QUANTITY SHEET : Estimator : Yanichi S Estimate : : Extention : Sheet : 1 : Kurniawan Checker : Ivan S Date : 16 /08 /2015 : Pengali Kode 1.00 p = 42,000 m Pembersihan lahan l = 14,000 m [( 42m x 14m = 588 m²)] 588,000 m² 2 p = 42,000 m 2 l = 14,000 m 112,000 m' 2 p = 34,000 m 2 l = 6,000 m 80,000 m' p = 3,000 m l = 3,000 m 9,000 m² 2.00 p = 1,800 m l = 1,800 m t = 0,850 m 18 vol 1 pondasi = 2,754 m 3 49,572 m 3 p = 2,200 m l = 0,800 m t = 0,600 m 25 vol 1 sloof = 1,056 m 3 26,400 m3 Total galian tanah 75,972 m 3 49,572m³ + 26,4m³ p = 1,800 m l = 1,800 m t = 0,200 m 18 vol = 0,648 m 3 11,664 m 3 p = 1,800 m l = 1,800 m t = 0,200 m 18 vol = 0,648 m 3 11,664 m 3 1.4 [(2 x 34m) + (2x6m) = 80m'] Pembuatan gudang bahan sementara 2.2 Pek. Galian tanah sloof ( lebar sloof ditambah 30 cm di kedua sisinya untuk space pekerja) Keterangan 1. PEKERJAAN PERSIAPAN Project Location Engineer Classification Dimensi Hasil 1.1 1.3 Pembuatan pagar sementara dari seng gelombang tinggi 2 m [( 2x42m)+(2x14m) = 112m'] Pemasangan bouwplank (bouwplank diambil 1 m dari as pondasi terluar) [(2 x 34m) + (2x6m) = 80m'] Pek. Galian tanah pondasi (lebar pondasi ditambah 30 cm di keempat sisinya untuk space pekerja). Pek. pemadatan pasir bawah pondasi 2.4 [(1,8m x 1,8m x 0,2m) x 18 = 11,664 m³] [(2,2m x 0,8m x 0,6m)x 25 = 26,4 m³] 2. PEKERJAAN TANAH 2.1 [(1,8m x 1,8m x0,85m) x 18 = 49,572 m³] 2.3 Pek. urugan pasir bawah pondasi [(1,8m x 1,8m x 0,2m) x 18 = 11,664 m³] 1.2

quantity sheet

Embed Size (px)

DESCRIPTION

contoh quantity sheet

Citation preview

QUANTITY SHEET

: Estimator : Yanichi S Estimate :

: Extention : Sheet : 1

: Kurniawan Checker : Ivan S Date : 16 /08 /2015

:

Pengali Kode

1.00

p = 42,000 m Pembersihan lahan

l = 14,000 m [( 42m x 14m = 588 m²)]

588,000 m²

2 p = 42,000 m

2 l = 14,000 m

112,000 m'

2 p = 34,000 m

2 l = 6,000 m

80,000 m'

p = 3,000 m

l = 3,000 m

9,000 m²

2.00

p = 1,800 m

l = 1,800 m

t = 0,850 m

18vol 1

pondasi =2,754 m

349,572 m

3

p = 2,200 m

l = 0,800 m

t = 0,600 m

25 vol 1 sloof =1,056 m

326,400 m3

Total galian tanah

75,972 m3

49,572m³ + 26,4m³

p = 1,800 m

l = 1,800 m

t = 0,200 m

18 vol = 0,648 m3

11,664 m3

p = 1,800 m

l = 1,800 m

t = 0,200 m

18 vol = 0,648 m3

11,664 m3

1.4

[(2 x 34m) + (2x6m) = 80m']

Pembuatan gudang bahan sementara

2.2Pek. Galian tanah sloof ( lebar sloof ditambah 30 cm di

kedua sisinya untuk space pekerja)

Keterangan

1. PEKERJAAN PERSIAPAN

Project

Location

Engineer

Classification

Dimensi Hasil

1.1

1.3

Pembuatan pagar sementara dari seng gelombang

tinggi 2 m

[( 2x42m)+(2x14m) = 112m']

Pemasangan bouwplank (bouwplank diambil 1 m dari

as pondasi terluar)

[(2 x 34m) + (2x6m) = 80m']

Pek. Galian tanah pondasi (lebar pondasi ditambah 30

cm di keempat sisinya untuk space pekerja).

Pek. pemadatan pasir bawah pondasi2.4

[(1,8m x 1,8m x 0,2m) x 18 = 11,664 m³]

[(2,2m x 0,8m x 0,6m)x 25 = 26,4 m³]

2. PEKERJAAN TANAH

2.1

[(1,8m x 1,8m x0,85m) x 18 = 49,572 m³]

2.3Pek. urugan pasir bawah pondasi

[(1,8m x 1,8m x 0,2m) x 18 = 11,664 m³]

1.2

QUANTITY SHEET

: Estimator : Yanichi S Estimate :

: Extention : Sheet : 2

: Kurniawan Checker : Ivan S Date : 16 /08 /2015

:

p = 2,800 m

l = 0,800 m

t = 0,150 m

25 vol = 0,336 m3

8,400 m3

p = 2,800 m

l = 0,800 m

t = 0,150 m

25 vol = 0,336 m3

8,400 m3

Volume total urugan pasir

20,064 m3

11,664m³ + 8,4m³

p = 1,800 m Vol. lantai kerja pondasi

l = 1,800 m (1PC : 3 PB : 5Kr)

t = 0,050 m

18 vol = 0,162 m3

2,916 m3

p = 2,800 m Vol lantai kerja sloof 5 cm

l = 0,800 m (1PC : 3 PB : 5Kr)

t = 0,050 m

25 vol = 0,112 m3

2,800 m3

Vol total lantai kerja

5,716 m3

2,916 m3 + 2,8m3

p = 1,200 m Vol plat pondasi

l = 1,200 m

t = 0,200 m

18 vol = 0,288 m3

5,184 m3

p = 3,600 m Vol Sloof

l = 0,200 m

t = 0,400 m

25 vol = 0,288 m3

7,200 m3

p = 0,400 m Vol kolom di dalam tanah

l = 0,400 m

t = 0,400 m

18 vol = 0,064 m3

1,152 m3

Project

Location

Engineer

Classification

[(1,8m x 1,8m x 0,05) x 18 = 11,664 m³]

Pek. pemadatan pasir bawah sloof2.6

[(2,8m x 0,8m x 0,15m)x 25 = 8,4 m³]

[(2,8m x 0,8m x 0,05m)x 25 = 2,8 m³]

[(1,2m x 1,m x 0,2 ) x 18 = 5,184 m³]

[(3,6m x 0,2m x 0,4m ) x 25 = 7,2 m³]

2.5Pek. urugan pasir bawah sloof

[(2,8m x 0,8m x 0,15m)x 25 = 8,4 m³]

[(0,4m x 0,4m x 0,4m) x 18 = 1,152 m³]

QUANTITY SHEET

: Estimator : Yanichi S Estimate :

: Extention : Sheet : 3

: Kurniawan Checker : Ivan S Date : 16 /08 /2015

:

Pek. Urugan kembali 2.7

36,656 m3

Pek. pemadatan tanah 2.8

36,656 m3

Pek. Buang Tanah Sisa Galian 2.9

39,316 m3 ( 75,972 m³ - 36,656 m³ )

3. PEKERJAAN BETON BERTULANG 3.00

3.1. Pek. Plat pondasi 3.10

p = 1,800 m Pengecoran lantai kerja plat pondasi

l = 1,800 m (1PC : 3 PB : 5Kr)

t = 0,050 m

18 vol = 0,162 m³ 2,916 m³

18/ 7/ 2/ l = 1,276 m Pembesian tulangan atas D13 pondasi

vol pek = 321,552 m' n = [(1200 - 80) / 200] + 1 = 7 tulangan

w = 1,040 kg/m' l = 1200 - 80 + 2 x 78 = 1276 mm

334,414 kg vol besi = 321,552m' x 1,040 kg/m'= 334,414 kg

18/ 9/ 2/ l = 1,312 m Pembesian tulangan bawah D16 pondasi

vol pek = 425,088 m' n=[(1200-80) / 150] + 1 = 9 tulangan

w = 1,580 kg/m' l= 1200 - 80 + 2 x 96 = 1312mm

671,639 kg vol besi = 425,088m' x 1,580 kg/m'= 671,639kg

p = 1,200 m Bekisting Plat Pondasi

t = 0,200 m (1,2m x 0,2m) x 4 x 18 = 17,28 m²

4/ 18/ luas = 0,240 m2

17,280 m2

p = 1,200 m

l = 1,200 m (1 PC : 1,5 PB : 2,5 BP)

t = 0,200 m

18 vol = 0,288 m3

5,184 m3

3.20

p = 2,800 m Pengecoran lantai kerja sloof 3.2.1

l = 0,800 m (1PC : 3 PB : 5Kr)

t = 0,050 m

25 vol = 0,112 m3

2,800 m3

[(1,2m x 1,m x 0,2m ) x 18 = 5,184 m³]

Project

Location

Engineer

Classification

(75,972 m³ - 20,064 m³ - 5,716 m³ - 5,184 m³ - 7,2 m³ -

1,152 m³)

(1,8 m x 1,8 m x 0,05 m)x 18 = 2,916 m³

(75,972 m³ - 20,064 m³ - 5,716 m³ - 5,184 m³ - 7,2 m³ -

1,152 m³)

Pengecoran plat pondasi dengan campuran 3.1.5

(2,8m x 0,8m x 0,05m x 25) = 2,8 m³

3.1.1

3.1.4

3.1.3

3.1.2

3.2 Pek. Beton sloof

QUANTITY SHEET

: Estimator : Yanichi S Estimate :

: Extention : Sheet : 4

: Kurniawan Checker : Ivan S Date : 16 /08 /2015

:

p = 3,600 m Bekisting sloof

t = 0,400 m (3,6 m x 0,4 m) x 2 x 25 = 72 m2

2/ 25/ luas = 1,440 m2

72,000 m2

l total = 487,040 m Pembesian tulangan sloof D16

w = 1,578 kg/m' lx =[ 32m + (40 x 0,016m x 2 x 4)] x 8 = 296,96 m

768,549 kg ly =[ 4m + (2 x 40 x 0,016m)] x 36 = 190,08 m

vol besi= 487,04 m x 1,578 kg/m' = 768,549kg

625 l = 1,030 m Pembesian tulangan sengkang Ø8 sloof

vol pek = 643,750 kg/m' l = (0.32m x 2)+(0.12m x 2)+(2 x 0.075m) = 1,03m

w = 0,395 kg/m' n= 25 x [(4m - 0.4m ) / (0.15m + 1)] = 625 buah

254,281 kg vol besi= 1,030m x 0,395 kg/m' x 625 = 254,281 kg

p = 3,600 m Pengecoran sloof dengan campuran

l = 0,200 m (1 PC : 1,5 PB : 2,5 BP)

t = 0,400 m

25 vol = 0,288 m3

7,200 m3

3.30

p = 1,600 m Bekisting kolom

t = 0,400 m (1,6 m x 0,4 m) x 4 x 18 = 46,080 m2

4/ 18/ luas = 0,640 m2

46,080 m2

18/ 8/ l = 2,453 m Pembesian tulangan D19 kolom

vol pek = 353,232 kg l= 1.6m 0.04m+(2/3 x 0.2m)+(40 x 0,019m)=2,453

w = 2,230 kg/m' n = 8 x 18 = 144

787,707 kg vol besi= 2,453m x 2,230 kg/m' x 18 x 8 = 787,707kg

18/ 12/ l = 1,430 m Pembesian tulangan sengkang Ø8 kolom

vol pek = 308,880 kg l= (0,32m x 4) + (0,075m x 2) =1,43m

w = 0,395 kg/m' n= ( 1.6 - 0.04 ) / 0.15 + 1 = 12

122,008 kg vol besi=1,43m x 0,395 kg/m' x 18 x 12=122,01kg

p = 0,400 m Pengecoran dengan campuran

l = 0,400 m (1 PC : 1,5 PB : 2,5 Kr)

t = 1,600 m

18 luas = 0,256 m3

4,608 m3

IV. PEKERJAAN AKHIR PROYEK

p = 34,000 m Pembersihan akhir proyek 4.1

l = 6,000 m (34m x 6m) = 204 m²

vol = 204,000 m² 204,000 m²

[(3,6m x 0,2m x 0,4m ) x 25 = 7,2 m³]

[(0,4m x 0,4m x 1,6m) x 18 = 4,608 m³]

Project

Location

Engineer

Classification

3.3.3

3.3.4

3.3 Pek. Beton kolom

3.3.1

3.3.2

3.2.4

3.2.5

3.2.3

3.2.2