GOVERNMENT OF ANDHRA PRADESH ROADS AND BUILDINGS DEPARTMENT QUALITY CONTROL SUB DIVISION, KADAPA 1.0 1.1 Name of Work : rr road 1.1.2 Estimate Rs : 100 Lakhs CR No. 1.1.3 WE/RE Rs. : 100 Lakhs Authority : EE(R 1.1.4 : 98.80 Lakhs 1.2.1 Name of the contractor : M/S S S R R Constructions, Kodur 1.2.2 C R Agt. No : 55/2010-2011, Dated: 13.9.2010 1.2.3 : Rs 98 80 196/- Tender precentage : 4.99% excess 1.2.4 D H S : 13.9.2010 D F C : 12.3.2011 1.3.1 : This is the first Inspection 1.3.2 : Rs 67 455/- 1.3.3 : This is the first Inspection 1.3.4 : 6.4.2011 1.3.5 : 9 pages To The Executive Engineer, (R&B) Division, Rajampet Copy Submitted to the Superintending Engineer (R&B) Circle, Ka Corenet dt. Value of work done so far Rs Estimate / Agreement contract value Recovery proposed in previous Q C R's Rs. Recovery proposed in present Q C R Rs. Date of Previous Inspection Date of Present Inspection This QC Report consists of Copy Submitted to the Superintending Engineer (R&B) I & Q.C Cir Copy submitted to the Executive Engineer (R&B) Q.C Division, Ka Copy to the Deputy Executive Engineer (R&B) Sub - Division, Kod

R R road

Embed Size (px)

DESCRIPTION

REPORT

Citation preview

1st sheetGOVERNMENT OF ANDHRA PRADESHROADS AND BUILDINGS DEPARTMENTQUALITY CONTROL SUB DIVISION, KADAPA1.01.1Name of Work:rr road1.1.2Estimate Rs:100LakhsCR No.Corenet/MDRDC/2010-11 dt. 15.5.20101.1.3WE/RE Rs.:100LakhsAuthority :EE(R&B) Kadapa1.1.4Value of work done so far Rs:98.80Lakhs1.2.1Name of the contractor:M/S S S R R Constructions, Kodur1.2.2C R Agt. No:55/2010-2011, Dated: 13.9.20101.2.3Estimate / Agreement contract value:Rs 98 80 196/-Tender precentage:4.99% excess1.2.4D H S:13.9.2010D F C :12.3.20111.3.1Recovery proposed in previous Q C R's Rs.:This is the first Inspection1.3.2Recovery proposed in present Q C R Rs.:Rs 67 455/-1.3.3Date of Previous Inspection:This is the first Inspection1.3.4Date of Present Inspection:6.4.20111.3.5This QC Report consists of:9pagesToThe Executive Engineer,(R&B) Division, RajampetCopy Submitted to the Superintending Engineer (R&B) Circle, KadapaCopy Submitted to the Superintending Engineer (R&B) I & Q.C Circle, Kadapa.Copy submitted to the Executive Engineer (R&B) Q.C Division, Kadapa.Copy to the Deputy Executive Engineer (R&B) Sub - Division, Kodur

2.0 Est. provisions 2.0 Estimate Provisions and Stage of WorksName of the work :rr roadSl. No.Description of itemsThick in mmC W W in mSpecificationStretchesStage of WorkCompleted stretchKms1Providing B T Patch work for pot holes using 40mm HBD metal50Varying--45/0 to 73/0Km 45/0-102,299-899,45/899-46/6,45/850-47/0,50/750-51/0,51/345-645,52/110-250,550-630,750-1000,54/0,350,55/320-520,57/350-600,59/740-60/050,60/540-960,61/600-905,63/675-9754.5732Tack coat--50310-do--do-4.5733B.M as per table 500-4 of MORT&H spn5050410-do--do-Deleted4SDBC as per table 500-15 of MORT&H spn2550810-do--do-4.5735Forming Embankement with borrowed earth1003052 x 1.00-do--do-4.5732.0Items verified in this Q.C. InspectionSDBC Km 45/0-73/0 at different stretches2.2Deviations made if Any :NIL

5.0 Summary 5.0 SUMMARY OF Q C TESTS5.1Quality Control Tests By Field Staff :Sl No.Description of workType of testMethodFrequency for each testTotal quantity Executed in cumNo. of TestsRequired as per MORTHDone1Soils used for embankement or barrow soilsMaximum particle sizeIS: 2720 -part IV 19652 tests for 3000 cum1821113-2sand contentIS: 2720 -part IV 19652 tests for 3000 cum13-3Atterbergs limitsIS: 2720 -part V 19652 tests for 3000 cum( for each soil type)1314Max. dry densityIS: 2720 -part VIII 19652 tests for 3000 cum( for each soil type)13105Density of compacted layerIS: 2720 -part 281 test for 1000 cum19-6Moisture content field ompactionIS: 2720 -part II 19651 test for 250 cum73-7C B RIS: 2720 -part XVI 19651 tets for 3000 cum718Free swell index for expansive soilsIS: 2720 -part 401per source1-9Granualar base or sub baseGradationIS: 2720 -part IV 19651 test for 200 cum2243121810Atterberg limits(LL,PL &PI)IS: 2720 -part IV 19701 test for 200 cum12-11Moisture content field ompactionIS: 2720 -part II 19731 test for 250 sq.m60-12Density of compacted layerIS: 2720 -part 28 19741 test for 500 sq.m30613C B RIS: 2720 -part XVI 1965As required1114W M MGradationIS: 2386 -part I 19631 test for 100 cum1796181215A I VIS: 2386 -part IV1 test for 200 cum9416F I VIS: 2386 -part I 19631 test for 200 cum9417Water absorptionIS: 2386 -part III 19631 test for 100 cum18-18Density of compacted layerIS: 2720 -part 28 19741 test for 500 sq.m183Pavement conctrete19Course aggregateGradationIS: 2386 -part I1 test for every days work1465520A I VIS: 2386 -part IVonce for each source1121Water absorptionIS: 2386 -part III 19631 test per day5-22ConcreteStrength of concreteIS: 516-19596 cubes for 150 cum(3 for 7days and 3 for 28 days)min.6 cubes per day10961023slump cone testIS: 1199-19591 test for each dumper load(10 cum)1112Structural Concrete24Course aggregateGradationIS: 2386 -part I1 test for 15 cum352241825A I VIS: 2386 -part IVonce for each source1126F I VIS: 2386 -part I 1963once for each source1127Water absorptionIS: 2386 -part III 19631 test per day5-28ConcreteStrength of concreteIS: 516-19591 for 1-52for 6-153 for 16-304 for 31-50+1 test for each 50 cum25012429slump cone testIS: 1199-19591 test for each dumper load(10 cum)25430Mix designIS: 10262 & SP 231 per source1131SandGradationIS: 2386 -part I1 test for 15 cum24917432BulkageIS: 2386 -part IIIonce for each source1133Fineness modulusIS: 2386 -part I 1963once for each source1134Clay contentIS: 2116 -once for each source11The field officers are not conducting sufficient No. of quality control tests both on materials and workmanship there are chances to occur damages as such they are requested to watch the performance of the work at closer intervals and take necessary steps for rectification of such type damages if occurs duly notifying to the contractor.The field staff have furnished the extract of QC tests conducted and shortfall tests are shown in Annexure. Quality control tests have to be conducted as per the table 900.3,900.4 and 900.6 of MORTH specifications.The Q C tests done by AEE are inadequate. The DEE & EE had not furnished Q C test records conducted independently during the present inspection.As per clause 1.11 of IRC SP - 11 " Quality Control for construction of roads and runways ", Out of total tests, preferably 70% to be carried out by AEE/AE, 20% by DEE & 10% by EE.The field officers shall carry out quality control tests on the materials namely bitumen mineral aggregates used in BM and SDBC item of work to the frequency stipulated in the table 900-4 which is in annexure-I.Further after completion of the work the field officers shall conduct necessary quality control tests on finished items of works and to ascertain the test results obtained is whether within the acceptance criteria or not as specified in table 903.4.2 which is as follows.903.4.2Acceptance Criteria : The acceptance criteria for tests on density and Marshall stability shall be subject to the condition that the mean value is not less than the specified value plus :1.65 -1.65(No. of samples) 05The field officers had furnished in the work memos stating that the following tests were conductedS. No.Name of the testRequired as per MORT&HNo. of tests doneShort fallRemarksReqQuantityNo of testsFor S.D.B.C1Binder Content2 test per day / 1 test per 400 mt1179 cum720--Q C test reocrds not furnished.2Gradation1 No / 400 MT736--Q C test reocrds not furnished.3AIV1 No / 50 cum24195Q C test reocrds not furnished.4FIV1 No / 50 cum24--24Q C test reocrds not furnished.5Field Density1 No / 250 sqmt18914544Q C test reocrds not furnished.As per clause 1.11 of IRC SP-11 Quality Control for construction of roads and runways. Out of total tests, preferably 70% to be carried out by AEE/AE, 20% by DEE & 10% by E.E. The test result record register shall be presented to the QC staff during there inspection. This is not followed.The field officers have not conducted sufficient no. of QC tests both on materials and workmanship, during process control and also on finished item of works as such the Executive Engineer (R&B) is requested to conduct all the QC tests as per frequency specified by the MORT&H and satisfy himself before making final payment. If any tests cannot be done at this stage the performance of the work should be watched at closer intervals and shall take necessary steps for rectification of damages if any occurs, duly notifying to the contractor.

Times the standard deviation

SDBC&BM DepthOBSERVATIONSThickness of SDBCLocation in KmObserbved thickness in mmRequired thicknessShort thickness in mmCarriageway width observed as against 10.00 mtsCamber observed as against 1 in 40 mtsRemarksType of layerL1L2L3CR1R2R3Km AverageL/sR/s1234567891011121314151645/400S.D.B.C3133333126353231.5730.00Nil10.00curveSome cambers are exceeding tolerable limits as per possible the camber should be brought to with in limits45/760S.D.B.C1630392328443030.0030.0010.001 in 431 in 4346/390S.D.B.C3431323129282630.1425.00Nil10.001 in 551 in 7050/880S.D.B.C2628272830323028.7125.0010.001 in 411 in 3454/240S.D.B.C3036373629282131.0025.00Nil10.001 in 411 in 4659/430S.D.B.C2640303029334132.7125.00Nil10.001 in 521 in 38Assist.Exe..Engineer(R&B)Dy.Exe.Engineer(R&B)QC Sub Division, KadapaQC Sub Division, Kadapa

General Remarks General RemarksThe following QC lapses have been observed during the inspection of the work as follows:General1As per agreement Date of handing over site is 13.9.2010 and the date for completion is 12.3.2011. As on date of inspection the value of work done is 98.80 lakhs & the work is completed. The Executive Engineer is requested to verify the progress of work in accordance with mile stones both Physical and Financial specified in the agreement and take appropriate measures as per agreement conditions.2Some of the KM & HM stones are missing. The field officers have to fix up the same duly painting and numbering at correct chainage location.3As per clause 1.11 of IRC SP-11 Quality Control for construction of roads and runways. Out of total tests, preferably 70% to be carried out by AEE/AE, 20% by DEE & 10% by E.E. The test result record register shall be presented to the QC staff during there inspection. This is not followed.4The longitudinal undulations and camber are exceeding the specified tolerant limits specified by the MORTH.5As per para 2 (viii) of G.O.Ms.No: 84 of I&CAD (PWQC&IWS) Dept. dt: 8-8-2000, Check measurement is to be done by higher officers at 1/3rd, 2/3rd stage of work and should cover not less than 30% of the total expenditure incurred each time. As verified from the M-Books, it is noticed that this is not followed.6The Government vide G.O. Ms. No. 80 of T R&B (RI) Department, dated 25.04.2005 have issued certain guidelines on road safety along with certain road safety interventions to be taken up duly making provision in the estimate and to execute the same without omission, so as to avoid / minimize the road accidents but the field officers did not put forth any efforts to execute the road safety measures and its amounts to violation of government orders.4) BM & SDBC7The field officers have not conducted the tests as specified in MORTH to confirm the bitumen used on the work is 60/70 grade for for SDBC.8The density of SDBC observed is 2.102 grm/cc. The Field Engineers are requested to conduct the density tests of SDBC at closer interval and ensure the density of SDBC with specified density as per the job mix formula, and shall take appropriate measures as per agreement conditions.9As per agreement, laying of SDBC is with bituminous binder of with 60/70 grade from refinery at 5.00 % by total weight of mix. The field officers have not produced copy of bitumen bills during inspection. The Executive Engineer (R&B) is requested to insist upon the field officers to furnish the copy of bitumen bills noting name of work details duly counter signed to this office for verification.10Newly laid SDBC rough, not sealed properly at some places and is likely to get damaged prematurely due to infiltration of rain water. Segregation of chips observed on top surface at some places.. The field officers should be more careful during execution of works.11It is observed that the Longitudinal joints for BT surface are not made as specified at some locations. The Field Officers has to follow clause 501.7 of MoRTH specifications, while laying longitudinal joints.12It is observed in some of the sample pits that cleaning was not done properly before laying SDBC.13As per the observations of the Q.C wing and as per the QC tests conducted at our QC labs, on the SDBC sample extracted at the above mentioned locations the recovery amount works out to be as follows in respect of GSB, WMM, BM and SDBC items only.Recovery AbstractRecovery towards less bitumen content in SDBC67455.0014The Executive Engineer (R&B) is requested to effect the recovery of Rs 67 455 /- from the contractor bills towards less bitumen content in SDBC observed by the QC wing for the items of works inspected, tested and intimate the recovery particulars such as MB No. and CB voucher No along with the compliance report on all the lapses pointed out in the above General Remarks.NOTE: -1The Q.C report furnished above are not basis for making payment on the work as it does not purport to be covering all the aspects of the work and field Engineers are requested to check up the work at closer intervals during process control and also requested to conduct necessary QC tests on finished item of works and satisfy themselves before making payment. If any deficiency is observed other than shown in this QCR, the recovery shall be effected as per Engineer in Chief (R&B) (Admn & Roads) circular Memo No: 12582/Vig-I/1/2005-1, Dt: 17-10-2006.2The field officers are requested to check the recovery calculations as per agreement conditions before effecting the recovery, keeping in view Engineer in Chief (R&B) (Admn & Roads) circular Memo No: 12582/Vig-I/1/2005-1, Dt: 17-10-2006.3The Q.C report furnished above is not valid for any evidence in any court of law.4The test results given in the Q.C report are valid for the samples extracted at the above-specified locations as the same were tested in our Q.C laboratory only.5The recovery amount proposed in QCR does not include for the items of work which requires rectification as pointed out in General Remarks. The QCRs issued based on the observations made on the day of inspections and if any unraveling or damages occurs / took place subsequently should be watched carefully and prompt action shall be taken for rectification. After rectification only payment shall be made but not solely based on these QCRs.Assist.Exe..Engineer(R&B)Dy.Exe.Engineer(R&B)QC Sub Division, KadapaQC Sub Division, Kadapa

GSB Grd'n & SDBC DensityAnnexure-VFIELD DENSITY TEST FOR S.D.B.CS.NoDescriptionSample taken in Km 45/760Remarks1Wt: of Sand + Cylinder (W1) grms64932Wt: of Sand after pouring in pit (W2) grms58803Wt: of Sand in pit + Cone (W3) grms6134Wt: of Sand in Cone (W4) grms3285Wt: of Sand in pit (W5) = W3-W4 grms2856Density of sand1.4067Volume of pit (V)202.708Wt: of S.D.B.C Sample (W6) grms4269Density of S.D.B.C achieved Wt: (W6/V)2.102gm/ccJob mix formula is not furnished during the inspection. Field staff is requested to conduct density test at closure intervals at the frequency specified by MORT&H 900 clause and ensure the density of S.D.B.C with specified density as per job mix formula.Assist.Exe..Engineer(R&B)Dy.Exe.Engineer(R&B)QC Sub Division, KadapaQC Sub Division, Kadapa

Sheet7Bitumen Extraction Test ResultsLocationtype of sampleWt.of sampleFilter paper initial Wt.Filter paper final Wt.Fines in filter papersample wt. after testTotal Wt. of sampleBitumen(gm)Assessed bitumen content in %Average %specified %shortfall %SDBC45/400do5012.13.11475476254.9904.9575.0000.04345/760do6502.13.11617618324.92346/390do7472.13.11709710374.9534.9535.0000.04750/880do5852.13.11555556294.9574.9575.0000.04354/240do7822.13.11742743394.9874.9875.0000.01359/430do6222.13.11590591314.9844.9845.0000.016Assist.Exe..Engineer(R&B)Dy.Exe.Engineer(R&B)QC Sub Division, KadapaQC Sub Division, Kadapa

Sheet7 (2)Bitumen Extraction Test ResultsK MShort fallDeficit Wt. of bitumen per cum of kgQty. of SDBC/BM doneDeficit Wt. of Bitumen in KgsCost of Bitumen per MTAmount of Recovery in Rs.As per E-n-c (R&B)(A&R) Circular memo No. 12582/vigl/1/2005-1,dt. 17.10.06SDBC460.0430.043 x 115.4/5.0 =0.99210.60209.01470.0470.047 x 115.4/5.0 =1.08212.75230.78510.0430.043 x 115.4/5.0 =0.99253.75251.83550.0130.013 x 115.4/5.0 =0.30265.0079.51600.0160.016 x 115.4/5.0 =0.37236.2587.24Bitumen rate 60/70 as per estimate32096.60Add for over head charges @ 6%34022.40Add for Contractors Profit @ 10%37424.64Add T.P @ 4.99 %1867.49858.3839292.1233727.3967455.00Assist.Exe..Engineer(R&B)Dy.Exe.Engineer(R&B)QC Sub Division, KadapaQC Sub Division, Kadapa