INNOVATIVE SOLUTIONS                     ©2014  www.aster‐integral.com 

ENERGY

We offer services for feasibility studies, engineering design, procurement assistance, construction 

supervision and project management for the following fields: 

Power generation from Solar‐Photovoltaics (standalone and grid‐connected power plants), 

Hydropower, Biomass (Wood residues and Biogasification), Wind energy 

Power transmission and Distribution (132kV, 33kV, 11kV, 415/240V voltage standards) 

Rural electrification including medium and low voltage networks as well as customer service 

connections 

Hybrid and Standalone mini‐grid power supply schemes for isolated remote communities 

Network studies, Dynamic and Transient stability study for power networks and distributed 

power generation systems 

Energy efficiency, Power audits and retrofits for power factor correction 

Electrical installations for factories, commercial buildings and Residential houses 

Power market studies, Energy economics and financial analysis 

Solar‐thermal technology for related applications like water heating for domestic, institutional 

and commercial applications 

Power backup and Uni‐interruptible Power Supply systems based on online technology for 

commercial buildings, institutions and Residential houses 

Example‐1: Hydropower development and implementation 

 

 ASTER  INTEGRAL was  contracted by Hydromax  Limited  to  provide  various  consulting  services  for 

feasibility study, ESIA for the 9MW Buseruka HPP power evacuation, including engineering design of 

Kinubi‐substation  extension.  We  also  provided  services  for  Network  studies,  loadflow  analysis, 

dynamic and Transient stability studies, technical assistance to commissioning and protocols for the 

plant as well as specialized rural electrification planning within the project area of Buseruka‐Hoima.  

ASTER  INTEGRAL  is  also  providing  various  expert  services  for  the  proposed  10MW  Nkusi  Hpp, 

1.2MW Pachwa Hpp, and 4.5MW Waki HPP including  power market studies, Network studies, load‐

flow analysis, dynamic and  transient stability studies; and  technical assistance  in PPA negotiations 

for the proposed 4.5MW Waki HPP being implemented by Hydromax (Nkusi) Limited. 

Page 3: Read the full article (PDF 1.0 MB)

ASTER INTEGRAL SERVICE CATALOG

INNOVATIVE SOLUTIONS                     ©2014  www.aster‐integral.com 

Example‐2: Solar PV systems (commercial, institutional, Residential and grid connected systems) 

   ASTER  INTEGRAL  was  contracted  by  Emerging  Power  FZC/Z‐One  Holding  of  UAE  to  provide 

specialized  services  for  the  15MWp  grid‐connected  solar  power  plant,  proposed  at  Bufulubi‐

Mayuge district. 

We were contracted by Danish SunEnergy to provide services for 2x10MWp grid connected solar 

plants  proposed  at  Gulu  and Masindi,  for  Voltage‐Frequency  Dynamic  and  Transient  Stability 

analysis of the power plant effects when connected to the national grid at Gulu 33kV substation 

and Masindi 33kV substation  

Our  staffs  are  assisting  Newplan  Limited  in  construction  supervision  including  start‐up, 

commissioning  and  handover  of  the  635kWp  hybrid  solar  plant  being  implemented  by  KIS,  at 

Kalangala‐Bugala  Island on  lake Victoria. The Plant has backup 1MVA diesel  generators, 600kW 

grid‐Tie  inverters,  400kW  Island  bi‐directional  inverters  with  a  480x910Ah/2V  with  Aqua‐gen 

Recombiner technology battery bank. 

We  have  also  implemented  several  commercial  and  institutional  solar‐PV  projects  for  hybrid 

power supply to Kolping offices in Hoima, Kampala‐Kolping Hotel at Kampala; Nile Guest House in 

Njeru  town  council,  together with  a  large  number  of  institutions/schools  in Mukono, Mityana, 

Gulu, Lira, and urban homes in Kiwatule, Naguru and Wakiso district. 

Page 4: Read the full article (PDF 1.0 MB)

ASTER

INNOV

WATWe offe

supervis

29.0kWp

Koboko,

Water  a

planning

manage

Northea

NORDIC

Example

R INTEGRA

VATIVE SO

TER SUr services fo

sion and proj

Solar‐water 

small DC  pu

power. 

Piped water

Back‐up  sup

building for 

Example‐1: 

p with a 22k

, Northern U

and  Environ

g,    feasibility

d  implemen

astern Ugand

 Developme

e‐2: Solar‐po

AL

OLUTIONS

UPPLYr feasibility s

ject manage

pumping, fo

umps  and  la

r supply sche

pport  for  op

water schem

ERT‐Water P

kW 3‐phase A

Uganda,  deli

nment/DWD

y  study,  eng

ntation  of  3

da under ER

nt Fund  

owered mini

S                 

Y studies, engi

ment for the

or water nee

arge‐three  p

emes for sma

peration  and

me operators

Project 

AC auto‐pum

ivering  over

‐Rural  Wate

gineering  de

33  such  faci

T‐II Water p

i‐piped wate

neering desi

e following fi

eds ranging b

hase  AC  pu

all towns and

d maintenan

mp drive sola

r  150m3/day

er  program

esign,  tende

ilities  in  sm

project,  finan

er project for

ign, procurem

ields: 

between 1m

mps with  e

d rural growt

nce  as well  a

ar‐water pum

y.  Aster  Inte

to  provide

ring  suppor

mall  towns  i

nced by Wor

r rural areas

 

Aster

Minis

Envir

progr

servic

feasib

tende

super

wate

cente

finan

S

©2014  

ment assista

m3/day to ov

lectric moto

th centres 

as  specialize

mping system

egral was  co

e  consulting

t  and  const

n  Northern 

rld‐Bank‐IDA

 in Uganda

r  Integral  w

stry  of 

onment/DW

ram  to 

ces  for  t

bility  study, 

ering  suppo

rvision  for 

r  supply  sc

ers  in  Ug

cing 

SERVICE

www.aster‐

nce, constru

ver 300m3/d

ors  requiring

ed  training  a

m at Anaka, K

ontracted  by

g  services  f

truction  sup

Uganda,  W

A credit/ GEF

was  contra

Water 

WD‐Rural 

provide  co

technical  p

engineering

ort  and  con

decentralize

hemes  for 

anda  unde

CATALOG

integral.com

uction 

ay powering

g  over  30kW

and  capacity

 

Kaabong and

y Ministry  of

or  technica

ervision  and

WestNile  and

F Grants and

acted  by 

and 

Water 

onsulting 

planning,  

g  design, 

struction 

ed  piped 

60  rural 

er  AfDB 

G

Page 5: Read the full article (PDF 1.0 MB)

ASTER INTEGRAL SERVICE CATALOG

INNOVATIVE SOLUTIONS                     ©2014  www.aster‐integral.com 

ENVIRONMENT We offer services for environment impact assessments for the following specialized facilities: 

Hydropower plants 

HV Power Transmission lines 

MV Power distribution lines 

MEGGA WATT‐Range solar‐PV grid connected plants  

Decentralized power generation plants, stone quaries and factories 

 

 

 

   

Aster  Integral  is  assisting  Emerging  Power  FZC  of  UAE  to  carry  out  the  ESIA  for  the  proposed 

15MWp  solar  plant proposed  for Myanzi‐Kiganda  area  and Mayuge  area  to  be  implemented  on 

250acres of land at Bufulubi village 

Aster  Integral was contracted by Hydromax  limited to carry out the ESIA for the 46km Power  line 

evacuating  the  9MW  generated  from  Buseruka HPP;  including  the  update  of  the  Environmental 

Statement for the Hydropower site 

Aster Integral was also contracted by DOTT Services to carry out ESAI for the Masindi Stone Quarry 

as well as carry out the Environment audit for the Ssemuto stone Quarry 

Page 6: Read the full article (PDF 1.0 MB)

ASTER INTEGRAL SERVICE CATALOG

INNOVATIVE SOLUTIONS                     ©2014  www.aster‐integral.com 

ADVISORY SERVICES Combined with our Sociology, Statistics, Economics and Monitoring & Evaluation teams, We offer 

specialized advisory services in the field of water and energy related to the following topics: 

Socio‐economic studies 

Baseline studies 

Market studies for water and energy 

Eligibility assessment and technical appraisal studies 

Performance assessment studies 

Impacts assessment studies 

Independent verifications and audits 

Monitoring and evaluation of Water and Energy projects 

Training, Capacity building and institutional support services 

 

 

Aster  Integral was  contracted  by Hydromax  (Nkusi)  Limited  to  provided  services  for  Socio‐

economic and Power Market  studies during  the  feasibility of  the 4.5MW Waki Hydropower 

plant. 

Aster  Integral as also provided baseline studies, eligibility studies, performance assessments 

and  impacts studies  for  the 33 Water supply schemes  implemented under  the ERT‐II Water 

project;  as  well  as  for  the  60‐rural  water  schemes  to  be  implemented  under  the  solar‐

powered mini‐piped water supply project. 

We are also providing specialized consulting services to MWE/DWD‐Urban Water program; for 

the  management  of  the  O&M  framework  contracts  for  back‐up  support  to  sustainable 

operation of 51‐solar water schemes in Northern, NorthEast and Western Uganda. 

Page 7: Read the full article (PDF 1.0 MB)

ASTER

INNOV

INNO

“SELF‐SU

This  is a 

solutions

saves  a 

reliability

need for 

The Conc

(such as f

the  abu

value‐for

Energy s

These ar

free and 

Water su

over hea

installed 

for detail

Applicabdue to thor underan expersystem c

Cost‐benof supplymonths f

System msemi‐autoperator

R INTEGRA

VATIVE SO

OVATION

USTAINING R

concept  in w

s that relieve a

domestic  hom

y at affordabl

human opera

cept once  imp

from NWSC) o

ndant  God‐g

r‐money when

upply: Solar‐

e fully  integra

requires no h

upply: Rain wa

ad tank using 

originally. No

ls) 

bility and costhe abundant r‐ground watert from Aster omponents, i

nefit and Pay‐y of energy anfor hot water 

maintenanceomated on thr, and offer fle

AL

OLUTIONS

N PRODU

RENEWABLE

which  the  sola

a home‐owne

me  owner  ne

e one‐time co

ator, and very

plemented en

only act as ba

given  solar  e

n he has no w

Panels are us

ated, and aut

human operat

ater is harvest

a solar‐powe

o need for a n

ts: The “Self‐srenewable noer. The equipmIntegral to canstall and com

‐back: The “Send water comsystems and 3

:  All  systemshe request of exibility for “P

S                 

UCTS U

E HOMESTM”

ar engineers 

er in the urba

early  90%  of 

osts. Operatio

y limited repai

nsures that th

ackup in cases

energy  (sunsh

worry of utility 

sed  to supply 

tomated  in hy

or. 

ted and store

ered pump. En

new system u

sustaining Renon‐exhaustiblement is availarry out enginemmission the 

elf‐sustaining plementing th3‐5 years for h

s  are  installedthe Client anarental Contr

NDER P

Get relief fro

at Aster‐Integ

n or peri‐urba

all  utility  bil

on and mainte

rs. 

he utility serv

s when nature

hine)  and  ra

load‐shading

  

electricity w

ybrid with the

ed in surface o

nergy to the p

nless otherwi

newable Home solar‐energyble at affordaeering designfacilities. 

Renewable Hhe conventionhybrid solar‐P

d  on  the  FIT nd are mainteol” by use of s

PROMOT

om blackouts

gral have pac

an areas from

ls,  and  offers

enance of the

ices for elect

e has dictated

ain.  This  give

 or dry water 

hile solar‐wat

e Utility powe

or undergroun

pump  is supp

ise specified b

mes” productsy (sun‐shine) able rates on t, fully integra

Homes” concenal utility servPV systems wh

&  FORGET  penance free. Tsimple on/off

S

©2014  

TION

s and realize

ckaged  sustain

m high un‐fair 

s  nearly  99% 

ese facilities is

ricity (such as

. Energy and w

es  a  homeo

taps. 

ter heaters a

er/water supp

nd tank. The w

plied by the sa

by the engine

s package  is hand rain watethe local marate the system

ept is cost‐effvices.  The pahich supply th

principle.  TheThere is no nef electric switc

SERVICE

www.aster‐

e savings on

nable energy‐

utility bills. Th

energy  and 

s almost zero 

s from UMEM

water supply 

wner  more 

re used  for h

ply. System  is 

water is then p

ame solar sys

eer. (See sepa

highly applicaber during the ket; howeverm components

fective and ofyback is aboue electricity.  

ey  are  fully  aeed for a dedches. 

CATALOG

integral.com

utility bills 

‐water  supply

he technology

water  supply

cost, with no

ME) and water

all depend on

comfort  and

heating water

maintenance

pumped to an

stem that was

rate brochure

ble  in Ugandarainy seasons, this requiress, procure the

ffers reliabilityut 24‐calender

automated  oricated human

G

a s s e 

y r 

r n 

Page 8: Read the full article (PDF 1.0 MB)

ASTER

INNOV

SOL

Sola

240‐

have

We 

per 

Energy s

to power

even whe

Water su

water  is 

powered

Applicabnon‐exhaequipmeto carry and com

Cost‐bendrip irrigaand the v

System msemi‐autoperator

R INTEGRA

VATIVE SO

LAR SUPP

ar supported

‐500Wp, del

e ranges abo

can power  i

day. 

upply: Solar‐P

r the pump. T

en there are m

upply: Rain w

pumped  from

d pump and flo

bility  and  costaustible  solarnt is availableout engineermission the fa

nefit and Pay‐ation and grevolume of agr

maintenanceomated on thr.  

AL

OLUTIONS

PORTED D

 drip irrigati

livering 6,00

ove 1200Wp

irrigation wa

Panels are use

The system st

mild cloudy co

water  is harves

m undergroun

ows to the ag

ts:  The  produ‐energy  (sun‐e at affordableing design,  fuacilities. 

‐back: The conhouses.  Theo‐produce.  

:  All  systemshe request of 

S                 

DRIP IRRIG

on system fo

00liters per d

p of solar‐PV 

ater pumps o

ed to supply e

tarts working 

onditions, exc

sted and stor

nd  borehole. 

ricultural field

ucts  package‐shine)  and  re rates on theully  integrate 

oncept  is coste payback is a

s  are  installedthe Client an

GATION

or agri‐busin

day, enough

system requ

of capacity u

electricity usin

at 8am  in the

ept during rai

ed  in surface 

The water  is

d by gravity. 

is  highly  appain water  due local marketthe system c

t‐effective andabout 24‐calen

d  on  the  FIT nd are mainte

ness. Small s

  to  irrigate 

uirements an

up to 50kW 

ng automated

e morning till

ining period w

or undergrou

s  then  pumpe

plicable  in Ugring  the  raint; however, thomponents, p

d offers  reliabnder months 

&  FORGET  penance free. T

S

©2014  

sizes of such 

3 acres of  la

nd deliver ov

delivering ov

d inverter syst

 6:00pm  in th

with heavy clo

und tank or b

ed  to  an  ove

ganda  due  toy  seasons  or is requires anprocure the s

bility of suppdepending on

principle.  TheThere is no ne

SERVICE

www.aster‐

systems ran

and daily. La

ver 20,000lit

ver 350,000

tems and pum

he evening w

uds.  

borehole can b

r head  tank 

o  the  abundaunder‐groun

n expert from system compo

ly of energy an the acrage b

ey  are  fully  aeed for a ded

CATALOG

integral.com

nge between

arge systems

tres per day

ltrs of water

 

mp controllers

ithout stalling

be drilled and

using  a  solar‐

nt  renewablend water.  TheAster Integraonents,  instal

and water  frobeing irrigated

automated  oricated human

G

e e l l 

o d 

r n 

Page 9: Read the full article (PDF 1.0 MB)

ASTER

INNOV

COMP

 

4.5MW study, study: the HPloadflowstability project. PPA neplant – (

Solar WRural implemeTransfowater suthe WoincludedassessmsurveysConstruSupportboards dissemi

9MW Btransienin plannationaldevelopreliabilitat Buse

R INTEGRA

VATIVE SO

PLETED

Waki HPP-InLoad-flow A Consultancy

PP interconnew analysis in

study analysWe are also

egotiations an(year-2014 Co

Water PumpTransformat

entation supormation Projeupply and sanorld Bank/ Id; solar resoument, socio-s and deuction supervist, developing

and prination. (Septe

useruka HPPnt stability studnt commissionl grid at

pment of proty to take-up teruka HPP (ye

AL

OLUTIONS

PROJEC

nterconnectionalysis, Transervices for e

ection power ncluding tranis for the 4.5Mproviding tec

d Licensing pompleted)

ing Systemstion: Consuport of the ect ERT-II wnitation water DA and NDurce assessm-economic s

esigns, tendsion, capacity of IEC materi

rivate operember 2010-2

P: Network studies includingning and int

Kinubi-Hoimoposals for fothe 9.0MW poar 2013)

S                 

CTS

on design, Nnsient and Dengineering deline, network

nsient and dMW Waki hydrchnical assistaprocess of the

s under Eneltancy servic

Energy forwater project schemes fina

DF. Services ment, water resurvey, engider documey Building, Instrials, training orators, info014)

udies and voltag technical assterconnection a substationor grid stabilower to be ge

Network Dynamic

esign of k study, dynamic ropower ance for e power

rgy for ces for r Rural

for 41 nced by offered

esources ineering

entation, titutional of water ormation

age and sistance

to the n plus lity and

enerated

S

©2014  

SERVICE

www.aster‐

CATALOG

integral.com

G

Page 10: Read the full article (PDF 1.0 MB)

ASTER

INNOV

Hydropand pofor feasmini-hydand intercongrid. (ye

33kV pHPP: CDesign environsWe alsoESIA fo2010)

Hybrid Consultand econstrucsupply Nile-SE2012)

Waki HAnalysienergy conducthydropo

R INTEGRA

VATIVE SO

power Feasibwer/energy e

sibility and hyddropower proj

Ndugutu; nnecting/evacuear2010-2011)

power transmConsultancy se

and EIA for 3s from the 9Mo provided seror the Dam S

Power systancy servicesengineering ction superviimprovement C campus o

HPP-Power mis: Consultademand in r

ting a load-floower project –

AL

OLUTIONS

ility Study-Hyestimations: drological stujects located

includinguation power )

mission line ervices to cond33kV power tMW Buserukarvices for revieSite and Pow

stem for NIs for Energy aservices, plsion and traand UPS po

of Nile-Basin

market studncy services region, peak ow analysis f

– (year2012-Co

S                 

ydrological aConsultancy sdies of the pron river Mitan

g plans lines to the

for 9MW Buduct Baseline transmission la Hydro Poweew and updat

wer plant. (ye

ILE SEC Caudit, Systemlus tenderin

aining for theower system Initiative. (ye

dies and Lofor baseline power demanfor the 4.5MWompleted)

analysis services roposed no, Esia

for national

useruka Survey, line and er Plant. te of the

ear2008-

ampus: m design

g and e power

for the ear2011-

ad-flow studies, nd, and W Waki

S

©2014  

SERVICE

www.aster‐

CATALOG

integral.com

G

Page 11: Read the full article (PDF 1.0 MB)

ASTER

INNOV

BuseruSynchrHydromHydro Pengineeplant, syinterconBuseruk

KitimbwConsultprocurefor the Kitimbwresourcsocio-ecdesignssupervis

EnviroMasindidentificinvestigserviceBiologiInstitutMitigatRecom

EnviroSsemuenvironincludinenvironthe phyversus (currenAspecteffectivImpacteffectivRecom2009)  

R INTEGRA

VATIVE SO

uka HPPronization: AS

max Limited dPower Plant ering expertiseynchronizationnnection at Kka HPP projec

wa mini-pipetancy servicesement and con

mini-piped swa, Kayunga

e assessmenconomic sur

s, tender sion, capacity

onmental impdi: Consultancation of engations includes offered inccal Environmeional Aspeion Mea

mmendations (

onmental imuto: Consultanmental aspng assessmenment monitoysical and bio

previous); dnt state versuts regardingveness of ints (air and noves; Mitigatio

mmendations f

AL

OLUTIONS

P CommSTER Integra

developers of to offer teche for the comn of plant, andKinubi Powerct. (year 2011-

d solar wates for System nstruction supsolar water

district. Sernt, water resrvey, engine

documentay Building

pact assessmncy servicesnvironmental

ding assessmelude: Descripent, Social Enects, Enviroasures, (year-2009)

pacts audit ancy servicespects and ent and analyring activities

ological Envirodescription of s previous); lg mitigationterventions t

oise pollution) on Measurefor Project af

S                 

missioning al was contra

the 9MW Bnical assistan

mmissioning od 33kV power r substation -2012)

r pumping sengineering

pervision and pumping schrvices offeredsources asseering survey

ation, Cons

ent for the qus for EIA in

aspects anent and analysption of Physi

nvironment, Leonmental IMonitoring

for the qus for EIA infield invest

ysis. The au include: moonment (curre

Social Enviregal and Instn measurestaken; enviromitigations a

es, Monitorinffected person

and acted by useruka nce and of power line and for the

cheme: design, training eme at

d: solar essment, ys and struction

uarry at nvolving nd field sis. The ical and egal and mpacts,

and

arry at nvolving tigations udit and onitoring ent state ronment titutional s and nmental

and their ng and ns(year-

S

©2014  

SERVICE

www.aster‐

CATALOG

integral.com

G

Page 12: Read the full article (PDF 1.0 MB)

ASTER INTEGRAL SERVICE CATALOG

INNOVATIVE SOLUTIONS                     ©2014  www.aster‐integral.com 

ONGOING PROJECTS

Project Title Country Client

10MW Nkusi HPP: Contracted by PA Technical Services and Freyer of Norway, we are providing various services including Environmant and Social Impacts Assessment, Power line design and detailed Network Studies, Dynamic and Transient Stability studies as well as, technical assistance for GETFIT Application. 2014-Ongoing

Uganda

PA Technical Services/Freyer

AS

1.4MW Pachwa HPP: Contracted by Flow Power 1 and Freyer of Norway, we are providing various services including Environmant and Social Impacts Assessment, Power line design and detailed Network Studies, Dynamic and Transient Stability studies as well as, technical assistance for GETFIT Application. 2013-Ongoing

Uganda

Flow Power AS /Freyer AS

Monitoring, Evaluation and audit of Energy sector projects financed by Norwegian Government; being sub-contracted by KPMG as the main consultant. The scope of projects includes Feasibility of Isimba HPP; six 33kV power line projects for rural electrification, three HVAC power transmission lines of 132kV and 220kV including Nkenda-Hoima, Hoima-Kafu, Mirama-Kikagati 132kV and Hoima-Kafu 220kV – 2013-Ongoing

Uganda

KPMG/RNE-GoN

Independent Verification Agent working with KPMG for monitoring and evaluation of customer service connections implemented under the OBA program, financed by Worldbank; under the Rural electrification Agency. We are offering services for verifying the standards of service connections, numbers of services connections and their authenticity as well as their sustainability for a period of 4-years. 2014-Ongoing

Uganda

KPMG/REA

Maintenance framework contract for backup technical support to water schemes using Solar-PV water Pumping systems in Uganda: consultancy services for technical support to monitoring and o&m management in the repair and replacement of system components of solar powered water supply systems under the ert (water component) in uganda; commissioned by MWE/DWD-Urban Water. JWTL is providing technical backup support for O&M organization and management, including Condition based observation and monitoring of solar water pumping schemes, as well as Monitoring and supervision of the framework contractor for supply, maintenance and replacements; plus training and capacity building of scheme operators/technicians/MWE engineers and institutional support. 2014-Ongoing

Uganda

MWE

Waki HPP: Network studies and voltage and transient stability studies, including study of the interconnection arrangements to the national grid, as well as developing proposals for grid stability and reliability to take-up the 4.5MW power to be generated at Waki HPP; including assistance to GETFIT and PPA Negotiations-2012-Ongoing.

Uganda

HYDROMAX (NKUSI) LTD

Grid connected Solar-PV-15MWp power plant: Interconnection arrangements and ESIA for the proposed 15MWp solar-PV based power plant at Mayuge, under license to be developed by EMERGING POWER FZC of UAE.

We are supporting the developer for the feasibility study and the environment impact assessments including technical assistance to PPA Negotiations (2013-Ongoing)

Uganda

EMERGING POWER FZC

635kWp Hybrid Solar-PV power plant: Consultancy services to NEWPLAN in the Development of a 635kWp-hybrid with 1MVA backup generators solar-PV power plant for Kalangala Infrastructure Service (KIS), including a 40km 33kV power distribution line and associated low voltage network plus customer service connections. Services

Uganda

NEWPLAN/KIS-INFRACO

Page 13: Read the full article (PDF 1.0 MB)

ASTER INTEGRAL SERVICE CATALOG

INNOVATIVE SOLUTIONS                     ©2014  www.aster‐integral.com 

offered included; geo-technical studies, socio-economic survey, engineering surveys and designs, Construction supervision, and plant commissioning. (2013-ongoing)

Solar Powered mini-piped water supply schemes: Consultancy services for Technical Planning, Design and Construction Supervision of Solar powered piped water supply and sanitation schemes in 60 districts of Uganda project financed by the African Development Bank. Services offered included; solar resource assessment, water resources assessment, socio-economic survey, engineering surveys and designs, tender documentation, Construction supervision, capacity Building, Institutional Support, developing of IEC materials, training of water boards and private operators, information dissemination. (March 2013-ongoing)

Uganda

MWE