RAV MAMAD - Eng Defensetrchs

Embed Size (px)

Citation preview

  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    1/21

    RAV MAMAD (RM)

    A Universal Modular (Assemble & Dismantle)

    Indoor Protection System.

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    2/21

    The Present Situation & Problem

    There is a ballistic threat of high-trajectory weapons aimed towards 1/3

    of the Israeli CIVILIAN population (north and south).

    The present ALERT time does provide enough time for the citizens to

    reach a protected shelter.

    Building a Protected Room (MAMAD) is not practical in many of the

    apartments and houses.

    Registered Patent

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    3/21

    A concrete ceilingstructure hit bya rocket

    Registered Patent

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    4/21

    [email protected] www.defensetechs.com

    A tiled roof and a Ravitz ceiling house hit by a rocket.

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    5/21

    The Solution

    An indoor protection system created

    by a metal protective layer, installed

    and adjusted to the ceiling and wall of

    a pre-chosen room (or space).

    A defense room plan (ceiling + wall)

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    6/21

    The standard RM withstands a direct hit of

    a Quassam II light missile and theKatyusha 122mm and 120mm Mortar.The protection level can be upgraded

    according to the threat defined by anadditional layer and without the need todismantle the base.

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    7/21

    The Protective SystemThe ceiling and threatened walls inside the pre-chosen room

    are covered with constructive steel panels, combined to

    create a protective layer against shrapnel and shock waves.

    The panels are manually inserted and installed upon supportive

    hidden columns in the corners of the room.

    By this action, it is not required to reinforce the completestructure of the house / apartment, as the weight is diverted

    to the floor and at its strongest points.

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    8/21

    The Protective System

    Combining the panels, creates a strong but

    flexible (to a limit) continuous surface, enabling

    it to resist and block the explosion effects.

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    9/21

    Plastercover

    Supporting Steelcolumns

    Protected room by Rav mamad

    Protectionelement

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    10/21

    Protectionelement

    A wall protectionoption

    Protected room by rav mamad

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    11/21

    IMPS SIMULATIONS

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    12/21

    1.Original Condition

    IMPS SIMULATIONS

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    13/212. Wall Protection

    IMPS SIMULATIONS

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    14/21

    IMPS SIMULATIONS

    3. IMPS Ceiling Supporting [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    15/21

    IMPS SIMULATIONS

    5. IMPS [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    16/21

    5. Paneling Walls & Columns With Chemistry

    IMPS SIMULATIONS

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    17/21

    6. Complete IMPS- Inside View

    IMPS SIMULATIONS

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    18/21

    Advantages

    Creates a possibility to form a protected zone inunqualified for reinforcement (construction) structures.

    Modular, suitable for any room in any structure.License freeQuick installation ( 1 day for protection, 1 day for finishesUpgrading ability (threat related).Cost Effective

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    19/21

    From the report made for the test of durability of

    protection layers for indoor room and spaces

    towards direct rocket hit.

    ...on January 8th, 2007 a test was conducted for checking the

    durability of IMPS indoor modular protection system, towards

    a direct rocket hit

    the test was done at the Rosh HaAyin Quarries for the Mifram

    co. by Tamar co. and supervised by YY (Yaacov Yerushalmi)

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    20/21

    the 2 explosions results showed success for the IMPS

    as the system did not collapse, did not tear and no

    fragments or shrapnel penetrated beyond the

    the test included 2 static operational demolitions of rocket simulator

    containers.

    1. 5Kg TNT upon 8cm thick concrete surface.

    2. 7.5Kg TNT upon 20CM cement blocks

    [email protected] www.defensetechs.com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]
  • 7/31/2019 RAV MAMAD - Eng Defensetrchs

    21/21

    Protection of commercial facility

    info@defensetechs com www defensetechs com

    mailto:[email protected]://www.defensetechs.com/http://www.defensetechs.com/mailto:[email protected]