10
Petrov V.L. , Panasyuk M.I., Amelyushkin A.M., Drozdov A.Yu., Nechaev O.Yu. Skobeltsyn Institute of Nuclear Physics, Lomonosov MSU RAZREZ system RAZREZ system for RADIOSCAF experiment for RADIOSCAF experiment WRMISS 14 Dublin, 2009

RAZREZ system for RADIOSCAF experimentAbsorbed dose 0.09 nGr … 1.5 mkGr Surface temperature-120ºC … +150ºC. RAZREZ equipment Telescopic platform RAZREZ payload. Schedule:Schedule:

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: RAZREZ system for RADIOSCAF experimentAbsorbed dose 0.09 nGr … 1.5 mkGr Surface temperature-120ºC … +150ºC. RAZREZ equipment Telescopic platform RAZREZ payload. Schedule:Schedule:

Petrov V.L., Panasyuk M.I., Amelyushkin A.M., Drozdov A.Yu.,

Nechaev O.Yu.

Skobeltsyn Institute of Nuclear Physics, Lomonosov MSU

RAZREZ system RAZREZ system for RADIOSCAF experimentfor RADIOSCAF experiment

WRMISS 14Dublin, 2009

Page 2: RAZREZ system for RADIOSCAF experimentAbsorbed dose 0.09 nGr … 1.5 mkGr Surface temperature-120ºC … +150ºC. RAZREZ equipment Telescopic platform RAZREZ payload. Schedule:Schedule:

The start point:Spacesuit as spacecraft

The start pointThe start point::Spacesuit Spacesuit as as spacecraftspacecraft

Altitude: 350…380 kmdown to atmosphere

Lifetime: up to 6 month

Power: up to 20 W(chemical +solar batteries)

Payload: 17 kg(protons, electrons,neutrons,γ-rays,dosimetry,temperature)

Telemetry: 145 MHz,up to 4 Mb per day

Total mass: 150 kg

Page 3: RAZREZ system for RADIOSCAF experimentAbsorbed dose 0.09 nGr … 1.5 mkGr Surface temperature-120ºC … +150ºC. RAZREZ equipment Telescopic platform RAZREZ payload. Schedule:Schedule:

Progress cargo Progress cargo spaceship:spaceship:

3 launches3 launches;;

up to up to 100 W 100 W power supply;power supply;

up to up to 100 Mbod100 Mbod telemetry;telemetry;

up to up to 3 months3 months lifetime;lifetime;

active active altitude altitude stabilization;stabilization;

oneone--axisaxis orientation;orientation;

telescopictelescopic platform;platform;

great great total masstotal mass increase;increase;

great great payloadpayload increaseincrease

Now we have:Now we haveNow we have::

Page 4: RAZREZ system for RADIOSCAF experimentAbsorbed dose 0.09 nGr … 1.5 mkGr Surface temperature-120ºC … +150ºC. RAZREZ equipment Telescopic platform RAZREZ payload. Schedule:Schedule:

Main scientific goals:Main scientific goals:

Measurement of altitudinal distribution of Measurement of altitudinal distribution of fluxes of thermal and smallfluxes of thermal and small--energy energy neutronsneutronsaway from ISSaway from ISS

Measurement of Measurement of absorbed dosesabsorbed doses in smallin small--shielded vehicleshielded vehicle

Measurement of Measurement of electronelectron spectrum at spectrum at altitudes < altitudes < 350 350 km at L < 2km at L < 2

(Panasyuk et al., 2000)

Electron fluxes at 600 kmElectron fluxes at 600 km

Page 5: RAZREZ system for RADIOSCAF experimentAbsorbed dose 0.09 nGr … 1.5 mkGr Surface temperature-120ºC … +150ºC. RAZREZ equipment Telescopic platform RAZREZ payload. Schedule:Schedule:

RR--BB –– base blockbase block((controllers, protons,controllers, protons,neutrons, electrons,neutrons, electrons,gammagamma))

RR--NN –– neutron blockneutron blockRR--DB1 DB1 –– DOSTEL dosimeterDOSTEL dosimeterRR--D1D1……D4D4 –– LIULIN dosimetersLIULIN dosimetersRR--DB2DB2 –– electron blockelectron block

((electrons,electrons,temperature sensor,temperature sensor,photo detectorphoto detector))

TemperatureTemperature sensorssensors

Scientific equipmentScientific equipment::

RAZREZ payloadRAZREZ payload

Engineering kitEngineering kit

RR--BB

RR--NNRR--DB1DB1 RR--DB2DB2

RR--D4D4

Page 6: RAZREZ system for RADIOSCAF experimentAbsorbed dose 0.09 nGr … 1.5 mkGr Surface temperature-120ºC … +150ºC. RAZREZ equipment Telescopic platform RAZREZ payload. Schedule:Schedule:

RAZREZ payloadRAZREZ payload

NeutronsNeutrons0.1 eV ... 1.9 MeV,0.1 eV ... 1.9 MeV,> 2> 2--3 MeV, 3 MeV, > 10> 10--20 MeV20 MeV

ProtonsProtons > 50 MeV> 50 MeV

ElectronsElectrons 200 keV 200 keV …… 3 MeV, spectrum3 MeV, spectrum

GammaGamma >100 keV, >300 keV, >100 keV, >300 keV, >500 keV, >1 MeV, >2 MeV>500 keV, >1 MeV, >2 MeV

LETLET 0.1 0.1 …… 200 keV/mkm200 keV/mkm

NucleusNucleus Z: 1 Z: 1 …… 2626DosimetryDosimetryAbsorbed doseAbsorbed dose 0.09 nGr 0.09 nGr …… 1.5 mkGr1.5 mkGr

SurfaceSurfacetemperaturetemperature --120120ººC C …… +150+150ººCC

Page 7: RAZREZ system for RADIOSCAF experimentAbsorbed dose 0.09 nGr … 1.5 mkGr Surface temperature-120ºC … +150ºC. RAZREZ equipment Telescopic platform RAZREZ payload. Schedule:Schedule:

RAZREZ equipment RAZREZ equipment

Telescopic Telescopic platformplatform

RAZREZ payloadRAZREZ payload

Page 8: RAZREZ system for RADIOSCAF experimentAbsorbed dose 0.09 nGr … 1.5 mkGr Surface temperature-120ºC … +150ºC. RAZREZ equipment Telescopic platform RAZREZ payload. Schedule:Schedule:

Schedule:Schedule:Schedule:

11stst launch:launch: 20102010Neutron measurement, dosimetry,Neutron measurement, dosimetry,rough electron spectrumrough electron spectrum

22ndnd launch:launch: appr. end of 2011appr. end of 2011

Fine charged particles measurementsFine charged particles measurements

33rdrd launch:launch: 2012 2012 …… 20132013

Waves + fields + charged particles Waves + fields + charged particles

Page 9: RAZREZ system for RADIOSCAF experimentAbsorbed dose 0.09 nGr … 1.5 mkGr Surface temperature-120ºC … +150ºC. RAZREZ equipment Telescopic platform RAZREZ payload. Schedule:Schedule:

AcknowledgmentsAcknowledgmentsAcknowledgments

Special thanks to our colleagues fromSpecial thanks to our colleagues from

•• SINP MSU, RussiaSINP MSU, Russia•• …… , Bulgaria, Bulgaria•• University of Kiel, GermanyUniversity of Kiel, Germany

Page 10: RAZREZ system for RADIOSCAF experimentAbsorbed dose 0.09 nGr … 1.5 mkGr Surface temperature-120ºC … +150ºC. RAZREZ equipment Telescopic platform RAZREZ payload. Schedule:Schedule:

Thank You!Thank You!Thank You!