Page 1: Rapid Asphalt Production/Construction Controls Feedback - PCF

Rapid Asphalt Production/Construction Controls Feedback - PCF

ETG Construction Task Force

Ervin Dukatz-Mathy Construction

Tim Ramirez-PennDOT

Louay Mohammad-LSU

Tim Aschenbrener-FHWA

AAPT

Page 2: Rapid Asphalt Production/Construction Controls Feedback - PCF

Production/Construction Feedback

PCF – controls and devices designed to provide rapid feedback to the user to improve the density and hence the performance of asphalt pavements.

AAPT

Page 3: Rapid Asphalt Production/Construction Controls Feedback - PCF

Production/Construction Feedback

Areas of concern: – Aggregate moisture

– Asphalt Sampling

– Compaction

AAPT

Page 4: Rapid Asphalt Production/Construction Controls Feedback - PCF

States Responding to Survey

AAPT

Page 5: Rapid Asphalt Production/Construction Controls Feedback - PCF

Production/Construction Feedback

Tools: Moisture Control

Microwave

“Increase moisture if unaccounted will lead to a decrease in mix density”.

“In binder cost”

“unaccounted change of aggregate blend/proportions.”

Pictures and quotes from Hydronix and Troxler literature

Radiation

AAPT

Page 6: Rapid Asphalt Production/Construction Controls Feedback - PCF

If yes: Moisture sensor(s) on plant and used for QC?

Page 7: Rapid Asphalt Production/Construction Controls Feedback - PCF

If yes: Moisture sensor(s) and automatic aggregate belt samplers on plant and used for QC?

AAPT

Page 8: Rapid Asphalt Production/Construction Controls Feedback - PCF

Production/Construction Feedback

Tools: asphalt mix sampling

Needs: – Samples of mix as produced

– Quick access to lab

– Safe for technician

AAPT

Page 9: Rapid Asphalt Production/Construction Controls Feedback - PCF

VT

If yes: Moisture sensor(s), automatic aggregate belt samplers and truck samplers for QC?

AAPT

Page 10: Rapid Asphalt Production/Construction Controls Feedback - PCF

Production/Construction Feedback

Tools: Temperature

FLIR

AAPT

Page 11: Rapid Asphalt Production/Construction Controls Feedback - PCF

Production/Construction Feedback

Tools: Temperature

MOBA

AAPT

Page 12: Rapid Asphalt Production/Construction Controls Feedback - PCF

Production/Construction Feedback

Tools: Temperature

MOBA

Page 13: Rapid Asphalt Production/Construction Controls Feedback - PCF

Pave-IR Scan

Production/Construction Feedback

AAPT

Page 14: Rapid Asphalt Production/Construction Controls Feedback - PCF

Pilot

IC IC

Ro

VT

If yes: Real-time measuring of paving temperature? for QC?

Page 15: Rapid Asphalt Production/Construction Controls Feedback - PCF
Page 16: Rapid Asphalt Production/Construction Controls Feedback - PCF

Today: IC Roller Equipment

GPS

Not shown accelerometer on steel wheel

Temperature Sensor

RADIO

Page 17: Rapid Asphalt Production/Construction Controls Feedback - PCF

Instrument Entire Rolling Train

Stabilized / Un-stabilized Full Depth Reclamation (FDR)

HMA Paving Train

Page 18: Rapid Asphalt Production/Construction Controls Feedback - PCF

Base

If yes: Use IC for Real-time Monitoring of Pavement Rolling? and used for QC?

Cloud

Thumb-drive magic

Data collection?

Asphalt

and

Base

Both MN and OK

monitor stiffness

OK

density=f(CMV)

Cloud and

Thumb Drive

Page 19: Rapid Asphalt Production/Construction Controls Feedback - PCF

TCC

Communication • Manual Data

Collection – 40% loss

• Automatic Data

Collection <1%

Production/Construction Feedback

Rebecca Embacher - MnDOT

How much data?

~10 million/lines

Page 20: Rapid Asphalt Production/Construction Controls Feedback - PCF

Goal: Roll so each section is

compacted at the same

temperature (±6F) and

receives the same number of

passes.

Before

After

Production/Construction Feedback

MN, OR and VT are using IC to:

• Monitor Passes

• Monitor % Coverage

• Mn monitoring stiffness

• Mn also using GSSI-RDM for real-

time measurement of Density

Page 21: Rapid Asphalt Production/Construction Controls Feedback - PCF

MNDOT Pre-map base stiffness, before paving.

Production/Construction Feedback

Page 22: Rapid Asphalt Production/Construction Controls Feedback - PCF

How are the different devices being specified?

• MN, OK, TN and VT - standard specification

• SD – special provision for belt samplers

• ID, IN, DE, MS, NH, OH and VA – no state

specifications, allow as contractor options.

Production/Construction Feedback

Page 23: Rapid Asphalt Production/Construction Controls Feedback - PCF

Which of the devices have the most promise to

add value to a project (cost savings and

improved pavement performance?

• Moisture Sensor: MD, OH, OK, VT

• Automated belt sampler: ID, SD

• Truck sampler: ID, VT

• Pavement temperature: LA, MN, MS, OH, OK,

VA, VT

• IC Compaction: FL, IN, LA, MN, MS, NH, OK,

SD, VT

• GPR: MD, MN, OK

Production/Construction Feedback

Page 24: Rapid Asphalt Production/Construction Controls Feedback - PCF

Production/Construction Feedback – most promising

0 2 4 6 8 10

Moisture Sensor

Auto.Belt Sampler

Truck Sampler

Pav't Temperature

IC Roller

GRP

Page 25: Rapid Asphalt Production/Construction Controls Feedback - PCF

Production/Construction Feedback – Planning to try

0 1 2 3 4 5

Auto.Belt Sampler

Truck Sampler

FLIR

MOBA IR

TBD (something)

Moisture Sensor

GSSI Rolling Density Meter

Pav'tTemperature

GRP

IC Roller

Page 26: Rapid Asphalt Production/Construction Controls Feedback - PCF

Production/Construction Feedback

Next Meeting:

• Survey Update

• FHWA Density Project