TELKOMSEL PROJECT SITE NAME/ID : Harjatani Mulai Selesai NO. BILL OF QUANTITY & UNIT RATE - CIVIL WORKS & TOWER WORKS PRICE UNIT Quantity As Built BOQ PO Standart Volume Total Price ITEM I. PRE-IMPLEMENTATION Sub Total I Pre-Implementation II. IMPLEMENTATION A. Preparation work - Site Clearing and Preparation (inc. Measurement of tower position, shelter & Landscape) Rp 2,421,255 Ls 1.00 2,421,255.000 SPK SIPIL - Establish water supply for site works Rp 1,398,930 Ls 1.00 1,398,930.000 KWITANSI - Mobilization and Demobilization Rp 6,600,000 Ls 1.00 6,600,000.000 KWITANSI - Mobilization from ground to rooftop for Poles Rp 3,500,000 Ls - - Mobilization from ground to rooftop for SST Rp 4,500,000 Ls - - Detailed Site Design - Tower Foundation Design Ls - Construction Drawing and BoQ Ls Sub Total A Preparation Work 10,420,185.0 B. General Construction B.1 Fence and Yard Standard a. Site Construction 10 m x 15 m - Fence (Included stone masonry,sloof,post) Rp 818,428 m1 38.500 31,509,472.6 SPK SIPIL, BON MATERIAL - Landscaping (gravel) thickness 15 cm Rp 48,425 m1 91.810 4,445,853.3 SPK SIPIL, BON MATERIAL - Sliding door 1,5 m width Rp 2,206,005 Ls 1.000 2,206,005.0 BON FABRIKASI - Yard Lamp Phillips mercury (includes material, labor, cabling and accessories) unit - - Yard Lamp TL 2 x 36 (type GMS HG Artolite) + Box + Bracket (includes labor, cabling and accessories) Rp 1,936,980 set 1.000 1,936,980.0 BON ME Non Standard (if applicable) - a. Retaining wall Rp 427,750 m3 - b. Excavation at rocky soil Rp 102,230 m3 - c. Cut and fill (labor and material) Rp 40,000 m3 - d. Import soil (inc. Transportation and compaction) Rp 102,230 m3 - BON MOBILISASI e. Gate 3 m unit - f. Open drainage system 1/2 dia 20 cm m' - g. Barbed wire fence for underdeveloped lease area Rp 36,000 m' 28.00 1,008,000.0 SPK SIPIL, BON MATERIAL h. concrete post for underdeveloped lease area (15x15x250 cm) Rp 137,500 pcs 15.00 2,062,500.0 SPK SIPIL, BON MATERIAL m. Stone Masonry Rp 397,500 m3 - SPK SIPIL, BON MATERIAL - B.2 Access Road - Non Standard (if applicable) - b. Gravel access road (thickness 150mm) Rp 48,425 m2 - SPK SIPIL, BON MATERIAL b. Gravel access road (thickness 200mm) Rp 66,000 6.00 396,000.0 f. Wooden Pile Ø 8 - 10 cm (supply and installation) Rp 12,375 m' - SPK SIPIL, BON MATERIAL i. Stone Masonry Rp 427,750 m3 - SPK SIPIL, BON MATERIAL j. Import Soil (inc. Transportation and compaction) Rp 102,230 m3 - SPK SIPIL, BON MATERIAL m. drainage system 1/2 dia 40 cm m' - B.3 PLN Connection - Standard Works - Non Standard (if applicable) - - NYFGBY 4x16mm2 Rp 96,250 m' 15.00 15.00 1,443,750.0 BON ME - NYFGBY 4x25mm2 m' -

RAB FINAL HARJATANI.xls

Embed Size (px)

Citation preview

Standard BoQTELKOMSEL PROJECTSITE NAME/ID : HarjataniMulai25 Nopember 2011SelesaiNO.BILL OF QUANTITY & UNIT RATE - CIVIL WORKS & TOWER WORKSPRICEUNITQuantityAs Built BOQRAPPO StandartVolumeTotal PriceVolumeTotal Price AktualITEMI.PRE-IMPLEMENTATIONStandard- Site Acquisition (Inc. Documentation, accessories and complete ground lease, SSR, Admin of Lease Payment)Ls- IMB Permit (Surat Izin Mendirikan Bangunan dan Izin Prinsip)Ls- Local Community Permit (Community permit, RT+RW+Lurah+Camat recommendation)Ls- Soil Test /Hammer Test Report (Present by University or representative consultant)Ls- Pre Design Package (detailed proposed site layout and access as Protelindo Standard format approved by Engineering Dept.)Ls- PLN (PLN Avaibility and application through AKLI certified company)LsNon Standard (if applicable)- Retribution per m' heightLs- Civil Aviation/MilitaryLs- HO (Ijin gangguan)Ls- AMDALLsSub Total I Pre-ImplementationII.IMPLEMENTATIONA.Preparation work- Site Clearing and Preparation (inc. Measurement of tower position, shelter & Landscape)2,421,255Ls1.002,421,255.0001,815,941.3SPK SIPIL- Establish water supply for site works1,398,930Ls1.001,398,930.0001,049,197.5KWITANSI- Mobilization and Demobilization6,600,000Ls1.006,600,000.0004,950,000.0KWITANSI- Mobilization from ground to rooftop for Poles3,500,000Ls0.0- Mobilization from ground to rooftop for SST4,500,000Ls0.0- Detailed Site Design- Tower Foundation DesignLs- Construction Drawing and BoQLsSub Total A Preparation Work10,420,185.00.07,815,138.8B.General ConstructionB.1 Fence and YardStandarda. Site Construction 10 m x 15 m- Fence (Included stone masonry,sloof,post)818,428m138.50031,509,472.638.5023,632,104.5SPK SIPIL, BON MATERIAL- Landscaping (gravel) thickness 15 cm48,425m191.8104,445,853.386.283,334,390.0SPK SIPIL, BON MATERIAL- Sliding door 1,5 m width2,206,005Ls1.0002,206,005.01.001,654,503.8BON FABRIKASI- Yard Lamp Phillips mercury (includes material, labor, cabling and accessories)unit0.00.0- Yard Lamp TL 2 x 36 (type GMS HG Artolite) + Box + Bracket (includes labor, cabling and accessories)1,936,980set1.0001,936,980.01.001,452,735.0BON MENon Standard (if applicable)0.00.0a. Retaining wall427,750m30.00.0b. Excavation at rocky soil102,230m30.00.0c. Cut and fill (labor and material)40,000m30.00.0d. Import soil (inc. Transportation and compaction)102,230m30.068.020.0BON MOBILISASIe. Gate 3 munit0.00.0f. Open drainage system 1/2 dia 20 cmm'0.00.0g. Barbed wire fence for underdeveloped lease area36,000m'28.001,008,000.050.00756,000.0SPK SIPIL, BON MATERIALh. concrete post for underdeveloped lease area (15x15x250 cm)137,500pcs15.002,062,500.027.001,546,875.0SPK SIPIL, BON MATERIALi. Wooden Pile 6 - 8 cm (supply and installation)10,000m'0.00.0SPK SIPIL, BON MATERIALj. Wooden Pile 8 - 10 cm (supply and installation)m'0.00.0SPK SIPIL, BON MATERIALk. Wooden Pile 10 - 12 cm (supply and installation)m'0.00.0SPK SIPIL, BON MATERIALl. Wooden Pile 12 - 15 cm (supply and installation)m'0.00.0SPK SIPIL, BON MATERIALm. Stone Masonry397,500m30.011.370.0SPK SIPIL, BON MATERIAL0.00.0B.2 Access Road0.00.0Non Standard (if applicable)0.00.0a. Concrete access road K-175 (thickness 150mm included wire mesh 6-150)m20.00.0b. Gravel access road (thickness 150mm)48,425m20.010.000.0SPK SIPIL, BON MATERIALb. Gravel access road (thickness 200mm)66,0006.00396,000.06.70c. Concrete bridge K-1750.00.0SPK SIPIL, BON MATERIAL- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standardkg0.00.0SPK SIPIL, BON MATERIAL- Concrete K-175 with SK SNI 03.2002 Standardm30.00.0SPK SIPIL, BON MATERIALd. Wooden Bridge (LxW = 3x1)unit0.00.0SPK SIPIL, BON MATERIALe. Wooden Pile 6 - 8 cm (supply and installation)m'0.00.0SPK SIPIL, BON MATERIALf. Wooden Pile 8 - 10 cm (supply and installation)12,375m'0.036.000.0SPK SIPIL, BON MATERIALg. Wooden Pile 10 - 12 cm (supply and installation)m'0.00.0SPK SIPIL, BON MATERIALh. Wooden Pile 12 - 15 cm (supply and installation)m'0.00.0SPK SIPIL, BON MATERIALi. Stone Masonry427,750m30.03.750.0SPK SIPIL, BON MATERIALj. Import Soil (inc. Transportation and compaction)102,230m30.03.040.0SPK SIPIL, BON MATERIALk. Cut and fill (labor and material)m30.00.0SPK SIPIL, BON MATERIALl. Open drainage system 1/2 dia 40 cm40,000m'0.012.000.0SPK SIPIL, BON MATERIALm. drainage system 1/2 dia 40 cmm'0.02.000.0B.3 PLN Connection0.00.0Standard Works0.00.0PLN Connection 7.7 kVA (inc. Pole 2 unit & Foundation + cable power 100m) by AKLI Certified CompanyLs0.00.0Non Standard (if applicable)0.00.0a. PLN Connection 4.40 kVA (inc. Pole 2 unit & Foundation + cable power 100m) by AKLI Certified CompanyLs0.00.0b. PLN Connection 5.50 kVA (inc. Pole 2 unit & Foundation + cable power 100m) by AKLI Certified CompanyLs0.00.0c. PLN Connection 6.60 kVA (inc. Pole 2 unit & Foundation + cable power 100m) by AKLI Certified CompanyLs0.00.0d. PLN Connection 10.6 kVA (inc. Pole 2 unit & Foundation + cable power 100m) by AKLI Certified CompanyLs0.00.0e. PLN Connection 11.0 kVA (inc. Pole 2 unit & Foundation + cable power 100m) by AKLI Certified CompanyLs0.00.0f. PLN Connection 13.2 kVA (inc. Pole 2 unit & Foundation + cable power 100m) by AKLI Certified CompanyLs0.00.0g. PLN Connection 13.9 kVA (inc. Pole 2 unit & Foundation + cable power 100m) by AKLI Certified CompanyLs0.00.0h. PLN Connection 16.5 kVA (inc. Pole 2 unit & Foundation + cable power 100m) by AKLI Certified CompanyLs0.00.0i. PLN Connection 23.0 kVA (inc. Pole 2 unit & Foundation + cable power 100m) by AKLI Certified CompanyLs0.00.0j. PLN Steel Pole (inc. Foundation) + Accessoriesunit0.00.0k. PLN Concrete Pole (inc. Foundation) + Accessoriesunit0.00.0l. Power Cable as per PLN Connection0.00.0- NYY 4x16mm2m'0.00.0BON ME- NYY 4x25mm2m'0.00.0- NYFGBY 4x16mm296,250m'15.0015.001,443,750.015.001,082,812.5BON ME- NYFGBY 4x25mm2m'0.0m. Laying cable under ground (inc. Excavation, sand layer and filing)m'0.0n. Transformer0.0- 20 kVA (inc. Accessories: Cable, Cage, Clamp, Bracket, Scoon, Box, Bolt & Nut, Etc)unit0.0- 25 kVA (inc. Accessories: Cable, Cage, Clamp, Bracket, Scoon, Box, Bolt & Nut, Etc)unit0.0- 50 kVA (inc. Accessories: Cable, Cage, Clamp, Bracket, Scoon, Box, Bolt & Nut, Etc)unit0.0- 60 kVA (inc. Accessories: Cable, Cage, Clamp, Bracket, Scoon, Box, Bolt & Nut, Etc)unit0.0- 80 kVA (inc. Accessories: Cable, Cage, Clamp, Bracket, Scoon, Box, Bolt & Nut, Etc)unit0.0- 100 kVA (inc. Accessories: Cable, Cage, Clamp, Bracket, Scoon, Box, Bolt & Nut, Etc)unit0.0o. Cable ducting for Rooftop sites (Legrand)m'0.0Sub Total B General Construction45,008,561.033,459,420.7C.Tower FoundationC.1 Standard WorksSoil worka. Excavation of soil for foundation41,968m345.6441,915,583110.671,436,687.1SPK SIPILb. Sand layer under the foundation t=10cm170,562m33.844655,6406.97491,729.8SPK SIPIL, BON MATERIALc. Backfilling foundation soil and compaction per 300mm30,669m320.898640,91861.35480,688.2SPK SIPILConcrete work0.00.0d. Concrete work floor (lean concrete 5cm)716,952m31.9221,377,981.0334.491,033,485.8SPK SIPIL, BON MATERIALe. Concrete K-2250.00.0- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standard14,527kg1,753.83025,478,502.2513,143.3919,108,876.7SPK SIPIL, BON MATERIAL BESI- Concrete K-225 with SK SNI 03.2002 Standard1,748,663m319.46834,042,961.55039.9725,532,221.2SPK SIPIL, BON MATERIALC.2 Non Standard Works0.00.0SPK SIPIL, BON MATERIALa. Bored Pile 40cm (supply and installation) longitudinal bar 8 pcs561,000m'0.00.0SPK SIPIL, BON MATERIALb. Bored Pile 60cm (supply and installation) longitudinal bar 12 pcsm'0.00.0SPK SIPIL, BON MATERIALc. Well Foundation 80cm (supply and installation) longitudinal Bar 16 pcs (Cassion Foundation)m'0.00.0SPK SIPIL, BON MATERIALd. Well Foundation 100cm (supply and installation) longitudinal Bar 20 pcs (Cassion Foundation)m'0.00.0SPK SIPIL, BON MATERIALe. Mini Pile 40cm (supply and installation)m'0.00.0SPK SIPIL, BON MATERIALf. Wooden Pile 6 - 8 cm (supply and installation)m'0.00.0SPK SIPIL, BON MATERIALg. Wooden Pile 8 - 10 cm (supply and installation)m'0.00.0SPK SIPIL, BON MATERIALh. Wooden Pile 10 - 12 cm (supply and installation)m'0.00.0SPK SIPIL, BON MATERIALi. Wooden Pile 12 - 15 cm (supply and installation)m'0.00.0SPK SIPIL, BON MATERIALj. Excavation at rocky soil (Labor and Equipment)m30.00.0SPK SIPIL, BON MATERIAL0.00.0C.3Steel Outdoor Base Frame (2G+3G)0.00.0a. IWF Steel (hot-dip galvanized)kg0.00.0SPK SIPIL, BON MATERIALb. Anchor HILTI M20 - 25cm (Include HILTI Chemicals)pcs0.00.0SPK SIPIL, BON MATERIALc. Concrete for counterweight K-225 (include rebar)0.00.0SPK SIPIL, BON MATERIAL- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standard14,527kg0.00.0SPK SIPIL, BON MATERIAL- Concrete K-225 with SK SNI 03.2002 Standard1,748,663m30.00.0SPK SIPIL, BON MATERIALd. Pole 6m (Installation only)unit0.00.0SPK SIPIL, BON MATERIALe. Pole 9m (Installation only)unit0.00.0SPK SIPIL, BON MATERIALf. Pole 12m (Installation only)unit0.00.0SPK SIPIL, BON MATERIALg. Base Frame Equipment, H beam 200x100x5.5 - (3500 mm for Siemens or 3000 mm for Nokia) HDG (70 mikron) complete with accessories5,456,000set0.02.000.0KWITANSI(moor, bolt, spring ring, plate ring HTB 8.8, dynabolt & grouting)0.00.0Non Standard (if applicable)0.00.0SPK SIPIL, BON MATERIALBuilding Strengthening0.00.0SPK SIPIL, BON MATERIALa. Steel Beam Reinforcementkg0.00.0SPK SIPIL, BON MATERIALb. Concrete K-2250.00.0SPK SIPIL, BON MATERIAL- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standard14,527kg0.00.00.0SPK SIPIL, BON MATERIAL- Concrete K-225 with SK SNI 03.2002 Standard1,748,663m30.00.00.0SPK SIPIL, BON MATERIALc. Anchor + Chemicals for Reinforcement0.00.0SPK SIPIL, BON MATERIAL- M20pcs0.00.0SPK SIPIL, BON MATERIAL- M12pcs0.00.0SPK SIPIL, BON MATERIALd. Sika Injection0.00.0SPK SIPIL, BON MATERIALe. Steel access stairm'0.00.0SPK SIPIL, BON MATERIALf. Wall demolitionm20.00.0Sub Total C Tower Foundation64,111,585.048,083,688.8D.Tower Work (Tower material supply by Protelindo)- Delivery of material to site1,815kg5,781.6905,781.690$10,493,7677,870,325.5BON DELIVERY- Tower erection works including installation of antenna mounting and any Accessories1,614kg5,781.695,781.69$9,332,5156,999,386.2SPK EREKTOR- Installation of Antenna Mounts0.00.0- Tower painting (Aviation permit required only)0.00.0Triangular Tower0.00.0a. SST 20mLs0.00.0b. SST 25mLs0.00.0c. SST 30mLs0.00.0d. SST 43m10,165,000Ls0.00.0e. SST 53mLs0.00.0f. SST 63mLs0.00.0g. SST 70mLs0.00.0h. SST 80mLs0.00.0i. SST 100mLs0.00.0Four Legs Tower0.00.0a. SST 20mLs0.00.0b. SST 25mLs0.00.0c. SST 30mLs0.00.0d. SST 43mLs0.00.0e. SST 53mLs0.00.0f. SST 63mLs0.00.0g. SST 70mLs0.00.0h. SST 80mLs0.00.0KWITANSIi. SST 100mLs0.00.0- Tower Name Plate (aluminum 22mm thk x 200 x 400mm)492,316Unit1.001.00$492,316369,236.8BON / KWITANSI- Support pole for horizontal cable tray installationUnit0.0- Supply and Install Cable Tray357,500m'0.0Sub Total D Packing + Delivery, erection and painting work20,318,598.015,238,948.5E.Shelter / BTSE.1 Shelter / BTS Foundation for Outdoor (HCPT)- Soil Excavationm3- Sand Layering 100mmm3- Lean Concrete 50mmm3- River Stone Masonry427,750m30.45192,487.388- Concrete K-2250.0- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standard14,527kg283.749283.749$4,122,121- Concrete K-225 with SK SNI 03.2002 Standard1,748,663m32.2862.286$3,996,568E.2 Shelter / BTS- CKD Shelter (material supply by Protelindo)a. DeliveryLsb. InstallationLs- Permanent Shelter (refer to drawing)a. BuildingLs- Base frame (material supply by Protelindo)a. DeliveryLsb. InstallationLsSPK SIPILE.3 Shelter / BTS Foundation for Outdoor (Excelcom)- Soil Excavationm3SPK SIPIL, BON MATERIAL- Sand Layering 100mmm3SPK SIPIL, BON MATERIAL- Lean Concrete 50mmm3- River Stone Masonrym3SPK SIPIL, BON MATERIAL BESI- Concrete K-225SPK SIPIL, BON MATERIAL- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standardkg- Concrete K-225 with SK SNI 03.2002 Standardm3E.4 Shelter / BTS Foundation for Indoor (Excelcom)- Soil Excavationm3- Sand Layering 100mmm3- Lean Concrete 50mmm3- River Stone Masonrym3- Concrete K-225- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standardkg- Concrete K-225 with SK SNI 03.2002 Standardm3E.5 Shelter / BTS Foundation for Outdoor (Telkomsel)- Soil Excavation41,968m30.04.000.0SPK SIPIL, BON MATERIAL- Sand Layering 100mm174,350m3191,785.0000.00.560.0SPK SIPIL, BON MATERIAL- Lean Concrete 50mm716,952m30.00.150.0SPK SIPIL, BON MATERIAL- River Stone Masonry427,750m30.04.390.0SPK SIPIL, BON MATERIAL- Concrete K-2250.00.0- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standard14,527kg0.0162.270.0SPK SIPIL, BON MATERIAL BESI- Concrete K-225 with SK SNI 03.2002 Standard1,748,663m30.01.800.0SPK SIPIL, BON MATERIAL0.00.00.0SPK SIPIL, BON MATERIALE.6 Shelter / BTS Foundation for Indoor (Telkomsel)0.00.00.0SPK SIPIL, BON MATERIAL- Soil Excavationm30.00.00.0SPK SIPIL, BON MATERIAL- Sand Layering 100mmm30.00.00.0SPK SIPIL, BON MATERIAL- Lean Concrete 50mmm30.00.00.0- River Stone Masonrym30.00.00.0- Concrete K-2250.00.00.0- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standardkg0.00.00.0- Concrete K-225 with SK SNI 03.2002 Standardm30.00.00.00.00.00.0E.7 Shelter / BTS Foundation for Outdoor (Indosat)0.00.00.0- Soil Excavationm30.00.00.0- Sand Layering 100mmm30.00.00.0- Lean Concrete 50mmm30.00.00.0- River Stone Masonrym30.00.00.0- Concrete K-2250.00.00.0- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standardkg0.00.00.0- Concrete K-225 with SK SNI 03.2002 Standardm30.00.00.00.00.00.0Non Standard (If applicable)0.00.0a. Bored Pile 40cm (supply and installation) longitudinal bar 8 pcsm'0.00.0b. Bored Pile 60cm (supply and installation) longitudinal bar 12 pcsm'0.00.0c. Mini Pile 40cm (supply and installation)m'0.00.0SPK SIPIL, BON MATERIALd. Wooden Pile 6 - 8 cm (supply and installation)m'0.00.0e. Wooden Pile 8 - 10 cm (supply and installation)m'0.00.0f. Wooden Pile 10 - 12 cm (supply and installation)m'0.00.0g. Wooden Pile 12 - 15 cm (supply and installation)m'0.00.0h. Cut and fill (labor and material)m30.00.0i. Soil Importm30.00.0j. Concrete K-2250.00.0- Weight of steel (WoS) with SNI 07.2052 1990/JIS G-3112 Standardkg0.00.0- Concrete K-225 with SK SNI 03.2002 Standardm30.00.0k. Stone Masonrym30.00.0Sub Total E Shelter / BTS Foundation$8,311,1770.0F.Obstruction light work- Lamp panel (fiber glass) + pilot lamp red - 220V / 6V (inc. Photocell & MCB 10A+contactor)unitSANKEINDO- Lamp LED 220 - 240V Compatible Protelindo SpecificationunitBON ME- Obstruction Light Work Type AC/DC2,271,432set2.000$4,542,8642.003,407,147.8SANKEINDO- NYY 2x2.5mm (taken from ACPDB in Shelter)13,989m'55.000$769,41255.00577,058.6BON MESub Total F Obstruction light work$5,312,2753,984,206.4G.Earthing systemG.1 Upper Earthing SystemGrounding system (Max : 1 ohm) as per drawing CME -11- Spitzen steel 3/4" x 150 cm + connection pipe 2" x 2 m+isolator322,830unit1.0001.000$322,8301.00242,122.5BON ME- BC 50 mm2 from spitzen to copper rodm'0.00.0BON ME- Steel Cable min 80 mm2 from tower/pole to copper rodm'0.00.0BON ME- Steel Cable min 80 mm2 (tower leg, fence, EGB)28,248m'80.00080.000$2,259,81080.001,694,857.8BON ME- Steel galvanized Busbar 10x30x0,8 cm 16 holes with isolator161,415unit3.0003.000$484,2453.00363,183.8BON MESub Total G.1 Upper Earthing System$3,066,8852,300,164.1G.2 Lower Earthing SystemGrounding system (Max : 1 ohm) as per drawing CME -10- Copper Rod 5/8" L=4munitBON ME- Grounding Well, 200x150x50 with galvanized steel plateunitBON ME- Grounding control Pit 50x50x50cm694,085unit1.0001.000$694,0851.00520,563.4BON ME- BC 50 mm2 for ring grounding tower and integration66,718m'70.00070.000$4,670,27470.003,502,705.5BON ME- EGB & IGB terminal, steel galvanized 10x30x0.8cm + Isolator + 14holes, diameter 12mm161,415pcs2.0002.000$322,8302.00242,122.5BON ME- BCC 50mm2 for equipmentm'0.00.0BON ME- BCC 50mm2 for bondingm'0.00.0BON ME- Exothermic Welding177,557point25.00025.000$4,438,91325.003,329,184.4BON MESub Total G.2 Lower Earthing System$10,126,1017,594,575.8H.Mechanical ElectricalH.2.8 M/E for Outdoor (HCPT)Panel KWH9,738,705unit1.0001.000$9,738,705- Supply Complete M/E as specification ( KWH Panel) + pole dia 3''- 5 meter0.0- Box Uk. 170x15x3 cm, Powder Coating, plat 2 mm thick, Polyurethane gasket, IP 540.0- Terminal Blok 60 A 3 Phase + N0.0- Change Over Switch I-O-II, interlocable 63A0.0Panel ACPDB11,245,245unit1.0001.000$11,245,245- Supply Complete M/E as specification ( ACPDB Panel ) + pole dia 1.5 meter- Box Size 60x40x21 cm, Plate Thickness 2 mm, Powder Coating, Polyurethane gasket, IP 54- Indicator Lamp R,S,T (Red, Yellow, Green)- Adjustable Thermostat- MCB 25A, 3 phase, 10kA (1 unit)- MCB 16A, 3 phase, 6 kA (3 unit)- MCB 10A, 1 phase, 6 kA (3 unit)- MCB 16A, 1 phase, 6 kA (4 unit)- MCB 16A, 1 phase, 6 kA (4 unit)- MCB 25A, 1 phase, 10kA (1 unit)- Arrester B+C Type I+II, lightning protection current 100 KA (NPE)- Magnetic Contractor 2 unit type 25 A Contact- Timer AC 220V, 24 hours- Panel Mounting AC outlet (untuk site outdoor)- Bush Bar RSTN Copper Plat 200x15x3 mm silver plating- Cable gland PG35, PG16- General Purpose Outlet (stop contact) 1 Phase 2 Holes- Delivery (ACPDB + KWh meter + Pole 3" 1.5m + Pole 3" 5m) Include foundation and accessories (If material from Protelindo/Client)Ls- Installation (ACPDB + KWh meter + Pole 3" 1.5m + Pole 3" 5m) Include foundation and accessories (if material from Protelindo/Client)LsH.2.8 M/E for Outdoor (EXCELCOM)Supply Complete M/E as specification ( KWH + ACPDB Panel)unit- Panel kWH Meter ( c/w arrester) Grey Colour, RAL 7032- COS 63A, 4 P, KG 64B T904/SGZ 001 VE, K&N 1 pc- Fuse, 2A, Auspicious, 3 pcs- Pilot lamp, AD 22, Axle, 3 pcs- Relay, LY2, Omron, 3 pcs- Arrester VALMS 230 1 set- MCB 3P 40A, 1 pcs- MCB 1P 32A, 9 pcs- MCB 1P 16A, 1 pcs- MCB 1P 10A, 2 pcs- Receptacle Genset, 3+N+PE, Legrand, 1 pcs.- Cable Gland PG 21, 5 pcs- Cable Gland PG 36, 2 pcs- Cu Bushbar, 3x15 mm, ex Japan, 1 pcSupply, Delivery and Install (Pole Galvanized dia 3''- 5 meter) Included Foundation and AccessoriesLsH.2.8 M/E for Indoor (Excelcom)a.Fire Alarm- Fire Alarm complete with battery - NITTANpcs- Smoke detectorpcs- Fixed heat detectorpcs- Alarm horn bellpcs- Fire Extinguisher 5 kg (Halotron,Gunebbo)pcs- Magnetic Door Sensorunit- Installation and testingLsb.Lighting in the Shelter- Indoor Lamp TL 2 x 40 watt (Artoria)set- Outdoor Lamp TL 2 x 18 watt (Artoria)set- Double Switch (Vimar, Broco, MK)pcs- Single Switch (Vimar,Broco,MK)pcs- Socket (Vimar, Broco, MK)pcs- Cable NYA 1 x 2,5 black (Supreme)m'- Cable NYA 1 x 2,5 blue (Supreme)m'- Cable NYA 1 x 2,5 red (Supreme)m'- Cable NYA 1 x 2,5 yellow green (Supreme)m'- Cable data ( Cable telfon) isi 6 for instalation alarmm'- Cable data ( Cable telfon ) isi 2 for instalation alarmm'- Cable NYAF 0.1 mm Jembo Cable for Alarmroll- Pipe Clipsal 20mm ''- 3 meterpcs- Clamp Clipsal 20mm 'pcs- Elbow Clipsal 20mm 'pcs- T Dust Clipsal three branchespcs- Screw - 1"wrap- Fotocell Lumina 10 A (Brand Jepan)pcs- Cable ties White Color 25cmwrap- Flexible White Color 20mmroll- Sealant White Colortube- Sealant Black Colortube- Feeder Entry Point (Roxtec) 18 holesunitc.Air Conditioning 1.5 pk Split wireless Cap. 12000 Btuh (Daikin)- Air Conditioning 1.5 pk Splitunit- Cable Ducting 10cm x 5cm x 200cm + Cover (Legrand)stem- Pipe Air Conditioning 1,5 pk ( 1/4 x 1/2 )m'- Duct tape lem pipe Air Conditioningpcs- Cable NYM 3 x 2,5 for instalation Air Conditioning (Supreme)m'- Cable NYM 4 x 2,5 for instalation Air Conditioning (Supreme)m'- Cage Air Conditioningunit- Padlock ABUS 40 cm for Cage Air Conditioningpcs- Dynabolt M 10 x 15pcs- Bolt + nut M 8 x 25 Stainlis steelpcsd.Emergency fan 2 x 24 / 48 Volt DC (Included Grill)unit- Inlet Box- Thermostat telemecanic- Installatione.Cable Ladder For Indoor Shelter- Cable Ladder indoor W = 400 - 2,4 meterpcs- Angle L Indoor 400 - LGpcs- Jointing tray Indoorpcs- Support tray indoorpcs- Bolt + nut M 8 x 25 stainlis steelpcs- Bolt + nut M 6 x 35 stainlis steel for suport traypcsf.Sub Distribution Panel (ACPDB)unit- Panel Box 60 x 40 x 40 cm + key- Indicator Lamp RST + Fuse- MCB Merlin Gerin 63 A 3 Phase I pcs- MCB Merlin Gerin 20 A 3 Phase 2 pcs- MCB Merlin Gerin 16 A 1 Phase 8 pcs- Magnetic contactor telemecanic 3P 25A 2 pcs- Timer theben Cell (2 unit)- Timer switch SDPT 24 hours 220 VAC, 1 pcs- Thermostat telemecanic/honeywell, 1 pcs- Phase Failure Relays 2 Poles, 5A, 220VAC 3 pcs- Fuse cartridge c/w fuse break indicator lapm 2A, 3 pcs- AC Indicator, 220 VAC, 16mm, LED type, green, 2 pcs- Terminal connection 6 mm 24 pcs- Terminal connection for control & status , 2,5 mm- Terminal connection 16 mm 2 pcs- Bar CU size 20 x 1.5 x 0.3 cm- Endstop- Arrester 20 kA , C Class- Polycarbonate Coverg.Panel KWHunit- Panel Box size 500 x 700 x 300,colour RAL 7032 Pepper and salt anti corossive plate,thickness 2mm powder coating- Grounding Cu busbar 170x15xx3mm c/w stainless bolt- Neutral Cu busbar 120x15x3mm c/w isolator & stainless bolt- Unistrut- Terminal Block- Clamp omega 3'- Cable Gland PG 16- Cable Gland PG 36- Box OKA- Receptacle 3P+N+PE 32 A 1 pc- Endstop- Surge Arrester 3P+NPEh.Change Over Switch ( COS )unit- Panel Box canopy,size 300 x 400 x 200,colour RAL 7032 Pepper and salt anti corossive plate,thickness 2mm powder coating- Grounding Cu busbar 15x3mm c/w stainless bolt- MCB for load breakers,1pole, 4,5kA,6A- MCB for load breakers,1pole, 4,5kA,10A- Change over Switch 63A,- Arrester 220 VAC- Endstopi.Shelter Grounding System- Connecting to Existing GroundingLs- EGB terminal, steel galvanized 10x30x0.8cm + Isolator + 14holes, diameter 12mmunit- Indoor Grounding bar Phoenix Contact (PEB)unit- Exothermic Welding / Cad weld (Refer to Drawing)ttk- BC wire 50 mm2m'- BCC wire 50 mm2 Grounding for Cable Traym'- Cable power NYFGBY 4 x 25 mmm'j.Pole Kwh meterunit- Pole dia 3''- 5 meter Included Foundation ( 1 pcs )- Steel Pipe dia 1.5" safety for cable PLN (1 pcs)- Clamp pipe dia 3" -1.5" Included Bout & Nut (4 pcs)H.2.8 M/E for Indoor (Telkomsel New Spec.)H.1.1Fire Alarm Protection, include :Ls- Vulcan CO2 non CFC tube, capacity 2 kgs for BTS- Fire trace hose, 15 m length for BTS- Pressure swing, pressure gauge, end of line miniball valveH.1.2SDP Size 40 x 40 x 15 cm, With Component :setMCB, 40 A / 3F (1 pcs)MCB, 32 A / 1F (6 pcs)MCB 10 A / 1F (3 pcs)Arrester B + C Class ( OBO ) (1 set)Grounding Bar (1 pcs)Netral Bar (1 pcs)Wiring, Label (1 Lot)H.1.3Lumination InstalationLamp 2 x 18 watt Reflector philips componentsetPemasangan saklar Hotel / Tukar merk Clipsal + OB KomsetOutlet Socket Clipsal + OB komsetAccessories cabling, scoen cable and ductingsetLumina Photcell 6A 220VACpcsPhilips lamps 8 watt + BalleyespcsH.1.4Indoor TrayIndoor tray size 40 x 300 cmstemTray accesorisLotH.1.5Feeder Entry PointFEP 12 Hole Andrew without C platesetH.1.6DC Exhaust FanDC Fan ebm/papst W1G 250-HH67-52 ukuran 38 x 38cm 48VDCpcsAir Inlet size 46 x 21,5 cmpcsNYYHY Cable 2 x 2,5 mmm'Exhaust Fan Panel :Set- Box V-Box 20 x 20 cm ( 1 Pcs );- Thermostat Honeywell T 6360 ( 1 Pcs );- Timer Hager EH 111 ( 1 Pcs );- MCB MG 6A ( 2 Pcs )- Terminal TR 30 ( 9 Pcs );- Wiring,marker ( 1 lot ).H.1.7Shelter Grounding SistemConnecting to Existing GroundingLsBCC Cable50 mmm'Busbar Cu 300 x 100 x 8 mmpcsBCC Cable35 mmm'Accessories cabling, scoen cable and ductingsetH.2.8 M/E for Outdoor (Telkomsel New Spec.)H.1Main Distribution PanelPanel box ACPDB dimension 60x40x20 cm IP 65 standard, grey coloured with powder coating complete with accessories (fuse, cable 10mm2, cable shoe, MCB rail, Terminals , cable ducting, label, cover, lock set) include Padlock 60 ex Cissa/Masterlock6,250,000Unit0.01.000.0INDOMITRAMCB 3 Phase 20A 10KA type NC100 H / MCB 1 Phase 32A 10KA type C60N (1 psc)0.00.0MCB 1 Phase 25A 5KA type NC45 N (3 pcs)0.00.0MCB 1 Phase 20A 5KA type NC45 N (3 pcs)0.00.0MCB 1 Phase 6A 5KA type NC45 N (3 pcs)0.00.0Relay LY2, phase R,S,T (3 pcs)0.00.0Socket Outlet 1 Phase with cover (1 pcs)0.00.0Door switch heavy duty with lockset ex KEEP/ABUS (1 pcs)0.00.0Wiring and montage (NYAF 10 mm2, completed with cable shoe & cable duct) (1 pcs)0.00.0Pole dia. 3" H = 1.5 m (galvanized) for Placed ACPDB1,450,000Unit0.01.000.0FABRIKASI0.00.0H.2Internal protection for Panel MDP (supply, delivery & installation)0.00.0Arrester Over Voltage 100 kA type 1 + 2 complete with origin certificate & guarantee (from official sole agent and attached material test result)5,950,000Unit0.01.000.0INDOMITRA0.00.0H.3KWH Panel (supply, delivery & installation)0.00.0Pole 3'' H.6 meter (galvanize) for placed KWH meter PLN incl foundation1,850,000Unit0.01.000.0FABRIKASIKWH Box Panel with safety lock dimension 70x50x30 cm , IP 66, grey coloured with powder coating Incl.Change Over Switch Krauss Neimer 4P type I-O-II (ABB/Schenider/K&N/Socomac) and Socket for Genset 3 Phase + NPE 32 A, IP 66 (Legrand/Mennekes/ABB), Cable Duct PVC 25 mm. include Padlock 60 ex Cissa/Masterlock.6,250,000Unit0.01.000.0INDOMITRA0.00.0H.4Grounding System from Equipment to Tower0.00.0Collecting Grounding Bar (EGB) use Steel Galvanize Busbar 400x200x4 (16 holes)200,000pcs0.00.0BON MESteel Wire 50mm connected TGB to vertical tray, include cable shoes + accessories20,000m0.06.000.0BON MESteel Wire 50mm connected tray to EGB, include cable shoes + accessories20,000m0.02.000.0BON MESteel Wire (minimum) 80mm connected EGB to MGB, include cable shoes + accessories30,000m0.010.000.0BON MESteel Wire (minimum) 80mm connected KWH to existing perimeter, include cable shoes + accessories30,000m0.03.000.0BON MEBC 50mm2 integration MGB to existing grounding include cadweld62,500m0.00.0BON MECadweld (Exothermic Welding)165,000point0.00.0BON MEH.2.8 M / E for Outdoor ( Indosat New Spec. )H.1Main Distribution PanelH.1.1Panel box MDP dimension 60x40x20 cm IP 65 standard, broken white coloured with powder coating + phase indicator lamp complete with accessories (fuse, cable 10mm2, cable shoe, MCB rail, Terminals , cable ducting, label, cover, lock set) include Padlock logo by CisaUnit- MCB 1 Phase 35A 6KA C Curve ( 1 - Pcs )- MCB 1 Phase 6A 6KA C Curve ( 12 - Pcs )- Relay LY2, phase R,S,T ( 3 - Pcs )- Socket Outlet 1 Phase with cover ( 1 - Pcs )- Door switch heavy duty ( 1 - Pcs )- Lamp for indoor Panel TL 1 x 18 W Philips small ( 1 - pcs )- Wiring and montage (NYAF 10 mm2, completed with cable shoe & cable duct) ( 1 - Lumpsum )H.1.2Pole dia. 3" H = 1.5 m (galvanized) for Placed ACPDB include Hilti M 12 + ChemicalUnitH.2Internal protection for Panel MDP (supply, delivery & installation)H.2.1Lightning Current and Surge Voltage Protection Arrester 100 KA OBO type MCD 50-B/3 + MCD 125 B/NPE combined V 20 C/3 + FS-SU or Phoenix type Flash Trab BC/3+1 - 100/FM complete with certificate (from internasional OBO or Phoenix sole agent and attached material test result) and connect to DDF.UnitH.3KWH Panel (supply, delivery & installation)H.3.1Pole 3'' H.6 meter (galvanize) for placed KWH meter PLNUnitH.3.2KWH Box Panel with safety lock dimension 70x50x30 cm , IP 66, broken white coloured with powder coating Incl.Change Over Switch 4P 63A Mounting Plate Type with handle selector (Kraus and Naimer / Socomec type Sirco VM1 ) and Receptacle for Genset 3 Phase + NPE 32 A, IP 66 (Legrand / Mennekes), Cable Duct PVC 25 mm + 1 MCB 1 pole 6A / C Curve. include Padlock logo by Cisa.UnitSub Total H Mechanical Electrical$20,983,9500.0I.Documentation- Site Binder (2 hardcopies and softcopies)2,959,275Ls1.0001.000$2,959,2752,219,456.3BON ATKRefer to Site Binder Check listSub Total I Documentation$2,959,2752,219,456.3J.Material HandlingManual Material Handling to Site (Valid for distance more than 30 m only)- Sand, Splite, Steel Rebar and Potland Cement (Concrete Foundation)m3- Steel Tower MaterialKg- Fence (Included Stone Masonry, Concrete sloof, Panel BRC, Post BRC and Gate)m1Sub Total IJ Material HandlingK.MiscellaneousAdditional transportation for outer and remote area (see case by case) consist of :- Mobilization and demobilization of all materials and man power to site (Supported by complete documents e.g. photos, Letter of Agrements, Route, etc.)Ls- Strengthening of Building work- FRS-CS N300/0.1 For Strengthening of Building36.00- FRS-CPS 05012 x 100- FRS-CB for bonding1.00- Water Proofing-FIS-VT-380 Injection ( For Building rebar or anchor to existing Building)21.00- Demolish Existing concrete- Demolish Existing roof-Stojet IH-BV-Finishing- Pole Adaptor- - Sub Total IJ Material HandlingGRAND TOTAL190,618,592120,695,599.3142,963,944.18S