Page 1: QUALITY ASSURANCE MANUAL - welderscertification.org

IRONWORKER/AWS WELDER

CERTIFICATION PROGRAM OF NORTH AMERICA

QUALITY ASSURANCE MANUAL

Rev. 12 2/2020

Page 2: QUALITY ASSURANCE MANUAL - welderscertification.org

2

Page 3: QUALITY ASSURANCE MANUAL - welderscertification.org

3

QUALITY ASSURANCE MANUAL

INDEX SUBJECT TAB NO. REV# DATE

QA Manual 1 10 4/19

Exhibit "A" Test Facility Worksheet 1 10 2/20

Exhibit "B" Welding Performance Qualification Test Record 1 3 4/01

Exhibit "C" Maintenance of Certification 1 4 1/12

Exhibit "D" Inspection and Calibration Seal 1 2 4/01

Exhibit "E" Equipment Calibration and Maintenance Log 1 2 4/01

Exhibit "F" Repair Tag 1 1 1/98

Test Facility Worksheet 3 13 2/20

Welding Test Labels 3 10 2/20

Personal Information Sheets - "A" 5 6 2/20

Personal Information Sheets - "B" 5 6 7/18

Personal Information Sheets - "C" 6 5 9/17

Personal Information Sheets - "D" 7 4 4/01

Personal Information Sheets - "E" 8 5 6/08

Personal Information Sheets - "F" 9 6 9/17

Page 4: QUALITY ASSURANCE MANUAL - welderscertification.org

4

QUALITY ASSURANCE MANUAL

INDEX (CONTINUED) SUBJECT TAB NO. REV# DATE

Personal Information Sheets - "G" 10 4 4/01

Personal Information Sheets - "H" 11 1 4/01

Personal Information Sheets - "I" 12 4 2/20

Personal Information Sheets - "U" 13 6/08

Welding Procedures "A" 14 6 2/20

Welding Procedures "B" 15 4 7/18

Welding Procedures "C" 16 4 9/17

Welding Procedures "D" 17 3 4/01

Welding Procedures "E" 18 3 6/08

Welding Procedures "F" 19 4 9/17

Welding Procedures "G" 20 3 4/01

Welding Procedures “H” 21 1 4/01

Welding Procedures “I” 22 3 2/20

Welding Procedures “U” 23 6/08

Audit Checklist 24 6 10/14

Welding Safety and Test Rules 25 4 4/01

Miscellaneous Additional Information 26 4 4/01 NOTE: NEW OR REVISED PROVISIONS IN THIS MANUAL ARE SHOWN IN BOLD TYPE.

Page 5: QUALITY ASSURANCE MANUAL - welderscertification.org

5

1.0 INTRODUCTION

1.1 This Quality Assurance Manual was compiled for the purpose of achieving a controlled weld testing program with a determined effort to maintain a high standard of quality by regulating and systematically controlling the testing process, from receipt of material through completion of the non destructive and/or destructive test with all the required documented support history.

1.2 The Facility Representative is responsible for the enforcement of the policies

outlined in this QA Manual. He or she and the Test Supervisor overseeing the examination of welds have the complete support of the local Joint Apprenticeship and Training Committee (JATC) or Trade Improvement Committee (TIC) to make required decisions independently.

1.3 IW/AWS accredited test facilities must process and enter all applicable welder

performance qualification tests (WPQR’s) performed, directly into the on-line IW/AWS Welder Certification program for processing. Issuing welder performance qualifications using the program’s pre-qualified procedures, logo, forms, etc. without doing so is prohibited.

1.4 The Test Supervisor will have complete authority in the administration of the welder

qualification tests.

1.5 Non conformances to the requirements in this QA manual will be referred in writing to the Facility Representative for preventive or disciplinary action.

1.6 The JAC (Joint Apprenticeship Committee) and/or JATC (Joint Apprenticeship and

Training Committee) or TIC (Trade Improvement Committee) are committees formed with equal representatives from labor and management. There primary purpose is to oversee the apprenticeship training and journeyman upgrading program and funds.

Page 6: QUALITY ASSURANCE MANUAL - welderscertification.org

6

Page 7: QUALITY ASSURANCE MANUAL - welderscertification.org

7

2.0 ORGANIZATIONAL CHART

International Association of Bridge, Structural, Ornamental and Reinforcing Iron Workers

National Ironworkers and Employers Apprenticeship Training and Journeyman

Upgrading Fund

National Ironworker Welding Certification Test Committee of

North America

QA Manager (National Program)

National Fund Chairman

Management Labor

Welding Advisors & Professionals

AWS Accredited Training Facility

Assessors

All Iron Worker Local Union JAC/TIC AWS Accredited Test Facilities

AWS/IW Assessor Training Coordinator/Director

Program Reviewer (member of JATC/TIC)

(member of internal audit team)

Welding Classroom Instructors

Facility Representative (May also be Training Coordinator/Director)

Welding Shop Instructors

NDE Personnel

Test Supervisor(s) (CWI)

Quality Assurance

Manager (CWI)

Page 8: QUALITY ASSURANCE MANUAL - welderscertification.org

8

Page 9: QUALITY ASSURANCE MANUAL - welderscertification.org

9

3.0 STATEMENT OF POLICY

3.1 It shall be the policy that while the facility is operating as an AWS accredited welding test laboratory, it will adhere to all of the requirements in the AWS QC 4-89 Standard for Accreditation of Test Facilities for AWS Certified Welder Program and the QC 7-93 Standard for AWS Certified Welders and all of its supplements.

3.2 It is the policy of this Training Facility/Test Site to certify individuals only after they

have demonstrated the necessary proficiency to perform welding operations in the particular process. This will be evidenced by a minimal practice session prior to issuing the welder the necessary paperwork and test coupons.

3.3 The Facility Representative and the Test Supervisor have the responsibility of

maintaining the control necessary to meet the requirements of this QA Manual and all pertinent specifications outlined in the applicable codes and standards listed below:

3.3.1 Each ATF shall maintain current copies of all applicable codes and standards

pertinent to the qualification tests being performed at their facility. The underlined standards and codes below are mandatory at each facility.

WELDING

A. AWS D1.1 STRUCTURAL WELDING CODE- STEEL B. AWS D1.2 STRUCTURAL WELDING CODE- ALUMINUM C. AWS D1.3 STRUCTURAL WELDING CODE- SHEET STEEL D. AWS D1.4 STRUCTURAL WELDING CODE- REINFORCING STEEL E. AWS D1.5 BRIDGE WELDING CODE F. AWS-D1.6 STRUCTURAL WELDING CODE - STAINLESS STEEL G. AWS D1.8 STRUCTURAL WELDING CODE – SEISMIC SUPPLEMENT H. AWS B2.1 WELDING PROCEDURE AND PERFORMANCE QUALIFICATION

STANDARD I. ASME Sec. IX QUALIFICATION STANDARD FOR WELDING AND BRAZING

PROCEDURES, WELDERS, BRAZERS AND WELDING AND BRAZING OPERATORS

J. API 1104 STANDARD FOR WELDING PIPELINES AND RELATED FACILITIES

MECHANICAL TESTING

A. AWS B4.0 STANDARD METHODS FOR MECHANICAL TESTING OF WELDS B. ASTM 370 MECHANICAL TESTING

NON DESTRUCTIVE TESTING AND INSPECTION

A. ASNT TC 1A RECOMMENDED PRACTICE No. SNT-TC-1A B. ASTM E165 LIQUID PENETRANT INSPECTION METHOD C. ASTM E709 MAGNETIC PARTICLE EXAMINATION D. ASTM E94 RADIOGRAPHIC TESTING

Page 10: QUALITY ASSURANCE MANUAL - welderscertification.org

10

E. ASTM E1032 RADIOGRAPHIC EXAMINATION OF WELDMENTS F. ASTM E164 ULTRASONIC CONTACT EXAMINATION OF WELDMENTS

QUALIFICATION AND CERTIFICATION

A. AWS QC 1 STANDARD FOR AWS CERTIFICATION OF WELDING INSPECTORS. B. AWS B5.2 SPECIFICATION FOR THE QUALIFICATION OF WELDING

INSPECTOR SPECIALISTS AND WELDING INSPECTOR ASSISTANTS.

C. AWS QC 4 STANDARD FOR ACCREDITATION OF TEST FACILITIES FOR AWS CERTIFIED WELDER PROGRAM.

D. AWS QC 5 AWS STANDARD FOR CERTIFICATION OF WELDING EDUCATORS. E. AWS QC 7 STANDARD FOR AWS CERTIFIED WELDERS. F. AWS QC 7 SUPPLEMENT G – AWS PERFORMANCE QUALIFICATION TEST

SAFETY AND HEALTH

A. ANSI Z49.1 SAFETY IN WELDING AND CUTTING ALLIED PROCESSES

Page 11: QUALITY ASSURANCE MANUAL - welderscertification.org

11

4.0 APPOINTMENT AND RESPONSIBILITIES OF QUALITY ASSURANCE MANAGER

4.1 NATIONAL PROGRAM PERSONNEL

4.1.1 Quality Assurance Manager

The QA Manager heads the Quality Assurance Team and is responsible for setting goals and implementing the requirements of the Ironworker Welding Certification Program of North America. The program complies with the requirements of AWS QC4 Standard for Accreditation of Test Facilities for AWS Certified Welder Program and AWS QC7 Standard for AWS Certified Welders. The position maintains current qualification as an AWS/IW Assessor and as an AWS CWI. The position reports to the Ironworkers Welding Certification Test Committee (Labor and Management) of the Ironworker/AWS Welding Certification Program of North America.

Duties include, but are not limited to: Oversight of the administrative implementation of the program through the

national office in Washington, D.C., including the documents and records control system. The position is also responsible for organizing management reviews of the quality assurance system.

Oversight of the training and certification program for IW Assessors.

Design and implementation of the Assessment schedule for JAC/JATC/TIC

ATFs, including assignment of IW assessors, and reviewing their audit plans and reports.

Design and implementation of a corrective action system.

Obtaining new WPSs and PQRs as needed for the National Program.

The position is responsible for maintaining and updating the QA Manual and

related procedures with input from other Assessors, the AWS, and IW JAC/JATC/TIC ATF's. A tracking system for changes will be maintained.

4.1.2. IW/AWS Assessor, National Program

The IW/AWS Assessor is responsible for the assessment of JATC/TIC ATF’s under the Ironworker Welding Certification Program of North America as directed by the QA Manager. The Assessor is a member of the Quality Assurance Team and contributes to the maintenance and improvement of the Quality Assurance Manual. The position maintains current qualification as an IW/AWS Assessor and as an AWS CWI.

Page 12: QUALITY ASSURANCE MANUAL - welderscertification.org

12

4.2 RESPONSIBILITIES and REQUIREMENTS OF IW/AWS ATF PERSONNEL – Adequate documentation shall be maintained for verification purposes.

4.2.1 Facility Representative (Technical Manager)

4.2.1.1 The Facility Representative should be a current CWI and oversee

the daily operation of all training at the facility on behalf of the Joint Apprenticeship Committee (JAC/JATC/TIC). The individual shall have at least five years of technical experience in inspection or testing of metals or welding.

4.2.1.2 The Facility Representative is responsible for the overall Quality

Assurance Program.

4.2.2 Quality Assurance Manager

4.2.2.1 The quality assurance manager must be a current CWI and is responsible for the maintenance of all files, tools, equipment, and maintenance procedures. The QA manager shall maintain current status as a qualified welder through the IW/AWS program.

4.2.3 Test Supervisor

4.2.3.1 The Test Supervisor(s) shall be a current CWI and be responsible for the execution of the QA program at the testing level and shall report to the Facility Representative. The test supervisor shall maintain current status as a qualified welder through the IW/AWS program.

4.2.4 Welding Instructor

4.2.4.1 The Welding Instructor is responsible for classroom and hands on

welding instruction. They are also responsible for the welding shop and welding operations when the shop is used for instructional purposes. The welding instructor shall maintain current status as a qualified welder through the IW/AWS program.

4.2.5 NDE Personnel

4.2.5.1 NDE Personnel, whether in house or a contract agency, NDE

personnel, must be familiar with all of the requirements of the Ironworker/AWS Certification Program of North America and must be qualified to perform non-destructive examination of welds.

4.2.6 QA Program Reviewer 4.2.6.1 Shall be a current JAC/JATC/TIC member. He/she shall attend

and take an active part in the Yearly Self-Assessments.

Page 13: QUALITY ASSURANCE MANUAL - welderscertification.org

13

5.0 ADMINISTRATION OF QUALITY ASSURANCE MANUAL

5.1 The National level QA Manual outlines the policy, responsibilities, and implementation strategy for the Ironworker/AWS Welding Certification Program of North America.

5.2 The National Quality Assurance Manager is responsible for maintaining and

updating the National QA Manual and related procedures with input from the IW/AWS ATF assessors, the AWS, and the IW ATF's themselves. A tracking system for changes will be maintained.

5.3 The National Quality Assurance Manager and the IW/AWS ATF Auditing Team

will meet at least once annually to review the QA manual and auditing procedures.

5.4 Revisions to the QA manual will be numbered, dated, identified, and recorded.

5.5 The Facility Representative is responsible for maintaining the Quality Assurance Manual in current status and for implementing its provisions.

5.6 The Facility Representative is responsible for ensuring that all provisions of

the program and this Quality Assurance (QA) manual are followed without exception. Failure to do so may result in suspension of ATF accreditation.

Page 14: QUALITY ASSURANCE MANUAL - welderscertification.org

14

Page 15: QUALITY ASSURANCE MANUAL - welderscertification.org

15

6.0 GENERAL INFORMATION

6.1 The Facility Representative and the Test Supervisor will ensure that the test area is clean and generally free of hazards. They will further insure that all safety requirements in accordance with ANSI/ASC Z.49.1 are met.

6.2 All welding and testing operations will be conducted in accordance to applicable

sections of the appropriate code/specifications and test procedures used for performance qualification.

6.3 Subcontracting of NDE services will be allowed. Only qualified contractors will be

used. A file with the contractor qualifications will be maintained and reviewed as necessary. All NDE personnel shall be qualified to ASNT SNT-TC-1A recommended practice.

6.4 Testing may be performed off site under the supervision of a facility test supervisor.

All test materials, consumables, and calibration equipment will be supplied by the IW/AWS ATF. The completed test assembly shall be returned to the ATF where the test specimens will be removed, bent, inspected, and results recorded by the QA Manager/Test Supervisor.

6.5 All technical complaints, non-conformances, comments, and suggestions will be

referred to the Facility Representative. The Facility Representative will respond to and forward a copy of the response to the JAC/JATC/TIC. The JAC/JATC/TIC will make final determination on what action to take. A report of all issues will be made and filed at the Accredited Test Facility of the original complaint and with the National Quality Assurance Manager. The Facility Representative shall develop and maintain a file for all correspondence regarding these issues.

Page 16: QUALITY ASSURANCE MANUAL - welderscertification.org

16

Page 17: QUALITY ASSURANCE MANUAL - welderscertification.org

17

7.0 PROCUREMENTS, CONTROL AND STORAGE

7.1 The Facility Representative and/or Quality Assurance Manager is responsible for inspection and acceptance of delivered material.

7.2 All materials procured for testing purposes shall be traceable and/or identified to,

the original Material Test Report and/or the filler metal Manufacturer Report.

7.2.1 The Material Test Report and/or the filler metal Manufacturer Report and the corresponding stock will be assigned a specific designation.

7.2.2 The Material Test Report and/or the filler metal Manufacturer Report will

be attached to the purchase slip identifying the seller, date material was purchased, and amount of material purchased.

7.3 It is mandatory that the designation be recorded on the Material Mill Test Report

and/or the filler metal Manufacturer Report and corresponding stock immediately upon receipt of material.

7.4 Coupon lengths cut from stock shall be individually identified by the appropriate

stock designation.

7.5 Only waterproof steel markers, paint, or stamps shall be used.

7.6 All test materials should be stored on racks if possible and shall be kept in a secure area which is relatively moisture free.

7.7 All filler metals and fluxes shall be stored in a secure area and in accordance

with the applicable codes.

Page 18: QUALITY ASSURANCE MANUAL - welderscertification.org

18

Page 19: QUALITY ASSURANCE MANUAL - welderscertification.org

19

8.0 FABRICATION CONTROLS

8.1 Fabrication of the test plates and test joints shall be done under the direction and supervision of a Test Supervisor to the requirements of the appropriate code and test procedures.

8.2 Prior to fit up - the Test Supervisor shall:

8.2.1 Make available necessary test facility worksheets, fit up instructions, safety

rules, and verify that approved testing materials are used.

8.2.2 Visually check condition of base material for defects such as laminations, cracks, tears, or any other surface irregularities.

8.2.3 Check edge preparation for beveling, cleaning, and acceptable dimensions.

8.3 After fit-up and prior to welding the test supervisor shall:

8.3.1 Check joint fit-up, alignment and tolerances as specified in the appropriate

code and test procedures.

8.3.2 Check the cleanliness of weld joint and surrounding area.

8.3.3 Stamp weld test coupons in the exact location that test specimens are to be removed with the assigned welder test certification numbers and weld position.

8.3.4 A suggested method for assigning a welder test certification number is

to use the year followed by a sequential test number. The position shall also be shown. (Ex: 11-001-3G). A welder qualification test log should be kept identifying the welder and the welder test certification number.

8.3.5 Check test coupon(s) for proper positioning in accordance with the applicable

code.

Page 20: QUALITY ASSURANCE MANUAL - welderscertification.org

20

Page 21: QUALITY ASSURANCE MANUAL - welderscertification.org

21

9.0 WELDING QUALITY CONTROL

9.1 Prior to welding of test coupons the Test Supervisor shall:

9.1.1 Verify that approved electrodes, filler metals, and fluxes are being used.

9.1.2 Check minimum preheat temperatures as specified in the appropriate code and test procedures if necessary.

9.1.3 Check for proper voltage and amperage setting in accordance with welding

procedure specifications.

9.2 During welding of test coupon the Test Supervisor shall:

9.2.1 Check fit up and root pass for fusion to base metal and for discontinuities.

9.2.2 Check opposite side root preparation (back gouging, grinding, or chipping to clean metal operations) if needed.

9.2.3 Re-verify proper positioning (see 8.3.4).

9.2.4 Randomly inspect proper cleaning between passes.

9.2.5 Verify interpass temperatures in accordance with the appropriate code

and test procedures if necessary.

9.3 After welding is complete the Test Supervisor shall:

9.3.1 Verify acceptance of welded coupon by visual inspection.

9.3.2 Verify Stress Relief Heat Treatment, if needed, in accordance with the appropriate code and test procedures.

9.3.3 Place welded test coupon in a controlled area to cool prior to cutting or

testing.

Page 22: QUALITY ASSURANCE MANUAL - welderscertification.org

22

Page 23: QUALITY ASSURANCE MANUAL - welderscertification.org

23

10.0 DESTRUCTIVE AND NON-DESTRUCTIVE TESTING

10.1 All test coupons shall be subjected to Destructive Testing unless otherwise required.

10.2 Prior to cutting test specimens from the coupon, the Test Supervisor shall:

10.2.1 Verify proper location and stamping of weld test certification number and position on the coupon(s). On limited thickness test specimens all stamps will be placed on the face side of specimen.

10.2.2 Remove test specimens from test coupon by an approved thermal or

mechanical cutting method at locations prescribed in the appropriate code and test procedures.

10.2.3 Prepare test specimens in accordance with the appropriate code.

10.2.4 Re-verify stamp of welder certification test number and position before

testing.

10.3 Testing of specimens

10.3.1 Perform test(s) in accordance with the appropriate code, standard, and test procedure.

10.3.2 Observe test results and record discontinuities on test facility

worksheet and Welder Performance Qualification Test Record (WPQR).

Page 24: QUALITY ASSURANCE MANUAL - welderscertification.org

24

Page 25: QUALITY ASSURANCE MANUAL - welderscertification.org

25

11.0 DOCUMENTATION

11.1 All Nondestructive and Destructive test results will be documented on the Test Facility Worksheet and WPQR (Exhibit "A").

11.2 The Welder Performance Qualification Test Record (WPQR), including welder

photo must be forwarded to the National Office using the online IW/AWS Welding Program database. Only successful WPQR results need be forwarded.

11.3 A copy of the completed Welder Performance Qualification Test Record

(WPQR) (Exhibit "B") will be attached to the Test Facility Worksheet and kept in the welders file at the ATF.

11.4 Persons who fail the welder examination will not be re-tested unless they:

11.4.1 Practice in the process and position(s) failed and demonstrate to the

Welding Instructor proficiency in the process and position(s) to be tested.

11.4.2 An immediate retest may be made consisting of two welds of each type

and position that the welder or welding operator failed. All retest specimens shall meet all of the specified requirements.

11.4.3 Personnel re-testing will be assigned a new welder control number and

new paperwork will be issued. 11.4.4 Re-testing will be performed on all positions failed.

11.5 When a welder’s or welding operator’s qualification period of effectiveness has

lapsed, a requalification test shall be required. Welders have the option of using a test thickness of 3/8 inch (10 mm) to qualify any production welding thickness greater than or equal to 1/8 inch (mm.) per 4.32.1.3 of the AWS D1.1 structural code.

11.5.1 No immediate retest shall be permitted after failure of a requalification

retest. A retest shall be permitted only after further training and practice. 11.6 Copies of all paperwork will be retained on file at the testing facility for a minimum of

five (5) years.

11.7 Certifications shall be renewed annually providing the welder presents proof of having performed welding operations (continuity) in the process they originally qualified (Exhibit "C").

11.8 At the completion of testing and documentation, test specimens shall be stored in a

secure area for a minimum period of six months until properly destroyed.

Page 26: QUALITY ASSURANCE MANUAL - welderscertification.org

26

Page 27: QUALITY ASSURANCE MANUAL - welderscertification.org

27

12.0 CALIBRATION OF TOOLS

12.1 All tools, equipment, and measuring devices used for welder qualification testing will be inspected annually for conformity to original manufacturer specifications and performance standards.

12.2 Tools and equipment not meeting performance standards will be tagged for repair or

disposal and removed from service. (Exhibit "F")

12.3 All calibration equipment will be calibrated to a national standard at least annually, or as needed, and results will be recorded and equipment labeled.

12.4 A log of equipment calibration will be kept on file at training center.

12.5 Welding equipment will be maintained and cleaned as needed.

12.6 Welding equipment used for testing will be checked for proper amperage and

voltage annually or properly calibrated equipment will be used as specified in 12.3 (Exhibit "D”.)

12.7 Preventive maintenance on welding equipment shall be performed regularly

according to usage.

12.8 All preventive maintenance will be recorded in a maintenance log. (Exhibit "E")

Page 28: QUALITY ASSURANCE MANUAL - welderscertification.org

28

Page 29: QUALITY ASSURANCE MANUAL - welderscertification.org

29

13.0 AUDIT OF QUALITY ASSURANCE PERFORMANCE AT EACH IW/AWS ATF

13.1 An initial on site audit by a member of the IW/AWS ATF Assessment Team shall be conducted to evaluate the adequacy of procedures, inspections, testing, process control and record keeping in order to insure that the program complies with the IW/AWS program standards.

13.2 Internal self audits shall be performed by the Facility Representative, Quality Assurance Manager, and attending JAC member annually. These audits shall take place on the second and third year following the onsite audit. The completed internal audit form will then be forwarded to the National Quality Assurance Manager for review and approval, copies of all audits shall be kept on file at the ATF.

13.3 Onsite audits will be performed every three years by a member of the IW/AWS ATF

auditing team. 13.4 All audits shall include:

13.4.1 Examination of all quality control operations and documentation.

13.4.2 Review procedures with the Test Supervisor(s) to determine familiarity

with established requirements.

13.4.3 Review test methods to assure conformance with specified procedures.

13.4.4 Written notification of required corrective action.

13.4.5 Follow up of corrective action within thirty days of written notification. 13.5 Results of the Quality Assurance audit will be documented in detail and maintained

as a permanent in-house record.

13.6 Follow up review of deficient areas shall be made on a more frequent basis until required corrections have been completed.

Page 30: QUALITY ASSURANCE MANUAL - welderscertification.org

30

Page 31: QUALITY ASSURANCE MANUAL - welderscertification.org

31

EXHIBIT A IRONWORKER/AWS WELDER CERTIFICATION PROGRAM

OF NORTH AMERICA

TEST FACILITY WORKSHEET COUPON MILL REPORT #: _______________ ROD LOT #: _______________ TEST #: ___________________ AWS CODE: _____________ WELDER: ______________ OPERATOR: ______________ DATE: ____________ WELDER NAME: _____________________________________________________________________________ ADDRESS: __________________________________ PHONE:( _________ ) _____________________________ CITY: _____________________________________ ST.: ___________________ ZIP ______________________ LOCAL UNION #: _____________ IW BOOK #: ______________________ S.S.__________________________ DRIVER LIC. #: _______________________________________ ST ___________________________________ TEST CODE: (CHOOSE ONE)

A1 A1-1 A1-2 A1a A2 A2a A2b A3 A4 A5 A6a A6b A6c A6d A6e A7 A7a A7aa A7ab A7ac A7b A7c A7d A7d2 A7e A7f A7f2 A7g A7h A7j A7k A7m A7n A7p A7q A7r A7s A7t A7z A8 A8a A9 A9a A10-

2 A10a-

2 A11 A12a A12b B1 B1-1 B1-2 B1a B2 B3 B4 B5 B6 B6a B6b B6c B6d B6e B6f

B6g B6h B7 B8 B9 B9a B10 C1 C1b C2 C2a C2b C2c C4 C5 D1 D2 D10 E1 E2 E3 E4 E4a E6 E11 F2 F3 F3a F3b F3c F8 G1 H1 I-2 I-2a I-2b I-5 I-6 I-6a I-6b I-7 I-8 1-9 1-10 U1 U2 U3

COUPON FITUP: _______________ POSITION: ____________ ___________ ___________ ___________ VOLTS: _____________ AMPS: _____________ PREHEAT: _______________ POST HEAT: ________________ ROOT PASS: ____________ VISUAL INSPECTION: _________ REMARKS: _____________________________ TYPE OF TEST PERFORMED:_________________________________________________________________ SPECIMEN #: ___________ P F SPECIMEN #: ___________P F SPECIMEN #: ____________ P F SPECIMEN #: ___________ P F SPECIMEN #: ___________P F SPECIMEN #: ____________ P F WITNESSED BY (MUST BE A CWI):_____________________________________________________________ ______________________________________ _______________________________________

TEST SUPERVISOR NAME TEST SUPERVISOR SIGNATURE

Page 32: QUALITY ASSURANCE MANUAL - welderscertification.org

32

EXHIBIT B IRONWORKER/AWS WELDER CERTIFICATION

PROGRAM OF NORTH AMERICA PERSONAL INFORMATION

L.U. & Book #: ________________________ S.S. #: __________________________ Test Code: ____________________ Name: ______________________________________ ____________ ____________________________________________

FIRST MIDDLE LAST Street Address: _________________________________________________________________________________________________________

City: ________________________________________ State: _______________________________________ Zip: _________________ Telephone: _____________ ________________ Test Site: _____________________________________________________________

AREA CODE WELDING PERFORMANCE QUALIFICATION TEST RECORD

Spec. Code: _______________ Process: ____________________ Test Cert. #: ______________________ BASE METAL: _______________ FILLER METAL: ____________________ POSITION: _______________________ Material: _______________ Specification: ____________________ 1G: ________ 1F: _________ Size: _______________ Classification: ____________________ 2G: ________ 2F: _________ Thickness: _______________ F #: ____________________ 3G: ________ 3F: _________ Plate: _______________ 4G: ________ 4F: _________ Tube: _______________ Current: ____________________ 5G: ________ Pipe: _______________ Polarity: ____________________ 6G: ________ Backing: _______________ Amperage: ____________________ 6GR: _______ Preheat: _______________ Voltage: ____________________ Post Heat: _______________ Gas: ____________________ Type of Joint: _______________ Thickness Range This Qualifies: ___________________

VISUAL TEST Pass: __________________ Fail: ____________________ Remarks: ________________________ Witnessed: __________________________________ ________________________

SIGNATURE OF EXAMINER DATE BEND OR DESTRUCTIVE TEST

We certify the statements in this record are correct and the test welds were prepared, welded and tested in accordance with the requirements of _________________________ .

SPEC. CODE

SIGNATURE OF EXAMINER CWI STAMP DATE

Position Specimen Direction Pass Fail Date Remarks Number of Bend

_______ _______ ________ ________ ________ _______ ___________________ _______ _______ ________ ________ ________ _______ ___________________ _______ _______ ________ ________ ________ _______ ___________________ _______ _______ ________ ________ ________ _______ ___________________ _______ _______ ________ ________ ________ _______ ___________________ _______ _______ ________ ________ ________ _______ ___________________ _______ _______ ________ ________ ________ _______ ___________________ _______ _______ ________ ________ ________ _______ ___________________

Page 33: QUALITY ASSURANCE MANUAL - welderscertification.org

33

EXHIBIT C

This is to inform you that your Ironworkers National Welder Certification Card is approaching its expiration. In order to renew your Certification card and keep it current, you must mail or email a copy of your continuity log book prior to the expiration date on the card and have all information including signatures for both 6 month periods, in order to verify your employment during the past calendar year. Please return to our office at the address listed on the front of this card.

Fraternally yours,

Lee Worley

Executive Director Apprenticeship and Training

PLEASE DISREGARD THIS NOTICE IF ALREADY RENEWED.

Ironworker/AWS National Welder Certification Program

Page 34: QUALITY ASSURANCE MANUAL - welderscertification.org

34

IRONWORKER/AWS WELDER CERTIFICATION

CONTINUITY LOGBOOK

Page 35: QUALITY ASSURANCE MANUAL - welderscertification.org

35

EXHIBIT D

INSPECTION AND CALIBRATION SEALS

Page 36: QUALITY ASSURANCE MANUAL - welderscertification.org

36

EXHIBIT E

IRONWORKER/AWS WELDER CERTIFICATION PROGRAM OF NORTH AMERICA

EQUIPMENT CALIBRATION RECORD

EQUIPMENT SERIAL #:

DESCRIPTION:

Date Calibrated or Repaired Status: OK/Repair Initial Next Inspection Date

Page 37: QUALITY ASSURANCE MANUAL - welderscertification.org

37

EXHIBIT F

REPAIR TAGS

FRONT BACK

Page 38: QUALITY ASSURANCE MANUAL - welderscertification.org

38