Erasmus + Project No 561586‐EPP‐1‐2015‐1‐RS‐EPPKA2‐CBHE‐JPEnhancement of HE Research Potential Contributing
to Further Growth of the WB Region (Re@WBC)
WORKPACKAGE 4. QUALITY
Ref. No. and Title of Workpackage 4.3-4.4 Re@WBC reporting
Title of Deliverable: Re@WBC reporting formInstitution: University of MontenegroAuthor/s of the deliverable OliveraPopovic, Dragana CvetkovicIlicDissemination Level Internal
Dear Partners,
Please use this form for the annual report on the progress of WPs within your institutions, as well as for your internal quality assurance procedures.
With best regards,
Re@WBC Project's Steering Committee
INSTITUTIONWP1. Preparation for the HR research management reform 1.1. Research potential at WBC universities mapped Start dateEnd date
Description of the activity carried out
/
Specific and measurable indicators of achievement
/
Planned results/
INSTITUTIONWP1. Preparation for the HR research management reform 1.2. Review of HR strategies at EU partnersStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
2 Quality Control and Monitoring Manual
INSTITUTIONWP1. Preparation for the HR research management reform 1.3. Comparative analysisStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
INSTITUTIONWP1. Preparation for the HR research management reform 1.4. Action plans for HE management reformStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
Quality Control and Monitoring Manual 3
INSTITUTIONWP1. Preparation for the HR research management reform 1.5. HR offices and centers equippedStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
4 Quality Control and Monitoring Manual
INSTITUTIONWP2. Excellent university for the researchers2.1. University centers and HR offices reinforcedStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
INSTITUTIONWP2. Excellent university for the researchers2.2 Administrative staff competences improvedStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
Quality Control and Monitoring Manual 5
INSTITUTIONWP2. Excellent university for the researchers2.3. University managements educated on the C&C implementationStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
INSTITUTIONWP2. Excellent university for the researchers2.4 HRS4R strategy created and adopted at partner universitiesStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
6 Quality Control and Monitoring Manual
INSTITUTIONWP2. Excellent university for the researchers2.5. Training trainersStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
INSTITUTIONWP2. Excellent university for the researchers2.6. Promotion procedures improvedStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
Quality Control and Monitoring Manual 7
INSTITUTIONWP2. Excellent university for the researchers2.7. Plagiarism monitoring tools implementedStart dateEnd date
Description of the activity carried out
/
Specific and measurable indicators of achievement
/
Planned results
/
INSTITUTIONWP2. Excellent university for the researchers2.8. Ethical committee procedures improvedStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
8 Quality Control and Monitoring Manual
INSTITUTIONWP2. Excellent university for the researchers2.9. Cooperation with scientific diaspora establishedStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
Quality Control and Monitoring Manual 9
INSTITUTIONWP3. Excellent researchers for the community3.1. Researchers trained on C&C and HRS4RStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
INSTITUTIONWP3. Excellent researchers for the community3.2. Webpages offer opportunity linksStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
10 Quality Control and Monitoring Manual
INSTITUTIONWP3. Excellent researchers for the community3.3. Young researchers trained on research methodologyStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
INSTITUTIONWP3. Excellent researchers for the community3.4. Young researchers trained in various skillsStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
Quality Control and Monitoring Manual 11
INSTITUTIONWP3. Excellent researchers for the community3.5. Training on teaching methodologyStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
INSTITUTIONWP3. Excellent researchers for the community3.6. Pilot Mentoring system introducedStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
12 Quality Control and Monitoring Manual
INSTITUTIONWP3. Excellent researchers for the community3.7. Measures for enhancement of multidisciplinarity in researchStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
INSTITUTIONWP3. Excellent researchers for the community3.8 Guide book publishedStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
Quality Control and Monitoring Manual 13
INSTITUTIONWP4. Quality at [email protected]. Quality Assurance Committee (QAC) establishedStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
INSTITUTIONWP4. Quality at [email protected]. Project quality procedures developedStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
14 Quality Control and Monitoring Manual
INSTITUTIONWP4. Quality at [email protected]. WP reportsStart dateEnd date
Description of the activity carried out
CPN have sent its Report at the beginning of July where we stated all activitieswe’ve been working on since the start of the project. The Report was requested from the coordinator due to the monitoring visit by the Erasmus+ office in Serbia.
Specific and measurable indicators of achievement
Planned results
INSTITUTIONWP4. Quality at [email protected]. Annual QA reportsStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
Quality Control and Monitoring Manual 15
INSTITUTIONWP4. Quality at [email protected]. Reports analysisStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
INSTITUTIONWP4. Quality at [email protected]. External monitoringStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
16 Quality Control and Monitoring Manual
INSTITUTIONWP5. Dissemination and exploitation at [email protected]. Project web-site created and regularly updatedStart dateEnd date
Description of the activity carried out
From the beginning of the Project, CPN has conducted the following activities in accordance with its role in the Project:
Design of the visual identity, the project logo and the memo which was accepted by the coordinator and all partners, and which is since used on all project materials.
The project website was created at the following address: http://rewbc.ni.ac.rs/ .
The website is regularlyupdated, and it contains the following information:
General information and relevant project documents.
Agendas, presentations and reports from all partner meetings.
Announcements and news for all events organized since the beginning of the Project.
Photo gallery from each event. After the monitoring visit, made by the representatives of the Erasmus+ office in Serbia and the project officer on July 7, the University of Niš received the feedback in November. The feedback stated that the website is fully functional, but there was also a set of recommended improvements:
The Documentssection should include only documents representing the outputs of particular activities;
A special section should be created on the website for reports and presentations from the meetings.
Specific and measurable indicators of achievement
The Project website was updated in accordance with the project requirements in January 2016.
All recommendations related to the improvement of the website were implemented within one month of receiving the report from the project officer.
Since the beginning of the project until the end of February the following was published on the website:
Meetings – 13 reports from project meetings which include:- the agenda, presentations, photographs and meeting
minutes,Quality Control and Monitoring Manual 17
- all photographs from the meetings and other events are posted in the Gallery section.
Dissemination – 19 seminars, lectures and otherdissemination activities. All of these activities included:- the agenda, presentations, photographs and meeting
minutes,- all photographs from the meetings and other events are
posted in the Gallery section. News – 23 news articles, announcements and invitations for
seminars and lectures.
The documents related to the project activities were being regularly posted on the website usually immediately after they’ve been sent by the coordinator.
Planned results
INSTITUTIONWP5. Dissemination and exploitation at [email protected]. Promotional material distributedStart dateEnd date
Description of the activity carried out
At the beginning of the Re@WBC project, CPN team created the visual identity, the project logo and the memo which was accepted by the coordinator and all partners and which is used on all project materials.
Specific and measurable indicators of achievement
Planned results
18 Quality Control and Monitoring Manual
INSTITUTIONWP5. Dissemination and exploitation at [email protected]. Project results disseminatedStart dateEnd date
Description of the activity carried out
The Re@WBC project was regularly presented at the meetings whose topic was international cooperation. Regarding the media exposure, apart from the announcements on the official CPN website, the New Year edition of the daily newspaper “Danas”published an article about the project. Also, science popular magazine named “Elementi” published an article about the project. It is important to emphasize that above mentioned magazine is very popular among the scientific community and people who are interested in science.
Specific and measurable indicators of achievement
“Elementi” magazineis printed in3500 copies. It is difficult (and officially not possible) to specify or nearly estimate a number of prints for any daily newspaper in Serbia, however “Danas” is generally estimated at 20,000 copies each day.
Planned results
INSTITUTIONWP5. Dissemination and exploitation at [email protected]. The label "HR Excellence in Research" obtained by a number of WB partner universitiesStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Quality Control and Monitoring Manual 19
Planned results /
20 Quality Control and Monitoring Manual
INSTITUTIONWP5. Dissemination and exploitation at [email protected]. Establishment of awards for young researchersStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
INSTITUTIONWP5. Dissemination and exploitation at [email protected]. Mentoring system adoptedStart dateEnd dateDescription of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
Quality Control and Monitoring Manual 21
INSTITUTIONWP5. Dissemination and exploitation at [email protected]. Strategy on continual training of researchers adoptedStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
22 Quality Control and Monitoring Manual
INSTITUTIONWP6. Management at [email protected]. Kick-off and coordinating meetings realisedStart dateEnd date
Description of the activity carried out
Two representatives of the Center attended the kick off meeting in Niš in December 2016. On this occasion they had two presentations about the CPN in general andexplaining the plan for project activities, including specifically WP5 related outcomes.
Specific and measurable indicators of achievement
Planned results
INSTITUTIONWP6. Management at [email protected]. Procedures for project managementStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
Quality Control and Monitoring Manual 23
24 Quality Control and Monitoring Manual
INSTITUTIONWP6. Management at [email protected]. PA signedStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
INSTITUTIONWP6. Management at [email protected]. Software platform for project managementStart dateEnd date
Description of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
Quality Control and Monitoring Manual 25
INSTITUTIONWP6. Management at [email protected]. Day-to-day coordinationStart dateEnd dateDescription of the activity carried out /
Specific and measurable indicators of achievement
/
Planned results /
INSTITUTIONWP6. Management at [email protected]. Financial managementStart dateEnd date
Description of the activity carried out
/
Specific and measurable indicators of achievement
/
Planned results /
26 Quality Control and Monitoring Manual
INTERNAL QUALITY ASSURANCE PROCEDURESREPORT PREPARED BYDATE
Quality Control and Monitoring Manual 27
Project number: 561586-EPP-1-2015-1-RS-EPPKA2-CBHE-JP
"This project has been funded with support from the European Commission. This publication reflects the views only of the author, and the Commission cannot be held responsible for any use which may be made of the information contained therein"