VGB PowerTech | 2019
Key SystemReference Designation System for Power Plants – RDS-PP® Referenzkennzeichensystem für Kraftwerke
Publications related to the RDS-PP®
Publikationen zum RDS-PP®
| Basics| Power Plants, General| Thermal Power Plants| Coal Power Plants| Combined Cycle Power Plant| Gas-fired Power Plants| Nuclear Power Plants| Hydro Power Plants| Wind Power Plants| Biomass Power Plants| Photovoltaic Power Plants| Solar Thermal Power Plants| Geothermal Power Plants| Power to Gas Plants| Plants for Air Separation and Coal Gasification | Plants for CO2 Capture
§
§Multi-User-Versionen und Lizenzen
Wichtiger Hinweis:Jegliche Form der weiteren Nutzung, z.B. als Multi-User-Version, in Publikationen oder elektronischen/digitalen Systemen, bedarf einer separaten vereinbarung mit VGB PowerTech.
Kontakt und Rückfragen:T: +49 201 8128-444/-271 E: [email protected].
Multi-user-versions and licensingImportant notice:Any further use, e.g. multi-user-access, transfer in publications or electronic/ digital systems, requires a separate agreement with VGB PowerTech.
Please contact us at T: +49 201 8128-444/-271 E: [email protected].
Urheberrechtshinweis
© Alle Rechte vorbehalten!
Publikationen von VGB PowerTech sind urheberrechtlich geschützt.Jede Verwertung außerhalb der engen Grenzen des Urheberrechtes ist ohne Zustimmung der Verlages unzulässig.
VGB PowerTech Service GmbHDeilbachtal 17345257 Essen
Copyright notice
© All rights reserved!
No part of VGB publications may be reproduced or transmitted in any form or by any means, electronic or mechanical photocopying, recording or any information storage or retrieval system without the express prior written consent of the publisher.
VGB PowerTech Service GmbHDeilbachtal 17345257 EssenGermany The subscription for
e-books is free for Ordinary* VGB-Members
www.vgb.org/vgbvs4om
*Operators &Plant Owners
1
! !!
! ! !
E-mail: [email protected] | Shop: www.vgb.org 29
VGB PowerTech Catalogue | Medienverzeichnis IV l 2019 RDS-PP® Key System / Schlüsselverwaltung
RDS-PP® Key System / Schlüsselverwaltung Das vollständige aktuelle RDS-PP® umfasst das Basisregelwerk VGB-S-821-00-2016-06-DE, VGB-S-823-01-2015-09-EN-DE, VGB-B 102 d/e und VGB-S-832-00-2016-04-DE-EN sowie typspezifische VGB-Standards der Reihe VGB-S-823; empfohlen werden der VGB-B 108 d/e, VGB-S-831-00-2015-05-DE und VGB-S-891-00-2012-06-DE-EN.The complete current RDS-PP® covers the basic VGB-Standards VGB-S-821-00-2016-06-EN, VGB-S-823-01-2015-09-EN-DE, VGB-B 102 d/e and VGB-S-832-00-2016-04-DE-EN as well as technology-specific VGB-Standards of the series VGB-S-823; the VGB-B 108 d/e, VGB-S-831-00-2015-05-EN and VGB-S-891-00-2012-06-DE-EN are recommended.Informationen zur Lizenzierung der Anwendung (Tabellen): E-Mail an [email protected], Tel.: +49 201 8128-444 Information concerning the licensing of the application (tables): e-mail request to [email protected], T: +49 201 8128-444
Ref. Ordering Number/
Bestell-Kennz.
Titel / Title Prices/Preise (net/netto)*Titles with “e” or “EN“ in the ordering reference number are available in English.
Titel mit dem Bestellkennzeichen „e“ oder „EN“ sind in Englisch lieferbar.ISBN Print
ISBN eBook*VGB-Member VGB-Mitglied
Non-Member Nichtmitglied
RDS-PP®-Basisregelwerk | RDS-PP® Basic-Standards
VGB-S-821-00-2016-06-DE RDS-PP Kennbuchstaben für Kraftwerkssysteme (Systemschlüssel). 4. überarb. Aufl., 636 S., 2016, RingordnerDer VGB-Standard VGB-S-821-00-2016-06-DE ersetzt die Publikation VGB-B 101.
978-3-86875-943-3 978-3-86875-944-0
335,00 335,00
470,00 470,00
VGB-RDS-PP-BASIS-EXCEL-DE (Microsoft Excel®)
RDS-PP® Systemschlüssel (VGB-S-821-00-2016-06-DE), Kennbuchstaben für Grundfunktionen und Produktklassen (VGB-B 102 d/e) Microsoft Excel®-Datei, 2016
978-3-96284-065-5 1.950,00 2.950,00
VGB-S-821-00-2016-06-EN RDS-PP® Letter Code for Power Plant Systems (System key). 4th Edition, 636 p., 2016, BinderThe VGB-Standard VGB-S-821-00-2016-06-EN replaces the VGB-B 101e.
978-3-86875-945-7 978-3-86875-946-4
335,00 335,00
470,00 470,00
VGB-RDS-PP-BASIS-EXCEL-EN (Microsoft Excel®)
RDS-PP® System key (VGB-S-821-00-2016-06-EN), Letter Codes for Basic Functions and Product Classes (VGB-B 102 d/e) Microsoft Excel® file, 2016
978-3-96284-066-2 1.950,00 2.950,00
VGB-B 102 d/e RDS-PP® – Referenzkennzeichensystem für Kraftwerke, Kennbuchstaben für Grundfunktionen und Produktklassen / Reference Designation System for Power Plants, Letter Codes for Basic Functions and Product Classes, 270 p./270 S., 2010
978-3-86875-352-3 978-3-86875-425-4
200,00 230,00
300,00 350,00
VGB-S-823-01-2015-09-EN-DE RDS-PP® – Application Guideline, Part 01: Power Plants, General; Anwen-dungsrichtlinie, Teil 01: Kraftwerke, Allgemein, 390 p./S., 2015
978-3-86875-845-0 978-3-86875-846-7
290,00 290,00
400,00 400,00
VGB-S-832-00-2016-04-DE-EN Dokumentenkennzeichen für Anlagen der Energieversorgung Designation codes for document kind classification code (DCC key), 198 S./p., 2016
978-3-86875-930-3 978-3-86875-931-0
300,00 300,00
450,00 450,00
Typspezifische RDS-PP®-Standards | Type-specific RDS-PP®-Standards
VGB-S-823-31-2014-12-EN-DE RDS-PP® – Application Guideline, Part 31: Hydro Power Plants; Anwen-dungsrichtlinie, Teil 31: Wasserkraftwerke, 221 p./S., 2014
978-3-86875-388-2 978-3-86875-389-9
295,00 295,00
425,00 425,00
VGB-S-823-32-2014-03-EN-DE RDS-PP® – Application Guideline; Part 32: Wind Power Plants; Anwendungsrichtlinie, Teil 32: Windkraftwerke, 314 p./S., 2014 Hinweis: Der VGB-S-823-32-2014-03-EN-DE ersetzt die Publikation VGB-B 116 D2. Remark: The VGB-S-823-32-2014-03-EN-DE replaces the publication VGB-B 116 D2e.
978-3-86875-693-7 978-3-86875-744-6
280,00 280,00
375,00 375,00
RDS-PP® – Application Guideline; Part 32: Wind Power Plants; Anwen-dungsrichtlinie, Teil 32: Windkraftwerke, 314 p./S., 2014, Einzelplatz (Grundwerk Kombi: Print und eBook, Annex 3 und 4: PDF)
978-3-86875-768-2 395,00 525,00
RDS-PP® – Application Guideline; Part 32: Wind Power Plants; Anwen-dungsrichtlinie, Teil 32: Windkraftwerke, 314 p./S., 2014 Einzelplatz (Basispaket Kombi: Print und eBook, Annex 3 und 4: Excel®)
978-3-86875-771-2 530,00 800,00
VGB-S-823-33-2018-07-EN-DE RDS-PP® – Application Guideline; Part 33: Photovoltaic Power Plants; Anwendungsrichtlinie, Teil 33: Photovoltaische Kraftwerke, 150 p./S., 2018
978-3-96284-069-3 978-3-96284-070-9
280,00 280,00
420,00 420,00
VGB-S-823-41-2018-07-EN-DE RDS-PP® – Application Guideline; Part 41: Power to Gas; Anwendungsrichtlinie, Teil 41: Power to Gas, 160 p./S., 2018
978-3-96284-071-6 978-3-96284-072-3
280,00 280,00
420,00 420,00
iOS and Android App for RDS-PP®
Kostenlose App für Smartphones und Tablets (iOS und Android) zur Dekodierung von RDS-PP®-Anlagenkennzeichen. Weitere Softwareoptionen auf Anfrage.Free smartphone and tablet app (iOS and Android) for decoding of RDS-PP®-designations. Further services on request.https://tipware.de/rdspp/index.html
Kostenlos/Free of charge
E-mail: [email protected] | Shop: www.vgb.org 31
VGB PowerTech Catalogue | Medienverzeichnis IV l 2019 RDS-PP® Key System / Schlüsselverwaltung
Ref. Ordering Number/
Bestell-Kennz.
Titel / Title Prices/Preise (net/netto)*Titles with “e” or “EN“ in the ordering reference number are available in English.
Titel mit dem Bestellkennzeichen „e“ oder „EN“ sind in Englisch lieferbar.ISBN Print
ISBN eBook*VGB-Member VGB-Mitglied
Non-Member Nichtmitglied
Zusätzlich empfohlen | Additionally recommended
VGB-B 108 d/e Richtlinie Regeln zur Bildung von Benennungen und deren Anwendung in der Kraftwerkstechnik/Guideline Rules for the creation of denominations and their application for power plant engineering, 2010
978-3-86875-228-1 978-3-86875-443-8
60,00 70,00
90,00 100,00
VGB-S-831-00-2015-05-DE Lieferung der Technischen Dokumentation (Technische Anlagendaten, Dokumente) für Anlagen der Energieversorgung
978-3-86875-865-8 978-3-86875-866-5
420,00 420,00
630,00 630,00
VGB-S-831-00-2015-05-EN Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units
978-3-86875-885-6 978-3-86875-886-3
420,00 420,00
630,00 630,00
VGB-S-891-00-2012-06-DE-EN VGB-Abkürzungskatalog für die Kraftwerkstechnik, 2012, Ringordner/ VGB abbreviation-catalogue for power plant technology, 2012, Binder
978-3-86875-227-4 978-3-86875-789-7
200,00 200,00
285,00 285,00
VGB-Abkürzungskatalog für die Kraftwerkstechnik/ VGB abbreviation-catalogue for power plant technology, 2012, mit Excel®-Datei Abkürzungsliste/Abbreviation list enclosed as Excel® file
978-3-86875-796-5 350,00 495,00
Zurückgezogen/überarbeitet | Withdrawn/Revised
VGB-B 101 Referenzkennzeichensystem für Kraftwerke RDS-PP® Kennbuchstaben für Kraftwerkssysteme (Systemschlüssel), 644 S., 2011, RingordnerHinweis: Der VGB-Standard VGB-S-821-00-2016-06-DE ersetzt die Publikation VGB-B 101. Für bestehende Anwendungen verbleibt die VGB-B 101 im Lieferangebot.Hinweis: Das vollständige RDS-PP® (alt) umfasst die Publikationen VGB-B 101 und VGB-B 102 d/e; zusätzlich empfohlen werden VGB-S-891-00-2012-06-DE-EN und VGB-B 108 d/e.
978-3-86875-223-6 978-3-86875-436-0
275,00 310,00
410,00 470,00
VGB-B 101e Reference Designation System for Power Plants RDS-PP®, Letter Codes for Power Plant Systems (System Key) DIN A4, 644 p., 2011Remark: The VGB-Standard VGB-S-821-00-2016-06-EN replaces the publication VGB-B 101e. For existing applications the VGB-B 101e is still available.Remark: The complete RDS-PP® (previous version) covers the publications VGB-B 101e (old version) and VGB-B 102 d/e; additionally the VGB-B 108 d/e and VGB-S-891-00-2012-06-DE-EN are recommended.
978-3-86875-437-7 310,00 470,00
VGB-B 116 D2 Referenzkennzeichensystem für Kraftwerke RDS-PP – Anwendungserläuterungen für Windkraftwerke – 2006 (zurückgezogen)Hinweis: Der VGB-Standard VGB-S-823-32-2014-03-EN-DE ersetzt den VGB-B 116 D2.
978-3-86875-446-9 auf Anfrage on request
VGB-B 116 D2e Reference Designation System for Power Plants RDS-PP – Application Explanations for Wind Power Plants – 2006 (withdrawn)Remark: The VGB Standard VGB-S-823-32-2014-03-EN-DE is substituting VGB-B 116 D2e.
978-3-86875-447-6 auf Anfrage on request
Tel. +49 201 8128-200 | Fax +49 201 8128-30230
RDS-PP Key System / RDS-PP Schlüsselverwaltung VGB PowerTech Catalogue | Medienverzeichnis I l 2019
RDS-PP®-Standards
VGB-S-821-00-2016-06-ENRDS-PP®
System Key
Supplementary VGB-Standards
VGB-S-891-00-2012-06-DE-ENVGB abbreviation cataloguefor power plant technology
VGB-B 108 d/eRules for the creation of denomi-
nations and their applicationfor power plant engineering
VGB-S-823-01-2015-09-EN-DERDS-PP® Application Guideline
Power Plants, General
Basic Standards (incl. part thermal power plants)
Supplementary power plant type specific parts
VGB-S-823-31-2014-12-EN-DERDS-PP® Application Guideline
Hydro Power Plants
VGB-S-823-32-2014-03-EN-DERDS-PP® Application Guideline
Wind Power Plants
VGB-S-823-33-2018-07-EN-DERDS-PP® Application Guideline
Photovoltaic Power Plants
VGB-S-823-41-2018-07-EN-DERDS-PP® Application Guideline
Power to Gas
VGB-B 102 d/eRDS-PP® Letter Codes
for Basic Functionsand Product Classes
VGB-S-832-00-2012-06-EN-DEDesignation codes for
document kindclassification code (DCC key)
VGB-S-831-00-2015-05-ENProvision of Technical
Documentation forEnergy Supply Units
DE/d/(void): German edition. EN/e: English edition. *only available in German.
RDS-PP®-Regelwerk
VGB-S-821-00-2016-06-DERDS-PP®
Systemschlüssel
Ergänzendes VGB-Regelwerk
VGB-S-891-00-2012-06-DE-ENVGB-Abkürzungskatalogfür die Kraftwerkstechnik
VGB-B 108 d/eRegeln zur Bildung von Benen-nungen und deren Anwendung
in der Kraftwerkstechnik
VGB-S-823-01-2015-09-EN-DERDS-PP® Anwendungsrichtlinie
Kraftwerke, Allgemein
Basisregelwerk (inkl. Teil thermische Kraftwerke)
Ergänzende Kraftwerkstyp spezifische Teile
VGB-S-823-31-2014-12-EN-DERDS-PP® Anwendungsrichtlinie
Wasserkraftwerke
VGB-S-823-32-2014-03-EN-DERDS-PP® Anwendungsrichtlinie
Windkraftwerke
VGB-S-823-33-2018-07-EN-DERDS-PP® AnwendungsrichtliniePhotovoltaische Kraftwerke
VGB-S-823-41-2018-07-EN-DERDS-PP® Anwendungsrichtlinie
Power to Gas
VGB-B 102 d/eRDS-PP® Kennbuchstaben
Grundfunktionen undProduktklassen
VGB-S-832-00-2012-06-EN-DEDokumentenkennzeichen für
Anlagen der Energieversorgung(DCC Schlüssel)
VGB-S-831-00-2015-05-DELieferung der TechnischenDokumentation für Anlagen
der Energieversorgung
DE/d/(ohne Kürzel): Deutsche Ausgabe. EN/e: Englische Ausgabe.
VGB-S-821-00-2016-06-EN
VGB-Standard
Reference Designation System for Power Plants RDS-PP®
Letter Code for Power Plant Systems (System Key)
4th revised edition 2016 (Revision c) (former VGB-B 101e)
VGB-Standard
Reference Designation System for Power Plants RDS-PP®
Letter Code for Power Plant Systems (System Key)
VGB-S-821-00-2016-06-EN (former VGB-B 101e) 4th revised edition 2016 (Revision c)
Publisher:
VGB PowerTech e.V.
Publishing house: VGB PowerTech Service GmbH Verlag technisch-wissenschaftlicher Schriften Deilbachtal 173, 45257 Essen, Germany
Tel.: +49 201 8128-200 Fax: +49 201 8128-302 E-mail: [email protected]
ISBN 978-3-86875-945-7 (Print) ISBN 978-3-86875-946-4 (eBook)
All rights reserved. VGB PowerTech www.vgb.org
VGB-S-821-00-2016-06-EN
3
Foreword The VGB Working Panel “Reference Designation and Plant Documentation”, which is attended by power plant operators and maintenance contractors as well as designers and suppliers of power plants, prepared this guideline. The tasks of this working panel also include the preparation and maintenance of dis-cipline-specific and power plant type-specific guidelines as well as the letter codes for power plant systems (system key). The members of the Working Panel represent the interests of VGB PowerTech e.V. in national and international standardization committees. Staff members of the following companies listed below contributed to preparing the “Letter Codes for Power Plant Systems” guideline:
ABB AG
GE Power AG
EnBW Energie Baden-Württemberg AG
Ingenieurbüro gabo gmbh
Kraftwerksschule e.V.
RWE Power AG
RWE Technology International GmbH
Siemens AG
Uniper Technologies GmbH
Vattenfall Europe Generation AG
VERBUND Hydro Power GmbH
The list makes no claim to distinctiveness and legal unambiguousness of the compa-ny names given.
VGB-S-821-00-2016-06-EN
3
VGB-S-821-00-2016-06-EN
4
Authors
The following authors actively participated in the elaboration of this Guideline
Name Company
Wolfgang Ernst Siemens AG
Andreas Menger Ingenieurbüro gabo GmbH
Heinz Müller IB Heinz Müller
Helmut Wank IB Helmut Wank
VGB-S-821-00-2016-06-EN
4
VGB-S-821-00-2016-06-EN
5
Amendments
All Amendments, compared with Version VGB-B 101e: 2011-12 (3rd revised edition), are made recognizable in the text passage with an outer frame line and in the ap-pendix with the letter "c". Previous editions First edition VGB-B 101e: 2007-05 2nd revised edition VGB-B 101e: 2010-04 3rd revised edition VGB-B 101e: 2011-12 The VGB Working Panel “Reference Designation and Plant Documentation” is re-sponsible for edition and update of this guideline.
Essen, June 2016
VGB PowerTech e.V.
VGB-S-821-00-2016-06-EN
5
VGB-S-821-00-2016-06-EN
6
Introduction
The basic international standards for reference designation provide users with gen-erally applicable general rules and letter codes for main classes for the designation of technical objects and their documentation.
The standard for power plants establishes sector-specific specifications based on the basic standards, and also includes options to enable application for different power plant types.
The fulfilment of specific designation tasks and addressing of collections of infor-mation necessitates coding systems which establish a relationship between the ob-ject names and letter codes.
IEC 81346-2 provides non-sector-specific binding letter codes for main classes and subclasses for technical systems and components, classifying the objects according to purpose and task.
For the designation of power plant systems, table 3 of IEC 81346-2 provides a framework for the designation of “infrastructure objects”. This VGB-Standard, VGB-S-821-00, assigns the power-plant-specific systems to letter codes based on this framework.
The relationships between the documents for designation tasks and the relative posi-tion of VGB-S-821-00 with respect to these are shown in Figure 1.
VGB-S-821-00-2016-06-EN
6
VGB-S-821-00-2016-06-EN
7
Figure 1 - Relationships between designation standards, guidelines, application guidelines.
VGB-S-821-00-2016-06-EN
7
VGB-S-821-00-2016-06-EN
8
Content
1 Scope ......................................................................................................... 9
2 Normative references ............................................................................. 10
3 Terms and definitions ............................................................................ 11
4 Application for amendment ................................................................... 12
5 Letter code .............................................................................................. 13
6 System key .............................................................................................. 14
VGB-S-821-00-2016-06-EN
8
VGB-S-821-00-2016-06-DE
VGB-Standard
Referenzkennzeichensystem für Kraftwerke RDS-PP®
Kennbuchstaben für Kraftwerkssysteme (Systemschlüssel)
4. überarbeitete Ausgabe 2016 (Revision c)(vormals VGB-B 101)
VGB-Standard
Referenzkennzeichensystem für Kraftwerke RDS-PP®
Kennbuchstaben für Kraftwerkssysteme (Systemschlüssel)
VGB-S-821-00-2016-06-DE (vormals VGB-B 101) 4. überarbeitete Ausgabe 2016 (Revision c)
Herausgeber:
VGB PowerTech e.V.
Verlag: VGB PowerTech Service GmbH Verlag technisch-wissenschaftlicher Schriften Deilbachtal 173, 45257 Essen
Tel.: +49 201 8128-200 Fax: +49 201 8128-302 E-Mail: [email protected]
ISBN 978-3-86875-943-3 (Print, Hardcover) ISBN 978-3-86875-972-3 (Print, Ordner) ISBN 978-3-86875-944-0 (eBook)
Jegliche Wiedergabe ist nur mit vorheriger Genehmigung des VGB PowerTech gestattet. www.vgb.org
VGB-S-821-00-2016-06-DE
4
Vorwort
Diese Richtlinie wurde von der VGB-Fachgruppe „Anlagenkennzeichnung und Do-kumentation“ erarbeitet, in dem Betreiber und Instandhalter sowie Planer und Her-steller von Kraftwerken gemeinsam tätig sind. Zu den Aufgaben dieser Fachgruppe gehören u. a. die Erstellung und Pflege von fachbezogenen und kraftwerkstypspezifischen Richtlinien sowie der vorliegenden Buchstabencode für Systeme der Kraftwerkstechnik (Systemschlüssel). Die Mitglieder der Fachgruppe vertreten die Interessen des VGB PowerTech e.V. in nationalen und internationalen Normungsgremien. Zum Zeitpunkt der Veröffentlichung der 4. überarbeiteten Ausgabe 2016 (Revision c) der „Kennbuchstaben für Kraftwerkssysteme“ waren in der VGB-Fachgruppe „Anla-genkennzeichnung und Dokumentation“ folgende Firmen vertreten:
ABB AG
GE Power AG
EnBW Energie Baden-Württemberg AG
Ingenieurbüro gabo gmbh
Kraftwerksschule e.V.
RWE Power AG
RWE Technology International GmbH
Siemens AG
Uniper Technologies GmbH
Vattenfall Europe Generation AG
VERBUND Hydro Power GmbH
Die aufgelisteten Namen erheben keinen Anspruch auf Unverwechselbarkeit bzw. juristische Eindeutigkeit
VGB-S-821-00-2016-06-DE
4
VGB-S-821-00-2016-06-DE
5
Autoren
An der Erstellung dieser Anwendungsrichtlinie waren folgende Autoren wesentlich beteiligt:
Name Firma
Wolfgang Ernst Siemens AG
Andreas Menger Ingenieurbüro gabo GmbH
Heinz Müller IB Heinz Müller
Helmut Wank IB Helmut Wank
VGB-S-821-00-2016-06-DE
5
VGB-S-821-00-2016-06-DE
6
Änderungen
Die Änderungen gegenüber VGB-B 101: 2011-12 (3. überarbeitete Ausgabe) wurden im Textteil mit einer äußeren Rahmenlinie, im Anhang mit dem Buchstaben „c“ kennt-lich gemacht. Frühere Ausgaben Erstausgabe VGB-B 101 : 2007-05 2. überarbeitete Ausgabe VGB-B 101 : 2010-04 3. überarbeitete Ausgabe VGB-B 101 : 2011-12 Für die laufende Pflege dieser Richtlinie ist der VGB-Arbeitskreis „Anlagenkenn-zeichnung und Dokumentation“ zuständig.
Essen, im Juni 2016
VGB PowerTech e.V.
VGB-S-821-00-2016-06-DE
6
VGB-S-821-00-2016-06-DE
7
Einleitung
Die internationalen Grundnormen zur Referenzkennzeichnung bieten den Anwen-dern allgemeingültige Grundregeln und Kennbuchstaben für Hauptklassen zur Kenn-zeichnung von technischen Objekten und deren Dokumentation.
Die Fachnorm für Kraftwerke trifft auf dieser Basis branchenbezogene Festlegungen, enthält aber ebenfalls noch Optionen, um die Anwendung für unterschiedliche Kraft-werkstypen möglich zu machen.
Zur Erfüllung konkreter Kennzeichnungsaufgaben und Adressierung von Informa-tionszusammenstellungen sind Kodiersysteme erforderlich, die die Namen der Ob-jekte zu Kennbuchstaben in Beziehung setzen.
Für technische Einrichtungen und Betriebsmittel steht die DIN EN 81346-2 mit bran-chenübergreifend verbindlichen Kennbuchstaben für Haupt- und Unterklassen zur Verfügung, wobei die Objekte nach Zweck und Aufgabe klassifiziert sind.
Zur Kennzeichnung von Kraftwerkssystemen bietet DIN EN 81346-2 mit Tabelle 3 einen Rahmen zur Kennzeichnung von „Infrastrukturobjekten“. Auf dieser Basis er-folgte im vorliegenden VGB-Standard VGB-S-821-00 die Zuordnung der kraftwerk-spezifischen Systeme zu Kennbuchstaben.
Die Zusammenhänge der Dokumente für Kennzeichnungsaufgaben und die Einord-nung der Richtlinie VGB-S-821-00 sind im nachfolgenden Bild 1 dargestellt.
VGB-S-821-00-2016-06-DE
7
VGB-S-821-00-2016-06-DE
8
Industrielle Systeme, Anlagen und Ausrüstungen undIndustrieprodukte
Strukturierungsprinzipien und Referenzkennzeichnung
DIN EN 81346‐2Klassifizierung von Objektenund Kennbuchstaben vonKlassen
DIN EN81346‐1AllgemeineRegeln
DIN ISO/TS 81346‐3Anwendungsregeln für einReferenzkennzeichensystem
Grund‐normen
DIN ISO/TS 81346‐10Referenzkennzeichensystem Teil 10: Kraftwerke
VGB‐S‐821‐00RDS-PP Kennbuchstaben für KraftwerkssystemeVGB‐B 102RDS-PP Kennbuchstaben für Grundfunktionen und Produktklassen
RichtlinienKennbuch‐staben
Fachnorm
Anwendungs‐richtlinien
VGB‐S‐823‐01Kraftwerke allgemein
VGB‐S‐823‐31WasserkraftwerkeVGB‐S‐823‐32Windkraftwerke
Bild 1: Zusammenhänge der Kennzeichnungs-Normen, Richtlinien, Anwendungsrichtlinien
VGB-S-821-00-2016-06-DE
8
VGB-S-821-00-2016-06-DE
9
Inhalt
1 Anwendungsbereich .............................................................................. 10
2 Normative Verweise ................................................................................ 11
3 Begriffe und Definitionen ....................................................................... 12
4 Änderungsantrag .................................................................................... 13
5 Kennbuchstaben ..................................................................................... 14
6 Systemschlüssel ..................................................................................... 15
VGB-S-821-00-2016-06-DE
9
VGB-B 102 (Deutsch/Englisch | German/English)
Richtlinie/Guideline
RDS-PP®
Referenzkennzeichensystem für KraftwerkeReference Designation System for Power PlantsKennbuchstaben für Grundfunktionenund ProduktklassenLetter Codes for Basic Functionsand Product Classes
www.vgb.org
© Jegliche Wiedergabe ist nur mit vorheriger Genehmigung des VGB PowerTech gestattet.
Richtlinie/Guideline
Herausgeber VGB PowerTech e.V.
Verlag VGB PowerTech Service GmbH Verlag technisch-wissenschaftlicher Schriften Postfach 10 39 32, 45039 Essen Tel.: +49 201 8128-200 Fax: +49 201 8128-302 E-Mail: [email protected]
ISBN 978-3-86875-352-3 (Print) ISBN 978-3-86875-425-4 (eBook)
VGB-B 102 (Deutsch/Englisch | German/English)
RDS-PPReferenzkennzeichensystem für KraftwerkeReference Designation System for Power PlantsKennbuchstaben für Grundfunktionen und ProduktklassenLetter Codes for Basic Functions and Product Classes
3
B102:2010-11
Vorwort
Diese Richtlinie wurde vom VGB-Arbeitskreis „Anlagenkennzeichnung und Dokumen-tation“ erarbeitet, in dem Betreiber und Instandhalter sowie Planer und Hersteller von Kraftwerken gemeinsam tätig sind. Zu den Aufgaben dieses Arbeitskreises gehören u. a. die Erstellung und Pflege von fachbezogenen und kraftwerkstypspezifischen Richtlinien, sowie der Kennbuchstaben für Kraftwerke. Die Mitglieder des Arbeitskreises vertreten die Interessen des VGB PowerTech e.V. in nationalen und internationalen Normungsgremien. Zu den Mitgliedern des Arbeitskreises gehören folgende Unternehmen: ABB ALSTOM Power AREVA NP E.ON New Build & Technology EnBW Kraftwerke Endress+Hauser Messtechnik Evonik Power Saar GABO iXIT Engineering Technology KRAFTWERKSSCHULE E.V. PASYS RWE Power Siemens Energy Sector Vattenfall Europe Generation VERBUND Hydro Power VGB-Geschäftsstelle Für die laufende Pflege dieser Richtlinie ist der VGB-Arbeitskreis „Anlagenkennzeich-nung und Dokumentation“ zuständig. Zur Neuaufnahme von Grundfunktionen und Produktklassen kann ein formloser Antrag an die VGB-Geschäftsstelle gestellt werden. Die dafür notwendigen Informationen sowie die Kontaktadresse stehen im Anhang dieser Richtlinie. Der VGB dankt allen an der Erstellung dieser Richtlinie beteiligten Unternehmen und den mit der Arbeit beauftragten Mitarbeitern. Essen, November 2010 VGB PowerTech e.V.
ISBN 978-3-86875-352-3
Haftungsausschluss
VGB-Richtlinien und VGB-Merkblätter sind Empfehlungen, die jedermann frei zur Anwendung stehen. Wer sie anwendet, hat für die richtige Anwendung im konkreten Fall Sorge zu tragen.
Sie berücksichtigen den zum Zeitpunkt der jeweiligen Ausgabe herrschenden Stand der Technik. Durch das Anwenden von VGB-Richtlinien oder VGB-Merkblättern entzieht sich niemand der Verantwortung für sein eigenes Handeln. Jeder handelt insoweit auf eigene Gefahr. Eine Haftung oder Garantie des VGB PowerTech und derjenigen, die an den VGB-Richtlinien oder VGB-Merkblättern beteiligt sind, ist ausgeschlossen.
4
B102:2010-11
Foreword This guideline was prepared by the VGB working panel "Reference Designation and Plant Documentation“, which is attended by power plant operators and maintenance contractors as well as designers and suppliers of power plants. The tasks of this working panel also include the preparation and maintenance of discipline-specific and power plant type-specific guidelines as well as the letter codes for power plants. The working panel members represent the interests of VGB PowerTech e. V. in national and international standardization commissions. Members of the working panel are the following companies: ABB ALSTOM Power AREVA NP E.ON New Build & Technology EnBW Kraftwerke Endress+Hauser Messtechnik Evonik Power Saar GABO iXIT Engineering Technology KRAFTWERKSSCHULE E.V. PASYS RWE Power Siemens Energy Sector Vattenfall Europe Generation VERBUND Hydro Power VGB-Geschäftsstelle The VGB working panel "Reference Designation and Plant Documentation" is responsi-ble for updating this guideline on an ongoing basis. To request entry of new basic functions and product classes send a submission form to the VGB. The necessary details and contact information can be found in the appendix of this guideline. The VGB thanks all companies and their employees, who participated in the creation of this guideline. Essen, November 2010 VGB PowerTech e.V. ISBN 978-3-86875-352-3 Disclaimer VGB Guidelines and VGB Instruction Sheets are recommendations which are available for unre-stricted use. Responsibility for their correct application in individual cases however rests with the persons using them. VGB Guidelines and VGB Instruction Sheets reflect the state of the art in good engineering prac-tice at the time of their publication. Their use does not in any way relieve users of any risks or the responsibility for their own actions. VGB PowerTech and the parties involved in the compilation of VGB Guidelines and VGB Instruction Sheets issue no warranties and accept no liability whatso-ever.
5
B102:2010-11
Inhaltsverzeichnis
1 Geltungsbereich.................................................................................................. 7 1.1 Einleitung .............................................................................................................. 7 1.2 Anwendungsbereich ............................................................................................. 9
2 Normative Verweise.......................................................................................... 11
3 Begriffe und Definitionen................................................................................. 12
4 Anwendung ....................................................................................................... 14 4.1 Allgemeines ........................................................................................................ 14 4.2 Regeln................................................................................................................. 15 4.3 Beispiele ............................................................................................................. 16 4.3.1 Durchflussmessung ............................................................................................ 16 4.3.2 Antriebssteuerung............................................................................................... 18
5 Kennbuchstaben............................................................................................... 19 5.1 Allgemeines ........................................................................................................ 19 5.2 Übersicht der Kennbuchstaben, Datenstelle 1 (Hauptklassen) .......................... 19 5.3 Bereiche für Unterklassen................................................................................... 24
6 Tabellen ............................................................................................................. 25 6.1 Allgemein ............................................................................................................ 25 6.2 Kennbuchstabe – Benennung – Denomination .................................................. 26 6.3 Benennung – Denomination – Kennbuchstabe ................................................ 107 6.4 Denomination – Benennung – Kennbuchstabe ................................................ 188
7 Weitere Unterteilung für bestimmte Unterklassen ...................................... 268
8 Antrag zur Aufnahme weiterer Klassen........................................................ 270
VGB-S-823-01-2015-09-EN-DE
VGB-Standard
RDS-PP®
Application Guideline Part 01: Power Plants, GeneralAnwendungsrichtlinie Teil 01: Kraftwerke, Allgemein
VGB-Standard
RDS-PP
Application Guideline Part 01: Power Plants, General
Anwendungsrichtlinie Teil 01: Kraftwerke, Allgemein
VGB-S-823-01-2015-09-EN-DE
Herausgeber/Publisher VGB PowerTech e.V.
Verlag / Publishing house: VGB PowerTech Service GmbH Verlag technisch-wissenschaftlicher Schriften Postfach 10 39 32, 45039 Essen Tel. +49 201 8128-200 Fax +49 201 8128-302 E-Mail: [email protected]
ISBN 978-3-86875-845-0 (Print)
ISBN 978-3-86875-846-7 (eBook)
All rights reserved. © VGB PowerTech 2015
VGB-S-823-01-2015-09-EN-DE
Page 5 of 390
Foreword Vorwort
This RDS-PP®
Application Guideline was prepared by a project group of the VGB Working Panel “Reference Designation and Plant Documentation”, in close cooperation with operators, maintainer as well as de-signer and manufacturer of power plants.
Diese RDS-PP® Anwendungsrichtlinie wurde von einer Projektgruppe des VGB-Arbeitskreises „Anlagenkennzeichnung und Dokumentation“ erarbeitet, in dem Betreiber und Instandhalter sowie Planer und Herstel-ler von Kraftwerken gemeinsam tätig sind.
The tasks of this working group includes among others, the preparation and mainte-nance of subject-specific and power plant specific guidelines and codes of power plant systems, basic functions and product classes.
Zu den Aufgaben dieses Arbeitskreises ge-hören u. a. die Erstellung und Pflege von fachbezogenen und kraftwerkstypspezifi-schen Richtlinien sowie der Kennbuchstaben für Kraftwerkssysteme, Grundfunktionen und Produktklassen
At the date of publication of this Guideline the following companies were members of the working panel “Reference Designation and Plant Documentation”:
Zum Zeitpunkt der Veröffentlichung dieses VGB-Standards waren im Arbeitskreis „An-lagenkennzeichnung und Dokumentation“ folgende Firmen vertreten:
- ABB AG
- ALSTOM Power
- E.ON Technologies
- EnBW AG
- EnviCon
- ingenieurbüro gabo gmbh
- Kraftwerksschule KWS
- RWE Power, RWE Technology
- Siemens AG
- Vattenfall Europe Generation
- VERBUND Hydro Power GmbH
RDS-PP® is a registered trademark of VGB PowerTech e.V. RDS-PP® ist eingetragene Marke des VGB PowerTech e.V.
VGB-S-823-01-2015-09-EN-DE
Page 6 of 390
Authors Autorenverzeichnis
The following authors actively participated in the elaboration of this Guideline:
An der Erstellung dieser Anwendungsrichtli-nie waren folgende Autoren wesentlich be-teiligt:
Name/Name Company/Firma Stefan Bonhage ABB AG Dr. Karl Dorfmeister VERBUND Hydro Power GmbH Jochen Hantschel E.ON Technologies GmbH Klaus Hartz Siemens AG Klaus Holzwarth EnBW AG Andreas Menger ingenieurbüro gabo gmbh Heinz Müller Ingenieubüro Heinz Müller Jörg Seiffert E.ON Technologies GmbH Helmut Wank Siemens AG
VGB would like to thank all companies and its employees, who participated in the prepa-ration of this Guideline for their contribution.
Der VGB dankt allen an der Erstellung die-ser Anwendungsrichtlinie beteiligten Firmen und den mit der Arbeit beauftragten Mitarbei-tern.
Essen, September 2015
VGB PowerTech e.V.
VGB-S-823-01-2015-09-EN-DE
Page 7 of 390
Remarks for Using this VGB-Standard
Hinweise zur Benutzung dieses VGB-Standards
The definitions of Chapter 3 serve the better understanding of the following chapter and should be appropriate to observe
Die Begriffsdefinitionen des Abschnitts 3 dienen dem Verständnis der folgen-den Abschnitte und sollten entspre-chende Beachtung finden.
Rules are inserted at the appropriate places of the chapter and highlighted by a box.
Regeln sind an den jeweiligen Stellen der Abschnitte eingefügt und optisch durch einen Kasten hervorgehoben
Statements that relate to project-specific stipulations are marked in colour.
Aussagen, die projektspezifische Fest-legungen betreffen, sind farbig markiert
The appendix provides a checklist of fundamental key stipulations that must be agreed between the parties before the project begins.
Im Anhang befindet sich eine Checklis-te der wesentlichen Festlegungen, die vor Projektbeginn zwischen den Betei-ligten abzustimmen ist.
The underscore “_” is used in this Guide line only as placeholder for not written data positions.
Der Unterstrich „_“ wird in dieser Richt-linie ausschließlich als Platzhalter für nicht geschriebene Datenstellen ver-wendet
The underscore shall not be used as part of a complete reference designa-tion with the exception of “Conjoint Des-ignation” and relating to signal names.
Der Unterstrich darf nicht Teil eines vollständigen Referenzkennzeichens sein mit Ausnahme von „Gemeinsame Zuordnung“ und im Zusammenhang mit Signalnamen.
When system interfaces are described in various tables the terms used are those in the figure below.
Bei der Beschreibung der Systemgren-zen in verschiedenen Tabellen sind die Begriffe der nachstehenden Abbildung verwendet.
VGB-S-823-01-2015-09-EN-DE
Page 8 of 390
Table of Contents
Foreword .................................................................................................................... 5
Authors .................................................................................................................... 6
Remarks for Using this VGB-Standards .................................................................. 7
Introduction ………………………………………………………………………………. 22
1 Scope ....................................................................................................... 26
2 Reference to standards and VGB-Standards ....................................... 27
3 Terms, Abbreviations, and Symbols ..................................................... 31
3.1 Terms .................................................................................................................. 31
3.2 Abbreviations ..................................................................................................... 43 3.2.1 Abbreviations General ..................................................................................................... 43
3.2.2 Short Signs for Data Positions ....................................................................................... 44
3.3 Symbols .............................................................................................................. 45
4 Fundamentals ......................................................................................... 47
4.1 Basic Terms ....................................................................................................... 47 4.1.1 General .............................................................................................................................. 47
4.1.2 Object ................................................................................................................................ 47
4.1.3 Aspect ............................................................................................................................... 48
4.1.4 Structuring ........................................................................................................................ 50
4.1.4.1 Partitative relation .............................................................................................................. 50
4.1.4.2 Associative Relation ........................................................................................................... 53
4.1.5 Classification .................................................................................................................... 54
4.1.6 Scope of Designation ...................................................................................................... 55
4.1.6.1 General .............................................................................................................................. 55
4.1.6.2 Plant Part ........................................................................................................................... 56
4.1.6.3 Point of Installation ............................................................................................................. 56
4.1.6.4 Site of Installation ............................................................................................................... 57
4.1.6.5 Equipment Part .................................................................................................................. 57
4.1.6.6 Delimitation Plant Part to Equipment Part ......................................................................... 57
4.2 Designation Process ......................................................................................... 60 4.2.1 General .............................................................................................................................. 60
4.2.2 Process Steps .................................................................................................................. 60
4.3 Designation Parts and Structure ...................................................................... 65 4.3.1 Designation Parts ............................................................................................................ 65
4.3.2 Designation Structure ..................................................................................................... 65
5 Kinds of Designation .............................................................................. 70
5.1 General ............................................................................................................... 70
VGB-S-823-01-2015-09-EN-DE
Page 9 of 390
5.2 Conjoint Designation ......................................................................................... 70
5.3 Functional Aspect .............................................................................................. 74 5.3.1 General .............................................................................................................................. 74
5.3.2 Functional Allocation ...................................................................................................... 75
5.3.2.1 Basics ................................................................................................................................. 75
5.3.2.2 Power Plant Process .......................................................................................................... 78
5.3.2.3 Control Functions ............................................................................................................... 83
5.3.3 Function ............................................................................................................................ 87
5.4 Product ............................................................................................................... 88
5.5 Operating Equipment ........................................................................................ 89
5.6 Location Aspect ................................................................................................. 93 5.6.1 General .............................................................................................................................. 93
5.6.2 Point of Installation .......................................................................................................... 95
5.6.3 Site of Installation ............................................................................................................ 96
5.7 Signals ................................................................................................................ 97
5.8 Terminals ............................................................................................................ 97
5.9 Documents ......................................................................................................... 98
5.10 Cables ................................................................................................................. 98
5.11 Pipes ................................................................................................................... 98
6 Designation Blocks, Structure and Contents general ......................... 99
6.1 Overview ............................................................................................................. 99
6.2 Designation Block “Conjoint Designation” ................................................... 101 6.2.1 Structure and Content ...................................................................................................101
6.2.2 Examples ........................................................................................................................102
6.3 Designation Block “Functional Allocation Group Level” ............................ 103 6.3.1 Structure and Content ...................................................................................................103
6.3.2 Example ..........................................................................................................................104
6.4 Designation Block “Functional Allocation Individual Level” ...................... 105 6.4.1 Structure and Content ...................................................................................................105
6.4.2 Example ..........................................................................................................................106
6.5 Designation Block “Function” ........................................................................ 107 6.5.1 Structure .........................................................................................................................107
6.5.2 Content General .............................................................................................................108
6.5.3 Breakdown Level 0 “Main System” ..............................................................................108
6.5.4 Examples Breakdown Level 0 “Main System” ............................................................108
6.5.5 Breakdown Level 1 “System” .......................................................................................112
6.5.6 Breakdown Level 2 “Basic Function” ..........................................................................116
6.6 Designation Block “Product Class“ .............................................................. 119 6.6.1 Structure .........................................................................................................................119
VGB-S-823-01-2015-09-EN-DE
Page 10 of 390
6.6.2 Content ............................................................................................................................120
6.6.3 Example ..........................................................................................................................122
6.7 Designation Block “Operating Equipment“ .................................................. 123 6.7.1 Structure .........................................................................................................................123
6.7.2 Example ..........................................................................................................................124
6.7.3 Example for the Designation Process of an Operating Equipment ..........................125
6.7.3.1 General ............................................................................................................................125
6.7.3.2 Process steps for Design A ..............................................................................................126
6.7.3.3 Process steps for Design B ..............................................................................................130
6.7.3.4 Comparison of the Solutions ............................................................................................137
6.8 Designation Block “Point of Installation“...................................................... 138 6.8.1 Structure .........................................................................................................................138
6.8.2 Breakdown Level 0 to 2 “Point of installation unit“ ...................................................139
6.8.3 Breakdown Level 3, “Point of Installation Place” .......................................................141
6.9 Designation Block “Site of Installation” ........................................................ 143 6.9.1 Structure .........................................................................................................................143
6.9.2 Content ............................................................................................................................144
6.10 Designation Block “Signal Name” ................................................................. 145
6.11 Designation Block “Terminal Name” ............................................................. 145 6.11.1 General ............................................................................................................................145
6.11.2 Structure .........................................................................................................................146
6.11.3 Content ............................................................................................................................146
6.12 Designation Block “Document Kind Classification code DCC” .................. 147 6.12.1 General ............................................................................................................................147
6.12.2 Structure .........................................................................................................................149
6.12.3 Content ............................................................................................................................149
6.13 Designation Block “Cable Designation” ....................................................... 150
6.14 Designation block “Cable Number“ ............................................................... 150
6.15 Combination of Designation Blocks .............................................................. 150 6.15.1 General ............................................................................................................................150
6.15.2 Linkage ............................................................................................................................150
6.15.3 Allocation ........................................................................................................................152
6.16 Notation in Documents ................................................................................... 152
7 Designation in the Mechanical and Process Engineering ................ 154
7.1 General ............................................................................................................. 154
7.2 Conjoint Designation ....................................................................................... 154
7.3 Functional Allocation, Group Level ............................................................... 154
7.4 Functional Allocation, Individual Level ......................................................... 159
7.5 Function ............................................................................................................ 159
VGB-S-823-01-2015-09-EN-DE
Page 11 of 390
7.5.1 General ............................................................................................................................159
7.5.2 Breakdown Level BL0, “Main System” ........................................................................159
7.5.3 Breakdown Level BL1, “System” .................................................................................161
7.5.4 Examples for Systems and Subsystems .....................................................................163
7.5.4.1 Coal Power Plant .............................................................................................................163
7.5.4.2 Combined Cycle Power Plant ..........................................................................................164
7.5.4.3 Hydro Power Plant ...........................................................................................................166
7.5.4.4 Wind Power Plant ............................................................................................................167
7.5.4.5 Solar Thermal Power Plant ..............................................................................................168
7.5.4.6 Biomass Power Plant .......................................................................................................169
7.5.4.7 Geothermal Power Plant ..................................................................................................170
7.5.4.8 Plant for Air Separation and Coal Gasification ................................................................171
7.5.4.9 Plant for CO2 Capture ......................................................................................................172
7.5.5 System Interfaces ..........................................................................................................173
7.5.5.1 System Interfaces in the Feed Water System .................................................................173
7.5.5.2 System Interfaces for Heat Exchange .............................................................................174
7.5.5.3 System Interfaces for Sampling Systems ........................................................................176
7.5.6 Designation of Supply Systems ...................................................................................176
7.5.7 System Counting ...........................................................................................................182
7.5.7.1 System Counting for Piping Systems ..............................................................................182
7.5.7.2 Counting of the Subsystems of the Feedwater Conveying ..............................................185
7.5.7.3 System Counting of the Boiler .........................................................................................186
7.5.8 Breakdown Level BL2, “Basic Function” ....................................................................187
7.5.9 Examples for Basic Function ........................................................................................187
7.5.9.1 Basic Function “Intervention” ...........................................................................................187
7.5.9.2 Basic Function “Measuring“ .............................................................................................189
7.5.9.3 Basic Function “Guiding or Transporting“ ........................................................................189
7.6 Product ............................................................................................................. 191
7.7 Operating Equipment ...................................................................................... 192
7.8 Point of Installation ......................................................................................... 195
7.9 Site of Installation ............................................................................................ 196
7.10 Mechanical Terminals ..................................................................................... 197
8 Designation in the Civil Engineering .................................................. 198
8.1 General ............................................................................................................. 198
8.2 Conjoint Designation ....................................................................................... 198
8.3 Functional Allocation, Group Level ............................................................... 198 8.3.1 General ............................................................................................................................198
8.3.2 Example Fire Areas ........................................................................................................199
8.4 Functional Allocation, Individual Level ......................................................... 201
VGB-S-823-01-2015-09-EN-DE
Page 12 of 390
8.5 Function ............................................................................................................ 203 8.5.1 General ............................................................................................................................203
8.5.2 Breakdown Level BL0, “Main System” ........................................................................203
8.5.3 Breakdown Level BL1, ”System” .................................................................................204
8.5.4 Examples for Civil Engineering Systems ....................................................................205
8.5.4.1 Structures .........................................................................................................................205
8.5.4.2 Bridge Structures .............................................................................................................206
8.5.4.3 Ducting Structures ...........................................................................................................207
8.5.4.4 Bridge and Ducting Structures .........................................................................................208
8.5.5 Breakdown Level BL2, “Basic Function” ....................................................................209
8.6 Product ............................................................................................................. 212
8.7 Operating Equiment ........................................................................................ 212
8.8 Point of Installation ......................................................................................... 214
8.9 Site of Installation ............................................................................................ 214 8.9.1 General ............................................................................................................................214
8.9.2 Application of BL3 in Buildings ....................................................................................215
8.9.3 Application of BL3 on Areas .........................................................................................220
9 Designation in the Electrical Engineering and Control Technology ........................................................................................... 223
9.1 General ............................................................................................................. 223
9.2 Conjoint Designation ....................................................................................... 223
9.3 Functional Allocation, Group Level ............................................................... 223
9.4 Functional Allocation, Individual Level ......................................................... 225
9.5 Function ............................................................................................................ 226 9.5.1 General ............................................................................................................................226
9.5.2 Breakdown Level BL0, “Main System” ........................................................................226
9.5.3 Breakdown Level BL1, “Systems” of the Electrical Engineering, Overview ...........227
9.5.4 Breakdown Level BL1, „Systems“ of the Electrical Engineering, Examples ..........229
9.5.4.1 Electrical Grid and Distribution System “A” ......................................................................229
9.5.4.2 Electrical Auxiliary Power Supply System for the Energy Conversion “B” ......................235
9.5.4.3 Generator System “MK“ ...................................................................................................242
9.5.4.4 Transmission of Electric Energy “MS” .............................................................................243
9.5.5 Breakdown Level BL1, “Systems” of the Control Technology, Overview ...............244
9.5.6 Breakdown Level BL1, “Systems” of the Control Technology, Examples ..............246
9.5.6.1 Process Automation “CA – CF” .......................................................................................246
9.5.6.2 Process Monitoring “CK” ..................................................................................................253
9.5.7 Installation Systems ......................................................................................................254
9.5.8 Basic Functions, Overview ...........................................................................................255
9.5.9 Basic Functions, Examples ..........................................................................................257
9.5.9.1 Electrical Grid and Distribution System “A” ......................................................................257
VGB-S-823-01-2015-09-EN-DE
Page 13 of 390
9.5.9.2 Mediumvoltage Switchgear ..............................................................................................260
9.5.9.3 Electrical Auxiliary Power Supply.....................................................................................262
9.5.9.4 Automation System ..........................................................................................................263
9.5.9.5 General Tasks, HMI, Data Transmission .........................................................................265
9.6 Product ............................................................................................................. 266
9.7 Operating Equipment ...................................................................................... 270
9.8 Point of Installation ......................................................................................... 281 9.8.1 General ............................................................................................................................281
9.8.2 Signal Sub-distributor ...................................................................................................283
9.8.3 Point of Installation Place .............................................................................................285
9.9 Site of Installation ............................................................................................ 286
9.10 Electrical Terminals ......................................................................................... 287
9.11 Cable ................................................................................................................. 289 9.11.1 General ............................................................................................................................289
9.11.2 Cable Designation ..........................................................................................................289
9.11.3 Cable Number .................................................................................................................293
10 Designation in the Process Control Technology ............................... 295
10.1 Functional Allocation and Control Function ................................................. 295 10.1.1 General ............................................................................................................................295
10.1.2 Code Letters Control Functions ...................................................................................297
10.2 Control Function Individual Level .................................................................. 298 10.2.1 Control Function Individual Level, General ................................................................298
10.2.2 Control Function Individual Level, Designation Block ..............................................300
10.2.3 Control Function Individual Level, Measuring ............................................................301
10.2.3.1 General ............................................................................................................................301
10.2.3.2 Direct Measuring ..............................................................................................................301
10.2.3.3 Measured Value Logic .....................................................................................................304
10.2.3.4 Assembly related Measurements.....................................................................................309
10.2.3.5 Multiple Sampling .............................................................................................................309
10.2.4 Control Function Individual Level, Open-loop Control ..............................................311
10.2.4.1 General ............................................................................................................................311
10.2.4.2 Drive Control ....................................................................................................................311
10.2.4.3 Equipment Protection .......................................................................................................313
10.2.5 Control Function Individual Level, Closed-loop Control ...........................................314
10.3 Control Function Group Level ........................................................................ 315 10.3.1 Control Function Group Level, General ......................................................................315
10.3.2 Control Function Group Level, Designation Block ....................................................316
10.3.3 Control Function Group Level, Open-loop Control ....................................................317
10.3.4 Control Function Group Level, Plant Protection ........................................................320
10.3.5 Control Function Group Level, Main Control ..............................................................322
VGB-S-823-01-2015-09-EN-DE
Page 14 of 390
10.4 Signal Designation .......................................................................................... 325 10.4.1 General ............................................................................................................................325
10.4.2 Designation Block “Signal Name“ ...............................................................................325
10.4.3 Recommentations for Signal Subclasses ...................................................................329
10.4.3.1 Group Control “A“ .............................................................................................................329
10.4.3.2 Individual Open-Loop Control “B“ ....................................................................................329
10.4.3.3 Individual Closed-Loop-Control “C“ .................................................................................329
10.4.3.4 Binary Process Signal “G“ ................................................................................................330
10.4.3.5 Limit Signal, generated from analog Process Signal “H“ .................................................334
10.4.3.6 Single Alarm “M“ ..............................................................................................................334
10.4.3.7 Analog Process Signal “Q” ...............................................................................................335
10.4.3.8 Main Control “R” ...............................................................................................................335
10.4.3.9 Step Control “S“ ...............................................................................................................335
10.4.3.10 Signal Logic “V” ................................................................................................................336
Annex A.1 Check List ........................................................................................... 337
Annex A.2 Shortened Notification of Designation Blocks ................................ 339
Annex B.1 Execution Examples of Mechanical and Process Engineering (Chapter 7) ............................................................................................. 343
Annex B.2 Execution Examples of Civil Engineering (Chapter 8). ......... .........353
Annex B.3 Execution Examples of Electric and Control Engineering (Chapter 9) ............................................................................................. 355
Annex B.4 Execution Examples of Process Control (Chapter 10) ................. 366
List of Figures ........................................................................................................ 378
List of Tables ......................................................................................................... 388
Bibliography ........................................................................................................... 390
VGB-S-823-01-2015-09-EN-DE
Page 15 of 390
Inhaltsverzeichnis
Vorwort .................................................................................................................... 5
Autorenverzeichnis ................................................................................................... 6
Hinweise zur Benutzung dieses VGB-Standards .................................................... 7
Einleitung ................................................................................................................. 22
1 Anwendungsbereich .............................................................................. 26
2 Verweis auf Normen und VGB-Standards ............................................ 27
3 Begriffe, Abkürzungen und Symbole .................................................... 31
3.1 Begriffe ............................................................................................................... 31
3.2 Abkürzungen ...................................................................................................... 43 3.2.1 Abkürzungen allgemein .................................................................................................. 43
3.2.2 Kurzzeichen für Datenstellen .......................................................................................... 44
3.3 Symbole .............................................................................................................. 45
4 Grundlagen ............................................................................................. 47
4.1 Grundbegriffe ..................................................................................................... 47 4.1.1 Allgemein .......................................................................................................................... 47
4.1.2 Objekt ................................................................................................................................ 47
4.1.3 Aspekt ............................................................................................................................... 48
4.1.4 Strukturierung .................................................................................................................. 50
4.1.4.1 Bestandsbeziehungen ....................................................................................................... 50
4.1.4.2 Assoziative Beziehung ....................................................................................................... 53
4.1.5 Klassifizierung ................................................................................................................. 54
4.1.6 Kennzeichnungsumfang ................................................................................................. 55
4.1.6.1 Allgemein ........................................................................................................................... 55
4.1.6.2 Anlagenteil ......................................................................................................................... 56
4.1.6.3 Einbauort ............................................................................................................................ 56
4.1.6.4 Aufstellungsort ................................................................................................................... 57
4.1.6.5 Ausrüstungsteil .................................................................................................................. 57
4.1.6.6 Abgrenzung Anlagenteil/Ausrüstungsteil ........................................................................... 57
4.2 Kennzeichnungsprozess .................................................................................. 60 4.2.1 Allgemein .......................................................................................................................... 60
4.2.2 Prozessschritte ................................................................................................................ 60
4.3 Kennzeichenteile und -aufbau .......................................................................... 65 4.3.1 Kennzeichenteile .............................................................................................................. 65
4.3.2 Kennzeichenaufbau ......................................................................................................... 65
5 Kennzeichnungsarten ............................................................................ 70
VGB-S-823-01-2015-09-EN-DE
Page 16 of 390
5.1 Allgemein ............................................................................................................ 70
5.2 Gemeinsame Zuordnung .................................................................................. 70
5.3 Funktionsaspekt ................................................................................................ 74 5.3.1 Allgemein .......................................................................................................................... 74
5.3.2 Funktionale Zuordnung ................................................................................................... 75
5.3.2.1 Grundlagen ........................................................................................................................ 75
5.3.2.2 Kraftwerksprozess ............................................................................................................. 78
5.3.2.3 Leitfunktionen ..................................................................................................................... 83
5.3.3 Funktion ............................................................................................................................ 87
5.4 Produkt ............................................................................................................... 88
5.5 Betriebsmitttel .................................................................................................... 89
5.6 Ortsaspekt .......................................................................................................... 93 5.6.1 Allgemein .......................................................................................................................... 93
5.6.2 Einbauort .......................................................................................................................... 95
5.6.3 Aufstellungsort................................................................................................................. 96
5.7 Signale ................................................................................................................ 97
5.8 Anschlüsse ......................................................................................................... 97
5.9 Dokumente ......................................................................................................... 98
5.10 Kabel ................................................................................................................... 98
5.11 Rohre .................................................................................................................. 98
6 Kennzeichenblöcke, Aufbau und Inhalt allgemein .............................. 99
6.1 Übersicht ............................................................................................................ 99
6.2 Kennzeichenblock „Gemeinsame Zuordnung” ............................................ 101 6.2.1 Aufbau und Inhalt ..........................................................................................................101
6.2.2 Beispiele .........................................................................................................................102
6.3 Kennzeichenblock „Funktionale Zuordnung Gruppenebene” .................... 103 6.3.1 Aufbau und Inhalt ..........................................................................................................103
6.3.2 Beispiel ...........................................................................................................................104
6.4 Kennzeichenblock „Funktionale Zuordnung Einzelebene” ......................... 105 6.4.1 Aufbau und Inhalt ..........................................................................................................105
6.4.2 Beispiel ...........................................................................................................................106
6.5 Kennzeichhenblock „Funktion” ..................................................................... 107 6.5.1 Aufbau .............................................................................................................................107
6.5.2 Inhalt allgemein ..............................................................................................................108
6.5.3 Gliederungsstufe 0 „Hauptsystem“ .............................................................................108
6.5.4 Beispiele Gliederungsstufe 0 „Hauptsystem“ ............................................................108
6.5.5 Gliederungsstufe 1 „System“ .......................................................................................112
6.5.6 Gliederungsstufe 2 „Grundfunktion“ ...........................................................................116
6.6 Kennzeichenblock „Produktklasse“ .............................................................. 119
VGB-S-823-01-2015-09-EN-DE
Page 17 of 390
6.6.1 Aufbau .............................................................................................................................119
6.6.2 Inhalt ................................................................................................................................120
6.6.3 Beispiel ...........................................................................................................................122
6.7 Kennzeichenblock „Betriebsmittel“ ............................................................... 123 6.7.1 Aufbau .............................................................................................................................123
6.7.2 Beispiel ...........................................................................................................................124
6.7.3 Beispiel für den Kennzeichnungsprozess eines Betriebsmittels .............................125
6.7.3.1 Allgemein .........................................................................................................................125
6.7.3.2 Prozessschritte für Ausführung A ...................................................................................126
6.7.3.3 Prozessschritte für Ausführung B ...................................................................................130
6.7.3.4 Vergleich der Lösungen ...................................................................................................137
6.8 Kennzeichenblock „Einbauort” ...................................................................... 138 6.8.1 Aufbau .............................................................................................................................138
6.8.2 Gliederungsstufen 0 bis 2 “Einbaueinheit” .................................................................139
6.8.3 Gliederungsstufe 3, „Einbauplatz“...............................................................................141
6.9 Kennzeichenblock „Aufstellungsort” ............................................................ 143 6.9.1 Aufbau .............................................................................................................................143
6.9.2 Inhalt ................................................................................................................................144
6.10 Kennzeichenblock „Signalname” .................................................................. 145
6.11 Kennzeichenblock „Anschlussname” ........................................................... 145 6.11.1 Allgemein ........................................................................................................................145
6.11.2 Aufbau .............................................................................................................................146
6.11.3 Inhalt ................................................................................................................................146
6.12 Kennzeichenblock „Dokumentenart Klassen-schlüssel DCC” ................... 147 6.12.1 Allgemein ........................................................................................................................147
6.12.2 Aufbau .............................................................................................................................149
6.12.3 Inhalt ................................................................................................................................149
6.13 Kennzeichenblock „Kabelkennzeichen” ....................................................... 150
6.14 Kennzeichenblock „Kabelnummer“ ............................................................... 150
6.15 Kombination von Kennzeichenblöcken ......................................................... 150 6.15.1 Allgemein ........................................................................................................................150
6.15.2 Verkettung ......................................................................................................................150
6.15.3 Zuordnung ......................................................................................................................152
6.16 Schreibweise in Dokumenten ......................................................................... 152
7 Kennzeichnung in der Maschinen- und Verfahrenstechnik .............. 154
7.1 Allgemein .......................................................................................................... 154
7.2 Gemeinsame Zuordnung ................................................................................ 154
7.3 Funktionale Zuordnung, Gruppenebene ....................................................... 154
7.4 Funktionale Zuordnung, Einzelebene ............................................................ 159
VGB-S-823-01-2015-09-EN-DE
Page 18 of 390
7.5 Funktion ............................................................................................................ 159 7.5.1 Allgemein ........................................................................................................................159
7.5.2 Gliederungsstufe GS0, „Hauptsystem“ .......................................................................159
7.5.3 Gliederungsstufe GS1, „System“ .................................................................................161
7.5.4 Beispiele für Systeme und Teilsysteme ......................................................................163
7.5.4.1 Kohlekraftwerk .................................................................................................................163
7.5.4.2 Kombikraftwerk ................................................................................................................164
7.5.4.3 Wasserkraftwerk ..............................................................................................................166
7.5.4.4 Windkraftwerk ..................................................................................................................167
7.5.4.5 Solarthermisches Kraftwerk .............................................................................................168
7.5.4.6 Biomasse Kraftwerk .........................................................................................................169
7.5.4.7 Geothermisches Kraftwerk ...............................................................................................170
7.5.4.8 Anlage zur Luftzerlegung und Kohlevergasung ...............................................................171
7.5.4.9 Anlage zur CO2-Abtrennung ............................................................................................172
7.5.5 Systemabgrenzungen ....................................................................................................173
7.5.5.1 Systemabgrenzung im Speisewassersystem .................................................................173
7.5.5.2 Systemabgrenzung für Wärmeübertragung .....................................................................174
7.5.5.3 Systemabgrenzung für Probenahmen .............................................................................176
7.5.6 Kennzeichnung von Versorgungssystemen ...............................................................176
7.5.7 Systemzählung ...............................................................................................................182
7.5.7.1 Systemzählung für Leitungssysteme ..............................................................................182
7.5.7.2 Zählung der Teilsysteme der Speisewasser Förderung ..................................................185
7.5.7.3 Systemzählung am Kessel ...............................................................................................186
7.5.8 Gliederungsstufe GS2, „Grundfunktion” ....................................................................187
7.5.9 Beispiele für Grundfunktion .........................................................................................187
7.5.9.1 Grundfunktion „Eingreifen” ...............................................................................................187
7.5.9.2 Grundfunktion „Messung“ ................................................................................................189
7.5.9.3 Grundfunktion „Leiten oder Führen“ ................................................................................189
7.6 Produkt ............................................................................................................. 191
7.7 Betriebsmittel ................................................................................................... 192
7.8 Einbauort .......................................................................................................... 195
7.9 Aufstellungsort ................................................................................................ 196
7.10 Mechanische Anschlüsse ............................................................................... 197
8 Kennzeichnung in der Bautechnik ...................................................... 198
8.1 Allgemein .......................................................................................................... 198
8.2 Gemeinsame Zuordnung ................................................................................ 198
8.3 Funktionale Zuordnung, Gruppenebene ....................................................... 198 8.3.1 Allgemein ........................................................................................................................198
8.3.2 Beispiel Brandabschnitte ..............................................................................................199
VGB-S-823-01-2015-09-EN-DE
Page 19 of 390
8.4 Funktionale Zuordnung, Einzelebene ............................................................ 201
8.5 Funktion ............................................................................................................ 203 8.5.1 Allgemein ........................................................................................................................203
8.5.2 Gliederungsstufe GS0, „Hauptsystem“ .......................................................................203
8.5.3 Gliederungsstufe GS1, „System“ ................................................................................204
8.5.4 Beispiele für bautechnische Systeme .........................................................................205
8.5.4.1 Bauwerke .........................................................................................................................205
8.5.4.2 Brückenbauwerke ............................................................................................................206
8.5.4.3 Kanalbauwerke ................................................................................................................207
8.5.4.4 Brücken und Kanalbauwerke ...........................................................................................208
8.5.5 Gliederungsstufe GS2, „Grundfunktion“ ....................................................................209
8.6 Produkt ............................................................................................................. 212
8.7 Betriebsmittel ................................................................................................... 212
8.8 Einbauort .......................................................................................................... 214
8.9 Aufstellungsort ................................................................................................ 214 8.9.1 Allgemein ........................................................................................................................214
8.9.2 Anwendung der GS3 bei Gebäuden .............................................................................215
8.9.3 Anwendung der GS3 bei Flächen .................................................................................220
9 Kennzeichnung in der Elektro- und Leittechnik ................................. 223
9.1 Allgemein .......................................................................................................... 223
9.2 Gemeinsame Zuordnung ................................................................................ 223
9.3 Funktionale Zuordnung, Gruppenebene ....................................................... 223
9.4 Funktionale Zuordnung, Einzelebene ............................................................ 225
9.5 Funktion ............................................................................................................ 226 9.5.1 Allgemein ........................................................................................................................226
9.5.2 Gliederungsstufe GS0, „Hauptsystem“ .......................................................................226
9.5.3 Gliederungsstufe GS1, „Systeme“ der Elektrotechik, Übersicht ..............................227
9.5.4 Gliederungsstufe GS1, „Systeme“ der Elektrotechnik, Beispiele ............................229
9.5.4.1 Elektrisches Netz- und Verteilungssystem „A” .................................................................229
9.5.4.2 Elektrisches Eigenbedarfssystem für die Energieumformung „B” ...................................235
9.5.4.3 Generatorsystem „MK“ .....................................................................................................242
9.5.4.4 Ableitung elektrischer Energie „MS“ ................................................................................243
9.5.5 Gliederungsstufe GS1, „Systeme“ der Leittechnik, Übersicht .................................244
9.5.6 Gliederungsstufe GS1, „Systeme“ der Leittechnik, Beispiele ..................................246
9.5.6.1 Prozessautomatisierung „CA – CF“ ................................................................................246
9.5.6.2 Prozessüberwachung „CK” ..............................................................................................253
9.5.7 Einbausysteme ...............................................................................................................254
9.5.8 Grundfunktionen, Übersicht .........................................................................................255
9.5.9 Grundfunktionen, Beispiele ..........................................................................................257
9.5.9.1 Elektrisches Netz- und Verteilungssystem „A” .................................................................257
VGB-S-823-01-2015-09-EN-DE
Page 20 of 390
9.5.9.2 Mittelspannungsschaltanlage ...........................................................................................260
9.5.9.3 Eigenbedarfsversorgung ..................................................................................................262
9.5.9.4 Automatisierungssystem ..................................................................................................263
9.5.9.5 Gemeinsame Aufgaben, MMS, Datenübertragung ..........................................................265
9.6 Produkt ............................................................................................................. 266
9.7 Betriebsmittel ................................................................................................... 270
9.8 Einbauort .......................................................................................................... 281 9.8.1 Allgemein ........................................................................................................................281
9.8.2 Signalunterverteiler .......................................................................................................283
9.8.3 Einbauplatz .....................................................................................................................285
9.9 Aufstellungsort ................................................................................................ 286
9.10 Elektrische Anschlüsse .................................................................................. 287
9.11 Kabel ................................................................................................................. 289 9.11.1 Allgemein ........................................................................................................................289
9.11.2 Kabelkennzeichen ..........................................................................................................289
9.11.3 Kabelnummer .................................................................................................................293
10 Kennzeichnung in der Prozessleittechnik .......................................... 295
10.1 Funktionale Zuordnung und Leitfunktion...................................................... 295 10.1.1 Allgemein ........................................................................................................................295
10.1.2 Kennbuchstaben Leitfunktionen ..................................................................................297
10.2 Leitfunktion Einzelebene ................................................................................ 298 10.2.1 Leitfunktion Einzelebene, Allgemein ...........................................................................298
10.2.2 Leitfunktion Einzelebene, Kennzeichenblock .............................................................300
10.2.3 Leitfunktion Einzelebene, Messung .............................................................................301
10.2.3.1 Allgemein .........................................................................................................................301
10.2.3.2 Direkte Messung ..............................................................................................................301
10.2.3.3 Messwertverknüpfung ......................................................................................................304
10.2.3.4 Aggregatbezogene Messungen .......................................................................................309
10.2.3.5 Mehrfachentnahme ..........................................................................................................309
10.2.4 Leitfunktion Einzelebene, Steuerung ...........................................................................311
10.2.4.1 Allgemein .........................................................................................................................311
10.2.4.2 Antriebssteuerung ............................................................................................................311
10.2.4.3 Aggregateschutz ..............................................................................................................313
10.2.5 Leitfunktion Einzelebene, Regelung ............................................................................314
10.3 Leitfunktion, Gruppenebene ........................................................................... 315 10.3.1 Leitfunktion Gruppenebene, Allgemein .......................................................................315
10.3.2 Leitfunktion Gruppenebene, Kennzeichenblock ........................................................316
10.3.3 Leitfunktion Gruppenebene, Steuerung ......................................................................317
10.3.4 Leitfunktion Gruppenebene, Anlagenschutz ..............................................................320
10.3.5 Leitfunktion Gruppenebene, Führungsregelung ........................................................322
VGB-S-823-01-2015-09-EN-DE
Page 21 of 390
10.4 Signalkennzeichnung ...................................................................................... 325 10.4.1 Allgemein ........................................................................................................................325
10.4.2 Kennzeichenblock „Signalname“.................................................................................325
10.4.3 Empfehlungen für Signalunterklassen ........................................................................329
10.4.3.1 Gruppensteuerung „A“ .....................................................................................................329
10.4.3.2 Einzelsteuerung „B“ .........................................................................................................329
10.4.3.3 Einzelregelung „C“ ...........................................................................................................329
10.4.3.4 Binäres Prozesssignal „G“ ...............................................................................................330
10.4.3.5 Grenzsignal, gebildet aus analogem Prozesssignal „H“ ..................................................334
10.4.3.6 Einzelstörmeldung „M“ .....................................................................................................334
10.4.3.7 Analoges Prozesssignal „Q“ ............................................................................................335
10.4.3.8 Führungsregelung „R“ ......................................................................................................335
10.4.3.9 Schrittsteuerung „S“ .........................................................................................................335
10.4.3.10 Signalverknüpfung „V“ .....................................................................................................336
Anhang A.1 Checkliste ......................................................................................... 337
Anhang A.2 Verkürzte Schreibweise von Kennzeichenblöcken ....................... 339
Anhang B.1 Ausführungsbeispiele der Maschinen- und Verfahrens- technik (Abschnitt 7) ....................................................................... 343
Anhang B.2 Ausführungsbeispiele der Bautechnik (Abschnitt 8) .................. 353
Anhang B.3 Ausführungsbeispiele der Elektro- und Leittechnik (Abschnitt 9) ...................................................................................... 355
Anhang B.4 Ausführungsbeispiele der Prozessleittechnik (Abschnitt 10) ... 366
Abbildungsverzeichnis ......................................................................................... 378
Tabellenverzeichnis .............................................................................................. 388
Literatur ................................................................................................................ 390
VGB-S-832-00-2016-04-DE-EN
VGB-Standard
Dokumentenkennzeichen für Anlagen der Energieversorgung
Document Designation for Energy Supply Units
(vormals/formerly VGB-B 103)
VGB-Standard Dokumentenkennzeichen für Anlagen der Energieversorgung Document Designation for Energy Supply Units
VGB-S-832-00-2016-04-DE-EN (vormals/formerly VGB-B 103)
Herausgegeben vom VGB PowerTech e.V.
Zu beziehen bei: VGB PowerTech Service GmbH Verlag technisch-wissenschaftlicher Schriften Postfach 10 39 32, 45039 Essen Tel. +49 201 8128-200 Fax +49 201 8128-302 E-Mail: [email protected] ISBN 978-3-86875-930-3 (Print) ISBN 978-3-86875-931-0 (eBook)
© VGB PowerTech 2016
VGB-S-832-00-2016-04-DE-EN
Page 3 of 195
Vorwort Foreword
Diese Richtlinie wurde von einer Projekt-gruppe der VGB-Fachgruppe „Anlagenkenn-zeichnung und Dokumentation“ erarbeitet, in der Betreiber und Instandhalter sowie Planer und Hersteller von Anlagen der Energiever-sorgung gemeinsam tätig sind.
This guideline has been prepared by a pro-ject group of the VGB technical group “Ref-erence Designation and Plant Documenta-tion”, in close cooperation with operators, maintenance personnel as well as designer and manufacturer of energy supply units.
Zu den Aufgaben dieser Fachgruppe gehört u. a. die Pflege der vorliegenden Richtlinie.
Freigegebene Änderungen dieser Richtlinie werden in Änderungsblättern dokumentiert. Diese werden zeitnah auf der VGB Home-page bis zur nächsten Ausgabe der Richtli-nie veröffentlicht.
The tasks of this technical group includes among others, the maintenance of this guideline.
Further verified modifications of this guide-line are documented via amendment sheets. These sheets are promptly tabled at the VGB homepage until publication of the next issue.
Diese vorliegende Richtlinie ist die Überar-beitung der VGB Richtlinie VGB-B 103, 1. Ausgabe von 2010.
This present standard is the revision of the VGB Guideline VGB-B 103, first issue from 2010.
Änderungen
Die Anpassung der Richtlinie wurde vorge-nommen, damit der Anwender noch effizien-ter bei der Verwendung von Objektschlüs-seln und DCC unterstützt wird. Dazu wurden insbesondere Empfehlungen für die Zuord-nung der DCC zu den Datenstellen A1 auf-genommen.
Auch die Anzahl der Steckbriefe wurde we-sentlich erhöht. Zudem hat sich in der An-wendung der Dokumentenkennzeichnung erwiesen, dass die Bereitstellung eines zu-sätzlichen Objektschlüssels unverzichtbar ist. Um die Bedeutung dieses Objektschlüs-sels zu unterstreichen, wurde dieser Teil der Richtlinie vom Anhang in die eigentliche Richtlinie integriert.
Diese Ausgabe stellt die Tabellen des DCC und des Objektschlüssel in zwei getrennten Dateien im Excel-Format zur Verfügung. Die verfügbaren Liefermodelle sind dem Medi-enverzeichnis des VGB zu entnehmen.
Modifications
The adaptation of the guideline has been adjusted to support the user more efficiently using object keys and DCC. In this respect some clear recommendations were made for the assignment of the DCC to the data posi-tions A1.
Also the number of fact sheets has been increased significantly. Furthermore the ap-plication of the designation of documents has been emerged that the provision of an additional object key is indispensable. Therefore the object key has been integrated from the appendix into the main part of the guideline to emphasize the importance of the object key,
This issue provides the spreadsheets with DCC and object keys in two separate files in the Excel format. The available delivery models are shown in the VGB media cata-logue.
VGB-S-832-00-2016-04-DE-EN
Page 4 of 195
Zum Zeitpunkt der Veröffentlichung dieser Richtlinie waren in der Fachgruppe „Anla-genkennzeichnung und Dokumentation“ fol-gende Unternehmen vertreten:
At the time of publication of this standard the following companies were members of the technical group “Reference Designation and Plant Documentation”:
- ABB AG
- Alstom Power GmbH
- DONG Energy A/S
- Eletrobras Eletronuclear
- Uniper Technologies GmbH
- EnBW Energie Baden-Württemberg AG
- Envi Con & Plant Engineering GmbH
- ESB Electricity Board
- ESKOM Technology Group
- EWEX-ENGINEERING GmbH & Co KG
- Ingenieurbüro Gabo GmbH
- Kraftwerksschule e.V.
- RWE Power AG
- RWE Technology GmbH
- Siemens AG
- Vattenfall Europe Generation AG
- VERBUND Hydro Power GmbH
- VGB PowerTech e.V.
Ein Antragsformular zur Änderung oder Auf-nahme weiterer Objektschlüssel und DCC ist als Anhang B beigefügt.
A change request template for modification or adding additional designations is covered under annex B.
VGB-S-832-00-2016-04-DE-EN
Page 6 of 195
Inhaltsverzeichnis
Vorwort ........................................................................................................ 3
1 Geltungsbereich ....................................................................................... 10
1.1 Einleitung .............................................................................................................. 10
1.2 Anwendungsbereich ............................................................................................ 11
2 Verweis auf Normen und Richtlinien....................................................... 12
3 Begriffe, Definitionen und Erläuterungen ............................................... 14
3.1 Begriffe .................................................................................................................. 14 3.1.1 Grundbegriffe ...................................................................................................................... 14
3.1.2 Begriffe zu Dokumentenarten ........................................................................................... 16
3.2 Erläuterungen zu Begriffen ................................................................................. 19
4 Dokumentenkennzeichen ......................................................................... 21
4.1 Aufbau des Dokumentenkennzeichens ............................................................. 21
4.2 Objektkennzeichen .............................................................................................. 22 4.2.1 Allgemein ............................................................................................................................. 22
4.2.2 Referenzkennzeichen ......................................................................................................... 22
4.2.3 Typkennzeichen oder Inventarnummer ........................................................................... 22
4.2.4 Objektschlüssel .................................................................................................................. 22
4.3 DCC ....................................................................................................................... 23
5 Anwendung des Dokumentenkennzeichens .......................................... 25
5.1 Bestimmung des Objektkennzeichens .............................................................. 25
5.2 Bestimmung des DCC ......................................................................................... 26 5.2.1 Regeln .................................................................................................................................. 26
5.2.2 Anleitung ............................................................................................................................. 26
5.3 Beispiele für Dokumentenkennzeichen ............................................................. 28
6 Objektschlüssel ........................................................................................ 32
6.1 Allgemeines .......................................................................................................... 32
6.2 Objektschlüssel sortiert nach Kennziffer .......................................................... 32
7 DCC ............................................................................................................ 38
7.1 Allgemeines .......................................................................................................... 38
7.2 Kennbuchstaben A1 für den technischen Bereich ........................................... 38
7.3 Kennbuchstaben A2 für die Dokumentenart-Hauptklasse ............................... 39
7.4 Kennbuchstaben A2A3 sortiert nach Kennbuchstaben ................................... 40
Anhang A Steckbriefe für Dokumentenarten ...................................................... 79
VGB-S-832-00-2016-04-DE-EN
Page 7 of 195
Anhang B Antrag zur Aufnahme weiterer Objektschlüssel und DCC ............. 195
Tabellenverzeichnis
Tabelle 1 – Objektschlüssel ............................................................................................................... 32
Tabelle 2 – Kennbuchstaben für den technischen Bereich ............................................................ 38
Tabelle 3 – Kennbuchstaben für die Dokumentenart-Hauptklasse ................................................ 39
Tabelle 4 – Liste der VGB-DCC .......................................................................................................... 41
VGB-S-832-00-2016-04-DE-EN
Page 8 of 195
Table of Contents
Foreword ..................................................................................................... 3
1 Scope ......................................................................................................... 10
1.1 Introduction .......................................................................................................... 10
1.2 Area of application ............................................................................................... 11
2 Reference to standards and guidelines .................................................. 12
3 Terms, definitions and explanations ....................................................... 14
3.1 Terms .................................................................................................................... 14 3.1.1 Basic terms ......................................................................................................................... 14
3.1.2 Terms for document kinds ................................................................................................ 16
3.2 Explanations to terms .......................................................................................... 19
4 Document designation ............................................................................. 21
4.1 Structure of the document designation ............................................................. 21
4.2 Object designation ............................................................................................... 22 4.2.1 General ................................................................................................................................ 22
4.2.2 Reference designation ....................................................................................................... 22
4.2.3 Type code or inventory number ........................................................................................ 22
4.2.4 Object key............................................................................................................................ 22
4.3 DCC ....................................................................................................................... 23
5 Application of the document designation .............................................. 25
5.1 Determination of the object designation ........................................................... 25
5.2 Determination of the DCC ................................................................................... 26 5.2.1 Rules .................................................................................................................................... 26
5.2.2 Instruction ........................................................................................................................... 26
5.3 Examples of document designations ................................................................. 28
6 Object key .................................................................................................. 32
6.1 General .................................................................................................................. 32
6.2 Object key sorted by code number .................................................................... 32
7 DCC ............................................................................................................ 38
7.1 General .................................................................................................................. 38
7.2 Code letters A1 for the technical areas .............................................................. 38
7.3 Code letters A2 for the document kind main class ........................................... 39
7.4 Code letters A2A3 sorted according to code letters ........................................ 40
Annex A Fact sheets for document kinds ............................................................. 79
VGB-S-832-00-2016-04-DE-EN
Page 9 of 195
Annex B Form for the Submission of new Designations .............................. 195
List of tables
Table 1 – Object key ............................................................................................................................ 32
Table 2 – Code letters for the technical areas .................................................................................. 38
Table 3 – Code letter for the document kind main class ................................................................. 39
Table 4 – List of VGB-DCC .................................................................................................................. 41
VGB-S-832-00-2016-04-DE-EN
Page 10 of 195
1 Geltungsbereich 1 Scope
1.1 Einleitung 1.1 Introduction
Dokumente sollen für bestimmte Aufgaben schnell verfügbar sein. Um dies zu erreichen ist eine Dokumentenkennzeichnung mit identifizierenden und klassifizierenden In-formationen erforderlich.
Wesentliche Bestandteile der Dokumenten-kennzeichnung sind Aussagen über den Darstellungsgegenstand und den Informa-tionsinhalt des Dokuments.
Beide Informationen werden durch das Do-kumentenkennzeichen abgebildet. Es be-steht aus dem Objektkennzeichen, das den Darstellungsgegenstand bestimmt, und dem Dokumentenart-Klassenschlüssel (DCC), der den Informationsinhalt klassifiziert.
Documents should be quickly available for certain tasks. To achieve this, a designation of documents with identifying and classifying information is necessary.
Essential parts of the designation of docu-ments are statements about the object rep-resented and the characteristic content of information.
Both pieces of information are presented by the document designation, consisting of the object designation, which defines the object represented and the document kind classifi-cation code (DCC), which classifies the con-tent of information.
Die vorliegende Richtlinie VGB-S-832-00 beschreibt für Anlagen der Energieversor-gung den Aufbau und die Bestandteile des Dokumentenkennzeichens. In Tabellen wer-den Objektschlüssel für übergeordnete Ob-jekte (technisch oder administrativ) und die Zuordnung der DCC zu den üblichen Doku-mentenbenennungen dargestellt.
The presented guideline VGB-S-832-00 describes the structure and the parts of the document designation for energy supply units. Tables provide object keys for general objects (technical or administrative) and the assignment of the DCC to denominations of documents, which are commonly in use.
Mit den Festlegungen dieser Richtlinie wird die Kommunikation zwischen allen mit der Handhabung von Dokumenten betrauten Partnern wesentlich verbessert. Unnötige Kosten können vermieden werden.
With the stipulations of this guideline the communication will be improved significantly between all partners dealing with docu-ments. Unnecessary costs can also be avoided.
In der Richtlinie VGB-S-831-00 (vormals VGB-R 171) zur Lieferung der technischen Dokumentation für Anlagen der Energiever-sorgung wird festgelegt, welche weiteren Informationen zur eindeutigen Kennzeich-nung von Dokumenten zu verwenden sind.
The guideline VGB-S-831-00 (ex VGB-R 171e) for the provision of technical docu-mentation for energy supply units provides further information how to designate docu-ments unambiguously.
Basis für die vorliegende Richtlinie ist die DIN EN 61355-1 (VDE 0040-3) „Klassifizie-rung und Kennzeichnung von Dokumenten für Anlagen, Systeme und Ausrüstungen“.
Basis for this guideline is the standard IEC 61355-1 “Classification and designation of documents for plants, systems and equip-ment”.
VGB-S-832-00-2016-04-DE-EN
Page 11 of 195
1.2 Anwendungsbereich 1.2 Area of application
Die vorliegende Richtlinie ist anzuwenden für alle Dokumente, die im Rahmen des Le-benszyklus von Anlagen der Energieversor-gung zu erstellen, zu ändern oder zu verwal-ten sind.
The present guideline should be used for all documents, which have to be created, modi-fied or managed in the life cycle of units for the energy supply.
VGB-S-832-00-2016-04-DE-EN
Page 12 of 195
2 Verweis auf Normen und Richtlinien
2 Reference to standards and guidelines
Die folgenden zitierten Vorschriften sind hilfreich für die Anwendung der vorliegenden Richtlinie.
The following referenced standards are beneficial for the application of this guide-line.
DIN 69901-5
Projektmanagement – Projektmanagement-systeme – Teil 5: Begriffe
DIN 69901-5
Project management – Project management systems –Part 5: Concepts
DIN EN 13460
Instandhaltung – Dokumente für die In-standhaltung
EN 13460
Maintenance – Documentation for mainte-nance
DIN EN 14943
Transportdienstleistungen – Logistik – Glossar
EN 14943
Transport services - Logistics - Glossary of terms
DIN EN 60652
Belastungsprüfungen an Freileitungstrag-werken
IEC 60652
Loading tests on overhead line structures
DIN EN 61082-1
Dokumente der Elektrotechnik – Teil 1: Re-geln
IEC 61082-1
Preparation of documents used in electro-technology – Part 1: Rules
DIN EN 61355-1
Klassifikation und Kennzeichnung von Do-kumenten für Anlagen, Systeme und Aus-rüstungen – Teil 1: Regeln und Tabellen zur Klassifikation
IEC 61355-1
Classification and designation of documents for plants, systems and equipment – Part 1: Rules and classification tables
DIN EN 82045-1
Dokumentenmanagement – Teil 1: Prinzi-pien und Methoden
IEC 82045-1
Document management – Part 1: Principles and methods
DIN EN 82079-1
Erstellen von Gebrauchsanleitungen – Glie-derung, Inhalt und Darstellung – Teil 1: All-gemeine Grundsätze und ausführliche An-forderungen
IEC 82079-1
Preparation of instructions for use – Struc-turing, content and presentation – Part 1: General principles and detailed require-ments
VGB-S-832-00-2016-04-DE-EN
Page 13 of 195
DIN EN ISO 10209
Technische Produktdokumentation - Voka-bular - Begriffe für technische Zeichnungen, Produktdefinition und verwandte Dokumen-tation
ISO 10209
Technical product documentation - Vocabu-lary - Terms relating to technical drawings, product definition and related documentation
ISO/IEC 2382
Information technology - Vocabulary
ISO/IEC 2382
Information technology - Vocabulary
VGB-S-831-00-DE (vormals VGB VGB-R 171)
Lieferung der Technischen Dokumentation (Technische Anlagendaten, Dokumente) für Anlagen der Energieversorgung
VGB-S-831-00-EN (formerly VGB-R 171e)
Provision of Technical Documentation (Technical Plant Data, Documents) for En-ergy Supply Units
VGB-S-823-31-2014-12-EN-DE
VGB-Standard
RDS-PP®
Application Guideline Part 31: Hydro Power PlantsAnwendungsrichtlinie Teil 31: Wasserkraftwerke
VGB-Standard
RDS-PP
Application Guideline Part 31: Hydro Power Plants
Anwendungsrichtlinie Teil 31: Wasserkraftwerke
VGB-Standard-S-823-31-2014-12-EN-DE
Herausgeber/Publisher: VGB PowerTech e.V.
Verlag/Publishing house: VGB PowerTech Service GmbH Verlag technisch-wissenschaftlicher Schriften Postfach 10 39 32, 45039 Essen Tel. +49 201 8128-200 Fax +49 201 8128-329 E-Mail: [email protected]
ISBN 978-3-86875-388-2 (Print) ISBN 978-3-86875-389-9 (eBook)
© VGB PowerTech 2014
VGB-S-823-31-2014-12-EN-DE
Page 5 of 221
Foreword Vorwort
This RDS-PP®
Application Guideline for Hy-dro Power Plants was prepared by a project group of the VGB Working Panel “Reference Designation and Plant Documentation“, in close cooperation with experts from manu-facturers and operators.
Diese RDS-PP®
-Anwendungsrichtlinie für Wasserkraftwerke wurde von einer Projekt-gruppe des Arbeitskreises „Anlagenkenn-zeichnung und Dokumentation“ in enger Zu-sammenarbeit mit Herstellern und Betreibern erarbeitet.
At the date of publication of this Guideline the following companies were members of the Technical Group “Reference Designation and Plant Documentation”:
Zum Zeitpunkt der Veröffentlichung dieser Richtlinie waren im Arbeitskreis „Anlagen-kennzeichnung und Dokumentation“ folgen-de Firmen vertreten:
― ABB AG
― ALSTOM Power GmbH
― E.ON New Build & Technology GmbH
― EnBW Erneuerbare und Konventionelle Erzeugung AG
― EnviCon & Plant Engineering GmbH
― ingenieurbüro gabo gmbh
― Kraftwerksschule e.V.
― RWE Power AG
― RWE Technology GmbH
― Siemens AG
― Vattenfall Europe Generation AG
― VERBUND Hydro Power GmbH
RDS-PP® is a registered trademark of VGB PowerTech e.V. RDS-PP® ist eingetragene Marke des VGB PowerTech e.V.
VGB-S-823-31-2014-12-EN-DE
Page 6 of 221
Remarks for using this guideline Hinweise zur Benutzung dieser Richtlinie
The definitions of chapter 3 serve the better understanding of the following chapters and should be appropriate to observe
Die Begriffsdefinitionen des Abschnitts 3 dienen dem Verständnis der folgen-den Abschnitte und sollten entspre-chende Beachtung finden.
Rules are inserted at the appropriate places of the chapters and highlighted by a box
Regeln sind an den jeweiligen Stellen der Abschnitte eingefügt und optisch durch einen Kasten hervorgehoben.
Statements that relate to project-specific definitions are marked in colour
Aussagen, die projektspezifische Fest-legungen betreffen sind farbig markiert
The annex provides a checklist of fun-damental key considerations that must be agreed between the parties before the project begins.
Im Anhang befindet sich eine Checklis-te der wesentlichen Festlegungen, die vor Projektbeginn zwischen den Betei-ligten abzustimmen ist.
The underscore “_” is used in this guideline only as placeholder for not written data positions
Der Unterstrich „_“ wird in dieser Richt-linie ausschließlich als Platzhalter für nicht geschriebene Datenstellen ver-wendet.
The underscore shall not be used as part of a complete reference designa-tion with the exception of “Conjoint Des-ignation” and relating to signal names.
Der Unterstrich darf nicht Teil eines vollständigen Referenzkennzeichens sein mit Ausnahme von „Gemeinsame Zuordnung“ und im Zusammenhang mit Signalnamen
When system interfaces are described in various tables the terms used are those in the figure below.
Bei der Beschreibung der Systemgren-zen in verschiedenen Tabellen des Ab-schnittes 6 sind die Begriffe der nach-stehenden Abbildung verwendet.
VGB-S-823-31-2014-12-EN-DE
Page 7 of 221
Authors Autorenverzeichnis
The following authors were engaged in the elaboration of this Guideline:
An der Erstellung dieser Anwendungsrichtli-nie waren folgende Autoren wesentlich be-teiligt:
Karl Dorfmeister VERBUND Hydro Power GmbH
Andreas Menger ingenieurbüro gabo gmbh
Heinz Müller Ingenieurbüro Heinz Müller
Rudolf Münch Voith Hydro Holding GmbH & Co. KG
VGB PowerTech thanks all companies and its employees, who participated in the prepa-ration of this guideline for their contribution.
Der VGB PowerTech dankt allen an der Er-stellung dieser Anwendungsrichtlinie betei-ligten Firmen und den mit der Arbeit beauf-tragten Mitarbeitern.
Essen, im Dezember 2014
VGB PowerTech e.V.
VGB-S-823-31-2014-12-EN-DE
Page 9 of 221
Table of contents
Foreword .................................................................................................................... 5
Remarks for using this guideline ............................................................................. 6
Authors ...................................................................................................................... 7
Introduction .............................................................................................................. 17
1 Scope .................................................................................................................... 19
2 Reference to Standards and Guidelines ............................................................ 21
3 Terms, abbreviations, and symbols ................................................................... 25 3.1 Terms .................................................................................................................................... 25
3.2 Abbreviations ........................................................................................................................ 33
3.2.1 Abbreviations general ........................................................................................................... 33
3.2.2 Short sign for data positions ................................................................................................. 34
3.3 Symbols ................................................................................................................................ 35
4 Designation system ............................................................................................. 37 4.1 Basics ................................................................................................................................... 37
4.1.1 General ................................................................................................................................. 37
4.1.2 Object ................................................................................................................................... 37
4.1.3 Aspect ................................................................................................................................... 38
4.1.4 Structuring ............................................................................................................................ 40
4.1.4.1 Partitive relation .................................................................................................................... 40
4.1.4.2 Associative relation ............................................................................................................... 43
4.1.5 Classification ........................................................................................................................ 44
4.1.6 Scope of designation ............................................................................................................ 45
4.1.6.1 General ................................................................................................................................. 45
4.1.6.2 Plant part .............................................................................................................................. 45
4.1.6.3 Point of installation ............................................................................................................... 46
4.1.6.4 Site of installation ................................................................................................................. 46
4.1.6.5 Equipment............................................................................................................................. 46
4.1.6.6 Delimitation of plant part to equipment ................................................................................. 47
4.2 Designation process ............................................................................................................. 49
4.2.1 General ................................................................................................................................. 49
4.2.2 Process steps ....................................................................................................................... 49
4.3 Designation structure ............................................................................................................ 54
4.3.1 General ................................................................................................................................. 54
4.3.2 Prefix ..................................................................................................................................... 55
4.3.3 Letters and digits .................................................................................................................. 56
4.3.4 Designation block ................................................................................................................. 59
VGB-S-823-31-2014-12-EN-DE
Page 10 of 221
5 Kinds of designation ............................................................................................ 61 5.1 General ................................................................................................................................. 61
5.2 Conjoint designation ............................................................................................................. 61
5.3 Functional aspect ................................................................................................................. 63
5.3.1 General ................................................................................................................................. 63
5.3.2 Functional allocation ............................................................................................................. 65
5.3.2.1 Basics ................................................................................................................................... 65
5.3.2.2 Power plant process ............................................................................................................. 67
5.3.2.3 Control functions ................................................................................................................... 69
5.3.3 Function ................................................................................................................................ 72
5.4 Product ................................................................................................................................. 73
5.5 Operating equipment ............................................................................................................ 74
5.6 Location aspect .................................................................................................................... 77
5.6.1 Point of installation ............................................................................................................... 79
5.6.2 Site of installation ................................................................................................................. 80
5.7 Signals .................................................................................................................................. 81
5.8 Terminals .............................................................................................................................. 83
5.9 Documents............................................................................................................................ 84
5.10 Cables ................................................................................................................................... 85
6 Designation block, structure and content ......................................................... 86 6.1 Overview ............................................................................................................................... 86
6.2 Designation block “Conjoint Designation” ........................................................................... 88
6.2.1 Structure and content ........................................................................................................... 88
6.2.2 Examples .............................................................................................................................. 89
6.3 Designation block “Functional Allocation” ........................................................................... 90
6.3.1 Structure and content functional allocation group level ........................................................ 90
6.3.2 Example ................................................................................................................................ 92
6.3.3 Structure and content functional allocation individual level ................................................ 93
6.3.4 Example “Functional Allocation, Individual Level” ................................................................ 94
6.4 Designation block “Control Function” .................................................................................. 95
6.4.1 Structure and content control function group level ............................................................... 95
6.4.2 Structure and content control function individual level ......................................................... 96
6.4.3 Letter code control function .................................................................................................. 97
6.5 Designation block “Function” ................................................................................................ 98
6.5.1 Structure ............................................................................................................................... 98
6.5.2 Content general .................................................................................................................... 99
6.5.3 Content breakdown level 0 ................................................................................................... 99
6.5.4 Content breakdown level 1 .................................................................................................105
6.5.4.1 Overview .............................................................................................................................105
6.5.4.2 Electrical grid and distribution system =A _ _ ....................................................................109
6.5.4.3 Electrical auxiliary power supply system =B_ _ .................................................................111
VGB-S-823-31-2014-12-EN-DE
Page 11 of 221
6.5.4.4 Control and management systems =C_ _ ..........................................................................115
6.5.4.5 Water supply, disposal and treatment =G_ _ .....................................................................117
6.5.4.6 Water system =L_ _............................................................................................................118
6.5.4.7 Systems for conversion of energy and for transmission of electrical energy =M_ _ ..........126
6.5.4.8 Cooling water systems =P_ _ .............................................................................................149
6.5.4.9 Auxiliary systems =Q_ _ .....................................................................................................151
6.5.4.10 Ancillary systems =X_ _ .....................................................................................................152
6.5.4.11 Structures and areas for systems inside the power plant process =U_ _ ..........................153
6.5.4.12 Structures and areas for systems outside the power plant process =Z_ _ ........................154
6.5.4.13 Installation systems for electric engineering and control technology =AS_, BS_, CS_ .....155
6.5.5 Content breakdown level 2 .................................................................................................157
6.5.5.1 General ...............................................................................................................................157
6.5.5.2 Basic functions in a HV distribution ...................................................................................159
6.5.5.3 Basic functions in the electrical auxiliary power supply system .........................................161
6.5.5.4 Basic functions in the mechanical engineering ..................................................................162
6.5.5.5 Basic functions installation systems ...................................................................................163
6.6 Designation block “Product Class” .....................................................................................164
6.7 Designation block “Operating Equipment” .........................................................................167
6.7.1 Structure of the designation block “Point of Installation” ....................................................175
6.7.2 Content of the designation block “Point of Installation” BL0 to BL2 ...................................178
6.7.3 Content of the designation block “Point of Installation” BL3 ...............................................178
6.8 Designation block “Site of Installation” ..............................................................................180
6.8.1 Structure of the designation block “Site of Installation” ......................................................180
6.8.2 Content of the designation block “Site of Installation” BL0 to BL1 .....................................182
6.8.3 Content of the designation block “Site of Installation” BL3 .................................................182
6.9 Designation block “Signal Name” .......................................................................................186
6.9.1 Structure of the designation block “Signal Name” ..............................................................186
6.9.2 Content of the designation block “Signal Name” ................................................................187
6.10 Designation block “Terminal” ..............................................................................................190
6.10.1 Structure of the designation block “Terminal” .....................................................................190
6.10.2 Content of the designation block “Terminal” .......................................................................190
6.11 Designation block “Document Type Classification Code DCC” .........................................192
6.12 Designation block “Cable Designation” .............................................................................194
6.12.1 Structure designation block “Cable Designation” ...............................................................194
6.12.2 Content of the designation block „Cable Designation“ .......................................................195
6.13 Designation block “Cable Number” ...................................................................................197
6.14 Combination of designation blocks .....................................................................................199
6.14.1 General ...............................................................................................................................199
6.14.2 Linkage ...............................................................................................................................199
6.14.3 Allocation ............................................................................................................................201
6.15 Notation in documents ........................................................................................................202
VGB-S-823-31-2014-12-EN-DE
Page 12 of 221
Annex A Check list ............................................................................................... 204
List of figures ......................................................................................................... 206
List of tables .......................................................................................................... 212
Glossary ................................................................................................................. 216
Bibliography ........................................................................................................... 220
VGB-S-823-31-2014-12-EN-DE
Page 13 of 221
Inhaltsverzeichnis
Vorwort ...................................................................................................................... 5
Hinweise zur Benutzung dieser Richtlinie ............................................................... 6
Autorenverzeichnis ................................................................................................... 7
Einleitung ................................................................................................................. 17
1 Anwendungsbereich ............................................................................................ 19
2 Verweis auf Normen und Richtlinien .................................................................. 21
3 Begriffe, Abkürzungen und Symbole ................................................................. 25 3.1 Begriffe ................................................................................................................................. 25
3.2 Abkürzungen ........................................................................................................................ 33
3.2.1 Abkürzungen allgemein ........................................................................................................ 33
3.2.2 Kurzzeichen für Datenstellen................................................................................................ 34
3.3 Symbole ................................................................................................................................ 35
4 Kennzeichnungssystematik ................................................................................ 37 4.1 Grundlagen ........................................................................................................................... 37
4.1.1 Allgemein .............................................................................................................................. 37
4.1.2 Objekt ................................................................................................................................... 37
4.1.3 Aspekt ................................................................................................................................... 38
4.1.4 Strukturierung ....................................................................................................................... 40
4.1.4.1 Bestandsbeziehungen .......................................................................................................... 40
4.1.4.2 Rollenbeziehung ................................................................................................................... 43
4.1.5 Klassifizierungen .................................................................................................................. 44
4.1.6 Kennzeichnungsumfang ....................................................................................................... 45
4.1.6.1 Allgemein .............................................................................................................................. 45
4.1.6.2 Anlagenteil ............................................................................................................................ 45
4.1.6.3 Einbauort .............................................................................................................................. 46
4.1.6.4 Aufstellungsort ...................................................................................................................... 46
4.1.6.5 Ausrüstungsteil ..................................................................................................................... 46
4.1.6.6 Abgrenzung Anlagenteil/Ausrüstungsteil .............................................................................. 47
4.2 Kennzeichnungsprozess ...................................................................................................... 49
4.2.1 Allgemein .............................................................................................................................. 49
4.2.2 Prozessschritte ..................................................................................................................... 49
4.3 Kennzeichnungsaufbau ........................................................................................................ 54
4.3.1 Allgemein .............................................................................................................................. 54
4.3.2 Vorzeichen ............................................................................................................................ 55
4.3.3 Buchstaben und Ziffern ........................................................................................................ 56
4.3.4 Kennzeichenblock ................................................................................................................ 59
VGB-S-823-31-2014-12-EN-DE
Page 14 of 221
5 Kennzeichnungsarten .......................................................................................... 61 5.1 Allgemein .............................................................................................................................. 61
5.2 Gemeinsame Zuordnung ...................................................................................................... 61
5.3 Funktionsaspekt ................................................................................................................... 63
5.3.1 Allgemein .............................................................................................................................. 63
5.3.2 Funktionale Zuordnung ......................................................................................................... 65
5.3.2.1 Grundlagen ........................................................................................................................... 65
5.3.2.2 Kraftwerksprozess ................................................................................................................ 67
5.3.2.3 Leitfunktionen ....................................................................................................................... 69
5.3.3 Funktion ................................................................................................................................ 72
5.4 Produkt ................................................................................................................................. 73
5.5 Betriebsmitttel ....................................................................................................................... 74
5.6 Ortsaspekt. ........................................................................................................................... 77
5.6.1 Einbauort .............................................................................................................................. 79
5.6.2 Aufstellungsort ...................................................................................................................... 80
5.7 Signale .................................................................................................................................. 81
5.8 Anschlüsse ........................................................................................................................... 83
5.9 Dokumente ........................................................................................................................... 84
5.10 Kabel ..................................................................................................................................... 85
6 Kennzeichenblöcke, Aufbau und Inhalt ............................................................. 86 6.1 Übersicht ............................................................................................................................... 86
6.2 Kennzeichenblock “Gemeinsame Zuordnung” .................................................................... 88
6.2.1 Aufbau und Inhalt ................................................................................................................. 88
6.2.2 Beispiele ............................................................................................................................... 89
6.3 Kennzeichenblock “Funktionale Zuordnung” ........................................................................ 90
6.3.1 Aufbau und Inhalt „Funktionale Zuordnung Gruppenebene“ ................................................ 90
6.3.2 Beispiel ................................................................................................................................. 92
6.3.3 Aufbau und Inhalt „Funktionale Zuordnung Einzelebene“ .................................................. 93
6.3.4 Beispiel „Funktionale Zuordnung, Einzelebene“................................................................... 94
6.4 Kennzeichenblock „Leitfunktion“ .......................................................................................... 95
6.4.1 Aufbau und Inhalt „Leitfunktion Gruppenebene“ .................................................................. 95
6.4.2 Aufbau und Inhalt „Leitfunktion Einzelebene“ ...................................................................... 96
6.4.3 Kennbuchstaben Leitfunktion ............................................................................................... 97
6.5 Kennzeichenblock „Funktion“ ............................................................................................... 98
6.5.1 Aufbau .................................................................................................................................. 98
6.5.2 Inhalt allgemein .................................................................................................................... 99
6.5.3 Inhalt Gliederungsstufe 0 ...................................................................................................... 99
6.5.4 Inhalt Gliederungsstufe 1 ....................................................................................................105
6.5.4.1 Übersicht .............................................................................................................................105
6.5.4.2 Elektrisches Netz- und Verteilungssystem =A_ _ ..............................................................109
6.5.4.3 Elektrisches Eigenbedarfssystem =B_ _ ............................................................................111
VGB-S-823-31-2014-12-EN-DE
Page 15 of 221
6.5.4.4 Leit- und Managementsysteme =C_ _ ...............................................................................115
6.5.4.5 Wasserversorgung, -entsorgung und -aufbereitung =G_ _ ..............................................117
6.5.4.6 Wassersystem =L_ _ ..........................................................................................................118
6.5.4.7 Systeme zur Umwandlung von Energie und Ableitung von elektrischer Energie =M_
_ .........................................................................................................................................126
6.5.4.8 Kühlwassersysteme =P_ _ .................................................................................................149
6.5.4.9 Hilfssysteme =Q_ _ ............................................................................................................151
6.5.4.10 Nebensysteme =X_ _ .........................................................................................................152
6.5.4.11 Bauwerke und Flächen für Systeme des Kraftwerksprozess =U_ _ ..................................153
6.5.4.12 Bauwerke und Flächen für Systeme außerhalb des Kraftwerksprozess =Z_ _ .................154
6.5.4.13 Einbausysteme der Elektro- und Leittechnik =AS_, BS_, CS_ ..........................................155
6.5.5 Inhalt Gliederungsstufe 2 ....................................................................................................157
6.5.5.1 Allgemein ............................................................................................................................157
6.5.5.2 Grundfunktionen in einer HS Netzverteilung .....................................................................159
6.5.5.3 Grundfunktionen des elektrischen Eigenbedarfs................................................................161
6.5.5.4 Grundfunktionen in der Maschinentechnik .........................................................................162
6.5.5.5 Grundfunktionen Einbausysteme .......................................................................................163
6.6 Kennzeichenblock „Produktklasse” ....................................................................................164
6.7 Kennzeichenblock „Betriebsmittel” ....................................................................................167
6.7.1 Aufbau des Kennzeichenblocks „Einbauort” ......................................................................175
6.7.2 Inhalt des Kennzeichenblocks „Einbauort“ GS0 bis GS2 ...................................................178
6.7.3 Inhalt des Kennzeichenblocks „Einbauort“ GS3 .................................................................178
6.8 Kennzeichenblock „Aufstellungsort“ ..................................................................................180
6.8.1 Aufbau des Kennzeichenblocks „Aufstellungsort“ ..............................................................180
6.8.2 Inhalt des Kennzeichenblocks „Aufstellungsort“ GS0 bis GS1 ..........................................182
6.8.3 Inhalt des Kennzeichenblocks “Aufstellungsort” GS3 ........................................................182
6.9 Kennzeichenblock „Signalname” ........................................................................................186
6.9.1 Aufbau des Kennzeichenblockes „Signalname“ .................................................................186
6.9.2 Inhalt des Kennzeichen-blockes „Signalname“ ..................................................................187
6.10 Kennzeichenblock „Anschluss” ..........................................................................................190
6.10.1 Aufbau des Kennzeichenblockes „Anschluss“ ...................................................................190
6.10.2 Inhalt des Kennzeichen-blocks „Anschluss“ .......................................................................190
6.11 Kennzeichenblock „Dokumentenart-Klassenschlüssel“ .....................................................192
6.12 Kennzeichenblock „Kabelkennzeichen“ .............................................................................194
6.12.1 Aufbau des Kennzeichenblocks „Kabelkennzeichen“ ........................................................194
6.12.2 Inhalt des Kennzeichenblocks „Kabelkennzeichen“ ...........................................................195
6.13 Kennzeichenblock „Kabelnummer“ ...................................................................................197
6.14 Kombination von Kennzeichenblöcken ..............................................................................199
6.14.1 Allgemein ............................................................................................................................199
6.14.2 Verkettung ..........................................................................................................................199
6.14.3 Zuordnung ..........................................................................................................................201
VGB-S-823-31-2014-12-EN-DE
Page 16 of 221
6.15 Schreibweise in Dokumenten .............................................................................................202
Anhang A Checkliste ............................................................................................ 204
Abbildungsverzeichnis ......................................................................................... 209
Liste der Tabellen .................................................................................................. 214
Glossar .................................................................................................................. 216
Literaturhinweise ................................................................................................... 220
VGB-S-823-32-2014-03-EN-DE
VGB-Standard
RDS-PP®
Application Guideline Part 32: Wind Power PlantsAnwendungsrichtlinie Teil 32: Windkraftwerke
2nd edition/2. Ausgabe 2014(vormals/ formerly VGB-B 116 D2/D2e)
VGB-Standard RDS-PP® Application Guideline Part 32: Wind Power Plants
Anwendungsrichtlinie Teil 32: Windkraftwerke
VGB-S-823-32-2014-03-EN-DE
Herausgeber: VGB PowerTech e.V.
Bezugsadresse: VGB PowerTech Service GmbH Verlag technisch-wissenschaftlicher Schriften Postfach 10 39 32, 45039 Essen Tel. +49 201 8128-200 Fax +49 201 8128-329 E-Mail: [email protected]
All rights reserved. VGB PowerTech.
www.vgb.org
ISBN 978-3-86875-693-7 (Print)ISBN 978-3-86875-744-6 (eBook)
VGB-S-823-32-2014-03-EN-DE
Page 3 of 314
Foreword Vorwort
This RDS-PP®
Application Guideline for wind power plants was prepared by a project group of the VGB Working Panel “Reference Designation and Plant Documentation”, in close cooperation with experts from manu-facturers, operators, research institutes, and service providers of the wind industry.
Diese RDS-PP®
Anwendungsrichtlinie für Windkraftwerke wurde von einer Projekt-gruppe des Arbeitskreises „Anlagenkenn-zeichnung und Dokumentation“ in enger Zu-sammenarbeit mit Herstellern, Betreibern, Forschungseinrichtungen und Instandhaltern aus der Windbranche erarbeitet.
The preparation of the guideline was sup-ported by a consultation process. Thereby the technical interested public had the oppor-tunity to comment on the draft presented.
Die Erstellung der Richtlinie wurde unter-stützt durch einen Konsultationsprozess, in dem die interessierte Öffentlichkeit die Gele-genheit hatte, zum vorgelegten Entwurf Stel-lung zu nehmen.
This guideline represents the revision of the Application explanation VGB-B 116 D2e, 1st
edition, 2007, (referred to as “revision 0” in this document).
Diese Richtlinie stellt die Überarbeitung der Anwendungserläuterung VGB-B 116 D2, 1. Ausgabe von 2006 (im weiteren Verlauf „Re-vision 0“ genannt) dar.
The revision of the Application Explanation became necessary due to market require-ments, technical developments in the wind industry as well as adaptions of international standards, above all of the 2009 edition of IEC 81346-2. All major changes to the revi-sion 0 of this guideline are listed in the re-spective clauses.
Die Anpassung der Anwendungserläuterung ist auf Grund von Marktanforderungen, technischen Weiterentwicklungen in der Windenergiebranche sowie Anpassungen an internationale Normen, insbesondere IEC 81346-2 von 2009, erforderlich geworden. In den jeweiligen Abschnitten sind die wesent-lichen Abweichungen zur ersten Ausgabe dieser Richtlinie (Rev. 0) dargestellt.
RDS-PP® is a registered trademark of VGB PowerTech e.V. RDS-PP® ist eingetragene Marke des VGB PowerTech e.V.
VGB-S-823-32-2014-03-EN-DE
Page 4 of 314
Remarks for Using this Guideline
Hinweise zur Benutzung dieser Richtlinie
The following notes to use this guideline should be considered:
- Extracts from external documents are writ-ten in italics in the guideline text.
- The underscore “_” is used in this guideline only as placeholder for not written data posi-tions.
- The underscore shall not be used as part of a complete reference designation with the exception of “Conjoint Designation” and re-lating to signal names.
Nachfolgend einige Hinweise zur Benutzung dieser Richtlinie:
- Auszüge aus anderen Dokumenten sind im Richtlinientext kursiv geschrieben.
- Der Unterstrich „_“ wird in dieser Richtlinie ausschließlich als Platzhalter für nicht ge-schriebene Datenstellen verwendet.
- Der Unterstrich darf nicht Teil eines voll-ständigen Referenzkennzeichens sein mit Ausnahme von „Gemeinsame Zuordnung“ und im Zusammenhang mit Signalnamen.
At the date of publication of this guideline the following companies were members of the working panel “Reference Designation and Plant Documentation”:
Zum Zeitpunkt der Veröffentlichung dieser Richtlinie waren im Arbeitskreis „Anlagen-kennzeichnung und Dokumentation“ folgen-de Firmen vertreten:
― ABB
― ALSTOM Power
― E.ON New Build & Technology
― EnBW Erneuerbare und Konventionelle Erzeugung
― EnviCon
― ingenieurbüro gabo
― Kraftwerksschule
― PASYS
― RWE Power, RWE Technology
― Siemens Energy Sector
― Vattenfall Europe Generation
― VERBUND Hydro Power
― VGB-Geschäftsstelle
Essen, im März 2014
VGB PowerTech e.V.
VGB-S-823-32-2014-03-EN-DE
Page 5 of 314
Authors Autorenverzeichnis
The following authors actively participated in the elaboration of this guideline:
An der Erstellung dieser Anwendungsrichtli-nie waren folgende Autoren wesentlich be-teiligt:
Name/Name Company/Firma Lars Berger Vattenfall Renewables Matthias Beyer WindMW Sönke Bolln Senvion SE Nina Jördis Carls HOCHTIEF Solutions Shahin Daniel Fassih HOCHTIEF Solutions Stefan Faulstich Fraunhofer IWES Jörg Fröhner ct.e Controltechnology Engineering Karl Goeman Enercon Jochen Hantschel E.ON New Build & Technology Matthias Hemsing RWE Innogy Thorsten Homann GEO Gesellschaft für Energie & Ökologie Jens Jensen GEO Gesellschaft für Energie & Ökologie Dominic Klein EnBW Erneuerbare & Konvent. Erzeugung Andreas Küchler vormals EnBW Silvio Matysik psm nature service Gabriel Michalski HOCHTIEF Solutions AG Heinz Müller IB Heinz Müller Karsten Müller WindMW Klaus Pfeiffer Enertrag Windstrom Jörg Richnow RWE Technology Axel Ringhandt Bachmann electronic Clemens Rossi RWE Innogy Manfred Sass Global Tech One Sebastian Schmidt WindStrom BuV Hanno Schnetgöke Senvion SE Jörg Seiffert E.ON New Build & Technology Thomas Stalin Vattenfall Wind Power Robin Strecker EnBW Erneuerbare & Konvent. Erzeugung Helmut Wank Siemens AG Energy Sector
VGB-S-823-32-2014-03-EN-DE
Page 6 of 314
On the technical validation of the guideline following people were involved:
An der technischen Validierung der Richtlinie waren folgende Personen beteiligt:
Name/Name Company/Firma Thomas Bunk Enercon Heinrich Duden Mitsubishi Power Berthold Hahn Fraunhofer IWES Raphaelle Madignier E.ON Climate and Renewables Johannes Schmidt InfAI Institut für angewandte Informatik
The VGB PowerTech would like to thank all companies and its employees, who partici-pated in the preparation of this guideline for their contribution.
Der VGB PowerTech dankt allen an der Er-stellung dieser Anwendungsrichtlinie betei-ligten Firmen und den mit der Arbeit beauf-tragten Mitarbeitern.
VGB-S-823-32-2014-03-EN-DE
Page 7 of 314
Table of Contents
Foreword .................................................................................................................... 3
Remarks for Using this Guideline ........................................................................... 4
Authors ...................................................................................................................... 5
Introduction .............................................................................................................. 15
1 Scope ......................................................................................................... 21
2 Reference to Standards and Guidelines ................................................. 21
3 Terms, Abbreviations, and Symbols ....................................................... 24
3.1 Terms .................................................................................................................... 24 3.1.1 Designation and Documentation ...................................................................................... 24
3.1.2 Wind Power Plants ............................................................................................................. 30
3.2 Abbreviations ....................................................................................................... 33 3.2.1 Abbreviations General ....................................................................................................... 33
3.2.2 Short Sign for Data Positions ............................................................................................ 34
3.3 Symbols ................................................................................................................ 34
4 Basics of Designation with RDS-PP ........................................................ 35
4.1 Introduction .......................................................................................................... 35
4.2 Goal of Designation with RDS-PP ..................................................................... 35
4.3 Scope of Designation with RDS-PP ................................................................... 36
4.4 Principles of RDS-PP Designation ..................................................................... 37
4.5 Designation Process during Project Execution ............................................... 41
4.6 Basic Rules for the Designation Structure ....................................................... 46
4.7 Designations Tasks of RDS-PP ......................................................................... 52 4.7.1 Overview .............................................................................................................................. 52
4.7.2 Conjoint Designation (#) .................................................................................................... 55
4.7.3 Function (=) ......................................................................................................................... 56
4.7.4 Product Class (-) ................................................................................................................. 61
4.7.5 Operating Equipment ......................................................................................................... 64
4.7.6 Location (+, ++) ................................................................................................................... 65
4.7.7 Functional Allocation (= =) ................................................................................................ 79
4.7.8 Signals (;) ............................................................................................................................ 80
4.7.9 Terminals (:) ........................................................................................................................ 85
4.7.10 Documents (&) .................................................................................................................... 87
4.8 Combination and Notation of Designation Blocks ........................................... 89 4.8.1 Combination of Designation Blocks ................................................................................ 89
4.8.2 Notation of Designation Blocks in Documents ............................................................... 91
VGB-S-823-32-2014-03-EN-DE
Page 8 of 314
5 Conjoint Designation and Overview Main Systems ............................... 92
5.1 General .................................................................................................................. 92
5.2 Conjoint Designation ........................................................................................... 92
5.3 Main Systems ..................................................................................................... 101
6 Main System Energy Conversion =G ................................................... 103
6.1 Overview ............................................................................................................. 103
6.2 MD_ Wind Turbine System ................................................................................ 104 6.2.1 MD_ General ......................................................................................................................104
6.2.2 MDA Rotor System ...........................................................................................................105
6.2.3 MDK Drive Train System ..................................................................................................117
6.2.4 MDL Yaw System ..............................................................................................................147
6.2.5 MDV Central Lubrication System ...................................................................................156
6.2.6 MDX Central Hydraulic System .......................................................................................157
6.2.7 MDY Control System ........................................................................................................159
6.3 MK_ Generation System .................................................................................... 163 6.3.1 MK_ General ......................................................................................................................163
6.3.2 MKA Power Generation System ......................................................................................164
6.4 MS_ Transmission ............................................................................................ 172 6.4.1 MS_ General ......................................................................................................................172
6.4.2 MSC Generator Switching System ................................................................................174
6.4.3 MSE Converter System ....................................................................................................178
6.4.4 MSS Compensation System ............................................................................................181
6.4.5 MST Generator Transformer System .............................................................................183
6.5 Circuit Variants =MKA/=MS ............................................................................... 185 6.5.1 Variant 1: Pole-Changing Generator (Stall-Turbine) ....................................................185
6.5.2 Variant 2: Variable speed WTG with Rectifier and Inverter ..........................................187
6.5.3 Variant 3: Variable speed WTG with several generators ..............................................190
6.5.4 Variant 4: Double-fed Asynchronous Generator ..........................................................193
6.6 MU_ Common Systems for Wind Turbines .................................................... 195 6.6.1 MU_ General ......................................................................................................................195
6.6.2 MUD Nacelle ......................................................................................................................195
6.6.3 MUD10 Main Frame and Nacelle ....................................................................................196
6.6.4 MUD20 Cooling System Nacelle .....................................................................................198
6.6.5 MUR Common Cooling Systems ....................................................................................200
6.7 MY_ Control and Protection ............................................................................. 202 6.7.1 MY_ General ......................................................................................................................202
6.7.2 MYA10 Remote Monitoring System ...............................................................................202
6.8 B__ Electrical Auxiliary Power Supply System .............................................. 203
6.9 CK_ Process Monitoring ................................................................................... 207 6.9.1 CK_ General ......................................................................................................................207
6.9.2 CKA10 Fire Alarm System ...............................................................................................208
VGB-S-823-32-2014-03-EN-DE
Page 9 of 314
6.9.3 CKC10 Video Monitoring System ..................................................................................210
6.9.4 CKJ Environmental Measuring System ........................................................................213
6.10 UMD Tower System ............................................................................................ 214 6.10.1 UMD Tower System General ............................................................................................214
6.10.2 UMD10 Tower System Overall ........................................................................................216
6.10.3 UMD11 Tower System Top Section ...............................................................................219
6.10.4 UMD12 – UMD28 Tower System Middle Section 1 – 16 ................................................219
6.10.5 UMD29 Tower System Bottom Section .........................................................................219
6.10.6 UMD40 Inner Support Structure Tower System ............................................................222
6.10.7 UMD80 Foundation Structures ........................................................................................223
6.10.8 UAB10 Transformer Station ............................................................................................225
6.11 WBA Personnel Rescue Systems ..................................................................... 226 6.11.1 WBA11 Personnel Rescue System ................................................................................226
6.11.2 WBA21 Offshore Personnel Rescue System ................................................................227
6.12 X__ Ancillary Systems ....................................................................................... 229 6.12.1 X__ Ancillary Systems General .......................................................................................229
6.12.2 XAM Ventilation Systems ................................................................................................230
6.12.3 XAM10 Air Conditioning ..................................................................................................230
6.12.4 XAM20 Air Circulation ......................................................................................................232
6.12.5 XF_ Equipotential Bonding Systems .............................................................................234
6.12.6 XFB Equipotential Bonding/Earthing System ...............................................................234
6.12.7 XFC Lightning Protection System ..................................................................................236
6.12.8 XFC10 External Lightning Protection System ..............................................................236
6.12.9 XGM Fire Extinguishing System .....................................................................................239
6.12.10 XGM10 Manual Fire Extinguishing System ...................................................................239
6.12.11 XGM2_ Automatic Fire Extinguishing System .............................................................240
6.12.12 XMM Lifting Gears ............................................................................................................241
6.12.13 XSD Obstacle Warning System ......................................................................................244
6.12.14 XSD10 Obstacle Warning System Aviation ...................................................................244
6.12.15 XSD20 Obstacle Warning System Marine ......................................................................246
6.12.16 XSD30 Sonar System .......................................................................................................247
6.13 YAA Telephone System ..................................................................................... 248
7 Main System Transmission of Energy or Resources =W .................... 250
7.1 Main System =W, Overview ............................................................................... 250
7.2 Main System Group MV Cable Systems =W101 - W399 ................................ 250 7.2.1 Main System Group MV Cable Systems, General ........................................................250
7.2.2 Main System Group MV Cable Systems, Functions ....................................................251
7.2.3 Main System Group MV Cable Systems, Operating Equipment ..................................254
7.3 Main System Group Access Ways =W601 - W699 ......................................... 262
8 Main System Transformation of Electrical Energy =T ......................... 265
8.1 Main System =T, Overview ................................................................................ 265
VGB-S-823-32-2014-03-EN-DE
Page 10 of 314
8.2 AA_ Systems for Higher-level Management ................................................... 267
8.3 AC_ to AM_ Systems for 1 kV ≤ Un ≤ 420 kV .................................................. 268
8.4 AN_ Systems for Un < 1 kV ............................................................................... 270
8.5 AT_ Transformer System .................................................................................. 271
8.6 U__ Structures and Areas inside of the Power Plant Process ...................... 272
8.7 V__ Systems for Storage of Material or Goods .............................................. 272
8.8 W__ Systems for Administrative or Social Purposes or Tasks ..................... 272
8.9 X__ Ancillary Systems ....................................................................................... 273
8.10 Y__ Systems for Communication and Information Tasks .............................. 274
8.11 Z__ Structures and Areas for Systems outside of the Power Plant Process ............................................................................................................... 274
9 Main System Common Communication =K ......................................... 276
9.1 Main System =K, General .................................................................................. 276
9.2 YCP IT Networks ................................................................................................ 278
9.3 CCA Wind Farm Load Management ................................................................. 281
9.4 CFA SCADA Systems ........................................................................................ 282
9.5 Differentiation to Remote Control System of WTG ........................................ 283
10 Main System Central Storage =C .......................................................... 284
11 Main System Meteorology =B ............................................................... 284
12 Main System Structures =U .................................................................. 284
List of Annexes ...................................................................................................... 285
Annex A1 Checklist for Starting the Designation Process .............................. 286
Annex A2 Stipulations and Examples for the shortened Notification of Designation Blocks ................................................................................ 287
Annex A3 List of all Designations of a Wind Turbine (Main System =G) ......... 291
Annex A4 List of all Signal Designations ........................................................... 291
Annex A5 Electrical Equipment - Cabinet view vs. Functional Designation .. 291
Annex B1 Form for the Submission of new Designations ............................... 299
Annex B2 List of figures ...................................................................................... 300
Annex B3 List of tables ........................................................................................ 306
VGB-S-823-32-2014-03-EN-DE
Page 11 of 314
Inhaltsverzeichnis
Vorwort ...................................................................................................................... 3
Hinweise zur Benutzung dieser Richtlinie ............................................................... 4
Autorenverzeichnis ................................................................................................... 5
Einleitung ................................................................................................................. 15
1 Anwendungsbereich................................................................................. 21
2 Verweis auf Normen und Richtlinien....................................................... 21
3 Begriffe, Abkürzungen und Symbole ...................................................... 24
3.1 Begriffe .................................................................................................................. 24 3.1.1 Kennzeichnung und Dokumentation ................................................................................ 24
3.1.2 Windkraftwerke ................................................................................................................... 30
3.2 Abkürzungen ........................................................................................................ 33 3.2.1 Abkürzungen allgemein ..................................................................................................... 33
3.2.2 Kurzzeichen für Datenstellen ............................................................................................ 34
3.3 Symbole ................................................................................................................ 34
4 Grundlagen der Kennzeichnung nach RDS-PP ...................................... 35
4.1 Einleitung .............................................................................................................. 35
4.2 Ziel der Kennzeichnung mit RDS-PP ................................................................. 35
4.3 Umfang der Kennzeichnung mit RDS-PP .......................................................... 36
4.4 Prinzipien der Kennzeichnung nach RDS-PP .................................................... 37
4.5 Kennzeichnungsprozess im Rahmen einer Projektabwicklung ...................... 41
4.6 Grundregeln für den Kennzeichenaufbau ........................................................ 46
4.7 Kennzeichnungsaufgaben nach RDS-PP ......................................................... 52 4.7.1 Übersicht ............................................................................................................................. 52
4.7.2 Gemeinsame Zuordnung (#) .............................................................................................. 55
4.7.3 Funktion (=) ......................................................................................................................... 56
4.7.4 Produktklasse (-) ................................................................................................................ 61
4.7.5 Betriebsmittel ...................................................................................................................... 64
4.7.6 Ort (+, ++) ............................................................................................................................. 65
4.7.7 Funktionale Zuordnung (= =) ............................................................................................. 79
4.7.8 Signale (;) ............................................................................................................................ 80
4.7.9 Anschlüsse (:) ..................................................................................................................... 85
4.7.10 Dokumente (&) .................................................................................................................... 87
4.8 Kombination und Schreibweise der Kennzeichenblöcke ................................ 89 4.8.1 Kombination von Kennzeichenblöcken .......................................................................... 89
4.8.2 Schreibweise von Kennzeichenblöcken in Dokumenten ............................................... 91
VGB-S-823-32-2014-03-EN-DE
Page 12 of 314
5 Gemeinsame Zuordnung und Übersicht Hauptsysteme ....................... 92
5.1 Allgemein .............................................................................................................. 92
5.2 Gemeinsame Zuordnung ..................................................................................... 92
5.3 Hauptsysteme ..................................................................................................... 101
6 Hauptsystem Energieumwandlung =G ................................................ 103
6.1 Übersicht ............................................................................................................. 103
6.2 MD_ Windturbinensystem ................................................................................. 104 6.2.1 MD_ Allgemein ..................................................................................................................104
6.2.2 MDA Rotorsystem ............................................................................................................105
6.2.3 MDK Antriebsstrangsystem ............................................................................................117
6.2.4 MDL Azimutsystem ..........................................................................................................147
6.2.5 MDV Zentrales Schmiersystem ......................................................................................156
6.2.6 MDX Zentrales Hydrauliksystem .....................................................................................157
6.2.7 MDY Steuerungssystem ..................................................................................................159
6.3 MK_ Erzeugungssystem .................................................................................... 163 6.3.1 MK_ Allgemein ..................................................................................................................163
6.3.2 MKA Stromerzeugungssystem .......................................................................................164
6.4 MS_ Ableitung elektrischer Energie ................................................................ 172 6.4.1 MS_ Allgemein ..................................................................................................................172
6.4.2 MSC Generatorschaltsystem .........................................................................................174
6.4.3 MSE Umrichtersystem .....................................................................................................178
6.4.4 MSS Kompensationssystem ...........................................................................................181
6.4.5 MST Maschinentransformatorsystem ...........................................................................183
6.5 Schaltungsvarianten =MKA/=MS ...................................................................... 185 6.5.1 Variante 1: Polumschaltbarer Generator in einer Stall-Anlage ....................................185
6.5.2 Variante 2: Drehzahlvariable WEA mit Gleich- und Wechselrichter ...........................187
6.5.3 Variante 3: Drehzahlvariable WEA mit mehreren Generatoren ...................................190
6.5.4 Variante 4: Doppelt gespeister Asynchrongenerator ...................................................193
6.6 MU_ Gemeinsame Systeme für Windenergieanlagen .................................... 195 6.6.1 MU_ Allgemein ..................................................................................................................195
6.6.2 MUD Maschinenhaus .......................................................................................................195
6.6.3 MUD10 Maschinenträger und Maschinenhaus ..............................................................196
6.6.4 MUD20 Kühlsystem Maschinenhaus ..............................................................................198
6.6.5 MUR Gemeinsame Kühlsysteme ....................................................................................200
6.7 MY_Steuer-, Regel-, Schutzeinrichtung .......................................................... 202 6.7.1 MY_ Allgemein ..................................................................................................................202
6.7.2 MYA10 Fernüberwachungssystem ................................................................................202
6.8 B__ Elektrisches Eigenbedarfssystem ........................................................... 203
6.9 CK_ Prozessüberwachung ................................................................................ 207 6.9.1 CK_ Allgemein ..................................................................................................................207
6.9.2 CKA10 Brandmeldesystem ..............................................................................................208
VGB-S-823-32-2014-03-EN-DE
Page 13 of 314
6.9.3 CKC10 Videoüberwachungssystem ..............................................................................210
6.9.4 CKJ Umweltmesssystem .................................................................................................213
6.10 UMD Turmsystem ............................................................................................... 214 6.10.1 UMD Turmsystem Allgemein ...........................................................................................214
6.10.2 UMD10 Turmsystem Übergeordnet ...............................................................................216
6.10.3 UMD11 Turmsystem Top-Sektion ..................................................................................219
6.10.4 UMD12 – UMD28 Turmsystem Mittelsektion 1 – 16 ......................................................219
6.10.5 UMD29 Turmsystem Turmfuß ........................................................................................219
6.10.6 UMD40 Innere Tragstruktur Turmsystem .......................................................................222
6.10.7 UMD80 Fundamentstrukturen .........................................................................................223
6.10.8 UAB10 Transformatorstation ..........................................................................................225
6.11 WBA Personenrettungssysteme ...................................................................... 226 6.11.1 WBA11 Personenrettungssystem ..................................................................................226
6.11.2 WBA21 Offshore Personenrettungssystem ..................................................................227
6.12 X__ Nebensysteme ............................................................................................ 229 6.12.1 X__ Nebensysteme Allgemein ........................................................................................229
6.12.2 XAM Lüftungssysteme .....................................................................................................230
6.12.3 XAM10 Luftaufbereitung ..................................................................................................230
6.12.4 XAM20 Luftumwälzung ....................................................................................................232
6.12.5 XF_ Potenzialausgleichssysteme ..................................................................................234
6.12.6 XFB Potenzialausgleichs-/Erdungssystem ....................................................................234
6.12.7 XFC Blitzschutzsystem ....................................................................................................236
6.12.8 XFC10 Äußerer Blitzschutz ..............................................................................................236
6.12.9 XGM Feuerlöschsystem ...................................................................................................239
6.12.10 XGM10 Manuelles Feuerlöschsystem ...........................................................................239
6.12.11 XGM2_ Automatisches Feuerlöschsystem ...................................................................240
6.12.12 XMM Hebezeuge ...............................................................................................................241
6.12.13 XSD Hinderniskennzeichnungssystem ..........................................................................244
6.12.14 XSD10 Hinderniskennzeichnungssystem Luftfahrt ......................................................244
6.12.15 XSD20 Hinderniskennzeichnungssystem Seefahrt ......................................................246
6.12.16 XSD30 Sonarsystem .........................................................................................................247
6.13 YAA Fernsprechsystem ..................................................................................... 248
7 Hauptsystem Übertragung von Energie oder Ressourcen =W ........... 250
7.1 Hauptsystem =W, Übersicht ............................................................................. 250
7.2 Hauptsystemgruppe MS-Kabelsysteme =W101 - W399 ................................. 250 7.2.1 Hauptsystemgruppe MS-Kabelsysteme, Allgemein ....................................................250
7.2.2 Hauptsystemgruppe MS-Kabelsysteme, Funktionen ..................................................251
7.2.3 Hauptsystemgruppe MS-Kabelsysteme, Betriebsmittel ...............................................254
7.3 Hauptsystemgruppe Wegenetz =W601 - W699............................................... 262
8 Hauptsystem Umwandlung von elektrischer Energie =T .................... 265
8.1 Hauptsystem =T, Übersicht ............................................................................... 265
VGB-S-823-32-2014-03-EN-DE
Page 14 of 314
8.2 AA_ Systeme zum übergeordneten Management .......................................... 267
8.3 AC_ bis AM_ Systeme für 1 kV ≤ Un ≤ 420 kV ................................................ 268
8.4 AN_ Systeme für Un < 1 kV ............................................................................... 270
8.5 AT_ Umspannanlagen ....................................................................................... 271
8.6 U__ Bauwerke und Flächen für den Kraftwerksprozess ................................ 272
8.7 V__ Systeme zur Speicherung von Material oder Gütern .............................. 272
8.8 W__ Systeme für administrative oder soziale Zwecke oder Aufgaben ......... 272
8.9 X__ Nebensysteme ............................................................................................ 273
8.10 Y__ Systeme für Kommunikations- und Informationsaufgaben ................... 274
8.11 Z__ Bauwerke und Flächen für Systeme außerhalb des Kraftwerksprozesses ......................................................................................... 274
9 Hauptsystem Übergeordnete Kommunikation =K ............................... 276
9.1 Hauptsystem =K, Allgemein .............................................................................. 276
9.2 YCP IT Netzwerke ............................................................................................... 278
9.3 CCA Lastmanagement ....................................................................................... 281
9.4 CFA SCADA Systeme ........................................................................................ 282
9.5 Abgrenzung zum Fernüberwachungssystem der WEA ................................. 283
10 Hauptsystem Speicher =C .................................................................... 284
11 Hauptsystem Meteorologie =B ............................................................. 284
12 Hauptsystem Gebäude =U .................................................................... 284
Verzeichnis der Anhänge ...................................................................................... 285
Anhang A1 Checkliste zum Start des Kennzeichnungsprozesses ................. 286
Anhang A2 Festlegungen und Beispiele für die verkürzte Schreibweise von Kennzeichenblöcken ....................................................................... 287
Anhang A3 Liste aller Kennzeichen für eine Windenergieanlage (Hauptsystem =G) ................................................................................... 291
Anhang A4 Liste aller Signalkennzeichen .......................................................... 291
Anhang A5 Elektrische Betriebsmittel - Schaltschranksicht versus funktionale Kennzeichnung ................................................................... 291
Anhang B1 Antrag zur Aufnahme weiterer Kennzeichen ................................. 299
Anhang B2 Abbildungsverzeichnis .................................................................... 303
Anhang B3 Tabellenverzeichnis .......................................................................... 310
VGB-S-823-33-2018-07-EN-DE
VGB-Standard
RDS-PP®
Application Guideline Part 33: Photovoltaic Power PlantsAnwendungsrichtlinie Teil 33: Photovoltaische Kraftwerke
VGB-Standard
RDS-PP
Application Guideline Part 33: Photovoltaic Power Plants
Anwendungsrichtlinie Teil 33: Photovoltaische Kraftwerke
VGB-S-823-33-2018-07-EN-DE
Herausgeber: VGB PowerTech e.V.
Bezugsadresse: VGB PowerTech Service GmbH Verlag technisch-wissenschaftlicher Schriften Postfach 10 39 32, 45039 Essen Tel. +49 201 8128-200 Fax +49 201 8128-302 E-Mail: [email protected]
ISBN 978-3-96284-069-3 (Print)
ISBN 978-3-96284-070-9 (eBook)
Jegliche Wiedergabe ist nur mit vorheriger Genehmigung des VGB PowerTech gestattet.
www.vgb.org
VGB-S-823-33-2018-07-EN-DE
Page 2 of 146
Copyright notice
All rights reserved.
This work is protected under the copyright law (UrhG) in the currently valid version. The exclusive right to exploit is at VGB Power-Tech e. V.
Any use outside the limits of copyright law is prohibited without the consent of the VGB. This applies to reproductions and all forms of digitization.
Urheberrechtsvermerk
Dieses Werk ist im Sinne des Urheberrecht-gesetzes (UrhG) in seiner jeweils gültigen Fassung geschützt. Das ausschließliche Recht zur Verwertung liegt beim VGB Power-Tech e.V.
Jede Verwertung außerhalb der Grenzen des Urheberrechtsgesetzes ist ohne Zu-stimmung des VGB PowerTech e.V. unzu-lässig. Dies gilt für Vervielfältigungen und jegliche Form der Digitalisierung.
Use of the VGB-Standards
The application of the content of this works is permitted. The content transfer of this works in own works is permitted if this is an auton-omous works. This grant of rights does not include any further waiver of copyright or rights of use.
Anwendung der VGB-Standards
Die Anwendung der Inhalte dieses Stan-dards ist gestattet. Die Überführung von In-halten in eigene Werke ist insofern gestattet, wenn es sich um selbstständige Werke han-delt. Diese Rechteeinräumung beinhaltet keinen weiteren Verzicht auf Urheber- oder Nutzungsrechte.
Disclaimer Haftungsausschluss
VGB-Standards are recommendations, ap-plying them is optional for everyone. They take into account the state of the art prevail-ing at the time of the output, but do not claim to completeness and accuracy. Anyone who uses the standards, is exclusively responsi-ble to take care for the correct application. In the case of Applying VGB-Standards no one defies its own responsibility for his own ac-tions, according to the state of the art.
Any liability or guarantee of VGB PowerTech e.V. or those that are directly or indirectly involved in the VGB-Standards is excluded insofar.
VGB-Standards sind Empfehlungen, deren Anwendung jedem freigestellt ist. Sie be-rücksichtigen den zum Zeitpunkt der jeweili-gen Ausgabe herrschenden anerkannten Stand der Technik, sie erheben jedoch kei-nen Anspruch auf Vollständigkeit und Rich-tigkeit. Wer sie anwendet, hat für die richtige Anwendung im konkreten Fall ausschließlich eigenverantwortlich Sorge zu tragen. Durch das Anwenden von VGB-Standards entzieht sich niemand der eigenen Verantwortung für sein eigenes Handeln entsprechend dem Stand der Technik.
Eine Haftung oder Garantie des VGB Power-Tech e.V. oder derjenigen, die an den VGB-Standards direkt oder indirekt beteiligt sind, ist insoweit ausgeschlossen.
RDS-PP® is a registered trademark of VGB PowerTech e.V. RDS-PP® ist eingetragene Marke des VGB PowerTech e.V.
VGB-S-823-33-2018-07-EN-DE
Page 3 of 146
Foreword Vorwort
This RDS-PP®
Application Guideline for photovoltaic power plants was prepared by a project group of the VGB Technical Group “Reference Designation and Plant Documen-tation”, in close cooperation with experts from manufacturers and operators.
Diese RDS-PP®-
Anwendungsrichtlinie für Photovoltaische Kraftwerke wurde von einer Projektgruppe der VGB-Fachgruppe „Anla-genkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet.
At the date of publication of this guideline the following companies were members of the Technical Group “Reference Designation and Plant Documentation”:
Zum Zeitpunkt der Veröffentlichung dieser Richtlinie waren in der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentati-on“ folgende Firmen vertreten:
The list makes no claim to distinctiveness and legal unambiguousness of the company names given.
Die aufgelisteten Namen erheben keinen Anspruch auf Unverwechselbarkeit bzw. juristische Eindeutigkeit.
ABB AG
Envi Con Engineering GmbH
Ingenieurbüro GABO GmbH
KRAFTWERKSSCHULE e.V.
Lausitz Energie Kraftwerke AG
RWE Power AG
RWE Technology International GmbH
Siemens AG Energy Solutions
Uniper Technologies GmbH
VERBUND Hydro Power GmbH
DONG Energy A/S *
Uniper Kraftwerke GmbH *
ESB Electricity Supply Board *
ESKOM Technology Group *
GE Boiler Deutschland GmbH *
*corresponding / korrespondierend
VGB-S-823-33-2018-07-EN-DE
Page 4 of 146
Remarks for Using this Guideline
Hinweise zur Benutzung dieser Richtlinie
Here are some notes for using this guideline: Nachfolgend einige Hinweise zur Benutzung dieser Richtlinie:
The underscore “_” is used in this guideline only as a placeholder for not written data positions.
Der Unterstrich „_“ wird in dieser Richt-linie ausschließlich als Platzhalter für nicht geschriebene Datenstellen ver-wendet.
The underscore shall not be a part of a complete reference designation with the exception of “Conjoint Designation” and in the context of signal names.
Der Unterstrich darf nicht Teil eines vollständigen Referenzkennzeichens sein, mit Ausnahme von „Gemeinsame Zuordnung“ und im Zusammenhang mit Signalnamen.
The graphical representations are in-tended to support the understanding of the rules of designation. They are not to be understood as additional determina-tion for the execution of certain docu-ments.
Die grafischen Darstellungen sollen das Verständnis der Kennzeichnungsregeln unterstützen. Sie sind nicht als zusätzli-che Festlegungen zur Ausführung be-stimmter Dokumente zu verstehen.
The figures are based on the rules and symbols of the applicable standards.
Die Bilder orientieren sich an den Re-geln und Symbolen der zutreffenden Normen.
VGB-S-823-33-2018-07-EN-DE
Page 5 of 146
Authors Autorenverzeichnis
The following authors actively participated in the elaboration of this guideline:
An der Erstellung dieser Richtlinie waren folgende Autoren wesentlich beteiligt:
VGB PowerTech would like to thank all com-panies and its employees, who participated in the preparation of this guideline for their contribution.
VGB PowerTech dankt allen an der Erstel-lung dieser Anwendungsrichtlinie beteiligten Firmen und den mit der Arbeit beauftragten Mitarbeitern.
Essen, July/Juli 2018
VGB PowerTech e.V.
Name/Name Company/Firma
Christian Bertsch-Engel CEE Operations GmbH
Andreas Böser VGB PowerTech e.V.
Claudia Buerhop-Lutz ZAE BAYERN
Felix Jetter BayWa r.e.
Jochen Hantschel UniperTechnologies GmbH
Florian Holy BayWa r.e.
Andreas Kühnel proElux GmbH
Andreas Menger IB GABO
Heinz Müller IB Heinz Müller
Moritz Nüsperling Nüsperling GmbH & Co. KG
Thomas Oesselke PHOENIX CONTACT Electronics GmbH
VGB-S-823-33-2018-07-EN-DE
Page 6 of 146
Table of Contents
Foreword .................................................................................................................... 3
Remarks for Using this Guideline ............................................................................ 4
Authors 5
Introduction .............................................................................................................. 12
1 Scope .................................................................................................................... 16
2 Reference to Standards and Guidelines ............................................................ 17
3 Terms, Abbreviations, and Symbols .................................................................. 19 3.1 Terms ................................................................................................................................... 19
3.2 Abbreviations ...................................................................................................................... 25
4 Designation System RDS-PP .............................................................................. 26 4.1 Basics .................................................................................................................................. 26
4.1.1 General --------------------------------------------------------------------------------------------------------- 26
4.1.2 Object ----------------------------------------------------------------------------------------------------------- 26
4.1.3 Aspect ---------------------------------------------------------------------------------------------------------- 27
4.1.4 Structuring ----------------------------------------------------------------------------------------------------- 29
4.1.5 Classification -------------------------------------------------------------------------------------------------- 31
4.1.6 Scope of Designation --------------------------------------------------------------------------------------- 32
4.1.6.1 General ................................................................................................................................ 32
4.1.6.2 Plant Part ............................................................................................................................. 33
4.1.6.3 Point of Installation ............................................................................................................... 33
4.1.6.4 Site of Installation ................................................................................................................. 34
4.1.6.5 Equipment Part .................................................................................................................... 34
4.1.6.6 Delimitation of Plant Part to Equipment Part ....................................................................... 34
4.2 Designation Process .......................................................................................................... 35
4.3 Designation Structure ........................................................................................................ 36
4.3.1 General --------------------------------------------------------------------------------------------------------- 36
4.3.2 Prefix ------------------------------------------------------------------------------------------------------------ 37
4.3.3 Letters and Digits -------------------------------------------------------------------------------------------- 38
4.3.4 Designation Block ------------------------------------------------------------------------------------------- 40
5 Designation Types ............................................................................................... 41 5.1 General ................................................................................................................................ 41
5.2 Conjoint Designation “#” ................................................................................................... 43
5.3 Function “=” ........................................................................................................................ 44
5.3.1 General, Designation Structure -------------------------------------------------------------------------- 44
5.3.2 Breakdown Level F0 ---------------------------------------------------------------------------------------- 45
5.3.3 Breakdown Level F1 ---------------------------------------------------------------------------------------- 45
5.3.4 Breakdown Level F2 ---------------------------------------------------------------------------------------- 46
VGB-S-823-33-2018-07-EN-DE
Page 7 of 146
5.4 Product Class “-“ ................................................................................................................ 47
5.5 Operating Equipment “=… –“ ............................................................................................ 49
5.6 Functional Allocation “==” ................................................................................................ 52
5.7 Point of Installation “+” ..................................................................................................... 54
5.7.1 General --------------------------------------------------------------------------------------------------------- 54
5.7.2 Structure and Application of the Point of Installation Designation ------------------------------ 55
5.8 Site of Installation “++” ...................................................................................................... 59
5.8.1 General --------------------------------------------------------------------------------------------------------- 59
5.8.2 Structure and Application of the Site of Installation Designation -------------------------------- 60
5.8.3 Application in Buildings ------------------------------------------------------------------------------------- 62
5.8.4 Application on Areas ---------------------------------------------------------------------------------------- 64
5.9 Signals “;” ........................................................................................................................... 65
5.9.1 General --------------------------------------------------------------------------------------------------------- 65
5.9.2 Structure and Content of the Signal Designation ---------------------------------------------------- 67
5.9.3 Structure and Content of the Signal Name ------------------------------------------------------------ 68
5.10 Terminals “:” ....................................................................................................................... 73
5.11 Documents “&” ................................................................................................................... 74
5.11.1 General --------------------------------------------------------------------------------------------------------- 74
5.11.2 Structure and Content of the Document Page Designation --------------------------------------- 74
5.11.3 Das Dokumentenkennzeichen---------------------------------------------------------------------------- 75
5.11.3.1 Object Designation ............................................................................................................... 75
5.11.3.2 Document Kind Classification Code DCC ............................................................................ 75
5.12 Cable .................................................................................................................................... 77
6 Reference Designation for Photovoltaic Power Plants .................................... 79 6.1 Overview .............................................................................................................................. 79
6.2 Conjoint Designation ......................................................................................................... 81
6.3 Designation of Operating Equipment .............................................................................. 84
6.3.1 Overview ------------------------------------------------------------------------------------------------------- 84
6.3.2 Main Systems ------------------------------------------------------------------------------------------------- 87
6.3.3 Systems of the Main Process ----------------------------------------------------------------------------- 89
6.3.3.1 Overview .............................................................................................................................. 89
6.3.3.2 PV Generator System =MQA ............................................................................................... 92
6.3.3.3 PV Inverter System =MSE ................................................................................................... 97
6.3.3.4 PV Generator Circuit Breaker System =MSC ....................................................................100
6.3.3.5 Transformer System =MST ................................................................................................102
6.3.3.6 MV Field Distribution System =AHQ ..................................................................................102
6.3.3.7 MV Delivery Distribution =AHA ..........................................................................................106
6.3.4 Electrical Auxiliary Power Supply =AN_ for Delivery Distribution =AHA --------------------- 107
6.3.5 Ancillary Systems =AX_ for Grid and Distribution System ---------------------------------------- 108
6.3.5.1 General ..............................................................................................................................108
6.3.5.2 Fire Protection System =AXB ............................................................................................109
VGB-S-823-33-2018-07-EN-DE
Page 8 of 146
6.3.5.3 Electrical installation (light and power) =AXC ....................................................................111
6.3.6 Common Ancillary Systems ------------------------------------------------------------------------------ 113
6.3.6.1 General ..............................................................................................................................113
6.3.6.2 Earthing/Grounding System =XFA .....................................................................................114
6.3.6.3 Video Monitoring System =XSB ........................................................................................115
6.3.7 Control and Management Systems =C__ ------------------------------------------------------------ 117
6.3.8 Structures and Areas =U__ ------------------------------------------------------------------------------ 120
6.3.8.1 General ..............................................................................................................................120
6.4 Location Designation .......................................................................................................122
6.4.1 Point of Installation ----------------------------------------------------------------------------------------- 122
6.4.2 Site of Installation ------------------------------------------------------------------------------------------- 123
7 Signal Designation ............................................................................................. 126
8 Terminal Designation ......................................................................................... 127
9 Document Designation ...................................................................................... 128
10 Cable Designation .............................................................................................. 130
Annex A Structure of a PV Array ......................................................................... 134
Annex B Checklist ................................................................................................. 135
Annex C Form for the Submission of new Designations ................................. 137
List of figures ......................................................................................................... 138
List of tables .......................................................................................................... 144
Bibliography ........................................................................................................... 146
VGB-S-823-33-2018-07-EN-DE
Page 9 of 146
Inhaltsverzeichnis
Vorwort ...................................................................................................................... 3
Hinweise zur Benutzung dieser Richtlinie ............................................................... 4
Autorenverzeichnis ................................................................................................... 5
Einleitung ................................................................................................................. 12
1 Anwendungsbereich ............................................................................................ 16
2 Verweis auf Normen und Richtlinien .................................................................. 17
3 Begriffe, Abkürzungen und Symbole ................................................................. 19 3.1 Begriffe ................................................................................................................................ 19
3.2 Abkürzungen ....................................................................................................................... 25
4 Kennzeichensystem RDS-PP .............................................................................. 26 4.1 Grundlagen.......................................................................................................................... 26
4.1.1 Allgemein ------------------------------------------------------------------------------------------------------ 26
4.1.2 Objekt ----------------------------------------------------------------------------------------------------------- 26
4.1.3 Aspekt ---------------------------------------------------------------------------------------------------------- 27
4.1.4 Strukturierung------------------------------------------------------------------------------------------------- 29
4.1.5 Klassifizierung ------------------------------------------------------------------------------------------------ 31
4.1.6 Kennzeichnungsumfang ----------------------------------------------------------------------------------- 32
4.1.6.1 Allgemein ............................................................................................................................. 32
4.1.6.2 Anlagenteil ........................................................................................................................... 33
4.1.6.3 Einbauort .............................................................................................................................. 33
4.1.6.4 Aufstellungsort ..................................................................................................................... 34
4.1.6.5 Ausrüstungsteil ..................................................................................................................... 34
4.1.6.6 Abgrenzung von Anlagenteil / zu Ausrüstungsteil ............................................................... 34
4.2 Kennzeichnungsprozess ................................................................................................... 35
4.3 Kennzeichenaufbau ............................................................................................................ 36
4.3.1 Allgemein ------------------------------------------------------------------------------------------------------ 36
4.3.2 Vorzeichen ---------------------------------------------------------------------------------------------------- 37
4.3.3 Buchstaben und Ziffern ------------------------------------------------------------------------------------ 38
4.3.4 Kennzeichenblock ------------------------------------------------------------------------------------------- 40
5 Kennzeichnungsarten .......................................................................................... 41 5.1 Allgemein ............................................................................................................................. 41
5.2 Gemeinsame Zuordnung „#“............................................................................................. 43
5.3 Funktion „=“ ........................................................................................................................ 44
5.3.1 Allgemein, Kennzeichenaufbau -------------------------------------------------------------------------- 44
5.3.2 Gliederungsstufe F0 ---------------------------------------------------------------------------------------- 45
5.3.3 Gliederungsstufe F1 ---------------------------------------------------------------------------------------- 45
5.3.4 Gliederungsstufe F2 ---------------------------------------------------------------------------------------- 46
VGB-S-823-33-2018-07-EN-DE
Page 10 of 146
5.4 Produktklasse „-“ ............................................................................................................... 47
5.5 Betriebsmittel „=… –“ ........................................................................................................ 49
5.6 Funktionale Zuordnung „==“............................................................................................. 52
5.7 Einbauort „+“ ...................................................................................................................... 54
5.7.1 Allgemein ------------------------------------------------------------------------------------------------------ 54
5.7.2 Aufbau und Anwendung des Einbauortkennzeichens ---------------------------------------------- 55
5.8 Aufstellungsort „++“ .......................................................................................................... 59
5.8.1 Allgemein ------------------------------------------------------------------------------------------------------ 59
5.8.2 Aufbau und Anwendung des Aufstellungsortkennzeichens --------------------------------------- 60
5.8.3 Anwendung in Gebäuden ---------------------------------------------------------------------------------- 62
5.8.4 Anwendung auf Flächen ----------------------------------------------------------------------------------- 64
5.9 Signale „;“ ........................................................................................................................... 65
5.9.1 Allgemein ------------------------------------------------------------------------------------------------------ 65
5.9.2 Aufbau und Inhalt des Signalkennzeichens ----------------------------------------------------------- 67
5.9.3 Aufbau und Inhalt des Signalnamens ------------------------------------------------------------------- 68
5.10 Anschlüsse „:“ .................................................................................................................... 73
5.11 Dokumente „&“ ................................................................................................................... 74
5.11.1 Allgemein ------------------------------------------------------------------------------------------------------ 74
5.11.2 Aufbau und Inhalt des Dokumentenseitenkennzeichens ------------------------------------------ 74
5.11.3 Object Designation ------------------------------------------------------------------------------------------ 75
5.11.3.1 Objektkennzeichnen ............................................................................................................ 75
5.11.3.2 Dokumentenart-Klassenschlüssel DCC ............................................................................... 75
5.12 Kabel .................................................................................................................................... 77
6 Referenzkennzeichnung für Photovoltaische Kraftwerke ................................ 79 6.1 Übersicht ............................................................................................................................. 79
6.2 Gemeinsame Zuordnung ................................................................................................... 81
6.3 Betriebsmittelkennzeichen ................................................................................................ 84
6.3.1 Übersicht ------------------------------------------------------------------------------------------------------- 84
6.3.2 Hauptsysteme ------------------------------------------------------------------------------------------------ 87
6.3.3 Systeme des Hauptprozesses ---------------------------------------------------------------------------- 89
6.3.3.1 Übersicht: ............................................................................................................................. 89
6.3.3.2 Photovoltaisches Generatorsystem =MQA .......................................................................... 92
6.3.3.3 PV Wechselrichtersystem =MSE ......................................................................................... 97
6.3.3.4 PV Generatorschaltersystem =MSC ..................................................................................100
6.3.3.5 Transformatorsystem =MST ..............................................................................................102
6.3.3.6 MS-Feldverteilungssystem =AHQ ......................................................................................102
6.3.3.7 MS-Übergabeverteilung =AHA ..........................................................................................106
6.3.4 Elektrisches Eigenbedarfssystem =AN_ für Übergabeverteilung =AHA ---------------------- 107
6.3.5 Nebensysteme =AX_ für Netz- und Verteilungssystem ------------------------------------------- 108
6.3.5.1 Allgemein ...........................................................................................................................108
6.3.5.2 Brandschutzsystem =AXB .................................................................................................109
VGB-S-823-33-2018-07-EN-DE
Page 11 of 146
6.3.5.3 Elektroinstallationssystem (Licht und Kraft) =AXC ............................................................111
6.3.6 Gemeinsame Nebensysteme ---------------------------------------------------------------------------- 113
6.3.6.1 Allgemein ...........................................................................................................................113
6.3.6.2 Erdungsanlage =XFA .........................................................................................................114
6.3.6.3 Videoüberwachungssystem =XSB ....................................................................................115
6.3.7 Leit- und Management Systeme =C__. -------------------------------------------------------------- 117
6.3.8 Bauwerke und Flächen =U__ ---------------------------------------------------------------------------- 120
6.3.8.1 Allgemein ...........................................................................................................................120
6.4 Ortskennzeichen ...............................................................................................................122
6.4.1 Einbauort ----------------------------------------------------------------------------------------------------- 122
6.4.2 Aufstellungsort----------------------------------------------------------------------------------------------- 123
7 Signalkennzeichen ............................................................................................. 126
8 Anschlusskennzeichen ..................................................................................... 127
9 Dokumentenkennzeichen .................................................................................. 128
10 Kabelkennzeichnung ......................................................................................... 130
Anhang A Struktur PV-Generatorfeld .................................................................. 134
Anhang B Checkliste ............................................................................................ 135
Anhang C Antragsformular zur Aufnahme weiterer Kennzeichen .................. 137
Abbildungsverzeichnis ......................................................................................... 141
Tabellenverzeichnis .............................................................................................. 145
Literaturhinweise ................................................................................................... 146
VGB-S-823-33-2018-07-EN-DE
Page 12 of 146
Introduction Einleitung
For efficient project planning, development, construction, operation and maintenance of a photovoltaic power plant, it is helpful to structure the respective plant and assign clear and unambiguous alphanumeric codes to all assemblies and components. A good designation system reflects closely the struc-ture of the plant and the interaction of its individual parts.
Für eine effiziente Abwicklung der Aufgaben von Planung, Entwicklung, Bau, Betrieb und Instandhaltung eines Photovoltaischen Kraftwerks, ist es hilfreich, die Anlage zu gliedern und die einzelnen Anlagenteile klar und eindeutig mit einem alphanumerischen Kennzeichen zu versehen. Eine gute Kenn-zeichensystematik bildet die Struktur der Anlage und das Zusammenwirken ihrer ein-zelnen Teile genau ab.
The designation supports, among others, an economic engineering of the plant as well as a cost-optimized procurement because parts with similar requirements can be identified much easier and early on. For operation and maintenance (O&M) a clear designation serves as an unambiguous address for O&M management systems.
Die Kennzeichnung unterstützt damit unter anderem ein wirtschaftliches Engineering der Anlage sowie eine kostenoptimierte Beschaf-fung, indem Anlagenteile mit vergleichbaren Anforderungen leicht und frühzeitig identifi-ziert werden können. Für Betrieb und In-standhaltung dient diese Kennzeichnung auch als eindeutige Adresse in Betriebsfüh-rungs- und Instandhaltungssystemen.
Some international standards for the desig-nation of industrial plants and its documenta-tion exist already, in particular the series of ISO/IEC 81346. The designation system called “Reference Designation System (RDS)” bases on these standards and can generally be applied to all industrial plants.
Zur Kennzeichnung von Industrieanlagen und ihrer Dokumentation gibt es internatio-nale Normen, vor allem die DIN/EN-Reihe 81346. Das auf diesen Grundnormen basie-rende Kennzeichnungskonzept wird „Refe-rence Designation System (RDS)“ genannt. Es ist prinzipiell für alle Industrieanlagen anwendbar.
For power plants, the sector specific stand-ard ISO/TS 81346-10 was developed and constitutes the normative basis for the “Ref-erence Designation System for Power Plants” RDS-PP
®.
Für den Kraftwerksbereich wurde in Einklang mit den Grundnormen die Fachnorm DIN ISO/TS 81346-10 veröffentlicht. Sie ist die normative Grundlage für das RDS-PP
®,
das „Reference Designation System for Power Plants“.
This sector specific standard covers the ap-plication for all engineering disciplines and for all types of plants of the energy supply sector.
Diese Fachnorm deckt die Anwendung für alle Fachbereiche und alle Typen von Anla-gen der Energieversorgung ab.
VGB-S-823-33-2018-07-EN-DE
Page 13 of 146
To reach a praxis-oriented solution of the RDS-PP the VGB Technical Group “Refer-ence Designation and Plant Documentation” published the following documents as an addition to the mentioned standards:
Für eine praxisgerechte Anwendung der Grundnormen hat die VGB-Fachgruppe „An-lagenkennzeichnung und Dokumentation“ die folgenden Dokumente ergänzt:
The guidelines VGB-S-821-00 (VGB-B 101e) “RDS-PP Letter Codes for Pow-er Plant Systems” and VGB-B 102 “RDS-PP Letter Codes for Basic Functions and Product Classes” provide the code letters for all important power plant systems and components.
Die Richtlinien VGB-S-821-00 (VGB-B 101) „RDS-PP Kennbuchstaben für Kraftwerkssysteme“ und VGB-B 102 „RDS-PP Kennbuchstaben für Grund-funktionen und Produktklassen“ stellen für alle wesentlichen Systeme und Kom-ponenten von Kraftwerken Kennbuchsta-ben zur Verfügung.
The application guideline series VGB-S-823 covers the rules correct implementa-tion of the basic standards for the power plant industry and illustrates them with practical examples. This guideline series is divided into a general part that is valid for all power plant types, and into power plant specific parts.
Die Anwendungsrichtlinienreihe VGB-S-823 regelt die sachgerechte Umsetzung der allgemeinen Kennzeichnungsnormen für die Kraftwerksbranche und verdeut-licht sie mit praxisbezogenen Beispielen. Diese Richtlinienreihe besteht aus einem allgemeinen Teil, der für alle Kraftwerks-arten gilt, sowie aus kraftwerkstypspezifi-schen Teilen.
The interrelations between the above men-tioned standards and guidelines are illustrat-ed in Figure 1.
Die Zusammenhänge dieser Normen und Richtlinien sind in Bild 1 dargestellt.
VGB-S-823-33-2018-07-EN-DE
Page 14 of 146
Figure 1 – Interrelation between designation standards and guidelines
Bild 1 – Zusammenhänge der Kennzeichnungsnormen und -richtlinien
Basic Standards
Grundnormen
IEC 81346-1 DIN EN 81346-1 Structuring principles and reference designations Basic rules
Strukturierungsprinzipien und Referenzkennzeichen Allgemeine Regeln
ISO/TS 81346-3 DIN ISO/TS 81346-3 Application rules for a Reference designation system
Anwendungsregeln für ein Referenzkennzeichen-system
IEC 81346-2 DIN EN 81346-2 Classification of objects and codes for classes
Klassifizierung von Objek-ten und Kennbuchstaben für Klassen
VGB-S-821-00 (former / früher VGB-B 101e/VGB-B 101)
RDS-PP Letter Codes for Power Plant Systems
RDS-PP Kennbuchstaben für Kraftwerkssysteme
VGB-B 102
RDS-PP Letter Codes for Basic Functions and Product Classes
RDS-PP Kennbuchstaben für Grundfunktionen und Produktklassen
Application Guidelines Anwendungs-richtlinien
VGB-S-823 RDS-PP
Basics / Grundlagen
- 01 Power Plants General / Kraftwerke allgemein
VGB-S-823 RDS-PP
Power plant type specific parts / Kraftwerkstyp spezifische Teile
- 31 Hydro Power Plants / Wasserkraftwerke /
- 32 Wind Power Plants / Windkraftwerke
- 33 Photovoltaic Power Plants / Photovoltaische Kraftwerke
Guidelines letter code
Richtlinien Kennbuchsta-ben
ISO/TS 81346-10 / DIN ISO/TS 81346-10
Reference designation system Part 10: Power plants
Referenzkennzeichensystem Teil 10: Kraftwerke
Sector specific Standard
Fachnorm
IEC 81346 series DIN EN 81346 Reihe
Industrial systems, installations and equipment and industrial products
Industrielle Systeme, Anlagen und Ausrüstungen und Industrieprodukte
VGB-S-823 RDS-PP
Energy Storage Systems / Energiespeichersysteme
- 41 Power to Gas / Power to Gas
VGB-S-823-33-2018-07-EN-DE
Page 15 of 146
This document covers the rules of the RDS-PP designation system for the photo-voltaic power plants.
Die vorliegende Richtlinie regelt die Anwen-dung des Kennzeichensystems RDS-PP für photovoltaische Kraftwerke.
This guideline provides detailed specifi-cations for the reference designation of plant parts that are specific to photovoltaic power plants (e.g. PV array, PV inverter system).
Die Richtlinie enthält detaillierte Festlegun-gen zur Referenzkennzeichnung für Anla-genteile, die spezifisch für ein photovoltai-sches Kraftwerk sind (z.B. PV Generatorfeld, PV Wechselrichtersystem).
For the designation of plant parts that vary from project to project, the guideline provides general guidance illustrated by examples, which has to be applied correspondingly to the specific case. This applies in particular to auxiliary and ancillary systems.
Für Anlagenteile, die projektspezifisch variie-ren, gibt die Richtlinie prinzipielle Anleitun-gen mit Beispielen, die im konkreten Anwen-dungsfall sinngemäß umzusetzen sind. Dies gilt insbesondere für Hilfs- und Nebensyste-me.
Part 1 of the RDS-PP Application Guidelines, Power Plants, General (VGB-S-823-01) ap-plies to PV power plant objects not covered by this guideline.
Für Objekte eines photovoltaischen Kraft-werks, die nicht in dieser Richtlinie behandelt werden, gilt Teil 1 der RDS-PP Anwen-dungsrichtlinie, Kraftwerke Allgemein (VGB-S-823-01).
The document is structured as follows:
Clause 1 defines the scope for this appli-cation guide.
Das Dokument ist wie folgt gegliedert:
In Abschnitt 1 wird der Anwendungsbe-reich dieser Richtlinie definiert.
Clause 2 lists all standards and guide-lines which are mentioned in this docu-ment.
In Abschnitt 2 sind alle Normen und Richtlinien, die in diesem Dokument ge-nannt werden, aufgeführt.
Clause 3 defines the terms, abbreviation and symbols used in this document.
In Abschnitt 3 werden die Begriffe, Ab-kürzungen und Symbole, die in diesem Dokument verwendet werden, definiert.
Clause 4 describes the basics of the Reference Designation System for Pow-er Plants. The associated terms are ex-plained in greater detail.
In Abschnitt 4 werden die Grundlagen des Kennzeichnungssystems RDS-PP beschrieben und die damit verbundenen Begriffe näher erläutert.
Clause 5 describes the designation types with their designation blocks.
In Abschnitt 5 werden die Kennzeich-nungsarten mit ihren Kennzeichen-blöcken beschrieben.
From clauses 6 the provisions and rec-ommendations for a photovoltaic power plant are described and illustrated with practical examples.
Ab Abschnitt 6 werden die Festlegungen und Empfehlungen für ein photovoltai-sches Kraftwerk beschrieben und mit praxisnahen Beispielen verdeutlicht.
VGB-S-823-41-2018-07-EN-DE
VGB-Standard
RDS-PP®
Application Guideline Part 41: Power to GasAnwendungsrichtlinie Teil 41: Power to Gas
VGB-Standard
RDS-PP
Application Guideline Part 41: Power to Gas
Anwendungsrichtlinie Teil 41: Power to Gas
VGB-S-823-41-2018-07-EN-DE
Herausgeber: VGB PowerTech e.V.
Bezugsadresse: VGB PowerTech Service GmbH Verlag technisch-wissenschaftlicher Schriften Postfach 10 39 32, 45039 Essen Tel. +49 201 8128-200 Fax +49 201 8128-302 E-Mail: [email protected]
ISBN 978-3-96284-071-6 (Print)
ISBN 978-3-96284-072-3 (eBook)
Jegliche Wiedergabe ist nur mit vorheriger Genehmigung des VGB PowerTech gestattet.
www.vgb.org
VGB-S-823-41-2018-07-EN-DE
Page 2 of 155
Copyright notice
All rights reserved.
This work is protected under the copyright law (UrhG) in the currently valid version. The exclusive right to exploit is at VGB PowerTech e. V.
Any use outside the limits of copyright law is prohibited without the consent of the VGB. This applies to reproductions and all forms of digitization.
Urheberrechtsvermerk
Dieses Werk ist im Sinne des Urheberrecht-gesetzes (UrhG) in seiner jeweils gültigen Fassung geschützt. Das ausschließliche Recht zur Verwertung liegt beim VGB Power-Tech e.V.
Jede Verwertung außerhalb der Grenzen des Urheberrechtsgesetzes ist ohne Zu-stimmung des VGB PowerTech e.V. unzu-lässig. Dies gilt für Vervielfältigungen und jegliche Form der Digitalisierung.
Use of the VGB-Standards
The application of the content of this works is permitted. The content transfer of this works in own works is permitted if this is an auton-omous works. This grant of rights does not include any further waiver of copyright or rights of use.
Anwendung der VGB-Standards
Die Anwendung der Inhalte dieses Stan-dards ist gestattet. Die Überführung von In-halten in eigene Werke ist insofern gestattet, wenn es sich um selbstständige Werke han-delt. Diese Rechteeinräumung beinhaltet keinen weiteren Verzicht auf Urheber- oder Nutzungsrechte.
Disclaimer Haftungsausschluss
VGB-Standards are recommendations, ap-plying them is optional for everyone. They take into account the state of the art prevail-ing at the time of the output, but do not claim to completeness and accuracy. Anyone who uses the standards is exclusively responsible to take care for the correct application. In the case of Applying VGB-Standards no one defies its own responsibility for his own ac-tions, according to the state of the art.
Any liability or guarantee of VGB PowerTech e.V. or those that are directly or indirectly involved in the VGB-Standards is excluded insofar.
VGB-Standards sind Empfehlungen, deren Anwendung jedem freigestellt ist. Sie be-rücksichtigen den zum Zeitpunkt der jeweili-gen Ausgabe herrschenden anerkannten Stand der Technik, sie erheben jedoch kei-nen Anspruch auf Vollständigkeit und Rich-tigkeit. Wer sie anwendet, hat für die richtige Anwendung im konkreten Fall ausschließlich eigenverantwortlich Sorge zu tragen. Durch das Anwenden von VGB-Standards entzieht sich niemand der eigenen Verantwortung für sein eigenes Handeln entsprechend dem Stand der Technik.
Eine Haftung oder Garantie des VGB Power-Tech e.V. oder derjenigen, die an den VGB-Standards direkt oder indirekt beteiligt sind, ist insoweit ausgeschlossen.
RDS-PP® is a registered trademark of VGB PowerTech e.V. RDS-PP® ist eingetragene Marke des VGB PowerTech e.V.
VGB-S-823-41-2018-07-EN-DE
Page 3 of 155
Foreword Vorwort
This RDS-PP®
Application Guideline for Power to Gas plants was prepared by a pro-ject group of the VGB Technical Group “Ref-erence Designation and Plant Documenta-tion”, in close cooperation with experts from manufacturers and operators.
Diese RDS-PP®-
Anwendungsrichtlinie für Power to Gas Anlagen wurde von einer Pro-jektgruppe der VGB-Fachgruppe „Anlagen-kennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betrei-bern erarbeitet.
At the date of publication of this guideline the following companies were members of the Technical Group “Reference Designation and Plant Documentation”:
Zum Zeitpunkt der Veröffentlichung dieser Richtlinie waren in der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentati-on“ folgende Firmen vertreten:
The list makes no claim to distinctiveness and legal unambiguousness of the company names given.
Die aufgelisteten Namen erheben keinen Anspruch auf Unverwechselbarkeit bzw. juristische Eindeutigkeit.
ABB AG Envi Con Engineering GmbH Ingenieurbüro GABO GmbH KRAFTWERKSSCHULE e.V. Lausitz Energie Kraftwerke AG RWE Power AG RWE Technology International GmbH Siemens AG Energy Solution Uniper Technologies GmbH VERBUND Hydro Power GmbH Ørsted A/S* Uniper Kraftwerke GmbH * ESB Electricity Supply Board * ESKOM Technology Group * GE Boiler Deutschland GmbH * *corresponding / korrespondierend
VGB-S-823-41-2018-07-EN-DE
Page 4 of 155
Remarks for Using this Guideline
Hinweise zur Benutzung dieser Richtlinie
Here are some notes for using this guideline: Nachfolgend einige Hinweise zur Benutzung dieser Richtlinie:
The underscore “_” is used in this guideline only as a placeholder for not written data positions.
Der Unterstrich „_“ wird in dieser Richt-linie ausschließlich als Platzhalter für nicht geschriebene Datenstellen ver-wendet.
The underscore shall not be a part of a complete reference designation with the exception of “Conjoint Designation” and in the context of signal names.
Der Unterstrich darf nicht Teil eines vollständigen Referenzkennzeichens sein mit Ausnahme von „Gemeinsame Zuordnung“ und im Zusammenhang mit Signalnamen.
The graphical representations are in-tended to support the understanding of the rules of designation. They are not to be understood as additional determina-tion for the execution of certain docu-ments.
Die grafischen Darstellungen sollen das Verständnis der Kennzeichnungsregeln unterstützen. Sie sind nicht als zusätzli-che Festlegungen zur Ausführung be-stimmter Dokumente zu verstehen.
The figures are based on the rules and symbols of the applicable standards.
Die Bilder orientieren sich an den Re-geln und Symbolen der zutreffenden Normen.
VGB-S-823-41-2018-07-EN-DE
Page 5 of 155
Authors Autorenverzeichnis
The following authors actively participated in the elaboration of this guideline:
An der Erstellung dieser Anwendungs-richtlinie waren folgende Autoren wesentlich beteiligt:
The VGB PowerTech would like to thank all companies and its employees, who partici-pated in the preparation of this guideline for their contribution.
VGB PowerTech dankt allen an der Erstel-lung dieser Anwendungsrichtlinie beteiligten Firmen und den mit der Arbeit beauftragten Mitarbeitern.
Essen, July/Juli 2018
VGB PowerTech e.V.
Name/Name Company/Firma
Andreas Böser VGB PowerTech e.V.
Jachin Gorre HSR Hochschule Rapperswil
Jochen Hantschel Uniper Technologies GmbH
Andreas Menger Ingenieurbüro GABO GmbH
Heinz Müller IB Heinz Müller
Helmut Wank Fa. desdo@a
VGB-S-823-41-2018-07-EN-DE
Page 6 of 155
Table of Contents
Foreword .................................................................................................................... 3
Remarks for Using this Guideline ............................................................................ 4
Authors ...................................................................................................................... 5
Introduction .............................................................................................................. 12
Scope .................................................................................................................... 16 1
Reference to Standards and Guidelines ............................................................ 17 2
Terms, Abbreviations .......................................................................................... 19 33.1 Terms .................................................................................................................... 19 3.2 Abbreviations ....................................................................................................... 22
Designation System RDS-PP ............................................................................. 23 44.1 Basics .................................................................................................................... 23
4.1.1 General ---------------------------------------------------------------------------------------------- 23
4.1.2 Object ------------------------------------------------------------------------------------------------ 23
4.1.3 Aspect ----------------------------------------------------------------------------------------------- 24
4.1.4 Structuring ----------------------------------------------------------------------------------------- 26
4.1.5 Classification -------------------------------------------------------------------------------------- 28
4.1.6 Scope of Designation -------------------------------------------------------------------------- 29
4.1.6.1 General .................................................................................................................. 29
4.1.6.2 Plant Part ............................................................................................................... 30
4.1.6.3 Point of Installation ................................................................................................ 30
4.1.6.4 Site of Installation .................................................................................................. 30
4.1.6.5 Equipment Part ...................................................................................................... 30
4.1.6.6 Delimitation of Plant Part to Equipment Part ......................................................... 31 4.2 Designation Process ............................................................................................ 32 4.3 Designation Structure .......................................................................................... 33
4.3.1 General ---------------------------------------------------------------------------------------------- 33
4.3.2 Prefix ------------------------------------------------------------------------------------------------- 34
4.3.3 Letters and Digits -------------------------------------------------------------------------------- 35
4.3.4 Designation Block ------------------------------------------------------------------------------- 37
Designation Types ............................................................................................... 38 55.1 General .................................................................................................................. 38 5.2 Conjoint Designation “#” .................................................................................... 40 5.3 Function “=” ......................................................................................................... 41
5.3.1 General, Designation Structure ------------------------------------------------------------- 41
5.3.2 Breakdown Level F0 ---------------------------------------------------------------------------- 42
5.3.3 Breakdown Level F1 ---------------------------------------------------------------------------- 42
VGB-S-823-41-2018-07-EN-DE
Page 7 of 155
5.3.4 Breakdown level F2 ----------------------------------------------------------------------------- 43 5.4 Product Class “-” ................................................................................................. 44 5.5 Operating Equipment “= ... –” ............................................................................. 46 5.6 Functional Allocation “==” .................................................................................. 50 5.7 Point of Installation “+” ....................................................................................... 52
5.7.1 General ---------------------------------------------------------------------------------------------- 52
5.7.2 Structure and Application of the Point of Installation Designation ------------- 53 5.8 Site of Installation “++” ....................................................................................... 57
5.8.1 General ---------------------------------------------------------------------------------------------- 57
5.8.2 Structure and Application of the Site of Installation Designation --------------- 58
5.8.3 Application in Buildings ----------------------------------------------------------------------- 60
5.8.4 Application on Areas --------------------------------------------------------------------------- 62 5.9 Signals “;” ............................................................................................................. 63
5.9.1 General ---------------------------------------------------------------------------------------------- 63
5.9.2 Structure and Content of the Signal Designation ------------------------------------- 65
5.9.3 Structure and Content of the Signal Name ---------------------------------------------- 66 5.10 Terminals “:” ........................................................................................................ 71 5.11 Documents “&” .................................................................................................... 72
5.11.1 General ---------------------------------------------------------------------------------------------- 72
5.11.2 Structure and Content of the Document Page Designation ----------------------- 72
5.11.3 The Document Designation ------------------------------------------------------------------ 73
5.11.3.1 Object Designation ................................................................................................ 73
5.11.3.2 Document Kind Classification Code DCC.............................................................. 73 5.12 Cable ..................................................................................................................... 75
Reference designation for Power to Gas Plants ............................................... 77 66.1 Overview ............................................................................................................... 77 6.2 Conjoint Designation ........................................................................................... 79 6.3 Operating Equipment Designation ..................................................................... 80
6.3.1 Overview -------------------------------------------------------------------------------------------- 80
6.3.2 Main Systems ------------------------------------------------------------------------------------- 84
6.3.3 Systems of the Main Process ---------------------------------------------------------------- 85
6.3.4 Electrolysis System =NH ---------------------------------------------------------------------- 87
6.3.4.1 General .................................................................................................................. 87
6.3.4.2 Rectifier System =NHA .......................................................................................... 88
6.3.4.3 Electrolyzer System =NHB .................................................................................... 89
6.3.4.4 H2 Treatment =NHC............................................................................................... 91
6.3.4.5 O2 Treatment =NHE............................................................................................... 94
6.3.4.6 Water Supply System =NHG ................................................................................. 96
6.3.4.7 Heat Dissipation System =NHP ............................................................................. 96
6.3.5 Methanation System =NM --------------------------------------------------------------------- 99
6.3.5.1 General .................................................................................................................. 99
6.3.5.2 Pre-treatment system =NMA ............................................................................... 101
VGB-S-823-41-2018-07-EN-DE
Page 8 of 155
6.3.5.3 Reactor System=NMC ......................................................................................... 103
6.3.5.4 Cooling System =NME ........................................................................................ 105
6.3.5.5 Drying System =NMG .......................................................................................... 111
6.3.5.6 Purification =NMH ................................................................................................ 113
6.3.5.7 Dosage =NML ...................................................................................................... 115
6.3.5.8 Heat Dissipation =NMP ....................................................................................... 115
6.3.5.9 Waste Water System =NMQ .............................................................................. 117
6.3.6 Auxiliary Systems ------------------------------------------------------------------------------ 119
6.3.6.1 Overview .............................................................................................................. 119
6.3.6.2 Electrical Grid and Distribution System =A .......................................................... 120
6.3.6.3 Electrical Auxiliary Power Supply System =B__ .................................................. 122
6.3.6.4 Central Control System =C .................................................................................. 126
6.3.6.5 Fire Alarm System =CKA ..................................................................................... 128
6.3.6.6 Gas Warning System =CKB ................................................................................ 130
6.3.6.7 Distribution System for demineralized water =GHC ............................................ 131
6.3.6.8 Waste Water Drainage System =GM .................................................................. 133
6.3.6.9 Waste Water Treatment Systems =GN ............................................................... 133
6.3.6.10 Cooling Water Piping System =PAB .................................................................... 134
6.3.6.11 Central Control Air Supply =QF ........................................................................... 136
6.3.7 Ancillary Systems ------------------------------------------------------------------------------ 137
6.3.8 Structures and Areas =U --------------------------------------------------------------------- 138
Signal Designation ............................................................................................. 139 7
Document Designation ...................................................................................... 140 8
Annex A Main System ........................................................................................... 141
Annex B Checklist ................................................................................................. 142
Annex C Form for the Submission of new Designations ................................. 144
List of figures ......................................................................................................... 145
List of tables .......................................................................................................... 151
Bibliography ........................................................................................................... 155
VGB-S-823-41-2018-07-EN-DE
Page 9 of 155
Inhaltsverzeichnis
Vorwort ...................................................................................................................... 3
Hinweise zur Benutzung dieser Richtlinie ............................................................... 4
Autorenverzeichnis ................................................................................................... 5
Einleitung ................................................................................................................. 12
Anwendungsbereich ............................................................................................ 16 1
Verweis auf Normen und Richtlinien .................................................................. 17 2
Begriffe, Abkürzungen ......................................................................................... 19 3 Begriffe .................................................................................................................. 19 3.1 Abkürzungen ........................................................................................................ 22 3.2
Kennzeichensystem RDS-PP ............................................................................. 23 4 Grundlagen ........................................................................................................... 23 4.1
4.1.1 Allgemein ------------------------------------------------------------------------------------------- 23
4.1.2 Objekt ------------------------------------------------------------------------------------------------ 23
4.1.3 Aspekt ----------------------------------------------------------------------------------------------- 24
4.1.4 Strukturierung ------------------------------------------------------------------------------------ 26
4.1.5 Klassifizierung ------------------------------------------------------------------------------------ 28
4.1.6 Kennzeichnungsumfang ---------------------------------------------------------------------- 29
4.1.6.1 Allgemein ............................................................................................................... 29
4.1.6.2 Anlagenteil ............................................................................................................. 30
4.1.6.3 Einbauort ............................................................................................................... 30
4.1.6.4 Aufstellungsort ....................................................................................................... 30
4.1.6.5 Ausrüstungsteil ...................................................................................................... 30
4.1.6.6 Abgrenzung von Anlagenteil / zu Ausrüstungsteil ................................................. 31 Kennzeichnungsprozess ..................................................................................... 32 4.2 Kennzeichenaufbau ............................................................................................. 33 4.3
4.3.1 Allgemein ------------------------------------------------------------------------------------------- 33
4.3.2 Vorzeichen ----------------------------------------------------------------------------------------- 34
4.3.3 Buchstaben und Ziffern ----------------------------------------------------------------------- 35
4.3.4 Kennzeichenblock ------------------------------------------------------------------------------- 37
Kennzeichnungsarten .......................................................................................... 38 5 Allgemein .............................................................................................................. 38 5.1 Gemeinsame Zuordnung „#“ .............................................................................. 40 5.2 Funktion „=“ ......................................................................................................... 41 5.3
5.3.1 Allgemein, Kennzeichenaufbau ------------------------------------------------------------- 41
5.3.2 Gliederungsstufe F0 ---------------------------------------------------------------------------- 42
5.3.3 Gliederungsstufe F1 ---------------------------------------------------------------------------- 42
5.3.4 Gliederungsstufe F2 ---------------------------------------------------------------------------- 43
VGB-S-823-41-2018-07-EN-DE
Page 10 of 155
Produktklasse „-“ ................................................................................................. 44 5.4 Betriebsmittel „= ... –“ ......................................................................................... 46 5.5 Funktionale Zuordnung „==“ .............................................................................. 50 5.6 Einbauort „+“ ........................................................................................................ 52 5.7
5.7.1 Allgemein ------------------------------------------------------------------------------------------- 52
5.7.2 Aufbau und Anwendung des Einbauortkennzeichens ------------------------------ 53 Aufstellungsort „++“ ............................................................................................ 57 5.8
5.8.1 Allgemein ------------------------------------------------------------------------------------------- 57
5.8.2 Aufbau und Anwendung des Aufstellungsortkennzeichens ---------------------- 58
5.8.3 Anwendung in Gebäuden --------------------------------------------------------------------- 60
5.8.4 Anwendung auf Flächen ---------------------------------------------------------------------- 62 Signale „;“ ............................................................................................................. 63 5.9
5.9.1 Allgemein ------------------------------------------------------------------------------------------- 63
5.9.2 Aufbau und Inhalt des Signalkennzeichens -------------------------------------------- 65
5.9.3 Aufbau und Inhalt des Signalnamens ---------------------------------------------------- 66 Anschlüsse „:“ ..................................................................................................... 71 5.10 Dokumente „&“ .................................................................................................... 72 5.11
5.11.1 Allgemein ------------------------------------------------------------------------------------------- 72
5.11.2 Aufbau und Inhalt des Dokumentenseitenkennzeichens -------------------------- 72
5.11.3 Das Dokumentenkennzeichen --------------------------------------------------------------- 73
5.11.3.1 Objektkennzeichen ................................................................................................ 73
5.11.3.2 Dokumentenart-Klassenschlüssel DCC ................................................................. 73 Kabel ..................................................................................................................... 75 5.12
Referenzkennzeichnung für Power to Gas Anlagen ......................................... 77 6 Übersicht ............................................................................................................... 77 6.1 Gemeinsame Zuordnung ..................................................................................... 79 6.2 Betriebsmittelkennzeichen .................................................................................. 80 6.3
6.3.1 Übersicht ------------------------------------------------------------------------------------------- 80
6.3.2 Hauptsysteme ------------------------------------------------------------------------------------- 84
6.3.3 Systeme des Hauptprozesses --------------------------------------------------------------- 85
6.3.4 Elektrolyse System =NH ----------------------------------------------------------------------- 87
6.3.4.1 Allgemein ............................................................................................................... 87
6.3.4.2 Gleichrichtersystem =NHA .................................................................................... 88
6.3.4.3 Elektrolyseursystem =NHB .................................................................................... 89
6.3.4.4 H2 Behandlung =NHC ............................................................................................ 91
6.3.4.5 O2 Behandlung =NHE ............................................................................................ 94
6.3.4.6 Wasserversorgungssystem =NHG ........................................................................ 96
6.3.4.7 Wärmeabfuhrsystem =NHP ................................................................................... 96
6.3.5 Methanisierungssystem =NM ---------------------------------------------------------------- 99
6.3.5.1 Allgemein ............................................................................................................... 99
6.3.5.2 Vorbehandlung =NMA ......................................................................................... 101
VGB-S-823-41-2018-07-EN-DE
Page 11 of 155
6.3.5.3 Reaktorsystem =NMC ......................................................................................... 103
6.3.5.4 Kühlsystem =NME ............................................................................................... 105
6.3.5.5 Trocknungssystem =NMG ................................................................................... 111
6.3.5.6 Veredelung =NMH ............................................................................................... 113
6.3.5.7 Dosierung =NML .................................................................................................. 115
6.3.5.8 Wärmeabführung =NMP ...................................................................................... 115
6.3.5.9 Abwassersystem =NMQ ...................................................................................... 117
6.3.6 Hilfssysteme -------------------------------------------------------------------------------------- 119
6.3.6.1 Übersicht ............................................................................................................. 119
6.3.6.2 Elektrisches Netz- und Verteilungssystem =A ..................................................... 120
6.3.6.3 Elektrisches Eigenbedarfssystem =B__ .............................................................. 122
6.3.6.4 Zentrales Leitsystem =C ...................................................................................... 126
6.3.6.5 Brandmeldesystem =CKA ................................................................................... 128
6.3.6.6 Gaswarnsystem =CKB ........................................................................................ 130
6.3.6.7 Verteilungssystem für vollentsalztes Wasser =GHC ........................................... 131
6.3.6.8 Sammel- und Ableitungssysteme für Betriebsabwasser =GM ............................ 133
6.3.6.9 Aufbereitung von Betriebsabwasser =GN ........................................................... 133
6.3.6.10 Kühlwasserleitungssystem =PAB ........................................................................ 134
6.3.6.11 Zentrale Steuerluftversorgung =QF ..................................................................... 136
6.3.7 Nebensysteme ----------------------------------------------------------------------------------- 137
6.3.8 Bauwerke und Flächen =U ------------------------------------------------------------------- 138
Signalkennzeichen ............................................................................................. 139 7
Dokumentenkennzeichen .................................................................................. 140 8
Anhang A Hauptsystem ........................................................................................ 141
Anhang B Checkliste ............................................................................................. 142
Anhang C Antragsformular zur Aufnahme weiterer Kennzeichen .................. 144
Abbildungsverzeichnis ......................................................................................... 148
Tabellenverzeichnis .............................................................................................. 153
Literaturhinweise ................................................................................................... 155
VGB-S-823-41-2018-07-EN-DE
Page 12 of 155
Introduction Einleitung
For efficient project planning, development, construction, operation and maintenance of any industrial plant, it is helpful to structure the respective plant and assign clear and unambiguous alphanumeric codes to all as-semblies and components. A good designa-tion system reflects closely the structure of the plant and the interaction of its individual parts.
Für eine effiziente Abwicklung der Aufgaben von Planung, Entwicklung, Bau, Betrieb und Instandhaltung einer industriellen Anlage, ist es hilfreich, die Anlage zu gliedern und die einzelnen Anlagenteile klar und eindeutig mit einem alphanumerischen Kennzeichen zu versehen. Eine gute Kennzeichensystematik bildet die Struktur der Anlage und das Zu-sammenwirken ihrer einzelnen Teile genau ab.
The designation supports, among others, an economic engineering of the plant as well as a cost-optimized procurement because parts with similar requirements can be identified much easier and early on. For operation and maintenance (O&M) a clear designation serves as an unambiguous address for O&M management systems.
Die Kennzeichnung unterstützt damit unter anderem ein wirtschaftliches Engineering der Anlage sowie eine kostenoptimierte Beschaf-fung, indem Anlagenteile mit vergleichbaren Anforderungen leicht und frühzeitig identifi-ziert werden können. Für Betrieb und In-standhaltung dient diese Kennzeichnung auch als eindeutige Adresse in Betriebsfüh-rungs- und Instandhaltungssystemen.
Some international standards for the desig-nation of industrial plants and its documenta-tion exist already, in particular the series of ISO/IEC 81346. The designation system called “Reference Designation System (RDS)” bases on these standards and can generally be applied to all industrial plants.
Zur Kennzeichnung von Industrieanlagen und ihrer Dokumentation gibt es internatio-nale Normen, vor allem die DIN/EN-Reihe 81346. Das auf diesen Grundnormen basierende Kennzeichnungskonzept wird „Reference Designation System (RDS)“ ge-nannt. Es ist prinzipiell für alle Industrieanla-gen anwendbar.
For power plants, the sector specific stand-ard ISO/TS 81346-10 was developed and constitutes the normative basis for the “Ref-erence Designation System for Power Plants” RDS-PP
®.
Für den Kraftwerksbereich wurde in Einklang mit den Grundnormen die Fachnorm DIN ISO/TS 81346-10 veröffentlicht. Sie ist die normative Grundlage für das RDS-PP
®,
das „Reference Designation System for Power Plants“.
This sector specific standard covers the ap-plication for all engineering disciplines and for all types of plants of the energy supply sector.
Diese Fachnorm deckt die Anwendung für alle Fachbereiche und alle Typen von Anla-gen der Energieversorgung ab.
VGB-S-823-41-2018-07-EN-DE
Page 13 of 155
To reach a praxis-oriented solution of the RDS-PP the VGB Technical Group “Refer-ence Designation and Plant Documentation” published the following documents as an addition to the mentioned standards:
Für eine praxisgerechte Anwendung der Grundnormen hat die VGB-Fachgruppe „An-lagenkennzeichnung und Dokumentation“ die folgenden Dokumente ergänzt:
The guidelines VGB-S821-00 (VGB-B 101e) “RDS-PP Letter Codes for Power Plant Systems” and VGB-B 102 “RDS-PP Letter Codes for Basic Functions and Product Classes” provide the code letters for all essential power plant sys-tems and components.
Die Richtlinien VGB-S-821-00 (VGB-B 101) „RDS-PP Kennbuchstaben für Kraftwerkssysteme“ und VGB-B 102 „RDS-PP Kennbuchstaben für Grund-funktionen und Produktklassen“ stellen für alle wesentlichen Systeme und Komponenten von Kraftwerken identifi-zierende Kennbuchstaben zur Verfü-gung.
The application guideline series VGB-S-823 covers the rules to implement the basic standards for the power plant in-dustry correctly and illustrates them with practical examples. This guideline series always consists of a general part, that is valid for all power plant types and power plant specific parts.
Die Anwendungsrichtlinienreihe VGB-S-823 regelt die sachgerechte Umset-zung der allgemeinen Kennzeich-nungsnormen für die Kraftwerksbran-che und verdeutlicht sie mit praxisbe-zogenen Beispielen. Diese Richtlinien-reihe besteht aus einem allgemeinen Teil, der für alle Kraftwerksarten gilt, sowie aus kraftwerkstypspezifischen Teilen.
The interrelations between the above men-tioned standards and guidelines are illustrat-ed in Figure 1.
Die Zusammenhänge dieser Normen und Richtlinien sind in Bild 1 dargestellt.
VGB-S-823-41-2018-07-EN-DE
Page 14 of 155
Figure 1 – Interrelation between designation standards and guidelines
Bild 1 – Zusammenhänge der Kennzeichnungsnormen und -richtlinien
Basic Standards
Grundnormen
IEC 81346-1 DIN EN 81346-1 Structuring principles and reference designations Basic rules
Strukturierungsprinzipien und Referenzkennzeichen Allgemeine Regeln
ISO/TS 81346-3 DIN ISO/TS 81346-3 Application rules for a Reference designation system
Anwendungsregeln für ein Referenzkennzeichen-system
IEC 81346-2 DIN EN 81346-2 Classification of objects and codes for classes
Klassifizierung von Objek-ten und Kennbuchstaben für Klassen
VGB S-821-00 (former / früher VGB-B 101e/VGB-B 101)
RDS-PP Letter Codes for Power Plant Systems
RDS-PP Kennbuchstaben für Kraftwerkssysteme
VGB-B 102
RDS-PP Letter Codes for Basic Functions and Product Classes
RDS-PP Kennbuchstaben für Grundfunktionen und Produktklassen
Application Guideline Anwendungs-richtlinie
Guidelines letter code
Richtlinien Kennbuchsta-ben
ISO/TS 81346-10 / DIN ISO/TS 81346-10
Reference designation system Part 10: Power plants
Referenzkennzeichensystem Teil 10: Kraftwerke
Sector specific Standard
Fachnorm
IEC 81346 series DIN EN 81346 Reihe
Industrial systems, installations and equipment and industrial products
Industrielle Systeme, Anlagen und Ausrüstungen und Industrieprodukte
VGB-S-823 RDS-PP
Basics / Grundlagen
- 01 Power Plants General / Kraftwerke allgemein
VGB-S-823 RDS-PP
Power plant type specific parts / Kraftwerkstyp spezifische Teile
- 31 Hydro Power Plants / Wasserkraftwerke /
- 32 Wind Power Plants / Windkraftwerke
- 33 Photovoltaic Power Plants / Photovoltaische Kraftwerke
VGB-S-823 RDS-PP
Energy Storage Systems / Energiespeichersysteme
- 41 Power to Gas / Power to Gas
VGB-S-823-41-2018-07-EN-DE
Page 15 of 155
This document covers the rules of the RDS-PP designation system for the Power to Gas plants.
Das vorliegende Dokument regelt die An-wendung des Kennzeichensystems RDS-PP für Power to Gas Anlagen.
This guideline provides detailed specifi-cations for the reference designation of plant parts that are specific to Power to Gas plants (e.g. Electrolyzer, Methanation system).
Die Richtlinie enthält detaillierte Festlegun-gen zur Referenzkennzeichnung für Anla-genteile, die spezifisch für eine Power to Gas Anlage sind (z.B. Elektrolyseur, Metha-nisierungssystem).
For the designation of plant parts that vary from project to project, the guideline provides general guidance illustrated by examples, which has to be applied correspondingly to the specific case. This applies in particular to auxiliary and ancillary systems.
Für Anlagenteile, die projektspezifisch variie-ren, gibt die Richtlinie prinzipielle Anleitun-gen mit Beispielen, die im konkreten Anwen-dungsfall sinngemäß umzusetzen sind. Dies gilt insbesondere für Hilfs- und Nebensyste-me.
Part 1 of the RDS-PP Application Guidelines, Power Plants, General (VGB-S-823-01) ap-plies to Power to Gas plant objects not cov-ered by this guideline.
Für Objekte einer Power to Gas Anlage die nicht in dieser Richtlinie behandelt werden, gilt Teil 1 der RDS-PP Anwendungsrichtlinie, Kraftwerke Allgemein (VGB-S-823-01).
The document is structured as follows:
Clause 1 defines the scope for this appli-cation guide.
Das Dokument ist wie folgt gegliedert:
In Abschnitt 1 wird der Anwendungs-bereich dieser Richtlinie definiert.
Clause 2 lists all standards and guidelines which are mentioned in this document.
In Abschnitt 2 sind alle Normen und Richtlinien, die in diesem Dokument ge-nannt werden, aufgeführt.
Clause 3 defines the terms, abbreviation and symbols used in this document.
In Abschnitt 3 werden die Begriffe, Abkür-zungen und Symbole, die in diesem Do-kument verwandt werden, erläutert.
Clause 4 describes the basics of the Ref-erence Designation System for Power Plants. The associated terms are ex-plained in greater detail.
In Abschnitt 4 werden die Grundlagen des Kennzeichnungssystems RDS-PP be-schrieben und die damit verbundenen Begriffe näher erläutert.
Clause 5 describes the designation types with their designation blocks.
In Abschnitt 5 werden die Kennzeich-nungsarten mit ihren Kennzeichenblöcken beschrieben.
From Clause 6 the provisions for the Power to Gas plants are described and il-lustrated with practical examples.
Ab Abschnitt 6 werden die Festlegungen für eine Power to Gas Anlage beschrie-ben und mit praxisnahen Beispielen ver-deutlicht.
VGB-S-831-00-2015-05-EN
VGB-Standard
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units(formerly VGB-R 171e)
VGB-Standard
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units VGB-S-831-00-2015-05-EN (Former VGB-R 171e)
Publisher: VGB PowerTech e.V. Publishing house: VGB PowerTech Service GmbH Verlag technisch-wissenschaftlicher Schriften Deilbachtal 173, 45257 Essen Tel.: +49 201 8128-200 Fax: +49 201 8128-302 E-mail: [email protected] ISBN 978-3-86875-885-6 (Print) ISBN 978-3-86875-886-3 (eBook)
All rights reserved.
www.vgb.org
VGB-S-831-00-2015-05-EN
4
Foreword
The provision of an energy supply unit its plant sections and their individual compo-nents in the context of projects and under the scope of individual orders entails the supply of the documentation required for operation and maintenance.
This is necessary to ensure safe and efficient operation of the energy supply unit and equipment.
Although projects very clearly describe the scope of a supply of energy supply unit and equipment, when it comes to the documentation often substantial differences exist be-tween the employer's expectations and the contractor´s actual deliveries.
This is partly due to the documentation structure not being laid down in advance, a lack of definition of the documentation scope of supply, and the wide variety of terms used when describing documentation.
The purpose of this Guideline is to establish a framework for the
● documentation contents (requirements for documents and data),
● documentation structure and form,
● designation of documents,
● assignment of documents to reference designations (KKS, RDS-PP®1)),
● delivery periods, handing over and taking over procedures, and
● plant labelling.
With the revised edition of the VGB-Standard VGB-S-831-00 (Former VGB-R 171e) created in 2010 the above mentioned requirements were met. The experience gained in its application however revealed a need to further detail the stipulations and explicit-ly integrate the topic of provision of technical plant data as an increasingly prioritized part of the documentation.
The classification of the technical plant data follows mainly international standards. Further standardization is being driven in cooperation with eCl@ss.
The requirements of civil engineering have been considered in agreement with the Central Federation of the German Construction Industry (Hauptverband der Bauindus-trie) and the VGB Civil Engineering Working Panel.
1 RDS-PP® is a registered trademark of VGB PowerTech e.V.
VGB-S-831-00-2015-05-EN
5
The specific demands of the wind industry for their energy supply units have been in-tegrated into the present edition.
A Project Group of the Working Panel on “Reference Designation and Plant Documen-tation”, comprising representatives of operators and manufacturers, has set out the necessary stipulations.
Essen, May 2015
VGB PowerTech e. V.
VGB-S-831-00-2015-05-EN
6
The members of the Working Panel include the following companies: ABB AG
Alstom Power GmbH
DONG Energy A/S
Eletrobras Eletronuclear
E.ON Technologies GmbH
EnBW Energie Baden-Württemberg AG
Envi Con & Plant Engineering GmbH
ESKOM Technology Group
EWEX-ENGINEERING GmbH & Co KG
ingenieurbüro gabo gmbH
Kraftwerksschule e.V.
RWE Power AG
RWE Technology International GmbH
Siemens AG
Vattenfall Europe Generation AG
VERBUND Hydro Power GmbH
VGB PowerTech e. V.
The continuous maintenance of this VGB-Standard is within the responsibility of the VGB Technical Group “Reference Designation and Plant Documentation“. The VGB Office will be pleased to receive any comments or suggestions.
Essen, May 2015 VGB PowerTech e. V.
VGB-S-831-00-2015-05-EN
8
Table of Contents
Foreword ................................................................................................................... 4
1 Scope .......................................................................................................12
1.1 Introduction ...............................................................................................12 1.2 Area of application and responsibilities .....................................................12
2 Reference to standards and guidelines ................................................13
3 Definition of terms and abbreviations ...................................................15
4 Project documentation ...........................................................................23
4.1 Integration in the life cycle of energy supply units .....................................23 4.2 Structure of the project documentation .....................................................24 4.3 Partial documentations of the project documentation ...............................25
4.3.1 Project management documentation ........................................................25
4.3.2 Approval documentation ...........................................................................25
4.3.3 Technical documentation (including technical plant data) .........................26
4.3.4 Operational documentation .......................................................................26
5 Technical documentation (including technical plant data) .................27
5.1 Structure of the technical documentation ..................................................27 5.2 Partial documentations of the technical documentation ............................27
5.2.1 Accompanying documentation ..................................................................27
5.2.2 Handover documentation ..........................................................................27
5.2.2.1 Overview ...................................................................................................27
5.2.2.2 Operating manuals for the overall plant, systems and plant sections .......28
5.2.2.3 Implementation documentation .................................................................30
5.2.2.4 Quality certificate documentation ..............................................................30
5.2.3 Documentation for delivered spare parts ..................................................31
VGB-S-831-00-2015-05-EN
9
5.3 Documentation contents and relationships ............................................... 32
5.3.1 Overview ................................................................................................... 32
5.3.2 Document/data requirements ................................................................... 32
5.3.3 Granularity of documentation .................................................................... 34
5.3.4 Assignment of contents, documents and objects to each other ................ 34
5.3.5 Level of detail of the plant in the context of reference designation ........... 37
5.4 Form, designation and properties of documents ....................................... 38
5.4.1 Document layout ....................................................................................... 38
5.4.2 Designation of documents ........................................................................ 38
5.4.3 Document properties (metadata) .............................................................. 38
5.4.4 Plant labelling ........................................................................................... 41
6 Phases of preparation and handover of the technical documentation42
6.1 Overview ................................................................................................... 42 6.2 Accompanying documentation .................................................................. 43 6.3 Handover documentation .......................................................................... 44
6.3.1 Handover – Preliminary documentation .................................................... 44
6.3.2 Handover – Documents with redlines (as-built) ........................................ 44
6.3.3 Handover – Final documentation .............................................................. 46
6.4 Form of handover ..................................................................................... 46 6.5 Acceptance of the handover documentation ............................................. 48 6.6 Overview table of handover dates and formats, and review period for
acceptance ............................................................................................... 49
7 Bibliography ............................................................................................ 51
8 List of Tables........................................................................................... 52
9 List of Figures ......................................................................................... 53
VGB-S-831-00-2015-05-EN
10
List of Appendices
Appendix A: Information Requirements Lists
Spreadsheet A.1 (Annex): Information Requirements List for Accom-panying Documentation
Spreadsheet A.2 (Annex): Information Requirements List for Systems Spreadsheet A.3 (Annex): Information Requirements List for Equip-
ment Spreadsheet A.4 (Annex): Information Requirements List for Tech-
nical Plant Data (Excel and PDF files include Appendix B.1 to B.4)
Appendix B: Technical Plant Data Spreadsheet B.1 (Annex): Data to be exchanged between employer
and contractor during project execution (accompanying data) Spreadsheet B.2 (Annex): Data for operation and continuous mainte-
nance of an energy supply unit (plant data for operation) Spreadsheet B.3 (Annex): Data for corrective maintenance of an en-
ergy supply unit and efficient materials management (plant data for corrective maintenance / materials management) – option
Spreadsheet B.4 (Annex): Data, which can be exchanged between the project partners, e.g. general planner and main employer, during project execution, depending on the respective business case (engi-neering data) – option
Spreadsheet B.5 (Annex): Example data sets for Technical plant data (MS Excel)
Appendix C: Quality Certificate Documentation Appendix D: Stipulations for Content, Structure and Layout of Operating Manuals for
Overall Plant, Systems/Plant Sections Appendix E: Plant Labelling Appendix F: Checklist of project specific documentation stipulations Appendix G: Documentation Civil Engineering Appendix H: Documentation Requirements for Wind Power Plants
Spreadsheet H.1 (Annex): Information Requirements List for Accom-panying Documentation for Wind power plant projects
Spreadsheet H.2 (Annex): Information Requirements List for Systems of a Wind Power Plant
Spreadsheet H.3 (Annex): Information Requirements List for Equip-ment of a Wind Power Plant
VGB-S-831-00-2015-05-EN
11
Appendix I: Data Medium
Information Requirements Lists in editable format (MS Excel) o Spreadsheet A.1: IRL Accompanying Documentation o Spreadsheet A.2: IRL Systems o Spreadsheet A.3: IRL Equipment o Spreadsheet A.4: IRL Technical Plant Data o Spreadsheet H.1: IRL Accompanying Documentation Wind o Spreadsheet H.2: IRL Systems Wind o Spreadsheet H.3: IRL Product Classes Wind
Information Requirements Lists in PDF format Example data sets for Technical Plant Data (Excel) Annex B.5 XML schema file for Technical Plant Data according spreadsheet A.4
and document metadata according table 2 Classification data base for XML schema file (MS Access 2003)
VGB-S-831-00-2015-05-EN
12
1 Scope
1.1 Introduction
This Guideline applies to the entire technical documentation (technical plant data and documents) which is necessary in the performance of projects, e.g. in planning, erec-tion and commissioning to ensure future operation and maintenance, taking account of the type of energy supply unit concerned.
The specific requirements of civil engineering have been considered in more detail. The assignment of generally used document kinds in civil engineering with their civil engineering specific terms to the document kind classification code (DCC) and the par-tial documentations defined in this standard is shown in Appendix G. Likewise, the special demands of the wind industry for their energy supply unit were integrated, refer to Appendix H.
This Guideline establishes a basis for ensuring that the documentation to be supplied is complete and up to date, and thus leads to cost savings for all contractual parties.
The Guideline contains the minimum requirements to be fulfilled, and sets out the op-tional arrangements to be made by the contracting parties when an order is placed. The stipulations of this standard and its Appendices are then to be applied by the em-ployer and agreement has to be reached with the contractors with regard to the op-tional arrangements to be made (please refer to the checklist in Appendix F).
The stipulations in this Guideline and its Appendices must be observed. They have to be expressed in precise form before the contract is concluded, and should then consti-tute an integral part of the supply contracts.
The language of the documentation to be supplied has to be stipulated before the con-tract is concluded.
1.2 Area of application and responsibilities
This Guideline and its Appendices have to be used when ordering an energy supply unit, plant sections and their individual components (parts and equipment), and ser-vices. They regulate the provision of the documentation necessary for planning, erec-tion, commissioning, operation, maintenance and dismantling.
The relevant legal and official regulations applicable at the site have to be applied in conjunction with the technical rules and standards.
The contractor shall bear responsibility for compliance with the stipulations in this Guideline and its Appendices, and shall pass on the obligation to comply with those stipulations to subcontractors in its orders placed with them. Consequently, corre-sponding contractual agreements on the basis of this Guideline and its Appendices are necessary.
VGB-S-831-00-2015-05-DE
VGB-Standard
Lieferung der Technischen Dokumentation (Technische Anlagendaten, Dokumente) für Anlagen der Energieversorgung(vormals VGB-R 171)
VGB-Standard
Lieferung der Technischen Dokumentation (Technische Anlagendaten, Dokumente) für Anlagen der Energieversorgung
VGB-S-831-00-2015-05-DE
(vormals VGB-R-171)
Herausgeber:
VGB PowerTech e.V.
Verlag:
VGB PowerTech Service GmbH
Verlag technisch-wissenschaftlicher Schriften
Deilbachtal 173, 45257 Essen
Tel.: +49 201 8128-200
Fax: +49 201 8128-302
E-Mail: [email protected]
ISBN 978-3-86875-865-8 (Print)
ISBN 978-3-86875-866-5 (eBook)
Jegliche Wiedergabe ist nur mit vorheriger Genehmigung des VGB PowerTech gestattet.
www.vgb.org
VGB-S-831-00-2015-05-DE
5
Vorwort
Mit der Lieferung von Anlagen der Energieversorgung, deren Teilanlagen und deren einzelnen Ausrüstungen (Bauteile) im Rahmen von Projekten und bei Einzelaufträgen ist auch die Lieferung der für die Betriebsführung und Instandhaltung erforderlichen Dokumentation verknüpft.
Diese ist erforderlich, um einen sicheren und wirtschaftlichen Betrieb der Energiever-sorgungsanlagen zu gewährleisten.
Während der Lieferumfang der Energieversorgungsanlagen bei Projekten präzise be-schrieben ist, bestehen hinsichtlich der zu liefernden Dokumentation oft erhebliche Unterschiede zwischen den Erwartungen der Auftraggeber und den tatsächlichen Lie-ferungen der Auftragnehmer.
Dies liegt zum Teil an nicht vorgeschriebenen Dokumentationsstrukturen, an den nicht festgelegten Lieferumfängen der Dokumentation und des Weiteren an der Begriffsviel-falt bei der Beschreibung der Dokumentationen.
Zweck dieses VGB-Standards ist die Festlegung eines Rahmens für:
● Dokumentationsinhalte (Bedarf an Dokumenten und Daten)
● Dokumentationsstruktur und -form
● Kennzeichnung von Dokumenten
● Zuordnung von Dokumenten zu Referenzkennzeichen (KKS, RDS-PP® 1))
● Lieferfristen, Übergabe- und Übernahmeprozedur
● Anlagenbeschilderung.
Mit der überarbeiteten Fassung des VGB-Standards VGB-S-831-00 (vormals VGB-R 171) aus dem Jahre 2010 wurde den oben genannten Forderungen entsprochen. Die Erfahrungen bei der Anwendung verlangten jedoch eine weitere Präzisierung der Vor-gaben und die explizite Integration des Themas der Lieferung von Technischen Anla-gendaten als zunehmend bevorzugten Gegenstand der Dokumentation.
Die Klassifizierung der Technischen Anlagendaten erfolgt weitgehend entsprechend internationalen Normen, wobei eine weitere Standardisierung in Zusammenarbeit mit eCl@ss e. V. vorgenommen wird.
Die Belange der Bautechnik wurden in Absprache mit dem Hauptverband der Bau-industrie e. V. und dem VGB-Fachausschuss „Bautechnik“ berücksichtigt.
Die speziellen Anforderungen der Windenergie für ihre Energieversorgungsanlagen sind in die vorliegende Fassung eingeflossen.
1) RDS-PP® ist eingetragene Marke des VGB PowerTech e.V.
VGB-S-831-00-2015-05-DE
6
Eine Projektgruppe der Fachgruppe „Anlagenkennzeichnung und Dokumentation“, die sich aus Betreibern und Herstellern zusammensetzt, hat die erforderlichen Vorgaben definiert.
Essen, im Mai 2015
VGB PowerTech e. V.
VGB-S-831-00-2015-05-DE
9
Inhaltsverzeichnis
1 Geltungsbereich ..................................................................................... 13
1.1 Einleitung .................................................................................................. 13 1.2 Anwendungsbereich und Zuständigkeiten ................................................ 13
2 Normative Verweise ................................................................................ 14
3 Begriffsdefinitionen und Abkürzungen ................................................ 17
4 Projektdokumentation ............................................................................ 27
4.1 Einordnung in den Lebenszyklus von Anlagen der Energieversorgung .... 27 4.2 Struktur der Projektdokumentation ........................................................... 28 4.3 Teildokumentation der Projektdokumentation ........................................... 29
4.3.1 Projektmanagementdokumentation .......................................................... 29
4.3.2 Genehmigungsdokumentation .................................................................. 29
4.3.3 Technische Dokumentation (inklusive Technischer Anlagendaten) .......... 30
4.3.4 Betriebsdokumentation ............................................................................. 30
5 Technische Dokumentation (inklusive Technischer Anlagendaten) .. 31
5.1 Struktur der Technische Dokumentation ................................................... 31 5.2 Teildokumentation der Technischen Dokumentation ................................ 31
5.2.1 Begleitdokumentation ............................................................................... 31
5.2.2 Übergabedokumentation .......................................................................... 31
5.2.2.1 Überblick ................................................................................................... 31
5.2.2.2 Betriebsanleitungen für Gesamtanlage, Systeme/Teilanlagen ................. 32
5.2.2.3 Ausführungsdokumentation ...................................................................... 34
5.2.2.4 Qualitätsnachweisdokumentation ............................................................. 34
5.2.3 Dokumentation für gelieferte Ersatzteile ................................................... 35
5.3 Dokumentationsinhalte/Zuordnung ........................................................... 36
VGB-S-831-00-2015-05-DE
10
5.3.1 Überblick ...................................................................................................36
5.3.2 Dokumenten-/Datenbedarf ........................................................................36
5.3.3 Granularität von Dokumenten ...................................................................38
5.3.4 Zuordnung von Inhalten, Dokumenten und Objekten zueinander .............39
5.3.5 Detaillierungsgrad der Anlage hinsichtlich Referenzkennzeichnung .........41
5.4 Form, Kennzeichnung und Merkmale von Dokumenten ...........................42
5.4.1 Dokumentengestaltung .............................................................................42
5.4.2 Dokumentenkennzeichnung .....................................................................42
5.4.3 Dokumentenmerkmale (Metadaten) .........................................................42
5.4.4 Anlagenbeschilderung ..............................................................................45
6 Erarbeitung und Übergabe der Technischen Dokumentation in den Projektphasen .........................................................................................46
6.1 Überblick ...................................................................................................46 6.2 Begleitdokumentation ...............................................................................47 6.3 Übergabedokumentation ...........................................................................47
6.3.1 Übergabe – vorläufige Dokumentation......................................................48
6.3.2 Übergabe – Dokumente mit Roteinträgen (As-built-Stand) .......................48
6.3.3 Übergabe – endgültige Dokumentation.....................................................49
6.4 Art der Übergabe ......................................................................................50 6.5 Abnahme der Übergabedokumentation ....................................................52 6.6 Tabellarische Übersicht der Übergabezeitpunkte/-formate, Prüfzeitraum
Abnahme ..................................................................................................54
7 Literatur ...................................................................................................55
8 Tabellen ...................................................................................................57
9 Bilder ........................................................................................................58
VGB-S-831-00-2015-05-DE
11
Verzeichnis der Anhänge
Anhang A: Informationsbedarfslisten
Tabelle A.1 (Anlage): Informationsbedarf für Begleitdokumentation Tabelle A.2 (Anlage): Informationsbedarf für Systeme Tabelle A.3 (Anlage): Informationsbedarf für Ausrüstungen (Bauteile) Tabelle A.4 (Anlage): Informationsbedarf für Technische Anlagen-
daten
Anhang B: Technische Anlagendaten Tabelle B.1 (Anlage): Daten, die zwischen Auftraggeber und Auftrag-
nehmer während der Projektabwicklung ausgetauscht werden (Be-gleitdaten)
Tabelle B.2 (Anlage): Daten für Betrieb und laufende Instandhaltung der Energieversorgungsanlage (Anlagendaten für Betrieb)
Tabelle B.3 (Anlage): Daten für Instandsetzung der Energieversor-gungsanlage und effiziente Materialwirtschaft (Anlagendaten für In-standsetzung/Materialwirtschaft) – Option
Tabelle B.4 (Anlage): Daten, die abhängig vom jeweiligen Geschäfts-fall während der Projektabwicklung zwischen Projektpartnern, z. B. Gesamtplaner und Hauptauftragnehmer, ausgetauscht werden kön-nen (Engineeringdaten) – Option
Tabellen Anlage B.5: Beispieldateien für Technische Anlagendaten (MS Excel)
Anhang C: Qualitätsnachweisdokumentation Anhang D: Regelungen zu Inhalt, Struktur und Gestaltung von Betriebsanleitungen
für Gesamtanlage, Systeme/Teilanlagen Anhang E: Anlagenbeschilderung Anhang F: Checkliste projektspezifischer Festlegungen zur Dokumentation Anhang G: Dokumentation Bautechnik Anhang H: Dokumentationsanforderungen für Windkraftwerke
Tabelle H.1 (Anlage): IBL Begleitdokumentation für Windkraftwerks-projekte
Tabelle H.2 (Anlage): IBL Systeme und Grundfunktionen eines Wind-kraftwerks
Tabelle H.3 (Anlage): IBL Produktklassen für Windkraftwerksprojekte
VGB-S-831-00-2015-05-DE
12
Anhang I: Datenträger (Anlage) mit
Informationsbedarfslisten in bearbeitbarem Format (MS Excel) o Tabelle A.1: IBL Begleitdokumentation o Tabelle A.2: IBL Systeme o Tabelle A.3: IBL Ausrüstungen (Bauteile) o Tabelle A.4: IBL Technische Anlagendaten o Tabelle H.1: IBL Begleitdokumentation Wind o Tabelle H.2: IBL Systeme Wind o Tabelle H.3: IBL Produktklassen Wind
Informationsbedarfslisten im Format PDF Beispieldateien für Technische Anlagendaten (MS Excel)
Anlage: B.5 Anlage I.1: XML-Schemafile für Technische Anlagendaten gemäß
Tabelle A.4 und Dokumentenmetadaten gemäß Tabelle 2 Anlage I.2: Klassifizierungsdatenbank für XML-Schemafile (MS Ac-
cess 2003)
VGB-S-831-00-2015-05-DE
13
1 Geltungsbereich
1.1 Einleitung
Dieser VGB-Standard gilt für die gesamte Technische Dokumentation (Technische Anla-gendaten, Dokumente), die bei der Abwicklung von Projekten (Planung, Errichtung und Inbetriebsetzung) erforderlich ist, um den künftigen Betrieb und die Instandhaltung sicher-zustellen, wobei die jeweilige Art der Energieversorgungsanlage zu berücksichtigen ist.
Die spezifischen Belange der Bautechnik wurden detaillierter berücksichtigt. Die Zu-ordnung der in der Bautechnik üblichen Dokumentenarten mit ihren bauspezifischen Bezeichnungen zum Dokumentarten-Klassenschlüssel (DCC) und den in diesem VGB-Standard verwendeten Teildokumentationen wird im Anhang G dargestellt. Ebenso konnten die speziellen Anforderungen der Windenergie für ihre Energiever-sorgungsanlagen Berücksichtigung finden, siehe Anhang H.
Dieser VGB-Standard schafft die Voraussetzung für Vollständigkeit und Aktualität der zu liefernden Dokumentation und führt damit zu Kosteneinsparungen für alle Vertragspartner.
Der VGB-Standard enthält die einzuhaltenden Mindestvorgaben und definiert die Frei-räume, die im Auftragsfall von den Vertragspartnern auszufüllen sind. Dabei sind Fest-legungen dieses VGB-Standards und der hierzu gehörenden Anhänge vom Auftrag-geber projektspezifisch umzusetzen und mit den Auftragnehmern hinsichtlich der Aus-füllung der Freiräume abzustimmen (Checkliste siehe Anhang F).
Die in diesem VGB-Standard getroffenen Festlegungen einschließlich der dazugehö-renden Anhänge sind einzuhalten. Sie sind vor Vertragsabschluss zu präzisieren und sollten Bestandteil der Lieferverträge sein.
Die Sprache in der zu liefernden Dokumentation ist vor Abschluss des Vertrages fest-zulegen.
1.2 Anwendungsbereich und Zuständigkeiten
Der vorliegende VGB-Standard mit den dazugehörenden Anhängen ist anzuwenden bei der Bestellung von Energieversorgungsanlagen, -teilanlagen und deren Ausrüstungen (Bauteilen) sowie Dienstleistungen. Er regelt die Lieferung der für Planung, Errichtung, Inbetriebsetzung, Betrieb, Instandhaltung und Rückbau erforderlichen Dokumentation.
Anzuwenden sind die am Standort geltenden einschlägigen gesetzlichen und behörd-lichen Vorschriften in Verbindung mit den Technischen Regeln und Normen.
Für die Einhaltung der in diesem VGB-Standard und den dazugehörenden Anhängen getroffenen Festlegungen ist der Auftragnehmer zuständig. Der Auftragnehmer hat eingeschaltete Unterlieferanten zur Einhaltung dieser Festlegungen im Rahmen seiner Bestellung zu verpflichten. Aus diesem Grunde sind entsprechende vertragliche Ver-einbarungen auf der Basis dieses VGB-Standards und ihrer Anhänge erforderlich.
VGB-S-891-00-2012-06-DE-EN
VGB-Standard
VGB-Abkürzungskatalog für die KraftwerkstechnikVGB abbreviation catalogue for power plant technology(vormals/formerly VGB-B 107)
VGB-Standard VGB-Abkürzungskatalog für die Kraftwerkstechnik VGB abbreviation-catalogue for power plant technology VGB-S-891-00-2012-06-DE-EN (Vormals / Formerly VGB-B 107)
Herausgegeben vom / Published by VGB PowerTech e.V.
Zu beziehen bei / Obtainable at: VGB PowerTech Service GmbH Verlag technisch-wissenschaftlicher Schriften Postfach 10 39 32, 45039 Essen Tel. / Phone +49 201 8128-200 Fax +49 201 8128-329 E-Mail: [email protected] ISBN 978-3-86875-227-4 (Print)ISBN 978-3-86875-789-7 (eBook)
Jegliche Wiedergabe ist nur mit vorheriger Genehmigung des VGB gestattet. Any reproduction only allowed with prior permission by VGB. www.vgb.org
ISBN 978-3-86875-796-5 (eBook + Excel®-Datei/Excel® file)
VGB-S-891-00-2012-06-DE-EN
5
Vorwort Preamble
Diese Richtlinie wurde vom VGB-Arbeitskreis „Anlagenkennzeichnung und Dokumentation“ erarbeitet, in dem Betreiber und Instandhalter sowie Pla-ner und Hersteller von Kraftwerken gemeinsam tätig sind. Zu den Aufga-ben dieses Arbeitskreises gehören u. a. die Erstellung und Pflege von fach-bezogenen und kraftwerkstypspezifi-schen Richtlinien sowie der Kenn-buchstaben für Kraftwerkssysteme. Für die laufende Pflege dieser Richtlinie ist der VGB-Arbeitskreis „Anlagenkenn-zeichnung und Dokumentation“ zu-ständig.
This guideline was prepared by the VGB Working Panel "Reference Des-ignation and Plant Documentation“, which is attended by power plant oper-ators and maintenance contractors as well as designers and suppliers of power plants. The tasks of this working panel include the preparation and maintenance of discipline-specific and power plant type-specific guidelines as well as the letter codes for power plant systems (system key). The VGB Work-ing Panel "Reference Designation and Plant Documentation" is responsible for updating this guideline on an ongo-ing basis.
Mit dieser 4. Ausgabe wurde die bisher nur in deutscher Sprache vorliegende VGB-Richtlinie redaktionell vollständig überarbeitet und in die englische Spra-che übertragen. Für die Anwendung von Abkürzungen im englischen Sprachraum wurden entsprechende Abkürzungsregeln benutzt, die teilwei-se von den deutschen Festlegungen abweichen.
This 4th issue is editorial amended and translated from German into English. For the application of abbreviations in English-speaking countries, corre-sponding abbreviations rules have been used. These are partly different from the German rules.
Zur Neuaufnahme von Abkürzungen steht im Anhang dieser Richtlinie und auf der Web-Seite des VGB ein For-mular zur Verfügung.
To submit new abbreviations, please use the form in the appendix of this guideline, or the form which can be found on the VGB web page.
VGB-S-891-00-2012-06-DE-EN
8
Einleitung Introduction
In der Kraftwerkstechnik ist es erfor-derlich, innerhalb verfahrenstechni-scher Abläufe sowohl Aggregate und Ausrüstungen als auch Anlagenteile, Funktionen und Zustände zu beschrei-ben.
In power plant technology there is a need to describe systems, equipment, components, functions and conditions within process engineering operational sequence.
Diese Beschreibungen werden ver-wendet zur:
― Erstellung der Planungsunterlagen und der Technischen Dokumentati-on,
― Projektierung der leittechnischen Automatisierung,
― Erstellung der Anlagen- und Be-dienbilder (Wartenbeschriftungen) sowie
― Erstellung der Anlagenbeschilderungen
und stellen die Grundlage für die Anla-genbetriebsführung und -instandhaltung dar.
These descriptions are used for
― Technical documentation and draw-ings,
― Graphic displays (e.g. control room interface displays for operators and engineers),
― Maintenance management systems and documentation,
― Labelling of plant equipment
and are the base for operation and maintenance of the power plants utili-ties.
Mit Beginn der verfahrenstechnischen Planung (Erarbeitung der R&I-Schemata) wird eine Liste der Syste-me und Teilsysteme erstellt. Diese Lis-te ist die Grundlage einheitlicher Be-griffe bei der Benennung der zu kenn-zeichnenden Objekte.
With the beginning of process engi-neering (development of P&ID) a list of systems and subsystems should be created. This list is the basis for unique terms when objects are designated.
Unter anderem für diesen Zweck wur-den die VGB-Richtlinien zur „Bildung von Benennungen und deren Anwen-dung in der Kraftwerkstechnik“ (VGB-B 108) sowie der „VGB-Abkürzungskatalog für die Kraftwerks-technik“ (VGB-S-891-00) erstellt.
For this purpose the VGB guidelines ”Creation of designations and their ap-plication for power plant technology” (VGB-B 108) and “VGB abbreviation catalogue for power plant technology” (VGB-S-891-00) have been created amongst other things.
VGB-S-891-00-2012-06-DE-EN
9
Ziel des vorliegenden VGB-Abkürzungskatalogs VGB-S-891-00 ist es die Systematik zur Bildung von Ab-kürzungen zu regeln. Durch Fest-schreibung von Abkürzungen für kraft-werkstechnische Begriffe wird den Planern, Errichtern und Betreibern von Kraftwerksanlagen eine verbindliche Arbeitsgrundlage zur Verfügung ge-stellt.
The objective of this VGB abbreviation catalogue VGB-S-891-00 is to regulate the systematic creation of abbrevia-tions. This determination of abbrevia-tions for terms related to power plants provides a common basis for the plan-ners, erectors and operators of power plant facilities.
Bei der Festlegung der Abkürzungen hatte deren Rückentschlüsselbarkeit und Eindeutigkeit oberste Priorität. Die Abkürzungen wurden dabei so kurz wie möglich gehalten.
The ability to decode abbreviations without ambiguity takes top priority in the determination of abbreviations. Therefore the abbreviations have been designed to be as short as possible.
Bei der Erstellung der Richtlinie wur-den sowohl bereits vorhandene Abkür-zungskataloge als auch die Belange der Betreiber und Hersteller weitestge-hend berücksichtigt.
Existing abbreviation catalogues as well as the interests of operators and producers have been considered for the creation of this guideline.
Bereits fest eingeführte und gängige Kurzformen wurden unverändert über-nommen.
Presently established and common short-form terms have been assumed unmodified.
Damit dieser Abkürzungskatalog auch international verwendet werden kann, wurde er bewusst zweisprachig (Deutsch und Englisch) aufgebaut.
This abbreviation catalogue has been designed in bilingual format (German and English) for international applica-tion.
Projektspezifisch notwendige Abkür-zungen, die nicht in der Abkürzungslis-te enthalten sind, bedürfen der Festle-gung zwischen den Projektbeteiligten unter Einhaltung der Abkürzungsre-geln.
Project-specific essential abbreviations which are not included in the abbrevia-tion list require special determinations between the project partners in com-pliance with the abbreviation rules.
Bei projektübergreifender Bedeutung von Ergänzungen (z.B. neue Kraft-werkstechnologien) sind diese dem Maintenance Team „Abkürzungskata-log“ des VGB-Arbeitskreises „Anlagen-kennzeichnung und Dokumentation“ zwecks Aufnahme in den Katalog mit-zuteilen.
Users of this guideline might have suggestions concerning additions (e. g. from the field of new power plant tech-nologies) which could have signifi-cance to other projects. Such sugges-tions should be submitted to the maintenance team “Abbreviation cata-logue” of the VGB working panel "Ref-erence designation and plant docu-mentation" for the inclusion in this catalogue.
VGB-S-891-00-2012-06-DE-EN
10
Inhalt
1 Anwendungsbereich .................................................................................. 12
2 Normative Verweisungen ........................................................................... 13
3 Definitionen ................................................................................................. 14
4 Abkürzungsregeln ...................................................................................... 15
5 Abkürzungslisten ........................................................................................ 21 5.1 Übersicht ...................................................................................................... 21 5.2 alphabetisch sortiert nach Langformen deutsch ........................................... 23 5.3 alphabetisch sortiert nach Langformen englisch ......................................... 263 5.4 alphabetisch sortiert nach Kurzformen deutsch .......................................... 513 5.5 alphabetisch sortiert nach Kurzformen englisch ......................................... 742
Anhang
A Antrag zur Aufnahme weiterer Abkürzungen ......................................... 977
VGB-S-891-00-2012-06-DE-EN
11
Table of contents
1 Scope ........................................................................................................... 12
2 Normative references ................................................................................. 13
3 Definitions ................................................................................................... 14
4 Abbreviation rules ...................................................................................... 15
5 Abbreviation lists ........................................................................................ 21 5.1 Overview ....................................................................................................... 21 5.2 alphabetical ordered by long-form term German .......................................... 23 5.3 alphabetical ordered by long-form term English ......................................... 263 5.4 alphabetical ordered by short-form term German ....................................... 513 5.5 alphabetical ordered by short-form term English ........................................ 742
Appendix
A Form for the submission of new abbreviations ..................................... 977
VGB-S-891-00-2012-06-DE-EN
12
1 Anwendungsbereich 1 Scope
Diese Richtlinie ist anzuwenden bei der Bildung von Abkürzungen für kraftwerkstechnische Begriffe im deutsch- und englischsprachigen Raum. Sie wurde erstellt für Planer, Errichter und Betreiber für alle Arten von Kraftwerksanlagen und gilt sowohl für die Projektierung als auch für den Betrieb. Sie gewährleistet jedoch nicht die vollständige Rückentschlüsselbarkeit von Abkür-zungen.
This guideline is applicable for the creation of abbreviations for terms related to power plants in German- and English-speaking countries. It was de-signed for planners, erectors and op-erators of all types of power plant facili-ties and applies to project development and operation. But it does not ensure the complete decoding of every abbre-viation.
SI-Einheiten sind in diesem Katalog nicht enthalten.
This catalogue does not include meas-urement units.
Der VGB-Abkürzungskatalog VGB-S-891-00 ist auch die Basis für die Bil-dung der jeweiligen Kurzform von Be-nennungen nach VGB-B 108, falls die entsprechende Benennung in ihrer Langform aufgrund einer Begrenzung nicht verwendet werden kann.
VGB-S-891-00 also forms the basis for creating short-form terms in accord-ance with guideline VGB B 108 if the long-form terms cannot be used be-cause of text length limitations.
VGB-S-891-00-2012-06-DE-EN
13
2 Normative Verweisungen
2 Normative references
DIN 2340:2009-04
Kurzformen für Benennungen und Namen
DIN 2340:2009-04
Short forms for terms and names
DIN EN ISO 7200:2004-05
Technische Produktdokumentation - Datenfelder in Schriftfeldern und Do-kumentenstammdaten
EN ISO 7200:2004-02
Technical product documentation - Da-ta fields in title blocks and document headers
ISO 80000
Größen und Einheiten
ISO 80000
Quantities and units
VGB-B 108:2010-12
Regeln zur Bildung von Benennungen und deren Anwendung in der Kraft-werkstechnik
VGB-B 108:2010-12
Rules for the creation of denomina-tions and their application for power plant engineering
VGB-B 108 d/e
VGB-Richtlinie/GuidelineRegeln zur Bildung von Benennungen und deren Anwendung in der KraftwerkstechnikRules for the creation of denominations and their application for power plant engineering3. Ausgabe 2010 (Deutsch/Englisch) 3rd Edition 2010 (German/English)
www.vgb.org
© Jegliche Wiedergabe ist nur mit vorheriger Genehmigung des VGB PowerTech gestattet.
Richtlinie/Guideline
Herausgeber VGB PowerTech e.V.
Verlag VGB PowerTech Service GmbH Verlag technisch-wissenschaftlicher Schriften Postfach 10 39 32, 45039 Essen Tel.: +49 201 8128-200 Fax: +49 201 8128-302 E-Mail: [email protected]
ISBN 978-3-86875-228-1 (Print) ISBN 978-3-86875-443-8 (eBook)
VGB-B 108 (Deutsch/Englisch | German/English)
Regeln zur Bildung von Benennungen und deren Anwendung in der KraftwerkstechnikRules for the creation of denominations and their application for power plant engineering
3B108 : 2010-12
Vorwort
Diese Richtlinie wurde vom VGB-Arbeitskreis „Anlagenkennzeichnung und Dokumentation“ erarbeitet, in dem Betreiber und Instandhalter sowie Planer und Hersteller von Kraftwerken gemeinsam tätig sind. Zu den Aufgaben dieses Arbeitskreises gehören u. a. die Erstellung und Pflege von fachbezogenen und kraftwerkstypspezifischen Richtlinien sowie der Kennbuchstaben für Kraftwerkssysteme. Für die laufende Pflege dieser Richtlinie ist ein Kompetenzteam dieses VGB-Arbeitskreises zuständig. Mit dieser 3. Ausgabe wurde die bisher nur in deutscher Sprache vorliegende VGB-Richtlinie redaktionell vollständig überarbeitet und in die englische Sprache übertragen. Für die Bildung von Benennungen im englischen Sprachraum wurden entsprechende Regeln benutzt, die teilweise von den deutschen Festlegungen abweichen. Zur Erfassung von Vorschlägen und Anregungen zur Bildung von Benennungen kann ein formloser Antrag an die VGB-Geschäftsstelle gestellt werden. Die dafür notwendigen Informationen sowie die Kontaktadresse stehen im Anhang dieser Richtlinie. Zu den Mitgliedern des Arbeitskreises gehören folgende Unternehmen: ABB ALSTOM Power AREVA NP E.ON New Build & Technology EnBW Kraftwerke Endress+Hauser Messtechnik Evonik Power Saar GABO IDM mbH iXiT Engineering Technology KRAFTWERKSSCHULE E.V PASYS RWE Power Siemens Energy Sector Vattenfall Europe Generation VERBUND Hydro Power VGB-Geschäftsstelle Der VGB dankt allen an der Erstellung dieser Richtlinie beteiligten Unternehmen und den mit der Arbeit beauftragten Mitarbeitern.
Essen, im Dezember 2010 VGB PowerTech e. V. ISBN 978-3-86875-228-1
Haftungsausschluss
VGB-Richtlinien und VGB-Merkblätter sind Empfehlungen, die jedermann frei zur Anwendung stehen. Wer sie anwendet, hat für die richtige Anwendung im konkreten Fall Sorge zu tragen.
Sie berücksichtigen den zum Zeitpunkt der jeweiligen Ausgabe herrschenden Stand der Technik. Durch das Anwenden von VGB-Richtlinien oder VGB-Merkblättern entzieht sich niemand der Verantwortung für sein eigenes Handeln. Jeder handelt insoweit auf eigene Gefahr. Eine Haftung oder Garantie des VGB PowerTech und derjenigen, die an den VGB-Richtlinien oder VGB-Merkblättern beteiligt sind, ist ausgeschlossen.
4 B108 : 2010-12
Foreword
This guideline was prepared by the VGB Working Panel "Reference Designation and Plant Documentation“, which is attended by power plant operators and maintenance contractors as well as designers and suppliers of power plants. The tasks of this Working Panel include the preparation and maintenance of discipline-specific and power plant type-specific guidelines as well as the letter codes for power plant systems (system key). A competence team of this VGB Working Panel is responsible for updating this guideline on an ongoing basis. This 3rd edition is editorially amended and translated from German to English. For the creation of denominations in English-speaking countries, corresponding rules have been used. These are partly different from the German rules. The intake of new suggestions concerning the creation of designations should be addressed to the VGB. The necessary details and contact information can be found in the appendix of this guideline Members of the working panel are the following companies: ABB ALSTOM Power AREVA NP E.ON New Build & Technology EnBW Kraftwerke Endress+Hauser Messtechnik Evonik Power Saar GABO IDM mbH iXiT Engineering Technology KRAFTWERKSSCHULE E.V. PASYS RWE Power Siemens Energy Sector Vattenfall Europe Generation VERBUND Hydro Power VGB-Geschäftsstelle The VGB thanks all companies and its employees, who participated in the creation of this guideline. Essen, December 2010 VGB PowerTech e.V. ISBN 978-3-86875-228-1 Exclusion of Liability
VGB Guidelines and VGB Instruction Sheets are recommendations which are available for unrestricted use. Responsibility for their correct application in individual cases however rests with the persons using them. VGB Guidelines and VGB Instruction Sheets reflect the state of the art in good engineering practice at the time of their publication. Their use does not in any way relieve users of any risks or the responsibility for their own actions. VGB PowerTech and the parties involved in the compilation of VGB Guidelines and VGB Instruction Sheets issue no warranties and accept no liability whatsoever.
5B108 : 2010-12
Inhalt
1 Geltungsbereich ................................................................................................ 7
1.1 Einleitung ........................................................................................................... 7
1.2 Anwendungsbereich ......................................................................................... 8
2 Normative Verweisungen.................................................................................. 9
3 Definitionen ........................................................................................................ 9
4 Regeln zur Bildung von Benennungen.......................................................... 10
Anhang
A Beispiele für Benennungen aus der Maschinen- und Verfahrenstechnik .. 13
B Beispiele für Benennungen aus der Elektro- und Leittechnik ..................... 24
C Beispiel für Benennungen aus der Bautechnik ............................................ 34
D Antrag zur Aufnahme weiterer Beispiele ....................................................... 35
6 B108 : 2010-12
Content
1 Scope.................................................................................................................. 7
1.1 Introduction........................................................................................................ 7
1.2 Field of application ............................................................................................ 8
2 Normative references ........................................................................................ 9
3 Definition ............................................................................................................ 9
4 Rules for the creation of designations .......................................................... 10
Appendix
A Examples of designations for mechanical and process engineering........... 13
B Examples of designations for electrical and I&C engineering ...................... 24
C Example of designations for civil engineering ............................................... 34
D Form for the submission of additional suggestions .................................... 35
7B108 : 2010-12
1 Geltungsbereich 1 Scope
1.1 Einleitung 1.1 Introduction
In der Kraftwerkstechnik ist es erforderlich, innerhalb verfahrenstechnischer Abläufe sowohl Aggregate und Ausrüstungen als auch Anlagenteile, Funktionen und Zustände zu beschreiben. Diese Beschreibungen werden verwendet zur: Erstellung der Planungsunterlagen und
der Technischen Dokumentation, Projektierung der leittechnischen
Automatisierung, Erstellung der Anlagen- und Bedienbilder
sowie Erstellung der Anlagenbeschilderungen und stellen die Grundlage für die Anlagenbetriebsführung und -instandhaltung dar. Mit Beginn der verfahrenstechnischen Planung (Erarbeitung der R&I-Schemata) wird eine Liste der Systeme und Teilsysteme erstellt. Diese Liste ist die Grundlage einheitlicher Begriffe bei der Benennung der zu kennzeichnenden Objekte. Unter anderem wurden für diesen Zweck die VGB-Richtlinien zur „Regeln zur Bildung von Benennungen und deren Anwendung in der Kraftwerkstechnik“ (VGB-B 108) sowie der „VGB-Abkürzungskatalog für die Kraftwerkstechnik“ (VGB-B 107) erstellt. Zweck dieser VGB-Richtlinie B 108 ist es, Planern, Errichtern und Betreibern von Kraftwerksanlagen die Möglichkeit zu geben, Anlagenteile, deren Funktionen, physikalische Größen und Zustände einheitlich sowie verfahrenstechnisch verständlich zu benennen. Damit diese Richtlinie auch international verwendet werden kann, wurde sie bewusst zweisprachig (Deutsch und Englisch) aufgebaut. Die Darstellung der Kennzeichen (KKS und RDS-PP) in den Beispielen dient lediglich zur Erläuterung der Benennung. Regeln für Darstellung und Inhalt sind aus den Beispielen nicht abzuleiten.
In power plant technology there is a need to describe systems, equipment, components, functions and conditions within process engineering operational sequence. These descriptions are used for: Technical documentation and drawings, Engineering automation Graphic displays (e.g. control room
interface displays for operators and engineers),
Labelling of plant equipment
and are the base for operation and maintenance of the power plants utilities. With the beginning of process engineering (development of P&ID) a list of systems and subsystems should be created. This list is the basis for unique terms when objects are designated. For this purpose the VGB guidelines ”Rules for the creation of designations and their application for power plant engineering” (VGB-B 108) and “VGB abbreviation catalogue for power plant technology” (VGB-B 107) have been created amongst other things. The objective of this VGB guideline B 108 is to give planners, erectors and operators of power plant facilities the possibility to identify the plant components, functions, physical quantities and conditions in a uniform and process-related comprehensive way. This guideline has been consciously designed bilingual (German and English) for its international application. The representation of the designation (KKS and RDS-PP) of the examples supports merely the understanding of the denomination. Rules for the application in regard of depiction and content should not be derived from the examples.
8 B108 : 2010-12
Bei projektübergreifender Bedeutung von Beispielen zur Bildung von Benennungen (z.B. aus dem Bereich neue Kraftwerkstechnologien) können diese dem Kompetenzteam „Bildung von Benennungen“ des VGB-Arbeitskreises „Anlagenkennzeichnung und Dokumentation“ zwecks Aufnahme in den Katalog mitgeteilt werden. Der VGB-Arbeitskreis „Anlagenkennzeichnung und Dokumentation“ entscheidet dann über eine eventuelle Anpassung dieser Richtlinie.
Users of this guideline might have suggestions concerning the creation of denominations (e. g. from the field of new power plant technologies) which could have significance to other projects. Such suggestions should be submitted to the competence team “creation of denominations” of the VGB working panel "Plant reference designation and documentation" for the update of this catalogue. The VGB working panel "Plant reference designation and documentation" will decide about further amendments of this guideline.
1.2 Anwendungsbereich 1.2 Field of application
Diese Richtlinie ist anzuwenden bei der Bildung von Benennungen im Bereich der Kraftwerkstechnik im deutschsprachigen und internationalen Raum. Sie wurde erstellt für Planer, Errichter und Betreiber für alle Arten von Kraftwerksanlagen und gilt sowohl für die Projektierung als auch für den Betrieb. Benennungen finden Anwendung z. B. in:
Messstellenlisten
Armaturenlisten
E-Verbraucherlisten
Signallisten
Meldelisten
Warten- und Leitstandsanzeigen
Anlagenbeschilderung
Funktionsplänen
Anlagendaten
This guideline is applicable for the creation of denominations related to power plants in German- and English-speaking countries. It was designed for planners, erectors and operators of all types of power plant facilities and applies to project development and operation. Denominations are applied in e.g.:
Measurement lists
Fitting lists
Electrical consumer lists
Signal lists
Detection lists
Control room displays
Plant labelling,
Continuous function charts
Plant data
9B108 : 2010-12
2 Normative Verweisungen 2 Normative references
DIN 2330:1993-12 Begriffe und Benennungen; Allgemeine Grundsätze
DIN 2330:1993-12 Concepts and terms; general principles
DIN 2340:2009-04 Kurzformen für Benennungen und Namen
DIN 2340:2009-04 Short forms for terms and names
DIN 2342-1:1992-10 Begriffe der Terminologielehre; Grundbegriffe (Stimmt in modifizierter Form mit ISO 1087-1 überein.)
ISO 1087-1:2000-10 Terminology work - Vocabulary - Part 1: Theory and application (DIN 2342-1 modified)
DIN 2344:2000-05 Ausarbeitung und Gestaltung von terminologischen Festlegungen in Normen (Stimmt in modifizierter Form mit ISO 10241 überein.)
ISO 10241:1992-12 International terminology standards; preparation and layout (DIN 2344 modified)
DIN EN 62424 * VDE 0810-24:2010-01 Darstellung von Aufgaben der Prozessleittechnik - Fließbilder und Datenaustausch zwischen EDV-Werkzeugen zur Fließbilderstellung und CAE-Systemen
IEC 62424:2008-08 Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools
ISO 704:2009-11 Terminologiearbeit - Grundsätze und Methoden
ISO 704:2009-11 Terminology work - Principles and methods
VGB-B 107: 2011 (in Überarbeitung) VGB-Abkürzungskatalog aus dem Bereich der Kraftwerkstechnik
VGB-B 107: 2011 (in revision) VGB abbreviation catalogue for power plant technology
3 Definitionen 3 Definitions
Benennung Eine Benennung ist die begriffliche Umsetzung der Bedeutungsinhalte eines Objekt-Kenn-zeichens.
Designation A designation is the distinguishing name of an object designations meaning.
Kurzform (Abkürzung) Die Kurzform ist die gekürzte Darstellung einer Langform eines Begriffes.
Short-form term (Abbreviation) The short-form term is the abbreviated version of a long-form term.
Langform Die Langform ist die ungekürzte Darstellung eines Begriffes unter Verwendung von Buchstaben, Zahlen und festgelegten Sonderzeichen. Eine Langform kann einteilig oder mehrteilig (Wortzusammensetzung) sein.
Long-form term The long-form term is the unabbreviated version of a term using letters, numbers and defined special characters. A long-form term may consist of one or more parts (composition of words).
VGB PowerTech e.V.Deilbachtal 17345257 Essen | Germany | 2019
Tel: +49 201 8128 – 200Fax: +49 201 8128 – 302www.vgb.org | [email protected]
Tel. +49 201 8128-200 | Fax +49 201 8128-3023
Wichtiger Hinweis: Jegliche Form der weiteren Nutzung, z.B. in Publikationen oder digitalen Systemen, bedarf einer separaten Lizenzvereinbarung mit VGB PowerTech. Kontakt und Rückfragen an [email protected].
Important notice: Any further use, e.g. in publications or digital systems, requires a separate license agreement with VGB PowerTech. Please contact us at [email protected].
Urheberrechtshinweis
© Alle Rechte vorbehalten!
Publikationen von VGB PowerTech sind urheberrechtlich geschützt.Jede Verwertung außerhalb der engen Grenzen des Urheberrechtes ist ohne Zustimmung der Verlages unzulässig.
VGB PowerTech Service GmbHDeilbachtal 17345257 Essen
Copyright notice
© All rights reserved!
No part of VGB publications may be reproduced or transmitted in any form or by any means, electronic or mechanical photocopying, recording or any information storage or retrieval system without the express prior written consent of the publisher.
VGB PowerTech Service GmbHDeilbachtal 17345257 EssenGermany
The subscription for e-books is free for Ordinary* VGB-Members
www.vgb.org/vgbvs4om
*Operators &Plant Owners
1
! !!
! ! !
1
! !!
! ! !
Tel. +49 201 8128-200 | Fax +49 201 8128-30228
RDS-PP Key System / RDS-PP Schlüsselverwaltung VGB PowerTech Catalogue | Medienverzeichnis I l 2019
RDS-PP® Key System / Schlüsselverwaltung Das vollständige aktuelle RDS-PP® umfasst das Basisregelwerk VGB-S-821-00-2016-06-DE, VGB-S-823-01-2015-09-EN-DE, VGB-B 102 d/e und VGB-S-832-00-2016-04-DE-EN sowie typspezifische VGB-Standards der Reihe VGB-S-823; empfohlen werden der VGB-B 108 d/e, VGB-S-831-00-2015-05-DE und VGB-S-891-00-2012-06-DE-EN.The complete current RDS-PP® covers the basic VGB-Standards VGB-S-821-00-2016-06-EN, VGB-S-823-01-2015-09-EN-DE, VGB-B 102 d/e and VGB-S-832-00-2016-04-DE-EN as well as technology-specific VGB-Standards of the series VGB-S-823; the VGB-B 108 d/e, VGB-S-831-00-2015-05-EN and VGB-S-891-00-2012-06-DE-EN are recommended.Informationen zur Lizenzierung der Anwendung (Tabellen): E-Mail an [email protected] Information concerning the licensing of the application (tables): e-mail request to [email protected]
Ref. Ordering Number/
Bestell-Kennz.
Titel / Title Prices/Preise (net/netto)*Titles with “e” or “EN“ in the ordering reference number are available in English.
Titel mit dem Bestellkennzeichen „e“ oder „EN“ sind in Englisch lieferbar.ISBN Print
ISBN eBook*VGB-Member VGB-Mitglied
Non-Member Nichtmitglied
RDS-PP®-Basisregelwerk | RDS-PP® Basic-Standards
VGB-S-821-00-2016-06-DE RDS-PP Kennbuchstaben für Kraftwerkssysteme (Systemschlüssel). 4. überarb. Aufl., 636 S., 2016Der VGB-Standard VGB-S-821-00-2016-06-DE ersetzt die Publikation VGB-B 101.
978-3-86875-943-3 978-3-86875-944-0
335,00 335,00
470,00 470,00
RDS-PP-BASIS-EXCEL-DE (Microsoft Excel®)
RDS-PP® Systemschlüssel (VGB-S-821-00-2016-06-DE), Kennbuchstaben für Grundfunktionen und Produktklassen (VGB-B 102 d/e) Microsoft Excel®-Datei, 2016
978-3-96284-065-5 1.950,00 2.950,00
VGB-S-821-00-2016-06-EN RDS-PP® Letter Code for Power Plant Systems (System key). 4th Edition, 636 p., 2016The VGB-Standard VGB-S-821-00-2016-06-EN replaces the VGB-B 101e.
978-3-86875-945-7 978-3-86875-946-4
335,00 335,00
470,00 470,00
RDS-PP-BASIS-EXCEL-EN (Microsoft Excel®)
RDS-PP® System key (VGB-S-821-00-2016-06-EN), Letter Codes for Basic Functions and Product Classes (VGB-B 102 d/e) Microsoft Excel® file, 2016
978-3-96284-066-2 1.950,00 2.950,00
VGB-B 102 d/e RDS-PP® – Referenzkennzeichensystem für Kraftwerke, Kennbuchstaben für Grundfunktionen und Produktklassen / Reference Designation System for Power Plants, Letter Codes for Basic Functions and Product Classes, 270 p./270 S., 2010
978-3-86875-352-3 978-3-86875-425-4
200,00 230,00
300,00 350,00
VGB-S-823-01-2015-09-EN-DE RDS-PP® – Application Guideline, Part 01: Power Plants, General; Anwen-dungsrichtlinie, Teil 01: Kraftwerke, Allgemein, 390 p./S., 2015
978-3-86875-845-0 978-3-86875-846-7
290,00 290,00
400,00 400,00
VGB-S-832-00-2016-04-DE-EN Dokumentenkennzeichen für Anlagen der Energieversorgung Designation codes for document kind classification code (DCC key), 198 S./p., 2016
978-3-86875-930-3 978-3-86875-931-0
300,00 300,00
450,00 450,00
Typspezifische RDS-PP®-Standards | Type-specific RDS-PP®-Standards
VGB-S-823-31-2014-12-EN-DE RDS-PP® – Application Guideline, Part 31: Hydro Power Plants; Anwen-dungsrichtlinie, Teil 31: Wasserkraftwerke, 221 p./S., 2014
978-3-86875-388-2 978-3-86875-389-9
295,00 295,00
425,00 425,00
VGB-S-823-32-2014-03-EN-DE RDS-PP® – Application Guideline; Part 32: Wind Power Plants; Anwendungsrichtlinie, Teil 32: Windkraftwerke, 314 p./S., 2014 Hinweis: Der VGB-S-823-32-2014-03-EN-DE ersetzt die Publikation VGB-B 116 D2. Remark: The VGB-S-823-32-2014-03-EN-DE replaces the publication VGB-B 116 D2e.
978-3-86875-693-7 978-3-86875-744-6
280,00 280,00
375,00 375,00
RDS-PP® – Application Guideline; Part 32: Wind Power Plants; Anwen-dungsrichtlinie, Teil 32: Windkraftwerke, 314 p./S., 2014, Einzelplatz (Grundwerk Kombi: Print und eBook, Annex 3 und 4: PDF)
978-3-86875-768-2 395,00 525,00
RDS-PP® – Application Guideline; Part 32: Wind Power Plants; Anwen-dungsrichtlinie, Teil 32: Windkraftwerke, 314 p./S., 2014 Einzelplatz (Basispaket Kombi: Print und eBook, Annex 3 und 4: Excel®)
978-3-86875-771-2 530,00 800,00
VGB-S-823-33-2018-07-EN-DE RDS-PP® – Application Guideline; Part 33: Photovoltaic Power Plants; Anwendungsrichtlinie, Teil 33: Photovoltaische Kraftwerke, 150 p./S., 2018
978-3-96284-069-3 978-3-96284-070-9
280,00 280,00
420,00 420,00
VGB-S-823-41-2018-07-EN-DE RDS-PP® – Application Guideline; Part 41: Power to Gas; Anwendungsrichtlinie, Teil 41: Power to Gas, 160 p./S., 2018
978-3-96284-071-6 978-3-96284-072-3
280,00 280,00
420,00 420,00
E-mail: [email protected] | Shop: www.vgb.org 29
VGB PowerTech Catalogue | Medienverzeichnis I l 2019 RDS-PP Key System / RDS-PP Schlüsselverwaltung
Ref. Ordering Number/
Bestell-Kennz.
Titel / Title Prices/Preise (net/netto)*Titles with “e” or “EN“ in the ordering reference number are available in English.
Titel mit dem Bestellkennzeichen „e“ oder „EN“ sind in Englisch lieferbar.ISBN Print
ISBN eBook*VGB-Member VGB-Mitglied
Non-Member Nichtmitglied
Zusätzlich empfohlen | Additionally recommended
VGB-B 108 d/e Richtlinie Regeln zur Bildung von Benennungen und deren Anwendung in der Kraftwerkstechnik/Guideline Rules for the creation of denominations and their application for power plant engineering, 2010
978-3-86875-228-1 978-3-86875-443-8
60,00 70,00
90,00 100,00
VGB-S-831-00-2015-05-DE Lieferung der Technischen Dokumentation (Technische Anlagendaten, Dokumente) für Anlagen der Energieversorgung
978-3-86875-865-8 978-3-86875-866-5
420,00 420,00
630,00 630,00
VGB-S-831-00-2015-05-EN Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units
978-3-86875-885-6 978-3-86875-886-3
420,00 420,00
630,00 630,00
VGB-S-891-00-2012-06-DE-EN VGB-Abkürzungskatalog für die Kraftwerkstechnik/ VGB abbreviation-catalogue for power plant technology, 2012
978-3-86875-227-4 978-3-86875-789-7
200,00 200,00
285,00 285,00
VGB-Abkürzungskatalog für die Kraftwerkstechnik/ VGB abbreviation-catalogue for power plant technology, 2012, mit Excel®-Datei Abkürzungsliste/Abbreviation list enclosed as Excel® file
978-3-86875-796-5 350,00 495,00
Zurückgezogen/überarbeitet | Withdrawn/Revised
VGB-B 101 Referenzkennzeichensystem für Kraftwerke RDS-PP® Kennbuchstaben für Kraftwerkssysteme (Systemschlüssel), Ringordner, 644 S., 2011Hinweis: Der VGB-Standard VGB-S-821-00-2016-06-DE ersetzt die Publikation VGB-B 101. Für bestehende Anwendungen verbleibt die VGB-B 101 im Lieferangebot.Hinweis: Das vollständige RDS-PP® (alt) umfasst die Publikationen VGB-B 101 und VGB-B 102 d/e; zusätzlich empfohlen werden VGB-S-891-00-2012-06-DE-EN und VGB-B 108 d/e.
978-3-86875-436-0 310,00 470,00
VGB-B 101e Reference Designation System for Power Plants RDS-PP®, Letter Codes for Power Plant Systems (System Key) DIN A4, 644 p., 2011Remark: The VGB-Standard VGB-S-821-00-2016-06-EN replaces the publication VGB-B 101e. For existing applications the VGB-B 101e is still available.Remark: The complete RDS-PP® (previous version) covers the publications VGB-B 101e (old version) and VGB-B 102 d/e; additionally the VGB-B 108 d/e and VGB-S-891-00-2012-06-DE-EN are recommended.
978-3-86875-437-7 310,00 470,00
VGB-B 116 D2 Referenzkennzeichensystem für Kraftwerke RDS-PP – Anwendungserläuterungen für Windkraftwerke – 2006 (zurückgezogen)Hinweis: Der VGB-Standard VGB-S-823-32-2014-03-EN-DE ersetzt den VGB-B 116 D2.
978-3-86875-446-9 auf Anfrage on request
VGB-B 116 D2e Reference Designation System for Power Plants RDS-PP – Application Explanations for Wind Power Plants – 2006 (withdrawn)Remark: The VGB Standard VGB-S-823-32-2014-03-EN-DE is substituting VGB-B 116 D2e.
978-3-86875-447-6 auf Anfrage on request
Tel. +49 201 8128-200 | Fax +49 201 8128-30230
RDS-PP Key System / RDS-PP Schlüsselverwaltung VGB PowerTech Catalogue | Medienverzeichnis I l 2019
RDS-PP®-Standards
VGB-S-821-00-2016-06-ENRDS-PP®
System Key
Supplementary VGB-Standards
VGB-S-891-00-2012-06-DE-ENVGB abbreviation cataloguefor power plant technology
VGB-B 108 d/eRules for the creation of denomi-
nations and their applicationfor power plant engineering
VGB-S-823-01-2015-09-EN-DERDS-PP® Application Guideline
Power Plants, General
Basic Standards (incl. part thermal power plants)
Supplementary power plant type specific parts
VGB-S-823-31-2014-12-EN-DERDS-PP® Application Guideline
Hydro Power Plants
VGB-S-823-32-2014-03-EN-DERDS-PP® Application Guideline
Wind Power Plants
VGB-S-823-33-2018-07-EN-DERDS-PP® Application Guideline
Photovoltaic Power Plants
VGB-S-823-41-2018-07-EN-DERDS-PP® Application Guideline
Power to Gas
VGB-B 102 d/eRDS-PP® Letter Codes
for Basic Functionsand Product Classes
VGB-S-832-00-2012-06-EN-DEDesignation codes for
document kindclassification code (DCC key)
VGB-S-831-00-2015-05-ENProvision of Technical
Documentation forEnergy Supply Units
DE/d/(void): German edition. EN/e: English edition. *only available in German.
RDS-PP®-Regelwerk
VGB-S-821-00-2016-06-DERDS-PP®
Systemschlüssel
Ergänzendes VGB-Regelwerk
VGB-S-891-00-2012-06-DE-ENVGB-Abkürzungskatalogfür die Kraftwerkstechnik
VGB-B 108 d/eRegeln zur Bildung von Benen-nungen und deren Anwendung
in der Kraftwerkstechnik
VGB-S-823-01-2015-09-EN-DERDS-PP® Anwendungsrichtlinie
Kraftwerke, Allgemein
Basisregelwerk (inkl. Teil thermische Kraftwerke)
Ergänzende Kraftwerkstyp spezifische Teile
VGB-S-823-31-2014-12-EN-DERDS-PP® Anwendungsrichtlinie
Wasserkraftwerke
VGB-S-823-32-2014-03-EN-DERDS-PP® Anwendungsrichtlinie
Windkraftwerke
VGB-S-823-33-2018-07-EN-DERDS-PP® AnwendungsrichtliniePhotovoltaische Kraftwerke
VGB-S-823-41-2018-07-EN-DERDS-PP® Anwendungsrichtlinie
Power to Gas
VGB-B 102 d/eRDS-PP® Kennbuchstaben
Grundfunktionen undProduktklassen
VGB-S-832-00-2012-06-EN-DEDokumentenkennzeichen für
Anlagen der Energieversorgung(DCC Schlüssel)
VGB-S-831-00-2015-05-DELieferung der TechnischenDokumentation für Anlagen
der Energieversorgung
DE/d/(ohne Kürzel): Deutsche Ausgabe. EN/e: Englische Ausgabe.
VGB-S-821-00-2016-06-EN
VGB-Standard
Reference Designation System for Power Plants RDS-PP®
Letter Code for Power Plant Systems (System Key)
4th revised edition 2016 (Revision c) (former VGB-B 101e)
VGB-S-821-00-2016-06-EN
3
Foreword The VGB Working Panel “Reference Designation and Plant Documentation”, which is attended by power plant operators and maintenance contractors as well as designers and suppliers of power plants, prepared this guideline. The tasks of this working panel also include the preparation and maintenance of dis-cipline-specific and power plant type-specific guidelines as well as the letter codes for power plant systems (system key). The members of the Working Panel represent the interests of VGB PowerTech e.V. in national and international standardization committees. Staff members of the following companies listed below contributed to preparing the “Letter Codes for Power Plant Systems” guideline:
ABB AG
GE Power AG
EnBW Energie Baden-Württemberg AG
Ingenieurbüro gabo gmbh
Kraftwerksschule e.V.
RWE Power AG
RWE Technology International GmbH
Siemens AG
Uniper Technologies GmbH
Vattenfall Europe Generation AG
VERBUND Hydro Power GmbH
The list makes no claim to distinctiveness and legal unambiguousness of the compa-ny names given.
VGB-S-821-00-2016-06-EN
3
VGB-S-821-00-2016-06-EN
4
Authors
The following authors actively participated in the elaboration of this Guideline
Name Company
Wolfgang Ernst Siemens AG
Andreas Menger Ingenieurbüro gabo GmbH
Heinz Müller IB Heinz Müller
Helmut Wank IB Helmut Wank
VGB-S-821-00-2016-06-EN
4
VGB-S-821-00-2016-06-EN
5
Amendments
All Amendments, compared with Version VGB-B 101e: 2011-12 (3rd revised edition), are made recognizable in the text passage with an outer frame line and in the ap-pendix with the letter "c". Previous editions First edition VGB-B 101e: 2007-05 2nd revised edition VGB-B 101e: 2010-04 3rd revised edition VGB-B 101e: 2011-12 The VGB Working Panel “Reference Designation and Plant Documentation” is re-sponsible for edition and update of this guideline.
Essen, June 2016
VGB PowerTech e.V.
VGB-S-821-00-2016-06-EN
5
VGB-S-821-00-2016-06-EN
6
Introduction
The basic international standards for reference designation provide users with gen-erally applicable general rules and letter codes for main classes for the designation of technical objects and their documentation.
The standard for power plants establishes sector-specific specifications based on the basic standards, and also includes options to enable application for different power plant types.
The fulfilment of specific designation tasks and addressing of collections of infor-mation necessitates coding systems which establish a relationship between the ob-ject names and letter codes.
IEC 81346-2 provides non-sector-specific binding letter codes for main classes and subclasses for technical systems and components, classifying the objects according to purpose and task.
For the designation of power plant systems, table 3 of IEC 81346-2 provides a framework for the designation of “infrastructure objects”. This VGB-Standard, VGB-S-821-00, assigns the power-plant-specific systems to letter codes based on this framework.
The relationships between the documents for designation tasks and the relative posi-tion of VGB-S-821-00 with respect to these are shown in Figure 1.
VGB-S-821-00-2016-06-EN
6
VGB-S-821-00-2016-06-EN
7
Figure 1 - Relationships between designation standards, guidelines, application guidelines.
VGB-S-821-00-2016-06-EN
7
VGB-S-821-00-2016-06-EN
8
Content
1 Scope ......................................................................................................... 9
2 Normative references ............................................................................. 10
3 Terms and definitions ............................................................................ 11
4 Application for amendment ................................................................... 12
5 Letter code .............................................................................................. 13
6 System key .............................................................................................. 14
VGB-S-821-00-2016-06-EN
8
VGB-S-821-00-2016-06-DE
VGB-Standard
Referenzkennzeichensystem für Kraftwerke RDS-PP®
Kennbuchstaben für Kraftwerkssysteme (Systemschlüssel)
4. überarbeitete Ausgabe 2016 (Revision c)(vormals VGB-B 101)
VGB-S-821-00-2016-06-DE
4
Vorwort
Diese Richtlinie wurde von der VGB-Fachgruppe „Anlagenkennzeichnung und Do-kumentation“ erarbeitet, in dem Betreiber und Instandhalter sowie Planer und Her-steller von Kraftwerken gemeinsam tätig sind. Zu den Aufgaben dieser Fachgruppe gehören u. a. die Erstellung und Pflege von fachbezogenen und kraftwerkstypspezifischen Richtlinien sowie der vorliegenden Buchstabencode für Systeme der Kraftwerkstechnik (Systemschlüssel). Die Mitglieder der Fachgruppe vertreten die Interessen des VGB PowerTech e.V. in nationalen und internationalen Normungsgremien. Zum Zeitpunkt der Veröffentlichung der 4. überarbeiteten Ausgabe 2016 (Revision c) der „Kennbuchstaben für Kraftwerkssysteme“ waren in der VGB-Fachgruppe „Anla-genkennzeichnung und Dokumentation“ folgende Firmen vertreten:
ABB AG
GE Power AG
EnBW Energie Baden-Württemberg AG
Ingenieurbüro gabo gmbh
Kraftwerksschule e.V.
RWE Power AG
RWE Technology International GmbH
Siemens AG
Uniper Technologies GmbH
Vattenfall Europe Generation AG
VERBUND Hydro Power GmbH
Die aufgelisteten Namen erheben keinen Anspruch auf Unverwechselbarkeit bzw. juristische Eindeutigkeit
VGB-S-821-00-2016-06-DE
4
VGB-S-821-00-2016-06-DE
5
Autoren
An der Erstellung dieser Anwendungsrichtlinie waren folgende Autoren wesentlich beteiligt:
Name Firma
Wolfgang Ernst Siemens AG
Andreas Menger Ingenieurbüro gabo GmbH
Heinz Müller IB Heinz Müller
Helmut Wank IB Helmut Wank
VGB-S-821-00-2016-06-DE
5
VGB-S-821-00-2016-06-DE
6
Änderungen
Die Änderungen gegenüber VGB-B 101: 2011-12 (3. überarbeitete Ausgabe) wurden im Textteil mit einer äußeren Rahmenlinie, im Anhang mit dem Buchstaben „c“ kennt-lich gemacht. Frühere Ausgaben Erstausgabe VGB-B 101 : 2007-05 2. überarbeitete Ausgabe VGB-B 101 : 2010-04 3. überarbeitete Ausgabe VGB-B 101 : 2011-12 Für die laufende Pflege dieser Richtlinie ist der VGB-Arbeitskreis „Anlagenkenn-zeichnung und Dokumentation“ zuständig.
Essen, im Juni 2016
VGB PowerTech e.V.
VGB-S-821-00-2016-06-DE
6
VGB-S-821-00-2016-06-DE
7
Einleitung
Die internationalen Grundnormen zur Referenzkennzeichnung bieten den Anwen-dern allgemeingültige Grundregeln und Kennbuchstaben für Hauptklassen zur Kenn-zeichnung von technischen Objekten und deren Dokumentation.
Die Fachnorm für Kraftwerke trifft auf dieser Basis branchenbezogene Festlegungen, enthält aber ebenfalls noch Optionen, um die Anwendung für unterschiedliche Kraft-werkstypen möglich zu machen.
Zur Erfüllung konkreter Kennzeichnungsaufgaben und Adressierung von Informa-tionszusammenstellungen sind Kodiersysteme erforderlich, die die Namen der Ob-jekte zu Kennbuchstaben in Beziehung setzen.
Für technische Einrichtungen und Betriebsmittel steht die DIN EN 81346-2 mit bran-chenübergreifend verbindlichen Kennbuchstaben für Haupt- und Unterklassen zur Verfügung, wobei die Objekte nach Zweck und Aufgabe klassifiziert sind.
Zur Kennzeichnung von Kraftwerkssystemen bietet DIN EN 81346-2 mit Tabelle 3 einen Rahmen zur Kennzeichnung von „Infrastrukturobjekten“. Auf dieser Basis er-folgte im vorliegenden VGB-Standard VGB-S-821-00 die Zuordnung der kraftwerk-spezifischen Systeme zu Kennbuchstaben.
Die Zusammenhänge der Dokumente für Kennzeichnungsaufgaben und die Einord-nung der Richtlinie VGB-S-821-00 sind im nachfolgenden Bild 1 dargestellt.
VGB-S-821-00-2016-06-DE
7
VGB-S-821-00-2016-06-DE
8
Industrielle Systeme, Anlagen und Ausrüstungen undIndustrieprodukte
Strukturierungsprinzipien und Referenzkennzeichnung
DIN EN 81346‐2Klassifizierung von Objektenund Kennbuchstaben vonKlassen
DIN EN81346‐1AllgemeineRegeln
DIN ISO/TS 81346‐3Anwendungsregeln für einReferenzkennzeichensystem
Grund‐normen
DIN ISO/TS 81346‐10Referenzkennzeichensystem Teil 10: Kraftwerke
VGB‐S‐821‐00RDS-PP Kennbuchstaben für KraftwerkssystemeVGB‐B 102RDS-PP Kennbuchstaben für Grundfunktionen und Produktklassen
RichtlinienKennbuch‐staben
Fachnorm
Anwendungs‐richtlinien
VGB‐S‐823‐01Kraftwerke allgemein
VGB‐S‐823‐31WasserkraftwerkeVGB‐S‐823‐32Windkraftwerke
Bild 1: Zusammenhänge der Kennzeichnungs-Normen, Richtlinien, Anwendungsrichtlinien
VGB-S-821-00-2016-06-DE
8
VGB-S-821-00-2016-06-DE
9
Inhalt
1 Anwendungsbereich .............................................................................. 10
2 Normative Verweise ................................................................................ 11
3 Begriffe und Definitionen ....................................................................... 12
4 Änderungsantrag .................................................................................... 13
5 Kennbuchstaben ..................................................................................... 14
6 Systemschlüssel ..................................................................................... 15
VGB-S-821-00-2016-06-DE
9
VGB-B 102 (Deutsch/Englisch | German/English)
Richtlinie/Guideline
RDS-PP®
Referenzkennzeichensystem für KraftwerkeReference Designation System for Power PlantsKennbuchstaben für Grundfunktionenund ProduktklassenLetter Codes for Basic Functionsand Product Classes
VGB-S-823-01-2015-09-EN-DE
VGB-Standard
RDS-PP®
Application Guideline Part 01: Power Plants, GeneralAnwendungsrichtlinie Teil 01: Kraftwerke, Allgemein
VGB-S-832-00-2016-04-DE-EN
VGB-Standard
Dokumentenkennzeichen für Anlagen der Energieversorgung
Document Designation for Energy Supply Units
(vormals/formerly VGB-B 103)
VGB-S-823-31-2014-12-EN-DE
VGB-Standard
RDS-PP®
Application Guideline Part 31: Hydro Power PlantsAnwendungsrichtlinie Teil 31: Wasserkraftwerke
VGB-S-823-32-2014-03-EN-DE
VGB-Standard
RDS-PP®
Application Guideline Part 32: Wind Power PlantsAnwendungsrichtlinie Teil 32: Windkraftwerke
2nd edition/2. Ausgabe 2014(vormals/ formerly VGB-B 116 D2/D2e)
VGB-S-823-33-2018-07-EN-DE
VGB-Standard
RDS-PP®
Application Guideline Part 33: Photovoltaic Power PlantsAnwendungsrichtlinie Teil 33: Photovoltaische Kraftwerke
VGB-S-823-41-2018-07-EN-DE
VGB-Standard
RDS-PP®
Application Guideline Part 41: Power to GasAnwendungsrichtlinie Teil 41: Power to Gas
VGB-S-831-00-2015-05-EN
VGB-Standard
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units(formerly VGB-R 171e)
VGB-S-831-00-2015-05-DE
VGB-Standard
Lieferung der Technischen Dokumentation (Technische Anlagendaten, Dokumente) für Anlagen der Energieversorgung(vormals VGB-R 171)
VGB-S-891-00-2012-06-DE-EN
VGB-Standard
VGB-Abkürzungskatalog für die KraftwerkstechnikVGB abbreviation catalogue for power plant technology(vormals/formerly VGB-B 107)
VGB-B 108 d/e
VGB-Richtlinie/GuidelineRegeln zur Bildung von Benennungen und deren Anwendung in der KraftwerkstechnikRules for the creation of denominations and their application for power plant engineering3. Ausgabe 2010 (Deutsch/Englisch) 3rd Edition 2010 (German/English)
VGB PowerTech e.V.Deilbachtal 17345257 Essen | Germany | 2019
Tel: +49 201 8128 – 200Fax: +49 201 8128 – 302www.vgb.org | [email protected]