PERHITUNGAN BIAYA LANGSUNG PERSONIL JASA KONSULTANSI PERENCANAAN TEKNIS No Nama Personil/ Pengalaman Gaji Beban Beban Biaya Tunjangan Posisi/Jabatan Proffesional Dasar Biaya Sosial Umum Penugasan (tahun) (Rp.) (Rp.) (Rp.) (Rp.) a b c d e = (0,3-0,4)d f = (0,5-1,3)d g = (0,1-0,3)d 1 Team Leader Lingkungan 5 7,500,000.00 2,625,000.00 6,750,000.00 1,500,000.00 2 Ahli Geologis 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00 3 Ahli GIS 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00 4 Ahli Planologi 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00 5 Ahli Kelautan 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00 6 Ahli Biologi 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00 7 Ahli Sosial Ekonomi 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00 8 Ahli kimia 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00 9 Ahli Hidrologi 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00 1 Asisten GIS 1,750,000.00 612,500.00 1,575,000.00 350,000.00 1 Office Manager 1,250,000.00 437,500.00 1,125,000.00 250,000.00 2 Tenaga Administrasi 800,000.00 280,000.00 720,000.00 160,000.00 3 Operator Komputer 800,000.00 280,000.00 720,000.00 160,000.00 4 Document Specialist 650,000.00 227,500.00 585,000.00 130,000.00 5 Surveyor 1,750,000.00 612,500.00 1,575,000.00 350,000.00 6 Juru Gambar 1,750,000.00 612,500.00 1,575,000.00 350,000.00 PERHITUNGAN BIAYA LANGSUNG NON PERSONIL PERHITUNGAN BIAYA LANGSUNG NON PERSONIL Jenis Kendaraan : Roda Empat (Mobil) Jenis Kendaraan No. Uraian Pengeluaran Perbulan Jumlah No. ian Pengeluaran Perbu (Rp.) 1 Sewa Kendaraan Roda Empat 1 Unit 8,000,000.00 1 Sewa Kendaraan Roda 2 Biaya Operasional & Pemeliharaan 2,000,000.00 2 Biaya Operasional & ( 0,2 - 0,3) x Biaya Sewa Kendaraan ( 0,2 - 0,3) x Biaya 3 Biaya Sopir 750,000.00

RAB Proposal KLHS Kab Asmat 2012

Embed Size (px)

Citation preview

Page 1: RAB Proposal KLHS Kab Asmat 2012

PERHITUNGAN BIAYA LANGSUNG PERSONIL JASA KONSULTANSI PERENCANAAN TEKNIS

No Nama Personil/ Pengalaman Gaji Beban Beban Biaya TunjanganPosisi/Jabatan Proffesional Dasar Biaya Sosial Umum Penugasan

(tahun) (Rp.) (Rp.) (Rp.) (Rp.)a b c d e = (0,3-0,4)d f = (0,5-1,3)d g = (0,1-0,3)d

1 Team Leader Lingkungan 5 7,500,000.00 2,625,000.00 6,750,000.00 1,500,000.00 2 Ahli Geologis 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00 3 Ahli GIS 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00 4 Ahli Planologi 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00 5 Ahli Kelautan 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00 6 Ahli Biologi 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00 7 Ahli Sosial Ekonomi 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00 8 Ahli kimia 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00 9 Ahli Hidrologi 5 5,000,000.00 1,750,000.00 4,500,000.00 1,000,000.00

1 Asisten GIS 1,750,000.00 612,500.00 1,575,000.00 350,000.00

1 Office Manager 1,250,000.00 437,500.00 1,125,000.00 250,000.00 2 Tenaga Administrasi 800,000.00 280,000.00 720,000.00 160,000.00 3 Operator Komputer 800,000.00 280,000.00 720,000.00 160,000.00 4 Document Specialist 650,000.00 227,500.00 585,000.00 130,000.00 5 Surveyor 1,750,000.00 612,500.00 1,575,000.00 350,000.00 6 Juru Gambar 1,750,000.00 612,500.00 1,575,000.00 350,000.00

PERHITUNGAN BIAYA LANGSUNG NON PERSONIL PERHITUNGAN BIAYA LANGSUNG NON PERSONILJenis Kendaraan : Roda Empat (Mobil) Jenis Kendaraan

No. Uraian Pengeluaran Perbulan Jumlah No. Uraian Pengeluaran Perbulan(Rp.)

1 Sewa Kendaraan Roda Empat 1 Unit 8,000,000.00 1 Sewa Kendaraan Roda Dua 1 Unit

2 Biaya Operasional & Pemeliharaan 2,000,000.00 2 Biaya Operasional & Pemeliharaan( 0,2 - 0,3) x Biaya Sewa Kendaraan ( 0,2 - 0,3) x Biaya Sewa Kendaraan

3 Biaya Sopir 750,000.00

Page 2: RAB Proposal KLHS Kab Asmat 2012

Total Biaya Sewa Mobil/bulan 10,750,000.00 Total Biaya Sewa Motor/bulanDibulatkan 10,750,000.00 Dibulatkan

Page 3: RAB Proposal KLHS Kab Asmat 2012

Keuntungan Biaya LangsungPersonil Dibulatkan

(Rp.) (Rp.) (Rp.)h=0,1(d+e+f) I = (d+e+f+g+h)

1,687,500.00 20,062,500.00 20,062,000.00 1,125,000.00 13,375,000.00 13,300,000.00 1,125,000.00 13,375,000.00 13,300,000.00 1,125,000.00 13,375,000.00 13,300,000.00 1,125,000.00 13,375,000.00 13,300,000.00 1,125,000.00 13,375,000.00 13,300,000.00 1,125,000.00 13,375,000.00 13,300,000.00 1,125,000.00 13,375,000.00 13,300,000.00 1,125,000.00 13,375,000.00 13,300,000.00

393,750.00 4,681,250.00 4,681,000.00

281,250.00 3,343,750.00 3,340,000.00 180,000.00 2,140,000.00 2,140,000.00 180,000.00 2,140,000.00 2,140,000.00 146,250.00 1,738,750.00 1,730,000.00 393,750.00 4,681,250.00 4,680,000.00 393,750.00 4,681,250.00 4,680,000.00

PERHITUNGAN BIAYA LANGSUNG NON PERSONIL: Roda Dua (Motor)

Uraian Pengeluaran Perbulan Jumlah(Rp.)

Sewa Kendaraan Roda Dua 1 Unit 3,000,000.00

Biaya Operasional & Pemeliharaan 750,000.00 ( 0,2 - 0,3) x Biaya Sewa Kendaraan

Page 4: RAB Proposal KLHS Kab Asmat 2012

Total Biaya Sewa Motor/bulan 3,750,000.00 3,750,000.00

Page 5: RAB Proposal KLHS Kab Asmat 2012

DAFTAR KUANTITAS DAN HARGA

I . BIAYA LANGSUNG PERSONILA. BIAYA PERSONIL / TENAGA AHLI (Harga Satuan Tetap)No. JABATAN Jumlah Pengalaman Waktu Beban Biaya

Personil Tahun (Bulan) Personil(Rp.)

PROFESIONAL STAFF1 Team Leader Lingkungan 1 5 6 20,062,000 2 Ahli Geologis 1 5 6 13,300,000 3 Ahli GIS 1 5 3 13,300,000 4 Ahli Planologi 1 5 6 13,300,000 5 Ahli Kelautan 1 5 6 13,300,000 6 Ahli Biologi 1 5 6 13,300,000 7 Ahli Sosial Ekonomi 1 5 5 13,300,000 8 Ahli kimia 1 5 5 13,300,000 9 Ahli Hidrologi 1 5 6 13,300,000

JUMLAH A

B. BIAYA LANGSUNG PENDUKUNG (Harga Satuan Tetap)Jumlah Waktu Gaji Per

No. URAIAN Personil (Bulan) Bulan(Rp.)

ASISTEN MUDA1 Asisten GIS 1 4.0 4,681,000

STAF TEKNIK1 Surveyor 5 2 4,680,000 2 Juru Gambar 2 5 4,680,000

PENUNJANG1 Office Manager 1 6 3,340,000 2 Tenaga Administrasi 1 6 2,140,000 3 Operator Komputer 2 6 2,140,000 4 Document Specialist 1 6 1,730,000

JUMLAH B

II . BIAYA NON PERSONILC. UPAH TENAGA HARIAN (Harga Satuan Tetap)

Jumlah Gaji PerNo. URAIAN Personil Hari Hari

(Rp.)BURUH HARIAN

1 - Tenaga Lokal 5 28 150,000

JUMLAH C

D. TRANSPORTASI DAN AKOMODASI (Harga Satuan Tetap)

VolumeHarga

No. URAIAN Satuan(Rp.)

Page 6: RAB Proposal KLHS Kab Asmat 2012

1 Sewa Speedboat 28 Hr 2,800,000 2 Pesawat Daerah asal-Timika PP 15 org 4,000,000 3 Pesawat Timika-asmat PP 15 org 2,000,000 5 Penginapan Selama Di TIMIKA 16 8 kmr x 2 hr 300,000 6 Penginapan Selama Di ASMAT ( Masa survey ) 192 8 kmr x 28 hr 300,000 7 Biaya konsumsi selama masa survey 1 Ls 10,000,000

JUMLAH D

Page 7: RAB Proposal KLHS Kab Asmat 2012

E. PERALATAN PERLENGKAPAN LAPANGAN (Harga Satuan Tetap)Volume Harga

No. URAIAN Satuan(Rp.)

1 Film, Cuci dan Cetak 1 Ls 3,000,000 2 Sewa alat survey 1 Ls 10,000,000 3 Pengadaan Peta-peta 1 Ls 100,000,000 4 Sewa Laboratorium ( include peralatan ) 2 bln 15,000,000

JUMLAH D

F. FASILITAS KANTOR (Harga Satuan Tetap)Volume Harga

No. URAIAN Satuan(Rp.)

1 Sewa Kantor 6 Bln 5,000,000 2 Furniture Kantor 1 Ls 10,000,000 3 Sewa Komputer + Printer 6 Bln 3,500,000 4 Sewa Printer Gambar A3 6 Bln 250,000 5 Biaya Telefon dan internet 6 Bln 1,500,000 6 Alat tulis, peralatan dan bahan gambar 1 Ls 2,500,000 7 Pelaporan :

- Laporan Pendahuluan 5 Bk 250,000 - Laporan Interim 5 Bk 350,000 - Konsep Laporan Akhir 5 Bk 500,000 - Laporan Akhir 5 Bk 750,000 - Ringkasan Laporan 5 Bk 350,000 - Peta-peta 5 Set 6,500,000

JUMLAH E

Page 8: RAB Proposal KLHS Kab Asmat 2012

DAFTAR KUANTITAS DAN HARGA

JumlahBiaya(Rp)

120,372,000 79,800,000 39,900,000 79,800,000 79,800,000 79,800,000 66,500,000 66,500,000 79,800,000

692,272,000

JumlahBiaya(Rp)

18,724,000

9,360,000 23,400,000

20,040,000 12,840,000 25,680,000 10,380,000

120,424,000

JumlahBiaya(Rp)

21,000,000

21,000,000

JumlahBiaya(Rp)

Page 9: RAB Proposal KLHS Kab Asmat 2012

78,400,000 60,000,000 30,000,000 4,800,000 57,600,000 10,000,000

240,800,000

Page 10: RAB Proposal KLHS Kab Asmat 2012

JumlahBiaya(Rp)

3,000,000 10,000,000 100,000,000 30,000,000

143,000,000

JumlahBiaya(Rp)

30,000,000 10,000,000 21,000,000 1,500,000 9,000,000 2,500,000

1,250,000 1,750,000 2,500,000 3,750,000 1,750,000 32,500,000

117,500,000

Page 11: RAB Proposal KLHS Kab Asmat 2012

REKAPITULASI

KAJIAN LINGKUNGAN HIDUP STRATEGIS

( K L H S )

KABUPATEN ASMAT

TAHUN ANGGARAN 2012

No. URAIAN KEGIATAN

A BIAYA PERSONIL / TENAGA AHLI

B BIAYA TENAGA PENDUKUNG

C UPAH TENAGA HARIAN

D TRANSPORTASI

E PERALATAN & PERLENGKAPAN LAPANGAN

F FASILITAS KANTOR

BIAYA PEKERJAANPPn 10%TOTAL BIAYADIBULATKAN

Terbilang :

Satu Milyar Empat Ratus Enam Puluh Delapan Juta Empat Ratus Sembilan Puluh Lima Ribu Rupiah

Page 12: RAB Proposal KLHS Kab Asmat 2012

REKAPITULASI

KAJIAN LINGKUNGAN HIDUP STRATEGIS

( K L H S )

KABUPATEN ASMAT

TAHUN ANGGARAN 2012

JUMLAH(Rp.)

692,272,000.00

120,424,000.00

21,000,000.00

240,800,000.00

143,000,000.00

117,500,000.00

1,334,996,000.00 133,499,600.00 1,468,495,600.00 1,468,495,000.00

Satu Milyar Empat Ratus Enam Puluh Delapan Juta Empat Ratus Sembilan Puluh Lima Ribu Rupiah