National Cyclone Risk Mitigation Project
(NCRMP)Revenue (DM) Department
Government of Andhra Pradesh
National Cyclone Risk Mitigation Project
(NCRMP)Revenue (DM) Department
Government of Andhra Pradesh
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 2/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
INDEX
1.0 Project Background 2
1.1 Third Party Quality Audit Consultant 3
1.2 Mobilization of Team 4
1.3 Setting up offices and logistics for the consultant teams 8
2.0 Review Meetings and Other Activities 9
3.0 Status of TPQA Visits 10
4.0 Progress of NCRMP works 11
5.0 District wise status of tests conducted by TPQA 39
6 0 Details of Quality Control Audit Reports Submitted During this 3 Months 40
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 3/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
1.0 Project Background
Andhra Pradesh (AP) state has one of the longest coastal belts in India. Out of 67,362 Km of road network in the state,
the nine coastal districts cover 26,000 km of road length. Every year during the period of April-May and September-
December, cyclonic situations set in to the Bay of Bengal. With the recent changes in climatic conditions, the catastrophic
events are increasing resulting in very devastating cyclones like Laila, Jal etc where the loss is enormous. In the 97 years
ranging from 1892 to 1989, there were as many as 67 cyclones within the State.
It is essential to provide safe residential accommodation to the vulnerable population during any eventuality or disaster
due to natural calamities such as cyclones and associated tidal waves and storm surges. The project is formulated based
on experiences of Government of Andhra Pradesh in mitigating such disasters during the past and also keeping in view the
existing facilities available in the project area in Andhra Pradesh.
The Government of India has applied for a credit of US$ 255 Million equivalent from the International Development
Association (IDA) toward the cost of National Cyclone Risk Mitigation Project (NCRMP), and it intends to apply the
proceeds to payments for goods, works, related services and consulting services under this Project.
National Cyclone Risk Mitigation Project (NCRMP) – Project Implementation Unit (PIU), Andhra Pradesh, headquartered at
Hyderabad has invited the consultants to submit proposals for providing the consultancy services for Third Party Quality
Audit for 9 coastal districts namely Srikakulam, Vijayanagaram, Visakhapatnam, East Godavari, West Godavari, Krishna,
Guntur, Prakasam and Nellore. The project “Construction of Multipurpose Cyclone Shelters, Roads to Cyclone
Shelters, and Roads to habitations and Roads & Bridges under NCRMP” is funded by International Development
Association and received through Government of India. This consultancy is envisaged to audit the quality of works being
implemented by various line departments working under PIU. The number of works under progress / for which
agreements are concluded in each district is shown in the table below
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 4/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
1.1 Third Party Quality Audit Consultant.
To provide Consulting Services of Third Party Quality Auditor for Construction of Multipurpose Cyclone
Shelters, Roads to Cyclone Shelters, Roads to habitations, and Roads and Bridges under NCRMP in 9 coastal
districts The Commissioner for Disaster Management & Project Director Project Implementation Unit (PIU)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 5/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
1.2 Mobilization of Team
In accordance with the Contract for Consultant Services, executed on 31st
May’2011, by The Commissioner
for Disaster Management & Project Director, Project Implementation Unit (PIU) NCRMP and the Egis India,
professional services were authorized to commence work. The detail of team mobilization and organization
chart is shown below.
Sr.No. Name Designation
Date Of Joining
Last Day
of Working
NCRMP Project Office, Hyderabad
1 Bhavanna Rao Project Manager 01.06.2011
2 Dr. Surjit Singh Deepak Environmental Management Expert 09.06.2011
3 Dr. Sudesh Kaul Social Management Expert 01.06.2011
4 Mrityunjay Kumar MIS Expert 01.06.2011
5 V.Ravi Kumar Electrical 06.06.2011
6
Ch.Giridhar Electrical 02.06.2011 13.12.2012
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 6/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
13 B.Srinivasulu Reddy Site Engineer 06.06.2011 22.09.2012
14 H.Venugopal Site Engineer 06.06.2011
15
Siva Kishore Vedula Site Engineer 09.06.2011 04.01.2012
Sivaji Raju Site Engineer 13.02.2012
16
Srinivas.Y Site Engineer 27.06.2011 06.01.2012
Venkateshwara Prasad Site Engineer 13.02.2012
17
Babu.G Office Manager 01.06.2011 19.06.2012
KNVS.Malleswara Swamy Office Manager 20.06.2011 14.11.2012
N.Ramakrishana Office Manager 17.11.2012
ELURU
18
M. Manohar DPM / Eluru 27.06.2011
R. Sathi Babu Randhi Deputy Project Manager 02.06.2011
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 7/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
26 Arun Kumar DPM / Ongole 22.02.2012
27
P.Ramesh Reddy Site Engineer 06.06.2011 13.03.2012
T.SreeVishnu Site Engineer 14.03.2012
28
Shaik Zaheer Ahamad Gori Site Engineer 02.06.2011 31.08.2012
S.Narendar Site Engineer 10.09.2012
29 K. Rama Rao Site Engineer 22.06.2011
30 Suresh Babu.P Site Engineer 06.06.2011
31 R.Balakrishna Reddy Site Engineer 02.06.2011
32
Mallikarjuna Rao Site Engineer 02.06.2011 01.03.2012
Ravinder Reddy Site Engineer 15.07.2011
33 Neelakantan Office Manager 01.06.2011
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 8/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Organization Chart of TPQA, NCRMP
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 9/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
1.3 Setting up offices and logistics for the consultant teams
We have established a Main office at Hyderabad, where all the necessary expertise that is required for this project. There
is a core team of national experts to monitor the project activities and discipline specialist will appropriately support this
core team. These experts will again be supported from the respective home office. Other than the experts, support staff is
also be stationed in this office. This office will be the base office during the project period of consultants.
The details of our site offices are given in table below. These offices are provided with required communication equipment,
transportation facilities and necessary infrastructure. The offices are also equipped with computers with basic software
programs, printers, and other electronic gadgets like telephone, fax machines, etc. as felt needed. Apart from the abovePM and DPM offices, we have established site offices in all other districts
PM Office – Hyderabad
9-1-77/3, No.31, Third Floor
S.D. Road, Secundrabad – 500 003
Fax:=91-04-40179496
E- mail: [email protected]
DPM Office – Vishakhapatnam
Pavan Residency, Dr. No. 31-7-2/73,
Flat NO 503Kurmannapalem,
Opp to Bus Depot,
Vishakhapatnam - 530046
DPM Office – Eluru
Flat No. 504, Fourth Floor,
Yemireddy Residency Apartment,
Shekar Street, Gandhinagar,
Eluru, West Godavari Dist. A.P.
DPM – Ongole Office
H. No. 6-277, 2nd
lane
Beside computer Centre
Maruthi Nagar
Ongole - 523002
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 10/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
2.0 Review Meetings and Other Activities
S.No. Place Date Activity
1 Hyderabad 10-10-2012 Attended ENC (PR) office and attendeddiscussion with PD SPIU in ENC (PR) chambers.
2 Hyderabad 15-10-2012
Attended NCRMP office for Review meeting by
PM SPIU on TPQA Performance.
3 Hyderabad 17-10-2012 Attended NCRMP office for Review meeting byPM SPIU.
4 Hyderabad 19-10-2012 Attended NCRMP Review meeting in chambers of Commissioner DMA at 5th floor ‘L’ block APSecretariat.
5 Hyderabad 29-10-2012 Attended NCRMP Review meeting in Chief Secretary Peshi in ‘C’ block AP Secretariat.
6 Srikakulam 21.11.2012 Attended Review meeting at Srikakulam withWorld Bank ISR mission
7 Vi kh t 22 11 2012 Att d d R i ti t Vi kh t ith
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 11/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
3.0 Status of TPQA Visits:
The following table shows the details of TPQA visits to sites in respective districts.
DistrictTotal Number of Visits
TotalOct.'2012 Nov.'2012 Dec.'2012
Srikakulam 28 28 36 92Vizianagaram 5 05 01 11
Vishakhapatnam 19 11 23 53
East Godavari 16 32 22 70
West Godavari 10 13 26 49
Krishna 10 14 38 62
Guntur 23 21 32 76
Prakasam 27 17 23 67
Nellore 9 13 16 38
No. of Visits by TPQA
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 12/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
4.0 Progress of NCRMP works:
The district wise progress of works is shown below. The works in the West Godavari are not started and the works in
Krishna District has just started. At many places the first milestone is completed but works are not started. The line
departments are to analyze the reasons for the slow progress and if necessary penalty for the slow progress as per the
agreement conditions should be imposed.
Third Party Quality Audit by Egis – India consulting services
Summary of Activities
S.No. District
Agreements for PackagesCommunicated
Status of works
PR R&B Progress Not Started
1 Srikakulam 6 5 21 0
2 Vizianagaram - 3 3 0
3 Visakhapatnam 13 0 21 0
4 East Godavari 7 0 12 1
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 13/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
TPQA STATUS REPORT FOR NCRMP WORKS TO THE END OF DECEMBER 2012
S.No.
District
Packages /
Worksentrusted
Status of Works No. of Visits of
TPQA
Total No.
of QCtestsdone
NCRs AuditReportsIssued
Environmental
& SocialReportsIssuedPR R&B Started
NotStarted
Issued closed Pending
1 Srikakulam 16 5 21 0 452 1475 54 54 0 77 57
2 Vizianagaram - 3 3 0 72 461 3 1 2 11 9
3 Visakhapatnam 21 - 21 0 361 2237 25 25 0 71 41
4 East Godavari 13 - 12 1 612 1128 28 28 0 58 31
5 West Godavari 10 - 10 0 436 349 20 20 0 52 37
6 Krishna 8 - 8 0 299 85 3 3 0 35 21
7 Guntur 15 2 17 0 373 606 14 13 1 60 32
8 Prakasam 23 1 24 0 407 1905 36 30 6 116 50
9 Nellore 26 - 26 0 323 1174 32 28 4 109 48
Total 132 11 142 1 3335 9420 215 202 13 589 326
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 14/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Status of works in Srikakulam District up to 31.12.2012
CategoryPackages allottedunder Phase - 1
Names of works undereach package
AgreementNo. / Date
Milestone Completion Dates Progress w.r.t.milestone upto 31.12.2012
Remarks
First Second Third
RHB
NCRMP/B-W/AP/RHB/ PRED/01/Santhabommali/003
Road from DPN R&B road toUddandapalem
/2010-11, Dt.30.04.2011
31.08.11 31.12.11 30.04.12complete Entire
work completed
Road from K. Umilada Junctionto Koduru (Link Road)
/2010-11, Dt.30.04.2011
31.08.11 31.12.11 30.04.12complete Entire
work completed
Road from Borubhadra,Malagam to Kollipadu via
Seepuram, Gantapeta
/2010-11, Dt.30.04.2011
31.08.11 31.12.11 30.04.12complete Entire
work completed
NCRMP/B-W/AP/RHB/PRED/01 /Polaki/006
Road from R&B road Mobagamto Duubakavanipeta via
Gajapathinagaram
/2010-11, Dt.30.04.2011
30.08.11 31.12.11 30.04.12First Milestonei.e Earthwork & Cd works &GSB
300 mts CCroad
completed,GSB laying isin progress,
roadformationwidth vary
from 6.00mtsto 7.50mts
Road from Talasamudram to
Dola Regulator
/2010-11, Dt.
30.04.201130.08.11 31.12.11 30.04.12
First Milestonei.e Earthwork & Cd works &GSB
completed
NCRMP/B-W/AP/RHB/PRED/01 /Polaki/005
Road from R&B roadEdulavalasa - Killam to Jonnam
via Talasamudram
/2011-12, Dt.30.04.2011
31.07.11 31.10.11 31.01.12First Milestonei.e Earthwork & Cd works &GSB
BT layercompletedfrom Km
5/670 to Km7/270, andWBM Gr- III
metalcollection is
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 15/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
in progressfrom Km
5/000 to Km5/670
Bridges
NCRMP/B-W/ AP/Br/R&B/01/Patnavanipeta/001
Construction of bridge at Km11/6-8 of NH-5 toPatnavanipeta ConnectingSundarapalem
46/2011, Dt.17.12.2010
17.08.11 17.01.12 17.06.12Completion of entire work
Slab A2-piercompletedand Slab A1-pier sis inprogress,Approach roade/w,GSB,WMM,SDBCcompleted.CD,R/W workscompleted.
NCRMP/B-W/AP/Br/R&B/01/Surampeta/003
Construction of Minor Bridge atKm 12/2-4 of NH-5 to
Surampeta Road via Naruva,mentada
45/2010-2011,
Dt17.12.201017.05.11 17.10.11 17.03.12
Completion of entire work
Deck slabsweiring coat& hand railscompleted,A
pproacheroad work completed.
NCRMP/B-W/AP/Br/R&B/01/Bendigedda/004
Construction of High levelbridge across Bendi gedda at
KM 4/10 of Pundi-Parlakimidiroad in Srikakulam Dt, A.P.
1/2010,Dt.11.11.201
011.08.11 11.01.12 11.06.12
Completion of
entire work
Bridge work completed, Approach
roadcompletedupto WMMlayers, And
SDBCpending.
RoadsNCRMP/B-W/AP/RD/R&B/01/Nowpada/006)
Improvesments Naupada- Venkatapuram road from0/0to15/0km
43/2010-11,17.12.2010 17.05.11 17.10.11 17.03.12
Completion of
entire work
work
completed
Roads tocyclonic
NCRMP/B-W/AP/RCS/PRED/01
Road from NP road toURKpuram
G.o rt No 451dt
29.01.12 29.05.12 29.09.12WBM GR-II &III
completework
completed
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 16/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
shelters /V.KOTTURU/002 06.04.2010
Road from Deppuru,Bahadapalli road to onkuluru & to cyclone shelter
G.o rt No 451dt
06.04.201129.01.12 29.05.12 29.09.12
WBM GR-II &IIIcomplete
work completed
Road from R&B road toDevunthalada
G.o rt No 451dt
06.04.201229.01.12 29.05.12 29.09.12
WBM GR-II &IIIcomplete
work completed
Road from pollada toKomarthalada & to cycloneshelter
G.o rt No 451dt
06.04.201329.01.12 29.05.12 29.09.12
WBM GR-II &IIIcomplete
work completed
NCRMP/B-W/AP/RCS/PRED/01
/ETCHERLA/005
Road from Koyyam R&B Roadto Moosavanipeta
G.o rt No 451dt
06.04.201007.11.11 07.02.12 07.06.12
Completion of entire work
work completed
Road from Mentada toDovupeta
G.o rt No 451dt
06.04.2010
07.11.11 07.02.12 07.06.12Completion of entire work
work completed
Road from Kotcherela road toKollibhemavaram & cycloneshelter
G.o rt No 451dt
06.04.201007.11.11 07.02.12 07.06.12
Completion of entire work
work completed
Road from Kotcherla road toPathasundarapalem
G.o rt No 451dt
06.04.201007.11.11 07.02.12 07.06.12
Completion of entire work
work completed
MPCS
NCRMP/B_W/AP/MP
CS/PRED/01/Santhabommalli/005
Construction of Cyclone shelterat Kollipadu
G.o rt No 451dt
06.04.201007.03.12 07.08.12 07.01.13
Completion of stilt floor & first
floor
Silt floor levelslab
completed.
Construction of CycloneShelter at Runku
G.o rt No 451dt
06.04.201007.03.12 07.08.12 07.01.13
Completion of stilt floor & first
floor
Upto plinthbeam
completed,and columnsabove plinthbeam is inprogress
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 17/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATUS OF WORKS IN VIZIANAGARAM DISTRICT UP TO 31.12.2012
CategoryPackages
allotted underPhase – 1
Names of works under eachpackage
AgreementNo./ Date
Milestone Completion Dates Progress w.r.t.milestone upto 31.12.2012
RemarksFirst Second Third
Bridges
NCRMP/B-W/ AP/Br/ R&B/
02/Puligadda/ 007
Construction of Minor Bridge atKm. 7/2 near Puligedda of
Konada – Ramatheertham R&BRoad to Konathalapalem via
Yerukonda, Pasupam,Kollayavalsa (Z.P. Road)
31/2010-2011Dt. 01.12.2010
30.06.11 31.01.12 31.05.12100% of work
completed
As against of 100 % in the 3rd
Milestone
NCRMP/B-W/ AP/Br/ R&B/ 02/Chakaligadda
/008
Construction of Minor Bridge atKm 15/2 near Chakaligadda of Konada Ramatheertham R&Broad to Konathalapalem (via)
Yerukonda, Pasupam,Kollayavalsa (ZP Road)
34/2010-2011Dt. 08.12.2010
07.07.11 07.02.12 07.06.1290% of work completed
Minor deviationapproval is
awaited. It takes15 days’ time to
complete thework afterdeviationapproval
Road
NCRMP/B-
W/AP/RD/R&B/02/ Konada/009
Improvements to Road fromKonada Ramatheertham (R&B)Road to Konathalapalem (Via)
Pasupam, Yerukonda,Kollayavalsa from Km 12/0 to16/5 (Km 0/0 to 4/0 i.e. up to
NH-5 crossing)
33/2010-2011
Dt. 08.12.2010 07.06.11 07.12.11 07.03.12
100% of work
completed -
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 18/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATUS OF TOTAL WORKS IN VISAKHAPATNAM DISTRICT UP TO DECEMBER-31.12.2012
Categor y
Packagesallotted underPhase – 1
Names of worksunder each package
AgreementNo. / Date
Milestone Completion DatesProgress w.r.t.milestone up to
30.12.2012Remarks
First Second Third
MPCS
NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/
003
Construction of cycloneshelter at
Gajapathinagaram
/2011-12, Dt.03.10.2011
05.06.12 05.10.12 05.02.13
Plinth beam & Staircase,Stilt floor slab, First floorslab, ramp slabs arecompleted. EOAT submittedon 24.08.12
likely to becompleted
beforeMarch.201
3
Construction of cycloneshelter at Ratnayampeta
/2011-12, Dt.03.10.2011
02.02.12 02.06.12 02.10.12
All Slabs are completed.Inside and outside wallplastering work completed.White cement applications,wood joinery and Electricalworks are to be progress.
likely to becompleted
before15.02.2013
NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002
Construction of cycloneshelter at Patimeeda
/2011-12, Dt.03.10.2011
02.03.12 02.08.12 02.01.13
Plinth beam & Staircase,Stilt floor slab, First floorslab, ramp slabs arecompleted. EOATsubmitted on 24.08.12
likely to becompleted
beforeMarch.201
3
Construction of cycloneshelter at Mullaparra
/2011-12, Dt.03.10.2011
02.03.12 02.08.12 02.01.13
Stilt Slab & stilt floor, Firstfloor and head room slabsare completed. Ceilingplastering work and firstfloor brick work are inprogress.
likely to becompleted
beforeMarch.201
3
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 19/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Construction of cycloneshelter at Bangarampeta
/2011-12, Dt.03.10.2011
02.03.12 02.08.12 02.01.13
Stilt floor, First floor,second floor, Head roomslabs are completed. Istfloor and second floor brick
masonry work is inprogress.
likely to becompleted
before
March.2013
NCRMP/B-W/AP/MPCS/PRED/
03/Rambilli/004
Construction of cycloneshelter at
Venkayyapalem
/2011-12, Dt.03.10.2011
02.01.12 02.04.12 02.07.12
Plinth beam completed andfilling under floor is inprogress. EOAT proposalssubmitted on 29.06.12.
likely to becompleted
beforeJune.2013
NCRMP/B-W/AP/MPCS/PRED/03/Parawada/001
Construction of cycloneshelter at
Thikkavanipalem
/2011-12, Dt.07.10.2011
06.01.12 06.04.12 06.07.12Work not started due tosite problem
Progressis Slow
NCRMP/B-W/AP/RCS/PRED/03/Anandapuram/00
1
Road from NH-5 toRamarayadupalem
/2011-12, Dt.15.09.2011
14.12.11 14.03.12 14.06.12Road Furniture & B.T is
completed.completed
NCRMP/B-W/AP/RCS/PRED/0
3/Rambilli/002
Road from R & B road toRajakoduru
/2011-12, Dt.15.09.2011
14.01.12 14.05.12 14.09.12CD works are completed &
B.T work is Completedcompleted
Road from R & B road toKattubolu to Marripalem
/2011-12, Dt.15.09.2011
14.01.12 14.05.12 14.09.12CD works are completed &
B.T work is Completedcompleted
Road from R & B road toKrishnampalem
/2011-12, Dt.15.09.2011
14.01.12 14.05.12 14.09.12 CD Work is completed & B.T work is completed
completed
NCRMP/B-W/AP/RCS/PRED/03/Nakkapalli/003
Road from R&B road toPedatheernala toChinatheernala
/2011-12, Dt.15.09.2011
14.12.11 14.03.12 14.06.12B.T & C.C road works are
Completed.completed
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 20/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from UpmakaRajayyapeta R&B road
to Janakayyapeta
/2011-12, Dt.15.09.2011
14.12.11 14.03.12 14.06.12CD works are Completed &
B.T work is completedcompleted
NCRMP/B-W/AP/RHB/PRED/03/Nakkapalli/001
Road from Vempudi toPatimeeda
/2010-11, Dt.11.01.2011
10.05.11 10.09.11 10.01.12 Work is completed -
Road from R&B road toMullaparra up to Beach
end
/2010-11, Dt.27.01.2011
26.04.11 26.07.11 26.10.11 Work is completed -
NCRMP/B-W/AP/RHB/PRED/03/Anandapuram/00
3
Road from R&B B.PKallalu to
Matchvanipalem
/2010-11, Dt.10.03.2011
09.06.11 09.09.11 09.12.11 Work is completed -
NCRMP/B-W/AP/RHB/PRED/0
3/Paravada/004
Road from R & B road to
Pothurajanapalem
/2010-11, Dt.
28.03.2011
27.06.11 27.09.11 27.12.11 Work is completed -
Road from R & B road toJalaripeta
/2010-11, Dt.28.03.2011
27.06.11 27.09.11 27.12.11 Work is completed -
NCRMP/B-W/AP/RHB/PRED/0
3/Rambilli/006
Road from R & B road to Venkayyapalem
/2010-11, Dt.11.01.2011
10.04.11 10.07.11 10.10.11 Work is completed -
NCRMP/B-W/AP/RHB/PRED/03/Atchutapuram/0
07
Road from R&B road to
Ava- Somavaram
/2011-12, Dt.
27.04.2011 26.07.11 26.10.11 26.01.12 Work is completed -
Road from R&B Road to Avarajam
/2011-12, Dt.27.04.2011
26.07.11 26.10.11 26.01.12 Work is completed -
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 21/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATUS OF TOTAL WORKS IN EAST GODAVARI DISTRICT UP TO DECEMBER-31.12.2012.
Category Packages allotted underPhase - 1 Names of worksunder each package Agreement No./ Date
Milestone Completion Dates
Progress
w.r.t.
milestoneup to
31.07.2012
Remarks
First Second Third
RCS
NCRMP/B-W /RCS/PRED/04/Karapa/001
Approach Road tocyclone Shelter at Adivipudi
32/2011-12Dt:20.05.2011
30-11-2011 31-10-2011 31-01-2012 100% Completed.
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto P.Chodipallipeta CS
73/2011-12Dt:07.09.2011
3 months06.12.2011
3 months06.03.2012
3 months06.06.2012
100% Completed.
NCRMP/B-W /AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto K.Chodipallipeta CS
73/2011-12Dt:07.09.2011
3 months06.12.2011
3 months06.03.2012
3 months06.06.2012
100% Completed
NCRMP/B-W /AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Hukumpeta CS
73/2011-12Dt:07.09.2011
3 months06.12.2011
3 months06.03.2012
3 months06.06.2012
100% Completed
NCRMP/B-W/AP/RCS/PRED/04/Uppalaguptam/003
Road from R&B Roadto ChinaraghavulapetaCyclone Shelter
74/2011-12Dt: 23.09.2011
3 months22.11.2011
3 months22.06.2011
----------- 100% Completed
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Gaddipeta CS
73 /2011-12Dt:07.09.2011
3 months06.12.2011
3 months06.03.2012
3 months06.06.2012
100% Completed
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto Danavaipeta CS
73 /2011-12Dt:07.09.2011
3 months06.12.2011
3 months06.03.2012
3 months06.06.2012
100% Completed
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 22/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RCS/PRED/04/Thondangi/004
Road from R&B Roadto G.MusalayyapetaCS
73/2011-12Dt:07.09.2011
3 months06.12.2011
3 months06.03.2012
3 months06.06.2012
NilNot yetStarted
RHB
NCRMP/B-W/AP/RHB/PRED/04/Karapa/001
Road fromGurjanapalli toBandulavaripalem
24/2011-12Dt:27.04.2011
30-09-2011 31-10-2011 31-01-2012 100% Completed
NCRMP/B-W/AP/RHB/PRED/04/Katrenikona/003
Road from PR roadsto Dasarivanipeta andto Cyclone Shelter
18/2011-12Dt:27.04.2011
30-11-2011 30-11-2011 20-01-2012 100% Completed.
MPCS
NCRMP/B-W/AP/MPCS/PRED/04/Uppalaguptam/002
Construction of Cyclone Shelter atPedaraghavulapeta of Uppalaguptam Mandal
E.G.Dt.
78/2011-12Dt:17.10.2011
3 months16.01.2012
3 months16.04.2012
3 months16.07.2012
30%
Likely to becompleted byJune 2013
NCRMP/B-W /AP/MPCS/PRED/04/Thondangi/001
Construction of Cyclone Shelter atLakshmanudipeta inThondangi
77/2011-12Dt:07.09.2011
4 months16.02.2012
4 months16.06.2012
4 months16.10.2012
75%
Likely to becompleted byMarch 2013
NCRMP/B-W /AP/MPCS/PRED/04/Thondangi/001
Construction of Cyclone Shelter at Avulamanda
77/2011-12Dt:07.09.2011
4 months16.02.2012
4 months16.06.2012
4 months16.10.2012
75%
Likely to becompleted byMarch 2013
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 23/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATUS OF WORKS IN WEST GODAVARI DISTRICT UP TO 30.11.2012
Category
Packagesallotted under
Phase – 1
Names of works under eachpackage
AgreementNo. / Date
Milestone Completion Dates Progress w.r.t.milestone up
to 30.11.2012
RemarksFirst Second Third
RHB
NCRMP/B-W/AP/RHB/PRED/05/Mogaltur/001
Road from NH 214 A at Ranga Statuecenter to Harijanawada of Kalipatnam
(E) (Mogalthuru Mandal
16 /2011-12Dt.27.04.2011
27/4/2011to
22/9/2011
23/9/2011to
24/2/2012
25/2/2012to
26/7/2012
100% Completed
R&B road at Panchayat Office toPulaparthivarithota via Badava(Mogalthuru Mandal W.G.Dist.)
100% Completed
Mogalthuru Vempa R&B Road atUchintha Kalava Bridge to Gogulamma
Harijanapeta (Mogalthuru Mandal)100% Completed
From Narsapur Mogalthuru R&B road toDayadaldaspeta via VenkateshwaraSwamy temple (Mogalthuru Mandal )
100% Completed
Road from NH 214 A road toHarijanapeta of Kothota
27/4/2011to
22/9/2011
23/9/2011to
24/2/2012
25/2/2012to
26/7/2012100% Completed
NCRMP/B-W/AP/RHB/PRED/05/Narsapur/002
R&B road to Indira Nagar (via)Pochamma temple (Narsapur Mandal)
21 /2011-12Dt.09.05.2011
09/05/2011to
04/09/2011
05/09/2011to
06/01/2012
07/01/2011to
08/5/2012
100% Completed
Road from R&B road to Pedalanka(Narsapur Mandal W.G.Dist.)
100% Completed
Road from LB Cheria CC road to
Chillapalem of LB Cheria.
100% Completed
NCRMP/B-W/AP/RHB/PRED/05/Kalla/003
From A-U R&B Road toSatyanarayanapuram (Kalla Mandal)
25 /2011-12Dt.26.05.2011
26/5/2011To
20/8/2011
20/8/2011to
21/11/2011
22/11/2011To
23/2/2012
100% Completed
From A-U R&B Road to Mekaladibba(Kalla Mandal W.G.Dist.)
100% Completed
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 24/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATUS OF WORKS IN KRISHNA DISTRICT UP TO 31.12.2012
Category
Packages allottedunder Phase - 1
Names of works undereach package
Agreement No. /Date
Milestone Completion Dates Remarks
First Second Third
RHB
NCRMP/B-W/AP/RHB/PRED/06/Ma
chilipatnam/001
Road connecting R&B roadthrough Gantlammapalem
8/2011-12/27.04.2011
26.07.2011 26.10.2011 26.01.2012 Completed
NCRMP/B-W/AP/RHB/PRED/06/Ma
chilipatnam/002
Road from R & B Road toB.V Thota
7/2011-12/27.04.2011
26.07.2011 26.10.2011 26.01.2012 Completed
Road from Potalapalem Z.P
road to Chikativanipalem
7/2011-
12/27.04.2011 26.07.2011 26.10.2011 26.01.2012 Completed
NCRMP/B-W/AP/RHB/PRED/06/Kr
uthivennu/003
Road from Intheru R&BRoad to Rangaraopet
9/2011-12/27.04.2011
26.07.2011 26.10.2011 26.01.2012 Completed
Road from R&B road toCyclone Shelter atChandala
9/2011-12/27.04.2011
26.07.2011 26.10.2011 26.01.2012 Completed
RCSNCRMP/B-W
/AP/RCS/PRED/06/Machilipatnam/001
Road from BhogireddypalliR&B Road toRamakhandam
32/2011-12/Dt.02.09.2011
01.12.2011 01.03.2012 01.06.2012CD works, GSB, Gr-II,
Gr-III, BT,CCcompleted
Road from R&B RoadChinnapuram toGundupalem
32/2011-12/27.04.2011
01.12.2011 01.03.2012 01.06.2012CD works, GSB, Gr-II,Gr-III,BT completed
Road from Potalapalem Z.Proad to Pothepalli.
32/2011-12/Dt.02.09.2011
01.12.2011 01.03.2012 01.06.2012GSB, Gr-II, Gr-III,CC,BT completed
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 25/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATUS OF WORKS IN GUNTUR DISTRICT UP TO 31.12.2012
Category
Packages allottedunder Phase - 1
Names of works undereach package
Agreement No./Date
Milestone completion datesProgress
w.r.t.milestone
up to31.11.2012
RemarksFirst Second Third
RHB
NCRMP/B-W/AP/RHB/PRED/07/KA
RLAPALEM/001
R/f Ganapavaram R&BRoad to Kesavapuri ST colony
7/2011-2012
27.04.2011
26.7.2011 26.10.2011 26.01.2012 - Completed.
NCRMP/B-W/AP/PRED/07/Nagara
m/002
R/f R&B Road to Mohammad Alipalem 8/2011-
201227.04.2011
26.8.2011 26.12.2011 26.4.2012 - Completed.
R/f R&B Road toKaturivaripalem.
- Completed.
Bridges
NCRMP/B-W/AP/Br/R&B/07/Bapatl
a/010
Reconstruction of High-levelBridge @Km5/2 of Bapatla-Suryalanka Road across peralidrain in Guntur Dt.
79/2010-2011
1.12.2010
31.5.2011 30.11.2011 31.5.2012
90%
Likely to becompletedby end of Jan 2013
NCRMP/B-W/AP/Br/R&B/07/Bapatl
a/011
Reconstruction of High-levelBridge @Km2/4 of Bapatla-Pandurangapuram Road acrossperali drain in Guntur Dt.
78/2010-2011
1.12.2010
31.5.2011 30.11.2011 31.5.2012
90%
Likely to becompleted
beforeMarch 2013
RCS
NCRMP/B-
W/AP/RCS/PRED/07/PVPalem/001
Road from R&B road toMandevaripalem
2011-2012
1.11.2011
31.01.2012 30.04.2012 31.07.2012- Completed.
Road from R&B Road Alluru to Yadavapalem
31.01.2012 30.04.2012 31.07.2012
45%
Likely to be
completedbefore Feb
2013
NCRMP/B-W/AP/RCS/PRED/07/Karl
apalem/002
Road from Ganapavaram R&BRoad to Pedamarpuvaripalem
2011-20121.11.2011
29.02.2012 30.06.2012 31.10.2012
20%
Likely to becompletedbefore Jan
2013
Road from R&B Road toChinapuluguvaripalem
29.02.2012 30.06.2012 31.10.201225%
Likely to becompletedbefore Jan
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 26/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
2013
From R&B roadtoYaramvaripalem
29.02.2012 30.06.2012 31.10.201295% Completed.
Road from R&B Road toPedagollapalem CycloneShelter
29.02.2012 30.06.2012 31.10.201298% Completed.
Pedagollapalem P.R road toBonthagoralapalem
29.02.2012 30.06.2012 31.10.201295%
Shouldersare in
progress.
NCRMP/B-W/AP/RCS/PRED/07/Niz
ampatnam/003
Road from R&B Road toGurunadhanagar
2011-201217.10.2011
16.01.2012 16.04.2012 16.07.201299% Completed.
Road from R & B Road to Adavala H/O Bavaji Palem
16.01.2012 16.04.2012 16.07.201299% Completed.
Road from R & B Road to Atlavaripalem 16.01.2012 16.04.2012 16.07.2012 99% Completed.
NCRMP/B-W/AP/RCS/PRED/07/Bap
atla/004
Road from R & B Road toHanumathanagar
2011-201227.10.2011
26.01.2012 26.04.2012 26.07.201299% Completed.
Road from R & B Road to Adarsh nagar
26.01.2012 26.04.2012 26.07.201299% Completed.
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 27/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATUS OF WORKS IN PRAKASAM DISTRICT UP TO 31.12.2012
Category
Packages allottedunder Phase - 1
Names of works undereach package
Agreement No. /Date
Milestone completion dates Progress of work for the
month -December
Remarks
First Second Third
BRIDGES
NCRMP/B-W/AP/Br/R&B/08/Kanaparthy/012
Construction of High levelBridge at Km 16/10 of Naguluppapadu – Kanaparthyroad
76/2010-11Dated1/12/2010
5/31/2011Completionup to silllevel
12/31/2011Completionup to belowdeck slab
5/31/2012Completion of entirework includingapproach
es
Bridge work iscompleted.
completed
RHBNCRMP/B-W/AP/RHB/PRED/08/S.K onda/001
Road from Pakala ZP Road to Aulavaripalem Cyclone shelter
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/001Dated25.04.2011
8/24/2011Earth work,CD work,
GSB
12/24/2011WBM,
Grade II &
III
4/24/2012BT,
Shoulders& road
furniture
CC Road & Shoulderswork isCompleted.
completed
Road from R&B Road toSomarajupalli
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/001
Dated25.04.2011
BT, CC road & culverts arecompletedfrom KM 0/0 to
2/146.
completed
Road from R&B road toNarravaripalem
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/001Dated25.04.2011
BT, & culvertsare Completedfrom KM 0/0 to0/900. work iscompleted
completed
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 28/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RHB/PRED/08/S.K onda/002
Road from NH5 toMulaguntapadu
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002
dated10/02/2011
6/9/2011Earth work,CD work,
GSB
10/9/2011WBM,
Grade II & III
2/9/2012BT,
Shoulders& road
furniture
WBM-Grade-III LayerCompleted.OGPC + Seal
Coat To betaken up
80%
Road from R&B road toChalivendradibba
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002dated -10/02/2011
WBM-Grade-III LayerCompleted.OGPC + SealCoat To betaken up
80%
NCRMP/B-W/AP/RHB/PRED/08/S.K onda/002
Road from Pakala R&B road to
Mosanaladinne
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002dated10/02/2011
6/9/2011Earth work,CD work,
GSB
10/9/2011WBM,
Grade II & III
2/9/2012BT,
Shoulders& road
furniture
WBM-Grade-III materiallaying work isin progress
75%
Road from R&B road toBinginapalli HarijanawadaCyclone Shelter
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002dated10/02/2011
CC road work is completedfrom KM 0/0 toKM 0/220.Shoulderswork is to betaken up.
98%
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/003
Road from R&B Road Allur toM T Raju colony
NCRMP/B-
W/AP/RHB/PRED/08/K othapatnam /003 Dated27/04/2011
8/26/2011Earth work,CD work,GSB
12/26/2011WBM,Grade II & III
4/26/2012
BT,Shoulders& roadfurniture
BT, CC road,shoulders &
culverts arecompletedfrom km 0/0 tokm 3/8.work iscompleted
completed
NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/004
Road from KEM R&B Road toSankuvarigunta
NCRMP/B-W/AP/RHB/PRED/08/K othapatnam
9/26/2011Earth work,CD work,
GSB
2/26/2012WBM,
Grade II & III
7/26/2012BT,
Shoulders& road
BTcompleted.CDwork completed.CC
completed
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 29/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
/004 Dated27/04/2011
furniture road work completedfrom km 0/0 tokm 1/430 and
CC dip work iscompleted
Road from KEM R & B Road toPullareddypalem
NCRMP/B-W/AP/RHB/PRED/08/K othapatnam /004 Dated27/04/2011
BTcompleted.CDwork completed.CCroad andshoulders work completedfrom km 0/0 tokm 3/900.
completed
NCRMP/B-W/AP/RHB/PRED/08/Ulavapadu/07
Road from MC Road toSubbarayudu Satram
NCRMP/B-W/AP/RHB/PRED/08/Ulavapadu/07dated27/04/2011
8/26/2011Earth work,CD work,GSB
12/26/2011WBM,Grade II & III
4/26/2012BT,Shoulders& roadfurniture
BTcompleted.CDwork completed andshoulders work completedfrom km 0/0 tokm 3/4. work is completed
completed
NCRMP/B-W/AP/RHB/PRED/08/Ulavapadu/08
Road from R&B road Tettu toRamayapatnam
NCRMP/B-W/AP/RHB/PRED/08/Ulavapadu/08dated27/04/2011
8/26/2011Earth work,CD work,GSB
12/26/2011WBM,Grade II & III
4/26/2012BT,Shoulders& roadfurniture
BTcompleted.CDwork
completed.CCroad andshoulders work completedfrom km 0/0 tokm 5/086.work iscompleted
completed
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 30/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-
W/AP/RHB/PRED/08/Tangutur/09
Road from R&B road Pellur to Vasepallipadu
NCRMP/B-W/AP/RHB/PRED/08/Tangutur/09dated16/03/2011
7/15/2011Earth work,CD work,GSB
11/15/2011WBM,Grade II & III
3/15/2012BT,
Shoulders& roadfurniture
BT completed.CD work completed.CCroad and
shoulders work completedfrom km 0/0 tokm 4/5. work is completed
completed
NCRMP/B-W/AP/RHB/PRED/08/Tangutur/10
Road from R&B road toKesupalem
NCRMP/B-W/AP/RHB/PRED/08/Tangutur/10dated19/04/2011
7/18/2011Earth work,CD work,GSB
10/18/2011WBM,Grade II & II
1/18/2012BT,Shoulders& road
furniture
BT completed.CD work completed.CCroad andshoulders work completedfrom km 0/0 tokm 2/103.work iscompleted
completed
RCSNCRMP/B-W/AP/RCS/PRED/08/Vetapalem/001
Road from R&B road to Vijayanagar colony cycloneshelter
NCRMP/B-W/AP/RCS/PRED/08/V
etapalem/001 dated2011/12dated30.09.2011
1/29/2012Earth work,GSB
5/29/2012shoulders,Gr-III
9/29/2012BT, CCpavementand roadfurniture
cc roadcompleted, BTroadcompleted& shoulderscompleted.Road from km0/0 to km
0/525. work iscompleted
completed
Road from NH road toChallareddypalem
cc roadcompleted, BTroadcompleted& shoulderscompleted.Road from km0/0 to km
completed
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 31/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
1/735. work iscompleted
Road from R&B road to jeevaraksh nagar colonycyclone shelter
C.C.road andShoulders arecompletedRoad from km0/0 to km0/500.
completed
Road from R&B road toRamnagar colony cycloneshelter
C.C.completedRoad from km0/0 to km0/475.Shoulders to be taken
up.
completed
Road from R&B road tocyclone shelter atMankenavaripalem
CC roadcompleted.Shoulderswork is to betaken up.
completed
NCRMP/B-W/AP/RCS/PRED/08/Chirala/002
Road from R&B Road toKeerthivaripalem cycloneshelter NCRMP/B-
W/AP/RCS/
PRED/08/Chirala/002dated27.08.2011
C.C road andShoulders arecompletedfrom km 0/0 tokm 0/265.work is
completed
completed
Road from R&B Road toDevinuthula cyclone shelter of Chirala Mandal
C.C road andShoulders arecompletedfrom km 0/0 tokm 0/800.work iscompleted
completed
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 32/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
MPCSNCRMP/B-W/APMPCS/PRED/08/Ulavapadu/001
Chakicharla cyclone shelter inUlavapadu Mandal
NCRMP/B-W/AP/MPCS /PRED/08/Ulavapadu/001
24.11.2011 All items upto stilt floorslabincludingramp, staircasefoundations
, columns,beams, pccflooringetc.,
24.02.2012 All items upto secondfloor slabincludingfirst floor,and in 2ndfloor
includingstair case,columnsetc.,
24.05.2012 Headroom,plastering
, flooring,watersupplyarrangements,sanitaryfitting,electricalitems,compound wall, ccpavement. Earthenmounds(raisedportion),waterharvesting, septictank,slump andsoak pit.etc.,
Stilt floor, G.F ,& Terracefloor- roof slabcompleted.Brick work completed,Plasteringwork completed,Cattle platformcompletedrevetmentwork completed,
flooring work is completed,compound wall120 meterslengthcompleted,Electrical work is completed.work iscompleted
completed
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 33/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/APMPCS/PRED/08/NGPadu/003
Kanaparthy cyclone shelter inNaguluppapadu Mandalprakasam district
NCRMP/B-W/AP/MPCS /PRED/08/NGPadu/003
23.11.2011 All items upto stilt floorslabincludingramp, staircasefoundations, columns,
beams, pccflooringetc.,
23.02.2012 All items upto first floorslab andhead roomslb in 2 ndfloorincluding
stair case,columnsetc.,
23.05.2012plastering, flooring,
watersupplyarrangements,sanitaryfitting,electricalitems,compound wall, ccpavement. Earthen
mounds(raisedportion),waterharvesting, septictank,slump andsoak pit.etc.,
Internal & ExternalPlasteringcompleted.Flooring Work Completed.CompoundWall PaintingCompleted. CCRoadCompleted.Shoulder work in Completed.Painting work in Completed.
ElectricalFittings inprogress. Tilesin bathroomswork inCompleted.Water harvest& Soak pitwork incompleted.
completed
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 34/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATUS OF WORKS IN SPSR NELLORE DISTRICT UP TO 31.12.2012
Name of package Name of work date of
agreement
mile stone -I mile stone -IImile stone -
III
Present
Statues of work
Remark
s
RHB
NCRMP/B-W/AP/RHB/PRED/09/BOGOLO/RHB/
001
1. Road from NH5 toSambasiva Puram
1/19/20115Months: Earth
Work, PipeCulverts, GSB
10 Months:WBM Gr-II,Gr-II andShoulders
15 Months:BT and Road
Furniture
OGPC+ SCcompleted
completed
Road from 9/6 of JuvvaladinneR&B Road to 11/0 of
Juvvaladinne R&B Road Via Venkateshpalem
OGPC+ SCcompleted
completed
NCRMP/B-W/AP/RHB/PRED/09/BOGOLU/002
Road from 1/6 of ZuvvaladinneR&B Road to Tellagunta KM to
2/72007.02.2011
6.5,2011 3Months:Earth Work, Pipe
Culverts, GSB
6.8.2011 6Months: WBMGr-II, Gr-II
and Shoulders
6.11.20119Months: BTand RoadFurniture
OGPC+ SCcompleted
completed
NCRMP/B-W/AP/RHB/PRED/09/CHITTAMURU/
003
Road from R&B Road toMuttambeka Via Pittuvanipalla
18.01.201117.6.2011
5Months: EarthWork, Pipe
Culverts, GSB
17.11.2011 10Months: WBMGr-II, Gr-II
and Shoulders
17.4.2012 15Months: BTand RoadFurniture
OGPC+ SCcompleted
completed
Road from R&B Chittamur toSoma Samudram
OGPC+ SCcompleted
completed
NCRMP/B-W/AP/RHB/PRED/09/RHB/KAVALI/0
04
Road from5/8 of Chennayapalem Road to
Gummadi bandla
17.01.2011
16.6.20115Months: Earthwork, CD
Works, ccpavement and
GSB
16.11.2011 10Months: WBMGr-II, Gr-Ii I
and Shoulders
16.4.201215 Months:
BT and RoadFurniture
OGPC+ SCcompleted
completed
Road from pedattapupalemR&B road to Chennayapalem
H.wada
OGPC+ SCcompleted
completed
Road from K.T R&B Road to Alliguntapalem
OGPC+ SCcompleted
completed
NCRMP/B-W/AP/RHB/PRED/09/VIDAVALURU/
005
1)Road from KT R&B road to Alaganipadu to Vavilla
27.04.2011
26.9.20115Months: Earth
Work, PipeCulverts, GSB
26.2.201210Months: WBMGr-II, Gr-II
and Shoulders
26.7.2012 15Months: BTand RoadFurniture
OGPC+SCcompleted
completed
Road from R&B roadKancharapalem HW to
Alaganipadu.
WBM Gr-II isin progress &
CD Workscompleted.
77%
NCRMP/B-W/AP/PRED/09/MUTHUKUR/RHB/0
Road from R&B road toPatuvari Kandriga
25.4.1124.7.2011
3Months: EarthWork, Pipe
24.10.2011 6Months: WBMGr-II, Gr-II,
24.1.2012 9Months: BTand Road
OGPC+ SCcompleted
96%
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 35/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
06 Culverts, GSB CC Pavementand Shoulders
Furniture
NCRMP/B-W/AP/RHB/PRED/09V.CHALEM/RHB
/007
Road from Survepalli-Pudiparthi
road to Srikanth Colony27.04.2011
26.8.20114Months: EarthWork, Pipe
Culverts, GSB
26.12.2011 8Months: WBMGr-II, Gr-II
and Shoulders
26.4.2012 12Months: BTand RoadFurniture
OGPC+ SC
completed
comple
tedproviding BT Surface to the
road from R&B road to EdagaliKandriga
OGPC+ SCcompleted
97%
NCRMP/B-W/AP/RHB/PRED/
09/Allur/009
Road from R&B road Alluru toGalidibbalu (via) Chukavani
dibba24.01.2011
23.6.20115Months: Earth
Work, PipeCulverts, GSB
23.11.2011 10Months: WBMGr-II, Gr-II
and Shoulders
23.4.2012 15Months: BTand RoadFurniture
OGPC+ SCcompleted
99%
NCRMP/B-W/AP/RHB/PRED/009/T.P.GUDUR/0
12
Ring Road to TP Gudur-Salipeta R & B Road via CS
Puram and Mandapam Village 19.05.2011
18.8.20113Months: Earth
Work, Pipe
Culverts, GSB
18.11.2011 6Months: WBMGr-II, Gr-II,
CC Pavementand Shoulders
18.2.2012 9Months: BTand Road
Furniture
OGPC+ SCcompleted
96%
Road from R & B Road C SPuram to Sivaramapuram OGPC+ SCcompleted 98%
RCS
NCRMP/B-W/AP/PRED/09/k ota/RCS /001
Road from R&B road to A.SPURAM
10.05.20119.8.2011 3Months:Earth Work, Pipe
Culverts, GSB
9.11.11 6Months: WBMGr-II, Gr-II
and Shoulders
9.2.2012 9Months: BT,CC Pavement
and RoadFurniture
OGPC+ SCcompleted
98%
NCRMP/B-W/AP/PRED/09/k ota/RCS /001
Road from GD Road to VavillaPalem
OGPC+ SCcompleted
completed
NCRMP/B-W/AP/PRED/09/MUTHUKUR/RCS/00
2
Road from R&B Roadkappaladoruvu to bandla Palem
H.wada
21.04.2011
20.7.20113Months: Earth
Work, Pipe
Culverts, GSB
20.10.2011 6Months: WBMGr-II, Gr-II,CC
Pavement andShoulders
20.1.2012 9Months: BTCC road and
RoadFurniture
OGPC+ SCcompleted
98%
NCRMP/B-W/AP/PRED/09/Chillakur/RCS/004
Road from Kakuvaripalem R&Broad to Vellapalem
23.05.2011
22.8.20113Months: Earth
Work, CD Works,GSB
22.11.2011 6Months: WBMGr-II, Gr-II
and Shoulders
22.2.2012 9Months: BT,CC Pavement
and RoadFurniture
OGPC+ SCcompleted
completed
NCRMP/B-W/AP/RCS/PRED/09/T.P.GUDUR/00
Road from7/2 M.C Road to Venkannapalem Pattuapalem
17.05.201116.8.20113Months: EarthWork, Pipe
16.11.2011 6Months: WBMGr-II, Gr-II
16.2.2012 9Months: BT,CC Pavement
OGPC+ SCcompleted
completed
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 36/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
5 Culverts, GSB Shoulders andCC Pavement
and RoadFurniture
NCRMP/B-W/AP/RCS/PRED/09/KAVALI/006
Road Connecting R&B Roadthrough Voturu Village in SPSR
Nellore District.21.09.2011
20.1.2012 4Months: Earth
Work, PipeCulverts,
GSB
20.5.2012 4Months: WBMGr-II, Gr-II ,
Shoulders andCC Pavement
20.9.2012 4Months: BT,CC Pavement
and RoadFurniture
GSB. From
0.00 to5.320(Bits),WBM Gr-II,Gr-III from0.00 to 5.320and OGPC+SC0/6 to 5/1 iscompleted
completed
NCRMP/B-W/AP/RCS/PRED/
09/KAVALI/007
Road from Kotha satram R&Bto Indrsanagar (via)
Thumalapenta palam,Patharavadu palam, Ramudupalam, Karaduvari palam &
Sreeramapuram
29.08.2011
28.12.20114Months: Earth
Work, PipeCulverts, GSB
28.4.2012 4Months: WBM
GrII,GrII ,
Shoulders andCC Pavement
28.8.2012 4Months: BT,CC Pavement
and RoadFurniture
OGPC+ SCcompleted
99%
NCRMP/B-W/AP/PRED/09/D. V.SATRAM/RCS/0
08
Road from R&B road toSullurpeta Mallam to
Berijengalapalli cyclone shelter09.05.2011
8.8.2011 3Months:Earth Work, PipeCulverts, GSB
8.11.2011 6Months: WBMGrII, GrIIShoulders andCC Pavement
8.2.2012 9Months: BT,CC Pavementand RoadFurniture
OGPC+ SCcompleted
98%
NCRMP/B-W/AP/RCS/PRED/09/TADA/009
Providing BT road toPedapannamgadu in Tada
Mandal
14.09.2012
14.02.2013(5Months) EarthWork, PipeCulverts, GSB &
CC road
13.06.2013 (4Months): WBMGrII, GrII
Shoulders
13.09.2013Months) BTand Road
Furniture
GSB work is inprogress
59%
Road from @ 56/8 to C.K roadto Periyavettu kuppam cycloneshelter
14.02.2013(5Months) EarthWork, PipeCulverts, GSB & CC road
13.06.2013 (4Months): WBMGrII, GrIIShoulders
13.09.2012Months) BTand RoadFurniture
work is notstarted
5.88%
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 37/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
LIST OF NCR'S PENDING FOR NCRMP WORKS TO THE END OF DECEMBER 2012
Sl.No
Distric
t
sl.no
Date of Inspecti
on
Name of Work/Package No. Observation Remarks Status
1
V I Z I N A G A R A M
1
06.04.12
Construction of Minor Bridge at Km15/2 near Chakaligadda of KonadaRamatheertham R&B road toKonathalapalem (via) Yerukonda,Pasupam, Kollayavalsa (ZP Road)NCRMP/B-W/AP/Br/R&B/02/Chakaligadda/008
Revetment, Apron stone samples arecollected and verified for size andweight. Some samples are notsatisfying the requirements of MORT& H Clause 2504.Required minimumweight is 40 kgs and minimum size is300 MM minimum.
NCR-2 Issued to takesuitable remedialaction beforeproceeding withfurther layers.
The Contractor toldthat the under sizestones will be removedand repacked withsuitable stones as peragreement. NCR Pending.
2 2
25.07.12
Construction of Minor Bridge at Km.7/2 near Puligedda of Konada –Ramatheertham R&B Road toKonathalapalem via Yerukonda,Pasupam, Kollayavalsa (Z.P. Road)NCRMP/B-W/AP/Br/R&B/02/Puligedda/007
Rain cuts and gullies are formed inshoulder portion. Shoulders aredisturbed at some places. The sameshall be rectified.
NCR-3 Issued to takesuitable remedialaction beforeproceeding withfurther work.
The Contractorintimated that thegullies will be rectifiedby filling, compactingand sectioning theslopes after thecompletion of Raineyseason. NCR Pending.
3
G U N T U R
1 30.10.12 Reconstruction of HLB @ km5/2 of Bapatla - Suryalanka road acrossperali drain in Guntur DtPackage No.: NCRMP/B-W/AP/Br/R&B/07/Bapatla/010.
Revetment thickness is varying from220 mm to 275 mm as against thespecified thickness 300 mm. rectifythe same before tacking up thegrouting.
NCR-13 Issued, R&BDepartment officers isrequest to takesuitable remedialaction beforepreceding the furtherwork.
NCR Pending
4
P R A K A S A M
1
01.09.12
Road from R&B road Pellur to Vasepallipadu. NCRMP/B-W/AP/RHB/PRED/08/Tangutur/09
The sign boards which are providedin site are not semi reflective. Semireflective sign boards are to beprovided as per agreement.
NCR-27 Issued, PR Department officersinform that suitableremedial action will betaken beforeproceeding withfurther work.
NCR Pending
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 38/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
5 2
11.10.12
Construction Thoupula Kanaparthycyclone shelter in Nagulappapadumandal Prakasam districtNCRMP/B-W/APMPCS/PRED/08/NG
Padu/003
1. Street light fittings are not of approved brand specified in theagreement.2. Exhaust fans (2no's) of 225mm
size are provided whereas theagreement specifies 300mm size.3. For ceiling fans & tube lightsceiling roses are not provided.
NCR-32 Issued, PR Department officersinform that suitableremedial action will be
taken beforeproceeding withfurther work.
NCR Pending
6 3
19.10.12
Construction of High level Bridge atKm 16/10 of Naguluppalapadu –Kanaparthi road in PrakasamDistrict NCRMP/B-W/AP/Br/R&B/08/Kanaparthi/012
Rain cuts & dip gullies are formed inthe bridge approaches. Shoulders aredisturbed at many places. The sameshall be rectified immediately.
NCR-33 Issued, R & BDepartment officersinform that suitableremedial action will betaken beforeproceeding withfurther work.
NCR Pending
7 4
21.11.12
Construction of High level Bridge atKm 16/10 of Naguluppalapadu –Kanaparthi road in PrakasamDistrict NCRMP/B-W/AP/Br/R&B/08/Kanaparthi/012
Grouted rough stone revetment work for quadrants is damaged, deepgullies are formed in the bridgeapproaches and shoulders aredisturbed at many places (NCR no-33). These damages shall be rectifiedimmediately and compliance reportfurnished.
NCR-34 Issued R & BDepartment officers isinform to take suitableremedial action beforeproceeding withfurther work.
NCR Pending
8 5
28.11.12
Road from Pakala R&B road toMosanaladinneNCRMP/BW/AP/RHB/PRED/08/S.Konda/002
WBM Grade-III layer is badlydisturbed in the stretch km 0/000 tokm 0/450 which is to be rectifiedimmediately and compliance
furnished.
NCR-35 Issued, P R Department officers isinforming to takesuitable remedial
action beforeproceeding withfurther work.
NCR Pending
9 6
28.11.12
Road from NH5 to MulaguntapaduNCRMP/B-W/AP/RHB/PRED/08/S.Konda/002
WBM Grade-III layer is badly disturbedin the stretches from km 0/000 to km0/310 and from km 0/400 to km 0/600.The disturbed stretches are to berectified immediately and compliancefurnished.
NCR-36 Issued, P R Department officers isrequested to takesuitable remedial actionbefore proceeding withfurther work.
NCR Pending
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 39/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
10
N E L L O R E
1 18.07.12 Road from 1/6 of Zuvvaladinne R&BRoad to Tellagunta NCRMP/B-W/AP/RHB/PRED/ 09/BOGOLU/001
1. Non Reflective type sign boards areprovided. As per agreementspecifications all the sign boards shallbe semi reflective in nature. Suitableremedial action is to be taken up2. in KM 1/6, big hole is left inbetween road and sluice head wall. it isvery dangerous to the public.Immediate protective action she betaken to prevent accidents.
NCR-14 Issued, PR Department officersinform that suitableremedial action will be
taken beforeproceeding withfurther work.
NCR Pending
11 2 17.07.12 Road from R&B road to PatuvariKandriga NCRMP/B-W/AP/RHB/PRED/09/MUTHUKUR/006
Sump is constructed in the formationwidth of the road near slab culvertlocation in km 0/200. Proper safetymeasures shall be taken to avoidaccidents
NCR-28 Issued, PR Department officersinform that suitableremedial action will betaken before proceedingwith further work.
NCR Pending
12 3
17.08.12
Road from R&B Chittamur to SomaSamudram NCRMP/B-W/AP/RHB/PRED/09/CHITTAMURU/003
l)At Km 1.380(RHs),collection chamberhas to be covered with suitablemeasures to avoid accident.2.At Km 1.250(LHS)a deep ditch existat the BT edge where a water Bump islocated. It is hazardous to the roaduser and it shall be protected bysuitable arrangements
NCR-29 Issued, PR Department officersinform that suitableremedial action will betaken beforeproceeding withfurther work.
NCR Pending
13 4
17.08.12
Providing BT Surface to the Road tothe Road from R&B Road to EdagaliKandriga NCRMP/B-W/AP/RHB/PRED/09/Chalam/007
At Km 0,010(RHs), uncovered waterpump chamber is located on theshoulder of the road. It has to becovered immediately
NCR-30 Issued, PR Department officersinform that suitableremedial action will betaken before proceedingwith further work.
NCR Pending
14 5
08.10.12
Road Connecting R&B Roadthrough Voturu Village in SPSR Nellore District. NCRMP/B-W/AP/RCS/PRED/09/KAVALI/006
Road is badly damaged in somestretches from km 1/8 to km 2/6.Thorough rectification is to be done
NCR-31 Issued, PR Department officersinform that suitableremedial action will betaken before proceedingwith further work.
NCR Pending
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 40/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
5.0 District wise status of tests conducted by TPQA:
Apart from monitoring the tests being conducted by the implementation team (contractors & Line department) at various
stages, the Third party Quality Audit team also conducted tests to confirm its compliance with the standards. These tests are
carried out in the site itself and in some cases samples are collected and testing done in outside laboratories. The details of
tests conducted in the field till end of December 2012 are presented.
Summary of QC Tests - Up to 31.12.2012
S.No. District
No. TestsConductedduring the
Month
Total no. of TestsCumulativeTests Done
Total no. of Tests
Passed Failed Passed Failed
1 Srikakulam 82 82 0 1475 1469 6
2 Vizianagaram 4 4 0 461 461 0
3 Visakhapatnam 106 106 0 2237 2191 46
4 East Godavari 54 54 0 1128 1128 0
5 West Godavari 0 0 0 349 349 0
6 Krishna 3 3 0 85 85 0
7 Guntur 23 23 0 606 595 11
8 Prakasam 6 6 0 1905 1901 4
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 41/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
6.0 Details of Quality Control Audit Reports Submitted during this 3 months:
6.1 Details of Quality Control Audit Reports Submitted During this Month of October-2012:
Package Number Name of Work District
NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002
Construction of cyclone shelter atBangarampeta in Nakkapalli Mandal
Vishakhapatnam
NCRMP/B-W/AP/RCS/PRED/
07/Nizampatnam/003
Road from R&B Road to
GurunadhanagarGuntur
NCRMP/B-W/AP/RCS/PRED/07/Karlapalem/002
From R&B Road to Yaramavaripalem Guntur
NCRMP/B-W/AP/RCS/PRED/09/Kavali/006
Road Connecting R&B Road through Voturu Village in SPSR Nellore District
from km 0.00 to km 5.320Nellore
NCRMP/B-W/AP/MPCS/PRED/
03/Payakaraopeta/003
Construction of cyclone shelter at
Gajapathinagaram in Payakaraopeta
Vishakhapatnam
NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter atRatnayampeta in Payakaraopeta
Vishakhapatnam
NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002
Construction of cyclone shelter atMullaparra in Nakkapalli Mandal
Vishakhapatnam
NCRMP/B-W/AP/MPCS/PRED/ Construction of cyclone shelter at Vishakhapatnam
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 42/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
6.2 Details of Quality Control Audit Reports Submitted During this Month of November-2012:
Package Number Name of Work District
NCRMP/B-W/AP/MPCS/PRED/08/NGPadu/003
Construction of Cyclone shelter atThopupalem kanaparthy in
Nagulapapadu MandalPrakasam
NCRMP/B-W/AP/RHB/PRED/
08/S.Konda/002
Road from NH5 to Mulaguntapadu
village in Singarayakonda Mandal
Prakasam
NCRMP/B-W/AP/Br/R&B/07/Bapatla/011/2010
Reconstruction of HLB @ km 2/4 of Bapatla-Pandurangapuram road
across Perali drainGuntur
NCRMP/B-W/AP/RCS/PRED/06/Machilipatnam/001
Road from Bhogireddypalli R&B roadto Ramakhandam
Krishna
NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002
Road from R&B Road toChalivendradibba in Singarayakonda
mandalPrakasam
NCRMP/B-W/AP/RHB/PRED/06/Kruthivennu/003
Road from R&B road to Cycloneshelter at Chandala
Krishna
NCRMP/B-W/AP/Br/R&B/Reconstruction of HLB @ km 5/2 of
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 43/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/B-W/AP/RHB/PRED/
05/MOGALTHURU/001
Road from NH 214 A road to
Harijanawada of kothota of Mogalthuru Mandal West Godavari
NCRMP/B-W/AP/RHB/PRED/05/MOGALTHURU/001
From Narsapur Mogaltur R&B road toDayadalspeta via Venkateshwara
Swamy Temple of Mogalthuru MandalWest Godavari
NCRMP/B-W/AP/RCS/PRED/
07/Nizampatnam/003
Road from R&B Road to
Gurunadhanagar Guntur
NCRMP/B-W/AP/RCS/PRED/07/Nizampatnam/003
Road from R&B Road to Atlavaripalem in Nizampatnam Mandal
Guntur
NCRMP/BW/AP/RCS/PRED/07/Karlapalem/002.
Road from Ganapavaram R&B road toPedamarpuvaripalem
Guntur
NCRMP/B-W/AP/RHB/PRED/05/Narasapur/002
Road from LB Cherla CC road toChillapalem of LB Cherla of Narsapur
MandalWest Godavari
NCRMP/B-W/AP/RHB/PRED/05/Narasapur/002
Road from R&B road to Pedalanka of Narsapur Mandal
West Godavari
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 44/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
6.3Details of Quality Control Audit Reports Submitted During this Month of October-2012:
Package Number Name of Work District
NCRMP/BW/AP/RHB/PRED/01/Polaki/005
Road from R&B road Edulavalasa -Killam roadto Jonnam via Talasamudram in Polaki
Mandal.Srikakulam
NCRMP/B-W/AP/RCS/PRED/09/TADA/009
Providing BT road to Peda Pannam Gadu inTada Mandal.
SPSR Nellore
NCRMP/BW/AP/RCS/PRED/07/Karlapalem/002.
Road from R&B Road toChinapuluguvaripalem.
Guntur
NCRMP/BW/AP/RCS/PRED/07/Karlapalem/002.
Road from Ganapavaram R&B road toPedamarpuvaripalem.
Guntur
NCRMP/BW/AP/RHD/PRED/01/Polaki/005
Road from R&B road Edulavalasa -Killam roadto Jonnam via Talasamudram in Polaki
Mandal.Srikakulam
NCRMP/BW/AP/RHB/PRED/09/Vidavalur/005
Road from R&B road Kancharapalem HW to Alaganipadu.
SPSR Nellore
NCRMP/B-W/AP/RCS/PRED/04/THONDANGI/004
Road from R&B Road to Danavaipeta. East Godavari
NCRMP/B-W/AP/RCS/PRED/04/THONDANGI/004
Road from R&B Road to Gaddipeta of Thondangi Mandal.
East Godavari
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 45/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
NCRMP/BW/AP/RHB/PRED/01/Polaki/005
Road from R&B road Edulavalasa - Killam roadto Jonnam via Talasamudram in Polaki Mandal
Srikakulam
NCRMP/BW/AP/RHB/PRED/01/Polaki/005
Road from Talasamudram to Dola regulator of Polaki Mandal
Srikakulam
NCRMP/B-W/AP/RCS/PRED/08/VETAPALEM/001
Road from R&B Road to Vijayanagar colonycyclone shelter In Prakasam District
Prakasam
NCRMP/BW/AP/BR/R&B/01/Patnavanipeta/001
Construction of HLB Act KM 11/6-8 of NH-5 to
Patnavanipeta Road Via Tamada connectingSundarapalem in Srikakulam District.
Srikakulam
NCRMP/B-W/AP/MPCS/PRED/04/Uppalaguptam/002
Construction of Cyclone Shelter atPedaraghavulapeta in Uppalaguptam Mandal,
E.G.Dt.East Godavari
NCRMP/BW/AP/RCS/PRED/
07/Karlapalem/002.
Road from R&B Road to Chinapuluguvaripalem
in Guntur DT.
Guntur
NCRMP/B-W/AP/RCS/PRED/04/Uppalaguptam/003.
Road from R & B road to ChinaraghavulapetaCyclone Shelter in East Godavari District.
East Godavari
NCRMP/B-W/AP/MPCS/PRED/03/Rambilli/004
Construction of cyclone shelter at Venkayyapalem in Rambilli
Visakhapatnam
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 46/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7.0 Details of Environmental and Social Reports Submitted During this 3 Months:
7.1 Details of Environmental and Social Reports Submitted During this Month of October 2012:
Package Number Name of Work District
NCRMP/B-W/AP/Br/R&B/PRED/O7/Bapatla/010
Reconstruction of HLB @ Km.5/2 of Bapatla-Suryalanka road across
Guntur
NCRMP/B-W/AP/Br/R&B/PRED/O7/Bapatla/011
Reconstruction of HLB @ Km.2/4 of Bapatla-Pandurangapuram road
across Perali DrainGuntur
NCRMP/B-W/AP/RCS/PRED/O7/Bapatla/004
Road from R&B Road to Adarsh nagar Guntur
NCRMP/B-W/AP/RCS/PRED/
O7/Bapatla/004
Road from R&B Road to
HanumathanagarGuntur
NCRMP/B-W/AP/RCS/PRED/O7/Nizampatnam/003
Road from R&B Road to Atlavaripalem Guntur
NCRMP/B-W/AP/RCS/PRED/O7/Nizampatnam/003
Road from R&B Road toGurunadhanagar
Guntur
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 47/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7.2 Details of Environmental and Social Reports Submitted During this Month of November 2012:
Package Number Name of Work District
NCRMP/B-W/AP/Br/R&B/PRED/O7/Bapatla/010
Reconstruction of HLB @ Km.5/2 of Bapatla-Suryalanka road across Perali Drain
Guntur
NCRMP/B-W/AP/Br/R&B/PRED/O7/Bapatla/011
Reconstruction of HLB @ Km.2/4 of Bapatla-Pandurangapuram road across Perali Drain
Guntur
NCRMP/B-W/AP/RCS/PRED/O7/Karlapalem/002
Road from R&B Road to Pedagollapalem Guntur
NCRMP/B-W/AP/RCS/PRED/O7/Karlapalem/002
Road from Pedagollapalem P.R. Road toBonthagoralapalem
Guntur
NCRMP/B-W/AP/RCS/PRED/O7/Nizampatnam/003
Road from R&B Road to Gurunadhanagar Guntur
NCRMP/B-W/AP/RCS/PRED/O7/Karlapalem/002
Road from Ganapavaram R&B Road to Kesavapuri STColony
Guntur
NCRMP/B-W/AP/RCS/PRED/O7/Karlapalem/002
Road from Ganapavaram R&B Road toPedamarpuvaripalem
Guntur
NCRMP/B-W/AP/RCS/PRED/O7/Karlapalem/002
Road from R&B Road to Chinapuluguvaripalem Guntur
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 48/259
QUARTERLY SUMMARY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7.3 Details of Environmental and Social Reports Submitted During this Month of December 2012:
Package Number Name of Work District
NCRMP/B-W/AP/RHB/PRED/01/Polaki/005
Road from R&B Road Edulavalasa Killam toJonnam via Talasamudram
Srikakulam
NCRMP/B-W/AP/RHB/PRED/01/Polaki/006
Road from R&B Road Mobagam toDubbakavanipeta via Gajapathinagaram
Srikakulam
NCRMP/B-W/AP/RHB/PRED/01/Polaki/006
Road from Talasamudram to Dola Regulator Srikakulam
NCRMP/B-W/AP/MPCS/PRED/01/Santhabommali/005
Construction of Cyclone Shelter at Kollipadu Srikakulam
NCRMP/B-W/AP/MPCS/PRED/01/Santhabommali/005
Construction of Cyclone Shelter at Runku Srikakulam
NCRMP/B-W/AP/MPCS/PRED/04/Uppalaguptam/002
Construction of Cyclone Shelter atPedaraghavulapeta
EastGodavari
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 49/259
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
8.0 Consolidated E&S Reports during this 3 Months:
8.1 Consolidated E&S Report for Guntur District in the Month of October 2012:
Third Party Quality Audit for Construction of Cyclone Shelters, Roads toCyclone Shelters & Habitations, Bridges and Culverts under NCRMP (Detailsof Guntur in October,2012)
S.No Activity Measures to be implemented by the contractor COMPLICEDNOT
COMPLICEDNOT
APPLICABLETOTAL
1Work Plan for EMPimplementation
The Contractor’s Project Manager shall be responsible for implementation of EMP provisions and will coordinate the over-allimplementation of the said plan. Along with the Work Programme, theContractor shall submit a plan including method statement and timelineabout specific actions that will be taken by him to implement the
provisions laid out in the EMP
7 7
2RegulatoryPermissions andConsents
The Contractor shall obtain all requisite statutory clearances prior tocommencement of civil works, which includes obtainingpermission/consent for plants, water and extraction and borrow areasoperations. This includes:
· Consent for establishment and operation of plant (for concretework) from SPCB.
7 7
· PUC certification for all vehicles/equipment used for/duringconstruction.
7 7
· Permission/consent of the District Administration/MiningDepartment/other agencies for quarrying and/or borrowing operations for materials like sand and earth.
7 7
· Permission for water extraction, if applicable in the local areacontext.
7 7
The Contractor shall abide by all conditions laid out in the saidclearances.
7 7
3Consultation andCommunityConsent
The Contractor shall consult and obtain written consents of landowners(individual/panchayat/govt. agency) for temporary use of landfor all construction related activities including:
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 50/259
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
a) Setting-up and operation of construction camp including labour camps, stock yards etc.
7 7
b) borrow areas and 7 7
c) Disposal of debris and other waste material. 7 7
4 Construction/Labour Camp
a) Location: The camp and plant site/s location and establishment shallbe done in a manner that does not interfere or disturb the activities of local inhabitants, particularly those of schools and health facilities.Written permission (no objection certificate) shall be taken from theGramsabha and the land owner prior to location selection and a copyshall be submitted to the Engineer approval.
7 7
b) Camp site shall not be located within 250mts. From a water bodyincluding village ponds.
7 7
c) A distance of at least 500mts. Shall be maintained fromdesignated/protected natural habitats (such as National Parks,Sanctuaries, Biosphere Reserves, Reserve Forests and Ramsar Sites)and Coastal Regulation Zone.
7 7
b) Accommodation and Basic Amenities: All weather shelter with therequired tenement size and toilets shall be provided, as per provisions of Labour Laws. Separate toilet facilities shall be provided for womenworkers. If a common mess is not provided/operated additional space for cooking shall be provided. The contractor shall ensure that hygienicconditions are maintained during the operation of such camps/facilities.
7 7
c) Fuel for Cooking: The Contractor shall ensure that fuel wood is notused as a cooking medium in the construction /labour camp.
7 7
d) Potable water supply: Drinking water supply of at least 40Ipcd withthe required supply points shall be provided.
7 7
e) Fire Safety: Adequate fire safety precautions shall be taken andrequired fire safety equipment (such as fire extinguishers) shall beprovided by the contractor.
7 7
5 Site Clearance
a) NO tree cutting is to carried out without the written instruction fromthe Employer, who in turn will ensure that relevant regulatorypermission/s (including those from Forest Dept., if required) are obtainedprior to cutting of such trees.
7 7
b) The non-timber grade trees are to be stacked and possession is tobe given to Employer/concerned Govt. Department.
7 7
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 51/259
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
c) The Contractor shall strip, store and preserve top soil from the site of construction work and in the stock yards prior to stacking of materials.The top soil shall be reinstated in the cyclone shelter compound after theconstruction is over.
7 7
6Protection of Properties andResources
The Contractor shall take due care to protect and prevent damages to
the following resources during preparatory and construction work:a) Water supply lines 7 7
b) Irrigation canals 7 7
c) Cart, cattle and/or foot trail/tracks 7 7
d) Cultural properties and sites/structures of religious importance 7 7
e) Houses, Farmlands, Orchids and/or Trees. 7 7
f) School and other existing buildings adjacent to the site of construction.
7 7
In case of damage due to construction activity, the restoration/repairsshall be carried out by the contractor at his own cost.
7 7
7QuarryOperations
The Contractor shall procure material from quarries that have beenapproved/licensed by the State Govt. A copy of such an approval shallbe submitted to the Engineer prior to procuring material.
7
8 Borrow Areas
a) Borrow areas for the project will be selected by the Contractor following the stipulations given below: The finalization of all suchlocations shall be dependent on the approval of the Engineer ontechnical and environmental grounds. This includes on-site verification tocross-check the accuracy of details provided by the contractor. Onlyafter receipt of the written approval from the Engineer, the Contractor shall enter into a formal agreement with landowner.
7 7
b) The Contractor shall not procure any kind of construction material(such as aggregates, sand and earth) from ecologically protected areas.
7 7
c) Identification and Selection:
1. The borrow area should not be located in agriculture field’s/ unlessunavoidable i.e. barren land is not available. In case borrowing needs tobe done on an agricultural land, top-soil stripping, stacking andpreservation is must.
7 7
2. Borrow pits shall not be located within a distance of 100mts. Fromany NH, SH or other roads.
7 7
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 52/259
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
3. Borrow pits shall be preferably located 500mts. away fromsettlements/habitations.
7 7
4. No borrow pits shall be located within 500mts. from schools,colleges, playgrounds, religious structures and health centers.
7 7
5. No borrow area shall be opened with in 500mts. from a reserved or
protected forest area, protected sites, wildlife movement zone andcultural heritage site.
7 7
6. No tree cutting shall be undertaken. 7 7
7. Borrow area near any surface water body will be at least 100mts.away.
7 7
d) Operation 7
1. Area up to which material will be extracted shall be cleareddemarcated on ground.
7 7
2. A 15cm topsoil layer will be stripped and preserved in stockpiles. 7 7
3. Borrowing of earth should be preferably limited to a depth of 1.5mtr from the existing ground level.
7 7
4. Slope at the edges will be maintained not steeper than 2:3 (Vertical: Horizontal)
7 7
e) Rehabilitation of Borrow Areas:
1. Rehabilitation shall be satisfactory undertaken immediately after theuse has ceased and at least three weeks prior to monsoon
7 7
2. Preserved top soil has be spread uniformly over land (except incases where borrow area is developed as a water body) used as aborrow area.
7 7
9
Water Extraction
/Use
Water for construction and for use at construction camps (includinglabour camps) is to be extracted with prior written permission of(a) the
individual owner, in case the source is private well/tube well; (b) GramPanchayat in case the source belongs to community: and (c) IrrigationDepartment in case the source is an irrigation canal or river.
7 1
10Safety of RoadUsers and LocalResidents
a) Traffic safety arrangements (including provision of warning signage,speed breakers etc.) shall be made by the contractor to ensure safety of road users and local people, particularly in the internal village roadswhich will be used for transporting materials.
7 1
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 53/259
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
b) Material shall be covered during transportation to prevent spillage,accidents and pollution.
7 1
c) All required measures to ensure safety of local residents includingchildren and other near-by residents shall be taken up by the Contractor.This shall include provisions to prevent un authorized entry into the
construction.
7 1
11 Worker’s Safety
a) All measures required for ensuring safety and health of the workersshall be taken up by the Contractor. This includes provision andenforcement of appropriate personal protective equipment; first aidfacility; emergency response arrangement; proper storage of hazardous/toxic and polluting materials and; measures for ensuring fireelectrical and mechanical safety arrangements in camp and in work site.
7 1
b) All methods steps and measures are required for ensuring safety of workers, particularly those needed while undertaking work in or aroundexcavations; workings at height; and; while handling inflammable, toxicand/or hazardous materials shall be ensured by the contractor.
7 1
c) Material safety data sheet record of fuel and other inflammable
chemicals shall be maintained at the site. 7 1
12 Air pollut ion a) Wind barriers or screens shall be provided in the downwinddirection at air pollution causing sources like plant sites and fine materialstorage stock yards
7 1
b) Fugitive dust emissions have to be eliminated by providing dustsuppression/control measures, such as water sprinkling and cover onmaterials, based on activity and site conditions.
7 1
c) All plants and equipment shall comply with pollution control norms. 7 1
d) Water shall be sprinkled at least twice during dry day on haulageroads passing through or near settlements(including at least 100mbefore the settlement)
7 1
13 Water Pollution
a) All measures (including provision of temporary silt fencing tocontrol sediment run-off) required for avoiding adverse impacts to water bodies (such as ponds, streams, canals and rivers), water sources (suchas hand pumps and wells) and adjacent farmland shall be undertaken bythe Contractor.
7 1
b) Storage of materials like fuel, chemicals, and cement shall be donein a manner (with impervious layer on bottom and a covered shed ontop) that does not contaminate land and ground/surface water.
7 1
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 54/259
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
14 Noise Pollution
a) All noise causing activities shall be stopped during night time (9.00PM to 6.00 AM). The Contractor shall schedule construction works inconsultation with local Panchayat Authority and School Principal toensure least disturbance to school children and other adjacent residents.
1
b) Ear plugs shall be provided to the labour facing risk from high
noise pollution such as plant site and those working near generators,heavy equipment /machinery.
7 1
c) Appropriate noise controlling devices including acoustic generatorsshall be used to minimize noise during construction work and operationof camp.
7 1
15Disposal Debris/wastes
a) Debris and other construction waste, if any, shall be disposed inlocations pre-approved by the Engineer in a manner that it does notcontaminate the environment.
7 1
b) Location of Debris Disposal Sites: Debris disposal sites shall belocated preferably away from farmlands, water sources and water bodies. In no case, debris shall be disposed within 500mts. of ecologically sensitive areas, including forests, wetlands and protected
natural habitats.
7 1
16Restoration andRehabilitation of Sites
All work sites and areas under temporary use (including construction andlabour camps, plant, sites, haul roads and borrow areas) shall berestored/rehabilitated to a better condition (if not at least to its originalcondition) and to the satisfaction of the Engineer and land owner uponcompletion of construction work by the Contractor.
7 1
Completion of work(as covered under clause 55.1 of GCC) will alsoinclude completion of rehabilitation and clean-up of the work sitesincluding camps, plants, in and around the construction site; disposal of debris/construction wastes at pre-approved locations and; restoration of borrow areas and other sites/ locations used for material sourcing.
7 1
17 Liabilities
Any liability arising out of Contractor’s agreement with landowners/ local
people/gram Panchayat (including those related to temporary use of land, water extraction and disposal of debris) shall be settled by theContractor.
7 1
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 55/259
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
8.2 Consolidated E&S Report for East Godavari District in the Month of October 2012:
Third Party Quality Audit for Construction of Cyclone Shelters, Roads toCyclone Shelters & Habitations, Bridges and Culverts under NCRMP (Detailsof East Godavari in October,2012)
S.No Activity Measures to be implemented by the contractor COMPLICEDNOT
COMPLICEDNOT
APPLICABLETOTAL
1Work Plan for EMPimplementation
The Contractor’s Project Manager shall be responsible for implementation of EMP provisions and will coordinate the over-allimplementation of the said plan. Along with the Work Programme, theContractor shall submit a plan including method statement and timelineabout specific actions that will be taken by him to implement theprovisions laid out in the EMP
4 4
2RegulatoryPermissions andConsents
The Contractor shall obtain all requisite statutory clearances prior tocommencement of civil works, which includes obtainingpermission/consent for plants, water and extraction and borrow areasoperations. This includes:
· Consent for establishment and operation of plant (for concretework) from SPCB.
4 4
· PUC certification for all vehicles/equipment used for/duringconstruction.
4 4
· Permission/consent of the District Administration/MiningDepartment/other agencies for quarrying and/or borrowing operations for materials like sand and earth.
4 4
· Permission for water extraction, if applicable in the local area
context.4 4
The Contractor shall abide by all conditions laid out in the saidclearances.
4 4
3Consultation andCommunityConsent
The Contractor shall consult and obtain written consents of landowners(individual/Panchayat/govt. agency) for temporary use of land for all construction related activities including:
a) Setting-up and operation of construction camp including labour camps, stock yards etc.
4 4
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 56/259
Q
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
b) borrow areas and 4
c) Disposal of debris and other waste material. 4
4Construction/Labour Camp
a) Location: The camp and plant site/s location and establishment shallbe done in a manner that does not interfere or disturb the activities of local inhabitants, particularly those of schools and health facilities.
Written permission (no objection certificate) shall be taken from theGramsabha and the land owner prior to location selection and a copyshall be submitted to the Engineer approval.
4 4
b) Camp site shall not be located within 250mts. From a water bodyincluding village ponds.
4 4
c) A distance of at least 500mts. Shall be maintained fromdesignated/protected natural habitats (such as National Parks,Sanctuaries, Biosphere Reserves, Reserve Forests and Ramsar Sites)and Coastal Regulation Zone.
4 4
b) Accommodation and Basic Amenities: All weather shelter with therequired tenement size and toilets shall be provided, as per provisions of
Labour Laws. Separate toilet facilities shall be provided for womenworkers. If a common mess is not provided/operated additional space for cooking shall be provided. The contractor shall ensure that hygienicconditions are maintained during the operation of such camps/facilities.
4 4
c) Fuel for Cooking: The Contractor shall ensure that fuel wood is notused as a cooking medium in the construction /labour camp.
4 4
d) Potable water supply: Drinking water supply of at least 40Ipcd withthe required supply points shall be provided.
4 4
e) Fire Safety: Adequate fire safety precautions shall be taken andrequired fire safety equipment (such as fire extinguishers) shall beprovided by the contractor.
4 4
5 Site Clearance
a) NO tree cutting is to carried out without the written instruction fromthe Employer, who in turn will ensure that relevant regulatorypermission/s (including those from Forest Dept., if required) are obtainedprior to cutting of such trees.
4 4
b) The non-timber grade trees are to be stacked and possession is tobe given to Employer/concerned Govt. Department.
4 4
c) The Contractor shall strip, store and preserve top soil from the site of construction work and in the stock yards prior to stacking of materials.The top soil shall be reinstated in the cyclone shelter compound after the
4 4
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 57/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
construction is over.
6Protection of Properties andResources
The Contractor shall take due care to protect and prevent damages tothe following resources during preparatory and construction work:
a) Water supply lines 4 4
b) Irrigation canals 1 3 4
c) Cart, cattle and/or foot trail/tracks 4 4
d) Cultural properties and sites/structures of religious importance 4 4
e) Houses, Farmlands, Orchids and/or Trees. 2 2 4
f) School and other existing buildings adjacent to the site of construction.
1 3 4
In case of damage due to construction activity, the restoration/repairsshall be carried out by the contractor at his own cost.
4 4
7 QuarryOperations
The Contractor shall procure material from quarries that have been
approved/licensed by the State Govt. A copy of such an approval shallbe submitted to the Engineer prior to procuring material.
4 4
8 Borrow Areas
a) Borrow areas for the project will be selected by the Contractor following the stipulations given below: The finalization of all suchlocations shall be dependent on the approval of the Engineer ontechnical and environmental grounds. This includes on-site verification tocross-check the accuracy of details provided by the contractor. Onlyafter receipt of the written approval from the Engineer, the Contractor shall enter into a formal agreement with landowner.
4 4
b) The Contractor shall not procure any kind of construction material(such as aggregates, sand and earth) from ecologically protected areas.
4 4
c) Identification and Selection:1. The borrow area should not be located in agriculture field’s/ unlessunavoidable i.e. barren land is not available. In case borrowing needs tobe done on an agricultural land, top-soil stripping, stacking andpreservation is must.
4 4
2. Borrow pits shall not be located within a distance of 100mts. Fromany NH, SH or other roads.
4 4
3. Borrow pits shall be preferably located 500mts. away fromsettlements/habitations.
4 4
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 58/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
4. No borrow pits shall be located within 500mts. from schools,colleges, playgrounds, religious structures and health centers.
4 4
5. No borrow area shall be opened with in 500mts. from a reserved or protected forest area, protected sites, wildlife movement zone andcultural heritage site.
4 4
6. No tree cutting shall be undertaken. 4 47. Borrow area near any surface water body will be at least 100mts.away.
4 4
d) Operation
1. Area up to which material will be extracted shall be cleareddemarcated on ground.
4 4
2. A 15cm topsoil layer will be stripped and preserved in stockpiles. 4 4
3. Borrowing of earth should be preferably limited to a depth of 1.5mtr from the existing ground level.
4 4
4. Slope at the edges will be maintained not steeper than 2:3 (Vertical: Horizontal)
4
e) Rehabilitation of Borrow Areas:
1. Rehabilitation shall be satisfactory undertaken immediately after theuse has ceased and at least three weeks prior to monsoon
4 4
2. Preserved top soil has be spread uniformly over land (except incases where borrow area is developed as a water body) used as aborrow area.
4 4
9Water Extraction/Use
Water for construction and for use at construction camps (includinglabour camps) is to be extracted with prior written permission of(a) theindividual owner, in case the source is private well/tube well; (b) GramPanchayat in case the source belongs to community: and (c) IrrigationDepartment in case the source is an irrigation canal or river.
4 4
10Safety of RoadUsers and LocalResidents
a) Traffic safety arrangements (including provision of warning signage,speed breakers etc.) shall be made by the contractor to ensure safety of road users and local people, particularly in the internal village roadswhich will be used for transporting materials.
4 4
b) Material shall be covered during transportation to prevent spillage,accidents and pollution.
4 4
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 59/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
c) All required measures to ensure safety of local residents includingchildren and other near-by residents shall be taken up by the Contractor.This shall include provisions to prevent un authorized entry into theconstruction.
4 4
11 Worker’s Safety
a) All measures required for ensuring safety and health of the workersshall be taken up by the Contractor. This includes provision andenforcement of appropriate personal protective equipment; first aidfacility; emergency response arrangement; proper storage of hazardous/toxic and polluting materials and; measures for ensuring fireelectrical and mechanical safety arrangements in camp and in work site.
4 4
b) All methods steps and measures are required for ensuring safety of workers, particularly those needed while undertaking work in or aroundexcavations; workings at height; and; while handling inflammable, toxicand/or hazardous materials shall be ensured by the contractor.
4 4
c) Material safety data sheet record of fuel and other inflammablechemicals shall be maintained at the site.
4 4
12 Air pollut ion a) Wind barriers or screens shall be provided in the downwind
direction at air pollution causing sources like plant sites and fine materialstorage stock yards
4 4
b) Fugitive dust emissions have to be eliminated by providing dustsuppression/control measures, such as water sprinkling and cover onmaterials, based on activity and site conditions.
4 4
c) All plants and equipment shall comply with pollution control norms. 4 4
d) Water shall be sprinkled at least twice during dry day on haulageroads passing through or near settlements(including at least 100mbefore the settlement)
4 4
13 Water Pollution
a) All measures (including provision of temporary silt fencing tocontrol sediment run-off) required for avoiding adverse impacts to water
bodies (such as ponds, streams, canals and rivers), water sources (suchas hand pumps and wells) and adjacent farmland shall be undertaken bythe Contractor.
4 4
b) Storage of materials like fuel, chemicals, and cement shall be donein a manner (with impervious layer on bottom and a covered shed ontop) that does not contaminate land and ground/surface water.
2 2 4
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 60/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
14 Noise Pollution
a) All noise causing activities shall be stopped during night time (9.00PM to 6.00 AM). The Contractor shall schedule construction works inconsultation with local Panchayat Authority and School Principal toensure least disturbance to school children and other adjacent residents.
4
b) Ear plugs shall be provided to the labour facing risk from high
noise pollution such as plant site and those working near generators,heavy equipment /machinery.
4 4
c) Appropriate noise controlling devices including acoustic generatorsshall be used to minimize noise during construction work and operationof camp.
4 4
15Disposal Debris/wastes
a) Debris and other construction waste, if any, shall be disposed inlocations pre-approved by the Engineer in a manner that it does notcontaminate the environment.
4 4
b) Location of Debris Disposal Sites: Debris disposal sites shall belocated preferably away from farmlands, water sources and water bodies. In no case, debris shall be disposed within 500mts. of ecologically sensitive areas, including forests, wetlands and protected
natural habitats.
4 4
16Restoration andRehabilitation of Sites
All work sites and areas under temporary use (including construction andlabour camps, plant, sites, haul roads and borrow areas) shall berestored/rehabilitated to a better condition (if not at least to its originalcondition) and to the satisfaction of the Engineer and land owner uponcompletion of construction work by the Contractor.
4 4
Completion of work(as covered under clause 55.1 of GCC) will alsoinclude completion of rehabilitation and clean-up of the work sitesincluding camps, plants, in and around the construction site; disposal of debris/construction wastes at pre-approved locations and; restoration of borrow areas and other sites/ locations used for material sourcing.
4 4
17 Liabilities
Any liability arising out of Contractor’s agreement with landowners/ local
people/gram Panchayat (including those related to temporary use of land, water extraction and disposal of debris) shall be settled by theContractor.
4 4
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 61/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
8.3 Consolidated E&S Report for Prakasam District in the Month of October 2012:
Third Party Quality Audit for Construction of Cyclone Shelters, Roads toCyclone Shelters & Habitations, Bridges and Culverts under NCRMP (Detailsof Prakasam in October,2012)
S.No Activity Measures to be implemented by the contractor COMPLICEDNOT
COMPLICEDNOT
APPLICABLETOTAL
1Work Plan for EMPimplementation
The Contractor’s Project Manager shall be responsible for implementation of EMP provisions and will coordinate the over-allimplementation of the said plan. Along with the Work Programme, theContractor shall submit a plan including method statement and timelineabout specific actions that will be taken by him to implement theprovisions laid out in the EMP
1 1
2RegulatoryPermissions andConsents
The Contractor shall obtain all requisite statutory clearances prior tocommencement of civil works, which includes obtainingpermission/consent for plants, water and extraction and borrow areasoperations. This includes:
· Consent for establishment and operation of plant (for concretework) from SPCB.
1 1
· PUC certification for all vehicles/equipment used for/duringconstruction.
1 1
· Permission/consent of the District Administration/MiningDepartment/other agencies for quarrying and/or borrowing operations for materials like sand and earth.
1 1
· Permission for water extraction, if applicable in the local area
context.1 1
The Contractor shall abide by all conditions laid out in the saidclearances.
1 1
3Consultation andCommunityConsent
The Contractor shall consult and obtain written consents of landowners(individual/Panchayat/govt. agency) for temporary use of land for all construction related activities including:
a) Setting-up and operation of construction camp including labour camps, stock yards etc.
1 1
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 62/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
b) borrow areas and 1 1
c) Disposal of debris and other waste material. 1 1
4Construction/Labour Camp
a) Location: The camp and plant site/s location and establishment shallbe done in a manner that does not interfere or disturb the activities of local inhabitants, particularly those of schools and health facilities.
Written permission (no objection certificate) shall be taken from theGramsabha and the land owner prior to location selection and a copyshall be submitted to the Engineer approval.
1 1
b) Camp site shall not be located within 250mts. From a water bodyincluding village ponds.
1 1
c) A distance of at least 500mts. Shall be maintained fromdesignated/protected natural habitats (such as National Parks,Sanctuaries, Biosphere Reserves, Reserve Forests and Ramsar Sites)and Coastal Regulation Zone.
1 1
b) Accommodation and Basic Amenities: All weather shelter with therequired tenement size and toilets shall be provided, as per provisions of
Labour Laws. Separate toilet facilities shall be provided for womenworkers. If a common mess is not provided/operated additional space for cooking shall be provided. The contractor shall ensure that hygienicconditions are maintained during the operation of such camps/facilities.
1 1
c) Fuel for Cooking: The Contractor shall ensure that fuel wood is notused as a cooking medium in the construction /labour camp.
1 1
d) Potable water supply: Drinking water supply of at least 40Ipcd withthe required supply points shall be provided.
1 1
e) Fire Safety: Adequate fire safety precautions shall be taken andrequired fire safety equipment (such as fire extinguishers) shall beprovided by the contractor.
1 1
5 Site Clearance
a) NO tree cutting is to carried out without the written instruction fromthe Employer, who in turn will ensure that relevant regulatorypermission/s (including those from Forest Dept., if required) are obtainedprior to cutting of such trees.
1 1
b) The non-timber grade trees are to be stacked and possession is tobe given to Employer/concerned Govt. Department.
1 1
c) The Contractor shall strip, store and preserve top soil from the site of construction work and in the stock yards prior to stacking of materials.The top soil shall be reinstated in the cyclone shelter compound after the
1 1
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 63/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
construction is over.
6Protection of Properties andResources
The Contractor shall take due care to protect and prevent damages tothe following resources during preparatory and construction work:
a) Water supply lines 1 1
b) Irrigation canals 1 1
c) Cart, cattle and/or foot trail/tracks 1 1
d) Cultural properties and sites/structures of religious importance 1 1
e) Houses, Farmlands, Orchids and/or Trees. 1 1
f) School and other existing buildings adjacent to the site of construction.
1 1
In case of damage due to construction activity, the restoration/repairsshall be carried out by the contractor at his own cost.
1 1
7QuarryOperations
The Contractor shall procure material from quarries that have been
approved/licensed by the State Govt. A copy of such an approval shallbe submitted to the Engineer prior to procuring material.
1
8 Borrow Areas
a) Borrow areas for the project will be selected by the Contractor following the stipulations given below: The finalization of all suchlocations shall be dependent on the approval of the Engineer ontechnical and environmental grounds. This includes on-site verification tocross-check the accuracy of details provided by the contractor. Onlyafter receipt of the written approval from the Engineer, the Contractor shall enter into a formal agreement with landowner.
1 1
b) The Contractor shall not procure any kind of construction material(such as aggregates, sand and earth) from ecologically protected areas.
1 1
c) Identification and Selection:1. The borrow area should not be located in agriculture field’s/ unlessunavoidable i.e. barren land is not available. In case borrowing needs tobe done on an agricultural land, top-soil stripping, stacking andpreservation is must.
1 1
2. Borrow pits shall not be located within a distance of 100mts. Fromany NH, SH or other roads.
1 1
3. Borrow pits shall be preferably located 500mts. away fromsettlements/habitations.
1 1
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 64/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
4. No borrow pits shall be located within 500mts. from schools,colleges, playgrounds, religious structures and health centers.
1 1
5. No borrow area shall be opened with in 500mts. from a reserved or protected forest area, protected sites, wildlife movement zone andcultural heritage site.
1 1
6. No tree cutting shall be undertaken. 1 17. Borrow area near any surface water body will be at least 100mts.away.
1 1
d) Operation 1
1. Area up to which material will be extracted shall be cleareddemarcated on ground.
1 1
2. A 15cm topsoil layer will be stripped and preserved in stockpiles. 1 1
3. Borrowing of earth should be preferably limited to a depth of 1.5mtr from the existing ground level.
1 1
4. Slope at the edges will be maintained not steeper than 2:3 (Vertical: Horizontal)
1
e) Rehabilitation of Borrow Areas:
1. Rehabilitation shall be satisfactory undertaken immediately after theuse has ceased and at least three weeks prior to monsoon
1 1
2. Preserved top soil has be spread uniformly over land (except incases where borrow area is developed as a water body) used as aborrow area.
1 1
9Water Extraction/Use
Water for construction and for use at construction camps (includinglabour camps) is to be extracted with prior written permission of(a) theindividual owner, in case the source is private well/tube well; (b) GramPanchayat in case the source belongs to community: and (c) IrrigationDepartment in case the source is an irrigation canal or river.
1 1
10Safety of RoadUsers and LocalResidents
a) Traffic safety arrangements (including provision of warning signage,speed breakers etc.) shall be made by the contractor to ensure safety of road users and local people, particularly in the internal village roadswhich will be used for transporting materials.
1 1
b) Material shall be covered during transportation to prevent spillage,accidents and pollution.
1 1
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 65/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
c) All required measures to ensure safety of local residents includingchildren and other near-by residents shall be taken up by the Contractor.This shall include provisions to prevent un authorized entry into theconstruction.
1 1
11 Worker’s Safety
a) All measures required for ensuring safety and health of the workersshall be taken up by the Contractor. This includes provision and
enforcement of appropriate personal protective equipment; first aidfacility; emergency response arrangement; proper storage of hazardous/toxic and polluting materials and; measures for ensuring fireelectrical and mechanical safety arrangements in camp and in work site.
1 1
b) All methods steps and measures are required for ensuring safety of workers, particularly those needed while undertaking work in or aroundexcavations; workings at height; and; while handling inflammable, toxicand/or hazardous materials shall be ensured by the contractor.
1 1
c) Material safety data sheet record of fuel and other inflammablechemicals shall be maintained at the site.
1 1
12 Air pollut ion a) Wind barriers or screens shall be provided in the downwind
direction at air pollution causing sources like plant sites and fine materialstorage stock yards
1 1
b) Fugitive dust emissions have to be eliminated by providing dustsuppression/control measures, such as water sprinkling and cover onmaterials, based on activity and site conditions.
1 1
c) All plants and equipment shall comply with pollution control norms. 1 1
d) Water shall be sprinkled at least twice during dry day on haulageroads passing through or near settlements(including at least 100mbefore the settlement)
1 1
13 Water Pollution
a) All measures (including provision of temporary silt fencing tocontrol sediment run-off) required for avoiding adverse impacts to water
bodies (such as ponds, streams, canals and rivers), water sources (suchas hand pumps and wells) and adjacent farmland shall be undertaken bythe Contractor.
1 1
b) Storage of materials like fuel, chemicals, and cement shall be donein a manner (with impervious layer on bottom and a covered shed ontop) that does not contaminate land and ground/surface water.
1 1
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 66/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
14 Noise Pollution
a) All noise causing activities shall be stopped during night time (9.00PM to 6.00 AM). The Contractor shall schedule construction works inconsultation with local Panchayat Authority and School Principal toensure least disturbance to school children and other adjacent residents.
1
b) Ear plugs shall be provided to the labour facing risk from high
noise pollution such as plant site and those working near generators,heavy equipment /machinery. 1 1
c) Appropriate noise controlling devices including acoustic generatorsshall be used to minimize noise during construction work and operationof camp.
1 1
15Disposal Debris/wastes
a) Debris and other construction waste, if any, shall be disposed inlocations pre-approved by the Engineer in a manner that it does notcontaminate the environment.
1 1
b) Location of Debris Disposal Sites: Debris disposal sites shall belocated preferably away from farmlands, water sources and water bodies. In no case, debris shall be disposed within 500mts. of ecologically sensitive areas, including forests, wetlands and protected
natural habitats.
1 1
16Restoration andRehabilitation of Sites
All work sites and areas under temporary use (including construction andlabour camps, plant, sites, haul roads and borrow areas) shall berestored/rehabilitated to a better condition (if not at least to its originalcondition) and to the satisfaction of the Engineer and land owner uponcompletion of construction work by the Contractor.
1 1
Completion of work(as covered under clause 55.1 of GCC) will alsoinclude completion of rehabilitation and clean-up of the work sitesincluding camps, plants, in and around the construction site; disposal of debris/construction wastes at pre-approved locations and; restoration of borrow areas and other sites/ locations used for material sourcing.
1 1
17 Liabilities
Any liability arising out of Contractor’s agreement with landowners/ local
people/gram Panchayat (including those related to temporary use of land, water extraction and disposal of debris) shall be settled by theContractor.
1 1
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 67/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
8.4 Consolidated E&S Report for Prakasam District in the Month of October 2012:
Third Party Quality Audit for Construction of Cyclone Shelters, Roads to CycloneShelters & Habitations, Bridges and Culverts under NCRMP (Details of Guntur inOctober,2012)
S.No Activity Measures to be implemented by the contractor COMPLICEDNOT
COMPLICEDNOT
APPLICABLETOTAL
1Work Plan forEMP
implementation
The Contractor’s Project Manager shall be responsible forimplementation of EMP provisions and will coordinate the over-allimplementation of the said plan. Along with the Work Programme, theContractor shall submit a plan including method statement and timeline
about specific actions that will be taken by him to implement theprovisions laid out in the EMP
12 12
2RegulatoryPermissions andConsents
The Contractor shall obtain all requisite statutory clearances prior tocommencement of civil works, which includes obtainingpermission/consent for plants, water and extraction and borrow areasoperations. This includes:
· Consent for establishment and operation of plant (for concretework) from SPCB.
12 12
· PUC certification for all vehicles/equipment used for/duringconstruction.
12 12
· Permission/consent of the District Administration/Mining
Department/other agencies for quarrying and/or borrowing operationsfor materials like sand and earth.
12 12
· Permission for water extraction, if applicable in the local areacontext.
12 12
The Contractor shall abide by all conditions laid out in the saidclearances.
12 12
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 68/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
3Consultation andCommunityConsent
The Contractor shall consult and obtain written consents of landowners(individual/Panchayat/govt. agency) for temporary use of land for all construction related activities including:
a) Setting-up and operation of construction camp including labourcamps, stock yards etc.
12 12
b) borrow areas and 12 12c) Disposal of debris and other waste material. 12 12
4Construction/Labour Camp
a) Location: The camp and plant site/s location and establishmentshall be done in a manner that does not interfere or disturb theactivities of local inhabitants, particularly those of schools and healthfacilities. Written permission (no objection certificate) shall be takenfrom the Gramsabha and the land owner prior to location selection anda copy shall be submitted to the Engineer approval.
12 12
b) Camp site shall not be located within 250mts. From a water bodyincluding village ponds.
12 12
c) A distance of at least 500mts. Shall be maintained from
designated/protected natural habitats (such as National Parks,Sanctuaries, Biosphere Reserves, Reserve Forests and Ramsar Sites)and Coastal Regulation Zone.
12 12
b) Accommodation and Basic Amenities: All weather shelter with therequired tenement size and toilets shall be provided, as per provisionsof Labour Laws. Separate toilet facilities shall be provided for womenworkers. If a common mess is not provided/operated additional spacefor cooking shall be provided. The contractor shall ensure that hygienicconditions are maintained during the operation of such camps/facilities.
12 12
c) Fuel for Cooking: The Contractor shall ensure that fuel wood is notused as a cooking medium in the construction /labour camp.
12 12
d) Potable water supply: Drinking water supply of at least 40Ipcd withthe required supply points shall be provided.
12 12
e) Fire Safety: Adequate fire safety precautions shall be taken andrequired fire safety equipment (such as fire extinguishers) shall beprovided by the contractor.
12 12
5 Site Clearancea) NO tree cutting is to carried out without the written instructionfrom the Employer, who in turn will ensure that relevant regulatorypermission/s (including those from Forest Dept., if required) are
12 12
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 69/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
obtained prior to cutting of such trees.
b) The non-timber grade trees are to be stacked and possession is tobe given to Employer/concerned Govt. Department.
12 12
c) The Contractor shall strip, store and preserve top soil from the siteof construction work and in the stock yards prior to stacking of materials. The top soil shall be reinstated in the cyclone sheltercompound after the construction is over.
12 12
6Protection of Properties andResources
The Contractor shall take due care to protect and prevent damages tothe following resources during preparatory and construction work:
a) Water supply lines 12 12
b) Irrigation canals 1 11 12
c) Cart, cattle and/or foot trail/tracks 12 12
d) Cultural properties and sites/structures of religious importance 12 12
e) Houses, Farmlands, Orchids and/or Trees. 11 1 12f) School and other existing buildings adjacent to the site of construction.
12 12
In case of damage due to construction activity, the restoration/repairsshall be carried out by the contractor at his own cost.
12 12
7QuarryOperations
The Contractor shall procure material from quarries that have beenapproved/licensed by the State Govt. A copy of such an approval shallbe submitted to the Engineer prior to procuring material.
12
8 Borrow Areas
a) Borrow areas for the project will be selected by the Contractorfollowing the stipulations given below: The finalisation of all suchlocations shall be dependent on the approval of the Engineer on
technical and environmental grounds. This includes on-site verificationto cross-check the accuracy of details provided by the contractor. Onlyafter receipt of the written approval from the Engineer, the Contractorshall enter into a formal agreement with landowner.
12 12
b) The Contractor shall not procure any kind of construction material(such as aggregates, sand and earth) from ecologically protectedareas.
12 12
c) Identification and Selection:
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 70/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
1. The borrow area should not be located in agriculture field’s/unless unavoidable i.e. barren land is not available. In case borrowingneeds to be done on an agricultural land, top-soil stripping, stackingand preservation is must.
12 12
2. Borrow pits shall not be located within a distance of 100mts.
From any NH, SH or other roads.
12 12
3. Borrow pits shall be preferably located 500mts. away fromsettlements/habitations.
12 12
4. No borrow pits shall be located within 500mts. from schools,colleges, playgrounds, religious structures and health centres.
12 12
5. No borrow area shall be opened with in 500mts. from a reservedor protected forest area, protected sites, wildlife movement zone andcultural heritage site.
12 12
6. No tree cutting shall be undertaken. 1 12
7. Borrow area near any surface water body will be at least 100mts.away.
1 12
d) Operation 121. Area up to which material will be extracted shall be cleareddemarcated on ground.
12 12
2. A 15cm topsoil layer will be stripped and preserved in stockpiles. 12 12
3. Borrowing of earth should be preferably limited to a depth of 1.5mtr from the existing ground level.
12 12
4. Slope at the edges will be maintained not steeper than 2:3(Vertical : Horizontal)
12
e) Rehabilitation of Borrow Areas:
1. Rehabilitation shall be satisfactory undertaken immediately after
the use has ceased and at least three weeks prior to monsoon
12 12
2. Preserved top soil has be spread uniformly over land (except incases where borrow area is developed as a water body) used as aborrow area.
12 12
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 71/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
9Water Extraction /Use
Water for construction and for use at construction camps (includinglabour camps) is to be extracted with prior written permission of(a) theindividual owner, in case the source is private well/tube well; (b) GramPanchayat in case the source belongs to community: and (c) IrrigationDepartment in case the source is an irrigation canal or river.
12 12
10Safety of RoadUsers and LocalResidents
a) Traffic safety arrangements (including provision of warningsignage, speed breakers etc.) shall be made by the contractor toensure safety of road users and local people, particularly in the internal
village roads which will be used for transporting materials.
12 12
b) Material shall be covered during transportation to preventspillage, accidents and pollution.
12 12
c) All required measures to ensure safety of local residentsincluding children and other near-by residents shall be taken up by theContractor. This shall include provisions to prevent un authorised entryinto the construction.
12 12
11 Worker’s Safety
a) All measures required for ensuring safety and health of the
workers shall be taken up by the Contractor. This includes provisionand enforcement of appropriate personal protective equipment; firstaid facility; emergency response arrangement; proper storage of hazardous/toxic and polluting materials and; measures for ensuring fireelectrical and mechanical safety arrangements in camp and in work site.
12 12
b) All methods steps and measures are required for ensuring safetyof workers, particularly those needed while undertaking work in oraround excavations; workings at height; and; while handlinginflammable, toxic and/or hazardous materials shall be ensured by thecontractor.
12 12
c) Material safety data sheet record of fuel and other inflammablechemicals shall be maintained at the site. 12 12
12 Air pollution a) Wind barriers or screens shall be provided in the downwinddirection at air pollution causing sources like plant sites and finematerial storage stock yards
12 12
b) Fugitive dust emissions have to be eliminated by providing dustsuppression/control measures, such as water sprinkling and cover onmaterials, based on activity and site conditions.
12 12
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 72/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
c) All plants and equipment shall comply with pollution controlnorms.
12 12
d) Water shall be sprinkled at least twice during dry day on haulageroads passing through or near settlements(including at least 100mbefore the settlement)
12 12
13 Water Pollution
a) All measures (including provision of temporary silt fencing tocontrol sediment run-off) required for avoiding adverse impacts towater bodies (such as ponds, streams, canals and rivers), watersources (such as hand pumps and wells) and adjacent farmland shallbe undertaken by the Contractor.
12 12
b) Storage of materials like fuel, chemicals, and cement shall bedone in a manner (with impervious layer on bottom and a coveredshed on top) that does not contaminate land and ground/surfacewater.
12 12
14 Noise Pollution
a) All noise causing activities shall be stopped during night time(9.00 PM to 6.00 AM). The Contractor shall schedule constructionworks in consultation with local Panchayat Authority and School
Principal to ensure least disturbance to school children and otheradjacent residents.
12 12
b) Ear plugs shall be provided to the labour facing risk from highnoise pollution such as plant site and those working near generators,heavy equipment /machinery.
12 12
c) Appropriate noise controlling devices including acousticgenerators shall be used to minimise noise during construction work and operation of camp.
12 12
15 Disposal Debris/wastes
a) Debris and other construction waste, if any, shall be disposed inlocations pre-approved by the Engineer in a manner that it does notcontaminate the environment.
12 12
b) Location of Debris Disposal Sites: Debris disposal sites shall belocated preferably away from farmlands, water sources and waterbodies. In no case, debris shall be disposed within 500mts. of ecologically sensitive areas, including forests, wetlands and protectednatural habitats.
12 12
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 73/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
16Restoration andRehabilitation of Sites
All work sites and areas under temporary use (including constructionand labour camps, plant, sites, haul roads and borrow areas) shall berestored/rehabilitated to a better condition (if not at least to its originalcondition) and to the satisfaction of the Engineer and land owner uponcompletion of construction work by the Contractor.
12 12
Completion of work(as covered under clause 55.1 of GCC) will alsoinclude completion of rehabilitation and clean-up of the work sitesincluding camps, plants, in and around the construction site; disposalof debris/construction wastes at pre-approved locations and;restoration of borrow areas and other sites/ locations used for materialsourcing.
12 12
17 Liabilities
Any liability arising out of Contractor’s agreement with landowners/local people/gram Panchayat (including those related to temporary useof land, water extraction and disposal of debris) shall be settled by theContractor.
12 12
9.5 Consolidated E&S Report for Srikakulam & East Godavari Districts in the Month of December 2012:
Third Party Quality Audit for Construction of Cyclone Shelters, Roads to CycloneShelters & Habitations, Bridges and Culverts under NCRMP (Details of Srikakulamin December,2012)
S.No Activity Measures to be implemented by the contractor COMPLICEDNOT
COMPLICED
NOT
APPLICABLE
TOTAL
1Work Plan for EMPimplementation
The Contractor’s Project Manager shall be responsible for implementation of EMP provisions and will coordinate the over-allimplementation of the said plan. Along with the Work Programme, theContractor shall submit a plan including method statement and timelineabout specific actions that will be taken by him to implement theprovisions laid out in the EMP
5 5
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 74/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
2RegulatoryPermissions andConsents
The Contractor shall obtain all requisite statutory clearances prior tocommencement of civil works, which includes obtainingpermission/consent for plants, water and extraction and borrow areasoperations. This includes:
Consent for establishment and operation of plant (for concrete work)from SPCB.
5 5
PUC certification for all vehicles/equipment used for/duringconstruction.
5 5
Permission/consent of the District Administration/MiningDepartment/other agencies for quarrying and/or borrowing operationsfor materials like sand and earth.
5 5
Permission for water extraction, if applicable in the local area context. 5 5
The Contractor shall abide by all conditions laid out in the saidclearances.
5 5
3Consultationand CommunityConsent
The Contractor shall consult and obtain written consents of landowners(individual/Panchayat/govt. agency) for temporary use of land for all construction related activities including:
a) Setting-up and operation of construction camp including labour camps, stock yards etc.
5 5
b) borrow areas and 5 5
c) Disposal of debris and other waste material. 5 5
4Construction/
Labour Camp
a) Location: The camp and plant site/s location and establishment shallbe done in a manner that does not interfere or disturb the activities of local inhabitants, particularly those of schools and health facilities.Written permission (no objection certificate) shall be taken from theGramsabha and the land owner prior to location selection and a copyshall be submitted to the Engineer approval.
5 5
b) Camp site shall not be located within 250mts. From a water bodyincluding village ponds. 5 5
a) A distance of at least 500mts. Shall be maintained fromdesignated/protected natural habitats (such as National Parks,Sanctuaries, Biosphere Reserves, Reserve Forests and Ramsar Sites)and Coastal Regulation Zone.
5 5
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 75/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
b) Accommodation and Basic Amenities: All weather shelter with therequired tenement size and toilets shall be provided, as per provisionsof Labour Laws. Separate toilet facilities shall be provided for womenworkers. If a common mess is not provided/operated additional spacefor cooking shall be provided. The contractor shall ensure that hygienicconditions are maintained during the operation of such camps/facilities.
5 5
c) Fuel for Cooking: The Contractor shall ensure that fuel wood is notused as a cooking medium in the construction /labour camp.
5 5
d) Potable water supply: Drinking water supply of at least 40Ipcd withthe required supply points shall be provided.
5 5
e) Fire Safety: Adequate fire safety precautions shall be taken andrequired fire safety equipment (such as fire extinguishers) shall beprovided by the contractor.
5 5
5 Site Clearance
a) NO tree cutting is to carried out without the written instruction fromthe Employer, who in turn will ensure that relevant regulatorypermission/s (including those from Forest Dept., if required) are
obtained prior to cutting of such trees.
5 5
b) The non-timber grade trees are to be stacked and possession is tobe given to Employer/concerned Govt. Department.
5 5
c) The Contractor shall strip, store and preserve top soil from the siteof construction work and in the stock yards prior to stacking of materials. The top soil shall be reinstated in the cyclone shelter compound after the construction is over.
5 5
6Protection of Properties andResources
The Contractor shall take due care to protect and prevent damages tothe following resources during preparatory and construction work:
a) Water supply lines 5 5
b) Irrigation canals 5 5
c) Cart, cattle and/or foot trail/tracks 5 5
d) Cultural properties and sites/structures of religious importance 5 5
e) Houses, Farmlands, Orchids and/or Trees. 5 5
f) School and other existing buildings adjacent to the site of construction.
5 5
In case of damage due to construction activity, the restoration/repairsshall be carried out by the contractor at his own cost.
5 5
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 76/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7QuarryOperations
The Contractor shall procure material from quarries that have beenapproved/licensed by the State Govt. A copy of such an approval shallbe submitted to the Engineer prior to procuring material.
5
8 Borrow Areas
a) Borrow areas for the project will be selected by the Contractorfollowing the stipulations given below: The finalisation of all such
locations shall be dependent on the approval of the Engineer ontechnical and environmental grounds. This includes on-site verificationto cross-check the accuracy of details provided by the contractor. Onlyafter receipt of the written approval from the Engineer, the Contractorshall enter into a formal agreement with landowner.
5 5
b) The Contractor shall not procure any kind of construction material(such as aggregates, sand and earth) from ecologically protectedareas.
5 5
c) Identification and Selection:
1. The borrow area should not be located in agriculture field’s/unless unavoidable i.e. barren land is not available. In case borrowingneeds to be done on an agricultural land, top-soil stripping, stackingand preservation is must.
5 5
2. Borrow pits shall not be located within a distance of 100mts. Fromany NH, SH or other roads.
5 5
3. Borrow pits shall be preferably located 500mts. away fromsettlements/habitations.
5 5
4. No borrow pits shall be located within 500mts. from schools,colleges, playgrounds, religious structures and health centres.
5 5
5. No borrow area shall be opened with in 500mts. from a reservedor protected forest area, protected sites, wildlife movement zone andcultural heritage site.
5 5
6. No tree cutting shall be undertaken.5 5
7. Borrow area near any surface water body will be at least 100mts.away.
5 5
d) Operation 5
1. Area up to which material will be extracted shall be cleareddemarcated on ground.
5 5
2. A 15cm topsoil layer will be stripped and preserved in stockpiles. 5 5
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 77/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
3. Borrowing of earth should be preferably limited to a depth of 1.5mtr from the existing ground level.
5 5
4. Slope at the edges will be maintained not steeper than 2:3(Vertical : Horizontal)
5 5
e) Rehabilitation of Borrow Areas:
1. Rehabilitation shall be satisfactory undertaken immediately afterthe use has ceased and at least three weeks prior to monsoon
5 5
2. Preserved top soil has be spread uniformly over land (except incases where borrow area is developed as a water body) used as aborrow area.
5 5
9Water Extraction /Use
Water for construction and for use at construction camps (includinglabour camps) is to be extracted with prior written permission of(a) theindividual owner, in case the source is private well/tube well; (b) GramPanchayat in case the source belongs to community: and (c) IrrigationDepartment in case the source is an irrigation canal or river.
5 5
10Safety of RoadUsers and LocalResidents
a) Traffic safety arrangements (including provision of warning
signage, speed breakers etc.) shall be made by the contractor toensure safety of road users and local people, particularly in the internalvillage roads which will be used for transporting materials.
5 5
b) Material shall be covered during transportation to preventspillage, accidents and pollution.
5 5
c) All required measures to ensure safety of local residentsincluding children and other near-by residents shall be taken up by theContractor. This shall include provisions to prevent un authorised entryinto the construction.
5 5
11 Worker’s Safety
a) All measures required for ensuring safety and health of theworkers shall be taken up by the Contractor. This includes provision
and enforcement of appropriate personal protective equipment; firstaid facility; emergency response arrangement; proper storage of hazardous/toxic and polluting materials and; measures for ensuring fireelectrical and mechanical safety arrangements in camp and in work site.
5 5
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 78/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
b) All methods steps and measures are required for ensuring safetyof workers, particularly those needed while undertaking work in oraround excavations; workings at height; and; while handlinginflammable, toxic and/or hazardous materials shall be ensured by thecontractor.
5 5
c) Material safety data sheet record of fuel and other inflammablechemicals shall be maintained at the site. 5 5
12 Air pollution a) Wind barriers or screens shall be provided in the downwinddirection at air pollution causing sources like plant sites and finematerial storage stock yards
5 5
b) Fugitive dust emissions have to be eliminated by providing dustsuppression/control measures, such as water sprinkling and cover onmaterials, based on activity and site conditions.
5 5
c) All plants and equipment shall comply with pollution controlnorms.
5 5
d) Water shall be sprinkled at least twice during dry day on haulageroads passing through or near settlements(including at least 100m
before the settlement)
5 5
13 Water Pollution
a) All measures (including provision of temporary silt fencing tocontrol sediment run-off) required for avoiding adverse impacts towater bodies (such as ponds, streams, canals and rivers), watersources (such as hand pumps and wells) and adjacent farmland shallbe undertaken by the Contractor.
5 5
b) Storage of materials like fuel, chemicals, and cement shall bedone in a manner (with impervious layer on bottom and a coveredshed on top) that does not contaminate land and ground/surfacewater.
5 5
14 Noise Pollution
a) All noise causing activities shall be stopped during night time
(9.00 PM to 6.00 AM). The Contractor shall schedule constructionworks in consultation with local Panchayat Authority and SchoolPrincipal to ensure least disturbance to school children and otheradjacent residents.
5 5
b) Ear plugs shall be provided to the labour facing risk from highnoise pollution such as plant site and those working near generators,heavy equipment /machinery.
5 5
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 79/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
c) Appropriate noise controlling devices including acousticgenerators shall be used to minimise noise during construction work and operation of camp.
5 5
15Disposal Debris/wastes
a) Debris and other construction waste, if any, shall be disposed inlocations pre-approved by the Engineer in a manner that it does notcontaminate the environment.
5 5
b) Location of Debris Disposal Sites: Debris disposal sites shall belocated preferably away from farmlands, water sources and waterbodies. In no case, debris shall be disposed within 500mts. of ecologically sensitive areas, including forests, wetlands and protectednatural habitats.
5 5
16Restoration andRehabilitation of
Sites
All work sites and areas under temporary use (including constructionand labour camps, plant, sites, haul roads and borrow areas) shall berestored/rehabilitated to a better condition (if not at least to its originalcondition) and to the satisfaction of the Engineer and land owner uponcompletion of construction work by the Contractor.
5 5
Completion of work(as covered under clause 55.1 of GCC) will also
include completion of rehabilitation and clean-up of the work sitesincluding camps, plants, in and around the construction site; disposalof debris/construction wastes at pre-approved locations and;restoration of borrow areas and other sites/ locations used for materialsourcing.
5 5
17 Liabilities
Any liability arising out of Contractor’s agreement with landowners/local people/gram Panchayat ( including those related to temporary useof land, water extraction and disposal of debris) shall be settled by theContractor.
5 5
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 80/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Third Party Quality Audit for Construction of Cyclone Shelters, Roads to CycloneShelters & Habitations, Bridges and Culverts under NCRMP (Details of EastGodavari in December,2012)
S.No Activity Measures to be implemented by the contractor COMPLICEDNOT
COMPLICEDNOT
APPLICABLETOTAL
1Work Plan for EMPimplementation
The Contractor’s Project Manager shall be responsible for implementation of EMP provisions and will coordinate the over-allimplementation of the said plan. Along with the Work Programme, theContractor shall submit a plan including method statement and timelineabout specific actions that will be taken by him to implement theprovisions laid out in the EMP
1 1
2RegulatoryPermissions andConsents
The Contractor shall obtain all requisite statutory clearances prior tocommencement of civil works, which includes obtainingpermission/consent for plants, water and extraction and borrow areasoperations. This includes:
1
Consent for establishment and operation of plant (for concrete work)from SPCB.
1 1
PUC certification for all vehicles/equipment used for/duringconstruction.
1 1
Permission/consent of the District Administration/MiningDepartment/other agencies for quarrying and/or borrowing operationsfor materials like sand and earth.
1 1
Permission for water extraction, if applicable in the local area context. 1 1
The Contractor shall abide by all conditions laid out in the said
clearances.
1 1
3Consultationand CommunityConsent
The Contractor shall consult and obtain written consents of landowners(individual/Panchayat/govt. agency) for temporary use of land for all construction related activities including:
a) Setting-up and operation of construction camp including labour camps, stock yards etc.
1 1
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 81/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
b) borrow areas and 1 1
c) Disposal of debris and other waste material. 1 1
4Construction/Labour Camp
a) Location: The camp and plant site/s location and establishment shallbe done in a manner that does not interfere or disturb the activities of
local inhabitants, particularly those of schools and health facilities.Written permission (no objection certificate) shall be taken from theGramsabha and the land owner prior to location selection and a copyshall be submitted to the Engineer approval.
1 1
b) Camp site shall not be located within 250mts. From a water bodyincluding village ponds.
1 1
a) A distance of at least 500mts. Shall be maintained fromdesignated/protected natural habitats (such as National Parks,Sanctuaries, Biosphere Reserves, Reserve Forests and Ramsar Sites)and Coastal Regulation Zone.
1 1
b) Accommodation and Basic Amenities: All weather shelter with therequired tenement size and toilets shall be provided, as per provisionsof Labour Laws. Separate toilet facilities shall be provided for womenworkers. If a common mess is not provided/operated additional spacefor cooking shall be provided. The contractor shall ensure that hygienicconditions are maintained during the operation of such camps/facilities.
1 1
c) Fuel for Cooking: The Contractor shall ensure that fuel wood is notused as a cooking medium in the construction /labour camp.
1 1
d) Potable water supply: Drinking water supply of at least 40Ipcd withthe required supply points shall be provided.
1 1
e) Fire Safety: Adequate fire safety precautions shall be taken andrequired fire safety equipment (such as fire extinguishers) shall be
provided by the contractor.
1 1
5 Site Clearance
a) NO tree cutting is to carried out without the written instruction fromthe Employer, who in turn will ensure that relevant regulatorypermission/s (including those from Forest Dept., if required) areobtained prior to cutting of such trees.
1 1
b) The non-timber grade trees are to be stacked and possession is tobe given to Employer/concerned Govt. Department.
1 1
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 82/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
c) The Contractor shall strip, store and preserve top soil from the siteof construction work and in the stock yards prior to stacking of materials. The top soil shall be reinstated in the cyclone shelter compound after the construction is over.
1 1
6Protection of Properties andResources
The Contractor shall take due care to protect and prevent damages to
the following resources during preparatory and construction work:a) Water supply lines 1 1
b) Irrigation canals 1 1
c) Cart, cattle and/or foot trail/tracks 1 1
d) Cultural properties and sites/structures of religious importance 1 1
e) Houses, Farmlands, Orchids and/or Trees. 1 1
f) School and other existing buildings adjacent to the site of construction.
1 1
In case of damage due to construction activity, the restoration/repairsshall be carried out by the contractor at his own cost.
1 1
7QuarryOperations
The Contractor shall procure material from quarries that have beenapproved/licensed by the State Govt. A copy of such an approval shallbe submitted to the Engineer prior to procuring material.
1
8 Borrow Areas
a) Borrow areas for the project will be selected by the Contractorfollowing the stipulations given below: The finalisation of all suchlocations shall be dependent on the approval of the Engineer ontechnical and environmental grounds. This includes on-site verificationto cross-check the accuracy of details provided by the contractor. Onlyafter receipt of the written approval from the Engineer, the Contractorshall enter into a formal agreement with landowner.
1 1
b) The Contractor shall not procure any kind of construction material
(such as aggregates, sand and earth) from ecologically protectedareas.
1 1
c) Identification and Selection:
1. The borrow area should not be located in agriculture field’s/unless unavoidable i.e. barren land is not available. In case borrowingneeds to be done on an agricultural land, top-soil stripping, stackingand preservation is must.
1 1
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 83/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
2. Borrow pits shall not be located within a distance of 100mts. Fromany NH, SH or other roads.
1 1
3. Borrow pits shall be preferably located 500mts. away fromsettlements/habitations.
1 1
4. No borrow pits shall be located within 500mts. from schools,
colleges, playgrounds, religious structures and health centres.
1 1
5. No borrow area shall be opened with in 500mts. from a reservedor protected forest area, protected sites, wildlife movement zone andcultural heritage site.
1 1
6. No tree cutting shall be undertaken. 1 1
7. Borrow area near any surface water body will be at least 100mts.away.
1 1
d) Operation 1
1. Area up to which material will be extracted shall be cleareddemarcated on ground.
1 1
2. A 15cm topsoil layer will be stripped and preserved in stockpiles. 1 1
3. Borrowing of earth should be preferably limited to a depth of 1.5mtr from the existing ground level.
1 1
4. Slope at the edges will be maintained not steeper than 2:3(Vertical : Horizontal)
1 1
e) Rehabilitation of Borrow Areas:
1. Rehabilitation shall be satisfactory undertaken immediately after
the use has ceased and at least three weeks prior to monsoon1 1
2. Preserved top soil has be spread uniformly over land (except incases where borrow area is developed as a water body) used as aborrow area.
1 1
9Water Extraction /Use
Water for construction and for use at construction camps (includinglabour camps) is to be extracted with prior written permission of(a) theindividual owner, in case the source is private well/tube well; (b) GramPanchayat in case the source belongs to community: and (c) IrrigationDepartment in case the source is an irrigation canal or river.
1 1
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 84/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
10Safety of RoadUsers and Local
Residents
a) Traffic safety arrangements (including provision of warningsignage, speed breakers etc.) shall be made by the contractor toensure safety of road users and local people, particularly in the internalvillage roads which will be used for transporting materials.
1 1
b) Material shall be covered during transportation to prevent
spillage, accidents and pollution.
1 1
c) All required measures to ensure safety of local residentsincluding children and other near-by residents shall be taken up by theContractor. This shall include provisions to prevent un authorised entryinto the construction.
1 1
11 Worker’s Safety
a) All measures required for ensuring safety and health of theworkers shall be taken up by the Contractor. This includes provisionand enforcement of appropriate personal protective equipment; firstaid facility; emergency response arrangement; proper storage of hazardous/toxic and polluting materials and; measures for ensuring fireelectrical and mechanical safety arrangements in camp and in work site.
1 1
b) All methods steps and measures are required for ensuring safetyof workers, particularly those needed while undertaking work in oraround excavations; workings at height; and; while handlinginflammable, toxic and/or hazardous materials shall be ensured by thecontractor.
1 1
c) Material safety data sheet record of fuel and other inflammablechemicals shall be maintained at the site.
1 1
12 Air pollution a) Wind barriers or screens shall be provided in the downwinddirection at air pollution causing sources like plant sites and finematerial storage stock yards
1 1
b) Fugitive dust emissions have to be eliminated by providing dust
suppression/control measures, such as water sprinkling and cover onmaterials, based on activity and site conditions.
1 1
c) All plants and equipment shall comply with pollution controlnorms.
1 1
d) Water shall be sprinkled at least twice during dry day on haulageroads passing through or near settlements(including at least 100mbefore the settlement)
1 1
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 85/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
13 Water Pollution
a) All measures (including provision of temporary silt fencing tocontrol sediment run-off) required for avoiding adverse impacts towater bodies (such as ponds, streams, canals and rivers), watersources (such as hand pumps and wells) and adjacent farmland shallbe undertaken by the Contractor.
1 1
b) Storage of materials like fuel, chemicals, and cement shall be
done in a manner (with impervious layer on bottom and a coveredshed on top) that does not contaminate land and ground/surfacewater.
1 1
14 Noise Pollution
a) All noise causing activities shall be stopped during night time(9.00 PM to 6.00 AM). The Contractor shall schedule constructionworks in consultation with local Panchayat Authority and SchoolPrincipal to ensure least disturbance to school children and otheradjacent residents.
1 1
b) Ear plugs shall be provided to the labour facing risk from highnoise pollution such as plant site and those working near generators,heavy equipment /machinery.
1 1
c) Appropriate noise controlling devices including acousticgenerators shall be used to minimise noise during construction work and operation of camp.
1 1
15Disposal Debris/wastes
a) Debris and other construction waste, if any, shall be disposed inlocations pre-approved by the Engineer in a manner that it does notcontaminate the environment.
1 1
b) Location of Debris Disposal Sites: Debris disposal sites shall belocated preferably away from farmlands, water sources and waterbodies. In no case, debris shall be disposed within 500mts. of ecologically sensitive areas, including forests, wetlands and protectednatural habitats.
1 1
16Restoration andRehabilitation of Sites
All work sites and areas under temporary use (including constructionand labour camps, plant, sites, haul roads and borrow areas) shall berestored/rehabilitated to a better condition (if not at least to its originalcondition) and to the satisfaction of the Engineer and land owner uponcompletion of construction work by the Contractor.
1 1
QUARTERLY REPORT
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 86/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Completion of work(as covered under clause 55.1 of GCC) will alsoinclude completion of rehabilitation and clean-up of the work sitesincluding camps, plants, in and around the construction site; disposalof debris/construction wastes at pre-approved locations and;restoration of borrow areas and other sites/ locations used for materialsourcing.
1 1
17 Liabilities
Any liability arising out of Contractor’s agreement with landowners/local people/gram Panchayat ( including those related to temporary useof land, water extraction and disposal of debris) shall be settled by theContractor.
1 1
QUARTERLY REPORT
f f
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 87/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
9.0 Statement Showing the Inspections and Site Visits of Districts during this 3 Months:
9.1 Statement Showing the Inspections and Site Visits of Districts during the Month of October -2012
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN SRIKAKULAM DISTRICT DURING THE MONTH
OF OCTOBER 2012
SNO
PACKAGE NO NAME OF WORK
TPQA INSPECTIONSDURING THIS MONTH
DATES OF VISIT
NO. OF VISITS
1NCRMP/B-W/AP/RHB/PRED/01/Santhabommali/003
Road from Borubadra,Malagam road to Kollipadu via Seepuram,Ghantapeta in Santhabommali Mandal
5.10.12,18.10.12,
2
2NCRMP/B-W/AP/MPCS/PRED/01/Santhabommali/005
Construction of Cyclone shelter at Runku in Santhabommali Mandal.
05.10.12,10.10.12,16.10.12,18.10.12,27.10.12
5
3 NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002 Road from Deppuru, Bahadapalli road to Onkuluru & cyclone shelter. 10.10.12 1
4 NCRMP/B-W/AP/MPCS/PRED/01/Santhabommali/005 Construction of Cyclone shelter at Kollipadu in SanthabommaliMandal.
05.10.12,09.10.12,
10.10.12,18.10.12,27.10.12
5
5 NCRMP/B_W/AP/Br/R&B/01/Bendigedda/004Construction of High level Bridge across Bendigedda at km 4/10 of Pundi-Parlkimidi road in Srikakulam Dist.
08.10.12,10.10.12,
2
QUARTERLY REPORT
C lt S i f Thi d P t Q lit A dit (TPQA) f N ti l C l Ri k Miti ti P j t (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 88/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
6 NCRMP/B_W/AP/Br/R&B/01/Surampeta/003Construction of Minor Bridge at km 12/2-4 of NH-5 to Surampeta
road via Naruva&Mentada18.10.12 1
7 NCRMP/B-W/AP/MPCS/PRED/01/Polaki/006 Road from Talasamudram to Dola regulator 22.10.12 1
8 NCRMP/B-W/AP/MPCS/PRED/01/Polaki/006Road from Mabagam R&B road to Dubbakavanipeta viaGajapathinagaram.
22.10.12 1
9 NCRMP/B-W/AP/MPCS/PRED/01/Polaki/005Road from R&B road Edullavalasa-Killam to jonnam viaTalasamudram
22.10.12 1
10NCRMP/B-W/AP/RHB/PRED/01/Santhabommali/003
Road from DPN road Uddandapalem10.10.12,18.10.12
2
11
NCRMP/B-
W/AP/RHB/PRED/01/Santhabommali/003 Road from K.Umilada to Koduru (Link road) 10.10.12 1
12 NCRMP/B_W/BR/R&B/01/uppigedda/002Construction of HLB across Uppuguda at Km 7/6 of Srikakulam
municipal limits to Pukkalapeta09.10.12 1
13 NCRMP/B_W/AP/RCS/PRED/01/ETCHERLA/005 Road from Kotcherla road to Kollibhemavaram & cyclone shelter 12.10.12 1
14 NCRMP/B_W/AP/RCS/PRED/01/ETCHERLA/005 Road from Kotcherla road to Pathesundrapalem 12.10.12 1
15NCRMP/BW/AP/Br/AR&B/01/Patnavanipeta/00
1Construction of Bridge at km 11/6-8 of NH-5 to Patnavanipetaconnecting Sundarapalem.
15.10.12,18.10.12
2
TOTAL 28
QUARTERLY REPORT
C lt S i f Thi d P t Q lit A dit (TPQA) f N ti l C l Ri k Miti ti P j t (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 89/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN VIJAYNAGARAM DISTRICT DURING THE
MONTH OF OCTOBER 2012
SNO.
PACKAGE NO NAME OF WORK
TPQA INSPECTIONS
DURING THIS MONTHDATES OF
VISITNO. OF
VISITS
1NCRMP/B-W/ AP/ Br/ R&B/ 02/ Chakaligadda /008
Construction of Minor Bridge at Km 15/2 near Chakaligadda of Konada Ramatheertham R&B road to Konathalapalem (via) Yerukonda, Pasupam, Kollayavalsa (ZP Road) in VizianagaramDistrict.
06.10.201211.10.201220.10.2012
3
2 NCRMP/B-W/ AP/ Br/ R&B/ 02/Puligedda/ 007Construction of Minor Bridge at Km. 7/2 near Puligedda of Konada –Ramatheertham R&B Road to Konathalapalem via Yerukonda,Pasupam, Kollayavalsa (Z.P. Road) in Vizianagaram District.
11.10.2012 1
3 NCRMP/B-W/ AP/ RD/ R&B/ 02/Konada/ 009
Improvements to Road from Konada Ramatheertham (R&B) Road toKonathalapalem (Via) Pasupam, Yerukonda, Kollayavalsa from Km12/0 to Km 16/5 (Km 0/0 to 4/0 i.e. up to NH-5 crossing ) in Vizianagaram District, Andhra Pradesh
11.10.2012 1
Total 5
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 90/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN VISHAKAPATNAM DISTRICT DURING THE
MONTH OF OCTOBER 2012
SNO
.
PACKAGE NO NAME OF WORK
TPQA INSPECTIONSDURING THIS
MONTH
DATES OF VISIT
NO. OF VISITS
1 NCRMP/B-W/AP/RCS/PRED/03/Rambilli/004 Construction of cyclone shelter at Venkayyapalem in Rambilli Mandal06.10.201231.10.2012
2
2 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002 Construction of cyclone shelter at Mullaparra in Nakkapalli Mandal 16.10.2012 1
3NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at Gajapathinagaram in PayakaraopetaMandal
04.10.201211.10.201216.10.201225.10.2012
4
4 NCRMP/B-W/AP/RHB/PRED/03/Anandapuram/003 R&B Road from B.P kallalu to Matchvanipalem 11.10.2012 1
NCRMP/B-W/AP/RCS/PRED/03/Anandapuram/001 B.T to the Road from NH-5 to Ramarayadupalem 11.10.2012 1
5 NCRMP/B-W/AP/RCS/PRED/03/Nakkapalli/003 Road from Upmaka Rajayyapeta R&B road to Janakayyapeta 11.10.2012 1
5 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002 Construction of cyclone shelter at Bangarampeta in Nakkapalli Mandal17.10.201219.10.2012
2
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 91/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
6NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at Ratnayampeta in PayakaraopetaMandal
04.10.201211.10.2012
16.10.2012
3
7 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002 Construction of cyclone shelter at Patimeeda in Nakkapalli Mandal
04.10.201216.10.201229.10.201231.10.2012
4
TOTAL 19
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 92/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN EASTGODAVARI DISTRICT DURING THE
MONTH OF OCTOBER 2012
S NO. PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURING
THIS MONTH
DATES OF VISITNO. OF
VISITS
1
NCRMP/B-W/ AP/MPCS/PRED/04/Thondangi/001
Cyclone Shelter at Avulamanda and of Thondangi Mandal,E.G.Dt.
12.10.2012,17.102012,25.10.2012,29.10.201231.10.2012
5
2Cyclone Shelter at Lakshmanudipeta of Thondangi Mandal,E.G.Dt.
12.10.2012,17.10.2012,25.10.2012
29.10.2012
4
3NCRMP/B-W/ AP/RCS/
PRED/04/Uppalaguptam/003Road from R&B Road to Chinaraghavulapeta Cyclone Shelter
13.10.2012 & 19.10.2012
2
4NCRMP/B-W/ AP/MPCS/
PRED/04/Uppalaguptam/002Cyclone Shelter at Pedaraghavulapeta of UppalaguptamMandal, E.G.Dt.
01.10.2012,06.102012,13.102012,19.10201230.102012
5
TOTAL 16
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 93/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN WEST GODAVARI DISTRICT DURING THE
MONTH OF OCTOBER 2012
S NO. PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURING THIS
MONTH
DATES OF VISITSNO. OF
VISITS
1.
NCRMP/B-W/AP/RHB/
PRED/05/Mogalthuru/001
Road from NH 214 A at Ranga Statue center to Harijanawada of
Kalipatnam (E) (Mogalthuru Mandal W.G.Dist.)09.10.2012 1
2.R&B road at Panchayat Office to Pulaparthivarithota via Badava
(Mogalthuru Mandal W.G.Dist.)09.10.2012 1
3. Mogalthuru Vempa R&B Road at Uchintha Kalava Bridge toGogulamma Harijanapeta (Mogalthuru Mandal W.G.Dist.)
09.10.2012 1
4.From Narsapur Mogalthuru R&B road to Dayadaldaspeta via
Venkateswara Swamy temple (Mogalthuru Mandal W.G.Dist.)09.10.2012 1
5.Road from NH 214 A road to Harijanapeta of Kothota
(Mogalthuru Mandal W.G.Dist.)09.10.2012 1
6.
NCRMP/B-W/AP/RHB/
PRED/05/Narsapur/002
R&B Road to Indira nagar (via) Pochamma temple (Narsapur
Mandal W.G.Dist.)09.10.2012 1
7.Road from R&B road to Pedalanka (Narsapur Mandal
W.G.Dist.)09.10.2012 1
8.Road from LB Cheria CC road to Chillapalem of LB Cheria
(Narsapur Mandal W.G.Dist.)09.10.2012 1
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 94/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
9.
NCRMP/B-W/AP/RHB/
PRED/05/Kalla/003
From A-U R&B Road to Satyanarayanapuram, (Kalla Mandal
W.G.Dist.)16.10.2012 1
10. From A-U R&B Road to Mekaladibba (Kalla Mandal W.G.Dist.) 16.10.2012 1
Total 10
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 95/259
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN KRISHNA DISTRICT DURING
THE MONTH OF OCTOBER 2012
SNO.
PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURING THISMONTH
DATES OF VISITS NO. OF VISITS
1NCRMP/B-
W/AP/RHB/PRED/06/Machilipatnam/002
Road from Potalapalem Z.P road to Chikativanipalem 18.10.2012 1
2NCRMP/B-W/AP/RHB/PRED/
06/Machipatnam/001Road connecting R&B road through Gantlammapalem 19.10.2012 1
3NCRMP/B-W/AP/RCS/PRED/
06/Machipatnam/001Road from Potalapalem ZP road to Pothepalli 18.10.2012 1
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 96/259
y y Q y ( Q ) y g j ( )
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN GUNTUR DISTRICT DURING
THE MONTH OF OCTOBER 2012
S NO. PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURING
THIS MONTH
DATES OF VISITNO. OF
VISITS
1 NCRMP/B-W/AP/RCS/PRED/07/Karlapalem/002
Road from Pedagollapalem PR. Road to Bonthagoralapalem. 30.10.2012 1
Road from Ganapavaram R&B Road to Pedamarpuvaripalem.19.10.2012,29.10.2012,30.10.2012,
3
Road from R&B road to chinapuluguvaripalem19.10.2012,29.10.2012,30.10.2012,
3
Road from R&B road to Pedagollapalem Cyclone Shelter.4.10.2012,30.10.2012
2
Road from R&B road toYaramvaripalem 30.10.2012 1
2NCRMP/B-
W/AP/RCS/PRED/07/Nizampatnam/003Road form R&B Road to Gurunadhanagar
9.10.2012,17.10.2012,30.10.2012
3
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 97/259
y y Q y ( Q ) y g j ( )
Road from R & B Road to Atlavaripalem9.10.2012,17.10.2012,30.10.2012
3
3 NCRMP/B-W/AP/RCS/PRED/07/Bapatla/003
Road from R & B Road to Adarsh nagar. 1.10.2012 1
Road from R & B Road to Hanumanth nagar. 1.10.2012 1
NCRMP/B-W/AP/RHB/PRED/07/Karlapalem/001Road from Ganapavaram R & B Road to Kesavapuri STColony.
30.10.2012 1
NCRMP/B-W/AP/RCS/PRED/07/Pv Palem/001 Road from R & B Road to Mandevaripalem 4.10.2012 1
5 NCRMP/B-W/AP/Br/R&B/07/Bapatla/010Reconstruction of HLB @ km 5/2 of Bapatla - Suryalanka
road across perali drain in Guntur District.1.10.2012,30.10.2012
2
6 NCRMP/B-W/AP/Br/R&B/07/Bapatla/011Reconstruction of HLB @ km 2/4 of Bapatla -
Pandurangapuram road across perali drain in Guntur District.1.10.2012 1
TOTAL 23
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 98/259
y y Q y ( Q ) y g j ( )
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN PRAKASHAM DISTRICT
DURING THE MONTH OF OCTOBER 2012
SNO.
PACKAGE NO NAME OF WORK
TPQA INSPECTIONS
DURING THIS MONTHDATES OF
VISITNO. OF
VISITS
1 NCRMP/B-W/AP/RHB/PRED/08/Tangutur/09 Road from R&B road Pellur to Vasepallipadu 02.10.2012 1
2 NCRMP/B-W/APMPCS/PRED/08/NG Padu/004Kanaparthy cyclone shelter in Naguluppapadu Mandal Prakasamdistrict
10.10.201212.10.201219.10.201226.10.2012
31.10.2012
5
3 NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002 Road from NH5 to Mulaguntapadu 29.10.2012 1
4 NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002 Road from R&B road to Chalivendradibba 29.10.2012 1
5 NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002 Road from Pakala R&B road to Mosanaladinne02.10.201229.10.2012
2
6 NCRMP/B-W/AP/Br/R&B/08/ Kanaparthy/012Construction of High level Bridge at Km 16/10 of Naguluppapadu
– Kanaparthy road in Prakasam District
12.10.201219.10.201231.10.2012
3
7 NCRMP/B-W/AP/RCS/PRED/08/Vetapalem/002 Road from NH Road to Challareddypalem 31.10.2012 1
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 99/259
8 Phase-IIProviding BT Surface to the road from Pallepalem of Chakicharla inUlavapadu Mandal
10.10.2012 1
9 Phase-II Road from ZP road to Sriramapattapupalem in Ulavapadu Mandal 10.10.2012 1
10 Phase-II Road from MC Road to Veerapalli in Ulavapadu mandal. 10.10.2012 1
11 Phase-II Road from R&B Road to Kothapalem in Chirala Mandal 11.10.2012 1
12 Phase-IIConstruction of Cyclone shelter at Vodarevu of Chirala Mandal inPrakasam District.
11.10.2012 1
13 Phase-IIRoad from Vedullapalli-Vodarevu R&B Road to Cyclone Shelter at
Vijaya Lakshmi Puram in Chirala Mandal11.10.2012 1
14 Phase-II Road from R&B road to Nayunipalli in Vetapalem 11.10.2012 1
15 Phase-II Road from R&B road to Sainagar in Vetapalem mandal 11.10.2012 1
16 Phase-IIRoad from Vutukuru Subbaiah Palem to Tenkayachetla Palem in Vetapalem mandal
11.10.2012 1
17 Phase-IIRoad from R & B Road to Motupalli Cyclone Shelter inChinaganjam Mandal.
11.10.2012 1
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 100/259
18 Phase-IIRoad from Motupalli R & B Road to Nirikshanagiri (via)Rudramambapuram Cyclone Shelter in Chinaganjam Mandal.
11.10.2012 1
19 Phase-IIRoad from Motupalli R & B Road to Krishna Nagar in ChinaganjamMandal.
11.10.2012 1
20 Phase-IIRoad from Jeedichetlapalem R & B Road to Kunkuduchetlapalem inChinaganjam Mandal.
11.10.2012 1
Total 27
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 101/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN NELLORE DISTRICT
DURING THE MONTH OF OCTOBER 2012
SLNO
Package Number Name of work
TPQA INSPECTIONS DURING THIS
MONTH
DATES OF VISITSNO. OF
VISITS
1 NCRMP/B-W/AP/RHB/PRED/09/VIDAVALURU/005Road from KT R&B road to Allaganipadu to
vavilla08.10.2012 1
2 NCRMP/B-W/AP/RHB/PRED/09/VIDAVALURU/005Road from R&B road Kancharlapalam HW to
Alaganipadu.08.10.2012 1
3 NCRMP/B-W/AP/RHB/PRED/09/V.CHALEM/007Road from Suvepalli-Pudiparthi road to Srikanth
Colony13.10.2012 1
4 NCRMP/B-W/AP/RHB/PRED/09V.CHALEM/RHB/007providing BT Surface to the road from R&B road
to Edagali kandriga13.10.2012 1
5 NCRMP/B-W/AP/RCS/PRED/09/TADA/009Providing BT road to Peda Pannam Gadu in Tada
Mandal of Nellore Dt.18.10.2012 1
6 NCRMP/B-W/AP/RCS/PRED/09/KAVALI/006Road Connecting R&B Road through Voturu
Village in SPSR Nellore District.08.10.2012,27.10.2012 2
7 NCRMP/B-W/AP/RCS/PRED/09/Muthukur/002Road from R&B Road Kappaladoruvu to
Bandlapalem H.wada in Muthukur mandal30.10.2012 1
8 NCRMP/B-W/AP/RHB/PRED/09/Muthukur/006 Road from R&B road to Patuvarikandriga 30.10.2012 1
Total 9
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 102/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN SRIKAKULAM DISTRICT DURING THE MONTH
OF NOVEMBER 2012
S
NO.PACKAGE NO NAME OF WORK
TPQA INSPECTIONS
DURING THIS MONTH
DATES OF
VISIT
NO. OF
VISITS
1 NCRMP/B-W/AP/MPCS/PRED/01/Santhabommali/005Construction of Cyclone shelter at Runku in SanthabommaliMandal.
07.11.12,14.11.12,17.11.12
3
2 NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002Road from Deppuru, Bahadapalli road to Onkuluru & cycloneshelter.
16.11.12 1
3 NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002 Road from NP Road to URK Puram06.11.12,16.11.12
2
4 NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002 Road from Pollada to Komaralthada &Cyclonic shelter 16.11.12 1
5 NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002 Road from R&B ROAD TO Devunalthada 16.11.12 1
6 NCRMP/B-W/AP/MPCS/PRED/01/Santhabommali/005Construction of Cyclone shelter at Kollipadu in SanthabommaliMandal.
17.11.12 1
7 NCRMP/B_W/AP/Br/R&B/01/Bendigedda/004Construction of High level Bridge across Bendigedda at km 4/10 of Pundi-Parlkimidi road in Srikakulam Dist.
15.11.12 1
8 NCRMP/B_W/AP/Br/R&B/01/Surampeta/003Construction of Minor Bridge at km 12/2-4 of NH-5 to Surampetaroad via Naruva & Mentada
05.11.12,21.11.12
2
9.2 Statement Showing the Inspections and Site Visits of Districts during the Month of November -2012
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 103/259
9 NCRMP/B-W/AP/MPCS/PRED/01/Polaki/006 Road from Talasamudram to Dola regulator 29.11.12 1
10 NCRMP/B-W/AP/MPCS/PRED/01/Polaki/006Road from Mabagam R&B road to Dubbakavanipeta viaGajapathinagaram.
29.11.12 1
11 NCRMP/B-W/AP/MPCS/PRED/01/Polaki/005Road from R&B road Edullavalasa-Killam to jonnam viaTalasamudram
29.11.12 1
12 NCRMP/B-W/AP/RHB/PRED/01/Santhabommali/003 Road from DPN road Uddandapalem 20.11.12 1
13 NCRMP/B-W/AP/RHB/PRED/01/Santhabommali/003 Road from K.Umilada to Koduru (Link road) 20.11.12 1
14 NCRMP/B_W/BR/R&B/01/uppigedda/002
Construction of HLB across uppigedda at Km 7/6 of Srikakulam
municipal limits to Pukkalapeta 20.11.12 1
15 NCRMP/B_W/AP/RCS/PRED/01/ETCHERLA/005 Road from Kotcherla road to Kollibhemavaram & cyclone shelter05.11.12,21.11.12
2
16 NCRMP/B_W/AP/RCS/PRED/01/ETCHERLA/005 Road from Kotcherla road to Pathesundrapalem05.11.12,21.11.12
2
17 NCRMP/BW/AP/Br/AR&B/01/Patnavanipeta/001Construction of Bridge at km 11/6-8 of NH-5 to Patnavanipeta
connecting Sundarapalem.
05.11.12,18.11.12,21.11.12,
28.11.12,29.11.12,30.11.12
6
TOTAL 28
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 104/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN VIZIANAGARAM DISTRICT DURING THE
MONTH OF NOVEMBER 2012
S
NO.
PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURING
THIS MONTH
DATES OF VISITNO. OF
VISITS
1NCRMP/B-W/ AP/ Br/ R&B/ 02/Chakaligadda /008
Construction of Minor Bridge at Km 15/2 near Chakaligadda of KonadaRamatheertham R&B road to Konathalapalem (via) Yerukonda,Pasupam, Kollayavalsa (ZP Road) in Vizianagaram District.
08.11.1219.11.1223.11.1224.11.1229.11.12
5
Total 5
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 105/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN VISHAKAPATNAM DISTRICT DURING THE
MONTH OF NOVEMBER 2012
S
NO.
PACKAGE NO NAME OF WORK
TPQA INSPECTIONS
DURING THIS MONTHDATES OF
VISITNO. OF
VISITS
1 NCRMP/B-W/AP/RCS/PRED/03/Rambilli/004Construction of cyclone shelter at Venkayyapalem in RambilliMandal
10.11.1220.11.12
2
2 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002 Construction of cyclone shelter at Mullaparra in Nakkapalli Mandal11.11.1226.11.12
2
3NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at Gajapathinagaram inPayakaraopeta Mandal 28.11.12 1
4 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002Construction of cyclone shelter at Bangarampeta in NakkapalliMandal
27.11.12 1
5NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at Ratnayampeta in PayakaraopetaMandal
20.11.12 1
6 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002 Construction of cyclone shelter at Patimeeda in Nakkapalli Mandal
10.11.1211.11.12
20.11.1226.11.12
4
TOTAL 11
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 106/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN EAST GODAVARI DISTRICT DURING THE
MONTH OF NOVEMBER 2012
S NO. PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURING THIS
MONTH
DATES OF VISITNO. OF
VISITS
1NCRMP/B-W/ AP/RCS/ PRED/04/
KARAPA/001ROAD FROM APPROACH ROAD TO CYCLONE SHELTER AT
ADAVIPUDI IN E.G.Dt.Nil Nil
2NCRMP/B-W/ AP/RHB/ PRED/04/
KARAPA/001ROAD FROM GURAJANAPALLI TO BANDULAVARIPALEM Nil Nil
3NCRMP/B-W/AP/RHB/ PRED/04/
Katrenikona/003Road from PR road to Dasarivanipeta and to Cyclone
Shelter Nil Nil
4
NCRMP/B-W /AP/RCS/PRED/04/Thondangi/004
Road from R&B Road to G.Musalayyapeta CS Nil Nil
5 Road from R&B Road to P.Chodipallipeta CS05.11.2012, 14.11.2012,19.11.2012 & 29.11.2012
4
6 Road from R&B Road to K. Chodipallipeta CS05.11.2012, 14.11.2012,19.11.2012 & 29.11.2012
4
7 Road from R&B Road to Hukumpeta CS
05.11.2012, 14.11.2012,
19.11.2012, 22.112012 & 29.11.2012
5
8 Road from R&B Road to Gaddipeta CS05.11.2012, 14.11.2012,19.11.2012
& 29.11.20124
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 107/259
9 Road from R&B Road to Danavaipeta CS05.11.2012, 14.11.2012,19.11.2012 & 29.11.2012
4
10
NCRMP/B-W/ AP/MPCS/PRED/04/Thondangi/001
Cyclone Shelter at Avulamanda and of Thondangi Mandal,
E.G.Dt.
14.11.2012, 19.11.2012,
22.11.2012, & 29.11.2012
4
11Cyclone Shelter at Lakshmanudipeta of Thondangi Mandal,E.G.Dt.
05.11.2012, 07.11.2012,14.11.2012, 19.11.2012,
22.11.2012, & 29.11.20126
12NCRMP/B-W/ AP/RCS/
PRED/04/Uppalaguptam/003Road from R&B Road to Chinaraghavulapeta Cyclone
ShelterNil Nil
13NCRMP/B-W/ AP/MPCS/
PRED/04/Uppalaguptam/002Cyclone Shelter at Pedaraghavulapeta of UppalaguptamMandal, E.G.Dt.
26.11.2012 1
TOTAL 32
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 108/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN WEST GODAVARI DISTRICT DURING THE
MONTH OF NOVEMBER 2012
SNO.
PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURINGTHIS MONTH
DATES OF
VISITS
NO. OF
VISITS
1.
NCRMP/B-W/AP/RHB/PRED/05/Mogalthuru/001
Road from NH 214 A at Ranga Statue centre to Harijanawada of Kalipatnam (E)(Mogalthuru Mandal W.G.Dist.)
05.11.2012 1
2.R&B road at Panchayat Office to Pulaparthivarithota via Badava (MogalthuruMandal W.G.Dist.)
05.11.2012 1
3.Mogalthuru Vempa R&B Road at Uchintha Kalava Bridge to GogulammaHarijanapeta (Mogalthuru Mandal W.G.Dist.)
05.11.2012,22.11.2012
2
4.From Narsapur Mogalthuru R&B road to Dayadaldaspeta via Venkateswara Swamytemple (Mogalthuru Mandal W.G.Dist.)
05.11.2012 1
5.Road from NH 214 A road to Harijanapeta of Kothota (Mogalthuru MandalW.G.Dist.)
05.11.2012 1
6.
NCRMP/B-W/AP/RHB/PRED/05/Narsapur/002
R&B Road to Indira nagar (via) Pochamma temple (Narsapur Mandal W.G.Dist.) 22.11.2012 1
7. Road from R&B road to Pedalanka (Narsapur Mandal W.G.Dist.)15.11.2012,26.11.2012
2
8.Road from LB Cheria CC road to Chillapalem of LB Cheria (Narsapur MandalW.G.Dist.)
15.11.2012,26.11.2012
2
9.NCRMP/B-W/AP/RHB/PRED/05/Kalla/003
From A-U R&B Road to Satyanarayanapuram, (Kalla Mandal W.G.Dist.) 15.11.2012,26.11.2012
2
10. From A-U R&B Road to Mekaladibba (Kalla Mandal W.G.Dist.) 0
Total 13
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 109/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN KRISHNA DISTRICT DURING THE MONTH OF
NOVEMBER 2012
SNO.
PACKAGE NO NAME OF WORK
TPQA INSPECTIONS
DURING THIS MONTHDATES OF VISITS
NO. OF VISITS
1 NCRMP/B-W/AP/RHB/PRED/06/Machilipatnam/002
Road from R&B road to Chikativanipalem 04.11.2012 1
Road from R&B road to B.V.Thota 05.11.2012 1
2 NCRMP/B-W/AP/RHB/PRED/ 06/Machipatnam/001 Road connecting R&B road through Gantlammapalem05.11.201221.11.2012
2
3NCRMP/B-W/AP/RHB/PRED/06/Kruthivennu(M)/003
Road from Intheru ZP road to Rangaraopet 05.11.2012 1
Road from R&B road to Cyclone shelter at Chandala05.11.201220.11.201221.11.2012
3
4 NCRMP/B-W/AP/RCS/PRED/ 06/Machipatnam/001
Road from Chinnapuram R&B road to Gundupalem02.11.201204.11.2012
2
Road from Potalapalem ZP road to Pothepalli04.11.201221.11.2012
2
Road from Bhogireddypalli R&B road to Ramakhandam02.11.201204.11.2012
2
Total 14
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 110/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN GUNTUR DISTRICT DURING THE MONTH OF
NOVEMBER 2012
S NO. PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURING THIS MONTH
DATES OF VISITNO. OF
VISITS
1 NCRMP/B-W/AP/RCS/PRED/07/Karalapalem/002
Road from Ganapavaram R&BRoad to Pedamarpuvaripalem.
09.11.2012 14.11.201221.11.2012 22.11.2012
29.11.2012.5
Road from R&B road toChinapuluguvaripalem
09.11.2012 14.11.201221.11.2012 22.11.2012
29.11.20125
2 NCRMP/B-W/AP/RCS/PRED/07/Nizampatnam/003
Road form R&B Road to
Gurunadhanagar 14.11.2012 1
Road form R&B Road to Adavala H/o Bavajipalem
19.11.2012 1
Road from R & B Road to Atlavaripalem
14.11.2012 1
3 NCRMP/B-W/AP/RCS/PRED/07/Bapatla/003
Road from R & B Road to Adarshnagar.
21.11.2012 1
Road from R & B Road to
Hanumanth nagar.
21.11.2012 1
4 NCRMP/B-W/AP/RHB/PRED/07/Nagaram/001Road from R&B Road toMohammadalipalem.
19.11.2012 1
5 NCRMP/B-W/AP/RCS/PRED/07/Pv palem/001Road from R & B Road Allur to Yadavapalem
21.11.2012 1
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 111/259
6 NCRMP/B-W/AP/Br/R&B/07/Bapatla/010
Reconstruction of HLB @ km 5/2of Bapatla - Suryalanka roadacross perali drain in GunturDistrict.
4.11.2012 1
7 NCRMP/B-W/AP/Br/R&B/07/Bapatla/011
Reconstruction of HLB @ km 2/4of Bapatla - Pandurangapuram
road across perali drain inGuntur District.
4.11.2012 1
8 Phase-II
Bridge in Km 14/6 of Chandolubridge to Nizampatnam road inGuntur district.
4.11.2012 1
Road from R&B road toChandramouli Nagar InNizampatnam Mandal.
4.11.2012 1
TOTAL 21
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 112/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN PRAKASAM DISTRICT DURING THE MONTH
OF NOVEMBER 2012
SNO. PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURINGTHIS MONTH
DATES OF VISIT
NO. OF VISITS
1 NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002 Road from NH5 to Mulaguntapadu02.11.201228.11.2012
2
2 NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002 Road from Pakala R&B road to Mosanaladinne
05.11.201209.11.201214.11.201228.11.2012
4
3 NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002 Road from R&B road to Chalivendradibba 02.11.201209.11.2012
2
4 NCRMP/B-W/AP/RHB/PRED/08/S.Konda/002Road from R&B road to Binginapalli Harijanawada CycloneShelter
09.11.2012 1
5NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/003
Road from R&B Road Allur to M T Raju colony 19.11.2012 1
6NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/004
Road from KEM R & B Road to Pullareddypalem 19.11.2012 1
7NCRMP/B-W/AP/RHB/PRED/08/Kothapatnam/004
Road from KEM R&B Road to Sankuvarigunta 19.11.2012 1
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 113/259
8NCRMP/B-W/APMPCS/PRED/08/NGPadu/003
Kanaparthy cyclone shelter in Naguluppapadu Mandal Prakasamdistrict
21.11.2012 1
9 NCRMP/B-W/AP/RHB/PRED/08/Tangutur/09 Road from R&B road Pellur to Vasepallipadu21.11.2012
25.11.2012
2
10NCRMP/B-W/AP/Br/R&B/08/Kanaparthy/012
Construction of High level Bridge at Km 16/10 of Naguluppapadu – Kanaparthy road in Prakasam District
21.11.201222.11.2012
2
Total 17
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 114/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN NELLORE DISTRICT DURING THE MONTH OF
NOVEMBER 2012
SLNO
Package Number Name of work
TPQA INSPECTIONS
DURING THIS MONTH
DATES OF VISITS
NO. OF VISITS
1NCRMP/B-W/AP/RHB/PRED/09/VIDAVALURU/005
Road from KT R&B road to Alaganipadu to Vavilla 09.11.2012 1
2NCRMP/B-W/AP/RHB/PRED/09/VIDAVALURU/005
Road from R&B road Kancharapalem HW to Alaganipadu. 09.11.2012 1
3NCRMP/B-W/AP/RHB/PRED/09/BOGOLO/RHB/01
Road from NH5 to Sambasiva Puram 15.11.2012 1
4NCRMP/B-W/AP/RHB/PRED/09/RHB/KAVALI/004
Road from5/8 of Chennayapalem Road to Gummadi bandla 15.11.2012 1
5NCRMP/B-W/AP/RHB/PRED/09/RHB/KAVALI/004
Road from Pedattapupalem R&B road to Chennayapalem H.wada 15.11.2012 1
6 NCRMP/B-W/AP/RCS/PRED/09/TADA/009 Providing BT road to Peda Pannam Gadu in Tada Mandal of Nellore Dt. 05.11.2012 1
7 NCRMP/B-W/AP/RCS/PRED/09/TADA/009Road from @ km 56/8 to CK Road to Periyavettu Kuppam CycloneShelter
05.11.2012 1
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 115/259
8NCRMP/B-W/AP/RHB/PRED/09/T.P.Gudur/012
Road from R&B Road C.S. Puram Siva Rama Puram. 21.11.2012 1
9NCRMP/B-
W/AP/RHB/PRED/09/T.P.Gudur/012
Ring Road to T.P.Gudur-Salipeta R&B Road via C.S.Puram and
Mandapam Village
21.11.2012 1
10NCRMP/B-W/AP/RHB/PRED/09/BOGOLO/001
Road from 9/6 of Juvvaladinne R&B Road to 11/0 of Juvvaladinne R&BRoad Via Venkateshpalem
22.11.2012 1
11NCRMP/B-W/AP/RHB/PRED/09V.CHALEM/007
Providing BT Surface to the road from R&B road to Edagali Kandriga 22.11.2012 1
12 NCRMP/B-W/AP/RHB/PRED/09/Muthukur/006
Road from R&B road to Patuvari Kandriga 22.11.2012 1
13NCRMP/B-W/AP/RHB/PRED/09/BOGOLU/001
Road from 1/6 of Zuvvaladinne R&B Road to Tellagunta 22.11.2012 1
Total 13
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 116/259
9.3 Statement Showing the Inspections and Site Visits of Districts during the Month of December -2012
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN SRIKAKULAM DISTRICT DURINGTHE MONTH OF DECEMBER 2012
SNO
.PACKAGE NO NAME OF WORK
TPQA INSPECTIONSDURING THIS MONTH
DATES OF VISIT
NO. OF VISITS
1NCRMP/B-W/AP/MPCS/PRED/01/Santhabommali/005
Construction of Cyclone shelter at Runku in SanthabommaliMandal.
6.12.12,12.12.12,13.12.12,14.12.12,
26.12.12
5
2 NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002Road from Deppuru, Bahadapalli road to Onkuluru & cycloneshelter.
7.12.12 1
3 NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002 Road from NP Road to URK Puram 7.12.12 1
4 NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002 Road from Pollada to Komaralthada &Cyclonic shelter 7.12.12 1
5 NCRMP/B-W/AP/RCS/PRED/01/V.Kotturu/002 Road from R&B ROAD TO Devunalthada 7.12.12 1
6NCRMP/B-W/AP/MPCS/PRED/01/Santhabommali/005
Construction of Cyclone shelter at Kollipadu in SanthabommaliMandal.
6.12.12,11.12.12,13.12.12,14.12.12,25.12.12,26.12.12
6
7 NCRMP/B_W/AP/Br/R&B/01/Bendigedda/004Construction of High level Bridge across Bendigedda at km 4/10 of Pundi-Parlkimidi road in Srikakulam Dist.
11.12.12 1
8 NCRMP/B-W/AP/MPCS/PRED/01/Polaki/006 Road from Talasamudram to Dola regulator
6.12.12,10.12.12,12.12.12,13.12.12,
7
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
14 12 12
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 117/259
14.12.12,15.12.12,18.12.12.
9 NCRMP/B-W/AP/MPCS/PRED/01/Polaki/006Road from Mabagam R&B road to Dubbakavanipeta via
Gajapathinagaram.
10.12.12,
18.12.122
10 NCRMP/B-W/AP/MPCS/PRED/01/Polaki/005Road from R&B road Edullavalasa-Killam to jonnam viaTalasamudram
1.12.12,2.12.12,3.12.12,4.12.12,10.12.12,13.12.12,18.12.12
7
11 NCRMP/B_W/BR/R&B/01/uppigedda/002Construction of HLB across uppigedda at Km 7/6 of Srikakulammunicipal limits to Pukkalapeta
20.12.12,26.12.12
2
12 NCRMP/BW/AP/Br/AR&B/01/Patnavanipeta/001Construction of Bridge at km 11/6-8 of NH-5 to Patnavanipetaconnecting Sundarapalem.
18.12.12 1
TOTAL 36
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 118/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN VIZIANAGARAM DISTRICT DURINGTHE MONTH OF DECEMBER 2012
S
NO.PACKAGE NO NAME OF WORK
TPQA INSPECTIONSDURING THIS MONTH
DATES OF
VISIT
NO. OF
VISITS
1NCRMP/B-W/ AP/ Br/ R&B/ 02/ Chakaligadda
/008
Construction of Minor Bridge at Km 15/2 near Chakaligaddaof Konada Ramatheertham R&B road to Konatalapalem (via)
Yerukonda, Pasupam, Kollayavalasa (ZP Road) in Vizianagaram District.
26.12.12 1
Total 1
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 119/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN VISHAKAPATNAM DISTRICT DURINGTHE MONTH OF DECEMBER 2012
SNO
.PACKAGE NO NAME OF WORK
TPQA INSPECTIONSDURING THIS MONTH
DATES OF
VISIT
NO. OF
VISITS
1 NCRMP/B-W/AP/RCS/PRED/03/Rambilli/004 Construction of cyclone shelter at Venkayyapalem in Rambilli Mandal
3.12.125.12.126.12.1222.12.12
4
2 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002 Construction of cyclone shelter at Mullaparra in Nakkapalli Mandal
3.12.125.12.1214.12.1218.12.1222.12.1229.12.12
6
3NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at Gajapathinagaram inPayakaraopeta Mandal
5.12.1228.12.12
2
4 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002Construction of cyclone shelter at Bangarampeta in NakkapalliMandal
8.12.1214.12.1229.12.12
3
5NCRMP/B-W/AP/MPCS/PRED/03/Payakaraopeta/003
Construction of cyclone shelter at Ratnayampeta in PayakaraopetaMandal
5.12.1228.12.12
2
6 NCRMP/B-W/AP/MPCS/PRED/03/Nakkapalli/002 Construction of cyclone shelter at Patimeeda in Nakkapalli Mandal
3.12.125.12.1214.12.1218.12.1222.12.1229.12.12
6
Total 23
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 120/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN EAST GODAVARI DISTRICT DURINGTHE MONTH OF DECEMBER 2012
S NO. PACKAGE NO NAME OF WORK
TPQA INSPECTIONSDURING THIS MONTH
DATES OF
VISIT
NO. OF
VISITS
1NCRMP/B-W/ AP/RCS/ PRED/04/
KARAPA/001Road from approach road to cyclone shelter at Adivipudi in E.G.Dt. 14.12.2012 Nil
2NCRMP/B-W/ AP/RHB/ PRED/04/
KARAPA/001Road from Gurjanapalli to Bandulavaripalem
14.12.201219.12.2012
Nil
3NCRMP/B-W/AP/RHB/ PRED/04/
Katrenikona/003Road from PR road to Dasarivanipeta and to Cyclone Shelter 08.12.2012 Nil
4
NCRMP/B-W /AP/RCS/PRED/04/Thondangi/004
Road from R&B Road to G.Musalayyapeta CS Nil Nil
5 Road from R&B Road to P.Chodipallipeta CS 08.12.2012 4
6 Road from R&B Road to K.Chodipallipeta CS 08.12.2012 4
7 Road from R&B Road to Hukumpeta CS 08.12.2012 5
8 Road from R&B Road to Gaddipeta CS 08.12.2012 4
9 Road from R&B Road to Danavaipeta CS 08.12.2012 4
10NCRMP/B-W/ AP/MPCS/PRED/04/Thondangi/001
Cyclone Shelter at Avulamanda and of Thondangi Mandal , E.G.Dt.12.12.2012 & 27.12.2012
4
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
12 12 2012
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 121/259
11 Cyclone Shelter at Lakshmanudipeta of Thondangi Mandal, E.G.Dt.12.12.2012,
17.12.2012 & 27.12.2012
6
12NCRMP/B-W/ AP/RCS/
PRED/04/Uppalaguptam/003Road from R&B Road to Chinaraghavulapeta Cyclone Shelter
13.12.2012 & 21.12.2012
2
13NCRMP/B-W/ AP/MPCS/
PRED/04/Uppalaguptam/002Cyclone Shelter at Pedaraghavulapeta of Uppalaguptam Mandal, E.G.Dt.
03.12.2012,04.12.2012,05.12.2012,06.12.2012,08.12.2012,13.12.2012,21.12.20012,
7
TOTAL 22
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN WEST GODAVARI DISTRICT DURING
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 122/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN WEST GODAVARI DISTRICT DURINGTHE MONTH OF DECEMBER 2012
SNO.
PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURINGTHIS MONTH
DATES OF VISITS
NO. OF VISITS
1.
NCRMP/B-W/AP/RHB/PRED/05/Mogalthuru/001
Road from NH 214 A at Ranga Statue centre to Harijanawada of Kalipatnam (E)(Mogalthuru Mandal W.G.Dist.)
- -
2.R&B road at Panchayat Office to Pulaparthivarithota via Badava (MogalthuruMandal W.G.Dist.)
- -
3.Mogalthuru Vempa R&B Road at Uchintha Kalava Bridge to GogulammaHarijanapeta (Mogalthuru Mandal W.G.Dist.)
- -
4.From Narsapur Mogalthuru R&B road to Dayadaldaspeta via Venkateswara Swamytemple (Mogalthuru Mandal W.G.Dist.)
- -
5.Road from NH 214 A road to Harijanapeta of Kothota (Mogalthuru MandalW.G.Dist.)
- -
6.
NCRMP/B-W/AP/RHB/PRED/05/Nasapur/002
R&B Road to Indira nagar (via) Pochamma temple (Narsapur Mandal W.G.Dist.) - -
7. Road from R&B road to Pedalanka (Narsapur Mandal W.G.Dist.) - -
8.Road from LB Cheria CC road to Chillapalem of LB Cheria (Narsapur MandalW.G.Dist.)
- -
9. NCRMP/B-W/AP/RHB/PRED/05/Kalla/003
From A-U R&B Road to Satyanarayanapuram, (Kalla Mandal W.G.Dist.) - -
10. From A-U R&B Road to Mekaladibba (Kalla Mandal W.G.Dist.) - -
Total 0
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Phase - II
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 123/259
Phase - II
1.NCRMP/B-W/AP/RCS/PRED /05/Achanta/002
Road from R&B road to Ayodya lanka Marrimula cyclone shelter. – –
2. NCRMP/B-W/AP/RCS/
PRED/05/Kalla/003
Road from R&B road to Modi Cyclone Shelter – –
3. Road from R&B road to S.C Bose Colony Cyclone Shleter – –
4.NCRMP/B-W/AP/RCS/PRED /05/Bhimavaram/004
Construction of approach road to cyclone shelter in Losari of Bhimavaram Mandal. – –
5.
NCRMP/B-W/AP/RCS/PRED/05/ Mogaltur /005
Road from R&B road to Kothakayalathippa cyclone shelter 19.12.2012 1
6. Road from Narsapur Perupalem R&B road to Mandavarithota 19.12.2012 1
7. Road from Mollaparru R & B road to Mollaparru Patha Colony 19.12.2012 1
8. Road from K.P Palem (N) Panchayat office to Metturevu Palli palem 19.12.2012 1
9.NCRMP/B-W/AP/RCS/PRED /05/Narsapur/006
R&B road to Chinamynavanilanka 15.12.2012 1
10. P.R road to Ramanujapuram 15.12.2012 1
11. Road from P.R road to Prakasapuram 15.12.2012 1
12.NCRMP/B-W/AP/RHB /PRED /05/Kalla/004
K.G. R&B Road to Mamidipudi of Kalawapudi. – –
13.NCRMP/B-W/AP/RHB /PRED/05/Bhimavaram/005
Road from Dongapindi R & B Road to Revu (Pallipalem) in Dongapindi of Bhimavaram Mandal.
– –
14.Road from R & B Road to Sarvodhyanagar (Garivelladibba) H/o Losari of Bhimavaram Mandal.
– –
15.
NCRMP/B-W/AP/RHB/
PRED /05/ Mogaltur /006 Khalipatnam R&B Road to Khalipatnam ferry 19.12.2012 1
16.
NCRMP/B-W/AP/RHB/PRED/05/Mogaltur/007
Road from R & B Road at Metturevu to Parasavari meraka via Kandulapativarimeraka
– –
17.Road from Narasapur Perupalem R &B Road to Janakiram Colony in Andevarimeraka of K.P.Palem (S)
– –
18. Road from Narsapur Perupalem R & B road to Dondaparthivari meraka – –
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from Narsapur Perupalem
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 124/259
19.
NCRMP/B-W/AP/RHB /PRED/05/ Mogaltur/008
Road from Narsapur PerupalemR & B Road to Melamvaripalem Perupalem(S)
20.12.2012 1
20.Road from Perupalem Mollaparru R & B road via Sattinenivarimeraka toK.D.Pallavapalem
20.12.2012 1
21. Road from Perupalem Dibbalapallipalem R & B road to Mellapallavapalem 20.12.2012 1
22.Road from Perupalem beach R & B Road to Challavarimeraka viaMucherlavarimeraka
20.12.2012 1
23.
NCRMP/B-W/AP/RHB/PRED/05/ Mogaltur /009
Road from Perupalem R&B road to Dindla – –
24.Road from Narsapur Perupalem R & B road to Nellipallipalem via Ambedkar colonyHarijanapeta
– –
25. Road from Perupalem R & B Road to Kouruvaripalem – –
26.
NCRMP/B-W/AP/ RHB
/PRED/05/ Narsapur /010
Road from SP R&B road to Pasaladeevi 26.12.2012 1
27. LT R&B road to Modi 26.12.2012 1
28. SP R&B road to Gannabathulavari palem of Chamakuripalem 26.12.2012 1
29.
NCRMP/B-W/AP/RHB/PRED/05/Narsapur/012
Road from R&B road to SC Colony of Pedalanka 15.12.2012 1
30. R&B road to Rajeev Nagar of Darbharevu 15.12.2012 1
31. SP R&B road to Pedathota of Turputallu 15.12.2012 1
32. R&B road to Peta of Turputallu 15.12.2012 1
33. R&B road to Pedathota of Turputallu 15.12.2012 1
34.
NCRMP/B-W/AP/RHB/PRED/05/Narsapur/013
R&B road to Guttulavarimeraka 26.12.2012 1
35. Road from R & B Road to Pulaparthivaripalem 26.12.2012 1
36. R&B road to Pedaedigapalem 26.12.2012 1
37. R&B road to Evanivarimeraka 26.12.2012 1
38. NCRMP/B-W/AP/RHB/ Road from PR Road to Prakashpuram SC colony of Vemuladeevi(E) 26.12.2012 1
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
PRED /05/Narsapur/014 Road from PR road to Vemuladeevi (E) colony (Via) Ralla cheruvu of Vemuladeevi
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 125/259
39.PRED /05/Narsapur/014 Road from PR road to Vemuladeevi (E) colony (Via) Ralla cheruvu of Vemuladeevi
(E)26.12.2012 1
40. Road from PR road to Addalavarimeraka of Vemuladeevi(E) – –
41. NCRMP/B-W/AP/MPCS/PRED/05/ Narsapur/001
Sardupalli Palem of Vemuladeevi – –
42. Pedamynavani lanka – –
43. NCRMP/B-W/AP/MPCS/PRED/05/ Narsapur/003
Chinamynavani lanka – –
44. Vemuladeevi East – –
45. NCRMP/B-W/AP/MPCS/PRED/05/Mogalturu/002
Yetimondi of Perupalem – –
46. Bellamkondavarimeraka – –
Total 26
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN KRISHNA DISTRICT DURING THE
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 126/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN KRISHNA DISTRICT DURING THEMONTH OF DECEMBER 2012
SNO.
PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURINGTHIS MONTH
DATES OF
VISITS
NO. OF
VISITS
1 NCRMP/B-W/AP/RHB/PRED/06/Machil ipatnam/002Road from R&B road to Chikativanipalem 04.12.2012 1
Road from R&B road to B.V.Thota 05.12.2012 1
2 NCRMP/B-W/AP/RHB/PRED/ 06/Machipatnam/001Road connecting R&B road throughGantalammapalem
05.12.2012 1
3 NCRMP/B-W/AP/RCS/PRED/ 06/Machipatnam/001
Road from Chinnapuram R&B road toGundupalem
06.12.2012 1
Road from Potlapalem ZP road to Potepalli 04.12.2012 1
Road from Bhogireddypalli R&B road toRamakhandam 06.12.2012 1
4 NCRMP/B-W/AP/RHB/ PRED/06/Bandar/016
Road from R&B Road Satravapalem toJonnalavarimodi
12.12.2012 1
Road From R&B road tallapalem to Pallipalem 12.12.2012 1
5 NCRMP/B-W/AP/RHB/ PRED/06/Bandar/017
Road from R&B road to Kamsalipalem 12.12.2012 1
Road from Gokavaram R&B road to Sathenapalem 12.12.2012 1
Road from R&B road Jonnalavanipalem to Vuchalvanipalem via Thallapalem
12.12.2012 1
6 NCRMP/B-W/AP/RHB/ PRED/06/Bandar/018
Road From Peddapatnam R&B road toSajjavaripalem
12.12.2012 1
Road from Thallapalem R&B road to Beach Area 12.12.2012 1
Road from Pedapatnam R&B road to Thalapalem 12.12.2012 1
7 NCRMP/B-W/AP/RHB/ PRED/06/Bandar/019Road from R&B road Potlapalem to ChinnaPothepalli
12.12.2012 1
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road From R&B road to Marridibba 12 12 2012 1
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 127/259
Road From R&B road to Marridibba 12.12.2012 1
Road From Peddapatnam R &B road to Vannaru Village Via Kannuru
12.12.2012 1
8 NCRMP/B-W/AP/RCS/ PRED/06/MACHILIPATNAM/008Kammavanicheruvu R&B Road to VenkataDurgambapuram in Bandar Mandal
19.12.2012 1
9 NCRMP/B-W/AP/RCS/ PRED/06/MACHILIPATNAM/010
Raod from R&B Road Karagraharam to Pallipalem 19.12.2012 1
Road from R&B Road Kammavanicheruvu to KPTPalem
19.12.2012 1
Road from R&B Road Kammavanicheruvu toMalakayalanka
19.12.2012 1
Road from R&B road Pallithumalapalem toNelithippa
19.12.2012 1
10 NCRMP/B-W/AP/RHB/ PRED/06/Machilipatnam/020
Road from Gokavaram R&B road to Vodarevupalem
20.12.2012 1
Road from Gokavaram R&B road to
Badugovanipalem
20.12.2012 1
Road from R&B road Thallapalem to Rayapalli 20.12.2012 1
Road from Mangenepudi R&B road toPathareddypalem
20.12.2012 1
11 NCRMP/B-W/AP/RCS/ PRED/06/Nagayalanka/003
Road from R&B road to Ramakrishnapuram R&Broad via Pahaupakali
28.12.2012 1
R&B Road to Cyclone Shelter at Kothaupakali 28.12.2012 1
12 NCRMP/B-W/AP/RCS/ PRED/06/Nagayalanka/004 From R&B road Bhavadevarapalli 28.12.2012 1
13 NCRMP/B-W/AP/RCS/ PRED/06/Nagayalanka/005
Road From R&B Road to Cyclone Shelter atPedapalem
28.12.2012 1
Road from Gullalamoda R&B road to Etimoga 28.12.2012 1
Road from R&B to Cyclone Shelter at ChinaEtimoga
28.12.2012 1
Road from R&B to Cyclone Shelter at ChinaKammavaripalem
28.12.2012 1
14 NCRMP/B-W/AP/RHB/ PRED/06/Nagayalanka/009 Road from R&B Road to Kommanamolu Village 28.12.2012 1
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Road from R&B Road to Nandyalavanidibba 28 12 2012 1
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 128/259
Road from R&B Road to Nandyalavanidibba 28.12.2012 1
Road from R&B Road to Pedakammavaripalem 28.12.2012 1
15 NCRMP/B-W/AP/RHB/ PRED/06/Nagayalanka/010Road from R&B Road to Indiramma Tank 28.12.2012 1
Road from R&B Road to MPUP School 28.12.2012 1
Total 38
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 129/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN GUNTUR DISTRICT DURING THEMONTH OF DECEMBER 2012
SNO. PACKAGE NO NAME OF WORK
TPQA INSPECTIONSDURING THIS MONTH
DATES OF VISIT
NO. OF VISITS
1
NCRMP/B-W/AP/RCS/PRED/07/Karalapalem/002
Road from Ganapavaram R&B Road to Pedamarpuvaripalem.
4.12.2012,10.12.2012,12.12.2012,14.12.2012,18.12.2012,19.12.2012,27.12.2012.
7
Road from R&B road to chinapuluguvaripalem
4.12.2012,10.12.2012,13.12.2012,14.12.2012,18.12.2012,19.12.2012,27.12.2012.
7
Road from Ganapavaram PR Road to Bonthagoralapalem.8.12.2012,12.12.2012.
2
2
NCRMP/B-W/AP/Br/R&B/07/Bapatla/010
Reconstruction of HLB @ km 5/2 of Bapatla - Suryalanka road
across perali drain in Guntur District. 10.12.2012 1
NCRMP/B-W/AP/Br/R&B/07/Bapatla/011Reconstruction of HLB @ km 2/4 of Bapatla - Pandurangapuram
road across perali drain in Guntur District.10.12.2012 1
NCRMP/B-W/AP/RCS/PRED/07/Pv palem/001 Road from R & B Road Allur to Yadavapalem 12.12.2012 1
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
Phase II Const ction of C clone shelto at Ha bo of Ni ampatnam 22 12 2012 1
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 130/259
3
Phase-II Construction of Cyclone sheltor at Harbour of Nizampatnam. 22.12.2012 1
Road from R&B Road to Gattuvaripalem inNagaram mandal(RHB).
22.12.2012 1
4Construction of Cyclone sheltor at Padamativeedi of Nizampatnam
village (Tybe c).
22.12.2012 1
5Construction of Cyclone sheltor near MRO's office of Nizampatnam (Tybe B)
22.12.2012 1
6Construction of Cyclone sheltor at fishermen colony of Nizampatnam (Tybe C).
22.12.2012 1
7 Road from krosurivari palem Road to Marakavaripalem (RCS). 22.12.2012 1
8
Road from R&B Road to Balavaripalem upto Gajulavaripalem inNizampatnam mandal. (RHB)
22.12.2012 1
Road from Gowdapalem to Mallevaripalem in Perli village inKarlapalem Mandal 27.12.2012 1
Road from Komali to Nagarajupalli in P.V.Palem Mandal 27.12.2012 1
Road from Muthayapalem to Venkatalaksmipuram in BapatlaMandal 27.12.2012 1
Road from Chandole R&B road to Kothapalem in P.V.PalemMandal 27.12.2012 1
Road from Bethapudi to Stuvartupuram in Bapatla Mandal 27.12.2012 1
Road from NH 214 to Dandubata (via) M.V.Rajupalem inKarlapalem Mandal 27.12.2012 1
TOTAL 32
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN PRAKASAM DISTRICT DURING THE
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 131/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN PRAKASAM DISTRICT DURING THEMONTH OF DECEMBER 2012
SNO.
PACKAGE NO NAME OF WORK
TPQA INSPECTIONS DURINGTHIS MONTH
DATES OF VISITNO. OF
VISITS
1NCRMP/B-W/AP/RHB/PRED/
08/S.Konda/002Road from NH5 to Mulaguntapadu 20.12.2012 1
2NCRMP/B-W/AP/RHB/PRED/
08/S.Konda/002Road from Pakala R&B road to Mosanaladinne 20.12.2012 1
3NCRMP/B-W/AP/RHB/PRED/
08/S.Konda/002Road from R&B road to Chalivendradibba
13.12.201220.12.2012
2
4NCRMP/B-W/AP/RHB/PRED/
08/S.Konda/002Road from R&B road to Binginapalli Harijanawada Cyclone Shelter 13.12.2012 1
5NCRMP/B-W/AP/RHB/PRED/
08/Kothapatnam/003Road from R&B Road Allur to M T Raju colony
04.12.201219.12.201228.12.2012
3
6NCRMP/B-W/AP/RHB/PRED/
08/Kothapatnam/004Road from KEM R & B Road to Pullareddypalem
04.12.201213.12.201224.12.201228.12.2012
4
7NCRMP/B-W/AP/RHB/PRED/
08/Kothapatnam/004Road from KEM R&B Road to Sankuvarigunta
04.12.201213.12.201228.12.2012
3
8NCRMP/B-W/APMPCS/PRED/
08/NGPadu/003Kanaparthy cyclone shelter in Nagulappapadu mandal Prakasamdistrict
05.12.201224.12.201228.12.2012
3
9 NCRMP/B-W/AP/RHB/PRED/08/Tangutur/09 Road from R&B road Pellur to Vasepallipadu
04.12.2012
24.12.201228.12.2012
3
10NCRMP/B-W/AP/Br/R&B/
08/Kanaparthi/012Construction of High level Bridge at Km 16/10 of Naguluppalapadu –Kanaparthi road in Prakasam District
24.12.201228.12.2012
2
Total 23
QUARTERLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 132/259
STATEMENT SHOWING THE NUMBER AND DATES OF TPQA INSPECTIONS IN NELLORE DISTRICT DURING THEMONTH OF DECEMBER 2012
SLNO Package Number Name of work
TPQA INSPECTIONSDURING THIS MONTH
DATES OF VISITS
NO. OF VISITS
1NCRMP/B-W/AP/RHB/PRED/
09/VIDAVALURU/005Road from KT R&B road to Allaganipadu to vavilla
08.12.2012,20.12.2012,29.12.2012
3
2NCRMP/B-W/AP/RHB/PRED/
09/VIDAVALURU/005Road from R&B road Kancharlapalam HW to Alaganipadu.
07.12.201208.12.2012,15.12.2012,20.12.2012
29.12.2012
5
3NCRMP/B-W/AP/RCS/PRED/
09/KAVALI/006Road Connecting R&B Road through Voturu Village in SPSR NelloreDistrict
20.12.2012,28.12.2012
2
4NCRMP/B-W/AP/RCS/PRED/
09/TADA/009Providing BT road to Peda Pannam Gadu in Tada Mandal of NelloreDt.
03.12.2012,14.12.2012,18.12.2012
3
5NCRMP/B-W/AP/RCS/PRED/
09/TADA/009Road from @ km 56/8 to CK Road to Periyavettu Kuppam CycloneShelter
03.12.2012,14.12.2012,18.12.2012
3
Total 16
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 133/259
In Joint Venture
Photo Presentation byThird Party Quality Audit
Consultant
of AP NCRMP Works
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 134/259
Page 133 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 135/259
Page 134 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 136/259
Page 135 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 137/259
Page 136 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 138/259
Page 137 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 139/259
Page 138 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 140/259
Page 139 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 141/259
Page 140 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 142/259
Page 141 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 143/259
Page 142 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 144/259
Page 143 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 145/259
Page 144 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 146/259
Page 145 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 147/259
Page 146 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 148/259
Page 147 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 149/259
Page 148 of 258
PD, SPIU,NCRMP’s inspection on 15-10-2012,Phase-II.Bridge
across Buckingham canal at Km.26/3 of Rajupalem - Iskapalli
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 150/259
Page 149 of 258
PD, SPIU,NCRMP’s inspection on 15-10-2012,Phase-II.Bridge
across Buckingham canal at Km.26/3 of Rajupalem - Iskapalli
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 151/259
Page 150 of 258
PD, SPIU,NCRMP’s inspection on 15-10-2012Construction of High level bridge at Km 7/2 of road from M.C.road to
Juvvaladinne via Mungamur in Nellore District
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 152/259
g
Page 151 of 258
PD, SPIU,NCRMP’s inspection on 15-10-2012Construction of High level bridge at Km 7/2 of road from M.C.road to
Juvvaladinne via Mungamur in Nellore District
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 153/259
g
Page 152 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 154/259
Page 153 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 155/259
Page 154 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 156/259
Page 155 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 157/259
Page 156 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 158/259
Page 157 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 159/259
Page 158 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 160/259
Page 159 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 161/259
Page 160 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 162/259
Page 161 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 163/259
Page 162 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 164/259
Page 163 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 165/259
Page 164 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 166/259
Page 165 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 167/259
Page 166 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 168/259
Page 167 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 169/259
Page 168 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 170/259
Page 169 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 171/259
Page 170 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 172/259
Page 171 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 173/259
Page 172 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 174/259
Page 173 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 175/259
Page 174 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 176/259
Page 175 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 177/259
Page 176 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 178/259
Page 177 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 179/259
Page 178 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 180/259
Page 179 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 181/259
Page 180 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 182/259
Page 181 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 183/259
Page 182 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 184/259
Page 183 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 185/259
Page 184 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 186/259
Page 185 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 187/259
Page 186 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 188/259
Page 187 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 189/259
Page 188 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 190/259
Page 189 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 191/259
Page 190 of 258
TPQA inspection of Providing BT road to Peda Pannam
Gadu in Tada Mandal of Nellore Dt on 03.12.2012.
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 192/259
HT Electric line crossing GSB layer thickness checking
View of CC road and electric
pole very close to CC road
View of CC road
Page 191 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 193/259
Page 192 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 194/259
Page 193 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 195/259
Page 194 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 196/259
Page 195 of 258
TPQA-NCRMP Inspection of Talasamudram road on 02-12-12 in Srikakulam
District. Sieve analysis for WBM GR II collections from km 5/000 to 5/670.
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 197/259
Page 196 of 258
TPQA-NCRMP Inspection of Talasamudram road on 03-12-12 in
Srikakulam District.WBM GR II is in progress from km 5/000 to
5/670.
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 198/259
Page 197 of 258
TPQA-NCRMP Inspection of Talasamudram road on 07-12-12 in
Srikakulam District.WBM GR II completed from km 5/000 to
5/670.
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 199/259
Page 198 of 258
NCRMP-TPQA inspection of Road from R&B road Kancharapalem
HW to Alaganipadu of Nellore Dt on 03.12.2012.
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 200/259
View of road dam Collection of GSB
Checking of road dam width GSB layer thickness checking
Page 199 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 201/259
Page 200 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 202/259
Page 201 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 203/259
Page 202 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 204/259
Page 203 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 205/259
Page 204 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 206/259
Page 205 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 207/259
Page 206 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 208/259
Page 207 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 209/259
Page 208 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 210/259
Page 209 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 211/259
Page 210 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 212/259
Page 211 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 213/259
Page 212 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 214/259
Page 213 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 215/259
Page 214 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 216/259
Page 215 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 217/259
Page 216 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 218/259
Page 217 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 219/259
Page 218 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 220/259
Page 219 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 221/259
Page 220 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 222/259
Page 221 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 223/259
Page 222 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 224/259
Page 223 of 258
PM,TPQA NCRMP inspection of Road from R&B roadKancharapalem HW to Alaganipadu of SPSR Nellore Dt on
15.12.2012
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 225/259
View of GSB layerView of GSB layer
GSB layer thickness checking GSB layer thickness checking
Page 224 of 258
PM,TPQA NCRMP inspection of Road from R&B roadKancharapalem HW to Alaganipadu of SPSR Nellore Dt on
15.12.2012
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 226/259
View of GSB layer GSB layer thickness checking
View of road dam Erection of project information board
Page 225 of 258
TPQA-NCRMP Inspection of Talasamudram road on 02-
12-12 in Srikakulam District. Prime coat applied on WBM
GR III surface.
TPQA-NCRMP Inspection of Talasamudram road on 02-
12-12 in Srikakulam District.OGPC+Seal coat work is in
progress.
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 227/259
TPQA-NCRMP Inspection of Talasamudram road on 02-
12-12 in Srikakulam District.Temprature verification forseal coat mix at site.
TPQA-NCRMP Inspection of Talasamudram road on 02-
12-12 in Srikakulam District. Bitumen extraction test
conducting at site.
Page 226 of 258
TPQA-NCRMP Inspection of Talasamudram road on 04-
12-12 in Srikakulam District. Thickness verification of
OGPC+seal coat layer.
TPQA-NCRMP Inspection of Talasamudram road on 04-
12-12 in Srikakulam District. Thickness verification of
OGPC+Seal coat layer.
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 228/259
TPQA-NCRMP Inspection of Talasamudram road on 04-
12-12 in Srikakulam District. Sample collected to conductBitumen extraction test at site.
TPQA-NCRMP Inspection of Talasamudram road on 04-
12-12 in Srikakulam District. Bitumen extraction testconducting at site.
Page 227 of 258
TPQA-NCRMP Inspection of Talasamudram road on 05-
12-12 in Srikakulam District. OGPC laying work is in
progress.
TPQA-NCRMP Inspection of Talasamudram road on 05-
12-12 in Srikakulam District. Seal coat laying work is in
progress.
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 229/259
TPQA-NCRMP Inspection of Talasamudram road on 05-
12-12 in Srikakulam District. Carriageway way widthverified at site.
TPQA-NCRMP Inspection of Talasamudram road on 05-
12-12 in Srikakulam District.WBM GR II is in progressfrom km 5/000 to 5/670.
Page 228 of 258
TPQA-NCRMP Inspection of Dola regulator road in
Srikakulam District. Temperature verification at the time
of OGPC laying.
TPQA-NCRMP Inspection of Dola regulator road in
Srikakulam District.Temprature verification of OGPC.
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 230/259
TPQA-NCRMP Inspection of Dola regulator road in
Srikakulam District. Thickness verification of OGPC+Seal
coat layer.
TPQA-NCRMP Inspection of Dola regulator road in
Srikakulam District. Carriage way width verification.
Page 229 of 258
TPQA-NCRMP Inspection of Dola regulator road in
Srikakulam District.
TPQA-NCRMP Inspection of Dola regulator road in
Srikakulam District.
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 231/259
TPQA-NCRMP Inspection of Talasamudram road on 03-
12-12 in Srikakulam District. Bitumen extraction test.
Page 230 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 232/259
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 233/259
Page 232 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 234/259
Page 233 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 235/259
Page 234 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 236/259
Page 235 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 237/259
Page 236 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 238/259
Page 237 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 239/259
Page 238 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 240/259
Page 239 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 241/259
Page 240 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 242/259
Page 241 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 243/259
Page 242 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 244/259
Page 243 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 245/259
Page 244 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 246/259
Page 245 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 247/259
Page 246 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 248/259
Page 247 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 249/259
Page 248 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 250/259
Page 249 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 251/259
Page 250 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 252/259
Page 251 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 253/259
Page 252 of 258
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 254/259
Page 253 of 258
TPQA-NCRMP Inspection of Runku shelter on 27-10-12 in
Srikakulam District. Sand sieve analysis test conducting at
site
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 255/259
TPQA-NCRMP Inspection of Runku shelter on 17-11-12 in
Srikakulam District. Stone dust sieve analysis testconducting at site.
Page 254 of 258
TPQA-NCRMP Inspection of Runku shelter on 08-12-12 in
Srikakulam District. Plinth beam sand filling work is in
progress.
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 256/259
TPQA-NCRMP Inspection of Runku shelter on 08-12-12 in
Srikakulam District. Plinth beam sand filling work is in
progress.
Page 255 of 258
TPQA-NCRMP inspection on 28-11-2012.
MPCS at Gajapathinagaram in
Visakhapatnam
Ready or concreting
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 257/259
Sieve analysis for CA Fine aggregate material test
Page 256 of 258
TPQA-NCRMP inspection on 28-11-2012.
MPCS at Gajapathinagaram in
Visakhapatnam District.Concrete temperature checking
Fine aggregate silt content test
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 258/259
Concrete Slump test Concrete Slump test
Page 257 of 258
TPQA-NCRMP inspection on 28-12-2012.
MPCS at Gajapathinagaram inVisakhapatnam District
1st floor brick work is in progress.
7/30/2019 Quarterly Report - Oct 2012 to Dec 2012
http://slidepdf.com/reader/full/quarterly-report-oct-2012-to-dec-2012 259/259
1st floor brick work is in progress.1st floor brick work is in progress.