RAILWAY PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK
Selen GÜNEL SUSUZ Head of Department 13 June 2017
CURRENT STATUS RAILWAY NETWORK
Total Lines, Length of Electrified and Signaled Lines
Total Railway Network 12.532 km
High Speed Lines 1.213 km
Conventional Lines 11.319 km
Signaled Lines (% 44) 5.462 km
Electrified Lines (% 35) 4.350 km
LINES IN OPERATION HST Lines
1.213 km HST line has been constructed and put into operation.
1.906 km is under construction.
İSTANBUL
EDİRNE
ESKİŞEHİR
Polatlı
ANKARA
KONYA
İZMİR
SİVAS
AFYONKARAHİSAR
KAYSERİ
BURSA
ERZİNCAN
ERZURUM
KARS
MERSİN ADANA
GAZİANTEP
DİYARBAKIR
ELAZIĞ
MALATYA
ZONGULDAK
SAMSUN
Bandırma
VAN
MUŞ
BİLECİK
ÇANKIRI
KIRIKKALE
TEKİRDAĞ
İZMİT
BALIKESİR
AYDIN DENİZLİ BURDUR ISPARTA
UŞAK MANİSA
KARAMAN
NİĞDE
OSMANİYE
K.MARAŞ
AMASYA
BATMAN
MARDİN
Yerköy
KARABÜK
Yenişehir
ANTALYA
AKSARAY
ŞANLIURFA
KÜTAHYA KIRŞEHİR
Ulukışla
ÇORUM
Selçuk
İskenderun
SİİRT
Habur Nusaybin
Palu
C.ovası
T.köy Eşme
Gözertepe
KIRKLARELİ
Çandarlı
Nemrut
Karasu
Manavgat
Alanya
Gemlik
Çetinkaya
ADIYAMAN
Bergama
At Projecting phase
Under Construction
Other Survey Projects Studies
Existing Conventional Lines
In operation
At Tendering Phase
F.paşa
NEVŞEHİR
ÇANAKKALE
IĞDIR
Dilucu Aralık
TOKAT Turhal
GÜMÜŞHANE
TRABZON
3
LINES UNDER CONSTRUCTION HSL, RL and CL
1.906 km High Speed Line
1154 km Rapid Line
769 km Conventional Line
3.829 km in total under construction.
İSTANBUL
EDİRNE
ESKİŞEHİR
Polatlı
ANKARA
KONYA
İZMİR
SİVAS
AFYONKARAHİSAR
KAYSERİ
BURSA
ERZİNCAN
ERZURUM
KARS
MERSİN ADANA
GAZİANTEP
DİYARBAKIR
ELAZIĞ
MALATYA
ZONGULDAK
SAMSUN
Bandırma
VAN
MUŞ
BİLECİK
ÇANKIRI
KIRIKKALE
TEKİRDAĞ
İZMİT
BALIKESİR
AYDIN DENİZLİ BURDUR ISPARTA
UŞAK MANİSA
KARAMAN
NİĞDE
OSMANİYE
K.MARAŞ
AMASYA
BATMAN
MARDİN
Yerköy
KARABÜK
Yenişehir
ANTALYA
AKSARAY
ŞANLIURFA
KÜTAHYA KIRŞEHİR
Ulukışla
ÇORUM
Selçuk
İskenderun
SİİRT
Habur Nusaybin
Palu
C.ovası
T.köy Eşme
Gözertepe
KIRKLARELİ
Çandarlı
Nemrut
Karasu
Manavgat
Alanya
Gemlik
Çetinkaya
ADIYAMAN
Bergama
At Projecting Phase
Under Construction
Other Survey and Project Studies
Existing Conventional Lines
In Operation
At Tendering Phase
F.paşa
NEVŞEHİR
ÇANAKKALE
IĞDIR
Dilucu Aralık
TOKAT Turhal
GÜMÜŞHANE
TRABZON
4
OTHER IMPORTANT INVESTMENT PROJECTS Electrification
The works on electrification of 1.947 km conventional line are going on.
İSTANBUL
EDİRNE
ESKİŞEHİR
ANKARA
KONYA
İZMİR
SİVAS
AFYONKARHİSAR
KAYSERİ
BURSA ERZİNCAN
ERZURUM
KARS
MERSİN ADANA
GAZİANTEP
DİYARBAKIR
ELAZIĞ
MALATYA
ZONGULDAK SAMSUN
Bandırma
VAN
MUŞ
BİLECİK
ÇANKIRI
KIRIKKALE
TEKİRDAĞ
İZMİT
BALIKESİR
AYDIN
DENİZLİ BURDUR
ISPARTA
UŞAK MANİSA
NİĞDE
OSMANİYE
K.MARAŞ
AMASYA
BATMAN
MARDİN
KARABÜK
Divriği
T.kale
C.ovası
Aliağa
KÜTAHYA
Tepeköy
Ulukışla
Selçuk
KARAMAN
BAŞKENTRAY
193 km 201 km
52 km 415 km
495 km
303 km
920 km
98 km
Electrified Lines (4.350 km) (% 35)
Under contruction(1.947 km) (% 50)
In projecting phase (1.603 km) (% 63)
214 km
390 km
236 km
33 km
5
OTHER IMPORTANT INVESTMENT PROJECTS Signalling
The installation of signalling on 2.385 km conventional line is going on.
İSTANBUL
EDİRNE
ESKİŞEHİR
ANKARA
KONYA
İZMİR
SİVAS
AFYONKARHİSAR
KAYSERİ
BURSA ERZİNCAN
ERZURUM
KARS
MERSİN ADANA
GAZİANTEP
DİYARBAKIR
ELAZIĞ
MALATYA
ZONGULDAK SAMSUN
Bandırma
VAN
MUŞ
BİLECİK
ÇANKIRI
KIRIKKALE
TEKİRDAĞ
İZMİT
BALIKESİR
AYDIN
DENİZLİ BURDUR
ISPARTA
UŞAK MANİSA
KARAMAN
NİĞDE
OSMANİYE
K.MARAŞ
AMASYA
BATMAN
MARDİN
KARABÜK
Divriği
T.kale
İskenderun
C.ovası
Aliağa
374 km
KÜTAHYA
356 km
Tepeköy
Ulukışla
376 km Selçuk
Ortaklar
176 km
BAŞKENTRAY
507 km
415 km
410 km
ŞANLIURFA
52 km
In projecting phase (805 km) (%69)
Signalled Lines at the end of the year(5.462 km) (%44)
At installation phase(2.385 km) (%63)
390 km
134 km
6
OTHER IMPORTANT INVESTMENT PROJECTS Railway Renewal
10.000 km of the existing conventional network has been renewed.
Renewed Lines (9.965 Km)
Under rehabilitation and renovation (864+490 = 1354 km)
Lines to be renewed during 2018-2019 (150 Km) 7
8
OTHER IMPORTANT INVESTMENT PROJECTS Construction of Logistics Centers
The construction of 7 out of 20 logistics centers have been completed. 7 of them are under
construction. Tendering, projecting and expropriating studies for 6 centers are going on.
Uşak
Köseköy/İzmit Halkalı/İstanbul
Gökköy/Balıkesi
r
Kaklık/Denizli
Gelemen/Samsu
n
Hasanbey/Eskişehir
In Operation Yenice/Mersin
Türkoğlu/Kahramanmaraş
Mardin
Palandöken/Erzurum
Bozüyük/Bilecik
Under Construction
Kemalpaşa/İzmi
r
AYGM
Kayacık/Kony
a
Boğazköprü/Kayseri
Habur
Kars
Sivas
Yeşilbayır/İstanbu
l
Under Projecting and Expropriating Studies
Tatvan/Bitlis
VISION 2023 Targets
Reaching totally 25.000 km railway network in 2023, by building 13.000 km railways which include 3.500 km high speed railway, 8.500 km rapid railway and 1.000 km conventional railway.
Performing the works for complying the existing vehicles with high speed train lines and manufacturing all types of rolling stock in Turkey.
Increasing the share of railway transport by 10% in passenger and by 15% in freight transport.
Ensuring the connection through branch lines with logistics centers, factories, industries, organized industrial zones and ports which have great freight potential.
9
LIBERALIZATION OF TURKISH RAILWAYS
Restructuring of Turkish State Railways (TCDD): «Law on the Liberalization of Railway Transport of Turkey»
No.6461 adopted in 2013
TCDD continues as Infrastructure Manager and the units of TCDD responsible for the operations of trains are separated, as an affiliate of TCDD named «TCDD Transport JSC.».
10
PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK
1
1- Baku-Tbilisi-Kars Railway Line Project
11
12
• The foundation of Turkish section was laid on 24th July 2008.
• The realization in the amount of 99 % has been provided.
• The project is planned to be completed in 2017.
Baku-Tbilisi-Kars Railway Line Project
PROJECTS OF TURKEY ON TRANS-ASIA RAILWAY NETWORK
PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK
2- Marmaray
1
2
Seamless railway connectivity between Asia and Europe with BTK Project
Total Length: 77 km
14 km is in operation including strait crossing tube tunnel and 5 stations
13
PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK
3- Kapıkule-Halkalı Railway Project
1
2
3
Length: 230 km Start and Completion date: 2017-2022 Complementary to Marmaray Will have 2 million passangers and 5 million ton freight capacity
14
PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK
4- Ankara-Eskisehir-Istanbul High Speed Train Project
1
2
3
4
Length: 513 km Travel time decreased to 3,5 hours from 7 hours 20,2 million passengers carried Share of passenger transport between Ankara-Eskişehir increased from 8% to 72%
15
PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK
5- Ankara-Izmir High Speed Train Project
1
2
3
4
5
Length : 625 km Completion date: 2020 Double track, electrified and signaled line Speed: 250 km/h 6 million passengers per year
16
PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK
6- Ankara-Sivas High Speed Train Project
1
2
3
4
5
6
Length: 405 km Completion date: 2018 Double track, electrified and signaled line Physical progress recorded: 57 % Speed: 250 km/h
17
PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK
7- Rehabilitation and Signaling of Samsun-Sivas (Kalın) Line
1
2
3
4
5
6
7
Length: 410 km Completion date: 2018 Physical progress: 30%
Increase from 21 to 49 in train capacity per day.
18
PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK
8- Sivas (Cetinkaya)-Malatya High Speed Train Project
1
2
3
4
5
6
7
8
Length: 125 km Start and Completion date: 2018-2022 Double track, electrified and signaled line 200 km/h speed
19
PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK
9- Sivas-Erzincan Rapid Train Project
1
2
3
4
5
6 7
8
9
Length : 242,5 km Start and Completion date: 2017-2023 Double track, electrified and signaled line Speed: 250 km/h
20
PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK
10- Erzincan-Erzurum-Kars Rapid Railway Line Study Project
1
2
3
4
5
6 7
8
9
10
Length : 414 km Start and completion date:2017-2019 Double track, electrified and signaled line Speed: 200 km/h
21
PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK
11-Adana-Mersin Rapid Train Line
1
2
3
4
5
6 7
8
9
10
11
Length : 67 km Completion date: 2019 (for construction) Aims to increase the capacity of existing line
22
PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK
12-Adana-İncirlik-Osmaniye(Toprakkale) Rapid Train Line (2. line)
1
2
3
4
5
6 7
8
9
10
11 12
Length : 79 km Start and completion date:2016-2019 Double track, electrified and signaled Speed: 160-200 km/h
23
PROJECTS OF TURKEY ON TRANS-ASIAN RAILWAY NETWORK
13-Malatya-Elazıg Rapid Railway Line Study Project
1
2
3
4
5
6 7
8
9
10
11 12
13
Length: 121 km Start and completion date: 2017-2019 Double track, signaled and electrified line Speed: 200 km/h
24
UIC 10th World Congress on High Speed Rail
UIC 10th World Congress on High Speed Rail, planned to be held on 11-14 July 2017, will be
organized on
8-11 May 2018 by TCDD, as the host, and with the support of CMS Project, as the official organizer, in
cooperation with UIC in Ankara.
«sharing knowledge for sustainable and competitive operations»
25
26 UDHB 2016 Bütçe
DEMiRYOLU 26
TEŞEKKÜRLER!
THANK YOU FOR YOUR ATTENTION