 Location: Engineer: Study Case: RA Page: 1 SN: 12345678 Filename:  penyulngKampusKedonganan Project:  ETAP Contract: Date: 30-06-2015 Revision: Base Config.:  Normal 7.5.0 SUMMARY System Indexes SAIFI 7.0748 f / customer.yr SAIDI 16.6318 hr / customer.yr CAIDI 2.351 hr / customer interruption ASAI 0.9981 pu ASUI 0.00190 pu EENS 153.315 MW hr / yr ECOST 0.00 $ / yr AENS 1.8472 MW hr / customer.yr IEAR 0.000 $ / kW hr SAIFI System Average Interruption Frequency Index SAIDI System Average Interruption Duration Index CAIDI Customer Average Interruption Duration Index ASAI Average service Availabi lity Index ASUI Average Service Unavailability Index EENS Expected Energy Not Supplied ECOST Expect ed Int erru pti on Cos t AENS Average Energy Not Supplied IEAR Interruption Energy Assessment Rate

Reablity

Embed Size (px)

DESCRIPTION

yohooo

Citation preview

  • Location:

    Engineer: Study Case: RA

    Page: 1

    SN: 12345678

    Filename: penyulngKampusKedonganan

    Project: ETAP

    Contract:

    Date: 30-06-2015

    Revision: Base

    Config.: Normal

    7.5.0

    SUMMARY

    System Indexes

    SAIFI 7.0748 f / customer.yr

    SAIDI 16.6318 hr / customer.yr

    CAIDI 2.351 hr / customer interruption

    ASAI 0.9981 pu

    ASUI 0.00190 pu

    EENS 153.315 MW hr / yr

    ECOST 0.00 $ / yr

    AENS 1.8472 MW hr / customer.yr

    IEAR 0.000 $ / kW hr

    SAIFI System Average Interruption Frequency IndexSAIDI System Average Interruption Duration IndexCAIDI Customer Average Interruption Duration IndexASAI Average service Availability IndexASUI Average Service Unavailability IndexEENS Expected Energy Not SuppliedECOST Expected Interruption CostAENS Average Energy Not SuppliedIEAR Interruption Energy Assessment Rate