32
www.arena.gov.au Renewable energy technology and the future; driving the long-term transformation to a clean energy technology economy in Queensland Queensland Energy 2013 20 February 2013

Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Renewable energy technology and the future; driving the long-term transformation to a clean energy technology economy in Queensland Queensland Energy 2013

20 February 2013

Page 2: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Summary

• The Australian Renewable Energy Landscape • Policy drivers • Price and non-price barriers and challenges to build

investor confidence • ARENA strategy and investment plan • Opportunities through ARENA

Building skills and capacity Driving renewable energy deployment in regional and

remote locations • Investment highlights in Queensland

2.

Page 3: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

1. The Australian Renewable Energy Landscape

3.

Page 4: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Renewables in Australia’s energy mix Renewables in Australia’s energy mix

Source: ABARES, Australian Energy Statistics (2011)

Australian Electricity Generation 2009-10

4.

Page 5: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Australia’s renewable energy mix

Source: CCA Discussion Paper Oct 2012

5.

Page 6: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Location of renewable energy capacity

Source: BREE (2012) Energy in Australia 2012

6.

Page 7: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au 7.

Capacity of renewable energy generation in Australia (in 2010)

Source: Clean Energy Council 2011, Clean Energy Australia Report 2011

Page 8: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Towards secure, reliable and cost-effective supply in Qld- the framework

Renewable Opportunity

PV / Wind forecast to be amongst lowest cost in 30

year time frame. Distributed generation and consumer

choice opportunity.

Globally private sector investor driven with high

percentage of spend local to deployment.

Clean generation

8.

Source: The 30 Year Electricity Strategy Directions Paper, Queensland Department of Energy and Water Supply

Page 9: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Compared to major solar markets, Australia is sunny

9.

Page 10: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

2. Policy drivers

10.

Page 11: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Australia’s targets - projected growth in emissions and the abatement challenge

11.

Source: Treasury modelling, 2011 (medium global action scenario)

Page 12: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Australian Government support for renewable energy technology development

12.

Page 13: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

ARENA - objectives

Funding technology through the development process

13.

Page 14: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

4. Price and non-price barriers and challenges to build investor confidence

14.

Page 15: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Progress across the full set of costs is required to increase commercial viability and deployment

Solar Device

Other Hardware,

Civils, Install, Land, O&M

Finance Channel Margins Local

costs 70-80% of

employment in these areas

Global costs

Technology IP key value

LCOE Drivers

PV LCOE now <$200MWHr

15.

Page 16: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

Research Development

Commercial Scale

Incubating Promoting Sustaining Imagining Demonstrating

Pilot Scale

Demonstration Deployment

Supported Commercial

Competitive Commercial

IMPACT TECHNOLOGY PUSH MARKET PULL

Proving it Works

Higher Efficiency

Lower Cost Materials & Components

Thermal & Chemical Storage

Control Strategies – Demand side management, resource

forecasting

Securing Capital

Lower Technology Risk Proof of Cost Supply Chain Development

System Integration – improving capacity

factors & Yields Manufacturing Process

Improvement O&M track record

Proving cash flows

Project Finance & Revenue Certainty

Maximising NPV Forecasting, storage, PPA terms

Capturing PPA value in uncertain

markets – carbon, regulation, ownership structures etc

Cost of ownership, permitting, social

acceptance, skills availability etc

www.arena.gov.au

Innovation chain – key challenges

16.

Page 17: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Unlocking the capital

Market

Commercial Viability

Technology Risk

ty”

$$$ Debt & Equity

Commercial viability • Upfront costs vs. long-term revenues • Highly sensitive to cost of finance • Bankable PPAs at market value

Technology risk (CSP) • Long-term nature of R&D • Funding the cost of proving its “bankabili Market • Policy stability • Variation between jurisdictions • People and skills

17.

Page 18: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

LCOEs for renewable energy technologies - 2012 Levelised energy costs in 2030

Source: BREE, Australian Energy Technologies Assessment 2012

18.

Page 19: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

4. ARENA’s Strategy and Investment Plan

19.

Page 20: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

ARENA - objectives

The basics

$3.2 billion in funding

20.

Page 21: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

General Funding Strategy

GENERAL PRINCIPLES

ALONG THE WHOLE INNOVATION CHAIN

INVESTMENT PLAN

RESEARCH (basic and applied) DEVELOPMENT DEMONSTRATION COMMERCIALISATION

COMPLEMENTARITY CONFIDENCE BUILDING DIVERSITY

STRATEGIC INITIATIVES SUPPORTING INITIATIVES COMPLEMENTARY INITIATIVES

21

Page 22: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Investment Plan

STRATEGIC INITIATIVES are larger in scope and scale and typically fund market-oriented, near commercial, demand pull projects

SUPPORTING INITIATIVES more limited in scope and address specific roadblocks to the success of a strategic initiative

COMPLEMENTARY INITIATIVES provide ARENA with the flexibility to do those things necessary to fulfil all of its functions

• Regional Australia’s Renewables • Deploying utility scale renewable energy

• Removing roadblocks for regional and remote renewable energy • Building Australia’s next generation solar

•Supporting High value Australian Renewable Energy knowledge (SHARE) •Continuing programs such as ERP and REVCF

22.

Page 23: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

4. Opportunities through ARENA

23.

Page 24: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Current Opportunities

24

Current funding opportunities through ARENA: •$126 million Emerging Renewables program •$200 million Southern Cross Renewable Energy Fund Coming up: •PhD Scholarships and Postdoctoral Fellowships •Regional Australia’s Renewables program

Page 25: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Regional Australia’s Renewables

Industry Size

Type of Support

Location of projects

Community 100kW – 1MW Grants - capital subsidy Off-grid

Roadblocks No size

Grants – project costs

Focus on - system issues, demand management,

control systems, storage optimisation etc

1MW or more Grants - capital / or revenue subsidy

Off-grid or fringe-of-grid

25.

PROPOSED OUTCOMES At least 50 MW of Roadblocks 10 MW or more renewable energy removed. Trained renewable energy capacity installed operators of systems by 2018 by 2020 renewables

Page 26: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Regional Australia’s Renewables – Consultation Process

Consultation sessions Brisbane, Melbourne, Perth, Karratha, Darwin and Cairns

53 written submissions received from technology developers,

industry and community groups

ARENA Consultation Paper

Program Design

26.

Page 27: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

5. Investment highlights

27..

Page 28: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

$650 million in investments

28.

Page 29: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

CS Energy Kogan Creek Solar Boost Project

29.

$34.9m funding for $104.9m project •The project will be the world's largest solar integration with a coal fired power station. •44 MW solar thermal addition to the

existing 750MW Kogan Creek Power Station in South West Queensland.

•AREVA Solar's CLFR technology. •30 hectare solar field. •Operational in 2013.

Page 30: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Solar Energy Management (SEM) system for utilities

30.

CSIRO, Ergon Energy, GWA Group $0.2m funding for $0.6m project Combines CSIRO’s thermally-driven residential desiccant solar cooling technology with a novel SEM system and natural gas-powered back-up to reduce peak electrical consumption from the grid with certainty while providing continuous operation of air-conditioning. The SEM technology will be tested in 3 residential buildings to verify its ability to address grid stability issues and test customer acceptance as “winx3” for the environment, consumers and utilities.

Page 31: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

Increasing the skills and capacity of the solar sector

31.

• ARENA supports 50 PhD

Scholars and Postdoctoral Fellows at universities across Australia

• Supporting a career pathway for the next generation of solar leaders

• Building the capacity of the solar sector for Australia to maintain its global leadership position in the R&D space

• Dr Xiaojing Hao says her Postdoctoral Fellowship has allowed her to take a lead role in setting up a new group at UNSW dedicated to developing terrawatt level applications of PV using CZTS thin film solar cells

Page 32: Queensland Energy 2013 - Australian Renewable Energy ... · Industry . Size Type of Support Location of projects . Community . 100kW – 1MW Grants - capital subsidy Off-grid . Roadblocks

www.arena.gov.au

• Market drivers for renewable deployment maturing.

• Technology globally and locally progressing through the commercialisation process.

• Opportunities in the near term in Regional Australia.

• ARENA Funding strategy in place with programs open and under development.

Summary

32.