1 Francisco García Peña [email protected] ELCOGAS, S.A. www.elcogas.es R & D plan R & D plan results results and and experience experience in in the the Puertollano IGCC Puertollano IGCC The 4th International Freiberg Conference on IGCC & XtL Technologies 3-5 May 2010- Dresden, Germany

R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

1

Francisco García Peña

[email protected]

ELCOGAS, S.A. www.elcogas.es

R & D plan R & D plan resultsresults andand experienceexperience in in thethe Puertollano IGCCPuertollano IGCC

The

4th International Freiberg

Conference

on IGCC & XtL

Technologies

3-5 May 2010-

Dresden, Germany

Page 2: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

2

1.

OPERATIONAL STATUS

2.

R&D

PLAN. REPORT

INDEX

Page 3: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

33

1. PUERTOLLANO IGCC POWER PLANT DESCRIPTION

GAS TURBINE

200 MWISO

Flue gas to stack

SteamHeat Recovery

Steam Generator STEAM

TURBINE

135MWISO

Hot combustion gasCondenser

Coal Petroleum CokeLimestone

Coalpreparation Gasifier

Slag

Sulfur (99.8%)

SulfurRecovery

Quench Gas

O2

Air

Clean syngas

Raw GasCoal - N2

HP Boiler

MP Boiler Waterwash

Fly ash

Claus gas

HP Steam

MP Steam

Air Separation Unit

N2

O2

Waste N2

Process description

Filtration Sulfur Removal

Tail Gas

Waterto treatment

G

G

Cooling tower

Compressed air

Page 4: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

4

1st

5

years: Learning

curve

2003: Major

overhaul

Gas Turbine

findings

2004 & 2005: Gas turbine

main

generation transformer

isolation

fault

2006: Gas turbine

major

overhaul

& candle

fly

ash

filters

crisis

2007 & 2008: ASU WN2

compressor

coupling

fault

and

repair

MAN TURBO

1. PUERTOLLANO IGCC POWER PLANT: Operating data

IGCC, NGCC and Total yearly production

9

1.1621.527

744

836

622

321343

301 452421 312 259 327

277

335

911

1.3911.595

1.371 1.293 1.129 1.150 1.130

0

500

1.000

1.500

2.000

2.500

1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

year

GW

hNGCC GWhIGCC GWh

752

1,171

1,5331,712

1,938

1,672 1,7441,550 1,462 1,389 1,489

1,803

Page 5: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

5

Emissions in NGCC and IGCC modes1. PUERTOLLANO IGCC POWER PLANT: Operating data

Emissions in NGCC mode

Emissions in IGCC mode

Natural gas (mg/Nm3 at 6% O2 dry)

4,229,2

291,7250,0

4,212,5

178,2

8,4 0,10

50100150200250300350

SO2 Particles NOx

EEC 88/609ELCOGAS Environmental PermitELCOGAS 2009 average

Coal gas (mg/Nm3 at 6% O2 dry)

50

400

650

500

200

5

200

0,1234,6

137,6

0100200300400500600700

SO2 NOx Particles

EU Directive 88/609/EECEU Directive 2001/80/EEC

ELCOGAS Environmental PermitELCOGAS 2009 average

Page 6: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

6

AVAILABILITY 2009

64,777,7

86,0 89,4

9,9 10,16,2 3,1

25,4 12,2 7,8 7,5

0%

20%

40%

60%

80%

100%

IGCC Gasifier Power Block ASU

Availability Planned Outages Unplanned Outages

1. PUERTOLLANO IGCC POWER PLANT: Operating data

Page 7: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

7

Gasification

WATER STEAM SYSTEMS & BOILERS

28%

GAS WET TREATMENT17%

SLAGS8%

DRY DEDUSTING & FLY ASH SYSTEMS

32%

QUENCH GAS RECIRCULATION

1%

SULPHUR RECOVERY &TAIL GAS RECYCLE

0%

MIXING & GRINDING PLANT

3%

START-UP BURNER & FLAME MONITORS

2%

DUST FUEL CONVEYING & FEEDING

9%

Combined cycle

WATER-STEAM CYCLE ; 7%

GAS SATURATOR; 22%

GAS TURBINE; 71%

BOP

AUXILIARY SYSTEM; 37%

DCS; 63%

ELECTRICAL SYSTEM; 0%

IGCC UNAVAILABILITY 2009

ASU

WASTE NAITROGEN PRODUCTION; 47%

GAS OXYGEN PRODUCTION; 48%

PURE NITROGEN PRODUCTION; 5%

Islands Unavailability

Gasification65%

Combined Cycle12%

BOP5%

ASU18%

1. PUERTOLLANO IGCC POWER PLANT: Operating data

Page 8: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

8

1.

OPERATIONAL STATUS

2.

R&D

PLAN. REPORT

INDEX

Page 9: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

9

PUERTOLLANO IGCC ACTIONS FOR THE PUERTOLLANO IGCC ACTIONS FOR THE FUTUREFUTURE

OUR PLANS ARE BASED ON THE OPPORTUNITY THAT REPRESENTS TO HAVE AN OPERATIVE IGCC PLANT NOW AND FOR THE FUTURE

CONTRIBUTION CAN BE RELEVANT IN SUSTAINABILITY ENERGY CONCERNS:

CLIMATE CHANGE MITIGATIONCLIMATE CHANGE MITIGATION

&&

ENERGY SUPPLY RELIABILITYENERGY SUPPLY RELIABILITY

2. ELCOGAS R&D INVESTMENT PLAN

Page 10: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

10

Since 2007 ELCOGAS has defined a R&D Investment Plan to develop IGCC technology in order to decrease the environmental impact of power production as main target

ELCOGAS presents a yearly results report of that R&D Plan to Spanish government for evaluation

CO2 EMISSION REDUCTION IN UTILIZATION OF FOSSIL FUELS

H2 PRODUCTION BY GASIFICATION OF FOSSIL FUELS

DIVERSIFICATION OF RAW FUELS AND PRODUCTS

OTHER ENVIRONMENTAL IMPROVEMENTS

IGCC PROCESSES OPTIMIZATION

DISSEMINATION OF RESULTS

MAIN LINES OF R&D PLAN ARE:

2. ELCOGAS R&D INVESTMENT PLAN

Page 11: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

11

Dissemination of results• Forum participations. CO2 , H2 , and sustainability associations and Technological Platforms. European and Spanish. Coordinating working groups in Technological Spanish Platforms.• Participation in conferences, seminars, congresses. • Consulting services. Germany, China, Chile • Attending and promoting technical visits. Generally international visits.

2. ELCOGAS R&D INVESTMENT PLAN

www.elcogas.es

Page 12: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

12

Optimization of IGCC processes. Oriented to improve availability and costs. • Gasifier materials. Life extension. • Syngas corrosion processes. Optimization and tests of materials.• Elimination of water leakages of membrane at reaction chamber. • Ceramic filters. Many tests with alternatives have been done. Final

assessment is to install a new filter system provided by Pall.• Gas Turbine reliability improvement and life extension.• Improvement of integration with ASU. (Start up compressor).• O&M specific availability incidents analysis.

2. ELCOGAS R&D INVESTMENT PLAN

Gasifier materials/syngas corrosion processes

Ceramic filters

Page 13: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

13

Other environmental improvements• Liquid wastes reduction. Change of waste

water treatment plant• Improvement of syngas cleaning systems.

Currently participating in project AGAPUTE (RFCS, 2004-08, to study improvements in syngas cleaning). Hg task.

• Improvements in Sulphur Recovery plant. In progress several modifications to improve availability and to reduce S emissions.

• Operation and additives parameters optimization. Included in AGAPUTE to study dosing of limestone, oxygen, steam, vs. concentration of contaminants in slags, fly ash and washing water

• Emissions reduction during start up and other transitory situations.

2. ELCOGAS R&D INVESTMENT PLAN

Overview of the test rig for mercury and carbonyls analysis

Cross correlation between limestone content in the fuel and Se bulk fly ash content

Page 14: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

14

Diversification of raw fuels and products Project PIIBE (ESP-CENIT). To impulse biofuels technologies in Spain.

ELCOGAS coordinates the subproject about biodiesel from gasification by real co-gasification 10% of biomass and syngas characterization (F-T process in laboratory)

Agreement with a private European Company to install a pilot plant in IGCC of Puertollano to develop process to obtain gasoline from syngas

Project PEIXE VERDE. (ESP-PSE). Technical-economic study about uses of syngas as fuel for fishing ships in different scales of production

Co-gasification of car manufacture wastes (shredder fibres) was agreed with supplier.

Available to do tests of gasification of different fuels at large scale to help in design of new IGCC plants

Clean H2 by gasification of fuels H2 production in IGCC. Project HYDROSEP (RFCS, to study IGCC adaptation to H2 production) Study and tests of new processes of H2 purification. Project SPHERA (ESP-CENIT)Available to collaborate with new H2 & Fuel Cells Experimental National Centre of Puertollano

2. ELCOGAS R&D INVESTMENT PLAN

Biomass yard

Page 15: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

15

CO2 EMISSION REDUCTION• IGCC Efficiency Optimization

Analysis of viability to improve efficiency based on Critical Assessment of Puertollano IGCC design

Auxiliary consumption optimization. New revisionDevelopment of tools to improve efficiency. Supervision on line

of main (120) equipment efficiency. Installed and in tests Integration optimization. Improvement of controls to adjust heat

& mass balances in real operationAnd

• CO2 capture for CCS with IGCC

2. ELCOGAS R&D INVESTMENT PLAN

Page 16: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

16

To demonstrate the feasibility of capture of CO2 and production of H2 in an IGCC that uses solid fossil fuels and wastes as main feedstock.

To obtain economic data enough to scale it to the full Puertollano IGCC capacity in synthetic gas production.

Project of pilot plant in existing IGCC of Puertollano is part of a Spanish national initiative, “Advanced technologies of CO2 conversion, capture and storage” and it is coordinated with other related projects:

Project # 2 is to explore CO2 capture with oxyfuel technology in a 20MW pilot plant. To be built in El Bierzo, NW of Spain. CIUDEN

Project # 3 is to study and regulate geological storage in Spain. IGME

Project #4 is to study public awareness of CCS technologies. CIEMAT

ELCOGAS – UCLM – Ciemat – INCAR CSIC 14 M€ (initially 18.5 M€)

TARGETS

PARTICIPANTS & BUDGET

COORDINATED

2. ELCOGAS R&D INVESTMENT PLAN.CO2

line –

“Singular and strategic project PSE‐CO2

Page 17: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

17

COMBINEDCYCLE

COAL + PETCOKE

GASIFICATIONRawgas FILTRATION

SYSTEM

CleangasPURIFICATION

& DESULPHURISATION

Clean Gas2% of total flow (3600 Nm3/h)

22.6 bar130 ºC

60.5 % CO22.1% H2

Tail Gas1,3 bar

MP steam

SHIFT REACTOR(Sour /Sweet)

CO2¿SH2

?

CO2 AND SULPHURREMOVAL

(Chemical, aMDEA)

183,000 Nm3/h

100 t/d

CO + H2

O →

CO2

+ H2

H2

99,99%

2 t/d

PIL

OT

PL

AN

T

Raw H2 (80%)

40%

H2

rich gas:37,5 % CO250,0 % H23,0 % CO

H2

PURIFICATION (PSA UNIT)

Recycle gas compressor

Pilot plant size: 1:50 ~ 14 MWth

2. ELCOGAS R&D INVESTMENT PLAN.CO2 line –

“Singular and strategic project PSE‐CO2”

Page 18: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

18

Executed (March 2010)100 % engineering work100 % equipment supply95 % construction

Detailed engineeringCO2 unitPSA unit

Civil workControl system supply

Reactors supplyHeat exchangers

Catalyst supplyPiping and fitting supply

Control valvesSafety valves

Manual valvesElectrical components

Analyzers system

Empresarios AgrupadosLinde-CaloricLindeConstrucciones Ocaña-CañasZeus ControlTecnicalTecnical y Boreal-VilaJohnson MattheySidsa, Cuñado, MASASAMSONTyco Valves & ControlsSAIDIGE PowerABB División de automatización de procesos

Start-up: April 2010End of the tests to obtain data for different operating conditions and purity grades March 2011

MAIN SUPPLIERS

2. ELCOGAS R&D INVESTMENT PLAN.CO2 line –

“Singular and strategic project PSE‐CO2”

Page 19: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

19

2. ELCOGAS R&D INVESTMENT PLAN.CO2

line –

“Singular and strategic project PSE‐CO2

Pilot plant location

Pilot plant 3D view

PRENFLO

gasifier

Coal preparation

Sulfur recovery plant

Combined cycle

Pilot plant for CO2 capture

and production of

H2

Page 20: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

20

2. ELCOGAS R&D INVESTMENT PLAN. CO2 line –

“Singular and strategic project PSE‐CO2”

Civil work (August 2009)

PSA unit buffers and absorbers (Linde)

Page 21: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

21

2. ELCOGAS R&D INVESTMENT PLAN. CO2 line –

“Singular and strategic project PSE‐CO2”

Aerial view (November 2009)

Page 22: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

22

2. ELCOGAS R&D INVESTMENT PLAN. CO2 line –

“Singular and strategic project PSE‐CO2”

Aerial view (February 2009)

Operation display of the pilot plant

Page 23: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

23

2. ELCOGAS R&D INVESTMENT PLAN. CO2 line –

“Singular and strategic project PSE‐CO2”

TOTAL QUOTE OF THE PP PROJECT UPDATED EVERY YEAR(K€ of the quoted year)

13.000 13.000 13.000

7.0048.441 8.535

1.088

2.383

4.010 4.329

521 531542

693

833 830547 535

521

514

509 509235241

0

2.000

4.000

6.000

8.000

10.000

12.000

14.000

16.000

2005 2006 2007 2008 2009 2010 2011

EQUIPMENTS SERVICES PERSONNEL OTHERS

Page 24: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

24

Pilot plant for CO2 capture and production of H2 and electricity with IGCC technology

Other activities: To be done after PSE as R&D platform: Water shift reaction catalyst optimization. Tests of different catalyst

New processes to separate CO2-H2

CO2 different treatment processes

Improvement of integration efficiency between CO2 separation processes and IGCC plant

Other proposals from Industry or Research community to use the IGCC plant and its pilot plant to develop of process, equipments, components, or even pre-engineering of new plants with CCS and Zero emissions

4. ELCOGAS R&D INVESTMENT PLAN. 

CO2

line

Page 25: R & D plan results results and experience experience in ... · 9 1.162 1.527 744 836 622 321 343 301 452 421 312 259 327 277 335 911 1.391 1.595 1.371 1.293 1.129 1.150 1.130

25

Francisco García Peña

[email protected]

ELCOGAS S A www elcogas es

R & D plan R & D plan resultsresults andand experienceexperience in in thethe Puertollano IGCCPuertollano IGCC

THANK YOU FOR YOUR ATTENTIONTHANK YOU FOR YOUR ATTENTION