Main tasks
Developing the database
Developing the RCM CMS
Rail Review 14 September 2001
Specifications and structure of
the database developed
Rail Review 14 September 2001
WP5: WP5: DDatabase requirements I
System Architecture is:
Modular: local database per company, but same structure
Interactive: to promote cooperation and information exchange inside the
company (and inter-companies)
Scalable: local databases should be able to include new information.
Open: to include heterogeneous information and legacy systems
Extensible: to guarantee future usability by including new elements and
operations.
Methodology is:
Based on standards: JAVA, CORBA, SQL, …
WEB oriented to promote remote access and cooperation
Distributed to allow co-operation, integration and scalability
Client-Server paradigm to provide and retrieve information
Rail Review 14 September 2001
WP5: WP5: DDatabase requirements II
RAIL database to:
Extend existing experience from companies, manufacturers, railway
associations, … Similar databases in OREDA, NRPDS, CCPS, US Navy
Mainly used to store anonymous statistical information related with
SCRI LCC, failures, maintenance operations, LCC info and to get feedback
from other sources.
Should be open to external sources of information, and should pervive
the RAIL project.
Integrate existing data bases with legacy information.
Other Company databases to:
Store day-to-day maint. data and operations, local LCCs, local
monitoring, …
Databases should be compatible to exchange information: providing
functions to load and unload data.
Rail Review 14 September 2001
WP5: WP5: DDatabase Functionality
Store lines and their sections and evaluate their states.
Store the components and their SCRIC values of a section and line.
SCRIC analysis of the functional failures, detection of the functional failure
and evaluate for each functional failure the frequency and severity, and the
criticality criteria.
Decision making help and maintenance tasks planning.
Reports on different aspects of the system (lines, SCRIC, functions, etc.) and
statistics of the RCM analysis.
To provide a decomposition of the SCRICs and information of their parts. Store and view the information about the meetings during the RCM process.
Facilities to load and unload data from/to existing databases and plain files
(format to be defined...)
Rail Review 14 September 2001
WP5: WP5: Database Integration
System Integration:
All Data base interfaces in Java: easy communication and
interfacing
Co-operation using Java through RCM Internet Tool
Friendly user interface: all data acquisition using RCM
predefined forms through an Internet based tool.
To define cooperation methods among different data bases
Rail Review 14 September 2001
WP5: WP5: Database organization
RAIL Da ta Ba se
RAIL In fo rm a tio n
Se rve r
C o m p a nyM a inte na nc e
Da ta Ba se
Exte rna lDa ta Ba se
M a int. Kno wle d g eDa ta Ac q u isitio nSta te Pre d ic tio n
M o nito ringLC C
Sta te Pre d ic tio nM o nito ring
M a int. M g m nt.M a int. Pla n
LC C
Da ta Ac q u isitio nM o nito ring
Rail Review 14 September 2001
High Level Design of the RAIL Data Base
Rail Review 14 September 2001
InfrastructureInfrastructure
Infrastructuredata
Line Section Component
Rail Review 14 September 2001
Cost model & LCC
Infrastructuredata
Cost model data Line costs Section costs Component cost ¿LCC data?
Rail Review 14 September 2001
CriticalityCriticality
Infrastructuredata
Cost model data Criticallity data
Line criticality Section criticality Component criticality Component state
Rail Review 14 September 2001
DecompositionDecomposition
Infrastructuredata
Cost model data Criticallity data
Descompositiondata
System Subsystem Mantenible item
Rail Review 14 September 2001
FMECAFMECA
Infrastructuredata
Cost model data Criticallity data
Descompositiondata
FMECA data
Function Failure mode Failure cause
Rail Review 14 September 2001
Failure CriticalityFailure Criticality
Infrastructuredata
Cost model data Criticallity data
Descompositiondata
FMECA data
Failure mode criticality Safety Availability in the line Av. In other lines Cost
Frequency Time to repair
Rail Review 14 September 2001
TASKTASK
Infrastructuredata
Cost model data Criticallity data
Descompositiondata
FMECA dataTask data
Task proposed Selected task
Rail Review 14 September 2001
TASK cost model & LCCTASK cost model & LCC
Infrastructuredata
Cost model data Criticallity data
Descompositiondata
FMECA dataTask data
Cost model LCC
Rail Review 14 September 2001
Groups & MeetingsGroups & Meetings
Infrastructuredata
Cost model data
Criticallity data
Descompositiondata
FMECA dataTask data
Group andmeeting data
Maintenance Group Pilot group Corridor Group Meetings
Rail Review 14 September 2001
RAIL Data Base Management
Rail Review 14 September 2001
Data acquisition
Active maintenance is done based on maintenance people reports.
Preventive maintenance needs: retrieval of qualitative information,
information on reliability parameters and information regarding
maintenace resources, LCC info. Historical information related to
failures.
Predefined forms for maintenance reports (based on expert’s
knowledge)
Condition information acquired via network (Inet, ATM, GSM-R, …)
using RCM predefined forms through an Internet based tool.
Future:
Condition monitoring.
All process should be mechanized: maintenance inspectors with
portable laptops?
Rail Review 14 September 2001
Data format (load)Data format (load)
RAILDB
Company Database
Plain Text FilePlain Text File
Loader
Plain text format: ASCII File with separators Database exchange format: e.g.: Oracle LOAD
Rail Review 14 September 2001
Data format (unload)Data format (unload)
RAILDB
Unloader
Plain Text FilePlain Text File
Reports
Plain text format: ASCII File with separators Reports Maintenance plans
Rail Review 14 September 2001
Results
Database reports:
Retrieval of qualitative information.
SCRIC information.
Information on reliability parameters and information
regarding maintenace resources.
LCC info.
Historical information related to failures.
Maintence plans: flexibility to generate plans with different criteria
Criticality, Urgency, Efficiency ….
Data exploitation: the prototype supports future applications.
Rail Review 14 September 2001
RAIL Internet RCM Toolbox
Rail Review 14 September 2001
Main Functionalities of the DB Main Functionalities of the DB ToolBoxToolBox
Editing lines, sections and components.
Introducing criticallity and failures in a friendly-user mode.
Helping to develop the RCM analysis: templates.
LCC method integrated with the tool and the DB.
Elaboration of reports of proposed task.
Posibility of doing several statistic analysis.
Administration: Data base and project creation. Data feeding using automated methods.
Rail Review 14 September 2001
RAIL Internet RCM Toolbox
Rail Review 14 September 2001
RAIL ToolBoxRAIL ToolBox
Rail Review 14 September 2001
RAIL ToolBoxRAIL ToolBox
Rail Review 14 September 2001
RAIL ToolBoxRAIL ToolBox
Rail Review 14 September 2001
RAIL ToolBoxRAIL ToolBox
Rail Review 14 September 2001
RAIL ToolBoxRAIL ToolBox
Rail Review 14 September 2001
RAIL ToolBoxRAIL ToolBox
Rail Review 14 September 2001
Better to see a DEMO ....