21
RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

Embed Size (px)

Citation preview

Page 1: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 1

Page 2: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 2

Austria Croatia

Czech Republic

Hungary Slovenia Slovakia

Page 3: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 3

New Motivations and Goals

Network of NWP partners

in Central Europe

Common R&D on meso-scale NWP

Individual operational applications, dedicated to end-users

Page 4: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 4

RC LACE new structure2nd RC LACE MoU (2003-2005)

CouncilLACE Steering Committee

Management Group

» Project Leader

» ALADIN System Co-ordinator

» Data Manager

Working Group Leader for

» Data Assimilation

» Dynamics and Coupling

» Physics

Page 5: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 5

Common objectives

Maintenance of ALADIN code

ARPEGE LBC for LACE domain

(00 and 12 UTC, 3h freq.)

Telecommunications Satellite dissemination

RETIM2000 - DVB equivalent for 128 kBps link

Page 6: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 6

Decentralized responsibilities

Operational Applications

(AU,CR,CZ,HU,SI)

Archiving

Local and decentralized R&D

Page 7: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 7

Scientific Plan for year 2003General goals

• to keep the level of R&D from previous period (40% of ALADIN human power)

• to continue the work on opened subjects• to add more networking• to organize R&D stays of the scientists • to organize training, workshops

Page 8: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 8

Scientific Plan for year 2003Local research and missions

• Each service organized environment for

local research and R&D visits • Visits are financed by LACE 15 person/months R&D missions :

4 person/months R&D stays par each WG

3 person/months equivalent for workshops and meetings

Total R&D: ~90 person/months for 2003

Page 9: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 9

Scientific Plan for year 2003Working group plans

Working Group Plans

Projects

Subjects

Workshops and training

Link with ALADIN and ALATNET subjects

1st LACE Steering Committee Meeting

Page 10: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 10

Working Group for Dynamics and Coupling

• Non-hydrostatic dynamics• Interative schemes • Choice of additional NH variables• Bottom boundary condition

• Dynamics – other topics• Horizontal diffusion• Radiative UBC• Physics/dynamics interface

• Coupling• Spectral coupling• Surface pressure tendency coupling• Two-time nesting• Coupling files initialization

Page 11: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 11

Results from WG for Dynamics and Coupling

• Mini-coupling workshop (Ljubljana, 17-21 February 2003)

part of ALATNET activities

Page 12: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 12

Results from WG for Dynamics and Coupling

NH Dynamics

Reformulation on Bottom Boundary Conditionfor term

non hydrostatic pressure departure

to cure the problem of “chimney effect” in SL scheme

Before: believe that chimney problem is specific to SL advection

Results find:

• turning ON horizontal diffusion can create chimney effect

in vertical velocity even in Eulerian advection

• stronger diffusion caused stronger chimney

to continue with 2D academic tests

ppwherep~~

,/

Page 13: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 13

Working Group for Physics

. Shallow convection / PBL cloudiness • Prognostic cloud water

• Subgrid -scale cloudiness

• Non-local vertical transport

• Radiation

. CAPE & deep convection triggering

. Orographic drag

V. Physics/dynamics interface (AROME)

Page 14: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 14

Results from WG for Physics

• Deep convection triggering- overestimation of convective precipitation

and cloudiness over Alps (to wide domains, to long prec. events)

1-Threshold for second KUO-type triggering

2-Cumulated moisture convergence -as condition for triggering

3-Time delay equation for moisture convergence

Page 15: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 15

Results from WG for Physics

Orographic drag study- for ALADIN and ARPEGE

- reduction of envelope presentation of orography

- optimization of sub-grid drag parameterization

Results:

some form of semienveloped orography

Page 16: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 16

Working Group for Data Assimilation

I .Methods - Algorithmic aspects• Biperiodic 3d-VAR analysis increments

• Moving to 3d-FGAT

• Study of vertical structure of 3d-VAR analysis increments

• Design of an explicit blending

. Methods - Cycling• Comparison of "DFI" and "explicit" blending

• Blendvar cycling experiments

• 3d-VAR cycling experiments to elaborate cold air-pad cases

Page 17: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 17

Working Group for Data Assimilation (cont.)

. Observations• Implementation of ODB – training

• Assimilation of ATOVS data; Radar data; AMDAR data

V. Surface • Implementation of CANARI/Diag-pack

• Smoothing of Soil Wetness Index

• Assimilation of 10m wind data

Page 18: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 18

Results from WG for Data Assimilation

• LACE ODB training

(Budapest, 14-18 April, 2003)

Observation Data Base from AL25t2 cycle

- implementation of ODB

- technical exercises

- compilation, tutorials

Page 19: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 19

Results from WG for Data Assimilation

• Study of vertical structure of 3d-VAR analysis increments - NMC and “lagged” statistics for Background error covariance

matrix B

- vertical structure of NMC and “lagged” statistics

- AIREP, Temp

Study of vertical structure of 3d-VAR analysis increments

- lagged statistics is responsible for reduction of analysis increments and more mesocsale structure of correlation functions

- reduction is smaller on lower levels, because small scale processes are more intensive in lower atmosphere

Page 20: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 20

Results from WG for Data Assimilation

Smoothing of Soil Wetness Index (SWI) over LACE Domain- problem: stationary hot spots in 2m Temperature field

- same problem in ARPEGE and

ALADIN/France caused by to warm soil

Page 21: RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon1

RC LACE 25th EWGLAM Meeting 6-9 October 2003, Lisbon 21

Future Actions

• LACE Data Assimilation Training and Workshop

(Budapest, 20-22 October, 2003)

• 13th ALADIN Workshop

(Prague, 24-28 November,2003)

• 2nd RC LACE Steering Committee Meeting

(Prague/Ljubljana, mid December, 2003)

Final report of R&D 2003; SP for 2004