Radioactive waste management in The Netherlands I Ewoud Verhoef and Hans Codée COVRA NV 8 December 2014 Miljøudvalget 2014-15 (1. samling) MIU Alm.del - Bilag 102 Offentligt

Radioactive waste management in The Netherlands I

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Radioactive waste management in The Netherlands I

Radioactive waste management in The Netherlands I

Ewoud Verhoef and Hans Codée COVRA NV

8 December 2014

Miljøudvalget 2014-15 (1. samling)MIU Alm.del - Bilag 102

Offentligt

Page 2: Radioactive waste management in The Netherlands I

2

CONTENT

•  Policy in the Netherlands

•  Management in practice

•  Geological disposal

Page 3: Radioactive waste management in The Netherlands I

3

CONTENT

•  Policy in the Netherlands

•  Management in practice

•  Geological disposal

Page 4: Radioactive waste management in The Netherlands I

4 4

RADIOACTIVE WASTE MANAGEMENT

•  Isolate, Control, Monitor

•  radioactivity will decay

hazard disappears

keep the waste in a safe place

Page 5: Radioactive waste management in The Netherlands I

5 5

RADIOACTIVE WASTE MANAGEMENT

•  isolate in buildings

•  shallow land burial

•  control by society

100 - 300 years

up to many millions of years

•  isolation by nature (geology)

Page 6: Radioactive waste management in The Netherlands I

6

RADIOACTIVE WASTE

•  2 nuclear power plants

1 operating (500 MWE)

1 shut down(GKN 1997)

•  2 research centers

•  U-enrichment plant

•  Mo-production

•  industry

•  medicine

•  research

1300 license holders

Page 7: Radioactive waste management in The Netherlands I

7

RADIOACTIVE WASTE

•  HLW: 90 m3

•  LILW: 11.00 m3

•  NORM: 17.000 m3

Page 8: Radioactive waste management in The Netherlands I

8

Page 9: Radioactive waste management in The Netherlands I

9

Page 10: Radioactive waste management in The Netherlands I

10

Page 11: Radioactive waste management in The Netherlands I

11 11

SOLUTIONS FOR THE NETHERLANDS

•  small amount of waste

•  high ground water table

•  high population density

•  high environmental awareness

•  advanced spatial

planning

no shallow disposal, only deep disposal

17 million people

Page 12: Radioactive waste management in The Netherlands I

12

RADIOACTIVE WASTE POLICY

•  all waste managed and owned by COVRA

•  all waste at one industrial site

•  at least 100 years storage, in buildings

•  disposal after 100 years either in national or international context

(dual track)

•  research

stable policy since 1984

Page 13: Radioactive waste management in The Netherlands I

13

CONTENT

•  Policy in the Netherlands

•  Management in practice

•  Geological disposal

Page 14: Radioactive waste management in The Netherlands I

14

COVRA SITE

Page 15: Radioactive waste management in The Netherlands I

15

COVRA SITE

Page 16: Radioactive waste management in The Netherlands I

16

Source low and intermediate level radioactive waste (LILW)

•  NPPs

•  Hospitals &

laboratoria

•  Oreprocessing & process industry

RADIOACTIVE WASTE

Page 17: Radioactive waste management in The Netherlands I

17

SUPERCOMPACTION

Page 18: Radioactive waste management in The Netherlands I

18

INCINERATION

Page 19: Radioactive waste management in The Netherlands I

19

STORAGE CONTAINERS LILW

1.   Supercompacted puck

2.   Concrete

3.   Gegalvanised drum

4.   Concrete overpack

Page 20: Radioactive waste management in The Netherlands I

20

STORAGE BUILDINGS LILW

Page 21: Radioactive waste management in The Netherlands I

21

Page 22: Radioactive waste management in The Netherlands I

22

STORAGE LILW

Page 23: Radioactive waste management in The Netherlands I

23

STACKING LILW CONTAINERS

Page 24: Radioactive waste management in The Netherlands I

24

RADIOACTIVE DECAY

Page 25: Radioactive waste management in The Netherlands I

25

HIGH LEVEL RADIOACTIVE STORAGE AND TREATMENT BUILDING (HABOG)

Page 26: Radioactive waste management in The Netherlands I

26

Source High Level radioactive Waste (HLW)

•  NPPs

•  Research reactors

RADIOACTIVE WASTE

Page 27: Radioactive waste management in The Netherlands I

27

Recycling HLW

• France

• GB

RADIOACTIVE WASTE

Page 28: Radioactive waste management in The Netherlands I

28

HABOG DESIGN CRITERIA

All events > 10-6 / a

•  Earthquake

•  Plane crash (F-16)

•  Flooding + 10 m NAP

•  Gas cloud explosions

•  Whirlwind up to 125 m/s

Page 29: Radioactive waste management in The Netherlands I

29

HABOG LAYOUT

Treatment Storage Reception

Page 30: Radioactive waste management in The Netherlands I

30

HABOG LAYOUT

Treatment Storage Reception

Page 31: Radioactive waste management in The Netherlands I

31

HABOG LAYOUT

Treatment Storage Reception

Page 32: Radioactive waste management in The Netherlands I

32

HABOG CROSS-SECTION

Heat producing waste Non-heat producing waste

Ventilation shaft

Page 33: Radioactive waste management in The Netherlands I

33

HABOG PASSIVE COOLING SYSTEEM

Air in

Air out

Page 34: Radioactive waste management in The Netherlands I

34

SAFE = BEAUTIFUL

Page 35: Radioactive waste management in The Netherlands I

35

2003

Page 36: Radioactive waste management in The Netherlands I

36

2023

Page 37: Radioactive waste management in The Netherlands I

37

2043

Page 38: Radioactive waste management in The Netherlands I

38

2063

Page 39: Radioactive waste management in The Netherlands I

39

2083

Page 40: Radioactive waste management in The Netherlands I

40

2103

Page 41: Radioactive waste management in The Netherlands I

41

CONTENT

•  Policy in the Netherlands

•  Management in practice

•  Geological disposal

Page 42: Radioactive waste management in The Netherlands I

42

RADIOACTIVE WASTE POLICY

•  all waste managed and owned by COVRA

•  all waste at one industrial site

•  at least 100 years storage, in buildings

•  disposal after 100 years either in national or international context

(dual track)

• research

Page 43: Radioactive waste management in The Netherlands I

COVRA TIME SCHEME

43

Page 44: Radioactive waste management in The Netherlands I

44 44

OPERA

•  Goals & ambitions:

Roadmap Research

1.  Evaluation previous studies

2.  Initial, conditional Safety Case

3.  Societal aspects

4.  Re-activate competences

•  Focus: Boom clay (and rocksalt)

Page 45: Radioactive waste management in The Netherlands I

45

DISPOSAL CONCEPT

Page 46: Radioactive waste management in The Netherlands I

46

DISPOSAL CONCEPT

Page 47: Radioactive waste management in The Netherlands I

47

DISPOSAL CONCEPT

Page 48: Radioactive waste management in The Netherlands I

48

OPERA STATUS

•  Two calls for proposals (in 2011 and 2012)

•  21 projects

•  20 organisations

Roadmap & Safety Case 2016