Quarry Rejuvenation
Our Aim
The goal of our project was to discourage trespassing in an
abandoned and dangerous quarry. We decided that the best way to go
about this was to take any part of the quarry that was not in use and ‘invite
the community in’.
Our Testing.
• Our samples we put through a series of tests. From these we got a table of results.
• From these we could tell which type of fish and plants we could use to populate the quarry in the future.
Soil Tests
pH Tests of Soil
Sample from… pH
Track to Lagoons 6
Bank at Entrance to Quarry 5
Silt from Lagoon 2 5
Humus Levels of Soil
Sample from… Humus %age
Track to Lagoons 1.3%
Bank at Entrance to Quarry 1.4%
Silt from Lagoon 2 0.7%
Water Tests
pH Tests Of Water
Sample from… pH
Lagoon 1, Sample A 6
Lagoon1, Sample B 6
Lagoon1, Sample C 6
Lagoon 2 7
Small Pool 6.5
Nitrate Levels Of Water
Sample from… Nitrate Levels (mg/l)
Lagoon 1 0.6
Lagoon 2 2.1
Small Pool 4.2
Water Tests (continued) Amount of Insoluble Substances in Water
Sample from…` Amount of insoluble substances (g/cl3)
Lagoon 1, Sample A 0.01
Lagoon1, Sample B 0.02
Lagoon1, Sample C 0.00
Lagoon 2 0.03
Small Pool 0.01
Amount of Soluble Substances in Water
Sample from… Amount of soluble substances (g/cl3)
Lagoon 1, Sample A 0.01
Lagoon1, Sample B 0.01
Lagoon1, Sample C 0.01
Lagoon 2 0.01
Small Pool 0.00