29
QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Embed Size (px)

Citation preview

Page 1: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

QuickBooks For Contractors

Instructor: Denise Chew, Loupe ConsultingTeaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Page 2: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Agenda

1. Profitability & Cash Flow (where is the money)?1. Idealism vs. the reality of QB2. Suggested changes to QB3. The numbers you really want to see (& use)

2. Timing & Control (systems that impact your ability to “see”)1. Cash vs. Accrual accounting; methods of data entry and QB’s default

parameters2. WHAT and WHEN you want to see about/in your business

determines the needed QB configuration and supporting system.

3. Business and Job level metric reporting1. Again, WHAT and WHEN are enabled (or disabled) by QB.2. Identify your specific needs, configure reports, make a “change

later” list to be implemented by your bookkeeper(s).

Page 3: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Profitability & Cash Flow

Profitability Frequency of assessment Formality of assessment Quality of assessment Usefulness of assessment

Cash Flow Frequency of assessment Formality of assessment Quality of assessment Usefulness of assessment

Page 4: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Company Example

15 year old contracting entity, ~4mm/year in sales Specializes in single room of the home Materials are purchased Subcontractors for all phases of build and they are paid by

the hour for each job Installers Plumbers Electricians

Jobs last 1-4 weeks

The ICF statement for this company is going to look very different from the “Text-

Book” Version

Page 5: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

The ICF – Textbook vs. QB Reality (a Quality issue)

What do you notice in the example co. ICF? Look at the Balance Sheet as well.

Page 6: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

QuickBooks can generate a cash-flow statement for you through the report center

Page 7: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Change QB Settings (must be logged in as Admin)

Page 8: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

The FCF – Textbook vs. Reality (a Usefulness issue)

What you choose to do with that “free” cash is up to you!

Money coming into your business

- (Money going out of business as expenses) (Money locked up in “Working Capital Cycle”)(Investment in business)(Debt Service)

= Free Cash Flow to “Shareholder”

Page 9: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

FCF Math

EBIAT

+

Depreciation Expense

- CAPEX

- Increase in Working Capital

- Debt Service after Tax

= Free Cash Flow

Page 10: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

FCF for ExampleCo (real data, formatted to tell the story)

Page 11: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Example Co. Income Statement

Page 12: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Using worksheet for Example Co Balance Sheet Differences Articulation of Impact on Cash Categorization to tell the story

Now do your own (with assistance as needed) What do you see?

Don’t forget to error check yourself, your cash balance from the math has to match the cash balance on the balance sheet.

FCF Practice

Page 13: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Reminder of why you care….

Free Cash Flow is the: Money I can take home Money I can pump back in

Revenue= $500,000, WC= $50,000, so WC/Sales= 10% If FCF= $30,000, What Percentage of Growth can be self

funded? What is the level of sales that can be generated? Money I can service additional debt and use

someone else’s money to grow EBITDA

(Principal + Interest Payment) = 1.25

Page 14: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

ExampleCO system

Issues & Resolutions Moving of the system driver/control point (using QB better) Changing the QB processes used Rethinking the order of workflow operations Reassignment of labor

Timing & Control (Getting to both Quality & Usefulness)

Page 15: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

WHAT and WHEN

What reports would you look at? When would you want to see these reports? What are the barriers to understanding these

reports? How did you choose these reports?

Time for Work Sheet on Reports

Page 16: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Enabling the WHAT and WHEN

Page 17: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

What do I want to be able to see

Range of Reports

Page 18: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Cash vs. Accrual

1 2

Income Statement – WHAT YOU DID

Cash Flows – WHERE ALL THE MONEY WENT

Accrual

Cash

Page 19: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

The Processes in QB

Page 20: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Reporting is Conditional

Page 21: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Reporting is conditional

How much ($)

What/WhyTo/From Whom

How

When

All Possible Reports

Some,not all reports

ITEM

Page 22: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

CONFIGURATION & IMPLEMENTATION

• Follow the money AND the generation of data

• Balance– # process steps– Usefulness of detail

obtained (i.e. level of detail in tracked items)

– Consistency of method (less things to master)

– Users & Permissions

• Consider all three gears (or layers) inherent in a system. (as taught by Professor Marty Anderson @ Babson in Extended Enterprise Management)

Page 23: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

What are some of the pain points from your work sheets?

Page 24: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Budget vs. Actual cost per Job

QB Process & Settings Using Estimates Assigning Customer:Job Treatment of Labor/Payroll

Accounting Process Accrual

Timing & Control Is all the data present

Reports to Run Estimate vs. Actual > Modify > Filter

Common Problems/Errors Missing Data Unallocated Data (unassigned)

0/1 {null} thinking

Page 25: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Bad vs. Good (Budget vs. Actual)

Page 26: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Cash Need to Finish Job? (Open PO’s per Job)

QB Process & Settings Using Purchase Orders Assigning Customer:Job

Accounting Process Accrual All things get PO’s or just some? “Units” to use for items ordered What about partial pay on subcontractors?

Timing & Control Is all the data present? Including the non-posting PO information? Are the person

who order and who enters data the same? Reports to Run

Open PO by Job> Modify > Filter Common Problems/Errors (resulting in different answers on different reports)

Mis-Timed Data, Mis-Entry of “expense” rather than “item” on a bill Unallocated Data (unassigned)

Page 27: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

Next Steps

Ones from your lists QB Process issues Data methods issues Timing & Control Issues

Action Item Lists Translate wish list into action items

Page 28: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan

QuickBooks For Contractors

[email protected] [email protected]

Page 29: QuickBooks For Contractors Instructor: Denise Chew, Loupe Consulting Teaching Assistants: Nathan Bernard, Jacob Geller, Derrick Kwan