 64 I 64
Budget ($-Thousand s) 634 200 200 200 200 200 200 6 906
Rehab ilit ti on ($-Thousands) 502 145 152 148 159 108 151 5 535
Preventive Maintenance
($-Th ou sands)132 55 48 52 41 92 49 1 371
Deferred Maintenance
($-Thou sands)5 904 8 5 35 9 992 10 106 I 9 368 I 5 872 I 22 723
Overall PCI 64 62 6 59 I 57 I 54 I 52
Nichols Consulting Engineers, Chtd 13
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
21/105
8 6
- Deferred Maintenance
25,000
'C:; 20, 0 00 I'
h : o:> 6 ~ 6 ~ h : 6 ~ 6 ~ 6 ~ 6 ~I
0s:
I - -- ~....c~ 15,000I
CIJuccCIJ
'E 10,000
;; I::2:"C
CIJ
I - - - - 4,479 4,557 4,1:>/l '1,.....
5,000IJ-IJ0 - - - - - - - -0 I - I - I - I - I - I I - I - I - > '< " 1.1) \ .0 I 00 en 0 . - i. - i . - i . - i . - i . - i . - i N N0 ..... 0 0 0 0 0 0 0 0+-- 0
3:N N N N N N N N
Year
6 ~
-I - INN
0N
Cit y of Carmel-by t he-Sea2013 Pavement Management Program Update
P CI
9022,723
-
80
~ 7 0
. M ~ ~ ' \ . . . . . . _ J. J,O/ L - 609.992 10 ,106 ......... .. .... I I t 0 ~40
- - - - - - 30
- - - - - - 20- - - - - - 10I I I I I I 0
M '< " 1.1) \ .0 I 00N N N N N N0 0 0 0 0 0N N N N N N
Figure 5. P I vs . Deferred Maintenance for Scenario 1 Current City Funding Level}
Nichol s Consulting Engineers Chtd 14
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
22/105
8 7
aScenario : Maintain the Current PCI
City of Carmel by the Sea2 13 Pavement Management Program Update
The City's pavement network is currently in the Fair condition category as a whole with an average PCI of 63. f the City wishes tomaintain the network at the current condition, then $12.2 million over the next 15 years is required. However, the unfunded backlog willcontinue to increase from $3.7 million to $16.5 million. Tables 5 and Figure 6 show the details below .
Table 5. Summary of Results for Scenario 2
I 689 I 582 I 577 I 6 8 I 627
Rehabilitation ($-Thousa nds) 19 78 2 736 598 417 416 416 419
Preventive Maintenance
($-Thousands)145 34 66 91 165 161 192 208
Deferred Maintenance
($-Thousands) I 3 332 I 3 409 I 3 465 I 3 519 I 4 647 I 4 75 9 I 4 898 I 5 000
Overall PCI I 63 I 63 I 63 I 63 I 63
Budget ($-Thou sa nd s) 637 835 819 749 1 051 1 71 4 1 505 I 12 175
Reha bilitation ($-Thousands) 430 666 458 427 861 1 570 1 115 I 9 330
Preventive Maintenance($-Thousand s)
2 7 169 361 322 190 144 390 I 2 845
Deferred Maintenance
( -Tho usands) I 6 218 I 8 385 I 9 672 I 9 784 I 8 784 I 11 027 I 16 498
Overall PCI I 63 I 63 I 63 I 63 I 63 I 63 I 63
Nichol s Consu lti ng Engineers, Chtd 15
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
23/105
8 8
~18,000
v; 16 ,000 Ic::
0
14,000 I 63 63 63 63E.S 12 000 - . - - Qj
10.000 I8,000
c::
(ij6,000 I::E
C~
4,000
I . , . S ~ L : : l , + U ~ .:> t i ' U JQj
-j 2,000 t - Il l I0 I I~ ~ .r 1./ l \ .00 .... 0 0 0
- 03N N N
- Deferred Maintenance
63 63 63 63 63 63,___
-- - - - -
I 7 '' ; c o 4 R R 5.000 r- 1
. .J ,J .J . . . ; ,J
- -I
1 l/111
City of Carmel-by-the-Sea2013 Pavement Management Program Update
PCI
~ 63 63 63 6 3 63 {63 H 70
60
~
~ nn soI I , 40I .J.--.4. d
--1:31 I 30
- - - - - I
20
111111 I II II I II I I I II Ir . 00 en 0 N (Y ) .r 1./ l \ .0 r . 00
.... N N N N N N N N N0 0 0 0 0 0 0 0 0 0 0 0N N N N N N N N N N N N
Year
Figure 6. PCI vs. Deferred Maintenance for Scenario 2 (Maintain Current PCI)
Nichols Consu lting Engineers, Chtd 16
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
24/105
8 9
uScenario 3: Unconstrained Funding
City of Carmel-by-the-Sea2013 Pavement Management Program Update
If the City had an unconstrained budget and wished to improve the network PCI to its optimal condition of approximately 85, $17.1 millionwill be required. This scenario is different from the Needs Budget on page 1 because the Needs Budget front loads all the work to thebeginning of the analysi s period to save on long term costs ($0.2 mill ion less). Simi la r to the Needs Budget it will eliminate the unfundedbacklog or pavement maintenance that is needed, but cannot be performed due to lack of funding. Additionally, a lmost all (96 .7 ) of thepavement sections woul d be in the Good category and nothing below the Fa ir category. Tables 6 and Figure 7 show the details below .
Table 6. Summarv of Results for Scenario 3
Budget ($-Thousands) 1 180 1 1 95 1 197 1 198 1 200 1 197 1 186 I 899
Rehab ilitation ($-Thousands) 1 068 1 148 1 123 1 122 1 008 983 757 I 690
Preventive Maintenance
($-Thousands)112
I47
I74
I76
I19 2
I2 14
I4 29
I209
Deferred Ma intenance
($-Thou sa nds) I 2 316 I 2 03 4 I 1 864 I 1 471 I 1 28 8 I 804 I 377 I 0
Ove r all PCI I 78 I 77
Bud get {$-Thousa nd s) 1 018 1 191 1 190 1 29 8 1 221 733 1 196 I 17 099
Rehabilitation ($-Thousa nd s) 669 1 001 1 002 1 02 0 482 706 I 12 861Preventive Maintenance
I I I I I{$-Thousands) 349 190 188 196 1 221 251 490 4 238
Defe rre d M aintena nc e
{$-Thousands) I 0 I 1 181 I 1 809 I 1 282 I 0 I 0 I 0
I Overall PCI I 7 9 I 81 I 83 I 85 I 86 I 85 I 85
Nichols Consulting Engineers, Chtd 17
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
25/105
9 0
u
41000 1 :> 7 n n- Deferred Mainte nance
77i i i 3 500 I - t / 40 I
cRl - ~~ 300 0 I - - I. J :1 . . .
.5 2 500
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
26/105
ummary
City of Carmel-by-the-Sea2013 Pavement Management Program Update
Figure 8 (below) illust rates the change in PCI over time for the three different budget scenarios.Scenario 1, the Current City Funding Level ($634,000, then $200,000 after 2022) has negativeconsequences for the road network after 2022 since the amount of funding is insufficient to
maintain the current PCIIevels . Prior to 2022, Scenario 1 provides suff icient fund ing to keep thePCI fairly steady around the low 60's , but after the loss of MeasureD funds the PCI will continueto decline without adequate funding . This decline w ill drop the pavement to a PCI of 52 by theend of 2028, near the threshold of the Poor category where pavements require more costlyrehabilitation measures to fix . In Scenario 2, the current PCI of 63 ( Fair ) is ma intained at acost of $12 .2 million over 15 years. In Scenario 3, it will take $17.1 million to raise the pavementnetwork to its optimal condition of 85 ( Good ) by 2028 .
. ._ Scenario 1 (Current City Fund ing Level ) . . . scenario 2 (Mainta in Current PCI of 63)
. ._ Scenario 3 (Unconst ra ined)90
4
~ - ' "< "l l
1.0r-..
00 0 1. t
N M "< "l l
1.0r ..
00. t . t . t . t . t . t N N N N N N N N N_
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
27/105
Scenario 1 (Current City Funding Level)
Scena rio 3 (Uncon st ra ined)
City o Carmel by the Sea2013 Pavement Management Program Update
Scenario 2 (Mainta in Cu rrent PCI of 63)
Figure 9 . Deferred Maintenance by Scenario by Year
Figure 9 illustrates the change in unfunded backlog or deferred maintenance for the threedifferent budget scenarios. The deferred maintenance in Scenario 1 (Current City Funding Level)will increase to $22 .7 million by 2028 (a 6-fold increase), which is the largest unfunded backlogof the three scenarios. Scenario 2 (Maintain the Current PCI of 63) will result in a deferredmaintenance of $16 .5 million by 2028 (over 4-fold increase), more moderate than Scenario 1. Inthe case of Scenario 3 (Unconstrained Funding), the deferred maintenance disappearscompletely as the pavement network has been opt imally maintained.
Figure 10 below illustrates the changes in the pavement condition under the three scenarios.Currently , 26 .5 of the network is in the Good condition category and the majority is in theFair category. Only 11.5% is in the Very Poor or Poor condition categories. Under Scenario
1 (Current City Funding Level), it is projected th t the amount of the network in the Good
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
28/105
Poor7 . 1
Fa ir
2.9
Very Current Condition(2013)Poor
2028 Condition Scenario 2Maintain Current PCI of 63)
City of Carmel-by-the-Sea2013 Pavement Management Program Update
Fai r
2028 Condition Scenario 1 Current CityFunding Level)
0.4
2028 Conditio n Scenario 3(Unconstrained Funding)
3 3 -::;;
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
29/105
Conclusions
City of Carmel-by-the-Sea2013 Pavement Management Program Update
The City of Carmel-by-the-Sea has a substantial investment in its road network, which isestimated to have a replacement cost of approximately $37.6 million. Overall, the roads are inFair condition with an average PCI of 63 . Most o f the cities roads (88.4%) are in the Good to
Fair condition categories. However, at the City's existing budget, the average PCI of thenetwork is expected to begin decreasing after 2022 when Measure D funding stops and thebudget falls to $200,000/year . After this point, the PCI begins declining and will reach 52 by2028, right on the threshold of the Poor category .
f sufficient funding is unavailable for road maintenance and repair, the average PCI is expectedto decrease and the deferred maintenance or unfunded backlog will increase . The higherbacklog will result in increased future costs as more capital intensive treatments (such asreconstruction) will increase, since repairs are deferred until less expensive treatments (such assurface seals or overlays) are no longer feasible or effective.
The analyses indicate that the City needs to spend $16.9 million (mostly at the beginning of theanalysis period) in pavement maintenance and rehabilitation over the next fifteen years, inorder to essentially eliminate the unfunded backlog. By doing so roads can be maintained inGood condition with on-going preventive maintenance.
a. Pavement Funding
The City's current funding level for pavements is estimated to be approximately $634,000/yearfor 9 years then drop to one-third or $200,000/year after 2022. At this budget level, thenetwork PCI will decrease to 52 by 2028. In addition, the percentage of roads in the Very Poorcondition will increase to 41.3% (from 4.4% in 2013). The unfunded backlog will also increasedrastically, from $3.7 million to $22.7 mill ion. Clearly, this funding level is inadequate after the
year 2022.
t is recommended that the City, as a minimum, consider increasing pavement expenditures to$814,000 per year to at least maintain the network condition at the low-60s . This will allow theCity to preserve and improve pavements in the Good category.
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
30/105
8
7
6C: 5
Cllu
4
] 3Q
:t 2
1
0
City of Carmel-by-the-Sea2013 Pavement Management Program Update
altrans shphalt PriceIndex
Figure 11. Asphalt Price Index (1999-2013, Caltrans)
Finally , NCE also recommends that the City continue with a strong and well-funded preventivemaintenance program. This is necessary to maintain the roads that are in good condition(currently 26.5% in 2013) and avoid increasing the unfunded backlog even more .
In light of the substantial financial commitment that is required to maintain and/or imp roveroad conditions and the increase in construction costs, it is recommended that the City considerextending Measure D beyond 2022 as a minimum .
b. Pavement Maintenance Strategies
The City's pavement maintenance strategies include seals overlays and reconstruction. Since aquarter of pavements are in Good condition, it is important to preserve good pavements.Crack sealing, one of the least expensive treatments, can keep moisture out of pavements and
t th d l i g gg g t b f t f il Lif t di g f l
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
31/105
City o f Carmel-by-the-Sea2013 Pavement Management Program Update
c Re-inspection Strategies
Since the City pavement network was updated in 2007 it is highly recommended to re-in spectsoon . In order to monitor future pavement performance and on-going maintenance needs it is
re commended that arterial and collector roads in the network be re- inspected every two years
and residential roads everyfour to
five years
d . Maintenance and Rehabilitation Decision Tree
The maintenance and rehabilitation d e cision tre e and the associated unit costs should bereviewed and updated annually to reflect new construction techniques/repairs and changingcosts so the budget analysis results can be reliable and accurate .
e. ext Steps
To summarize we recommend that the City undertake the following step s:
Cont inue to fund the current preventive maintenance strategies as aggressively a spossible .
Direct staff to determine additional funding sources. Consider alternative maintenance treatments as technology changes. Update the pavement management system regularly .
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
32/105
PPEN X
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
33/105
Section escription Inventory
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
34/105
Section Description Inventory Report
This report lists a variety of section description information for each of the City s pavement sections. It
lists the street and section ident ifiers, limits, functional class, surface type, number of lanes, length s,
widths, areas and projected 2013 PCI.
All of the City s pavement sections are included in the report . The report is so rted alphabetically by
Street Name and Section I D. The field de scr iption s in this report are listed below:
OLUMN DES RIPTION
Street Name Street Name- The name of the street as indicated by street signs in the field .
Street IDStreet Identification - A code up to ten characters/dig it s to identify the street. Generally, the
street name is truncated to six characte rs . The Street ID sh ould be unique for each stree t .
Section IDSection Identification- A code up to ten characters/digits to ident ify the section number . The
Section ID must be unique for each section of one street .
From Beginning limit of th e sectio n.
To Ending limit of the sect ion .
of Lanes Number of travel Ianes .
Length (ft) Length of the section in feet .
Width (ft) Average width of the section in feet.
Area ( sqft) Area of the section in square feet .
FC Functional Classification (A= Arterial, C =Collec to r , R =Residentia l).
STSurface Type AC = AC Pa veme nt , 0 = AC Overlay of AC Pavement, AC/PCC = AC Overlay of PCC
Pavement, PCC = PCC Pavement, ST = Surface treatment over gr ave l ba se/subgrade) .
PCI Average PCI fo r the section . The value is projected fo r 2013 and is based on the last calculatedPCI (i.e . from inspe ction or maintenance data) .
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
35/105
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
36/105
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
37/105
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
38/105
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
39/105
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
40/105
City of Carmel-by-the-Sea 2013 PMP U pda te Draft Nicho ls Consult ing Engin eers, Chtd.Section Description Inventory (Sorted by PCI}
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
41/105
1 0 6
Street Name Street IDSect ion
From Toof Leng th Width A rea
FC ST PC I Date PCIID Lanes Jft ) (ft) _{qft
2NDAV 2NDAV 050 JUNIPEROAV SANTA FEST 2 461 23 10,603 R s 8 /27 /2007 553RDAV 3R DA V 050B GU A DALUPE ST CARPENTE R ST 2 246 20 4 ,920 R s 812712 7 553RDAV 3RDAV 050C SANTA FEST SANTA RITA ST 2 236 20 4,720 R s 8/27 /2007 55LINCOLN ST LIN COL 015 2NDAV MID BLK S 0 3RD AV 2 610 23 14,030 R s 8/ 21 /2007 53MONTE VERDE ST MNTVRD 020 4THAV OCEANAV 2 1,060 25 26,500 0 s 8/22 /2007 52GUADALUPE ST GUADLP 010 C ITY LIMITS 2NDAV 2 632 27 17,064 R s 8/28 /200 7 50PERRY NEWB ERR Y WY PRYNBY 010 4THAV 6THAV 2 876 23 20 ,148 R s 8/27/2007 50SANTA RITA ST SANRIT 030 5THAV OCEANAV 2 620 25 15 ,500 R s 8/28 /2007 49VALLEY WAY VALLEY 0 10 N CITY LIMITS E CITY LIMITS 2 365 24 8,760 R s 8/27 /2007 49VISTAAV VISTA 010 DOLORES ST JUNIPERO AV 2 708 20 14 ,160 R s 8/20 / 200 7 494THAV 4THA V 070 GUA DALUPE ST CITY LIMITS 2 664 21 13,944 R s 8/28 /2007 48GUADALUPE ST GUADLP 040A OCEANAV 7THAV 2 492 23 11 ,316 R s 8/28 /2007 48SANTA RITA ST SANRIT 0108 2NDAV 3RDAV 2 456 30 13 ,680 R s 8 /28 /2007 48SANTA R ITA ST SANRIT 040 OCEANAV MOUNTAIN VIE WAV 2 650 20 13 ,000 R s 8/28 /2007 47OCEA N A V OCEAN 020 SAN AN TON IO AV MONTE VERDE ST 2 1 ,000 25 25,000 A p 8/29 /2007 46
LADERA DRIVE LADERA 0 1 0 RIORD TURNAROUND 2 1 ,033 23 23 ,759 R s 8/20 / 2007 427THAV 7THAV 0508 FOREST ST CITY LIMITS 2 224 16 3 ,584 R s 8/23 /2007 30
DO LORES ST DLORES 040A OC EANAV 7THAV 2 482 30 14,460
0p 8 /2 1/2007 24
DOLORES S T DLOR ES 040 8 7T H 8THAV 2 381 30 11 .430 0 p 8 /21 /2007 24-
FC (Functiona l Class}: A-Arte ria l, C-Co llecto r, R-ResidentialNovember 2013 ST (Surface Type} : A-AC, C-AC/PCC, 0-AC/AC , P-PCC S-Surface Treatment Page 7 7
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
42/105
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
43/105
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
44/105
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
45/105
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
46/105
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
47/105
Cit y of Carmel-by-the-Sea 2013 PMP Update Dra ft Nichols Co nsu lti n g Engineers, Chtd.Se ct ion Descrip t ion Inven t ory Sorted by Street Name)
Sec tion of Length W idth A rea
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
48/105
1 1 3
St reet Na me Stre et IDSec tion
From Toof Length W idth A rea
FC S T PCI Date PC IID Lanes ft) ft) sq ft)
.SANTE FEST SAN TFE 04 0 5THAV 6T H AV 2 449 23 10,327 R s 8/27 /2007 69
SA NTE F E ST SANT FE 05 0 OCE AN AV 8TH AV 2 906 18 16 ,308 R 0 9/1/2012 100
SAN TE FEST SANTF E 060 8THAV SOUTH EN D 2 408 18 7,344 R s 8/23 /2007 82SCEN IC ROA D SCEN IC 010 OCEAN AV 8THAV 2 865 25 21,625 A A 9/1 /2008 90
SCEN IC ROAD SCEN IC 0 20 8 TH AV BLKA3 SIEND 2 1,420 23 32,660 A A 9/ 1/2008 8 1
SCENIC ROAD SC ENIC 030 BLKA3 S/ END SANTA LUCIA AV 2 1,035 30 31 ,050 A A 9/1/2008 93
SC ENIC ROAD SCEN IC 040 SAN TA LUCIA AV CI TY LIMIT 2 832 30 2 4, 960 c A 9/1 /2008 81
ST ERLING WAY STR LNG 010 PER RY N EW BERR Y WAY TURN AROU ND 2 145 25 3,625 R s 8/20 /2007 7
TORRES ST TORR ES 020 3RDAV 4THAV 2 428 30 12 ,840 c s 8/24 /2007 81
TORR ES ST TO RRE S 040 OC EA NAV 8THAV 2 875 23 20, 125 R A 9/ 1/2012 100
TORR ES ST TORR ES 050 8THAV 285FT N/0 11TH AV 2 1,270 20 25,400 R s 8/23/2007 82
TO RRE S ST TO RRE S 060 285F T N/0 11TH AV 11TH AV 2 285 16 4 ,560 R A 8/23/2007 87
TOR RE S ST TORR ES 01 0A CITY LIMITS 2N D AV E 2 703 18 12,654 R A 9/1/201 1 100
TORRESST TORR ES 010 8 2ND AVE 3RDAVE 2 387 18 6 ,966 R s 8/27 /2007 84
TO RRE S ST TOR RE S 030A 4TH AV 5THAV 2 449 20 8,980 R A 10/1/2013 100
TORRESST TORR ES 030B 5 TH AV OC EANAV 2 620 20 12,400 R s 8/24 /2007 77
VA LLEY WAY VALLEY 010 N CITY LIMITS E CITY LIMITS 2 365 24 8,760 R s 8127/2007 49
VIS TA AV VIS TA 010 DOLO RE S S T JUN IPEROAV 2 708 20 14, 160 R s 8/20/2007 49
VIZCAINO VIZCAN 010 MO UNTAIN VIE W AV FLANDERS WAY 2 762 18 13 ,716 R s 8/20 /2007 76
FC Fu nctio nal C lass): A-Arterial, C-Co llector, R-Reside nt ia lNovem b er 2013 ST S u rface Type): A-AC, C-AC/PCC, 0-AC/AC, P-PCC, S-Surface Treatment Page 7/7
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
49/105
PPENDIXB
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
50/105
Maintenance and Rehabilitation (M R) ecision ree
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
51/105
Maintenance and Rehabilitation (M R) ecision Tree
This report presents the current maintenance and rehabilitation decision tree that exists in thedatabase . The decision tree forms the basis for all of the budgetary computations that are included in
this volume. Changes to the decision tree w ll m ke the results in the budget reports invalid Allpavement treatment unit costs relevant to the street types in the database were updated.
The decision tree lists the treatments and costs selected for preventive maintenance and rehabilitation
activities. Each line represents a specific combination of functional classification and surface type .
The preventive maintenance portion of the report is identified as Condition Category I Very Good. Allpreventive maintenance treatment listings are assigned only to sections in Condition Category I where
the PCI 70. Sections with PCI values less than 70 are assigned to treatments listed in Categories II
through V.
In the preventive maintenance category PCI ;; 70), a time sequence is used to identify the appropriate
treatment and cost . Each preventive maintenance treatment description consists of three parts: 1) a
CRACKtreatment , 2) a SURFACE treatment, and 3) a RESTORATION treatment . These three parts allow
the user to specify one of three different preventive maintenance treatments depending on the prior
maintenance history of the section.
1. The CRACK treatment part can be used to specify the mo st frequent type of preventive
maintenance activity planned typically crack seals).
2 . The SURFACE treatment part can be used to specify more extensive and less frequent
preventive maintenance activ ities, such as chip seals or slurry seals. For example, a
crack seal can be specified on a 3-year cycle with a slurry seal specified after 5 years.3. The RESTORATION part can be used to specify a surface rest oration treatment such as
an overlay) to be performed after a specified number of surface treatments. For
example, after a certain number of successive slurry sea ls, an overlay can be specified
instead of another slurry seal.
Rehabilitation treatments are assigned to sections in Condition Categories II through V PCIIess than 70).
Each line is defined by a specific combination of functional classification, surface type , and condition
category .
COLUMN DESCRIPTION
Functional Class Functional Classification identifying the bran ch number .
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
52/105
COLUMN DESCRIPTION
TreatmentName of treatments from the T reatme nt Descript ions report.
Yrs. Between Crack Sea ls First Row- number of years between succ e ss ive treatment applications specified in the firstrow (i.e. CRACK treatment).
Yrs Between Surfa ce Seals Second Row - number of years between successive treatment applications specified in the
second row (i.e . SURFACE treatment).
Number of Sequenti al Seals Number of t imes that the treatment application in the se cond ro w (i.e. SURFACE treatment)
will be performed prior to performing the treatment application in the third row.
Note that the treatments assigned to each section sho uld not be blindly followed in preparing a street
maintenance program. Engineering judgment and project level analysis should be applied to ensure
that the treatment is appropriate and cost effective for the section .
CITY OF CARMEL
ecision Tree
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
53/105
1 1 8
Printed: 11/0112013
Functional Class Surface Condition Category Treatment Type Treatment Cost/Sq Yd, Yrs Between Yrs Between o f Surfacee x e p ~Seal Crack Seals SurfaceS als Seals beforeCracks n LF: e Overlay
Arterial AC 1- Very Good Crack Treatment DO NOTHING $0.00 99
Surface Treatment SLURRY SEAL $3 .50 4Restoration Treatment THIN AC OVERLAY(1.5 INCHES) $17.50 2
II - Good , Non-Load Related THIN AC OVERLAY (2 ) $23.50I l l - Good, Load Related THIN AC OVERLAY (2 ) $25.50IV - Poor THICKAC OVERLAY(2.51NCHES) $34.00
V - Very Poor RECONSTRUCTSTRUCTURE(AC) $130.50AC/AC 1- Very Good Crack Treatment DO NOTHING $0.00 99
Surface Treatment SLURRY SEAL $3.50 4Restoration Treatment MILL &THIN AC OVERLAY (1.5 ) $20.00 2
II - Good , Non-Load Related MILL & THINAC OVERLAY (2 ) $26.00Ill - Good , Load Related MILL & THINAC OVERLAY (2 ) $28.00IV - Poor MILL &THICK AC OVERLAY (2.5 ) $37.50
Very Poor RECONSTRUCT STRUCTURE (AC) $130 .50
AC/PCC 1- Very Good Crack Treatment DO NOTHING $0.00 99Surface Treatment SLURRY SEAL $3.50 4Restoration Treatment MILL THIN AC OVERLAY 1 .5 ) $20.00 2
II - Good , Non-Load Related MILL THIN AC OVERLAY (2 ) $26.00Ill - Good, Load Related MILL THIN AC OVERLAY (2 ) $28.00IV - Poor MILL THICKAC OVERLAY (2.5 ) $37.50V - Very Poor RECONSTRUCTSTRUCTURE(AC) $130.50
PCC 1- Very Good Crack Treatment RUBBERIZED CRACK SEAL $1.10 4
Surface Treatment DO NOTHING $0.00 99
Restoration Treatment DO NOTHING $0.00II - Good , Non-Load Related DO NOTHING $0.00I l l - Good, Load Related DO NOTHING $0.00IV - Poor PANEL REPLACEMENT $31.00
Very Poor RECONSTRUCT STRUCTURE (PCC) $198.00
t Functional Class and Surface combination not used
Criteria : MTC StreetSaver
CITY OF CARMEL ecision Tree
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
54/105
1 1 9
Functional Clas s Surface
Arterial ST
Criter ia :
Cond ition Category
1- Very Good
II - Good , Non-Load Related
Ill -Good , Load Related
IV - Poor
V - Very Poor
Treatment Type
Crack Treatment
Surface Treatment
Restoration Treatment
Treatment
DO NOTHING
S LURRY SEAL
DO NOTHING
DO NOTHING
THIN AC OVERLAY (2 )
THIN AC OVERLAY (2 )
RECONS TRUCT STRUCTURE (AC)
2
Cost/Sq Yd ,except Sea l
Cracks in LF :0 .00
3 .50
0 .00
0.00
25 .50
28 .00
130 . 50
Printed : /01/2013
o f SurfaceYrs Between Yrs Between Seals beforeCrack Seals Surface Seals overlay
99
4
99
Functional Class and Surface combinat ion not used
MTC S treet S aver
CITY OF CARMEL
ecision Tree
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
55/105
1 2 0
Printed : 11/01/2013
Functional Class Surface Condition Category Treatment Type Treatment Cost/Sq Yd . Yrs Between Yrs Between o f Surfaceexcept Seal Crack Seals Surface Seals Seals beforeCracks rn LF: Overlay
Collector AC 1- Very Good Crack Treatment DO NOTHING $0 .00 99Surface Treatment SLURRY SEAL $3 .50 4Restoration Treatment THIN AC OVERLAY(1.51NCHES} $17.00 3
II - Good , Non-load Related THIN AC OVERLAY (2 } $22.50Ill - Good , load Related THIN AC OVERLAY (2 } $24 .00IV - Poor THICK AC OVERLAY(2.5 INCHES} $31.50V - Very Poor
RECONSTRUCT STRUCTURE (AC) $92 .00AC/AC 1- Very Good Crack Treatment DO NOTHING $0 .00 99
Surface Treatment SLURRY SEAL $3.50 4Restoration Treatment M i l l & THIN AC OVERLAY (1.5 } $19.50 3
II -Good , Non-load Related M i l l & THIN AC OVERLAY (2 } $25.00Ill - Good , load Related MILL& THIN AC OVERLAY (2 } $26 .50IV - Poor MILL& THICK AC OVERLAY (2.5 } $35.00V - Very Poor RECONSTRUCT STRUCTURE (AC} $92 .00
AC/PCC 1- Very Good Crack Treatment DO NOTHING $0.00 99Surface Treatment SLURRY SEAL $3.50 4Restoration Treatment M i l l & THIN AC OVERLAY (1.5 } $19 .50 3
II - Good , Non-load Related M i l l & THIN AC OVERLAY (2 } $25 .00Ill - Good , load Related MILL& THIN AC OVERLAY (2') $26 .50IV - Poor M il l & THICK AC OVERLAY (2 .5 } $35.00V - Very Poor RECONSTRUCT STRUCTURE (AC} $92.00
PCC 1- Very Good Crack Treatment RUBBERIZED CRACK SEAL ~ _ 1 .00Surface Treatment DO NOTHING C $0.00
RECONSTRUCT PCC $80 .00 ..estoration Treatment r1 (] 3I . . . .__._. . ----II - Good, Non-load Related DO NOTHING
,.$0 .00~ J
I l l - Good, load Related DO NOTHING~ ~ ~ ~
$0 ,00
DO NOTHINGIV - Poor ~ $0.00V - Very Poor RECONSTRUCT PCC (
~$80 ,00
Functional Class and Surface combination not usedCriteria: 3 MTC StreetSaver
CITY OF CARMELecision Tree
P i d / /2013
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
56/105
1 2 1
Functional Class Surface
Collector ST
Criteria :
Condition Category
1- Ve ry Good
II - Good, Non-Load Related
Ill- Good , Load Related
IV - Poor
V - Very Poor
Treatment Type
Crack Treatment
Surface Treatment
Restoration Treatment
Treatment
DO NOTHING
SURF ACE SEAL
O NOTHING
O NOTHING
THIN AC OVERLAY (2 )
THIN AC OVERLAY (2 )
RECONSTRUCT STR UCTURE (AC)
4
Cosi/Sq Yd ,except Seal
Cracks in LF :.00
3.50
.00
0 .00
24 .00
26.00
92 .00
Printed : / /2013
o f S ur fa ceYrs Between Yrs Between Seals befo reCrack Seals Surfac e Seals overlay
9
4
99
Functional Class and Surface combination not used
MTC StreetSaver
CITY OF CARMEL ecision Tree
Printed : 11/01/2013
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
57/105
1 2 2
Printed : 11/01/2013
Functional Class Surface Condition Category Treatment Type TreatmentCost /Sq Yd , Yrs Between Yrs Between o f Surfacee x c e p ~Seal Crack Seals Surface Seals Seals before
Cracks 1n LF : OverlayResidential/Local AC 1- Very Good Crack Treatment DO NOTHING $0 .00 99
Surface Treatment SLURRY SEAL $3 .50 4
Restoration Treatment THIN AC OVERLAY(1 .5 INCHES) $15 .50 3II - Good , Non-Load Related THIN AC OVERLAY (2 ) $20.50
I l l - Good , Load Related THIN AC OVERLAY (2 ) $22.00
IV - Poor THICK AC OVERLAY(2 .5 INCHES) $29 .00
V -Very Poor RECONSTRUCT STRUCTURE (AC) $67 .00
AC /AC 1- Very Good Crack Treatment DO NOTHING $0 .00 99
Surface Treatment SLURRY SEAL $3 .50 4
Restoration Treatment MILL& THIN AC OVERLAY (1.5 ) $18 .00 3
II - Good , Non-Load Related MILL & THIN AC OVERLAY (2 ) $23 .00
I l l - Good , Load Related MILL&THIN AC OVERLAY (2 ) $24 .50
IV - Poor MILL& THICK AC OVERLAY (2 .5') $32 .00
V - Very Poor RECONSTRUCT STRUCTURE (AC) $67 .00
AC/PCC 1- Very Good Crack Treatment DO NOTHIN G $0 .00
_~ . . . . ; , . r ~ . . _ _ = =
Surface Treatment SLURRY SEAL - - . ~ ~ _ . . lC $0 .75Restoration Treatment MILLAND THIN OVERLAY - - ~ J C $5 .04 L.....:::....::xr .r - 3
I - Good , Non -Load Related CHIP SEAL WITH CRO _J 1 .50Ill - Good, Load Related CHIP S EAL WITH CRO ' ] c _ : 1 .50IV - Poor MILL ANDTHIN OVERLAY ~ ' l L $5.04V - Very Poor RECONSTRUCT SURFACE (A C) = r $27 .00
PCC 1- Very Good Crack Treatment RUBBERIZED CRAC K SEAL ___ J 1 .00Surface Treatment DO NOTHING l l ~ $0 .00Restoration Treatment RECONSTRUCT PCC
5 ~$80 .00 If : 3
II - Good , Non -Load Related RE CON STRUCT STRUCTURE ( AC ) $40 .00
Ill - Good , Load Related DO NOTHING _j[___ $0 .00
IV - Poor DO NOTHING - l . $0 .00V - Very Poor REC ONSTRUCT PCC : ; r ~ ~ $80 .00
,.- Functional Class and Surface combination not used
Criter ia : 5 MTC StreetSaver
CITY OF CARMEL ecision Tree
Printed: 11/01/2013
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
58/105
1 2 3
Fun ction al Class Su rface Condition Ca tegory
Residential/local ST
Criteria :
1- Very Good
II - Good, Non-load Related
I l l - Good , load Related
IV Poor
V - Very Poor
Treatment Type
Crack Treatment
Surface Treatment
Restoration Treatment
Treatment
DO NOTHING
SURFACE SEAL
DO NOTHING
DO NOTHING
THIN AC OVERlAY (2 )
THIN AC OVERlAY (2 )
REC ONSTRUCT STRUCTURE (AC)
6
Printed: 11/01/2013
o f Su rfa ceCost/Sq Yd , Yrs Between Yrs Between Seals beforeexcept Seal Crack Seals Surface Seals overlayc racks in LF:
$0.00 9
~
~ . 0 0 99
0 .00
0 0
2 ~ 0 0
6 ~ 0 0
Functional Class and Surface combination not used
MTC StreetSaver
CITY OF CARMEL
ecision Tree
Printed: 11/01/2013
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
59/105
1 2 4
Printed: 11/01/2013
Functional Class Surface Condition Category Treatment Type Treatment Cost/Sq Yd, Yrs Betwee n Yrs Betweenof
Surfacee x e p ~Seal Crack Seals Surface Seals Seals beforeCracks m LF: Overlay
Other AC 1- Very Good Crack Treatment DO NOTHING $0.00 99Surface Treatment SLURRY SEAL $3 .50 4Restoration Treatment THIN AC OVERLAY(1.5 INCHES) $15.50 3
II - Good , Non-Load Related THIN AC OVERLAY (2 ) $20.50I l l - Good, Load Related THIN AC OVERLAY (2 ) $22.00IV - Poor THICK AC OVERLAY(2 .5 INCHES) $29 .00V- Very Poor
RECONSTRUCT STRUCTURE (AC) $67 .00AC/AC 1- Very Good Crack Treatment DO NOTHING $0.00 99
Surface Treatment SLURRY SEAL $3.50 4Restoration Treatment MILL& THIN AC OVERLAY (1.5 ) $18 .00 3
II - Good , Non-Load Related MILL& THIN AC OVERLAY (2 ) $23 .00I l l - Good , Load Related MILL& THIN AC OVERLAY (2 ) $24.50IV - Poor MILL& THICK AC OVERLAY (2 .5 ) $32.00V- Very Poor RECONSTRUCT STRUCTURE (AC) $67.00
AC/PCC 1- Very Good Crack Treatment DO NOTHING _ ~ $0 .00~ . . . - - - - : : : : ; :Surface Treatment SLURRY SEAL - ..:J _ r $0.75Restoration Treatment MILL AND THICK OVERLAY ~ 5 .85
II - Good , Non-Load Related SLURRY SEAL [ $0 .75Ill -Good, Load Related MILL AND THICK OVERLAY L $5.85IV - Poor MILL AND THICK OVERLAY '1TTI $5,85
:J ~
V- Very Poor RECONSTRUCT SURFACE (AC) _{L $27 .00PCC 1- Very Good Crack Treatment RUBBERIZED CRACK SEAL 1 .10 5
Surface Treatment DO NOTHING $0 .00 99Restoration Treatment DO NOTHING $0.00 99
II - Good, Non-Load Related DO NOTHING $0.00I l l - Good, Load Related DO NOTHING $0.00IV - Poor PANEL REPLACEMENT $27.50
Very Poor RECONSTRUCT STRUCTURE (PCC) $175.00
Functional Class and Surface combination not usedCriteria : 7 MTC StreetSaver
CITY OF CARMELecision Tree
Printed: 11 /01/20 13
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
60/105
1 2 5
Functional Class Surface
Other ST
Criteria :
Condition Category
1- Very Good
II - Good, Non-Load Related
I l l - Good , load Related
IV - Poor
V - Very Poor
Treatment Type
Crack Treatment
Surface Treatment
Restoration Treatment
Treatment
DO NOTHING
SURFACE SEAL
DO NOTHING
DO NOTHING
THIN AC OV ERLAY (2 )
THIN AC OVERLAY (2 )
RECONSTRUCT STR UCTURE (AC)
8
Cost/Sq Yd .except Seal
Cracks in LF:0 .00
3 .50
$0.00
0 .00
$22 .00
$24 .00
$67.00
o f SurfaceYrs Between Yrs Between Seals beforeCrack Seals Surface Seals over la y
9
100
Functional Class and Surface combi nation not used
MTC Stree tSaver
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
61/105
PPENDIXC
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
62/105
udget Needs Reports
udget eeds Reports
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
63/105
udget eeds Reports
The purposeof
this module is to answer the question: f the City hod allthe
money in the worldwh t
sections should be fixed nd how much will it cost? Based on the Maintenance & Rehabilitation (M&R)decision tree and the PCis of the sections, the program will then select a maintenance or rehabilitation
action and compute the total costs over a period of five years . The Budget Needs represents the idealworld funding levels, while the Budget Scenarios reports in the next section represent the most cost
effective prior itization possible for the actual funding level s.
A budget needs analysis has been performed. The summary results from the analysis are shown below .
An interest rat e of 5 and an inflation f ctor of 5 were used to project the costs for the next fifteenyears . This report shows the tot l fifteen-year budget th t would be required to meet the City's
standards as exemplified in the M&R decision tree .
Budget Needs reports included in this volume are l isted below:
.> Projected PCI Cost SummaryPreventative Maintenance Treatment Cost Summary
Rehab ilit ation Treatment Co st Summary
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
64/105
Budget Needs Projected PCI/Cost Summary
Needs Projected PCI/Cost Summary
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
65/105
Needs Projected PCI/Cost Summary
This report summarizes and projects the City's network P I values over a five-year period, both with andwithout treatment s applied. These costs are based on those in the M R decision tree . t also projects
the costs over a five-year period.
OLUMN DESCRIPTION
Year Year in the ana lysis period.
P I Treated Projected network average P I with all needed treatments applied.
P I Untreated Projected network average P I without any treatments applied .
PM Cost Total preventive maintenance treatment cost .
Rehab Cost Total rehabilitation treatment cost.
Cost The budget required for each year in the analys is period to meet the City's standard as
shown on the M R decision tree .
Total Cost Total budget required over a fifteen -yea r period.
CITY OF CARMEL eeds Projected PCI Cost Summary
Inflation Rate= 5.00 Printed: 11 /01/20 13
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
66/105
Year PCI Treated PCI Untreated PM Cost Rehab Cost Cost __
..
____-
2014 74 61 155,027 3,562,925 3 ,717,952
2015 74 59 57,019 859,029 916,048
2016 75 56 51,127 720 ,136 771 ,263
2017 75 52 68,638 522,620 591,258
2018 77 49 566,673 650,093 1,216 ,766
2019 77 46 178,178 384,418 562,596
2020 77 43 166,779 486,494 653,273
2021 77 39 161,958 294,057 456,015
2022 80 36 781,671 668,745 1,450,416
2023 85 33 347,027 1,788,703 2,135,730
2024 88 30 251,669 1,270,344 1 ,522,013
2025 87 28 503,141 119,724 622,865
2026 87 25 796,140 40,201 836,341
2027 87 21 539,239 314,854 854,093
2028 87 18 610,296 0 610,296
PMPM
TotalCost Rehab Total Cost Total
Cost
30.94% 5,234,582 11,682,343 16,916,925
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
67/105
Budget Needs Preventive Maintenance Treatmen t/Cost Summary
Needs Preventive Maintenance Treatment Cost Summary
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
68/105
This report summarizes each preventive maintenance treatment type, quantity o f pavement affected,and total costs over the five-year period. t also summarizes the total quantities and costs over the ne xt
five years .
COLUMN DESCRIPTION
Treatment Type of preventive maintenance treatment s needed .
Year Year in the analysis period i.e. 2013, 2014, 2015, etc) .
Area Treated Quant it ie s in linear feet Rubberized Crack Seal) or square yard Slurry Seal Th in AC Overlay).
Cost Maintenance treatment cost.
CITY OF CARMEL Needs Preventive MaintenanceTreatment/Cost Summary
Inflation Rate 5.00 % Prin ted : 11/01/2013
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
69/105
Treatment Year Area Treated Cost
RUBBERIZED CRACK SEAL2014 89.57 sq. yd. 992018 78 .79 sq. yd. 1062020 9.17 sq. yd. 142022 67 .51 sq.yd. 1102026 56.62 sq.yd. 1122028 46.14 sq. yd . 101
Tota l 347 .8 542
SLURRY SEAL2014 44,262 .67 sq.yd . 154,9282015 15,514 .22 sq.yd . 57 ,0192016 13,248 .67 sq .yd. 51 t 1272017 16,939 sq. yd . 68,6382018 133 ,166 .56 sq. yd. 566,5672019 39,885.44 sq .yd . 178,1782020 35 ,553.22 sq .yd . 166,7652021 32,884 .67 sq.yd . 161 ,9582022 139 ,118.33 sq.yd. 719,4362023 46,661.22 sq.yd. 253 ,3652024 44,141.78 sq.yd . 251,669
2025 41 ,333.44 sq. yd. 247,4402026 104 ,759.33 sq.yd . 658,4972027 81,702.11 sq.yd . 539,2392028 59,180.89 sq.yd . 4 10,125
To tal 848 ,351 .56 4,484 ,951
THIN AC OVERLAY 1 .5 INCHES)2022 2,402. 78 sq .yd . 62 ,1252023 3,450 sq.yd . 93,6622025 8,543 sq.yd . 255,7012026 4 ,376.11 sq.yd . 137,53 1
2028 5 ,774.22 sq .yd . 200,070Total 24,546 . 11 749,089
Total Quantity 873,245.46 5,234,582
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
70/105
Budget Needs Rehabilitation Treatment/Cost Summary
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
71/105
CITY OF CARMEL eeds RehabilitationTreatment Cost Summary
Inflation Rate = 5.00 % Printed : 11 /01/2013
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
72/105
Treatment Year Area Treated Cost
MILL &THICK AC OVERLAY (2.5 ) 2017 5,093 .33 sq.yd. $221 ,107
Total 5,093.33 sq .yd . $221 ,107
MILL & THIN AC OVERLAY (2 ) 2014 10,189.56 sq.yd. $277,184
Total 10 ,189 .56 sq .yd . $277,184
RECONSTRUCT STRUCTURE (PCC) 2014 2,876 .67 sq .yd. $503,417
Total 2,876 .67 sq.yd . $503,417
THIN AC OVERLAY (2 ) 2014 58,376 .22 sq .yd . $1,377,3032015 18,940.11 sq .yd. $476,9502016 17 ,852.89 sq .yd . $509,40720 17 10,852.33 sq.yd. $301 ,5132018 21 ,938 .67 sq .yd . 650 ,0932019 12,550 sq .y d. $384,4182020 13,522 .56 sq.yd. $453,0052021 8,448.78 sq .yd . $294 ,0572022 18 ,266 .56 sq .yd . $653 ,3062023 47 ,148.89 sq.yd. $1,788,703
2024 32 ,432 .11 sq .yd . 1 ,270 ,3442025 2 ,916.67 sq .yd . $119 ,724202 7 2 ,513.89 sq.yd . $113 ,768
Total 265 ,759 .67 sq .y d . 8 ,392,591
RECONSTRUCT STRUCTURE (AC) 2014 15 ,844 .22 sq.yd . 1 ,061 ,5662015 5,431 .11 sq.yd . $382,0792016 1 ,573 .33 sq .yd. $116 ,219
Total 22,848.67 sq.yd , 1 ,559 ,864
THICKAC OVERLAY(2.51NCHES) 2014 7 ,568 .89 sq .yd . $257 ,3 432016 2 ,878 .33 sq .y d. $94,5102020 735 sq .yd. $33,4892022 360 .33 .yd . $15,439
Tota l 11 ,542 .56 sq .yd . $400 ,781
PANEL REPLACEMENT 2014 2,777 .78 sq.yd . $86 ,1122026 814 sq.yd . $40 ,2012027 3 ,440 sq .yd . $201,086
Tota l 7 ,031 .78 sq .yd. $32 7,399
Total Cost $11,682,343
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
73/105
Scenarios 1 3
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
74/105
Scenario : urrent City Funding Level
Cost Summary Report
Network Condition Summary Report
CITY OF CARMEL Scenarios ost Summary
Interest : 5.00 % Inflati o n : 5.00 % Printed: 11 /04 /2013
Scenario: 1. Existing Budget (2013)
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
75/105
PreventativeYear P M A m t Budget Rehab I tatio n Maintenance Surp lus PM Defer red Stop Gap
2014 19% 634 ,000 II 94 ,701 Non- 122,671 0 2 ,862,423 Funded 0Ill 5,390 Project Unmet 22 ,394
IV 410,498 Project 0
v 0Total 510 ,589
Project 0
2015 14% 634 ,000 II 108 ,817 Non - 90,993 0 3 ,172,783 Funded 0Ill 388,300 Project Unmet 7,081
IV 41,396 Pro ject 0
v 0Total 538,513
Project 0
2016 8% 634 ,000 II 68,796 Non- 51 ,127 0 3,247,594 Funded 0Ill 83 ,275 Project Unmet 2 ,793
IV 424 ,355 Project 0
v 0~ . . . : : . . _ . : : : _ _
Total 576,426
Project 0
2017 10% 634 ,000 II 38.492 Non - 68 ,638 0 3,368 ,770 Funded 0Ill 0 Proje c t Unmet 876
IV 521 ,269 Project 0
v 0~ = Total 559,761
Project 0
2018 20% 634 ,000 II 0 Non- 130,702 0 4,478,658 Funded 0Ill 11 ,731 Pro ject Unmet 1,328
IV 490 ,744 Project 0
v 0~ a . : = = . ; .
Total 502,475
Project 0
2019 20% 634 ,000 II 43,781 Non- 136 ,007 0 4,566 ,803 Funded 0Ill 0 Project Unmet 29,749
IV 453 ,919 Project 0
Year PM mt Budget Rehabilitation
2 2 20% 634,000 II 94 ,553Ill 0
IV 390 ,717
v 0
PreventativeMaintenance
Non - 148,320Project
Project 0
Surplus PM
0
Deferred Stop Gap
4,671,326 Funded 0
Unmet 17 ,089
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
76/105
Total 485 ,270
Project 0
2 21 20% 634,000 II 0Ill 0
IV 461,277
v 37,543~ ~
Total 1 ,148 ,093
Pro ject 0
2016 4% 1 ,200 ,000 II 115 ,609 Non 74 ,417 0 1, 863 ,696 Fu nded 1 ,35 3Ill 44,646 Project Unmet 0
IV 526,128 P roject 0v 437 ,028
~ ~ = : ; ; ; : ; ; ; ; ; ; : :
Total 1 ,123 ,411
Pro ject 0
2017 5% 1 ,200 ,000 II 0 Non- 76 ,180 0 1,471 ,298 Funded 0Ill 0 Project Unmet 0
IV 52 2, 620 Project 0
v 598 ,954Total 1 '121 ,574
Project 0
2018 15% 1 ,200 ,000 II 0 Non- 191 ,888 0 1 ,287,524 Funded 0Ill 0 Project Unmet 0
IV 650 ,093 Project 0
v 357 ,427...
Total 1 ,00 7,520
Proje ct 0
2019 15% 1 ,200 ,000 II 0 Non - 213 ,826 0 804,279 Funded 3 ,037Ill 0 Project Unmet 0
IV 384,418 Project 0
Ye a r PM Amt Budget Rehab ilita t ion
2020 15 % 1 ,200 ,000 II 0Ill 0
IV 486,494
270 ,956- ~ : :
Total 757,450
P j t 0
PreventativeMa intenance
Non - 428 ,701Pro ject
Project 0
Surplus PM
0
Deferred Stop Gap
376,790 Funded 0
Unmet 0
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
88/105
Project 0
2021 14% 1 ,200 ,000 II 0
Ill 0
IV 294 ,057
395 ,630= . ; : = ; : : . ~
Total 689,687
Project 0
2022 15% 1 ,200 ,000 II 0Ill 0
IV 668 ,745
0_ ~ .Total 668,745
Project 0
2023 15% 1 ,200,000 II 0Ill 0V 1 ,001 ,131
v 0Total 1 ,001 ,131
Project 0
2024 15% 1,200,000 II 0Ill 0
IV 1 ,002,350
v 0Tota l 1 ,002,350
Project 0
2025 15% 1,300 ,000 II 0Ill 0V 1 ,102 ,449
v 0Total 1 ,102,449
Project 0
2026 15% 1 ,300,000 II 0Ill 0
0
Non 209 ,160Project
Project 0
Non- 348 ,819Projec t
Project 0
Non - 190 ,040Project
Project 0
Non 187 ,679Project
Project 0
Non- 195 ,895Project
Project 0
Non- 1 ,221,399Project
Pr o ject 0
0
0
0
0
0
0
0 Funded 0
Unmet 0
0 Funded 0
Unmet 0
1 ,181,178 Funded 7 ,857
Unmet 0
1,809,429 Funded 9,753
Unmet 0
1 ,281 ,788 Funded 998
Unmet 0
0 Funded 0
Unmet 0
PreventativeYear PM Amt Budget Rehabilitation Maintenance Surplus PM Deferred Stop Gap
2027 15% 1 ,300,000 II 0 Non- 250 ,513 0 0 Funded 0Ill 0 Project Unmet 0
IV 113,768 Project 0
v 368,488~ ~ = =
Total 482,256
Project 0
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
89/105
Project 0
2028 15% 1,300 ,000 II 0 Non- 489,991 0 0 Funded 0Ill 0 Project Unmet 0
IV 0 Project0
v 706 0 83: = = ~ ~
Total 706,083
Project 0
ummary Funded UnmetFunctional Class Rehabilitation Prev . Main Stop Gap Stop Gap
Arterial 1 ,711,809 1 ,308 ,842 0 0
Collector 1,445,387 738 ,092 1 ,473 0
Other 1 ,083 ,287 355,945 5 ,733 0
Resident ial/Local 8,620 ,364 1 ,834 ,597 40 ,060 0~
-rand Total : 12 ,860 ,847 4 ,237,4 76 47,267 0- - - - - - - -
CITY OF CARMEL Scenarios Network ondition Summary
Interest: 5% Inflation: 5% Printed: 11 /01 /2013
Scenario: 3 . Unconstrained
Year Budget PM Amt Year Budget PMAmt Year Budget PM Amt1 200 000 11% 4%
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
90/105
2014 1,200 ,000 11% 2015 1 ,200,000 4% 2016 1,200 ,000 4%2017 1,200,000 5% 2018 1 ,200 ,000 15% 2019 1 ,200 ,000 15%
2020 1 ,200,000 15% 2021 1 ,200,000 14% 2022 1,200,000 15%
2023 1 ,200 ,000 15% 2024 1 ,200 ,000 15% 2025 1 ,300 ,000 15%
2026 1,300,000 15% 2027 1,300 ,000 15 % 2028 1,300,000 15%
Projected Network Average PCI by year
Year Ne ver Treated W1th Selected Treatment2014 61 672015 59 692016 56 702017 52 722018 49 742019 46 762020 43 782021 39 77
2022 36 792023 33 812024 30 832025 28 852026 25 862027 21 852028 18 85
Percent Network Area by Functional Class and Condition Category
Condition in base year 2014 prior to applying treatments.
Cond1t1on Artenal Collector Res /Loc Other Total10 .0% 3.2% 9.4% 3 .8% 26 .5%
II Ill 11 .1% 10 .0% 37.8% 3.0% 61 .9%IV 2.4% 0 .5% 3 .5% 0.7% 7.1%v 0.0% 0.0% 3.7% 0 .7% 4.4%Total 23 .6% 13 .7% 54 .5% 8.2% 100 .0%
Condition in year 2014 after schedulable treatments applied .
Cond1t1on Artenal Collector Res /La c Other Total18.6% 4.4% 9.5% 4.3% 36 .9%
5 .0% 9 .3% 37.8% 2.8% 54.9%
CITY OF CARMEL
Condition Arterial Co l lector
20 7 13 7
Scenarios Network ondition Summary
Res / Loc
54 0
Other
8 2
Printed : / / 2013
Scenario: 3 . Unconstrained
Total
96 7
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
91/105
20 .7 13 .7
11 111 2.9 0 .0
Total 236 13.7
54 .0
0.4
54 .5
8.2
0 .0
8 .2
96.7
3.3
100 .0
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
92/105
ppendixD
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
93/105
Scenario 1: urrent City Funding Level Sections Selected For Treatment
ections elected for reatment
This report summar izes a list of prospective streets eligible for maintenance o r rehabilitation as selected
by th StreetSaver program. his list is for budgeting and planning purposes only it does not represent a
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
94/105
final list of streets needed to be worked on. Final decision for section selection will be based on fieldreview by City Staff .
CITY OF CARMEL Scenar ios Sections Selected fo r Tr eatme nt
Interest: 5 .00% Inflation : 5 .00 % Printed : 11/04 /20 13
Scena rio: 1. Existing Budget (2013 )
Year Budget PMAmt Year Budget P M Amt Year Budget PM Amt2014 $634 ,000 19% 2015 $634 ,000 14% 2016 $634 ,000 8%
20 17 $634.000 10% 2018 $634 ,000 20% 20 19 $634 .000 20%
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
95/105
1 6 0
, 19
2020 $634 ,000 20% 2021 $634 ,000 20% 2022 $634 ,000 20%
2023 $200 ,000 20% 2024 $200 ,000 20% 2025 $200 ,000 20 %
2026 $200,000 20% 2027 $200 ,000 20% 2028 $200 ,000 20 %
Street Name Begin Location End Location S t reet ID Section ID F C Su r face PCI Cost Rating Treatment
Y ear 2014
OCEAN AV JUNIPEROAV CARPENTER ST OCEAN 040 A PCC 88 $99 5,710 ,108 RUBBERIZED CRACK SE AL
Trea tm e nt Tota l 99 n AV DOLORESST SAN CARLOS ST 7THAV 030 0 PCC 100 $0 0 PANELREPLACEMENT
.. DOLORES ST 7TH 8THAV DLORES 0408 0 PCC 100 $0 0 PANE L REPLACEMENT
OC EAN AV SAN ANTON IO AV MO NTE VERDE ST OCEAN 020 A PCC 100 $86 ,112 18 ,828 PANE L REPLACEMENT
**SAN CARLOS ST OCEAN AV 8THAV SAN CAR 050 A PCC 100 0 0 PANELREPLACEMENT
Treatment Tota l 86,112
JUNIPEROA V 3RDAV 4THAV JUNPRO 040 A AC/AC 100 $75 ,736 16 ,959 MILL THIN AC OVER LAY(2 )
Treatment Tota l $7 5 ,736
3RDAV TORRES ST SANTA FEST 3RDAV 040 A AC 100 $18 ,965 20 ,146 THIN AC OVERLAY (2 )
ESCOLLEWAY PERRY NEWBERRY TURN AROU ND ESCO LL 010 R S T 100 5 ,390 11 ,704 THIN AC OVERLAY (2 )WAY
GUADALUPE ST 6TH AV OCEA N AV GUADLP 030B R ST 100 $9.334 14 ,095 THIN AC OVERLAY (2 )
SAN ANTON IO AV OCEANA V 8THAV SANAN 015 c ST 100 57,70 9 16 ,341 THIN AC OVERLAY (2 )
T reatment Total $91 ,39811THAV JUNIP EROAV EAST END 11THAV 040 R AC 86 $4.6 06 22 ,837 SLURRY SEAL
13 TH AV 48 FTW/0 SAN JU NIPERO AV 13THAV 030 A AC/AC 87 $5,390 42,275 SLUR RY SEALCARLOS ST
2NDAV N. CASANOVA STREET MONTE VERDE STREET 2NDAV 03 0 R AC 85 $2 .674 26 ,902 SLURR Y S EAL
5THAV DOLORES ST SA N CARLOS ST 5THAV 0 12 c AC 90 $2.773 28 ,096 SLURR Y SEAL
** - Treatment from Project Selection 1 MTC St reetSa ver
Scen a rios Cri teria : SS1026
Stre et Nam e
6THAV
6THAV
7T H AV
8T H AV
CAM INO D EL MO NTECAMINO DEL MONT E
Beg in Location
MI SS ION S T
JU NIPE R OAV
SA N CARL OS S T
SA N CA RLOS ST
CITY LIMI
T3R D AV
End Loc at ion
J UNIP ERO AV
TOR R ES ST
JU NI PERO AV
JU NI PERO AV
2ND STREE TJUN IP ERO AV
Street 10
6TH AV
6THAV
7THAV
8THAV
CMDM NTCMDMNT
Sec tion 10
025
030
040
035
010020
FC Surface PCI
0 AC 87
C AC 88
0 AC 87
A AC 85
A AC/AC 87A AC 85
Cost
$2 ,772
$2 ,798
$5 ,4 55
$6 ,789
1 ,789$10 675
Ratin g Treatment
22,4 56 SL URRY SE A L
36 ,637 S LURRY SEAL
22 ,455 SLU R RY SEAL
36,339 S LURRY SEA L
41 ,611 SLURRY SEAL36 070 S LURRY SEAL
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
96/105
1 6 1
CAMINO DEL MONT E
FO R ESTRD
J UNI PEROAV
OCEA N AV
RIORD
SA N C ARLOS ST
SA NTA LU C IA AV
SANTA LUC IA AVSCE NIC R OAD
SCEN IC ROAD
TORRES ST
RIO RD
Year 2 15
SAN CARLOS ST
JUN IPEROAV
SA N ANT O NIO AV
SA N CARLOS STSCEN IC ROAD
4THAV
6T HAV
3R D AV
MOU NTA IN VIEW
CAM INO DEL MO NTE
CARP EN T ER ST
J UNIPE RO AV
8THAV
SCE NIC R D
CAM INO REALOCEA N AV
BLKA 3 S/END
285FT N/0 11TH AV
SANTALUC IAAV
3RDAV
4THAV
4TH AV
11TH AV8T H AV
SANTA FEST
MONTE VERDE ST
** - Treatment from Project S ele ction
Scen ar ios Criter ia :
JUN IP ERO AV
7TH AVE
2N D AVE
C ITY LIMITS
SA NTA LUC IA AV
11T H AV
CAM INO R EA L
DOLORES ST8 TH AV
SANTA LU C IA AV
11T H AV
SOUT H CITY LIMIT
5THAV
OCEA N AV
OCEA N AV
13TH AVBLK A3 S\E ND
SA NTA RITA ST
LINCO LN S T
CMDMNT
FOR E ST
JUN PR O
OC EA N
R IORD
SA NCAR
SA NLUC
SA NLUCSCE NIC
SCEN IC
TOR RES
RIORD
SA NCAR
JU NPRO
SA NAN
SA NCARSCE NIC
4THAV
6THA V
020
010
20
050
010
060
0 10
02001 0
030
060
020
030
050
010
070020
0608
0 10
2SS 102 6
A AC 85
R AC 87
C AC 89
A AC 86
A AC 82
A AC 83
C AC 87
C AC 89A AC 86
A AC 88
R AC 85
$10,675
$4 ,795
$2 ,101
$4 ,642
$3 ,559
$23,112
$7 ,465
$8 ,918$8 ,41 0
$12 ,075
$ 1,774
Tre at ment Tota l 122,572A AC 100 $257 ,343
Treat ment T ota l
Ye ar 201 4 Total
A AC /AC 100
Trea tment To talA AC 100
A S T 100
A AC 100A AC 100
Treatment To talR AC 92
0 AC 87
57 ,34 3
633,260
$105 ,6 44
105 ,644$185 ,492
$4 1 ,396
$108 ,817$9 7 ,164
432,869$2 ,170
$2 ,898
36 ,070 S LURRY SEAL
22 .148 SLURRY SEA L
28,4 73 SLURRY S EAL
36 ,03 2 S LUR RY S EAL
52,488 SLURRY SEAL
37,227 SLURRY SEAL
28 ,698 SLURRY SEAL
28 ,455 S LURRY SEA L36.0 18 SLURRY SEA L
34,209 SL URRY SEA L
23 ,577 SLURRY SEAL
17 ,297 TH ICK AC OVERLAY (2 .5INCHES)
16 ,212 MILL & T HIN AC OVER LA Y(2 )
17,198 THIN A C OV E RLAY (2 )
18,289 THIN AC OVERLAY (2 )
17, 478 THIN AC OV E R LAY (2 )16,552 THIN AC OVERLAY (2 )
14 ,570 SL URRY SEAL
21 ,390 SLURRY SEAL
MTC StreetSaver
St r e e t Name
DOLORES ST
DOLORESST
DOLORES ST
GUADALUPE ST
JUNIPEROAVLAUSE N DRIVE
Begin Location
VISTAAV
4THAV
FRANCISCA N WY
5THAV
OCEANAVRIOR D
E nd Loca t ion Street ID
2ND AV DLORES
5TH AV DLORES
Cll LIMIT DLORES
6TH AV GUADLP
8TH AV JUNPROS HARP RD BEND/C il LAUSE N
Sect ion ID
010
031
090
030A
060010
F C Surface PCI
R AC 92
0 AC 91
R AC 87
R AC 92
A AC 91C AC 94
Cost
$9,484
$5 ,807
$2 ,012
$3 ,594
$21 .221$6 ,59 1
Rating Treatment
14 ,570 SLURRY SEAL
16 ,761 SLURRY SEAL
21.433 S LURRY SEAL
14,570 SLURRY SEAL
27, 481 SLURRY SEAL21,375 SLURRY SEAL
8/13/2019 Receive and File the 2013 Pavement Management Program Update Report 12-03-13
97/105
1 6 2
LINCOLN ST
LOBOS ST
MISSION ST
MISSION ST
TOR RES ST
Year : 20 16CARPE NTER ST
3RDAV
5TH AV
5THAV
OCEAN AV
SAN CARLOS S T
SCEN IC ROAD
1 THAV
1STAV
2NDAV3RDAV
DEL MARAV
GUADALUPE ST
OCEAN AV
5TH AVE
2NDAV
3RDAV
OCEAN AV
Cll LIMITS
C ll