Location:
Engineer: Study Case: RA
Page: 1
SN: 12345678
Filename: penyulngKampusKedonganan
Project: ETAP
Contract:
Date: 30-06-2015
Revision: Base
Config.: Normal
7.5.0
SUMMARY
System Indexes
SAIFI 7.0748 f / customer.yr
SAIDI 16.6318 hr / customer.yr
CAIDI 2.351 hr / customer interruption
ASAI 0.9981 pu
ASUI 0.00190 pu
EENS 153.315 MW hr / yr
ECOST 0.00 $ / yr
AENS 1.8472 MW hr / customer.yr
IEAR 0.000 $ / kW hr
SAIFI System Average Interruption Frequency IndexSAIDI System Average Interruption Duration IndexCAIDI Customer Average Interruption Duration IndexASAI Average service Availability IndexASUI Average Service Unavailability IndexEENS Expected Energy Not SuppliedECOST Expected Interruption CostAENS Average Energy Not SuppliedIEAR Interruption Energy Assessment Rate