Quintiq Projects
Release Notes 2016Q1.01
QP/People Team
20 Feb 2016
2© 2015 Quintiq 2© 2015 Quintiq
Main Changes/Features
Agenda
Conversion and Data Changes
Issues (RFCs) Solved
3© 2015 Quintiq
Main Changes/Features
• Separate WIP count and FTR % for AE.
• Optimization state for projects
• Optimization related fields exported to the Systems and Projects KPI Overview.
Optimization 2.0
• VCM KPIVCM
© 2015 Quintiq. All rights reserved. Quintiq is a registered mark of Quintiq Holding B.V.
Quintiq Projects
Topic: Optimization 2.0
5© 2015 Quintiq
Separate WIP count and FTR % for AE
• The WIP count and FTR % for AE (and QA-AE) are now separated from the other technical roles which consist of QS and TC.
– For example, instead of showing 5 remaining issues in total, we can now see 2 issues are on Technical (QS and TC) while 3 are on Optimization (AE). The same goes to the FTR calculation.
• The same KPIs will be reflected in the PMR email.
• However, these changes have not been applied to the PMR Mobile yet. Hence, you will still see a single Technical WIP and FTR in the PMR Mobile for all the technical roles (QS, TC and AE) combined.
Technical – shows the WIP and FTR for QS/TC.
Optimization – shows the WIP and FTR for AE.
6© 2015 Quintiq
• If your project has optimization, you can now update the Optimization State to reflect the current state in the project. It is, by default, set to “Dormant”.
Optimization state for projects
2. Select the Optimization State from the dropdown and click OK to update.
1. double-click to edit the project.
7© 2015 Quintiq
• The following optimization related fields are now exported to the Projects and Systems KPI Overview dataset so you can easily see the information for all the projects.
– QA-AE name
– Optimization state
Optimization related fields exported to the Systems and Projects KPI Overview
© 2015 Quintiq. All rights reserved. Quintiq is a registered mark of Quintiq Holding B.V.
Quintiq Projects
Topic: VCM
9© 2015 Quintiq
• To measure the effect of VCM on the efficiency of modeling work, the average hours spent per issue is calculated based on the data of the week before and exported on a weekly basis to the Systems and Projects KPI Overview dataset for all the projects that are active and have not ended.
VCM KPI
• “Issues touched by” – Any issues that involve the QS/QAQS/AE/QAAE regardless of the issue status (including withdrawn issues). As long as there is any activity status created in the week with the QS/QAQS/AE/QAAE as the owner, the issue will be counted in. If there are more than one activity status created for the same QS in the same week, the issue will be counted only once in that week.
• E.g., if an issue is to be solved by QS John in week 30, returned to John in week 31 and then accepted in week 31, then this issue will be counted in both week 30 and 31 since the time is spent in both weeks.
• Issues that do not involve QS/QAQS/AE/QAAE at all, e.g. issues that are created by the customer and closed by the BC without any modeling work, will not be counted in.
• “Timesheet hours” – Approved timesheet hours in Maconomy on a weekly basis.• We are only interested in the phases where modeling work is involved, hence Initialization and Analysis
phase are excluded.• The KPI will be calculated and exported starting from 1st Jan 2015.
Average hours spent per issue = number of issues touched by QS/QAQS/AE/QAAE (so all the modeling roles) in the week
divided by the timesheet hours clocked (by these same people) in the same week
taking into account all the phases except Initialization and Analysis phase.
10© 2015 Quintiq
VCM KPI standard view
Use the standard view Systems and Projects KPI overview (a.k.a Management View) \VCM KPI.
Latest KPIs for all the projects exported on a weekly basis
Weekly KPI history of the selected project
© 2015 Quintiq. All rights reserved. Quintiq is a registered mark of Quintiq Holding B.V.
Quintiq Projects• Conversion & Data Changes
• Issues (RFCs) Solved
12© 2015 Quintiq
• Conversion & Data Changes
– N/A.
• Updated views
– System and Project control views
• Publish PMR
• Quality last 7 days (PMR First Time Right)
– Systems and Projects KPI overview (a.k.a Management View)
• Optimization KPIs
• VCM KPI
Conversion & Data Changes
13© 2015 Quintiq
• ID 4851: Tab order in import issues dialog has been fixed.
• SCP 67739, 67748: Booked hours on project level include only QPLC phases now which is consistent with the booked hours on phase level.
Issues (RFCs) Solved