Upload
trannhi
View
248
Download
3
Embed Size (px)
Citation preview
SERVICES CATALOG
ASTER INTEGRAL SERVICE CATALOG
INNOVATIVE SOLUTIONS ©2014 www.aster‐integral.com
ENERGY
We offer services for feasibility studies, engineering design, procurement assistance, construction
supervision and project management for the following fields:
Power generation from Solar‐Photovoltaics (standalone and grid‐connected power plants),
Hydropower, Biomass (Wood residues and Biogasification), Wind energy
Power transmission and Distribution (132kV, 33kV, 11kV, 415/240V voltage standards)
Rural electrification including medium and low voltage networks as well as customer service
connections
Hybrid and Standalone mini‐grid power supply schemes for isolated remote communities
Network studies, Dynamic and Transient stability study for power networks and distributed
power generation systems
Energy efficiency, Power audits and retrofits for power factor correction
Electrical installations for factories, commercial buildings and Residential houses
Power market studies, Energy economics and financial analysis
Solar‐thermal technology for related applications like water heating for domestic, institutional
and commercial applications
Power backup and Uni‐interruptible Power Supply systems based on online technology for
commercial buildings, institutions and Residential houses
Example‐1: Hydropower development and implementation
ASTER INTEGRAL was contracted by Hydromax Limited to provide various consulting services for
feasibility study, ESIA for the 9MW Buseruka HPP power evacuation, including engineering design of
Kinubi‐substation extension. We also provided services for Network studies, loadflow analysis,
dynamic and Transient stability studies, technical assistance to commissioning and protocols for the
plant as well as specialized rural electrification planning within the project area of Buseruka‐Hoima.
ASTER INTEGRAL is also providing various expert services for the proposed 10MW Nkusi Hpp,
1.2MW Pachwa Hpp, and 4.5MW Waki HPP including power market studies, Network studies, load‐
flow analysis, dynamic and transient stability studies; and technical assistance in PPA negotiations
for the proposed 4.5MW Waki HPP being implemented by Hydromax (Nkusi) Limited.
ASTER INTEGRAL SERVICE CATALOG
INNOVATIVE SOLUTIONS ©2014 www.aster‐integral.com
Example‐2: Solar PV systems (commercial, institutional, Residential and grid connected systems)
ASTER INTEGRAL was contracted by Emerging Power FZC/Z‐One Holding of UAE to provide
specialized services for the 15MWp grid‐connected solar power plant, proposed at Bufulubi‐
Mayuge district.
We were contracted by Danish SunEnergy to provide services for 2x10MWp grid connected solar
plants proposed at Gulu and Masindi, for Voltage‐Frequency Dynamic and Transient Stability
analysis of the power plant effects when connected to the national grid at Gulu 33kV substation
and Masindi 33kV substation
Our staffs are assisting Newplan Limited in construction supervision including start‐up,
commissioning and handover of the 635kWp hybrid solar plant being implemented by KIS, at
Kalangala‐Bugala Island on lake Victoria. The Plant has backup 1MVA diesel generators, 600kW
grid‐Tie inverters, 400kW Island bi‐directional inverters with a 480x910Ah/2V with Aqua‐gen
Recombiner technology battery bank.
We have also implemented several commercial and institutional solar‐PV projects for hybrid
power supply to Kolping offices in Hoima, Kampala‐Kolping Hotel at Kampala; Nile Guest House in
Njeru town council, together with a large number of institutions/schools in Mukono, Mityana,
Gulu, Lira, and urban homes in Kiwatule, Naguru and Wakiso district.
ASTER
INNOV
WATWe offe
supervis
29.0kWp
Koboko,
Water a
planning
manage
Northea
NORDIC
Example
R INTEGRA
VATIVE SO
TER SUr services fo
sion and proj
Solar‐water
small DC pu
power.
Piped water
Back‐up sup
building for
Example‐1:
p with a 22k
, Northern U
and Environ
g, feasibility
d implemen
astern Ugand
Developme
e‐2: Solar‐po
AL
OLUTIONS
UPPLYr feasibility s
ject manage
pumping, fo
umps and la
r supply sche
pport for op
water schem
ERT‐Water P
kW 3‐phase A
Uganda, deli
nment/DWD
y study, eng
ntation of 3
da under ER
nt Fund
owered mini
S
Y studies, engi
ment for the
or water nee
arge‐three p
emes for sma
peration and
me operators
Project
AC auto‐pum
ivering over
‐Rural Wate
gineering de
33 such faci
T‐II Water p
i‐piped wate
neering desi
e following fi
eds ranging b
hase AC pu
all towns and
d maintenan
s
mp drive sola
r 150m3/day
er program
esign, tende
ilities in sm
project, finan
er project for
ign, procurem
ields:
between 1m
mps with e
d rural growt
nce as well a
ar‐water pum
y. Aster Inte
to provide
ring suppor
mall towns i
nced by Wor
r rural areas
Aster
Minis
Envir
progr
servic
feasib
tende
super
wate
cente
finan
S
©2014
ment assista
m3/day to ov
lectric moto
th centres
as specialize
mping system
egral was co
e consulting
t and const
n Northern
rld‐Bank‐IDA
in Uganda
r Integral w
stry of
onment/DW
ram to
ces for t
bility study,
ering suppo
rvision for
r supply sc
ers in Ug
cing
SERVICE
www.aster‐
nce, constru
ver 300m3/d
ors requiring
ed training a
m at Anaka, K
ontracted by
g services f
truction sup
Uganda, W
A credit/ GEF
was contra
Water
WD‐Rural
provide co
technical p
engineering
ort and con
decentralize
hemes for
anda unde
CATALOG
integral.com
uction
ay powering
g over 30kW
and capacity
Kaabong and
y Ministry of
or technica
ervision and
WestNile and
F Grants and
acted by
and
Water
onsulting
planning,
g design,
struction
ed piped
60 rural
er AfDB
G
m
g
W
y
d
f
l
d
d
d
ASTER INTEGRAL SERVICE CATALOG
INNOVATIVE SOLUTIONS ©2014 www.aster‐integral.com
ENVIRONMENT We offer services for environment impact assessments for the following specialized facilities:
Hydropower plants
HV Power Transmission lines
MV Power distribution lines
MEGGA WATT‐Range solar‐PV grid connected plants
Decentralized power generation plants, stone quaries and factories
Aster Integral is assisting Emerging Power FZC of UAE to carry out the ESIA for the proposed
15MWp solar plant proposed for Myanzi‐Kiganda area and Mayuge area to be implemented on
250acres of land at Bufulubi village
Aster Integral was contracted by Hydromax limited to carry out the ESIA for the 46km Power line
evacuating the 9MW generated from Buseruka HPP; including the update of the Environmental
Statement for the Hydropower site
Aster Integral was also contracted by DOTT Services to carry out ESAI for the Masindi Stone Quarry
as well as carry out the Environment audit for the Ssemuto stone Quarry
ASTER INTEGRAL SERVICE CATALOG
INNOVATIVE SOLUTIONS ©2014 www.aster‐integral.com
ADVISORY SERVICES Combined with our Sociology, Statistics, Economics and Monitoring & Evaluation teams, We offer
specialized advisory services in the field of water and energy related to the following topics:
Socio‐economic studies
Baseline studies
Market studies for water and energy
Eligibility assessment and technical appraisal studies
Performance assessment studies
Impacts assessment studies
Independent verifications and audits
Monitoring and evaluation of Water and Energy projects
Training, Capacity building and institutional support services
Aster Integral was contracted by Hydromax (Nkusi) Limited to provided services for Socio‐
economic and Power Market studies during the feasibility of the 4.5MW Waki Hydropower
plant.
Aster Integral as also provided baseline studies, eligibility studies, performance assessments
and impacts studies for the 33 Water supply schemes implemented under the ERT‐II Water
project; as well as for the 60‐rural water schemes to be implemented under the solar‐
powered mini‐piped water supply project.
We are also providing specialized consulting services to MWE/DWD‐Urban Water program; for
the management of the O&M framework contracts for back‐up support to sustainable
operation of 51‐solar water schemes in Northern, NorthEast and Western Uganda.
ASTER
INNOV
INNO
“SELF‐SU
This is a
solutions
saves a
reliability
need for
The Conc
(such as f
the abu
value‐for
Energy s
These ar
free and
Water su
over hea
installed
for detail
Applicabdue to thor underan expersystem c
Cost‐benof supplymonths f
System msemi‐autoperator
R INTEGRA
VATIVE SO
OVATION
USTAINING R
concept in w
s that relieve a
domestic hom
y at affordabl
human opera
cept once imp
from NWSC) o
ndant God‐g
r‐money when
upply: Solar‐
e fully integra
requires no h
upply: Rain wa
ad tank using
originally. No
ls)
bility and costhe abundant r‐ground watert from Aster omponents, i
nefit and Pay‐y of energy anfor hot water
maintenanceomated on thr, and offer fle
AL
OLUTIONS
N PRODU
RENEWABLE
which the sola
a home‐owne
me owner ne
e one‐time co
ator, and very
plemented en
only act as ba
given solar e
n he has no w
Panels are us
ated, and aut
human operat
ater is harvest
a solar‐powe
o need for a n
ts: The “Self‐srenewable noer. The equipmIntegral to canstall and com
‐back: The “Send water comsystems and 3
: All systemshe request of exibility for “P
S
UCTS U
E HOMESTM”
ar engineers
er in the urba
early 90% of
osts. Operatio
y limited repai
nsures that th
ackup in cases
energy (sunsh
worry of utility
sed to supply
tomated in hy
or.
ted and store
ered pump. En
new system u
sustaining Renon‐exhaustiblement is availarry out enginemmission the
elf‐sustaining plementing th3‐5 years for h
s are installedthe Client anarental Contr
NDER P
Get relief fro
at Aster‐Integ
n or peri‐urba
all utility bil
on and mainte
rs.
he utility serv
s when nature
hine) and ra
load‐shading
electricity w
ybrid with the
ed in surface o
nergy to the p
nless otherwi
newable Home solar‐energyble at affordaeering designfacilities.
Renewable Hhe conventionhybrid solar‐P
d on the FIT nd are mainteol” by use of s
PROMOT
om blackouts
gral have pac
an areas from
ls, and offers
enance of the
ices for elect
e has dictated
ain. This give
or dry water
hile solar‐wat
e Utility powe
or undergroun
pump is supp
ise specified b
mes” productsy (sun‐shine) able rates on t, fully integra
Homes” concenal utility servPV systems wh
& FORGET penance free. Tsimple on/off
S
©2014
TION
s and realize
ckaged sustain
m high un‐fair
s nearly 99%
ese facilities is
ricity (such as
. Energy and w
es a homeo
taps.
ter heaters a
er/water supp
nd tank. The w
plied by the sa
by the engine
s package is hand rain watethe local marate the system
ept is cost‐effvices. The pahich supply th
principle. TheThere is no nef electric switc
SERVICE
www.aster‐
e savings on
nable energy‐
utility bills. Th
energy and
s almost zero
s from UMEM
water supply
wner more
re used for h
ply. System is
water is then p
ame solar sys
eer. (See sepa
highly applicaber during the ket; howeverm components
fective and ofyback is aboue electricity.
ey are fully aeed for a dedches.
CATALOG
integral.com
utility bills
‐water supply
he technology
water supply
cost, with no
ME) and water
all depend on
comfort and
heating water
maintenance
pumped to an
stem that was
rate brochure
ble in Ugandarainy seasons, this requiress, procure the
ffers reliabilityut 24‐calender
automated oricated human
G
m
y
y
y
o
r
n
d
.
e
n
s
e
a s s e
y r
r n
ASTER
INNOV
SOL
Sola
240‐
have
We
per
Energy s
to power
even whe
Water su
water is
powered
Applicabnon‐exhaequipmeto carry and com
Cost‐bendrip irrigaand the v
System msemi‐autoperator
R INTEGRA
VATIVE SO
LAR SUPP
ar supported
‐500Wp, del
e ranges abo
can power i
day.
upply: Solar‐P
r the pump. T
en there are m
upply: Rain w
pumped from
d pump and flo
bility and costaustible solarnt is availableout engineermission the fa
nefit and Pay‐ation and grevolume of agr
maintenanceomated on thr.
AL
OLUTIONS
PORTED D
drip irrigati
livering 6,00
ove 1200Wp
irrigation wa
Panels are use
The system st
mild cloudy co
water is harves
m undergroun
ows to the ag
ts: The produ‐energy (sun‐e at affordableing design, fuacilities.
‐back: The conhouses. Theo‐produce.
: All systemshe request of
S
DRIP IRRIG
on system fo
00liters per d
p of solar‐PV
ater pumps o
ed to supply e
tarts working
onditions, exc
sted and stor
nd borehole.
ricultural field
ucts package‐shine) and re rates on theully integrate
oncept is coste payback is a
s are installedthe Client an
GATION
or agri‐busin
day, enough
system requ
of capacity u
electricity usin
at 8am in the
ept during rai
ed in surface
The water is
d by gravity.
is highly appain water due local marketthe system c
t‐effective andabout 24‐calen
d on the FIT nd are mainte
ness. Small s
to irrigate
uirements an
up to 50kW
ng automated
e morning till
ining period w
or undergrou
s then pumpe
plicable in Ugring the raint; however, thomponents, p
d offers reliabnder months
& FORGET penance free. T
S
©2014
sizes of such
3 acres of la
nd deliver ov
delivering ov
d inverter syst
6:00pm in th
with heavy clo
und tank or b
ed to an ove
ganda due toy seasons or is requires anprocure the s
bility of suppdepending on
principle. TheThere is no ne
SERVICE
www.aster‐
systems ran
and daily. La
ver 20,000lit
ver 350,000
tems and pum
he evening w
uds.
borehole can b
r head tank
o the abundaunder‐groun
n expert from system compo
ly of energy an the acrage b
ey are fully aeed for a ded
CATALOG
integral.com
nge between
arge systems
tres per day
ltrs of water
mp controllers
ithout stalling
be drilled and
using a solar‐
nt renewablend water. TheAster Integraonents, instal
and water frobeing irrigated
automated oricated human
G
m
n
s
.
r
s
g
d
‐
e e l l
o d
r n
ASTER
INNOV
COMP
4.5MW study, study: the HPloadflowstability project. PPA neplant – (
Solar WRural implemeTransfowater suthe WoincludedassessmsurveysConstruSupportboards dissemi
9MW Btransienin plannationaldevelopreliabilitat Buse
R INTEGRA
VATIVE SO
PLETED
Waki HPP-InLoad-flow A Consultancy
PP interconnew analysis in
study analysWe are also
egotiations an(year-2014 Co
Water PumpTransformat
entation supormation Projeupply and sanorld Bank/ Id; solar resoument, socio-s and deuction supervist, developing
and prination. (Septe
useruka HPPnt stability studnt commissionl grid at
pment of proty to take-up teruka HPP (ye
AL
OLUTIONS
PROJEC
nterconnectionalysis, Transervices for e
ection power ncluding tranis for the 4.5Mproviding tec
d Licensing pompleted)
ing Systemstion: Consuport of the ect ERT-II wnitation water DA and NDurce assessm-economic s
esigns, tendsion, capacity of IEC materi
rivate operember 2010-2
P: Network studies includingning and int
Kinubi-Hoimoposals for fothe 9.0MW poar 2013)
S
CTS
on design, Nnsient and Dengineering deline, network
nsient and dMW Waki hydrchnical assistaprocess of the
s under Eneltancy servic
Energy forwater project schemes fina
DF. Services ment, water resurvey, engider documey Building, Instrials, training orators, info014)
udies and voltag technical assterconnection a substationor grid stabilower to be ge
Network Dynamic
esign of k study, dynamic ropower ance for e power
rgy for ces for r Rural
for 41 nced by offered
esources ineering
entation, titutional of water ormation
age and sistance
to the n plus lity and
enerated
S
©2014
SERVICE
www.aster‐
CATALOG
integral.com
G
m
ASTER
INNOV
Hydropand pofor feasmini-hydand intercongrid. (ye
33kV pHPP: CDesign environsWe alsoESIA fo2010)
Hybrid Consultand econstrucsupply Nile-SE2012)
Waki HAnalysienergy conducthydropo
R INTEGRA
VATIVE SO
power Feasibwer/energy e
sibility and hyddropower proj
Ndugutu; nnecting/evacuear2010-2011)
power transmConsultancy se
and EIA for 3s from the 9Mo provided seror the Dam S
Power systancy servicesengineering ction superviimprovement C campus o
HPP-Power mis: Consultademand in r
ting a load-floower project –
AL
OLUTIONS
ility Study-Hyestimations: drological stujects located
includinguation power )
mission line ervices to cond33kV power tMW Buserukarvices for revieSite and Pow
stem for NIs for Energy aservices, plsion and traand UPS po
of Nile-Basin
market studncy services region, peak ow analysis f
– (year2012-Co
S
ydrological aConsultancy sdies of the pron river Mitan
g plans lines to the
for 9MW Buduct Baseline transmission la Hydro Poweew and updat
wer plant. (ye
ILE SEC Caudit, Systemlus tenderin
aining for theower system Initiative. (ye
dies and Lofor baseline power demanfor the 4.5MWompleted)
analysis services roposed no, Esia
for national
useruka Survey, line and er Plant. te of the
ear2008-
ampus: m design
g and e power
for the ear2011-
ad-flow studies, nd, and W Waki
S
©2014
SERVICE
www.aster‐
CATALOG
integral.com
G
m
ASTER
INNOV
BuseruSynchrHydromHydro Pengineeplant, syinterconBuseruk
KitimbwConsultprocurefor the Kitimbwresourcsocio-ecdesignssupervis
EnviroMasindidentificinvestigserviceBiologiInstitutMitigatRecom
EnviroSsemuenvironincludinenvironthe phyversus (currenAspecteffectivImpacteffectivRecom2009)
R INTEGRA
VATIVE SO
uka HPPronization: AS
max Limited dPower Plant ering expertiseynchronizationnnection at Kka HPP projec
wa mini-pipetancy servicesement and con
mini-piped swa, Kayunga
e assessmenconomic sur
s, tender sion, capacity
onmental impdi: Consultancation of engations includes offered inccal Environmeional Aspeion Mea
mmendations (
onmental imuto: Consultanmental aspng assessmenment monitoysical and bio
previous); dnt state versuts regardingveness of ints (air and noves; Mitigatio
mmendations f
AL
OLUTIONS
P CommSTER Integra
developers of to offer teche for the comn of plant, andKinubi Powerct. (year 2011-
d solar wates for System nstruction supsolar water
district. Sernt, water resrvey, engine
documentay Building
pact assessmncy servicesnvironmental
ding assessmelude: Descripent, Social Enects, Enviroasures, (year-2009)
pacts audit ancy servicespects and ent and analyring activities
ological Envirodescription of s previous); lg mitigationterventions t
oise pollution) on Measurefor Project af
S
missioning al was contra
the 9MW Bnical assistan
mmissioning od 33kV power r substation -2012)
r pumping sengineering
pervision and pumping schrvices offeredsources asseering survey
ation, Cons
ent for the qus for EIA in
aspects anent and analysption of Physi
nvironment, Leonmental IMonitoring
for the qus for EIA infield invest
ysis. The au include: moonment (curre
Social Enviregal and Instn measurestaken; enviromitigations a
es, Monitorinffected person
and acted by useruka nce and of power line and for the
cheme: design, training eme at
d: solar essment, ys and struction
uarry at nvolving nd field sis. The ical and egal and mpacts,
and
arry at nvolving tigations udit and onitoring ent state ronment titutional s and nmental
and their ng and ns(year-
S
©2014
SERVICE
www.aster‐
CATALOG
integral.com
G
m
ASTER INTEGRAL SERVICE CATALOG
INNOVATIVE SOLUTIONS ©2014 www.aster‐integral.com
ONGOING PROJECTS
Project Title Country Client
10MW Nkusi HPP: Contracted by PA Technical Services and Freyer of Norway, we are providing various services including Environmant and Social Impacts Assessment, Power line design and detailed Network Studies, Dynamic and Transient Stability studies as well as, technical assistance for GETFIT Application. 2014-Ongoing
Uganda
PA Technical Services/Freyer
AS
1.4MW Pachwa HPP: Contracted by Flow Power 1 and Freyer of Norway, we are providing various services including Environmant and Social Impacts Assessment, Power line design and detailed Network Studies, Dynamic and Transient Stability studies as well as, technical assistance for GETFIT Application. 2013-Ongoing
Uganda
Flow Power AS /Freyer AS
Monitoring, Evaluation and audit of Energy sector projects financed by Norwegian Government; being sub-contracted by KPMG as the main consultant. The scope of projects includes Feasibility of Isimba HPP; six 33kV power line projects for rural electrification, three HVAC power transmission lines of 132kV and 220kV including Nkenda-Hoima, Hoima-Kafu, Mirama-Kikagati 132kV and Hoima-Kafu 220kV – 2013-Ongoing
Uganda
KPMG/RNE-GoN
Independent Verification Agent working with KPMG for monitoring and evaluation of customer service connections implemented under the OBA program, financed by Worldbank; under the Rural electrification Agency. We are offering services for verifying the standards of service connections, numbers of services connections and their authenticity as well as their sustainability for a period of 4-years. 2014-Ongoing
Uganda
KPMG/REA
Maintenance framework contract for backup technical support to water schemes using Solar-PV water Pumping systems in Uganda: consultancy services for technical support to monitoring and o&m management in the repair and replacement of system components of solar powered water supply systems under the ert (water component) in uganda; commissioned by MWE/DWD-Urban Water. JWTL is providing technical backup support for O&M organization and management, including Condition based observation and monitoring of solar water pumping schemes, as well as Monitoring and supervision of the framework contractor for supply, maintenance and replacements; plus training and capacity building of scheme operators/technicians/MWE engineers and institutional support. 2014-Ongoing
Uganda
MWE
Waki HPP: Network studies and voltage and transient stability studies, including study of the interconnection arrangements to the national grid, as well as developing proposals for grid stability and reliability to take-up the 4.5MW power to be generated at Waki HPP; including assistance to GETFIT and PPA Negotiations-2012-Ongoing.
Uganda
HYDROMAX (NKUSI) LTD
Grid connected Solar-PV-15MWp power plant: Interconnection arrangements and ESIA for the proposed 15MWp solar-PV based power plant at Mayuge, under license to be developed by EMERGING POWER FZC of UAE.
We are supporting the developer for the feasibility study and the environment impact assessments including technical assistance to PPA Negotiations (2013-Ongoing)
Uganda
EMERGING POWER FZC
635kWp Hybrid Solar-PV power plant: Consultancy services to NEWPLAN in the Development of a 635kWp-hybrid with 1MVA backup generators solar-PV power plant for Kalangala Infrastructure Service (KIS), including a 40km 33kV power distribution line and associated low voltage network plus customer service connections. Services
Uganda
NEWPLAN/KIS-INFRACO
ASTER INTEGRAL SERVICE CATALOG
INNOVATIVE SOLUTIONS ©2014 www.aster‐integral.com
offered included; geo-technical studies, socio-economic survey, engineering surveys and designs, Construction supervision, and plant commissioning. (2013-ongoing)
Solar Powered mini-piped water supply schemes: Consultancy services for Technical Planning, Design and Construction Supervision of Solar powered piped water supply and sanitation schemes in 60 districts of Uganda project financed by the African Development Bank. Services offered included; solar resource assessment, water resources assessment, socio-economic survey, engineering surveys and designs, tender documentation, Construction supervision, capacity Building, Institutional Support, developing of IEC materials, training of water boards and private operators, information dissemination. (March 2013-ongoing)
Uganda
MWE