Rapid Assessment and Planning for Infrastructure Design (RAPID) Concept Demonstration Tool

Rapid Assessment and Planning for Infrastructure ... - Atkins/media/Files/A/Atkins-Corporate/uk-and-europe/sectors...RAPID is a concept demonstration tool created by Atkins to illustrate

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Rapid Assessment and Planning for Infrastructure ... - Atkins/media/Files/A/Atkins-Corporate/uk-and-europe/sectors...RAPID is a concept demonstration tool created by Atkins to illustrate

Rapid Assessment and Planning for Infrastructure Design (RAPID) Concept Demonstration Tool

Page 2: Rapid Assessment and Planning for Infrastructure ... - Atkins/media/Files/A/Atkins-Corporate/uk-and-europe/sectors...RAPID is a concept demonstration tool created by Atkins to illustrate

It was first showcased in March 2016 in response to a techUK ‘Deployed Operational Headquarters of the Future’ Innovation Challenge that asked respondents to consider how competitive military advantage could be maintained through operational agility. It was then developed further for demonstration at the DSEi exhibition in September 2017, where it attracted a high level of interest from potential MOD and Industry clients. It is now being developed for demonstration on the Army Warfighting Experiment 2018 – Autonomous Warrior (Land) in Q4 2018.

The current RAPID demonstrator includes a bird table touchscreen to allow users to visually plan the elements of their deployable infrastructure including water, field power,

RAPID is a concept demonstration tool created by Atkins to illustrate how data can be captured, analysed and visualised to inform deployable infrastructure concept designs, operational user decision-making, construction and asset management of camps and sites.

fuels, technical and domestic accommodation, mess halls, headquarters, plant, and force protection. The demo gives an indication of the welfare, defence, logistics, staff and power requirements for each of the assets and the overall efficiency of the user’s headquarters (see Appendix).

Once a user has planned their base they can explore it in Virtual Reality (VR) allowing immersive visualisation of the site during the planning phase. This enables planners to optimise the site more effectively than with a traditional two-dimensional Computer Aided Design (CAD) plan. The visualisation could also be used to conduct orientation tours of the camp in advance of deployment, as well as to develop the defensive plan testing scenarios using gaming technology.

RAPID Concept Demonstration Tool

Introduction

Page 3: Rapid Assessment and Planning for Infrastructure ... - Atkins/media/Files/A/Atkins-Corporate/uk-and-europe/sectors...RAPID is a concept demonstration tool created by Atkins to illustrate

Data capture and analysisThe site featured in the RAPID demonstration was surveyed from the air using a small (<7kg) Unmanned Aerial Vehicle (s-UAV). The s-UAV carried a high-quality camera, flew 100m Above Ground Level (AGL) and flew a flight plan specifically optimised for high-accuracy data capture. The 40-hectare site was surveyed in one working day and the imagery was photogrammetrically processed in the office.

The resultant data was used to create a survey grade CAD drawing and 3D terrain model, then exported into the ESRI ArcGIS mapping tool to produce visibility, gradient and drainage analysis.

3D visualisationFrom a 3D visualisation perspective, the objective of RAPID was to demonstrate that technology has developed sufficiently to provide an easy to use and rapid to implement solution for asset management in the context of 3D survey data.

The application is based on cutting edge, real-time rendering software, which offers an unprecedented level of detail, quality and realism when compared to traditional CAD approaches to the spatialisation of assets. This technology platform has now developed sufficiently that it can support the level of detail, scale and robustness required for this type of application, whilst requiring minimal development time to produce.

A valuable aspect of the technology is that its application logic, user interface and visual effect can be rapidly adapted to support the demands of the end user as the situation requires it, ensuring that the application is always relevant to the task in hand.

When combined with a large format touchscreen, the application becomes a multiuser strategic planning tool that is intuitive to operate and more effective than traditional approaches.

Virtual Reality

The virtual reality aspect of RAPID demonstrates the power of this technology in allowing users to better understand a virtual 3D space. The sense of place experienced by an immersed user ensures that they are fully focused on a task resulting in better decision making and learning outcomes1.

Within RAPID, we employ VR in the form of a high definition motion-tracked headset and controllers, offering users the ability to navigate the site in a more realistic format than the touchscreen provides.

As a tool, we have found that multi-user hybrid engagement – employing both touchscreen and VR – is a very effective method for design, planning and consultation.

RAPID Concept Demonstration Tool

1 Min Jou, Jingying Wang, Investigation of effects of virtual reality environments on learning performance of technical skills, Computers in Human Behavior, Volume 29, Issue 2, 2013, Pages 433-438, ISSN 0747-5632, http://dx.doi.org/10.1016/j.chb.2012.04.020.

Page 4: Rapid Assessment and Planning for Infrastructure ... - Atkins/media/Files/A/Atkins-Corporate/uk-and-europe/sectors...RAPID is a concept demonstration tool created by Atkins to illustrate

RAPID Concept Demonstration Tool

Development and next stepsThe demonstration has been created to showcase the capability and to provide a stepping off point for future projects. The technology behind RAPID has the capacity to include detailed asset management data on each asset. This can include data on power consumption through to the type of connector required to link to services. Applying the Whole Force Approach the data can also show stock levels, current location of assets, lead time and costs of assets.

The tool aims to support the detailed construction of camps using Building Information Modelling (BIM) dimensions 3D up to 6D ensuring compliance with UK Def Stan 23-13 Generic Base Architecture.

Providing an asset management tool to support both hard and soft facilities, the system could have a full lifecycle approach. Informing the decision making process during the initial planning phase, throughout the deployment, occupation of the site, and the staged withdrawal will help ensure efficiency throughout. In addition, the application could be aligned with UKNATO or other Defence Standards to support joint operations.

Further usesThe application could be applied to a variety of engineering and planning projects. In humanitarian operations, the affected area can be surveyed quickly from the air to ascertain the extent of damage providing an up-to-date

model in a situation where existing maps would become out of date overnight. Supporting infrastructure such as medical, stores, accommodation, power generation and welfare facilities can be planned by the operation commander in advance of arriving on site. This would decrease the required set-up time, enabling humanitarian support to be provided as quickly as possible.

Compounds are a key part of major engineering and construction projects providing facilities such as management offices, security accreditation, storage and vehicle workshops. The application could be used to optimise compound design ensuring efficiencies in the full lifecycle from set-up through occupation and breakdown. Once an asset of the compound has been added to the tool it can become a standard option for future projects. The properties of each asset including power, water, footprint, and exclusion area can all be attributed to the asset, adding further logic to the planning process.

Similarly, major events such as music festivals are often planned using traditional two-dimensional CAD tools. Once surveyed, a landscape can be explored in VR to inform the site planning process. Using this technology, the event site can be optimised in 3D and VR, allowing planners to consider aspects of the site such as evacuation routes, sight lines and event infrastructure. The model could also include natural factors such as daylight and weather including the effect of shadow and night time on the event site. This would allow detailed lighting plans to be developed at an early stage, ensuring both efficiency and health and safety compliance.

Page 5: Rapid Assessment and Planning for Infrastructure ... - Atkins/media/Files/A/Atkins-Corporate/uk-and-europe/sectors...RAPID is a concept demonstration tool created by Atkins to illustrate

RAPID Concept Demonstration Tool

Appendix – Asset Data MechanismThe current application logic is designed to demonstrate that synthetic assets assigned with data can be easily manipulated in an interactive environment and, in doing so, generate a holistic understanding of how efficiently a combination of assets is operating.

Each asset has been assigned a demand or supply requirement for the five resources: welfare, defence, logistics, staff and power. Each of these values is assigned a generic value (units) representing the scale of demand or supply for that asset.

The below table displays each asset and its demand (negative value) or supply (positive value) as programmed in the simulation.

The Base Efficiency percentage is calculated as a ratio of demand to supply for all the placed assets. A 100% efficient base would have a balanced provision resulting in no net

surplus or excess. A 0% Resource Efficiency is attained when the imbalance reaches a level that is deemed unacceptable, in this case plus or minus 50 units.

Overall, each resource contributes 20% of the whole and a 0% Base Efficiency is attained when the imbalance reaches a level that is deemed unacceptable, in this case plus or minus 50 units. As an example, a base that was operating at 100% in staffing, logistics, power and defence, but that had no welfare provision would have an overall efficiency of 80%.

The application’s key performance bar chart shows the level of imbalance as a percentage for each requirement and finally the overall percentage attained by the current base design.

Further details on RAPID can be obtained from the Atkins’ Client Manager – Land, Weapons and Infrastructure, Alistair Roxburgh, on [email protected]

Resources (units)

Asset Name Welfare Defence Logistics Staff Power

Barracks -25 0 -18 40 -8

Command Post -3 -15 -8 -21 -5

Medical 15 -2 -20 -12 -10

Mess 10 0 -25 -10 -12

Power 0 0 -15 -2 32

Stores -5 -20 62 -8 -4

Washing 15 0 -12 -3 -4

Watchtower -3 18 -3 -9 -1