41
Osamu Kamigaito RIKEN Nishina Center Rare-Isotope Beam Facilities in Asia

Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Osamu Kamigaito

RIKEN Nishina Center

Rare-Isotope Beam Facilities in Asia

Page 2: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Neutron halo

& skin

Proton halo

r-process

rp-process

Evolution of

Shell structure

Super-Heavy

Element

New excitation

mode

RIB facilities world-wide

RIKEN/RIBF KEK/KISS

ANL/CARIBU MSU/ReA3

FRIB TRIUMF/ISAC

Notre Dame

TwinSol

Sao Paulo

LBL/Bears IRIS

IMP HIRFL

CERN/REX-ISOLDE

GANIL SPIRAL II

GSI/FAIR

VECC IUAC

INFN/SPES

INFN/EXCYT IBS/RISP

EURISOL

Dubna

Texas A&M

Munich/MAF

F

RAL SIRIUS

Louvain-la-Neuve ARENAS3

CIAE/BRIF

“A new generation of high-intensity RNB facilities of each of the two basic

types, ISOL and In-Flight, should be built on a regional basis.” (The OECD Megascience Forum Report of the Working Group on Nuclear Physics, 1999)

Page 3: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

RIB facilities in Asia

RIKEN / RIBF

KEK / KISS

IMP / HIRFL

VECC

IUAC IBS / RISP

CIAE / BRIF

Page 4: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

fRC(2006)

AVF

(1989)

RRC(1986)

IRC(2006) BigRIPS

(2006)

RILAC2

(2010)

RILAC

(1981)

RIKEN RIBF, Japan

3 Injectors & 4 Booster cyclotrons

In-flight fragmentation / fission

SRC

(2006)

(RIBF=Radioactive Isotope Beam Factory) Y. Yano, NIM B261 (2007) 1009

Xe, U

Zn etc for SHE

Page 5: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

28GHz SC-ECRIS

Pre-buncher

RFQ

DTL1

DTL2

DTL3

Rebuncher

Rebuncher

To RRC @ 670 keV/u (M/q<6.8)

High-Energy

Beam Transport

Thin & Strong Quadrupoles Low-Energy

Beam Transport

RILAC2 Layout

Operation started in Dec 2010

K. Yamada, IPAC2012

Page 6: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

• pol-d(250 MeV/u)

• d(250 MeV/u)

• 4He(320 MeV/u)

• 14N(250 MeV/u)

• 18O(345 MeV/u)

• 48Ca(345 MeV/u)

• 86Kr(345 MeV/u)

•124Xe(345 MeV/u)

• 238U(345 MeV/u)

120 pnA

1000 pnA

1000 pnA

400 pnA

1000 pnA

415 pnA

(6.8 kW)

30 pnA

15 pnA

3.5 pnA

Achieved beam intensities at RIBF

=> 2 × 1010 pps

Page 7: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Intensity upgrade plan

R&Ds:

•Charge stripper

=> (Dr. Okuno’s talk)

•Upgrade of fRC

=> Waiting for beam test

•UO2 oven

=> in progress

•Stabilization of temperature

•Dated components

Xe, U

Ar, Ca

d, α, O

Page 8: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

New T1/2 measured !

99Rb

S. Nishimura et al., PRL 106 (2011) 052502

Recent results from RIBF

5 PRL, 3 PLB, 2 PRC, 2 JPSJ ..

Page 9: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

New experimental apparatus & Collaboration

EUROBALL-RIKEN

Cluster Array

(EURICA)

Superconducting Analyser for

MUlti-particle from RAdio Isotope

beam (SAMURAI)

Rare-RI ring

Budget approved!

KISS / KEK (former TRIAC group)

Page 10: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Argon-gas catcher cell

+ Laser resonant ionization (Z)

+ Mass separation (A)

+ Low-background det. system

Mass separator

Decay measurement

stations

E3-room

(KISS : KEK Isotope Separation System)

E2-room J3-room

εtot.~ 7 % (t1/2=500 ms)

Rz~ 1000, RA~ 840

τextr.~ 240 ms

~3 day machine time for 200W

KISS project by KEK at RIKEN Courtesy of Prof. Miyatake (KEK)

Page 11: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Argon-gas catcher cell

+ Laser resonant ionization (Z)

+ Mass separation (A)

+ Low-background det. system

Mass separator

Decay measurement

stations

E3-room

(KISS : KEK Isotope Separation System)

E2-room J3-room

εtot.~ 7 % (t1/2=500 ms)

Rz~ 1000, RA~ 840

τextr.~ 240 ms

~3 day machine time for 200W

KISS project by KEK at RIKEN

E2 - room

Mass-, Atomic-number

Separated Beams

High Voltage

Cage Gas Cell (inside)

Courtesy of Prof. Miyatake (KEK)

Page 12: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Layout of HIRFL

CSRm(2006)

10.64 Tm

C=161 m

CSRe(2007)

SFC(1987)

K69MeV

SSC(1988)

K450MeV

Cancer therapy

Internal target

External target

PISSA

Mass measurement ToF target

Low energy Exp. area

Medial energy Exp. area

E-cooler

2 Cyclotrons + 2 Cooler-ring Synchrotron In-flight fragmentation

8.4 Tm

C=128.8 m

Courtesy of Prof. Zhao (IMP) IMP-CAS HIRFL, China (HIRFL = Heavy Ion Research Facility in Lanzhou)

Page 13: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

209Bi36+, 170MeV/u

H2+, 400MeV/u

238U32+, 100MeV/u,107ppp

New beams in HIRFL Courtesy of Prof. Zhao (IMP)

Page 14: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

• 1/3 resonance slow extraction

• RF-Knockout exciting

• Feedback of extraction rates with fast Qs

240 50 ions

Long pulse slow extraction in CSRm:10,000 s Courtesy of Prof. Zhao (IMP)

Page 15: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Recent results from HIRFL

Mass measured for drip-line nuclei 63Ge, 65As, 67Se, 71Kr

X. L. Tu, PRL 106 (2011) 112501

Page 16: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

16

SC-ECR

LEBT

RFQ

MEBT

HEBT

DTL

SSC

1. 1 MeV/u beam for SSC

2. Beam intensity: >0.5 puA for 238U at Linac.

3. Parallel operation with SFC and Linac-SSC.

Near-future plan (next 2~3 years): SSC-Linac Courtesy of Prof. Zhao (IMP)

Page 17: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

17

SC-ECR

LEBT

RFQ

MEBT

HEBT

DTL

SSC

1. 1 MeV/u beam for SSC

2. Beam intensity: >0.5 puA for 238U at Linac.

3. Parallel operation with SFC and Linac-SSC.

Near-future plan (next 2~3 years): SSC-Linac

SC-ECR

LEBT RFQ MEBT

DTL

HEBT

Aluminum prototype of IH-DTL tank1 Cavity coated with copper

in inner surface

Courtesy of Prof. Zhao (IMP)

Page 18: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

18

SFC

SSC

T1

RIBLL1

PT

BL

2-S

Ly

3

BL

2-S

Lx

3B

L2

-SL

x1 B

L2

-MW

1

BL

2-S

Lx

2

BL

2-M

W2

BL

2-S

Ly

2B

L2

-SL

y1

2Q

07

2Q

08

BL

2-F

C3

BL

2-S

Lx

3B

L2

-SL

x1

BL

2-S

Lx

2

BL

2-S

Ly

2B

L2

-SL

y1

2Q

07

2Q

08

BLZ

-MW

1

BLZ

-FC

1

BS

WB

SW

R1

Q2

R1

Q2

L1

B1

2Q

12

2Q

11

2Q

12

2Q

11

2Q

10

2Q

10

BL

2-M

W4

RB

1R

B1

RQ

4R

Q4

RQ

6R

Q6

RQ

5R

Q5

2Q

14

2Q

13

2Q

14

2Q

13

2Q

15

2Q

15

TL1 -MW1

TL1-FC1

L1Q1

1V

S-1

RQ

7

BLR

-SW

2B

LR

-BS2

RQ

8

2Q

17

BLR

-FC

3

BLR

-SW

3

RQ

9R

Q9

RQ

10

RQ

10

2Q

18

BL

2-F

C5

R4B

1R

4B

1R

4Q

1R

4Q

1

1F

C-1

2Q

21

2Q

21

2Q

20

2Q

19

2Q

20

2Q

19

TR

4T

R4

R4B

2R

4B

2

A

R5B

1

R5

Q1

TR

5T

R5

R5

Q3

R5

Q4

TR5-FC1 TR5-MW

1

R5

Q2

R5B

2

BS

WB

SW

TR

1

R1

Q1

R1

Q2

R1

Q2

R1B

1

L1

B1

2Q

12

2Q

11

2Q

12

2Q

11

2Q

10

2Q

10

RQ

2

RQ

1

RQ

3

BL

2-F

C4

BLR

-SW

1B

LR

-BS1

RB

1R

B1

RQ

4R

Q4

RQ

6R

Q6

RQ

5R

Q5

2Q

14

2Q

13

2Q

14

2Q

13

2Q

15

2Q

15

TL1 -MW1

TL1-FC1

L1Q2

TR

2

RQ

7

BLR

-SW

2B

LR

-BS2

BLR

-FC

1

RQ

8B

LR

-DG

R

2Q

16

L3Q1

BLR

-FC

3

BLR

-SW

3

R3B

1

A

RQ

9R

Q9

RQ

10

RQ

10

BL

2-M

W6

BL

2-F

C5

R4B

1R

4B

1R

4Q

1R

4Q

1

1B

T-1

2Q

21

2Q

21

2Q

20

2Q

19

2Q

20

2Q

19

TR

4T

R4

R4B

2R

4B

2

R5B

1

R5

Q1

L3Q2

TR

5T

R5

R5

Q3

R5

Q4

R5

Q2

R5B

2

R3Q

1

R3Q

2

TR

3-MW

1

R3Q

4

R3Q

3

TR

3-FC1

TL

3

BL-SW

BL-FC

BL-SLx

BL-SLx

BL-SLy

BL-SLy

BL-FC

BL-DT1

BL-DT1

BL-DT2

TR2-FC1

TR2-VS1TR2PD1

R0B

2

R0B

3

R0Q

4

R0Q

1

R0Q

2

R0Q

3

TR

0

L2Q

1

L2Q

2

TL2

-FC1

TL2

-MW

1

L2B

1

TR

3

B

B

collimator

prebuncher

collimatorcollimator

collimatorcollimator

聚束器中心

L-Q24

L-B2

L-B3

L-Q1+CVH2L-Q4+CVH3

ChopperCVH4

FC+MW+SL

L-CV5L-CS1 L-B1

L-Q2L-Q3

L-CS2L-CS3

L-CS4L-CS5

L-CS6L-CS7

L-Q6L-Q7

rebuncher

L-Q8L-Q9

L-Q10-11L-Q12-14

L-Q15-17L-Q18-20

L-Q21-23

L-Q25

L-Q26

L-Q27

L-Q28

L-Q29

L-Q30

L-Q31

L-FC1

L-VS1

L-MW1

发射度测量系统

L-RFQ

L-BPM2L-BPM3

L-BPM4L-BPM5

L-BPM6

L-DTL1

L-DTL2L-DTL3

L-DTL4

真空阀门

发射度测

量系统

L-BPM1

IH-1

S1

S2

S3

S4

S5

S6

RFQ

re-Bunc

herB

uncher

DT

L1

DT

L2

DT

L3

DT

L4

DT

L5

DT

L6

DT

L7

DT

L8

DT

L9

DT

L10

DT

L11

DT

L12

DT

L13

DT

L14

DT

L15

DT

L16

DT

L17

DT

L18

DT

L19

S0

B0

re-Bunc

her

1. 10 MeV/u beam for CSRm.

2. Beam intensity: >5 euA for 238U.

3. Parallel operation with SFC,

SFC+SSC and Linac-CSR.

Element Length

[cm]

Frequency

[MHz]

Energy

[MeV/u]

LEBT 920 013.4167 0.00373

RFQ 252 53.6667 0.143

MEBT1 175 53.6667 0.143

DTL1 480 53.6667 1.025

MEBT2 400 161 1.025

DTL2 3000 161 10

HEBT 3300 161 10

CSR-Linac

Near-future plan (next 3~5 years): CSR-Linac Courtesy of Prof. Zhao (IMP)

Page 19: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Cyclotron

100 MeV H-

ISOL

Tandem

SCL

・ISOL / Driver = 100 MeV 200 mA compact H- cyclotron

・20000 mass resolution ISOL => Tandem => 2 MeV/q super-conducting LINAC

CIAE BRIF, China Courtesy of Prof. Liu (CIAE)

(BRIF = Beijing Rare Ion beam Facility)

・Project approved in 2003 - 2004 / Revised plan approved in 2008 – 2009

・Civil engineering started in 2011 / Cyclotron fabrication completed in 2011

Page 20: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

20

H- compact cyclotron (CYCIAE-100) Courtesy of Prof. Liu (CIAE)

Page 21: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

21

H- compact cyclotron (CYCIAE-100) Courtesy of Prof. Liu (CIAE)

Page 22: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Electric

polishing

device

Cold cabinet

Superconducting cavity

Cu-Nb spattering oven

Superconducting linac in fabrication

・BRIF will be commissioned in 2014.

Courtesy of Prof. Liu (CIAE)

Page 23: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Future plan : CARIF project at CIAE

・ISOL + PF scheme

Courtesy of Prof. Liu (CIAE)

Page 24: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

HR cave-1

New annex building Under construction

K130 vault

ECR

RFQ1

RFQ2

LINAC1

LINAC2

LINAC3

LINAC4-6

1.3 MeV/u RIB

100 keV/u

1.7 keV/u

289 keV/u

415 keV/u

2011-13

29 keV/u 2005

2008

2010

2011

Target-IS

K130 Cyclotron beam

Linac3 is placed here for the time-being

RIB project – VECC, India Courtesy of Prof. Chakrabarti (VECC)

Page 25: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

HR cave-1

New annex building Under construction

K130 vault

ECR

RFQ1

RFQ2

LINAC1

LINAC2

LINAC3

LINAC4-6

1.3 MeV/u RIB

100 keV/u

1.7 keV/u

289 keV/u

415 keV/u

2011-13

29 keV/u 2005

2008

2010

2011

Target-IS

K130 Cyclotron beam

Linac3 is placed here for the time-being

RIB project – VECC, India Courtesy of Prof. Chakrabarti (VECC)

Page 26: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

HR cave-1

New annex building Under construction

K130 vault

ECR

RFQ1

RFQ2

LINAC1

LINAC2

LINAC3

LINAC4-6

1.3 MeV/u RIB

100 keV/u

1.7 keV/u

289 keV/u

415 keV/u

2011-13

29 keV/u 2005

2008

2010

2011

Target-IS

K130 Cyclotron beam

Linac3 is placed here for the time-being

RIB project – VECC, India Courtesy of Prof. Chakrabarti (VECC)

Page 27: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

HR cave-1

New annex building Under construction

K130 vault

ECR

RFQ1

RFQ2

LINAC1

LINAC2

LINAC3

LINAC4-6

1.3 MeV/u RIB

100 keV/u

1.7 keV/u

289 keV/u

415 keV/u

2011-13

29 keV/u 2005

2008

2010

2011

Target-IS

K130 Cyclotron beam

Linac3 is placed here for the time-being

RIB project – VECC, India Courtesy of Prof. Chakrabarti (VECC)

Page 28: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

HR cave-1

New annex building Under construction

K130 vault

ECR

RFQ1

RFQ2

LINAC1

LINAC2

LINAC3

LINAC4-6

1.3 MeV/u RIB

100 keV/u

1.7 keV/u

289 keV/u

415 keV/u

2011-13

29 keV/u 2005

2008

2010

2011

Target-IS

K130 Cyclotron beam

Linac3 is placed here for the time-being

RIB project – VECC, India Courtesy of Prof. Chakrabarti (VECC)

Multiple target chamber

Page 29: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

RIB Prod. route T1/2 pps @ FC2

14O 14N(p,n) 71 s 4.4 x 103

42K 40Ar(α,pn) 12.36 hr 2.7 x 103

41Ar 40Ar(α,2pn) 109 min 1.3 x 103

1.46 MeV 40K (backg.)

2.31 MeV 14O (71 s)

4.4 x 10 3 pps

March 6,2012 Gamma-ray spectrum at FC2 (before RFQ)

ECR

RFQ2

Det @ FC1

Detector @FC2

L2 L1 L3

Detector @ entry

Radioactive atoms from

target chamber placed in

cyclotron vault

HR cave RIB site

1.29 MeV 41Ar (109 min)

1.3 x 10 3 pps

1.46 MeV 40K (backg.)

Gamma-ray spectrum at FC2 (before RFQ) Jan 12, 2012

41Argon (109 min.)

14Oxygen (71 sec.)

Measured RIB decay-spectra before RFQ2 Courtesy of Prof. Chakrabarti (VECC)

Page 30: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Injector

20kW

ICM

Gun

Buncher

300 keV

Accelerator

300 keV to 10 MeV 10 MeV to 50 MeV

20kW 20kW

ACM1

20kW 20kW

ACM2 Diag.

Beam dump

10MeV, 2 mA 50MeV, 2 mA

Diag.

Beam dump

Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017

VECC-TRIUMF

MOU phase-1

50 MeV superconducting e-linac (VECC-TRIUMF collaboration)

Courtesy of Prof. Chakrabarti (VECC)

Page 31: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Phase-1

Phase-2

1+

Ion

Source

1+ RIB

LINAC booster

SC Ring Cyclotron

Stripper

Stable isotope

injection

Stable Isotope Beam

Separator

RFQ

ECR Ion Source

LINAC

100 MeV/u

P

F

S

Material Science with stable & RIBs

Nuclear structure, Elastic/ Inelastic scattering, Coulomb barrier physics, Super Heavy Elements

1.0 MeV/u

1.5 keV/u

0.1 MeV/u

7 MeV/u

Spectroscopy of r-process, n-rich exotic nuclei

Nuclear Astrophysics

12th Plan 2012-17

2017-onwards

High freq., high current ECR Ion Source

Storage

Ring

n

Actinide

Target

SC electron LINAC 50 MeV, 100 kW

e- g

Ta

e-

1.5 keV/u

Studies on drip line & near drip line nuclei

Neutron beam-line for nuclear astrophysics

e+e-

e+ Positron beam-line

n+ RIB

RIB

RIB

Radioactive

Atoms

Future plan: ANURIB facility

A National Facility for Unstable and Rare Isotope Beams

・ISOL + PF scheme

Courtesy of Prof. Chakrabarti (VECC)

Page 32: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Production of low energy 7Be radioactive ion beam at IUAC using HIRA (HIRA: Heavy-Ion Reaction Analyzer)

7Be radioactive ion beam (RIB) has been optimised Energy range of 7Be RIB: 17 to 22 MeV

Production reactions: (p,n),(d,n) type of reactions in inverse kinematics

Filter + transporter: existing RMS, HIRA operated in new ion optics

Typical RIB parameters

Size ~ 4 mm (fwhm), & = +/- 30 mrad, E = +/- 0.5 MeV

Purity > 99% , Intensity ~104 pps

IUAC, India Courtesy of Prof. Roy (IUAC)

Page 33: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

HYbrid Recoil mass Analyzer - Unique dual-mode, dual-stage spectrometer

with large acceptances and rigidity at IUAC, New Delhi

(to fully exploit ECR + LINAC beams of higher energy and intensity)

Useful to access heavy fusion evaporation residues with large efficiency along beam direction in gas-filled mode rejecting beam-like particles, target-like recoils and fission fragments – First stage only

(similar to Dubna, RIKEN, LBL, JYFL facilities but unique in design)

Useful to produce secondary radioactive beams (similar to 7Be in HIRA but with higher energies and lesser purity) in momentum achromatic (vacuum) mode – First stage only

HYRA at IUAC, India N. Madhavan et al., PRAMANA J. Phys. 75 (2010) 317

Courtesy of Prof. Roy (IUAC)

Page 34: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

HYRA (Gas-Filled Separator / Vacuum Mode RMS) – First stage

Courtesy of Prof. Roy (IUAC)

Nuclei : 7Be, 13N, 17,18F

Energy Range: 20-50 MeV

Expected flux: 103-104 /s

Page 35: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Science Business Belt

Accelerator complex

Institute for Basic Science

IBS – RISP project, Korea Courtesy of Prof. Kim (SNU/IBS)

(RISP=Rare-Isotope Science Project)

Page 36: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Concept of the Accelerator Complex

IF Linac

Future Extension

200 MeV/ u (U),

8 p A

Stripper

18 MeV/u

280 MHz SCL

70 MHz

RFQ 70 MHz SCL

28 GHz

SC ECR IS

H2+ , D+

Spallation,

Fission Target

RF Cooler

Mass

Separator

ISOL Linac

ECR IS

70 MHz SCL 70 MHz RFQ

Charge Breeder

10 keV/u

Nuclear Data

Low Energy Experiments

0.3 MeV/u 1~5 MeV/u 18 MeV/u

High Energy

Experiments

SR

Medical

Research

400 kW

Target

Fragment

Separator

Atomic Trap

Experiments

70 kW

Cyclotron

Gas

Catcher,

Gas cell

Material

Science Beta-NMR

U33+

Nuclear Astrophysics

Material science

Bio science

Medical science

Nuclear data

Atomic / Nuclear

physics Nuclear Physics

Medical science

Material science

Material science

IBS – RISP project, Korea Courtesy of Prof. Kim (SNU/IBS)

Page 37: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

• R&Ds of RI-Beam facilities are very active in Asia.

• New facilities are planned to start in coming 10 years.

• Regional and international collaborations are important in

various technical challenges.

Summary

Page 38: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

H. Sakurai

M. Wakasugi

S. Nishimura

H. Miyatake

Accelerator Group

H. W. Zhao

A. Chakrabarti

A. Roy S. K. Kim

E. S. Kim

W. P. Liu

Many thanks to

Page 39: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

Nuclear Landscape

Neutron halo

& skin

Proton halo

r-process

rp-process

Evolution of

Shell structure

Super-Heavy

Element

New excitation

mode

Page 40: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

K2600-MeV SRC

World’s first superconduting RING cyclotron

Bmax= 3.8 T, Total weight = 8300 tons

First beam: Dec. 2006

Achieved Intensity=> 4He: 1000 pnA, 48Ca:415 pnA, 238U: 3.5 pnA etc.

Page 41: Rare-Isotope Beam Facilities in Asia · ACM1 20kW 20kW Diag. Beam dump 10MeV, 2 mA 50MeV, 2 mA Diag. Beam dump Phase-1 : 2009 – 2013 Phase-2 : 2013 – 2017 VECC-TRIUMF MOU phase-1

2007 BT

•T. Ohnishi et al., “Identification of New Isotopes 125Pd and 126Pd Produced by In-Flight Fission of 345

MeV/nucleon 238U: First Results from the RIKEN RI Beam Factory”, J. Phys. Soc. Jpn. 77 (2008) 083201. <= 238U 345 MeV/u

2008 BT

•T. Ohnishi et al., “Identification of 45 New Neutron-Rich Isotopes Produced by In-Flight Fission of a 238U

Beam at 345 MeV/nucleon”, J. Phys. Soc. Jpn. 79 (2010) 073201. <= 238U 345 MeV/u

•T. Nakamura et al., “Halo Structure of the Island of Inversion Nucleus 31Ne”, Phys. Rev. Lett. 103 (2009)

262502. <= 48Ca 345 MeV/u

•P. Doornenbal et al., “Spectroscopy of 32Ne and the Insland of Inversion”, Phys. Rev. Lett. 103 (2009)

032501. <= 48Ca 345MeV/u.

•P. Doornenbal et al., “Exploring the “island of inversion” by in-beam γ -ray spectroscopy of the neutron-rich

sodium isotopes 31,32,33Na”, Phys. Rev. C 81, (2010) 041305(R). <=48Ca 345 MeV/u

•M. Takechi et al., “Interaction cross sections for Ne isotopes towards the island of inversion and halo

structures of Ne-29 and Ne-31”, Phys. Lett. B 707, (2012) 357. <=48Ca 345 MeV/u

2009 BT

•S. Nishimiura et al., “b-Decay Half-Lives of Very Neutron-Rich Kr to Tc Isotopes on the Boundary of the r-

Process Path: An Indication of Fast r-Matter Flow”, Phys. Rev. Lett. 106 (2011) 052502. <= 238U 345 MeV/u

•T. Sumikama et al., “Structural Evolution in the Neutron-Rich Nuclei 106Zr and 108Zr” Phys. Rev. Lett. 106

(2011) 202501. <= 238U 345 MeV/u

•H. Watanabe et al., “Low-lying level structure of the neutron-rich nucleus 109Nb: A possible oblate-shape

isomer”, Phys. Lett. B 696 (2011) 186. <= 238U 345 MeV/u

•H. Watanabe et al., “Development of axial asymmetry in the neutron-rich nucleus 110Mo”, Phys. Lett. B 704

(2011) 270. <= 238U 345 MeV/u

•K. Sekiguchi et al., “Three nucleon force effects in intermediate-energy deuteron analyzing powers for d p

elastic scattering”, Phys. Rev. C 83 (2011) 061001(R). <=pol-d 250 MeV/u

2010 BT

•R. Chevrier et al., “Is the 7/2- Isomer State of 43S Spherical?”, Phys. Rev. Lett. 108 (2012) 162501. <=

48Ca 345 MeV/u