QUALITY ASSURANCE GUIDELINES
2014
January 2014
1
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
CONTENTS
QUALITY ASSURANCE GUIDELINES - 2014 pg. 4
1.0 POLICY FOR QUALITY pg. 7
1.1 Organising for Quality
1.2 Planning for Quality
1.2.1 Reviewing information between departments
within the factories
1.2.2 Supplier quality assessment
2.0 MONITORING PRODUCTION FOR QUALITY pg. 9
2.1 Critical Areas of Quality Control in a Garment Factory
3.0 FABRIC AND ACCESSORY / TRIM QUALITY pg. 10
3.1 Colour
3.2 Accessories
4.0 FABRIC INSPECTION SYSTEMS pg. 11
4.1 Definition
4.2 4 Point System
4.2.1 Total defect points per 100 square yards
5.0 FABRIC INSPECTION PROCEDURE pg. 13
5.1 Fabric Storage
5.2 Inspection Process for all Fabrics
5.3 Inspection Machines
5.4 Fabric Inspection Reporting Procedure
5.4.1 Fabric inspection reports from the fabric inspector
5.4.2 Daily fabric inspection report
5.4.3 Weekly fabric inspection report
5.4.4 Monthly fabric inspection report
7.5 Fabric Relaxing
6.0 QUALITY CONTROL IN THE CUTTING SECTION pg. 19
6.1 Fabric
6.2 Spreading
6.3 Cutting
6.4 Cutting Accuracy, Numbering and Bundling
7.0 QUALITY CONTROL IN THE SEWING SECTION pg. 24
7.1 Roving In-Line Quality Control Inspection
7.2 Static In-Line Quality Control Inspection
7.3 100% End-of-Line Quality Control Inspection
7.4 End-of-Line Quality Control Audits
8.0 QUALITY CONTROL IN THE FINISHING SECTION pg. 36
8.1 Washing, Pressing, Folding & Packing Quality Control
Inspection
8.2 Measuring for Quality
9.0 QUALITY CONTROL PERSONNEL pg. 38
9.1 Movement of Quality Control Personnel
9.2 Training People in Quality
9.2.1 Training procedures
9.3 Meetings for Quality and Co-operation between Departments
2
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
9.3.1 Better understanding between management,
production and quality personnel – 2 hourly checks
10.0 AUDITING PRODUCTION FOR QUALITY pg. 44
10.1 Garment pre-production
10.2 Nature of Audits
10.3 Acceptable Quality Level Auditing (AQL)
10.4 In-line Audit Inspection and Production Status Reports
10.5 Corrective Action Plan
10.6 Pre-final Audit Inspection
10.7 Final Audit Inspection
10.8 Inspection Findings Review Procedure and Release
Authority Levels
10.9 Traceability Measures
11.0 PRODUCTION CONTROL FOR QUALITY pg. 52
11.1 Metal Contamination in Garments
11.2 Needle Procedure
11.3 Metal Detection
11.4 Mechanics Repair Book
11.5 Special Machinery Control Report
12.0 PRODUCT TESTING FOR QUALITY pg. 58
12.1 Sampling Procedure for Product Testing
13.0 RESPONSIBILITY FOR QUALITY pg. 59
14.0 APPENDIX pg. 60
1) REF F.I.R - Knits
2) REF F.I.R – Woven
3) REF D.F.I.R
4) REF W.F.I.R
5) REF M.F.I.R
6) REF M.C.S
7) REF C.R.S.C.R
8) REF Q.C.C.N.R
9) REF Q.C.R.I.L.R
10) REF D.C
11) REF Q.C.G
12) REF Q.C.S.E.L.I.R
13) REF Q.C.A.I.R
14) REF S.O.B - Knits
15) REF S.O.B - Pants
16) REF S.O.B - Shirts
17) REF Q.C.A.I.R – 1
18) REF Q.C.M.R
19) REF Q.C.T.R
20) REF D.P-P.M
21) REF A.Q.L
22) REF Q.C.G.I.R 1
23) REF Q.C.G.I.R 2
24) REF Q.C.G.I.R 3
25) REF Q.C.G.I.R 4
26) REF D.C.A.P
3
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
27) REF W.C.A.P
28) REF N.P
29) REF M.R.B
30) REF Q.C.S.M.R
This “Quality Assurance Guideline - 2014" is a useful tool for any company wishing to improve its quality. It
contains a lot of important information and guidelines for all aspects of quality control from fabric inspection to
the finished packed garments.
These guidelines are a procedural document which could be implemented into any vendor’s facilities.
These procedures will -
1. Reduce operational costs.
2. Reduce claims due to quality failure.
3. Reduce "failure costs".
4. Improve productivity for the factory by producing "first quality garments first time".
5. Reduce lead times.
6. Improve liaison between the vendors, agents and American Eagle Outfitters.
7. Reduce airfreight costs.
These procedures are based on "PREVENTION" and "APPRAISAL" and not solely on "DETECTION".
These requirements can be implemented by any vendor or agent.
PROCEDURAL REQUIREMENTS ARE VERY IMPORTANT IN OBTAINING QUALITY GARMENTS
QUALITY ASSURANCE
QUALITY
a) What is quality?
b) Quality is being able to conform to American Eagle Outfitters requirements.
c) The ability of vendors to conform to American Eagle Outfitters requirements is essential. To
achieve this, the vendors must produce garments to the standard of the approved samples and in
line with American Eagle Outfitters style files. All safety requirements (data sheets) must also
be adhered to.
QUALITY COSTS It is generally recognised that the costs of quality, where a systematic approach is not used, represent a
cost equivalent of between 10% - 15% of a company's annual turnover.
The costs are made up as follows -
a) PREVENTION COSTS examples Pre-production planning, operator & QC training
etc.
b) APPRAISAL COSTS examples Inspection, Testing etc.
c) FAILURE COSTS examples Second choice garments, re-work or repair
costs, re-inspection costs, airfreight etc.
A systematic approach to quality control will help eliminate FAILURE COSTS.
The objective is to be "RIGHT FIRST TIME".
QUALITY ASSURANCE AND PROCEDURES These guidelines outline the areas that require attention in operating a quality orientated system.
4
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
There are many definitions of Quality Assurance. In basic terms, we mean getting it right the first time.
It means that the product, service or activity is assembled correctly throughout the system. It also means
that the system is under control. A system under control will assure quality.
Quality assurance means better morale, solid reputations, consistency in product, increased productivity
and satisfied customers.
Quality assurance does not simply mean a final inspection or an audit. A system out of control will
deliver a substandard end product. A substandard product is self-rejecting and will loose money for any
company.
QUALITY SYSTEMS
The objective of any quality system is to identify potential quality issues at the point of production. Having
identified the faults, the necessary corrective action must be implemented to bring the process back under control.
This action may identify the need for operator training, retraining, machinery adjustment, method analysis, etc.
etc.
The system assumes that operators are correctly trained in the first place, have full details of the key tasks of their
process and have the necessary visual standards.
The control documents used to implement a quality control system are set out in these guidelines.
The quality control inspectors are there to find the problem and alert the production supervisors or managers to
their findings. They are not there to find the problem and then rectify it. The solutions come from the production
supervisors or managers who are in charge of those operators which are not performing to the standards set up by
the company. The quality control inspectors are not there to un-pick the operator’s mistakes or to trim off the loose
threads which the thread trimmers missed. These operations are the total responsibility of the operators or thread
trimmers who didn’t carry them out correctly in the first place.
If operators in any organisation do not have to repair their own faults or problems then they will not be too
concerned about making more mistakes in the future. Having extra people to repair alterations made by other
operators only adds extra costs to an organisation and defeats the whole object of any quality control system.
1.0 POLICY FOR QUALITY The future of any new orders or sales is dependent upon providing products and services that
will help American Eagle Outfitters develop and prosper.
To achieve this goal, the vendor’s management must be committed to quality and productivity.
This commitment requires continued attention to innovation in new products and services,
materials, methods of production, job skills, training and marketing. It will command
investment in research, education and constant improvement of systems and operations.
The theme driving any vendor’s activities should be QUALITY -
Quality of products,
Quality of services,
Quality of management,
Quality of operators and
Quality of people.
1.1 Organising for Quality A vendor’s quality assurance function is only one part of the total organisation. It cannot
5
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
operate effectively alone.
Close liaison with head office, merchandising department, purchasing department, technical
department, and suppliers of raw materials, accessories and finished products is absolutely
necessary if the goal of QUALITY is to be satisfied.
It should be appreciated that -
1. The responsibility for American Eagle Outfitters contact, order finalisation, design
and specification of product order rests primarily with the merchandising department.
2. The responsibility for producing product to specification rests primarily with the
manufacturing unit.
3. The responsibility for assisting, advising on all quality tasks, monitoring and co-
ordinating these tasks through manufacturing to customer - rests primarily with the
technical, production and quality assurance departments.
1.2 Planning for Quality Quality Assurance is a system under control. Planning is the systematic analysis of those
actions necessary to ensure such control.
Planning is required prior to the start of any manufacturing process and should provide for
periodic reviews with merchandisers and production. A prime objective is to highlight any
special issues or requirements that may demand special attention before manufacturing begins.
Any issues - e.g. mandatory safety testing - could be performed to show that the product is
conforming to the requirements.
1.2.1 Reviewing information between departments within the factories Since the merchandiser is the vendor’s direct contact with American Eagle Outfitters, it is
necessary to establish close working relationships between merchandising, quality assurance and
technical personnel within the vendor base.
Weekly meetings should be scheduled to ensure that –
- pre-production meetings are held for all garments
- sample standards and procedures are established
- supplier specific product standards are established
- perceived supplier issues are highlighted
- the supplier quality profiles are reviewed
- the supplier base for fabric and accessories are reviewed
The technical department manager should initiate such meetings. This will ensure good working
relations and maintain open and constructive communication between all departments within
production.
1.2.2 Supplier quality assessment Current vendors, as well as potential ones, must be subject to evaluations and screenings to
monitor their capability in meeting the required deliveries and quality levels.
Audit procedures are needed to ensure quality first time.
The procedures should specify how the evaluation is to be conducted, who is qualified to
undertake such work, and defines associated reporting procedures. Long term assessment and
records will lay the foundation for better suppliers to be used.
2.0 MONITORING PRODUCTION FOR QUALITY Unless a system can constantly monitor and assess operators, inspectors, supervisors, managers
etc. for performance and quality, then the need to be or do better becomes less and less.
6
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
Complacency starts to set in and performances slip. Correct information which is recorded can
have something done about it, improvements can be tracked and further improvements can be
made. If no information is recorded then daily fire fighting becomes the norm. Without any
information a factory can never improve. The same problems probably occur everyday, every
week somewhere in the factory. This is wasting the managements, supervisors and operators
time as the situation never seems to get any better.
2.1 Critical Areas of Quality Control in a Garment Factory The most critical areas in the production of any garment are the quality of the fabric or
accessories, cutting, stitching and presentation of the garment prior to packing. If there is no
organised quality control system in these areas then any final control or inspection will be
meaningless as the problems have already been cut or stitched into the garment. No amount of
inspection after cutting and sewing will make the garment appear any better.
The second most critical area of garment quality is that all quality control inspectors must report
to the systems or operations managers and not to the production personnel. When any issues in
a garment factory come down to quality verses output - output always seems to win if
production personnel are involved.
The areas where quality control systems need to be set up and monitored are set out in the next
chapters.
3.0 FABRIC AND ACCESSORY / TRIM QUALITY To receive a full understanding of what goes into procuring a quality fabric or accessory / trim
you should study the American Eagle Outfitters - Bureau Veritas Consumer Products
Services, Inc. – Softlines – Quality Assurance Manual.
3.1 Colour Anyone who has anything to do with inspecting the colour should have their eyes checked for
colour vision. All fabric inspectors, QC, QA, warehouse and production supervisors, managers
and merchandisers should be tested as they are all, at some stage, going to review colour and
comment on it. Without being tested how will anyone know who is qualified to check the colour
or not? This test is known as the Farnsworth-Munsell 100-hue test. For American Eagle
Outfitters anyone who gets 25 points or less, when taking this test, can be certified to check
colour. Anyone who gets 26 points or more cannot be certified to check colour.
Most vendors have colour inspectors checking the colour of the garments for 10 hours a day. No
one can effectively check colour for this length of time without a break. Their eyes will become
saturated with colour. If a person has to check colour effectively (ie. colour inspectors in the
laundry, finishing sections etc.) then they can only check the colour continuously for 1 hour
before they need a break. After checking the colour for 1 hour they need to go and do another
job for 2 hours. After that they can come back and check the colour again. In the laundry you
could have 1 person checking colour, 1 person checking the front dry process and 1 person
checking the back dry process. Every hour they all change positions. This means that the colour
inspectors will have 2 hours off from checking the colour before they start again.
The question that needs to be asked when checking colour is: “does the colour match the
approved sample / lab dip / sample?”
3.2 Accessories All accessories and trims should be inspected on arrival into the factory by lot / shipment. Some
vendors use an AQL of 2.5 to inspect a shipment, but the best method is for a vendor to check
each lot / shipment a minimum of 10%. This means that if 10 cartons arrive, then 10% will be
7
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
checked from each of the 10 cartons eg if only 1 size of article is found in a carton then 10% of
each of the 10 cartons will be inspected. If more than 1 size is found in each carton then 10% of
each size of article found in each of the 10 cartons will be checked. Just checking 1 carton
(100%) out of the 10 cartons (10%) doesn’t mean that the balance quantity of pieces in the other
9 cartons is correct.
4.0 FABRIC INSPECTION SYSTEM All mills must audit, inspect and test their fabric for performance before shipment (see
American Eagle Outfitters Vendor Compliance Manual, Version 1.20 November 2013 –
Chapter 8. Quality Assurance – part E. Fabric 4-point Inspection Guidelines and
Calculations for Mills).
All vendors must also audit, inspect and test their fabric for performance after it is received into
their warehouse (see American Eagle Outfitters - Bureau Veritas Consumer Products
Services, Inc. – Softlines – Quality Assurance Manual).
4.1 Definition A “fabric fault” is defined as any feature within the usable width of the fabric which, if it
appeared in the finished garment, would down grade that garment.
American Eagle Outfitters uses the 4 Point System for the inspection of fabrics.
4.2 4 Point System This system is widely used by the textile producers of apparel fabrics and by the department of
defence in the U.S.A. This system is endorsed by the American Apparel Manufacturers
Association (AAMA) and the American Society of Quality Control (ASQC).
Fabric flaws or defects are assigned point values based on square yards. This is as follows:
4.2.1 Total defect points per 100 square yards Rolls of fabric containing more than a specified number of points per 100 square yards may be
considered “second” and rejected. However, the garment manufacturer, based on the price line
and the type of garment he makes, may decide to use more or less of these specified points per
100 square yards to accept or reject the shipment of piece goods.
Faults are assigned points according to their size in either the length or the width of the fabric.
Under the 4 Point System these are:
1 Point = Up to 3"
2 Points = Over 3“ up to 6"
3 Points = Over 6" up to 9"
4 Points = Over 9”
If there are holes or openings then the points allocated to them are as follows:
2 Point = 1" or less
4 Points = Over 1"
The total number of points for each roll is calculated from the number of faults in each category.
From this total the points per 100 square yards is calculated per roll / shipment.
Example :
A 120 yard roll of fabric which is 48" wide has the following defects found in it:
2 defects up to 3" 2 x 1 = 2 points
5 defects over 3" up to 6 “ 5 x 2 = 10 points
8
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
5 defect over 6" up to 9" 5 x 3 = 15 points
1 defect over 9" 1 x 4 = 4 points
Total defects found in roll = 31 points
The points per 100 square yards is calculated as follows:
Points per 100 sq yds = Total points scored in roll x 3600
Width of roll in inches x total yards
inspected
= 31 x 3600
48 x 120
= 19.375 points per 100 square yards
Therefore, if the acceptable criteria is up to 26 points per 100 square yards then this roll passes
the standard.
5.0 FABRIC INSPECTION PROCEDURE All fabric inspection procedures must have clearly defined rules and regulations by which to
inspect. Without these rules and regulations an accurate and reliable system cannot be set up to
inspect fabrics.
5.1 Fabric Storage All fabrics should be stored on pallets or in storage racks specially designed to handle fabrics
i.e. no sharp corners etc. All fabric rolls should be covered in plastic to protect them from dirt
etc. No fabric should ever be placed directly onto the floor for any reason. Don’t forget that
fabric is 50% - 60% of the cost of the garment.
Treat fabric with respect.
5.2 Inspection Process for all Fabrics Calculate the total fabric percentage that is required to be inspected from each delivery - per
colourway / lot / batch. The minimum to be inspected is 10% per colourway / lot / batch. If the
fabric fails then the balance percentage will be inspected.
Select the rolls for inspection and place the first one on the inspection machine (see section 5.3 -
Inspection Machines).
Cut off a 3” to 5” (7.5cm to 12.5 cm) strip across the full width of the roll and mark this to
determine –
a) the head / start of the roll,
b) face side of fabric,
c) left and right sides of roll,
d) roll number.
Use this to check shading from side to side and end to end within the roll of fabric being
inspected. Check this cut off piece against the roll of fabric at least once in the middle of the
roll and once near the end of it for shading. A further 3” to 5” (7.5cm to 12.5cm) strip is cut off
across the full width of the roll at the end of the roll. Again this is marked to determine –
e) the end / finish of the roll,
f) face side of fabric,
g) left and right sides of roll,
h) roll number.
9
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
All the marking is done on the underside of the fabric ie not on the face side. These 2 pieces are
then checked against each other to see if there is any shading from end to end or side to side and
kept for future reference.
Check the handfeel, appearance and colour of each roll of fabric against the signed and dated
approved colour / handfeel standard. These approved signed and dated fabric colour / handfeel
standards should be kept on the inspection machine for easy access. They should be A4 sized,
double ply and attached to a neutral coloured cardboard ie not white. These should have been
given to the inspector by the head of the fabric quality control department before commencing
with the fabric inspection.
Check the width of the fabric 3 times in one roll (ie at the beginning, in the middle and near the
end) against the width that was requested when the fabric was ordered and bought. This is noted
onto the inspection report (REF F.I.R).
Inspect for visual defects (using the 4 point system), marking each defect found on an inspection
report (REF F.I.R – Knits and REF F.I.R. – Woven) according to its size. Note whether the
fault has been strung by the fabric mill or not (S = Strung, U = Unstrung).
Mark any major faults which are unstrung either with a red tag at the side of the roll or with
removable chalk or a sticker on the fabric fault.
When inspection of the calculated percentage of fabric per delivery per colourway / lot / batch is
complete, calculate the points per 100 square yards for each roll as well as the average and
maximum for the total quantity. The number of yards per fault can also be calculated. This is
known as the "fault rate".
All of the fabric inspection reports per roll should be sent to the fabric team for their approval,
before any rolls can be sent to the cutting department.
5.3 Inspection Machines Adequate inspection machines must be provided to ensure accurate inspection of either woven
or knitted fabrics.
Fabric should be inspected at an angle with adequate overhead lighting. Lighting from behind
the piece goods is only used for inspection of woven greige and knitted fabrics. Finished woven
fabric should use adequate overhead lighting to inspect it.
Inspecting fabric on a flat horizontal table / cutting table is not adequate enough and
MUST NEVER be used under any circumstances.
A dark background is preferable for light fabrics but it may be helpful to have both light and
dark backgrounds available for all eventualities.
Inspection machine speeds should be slow enough to allow the operator time to detect any faults
on the fabric. American Eagle Outfitters recommends 12 to 15 yards per minute be the
maximum allowed speed.
A machine should also have easy forward and reverse mechanisms for ease of inspection. These
forward and reverse mechanisms must not put any tension (stretch) on the fabric while unrolling
it. Similarly they must not stretch the fabric when rolling it back up after inspection has taken
place.
To be able to check side to side (selvedge to selvedge) shading, additional lights can be placed
at the back of the machine. This is easier and faster than checking at the front of the machine,
where all the fabric is under tension from the top rollers. These additional lights at the back will
allow the operator to see if there is shading side to side. They can unroll the fabric as it is not
under tension at the back of the machine. Once done, the fabric is easier to smooth out at the
back rather than if this operation was done on the front of the machine.
10
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
5.4 Fabric Inspection Reporting Procedure Fabric information is critical to the garment manufacturing process. If a fabric is checked then a
fabric inspection report must be filled in. An inspection report should be completed for every
roll of fabric which is to be inspected by the fabric inspectors.
5.4.1 Fabric inspection reports from the fabric inspector A fabric inspection report per roll of fabric should look something like American Eagle
Outfitters fabric inspection report (REF F.I.R – Knits and REF F.I.R - Woven). The way to
inspect each roll of fabric has already been discussed in “5.0 - Fabric Inspection Procedure”.
5.4.2 Daily fabric inspection report Once the fabric has been inspected then a fabric inspection summary report (REF D.F.I.R)
should be prepared every day. This summary will help the head of the fabric Q.C,
merchandising and fabric sourcing personnel to see how delivered fabric is performing from
each mill when inspected. If a fabric fails fabric inspection then these reports and summaries can
be sent to the mill as proof of poor quality.
5.4.3 Weekly fabric inspection report At the end of every week the daily fabric inspection reports will be summarised onto a weekly
fabric inspection report (REF W.F.I.R). This helps keep a clear understanding of the fabric
inspection procedure and the results that are obtained by the inspectors on a weekly basis.
5.4.4 Monthly fabric inspection report At the end of every month the weekly fabric inspection reports will be summarised onto a
monthly fabric inspection report (REF M.F.I.R). These consolidated figures help all personnel
(the head of fabric Q.C, merchandisers and fabric sourcing) to be able to manage the business
more efficiently and effectively. If they had to manage solely on daily or weekly inspection
reports the amount of paperwork would soon become too great to manage effectively.
Clear, concise, accurate information is require to be able to manage the most expensive part of
the business efficiently - the fabric.
These reports will show that the fabric did or did not perform according to American Eagle
Outfitters standards. Questions can now be asked as to why the defective fabric was shipped to
the vendor and not rejected before shipment.
These reports and summaries will also show that the vendor knows how to manage their fabric
department professionally.
5.5 Fabric Relaxing Stretch fabrics (denim, knits etc.) need to be relaxed for up to 24 hours prior to cutting. This
helps take the tension out of the rolls prior to cutting. If relaxing doesn’t take place and the
fabric is cut immediately after it is layed up, the cut pieces will relax and get smaller. This will
obviously cause measurement issues.
Many vendors relax fabric and then tie the rolls up with string (see below photo)
11
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
This is obviously pointless, as again the fabric can’t relax as it is under tension where it has been
tied up.
The best way to relax and handle relaxed fabric is as follows:
1) Relax the fabric onto a wooden board.
2) The width of the relaxed fabric mustn’t be too narrow as rolls relaxed like this will fall
over. A wider base for the relaxed fabric is better
3) Once relaxed, the wooden board is picked up and transported to the relaxing rack. In this
way the fabric is not handled by anyone. If a board is not used, then normally 2 people (1
at either end of the roll) will physically pick up the roll of relaxed fabric and transport it to
the relaxing rack. This will stretch the fabric.
4) When all the racks are full the fabric is put into storage. On each of these racks will be a
report stating the time and date of when the fabric was relaxed as well as another time and
date of when the fabric can be used in the cutting department.
5) Once the fabric is ready to be cut these racks are transported to the ends of the cutting
tables. If a wooden board had been used, then this will be taken off and placed onto the
cutting table top or onto the plate on the fabric spreading machine. If a wooden board has
not been used then 2 people (1 at either end of the roll) will physically pick up the roll of
relaxed fabric and lift it onto the cutting table top or onto the plate of the fabric spreading
machine. This will stretch and distort the relaxed fabric and cause measurement problems
after cutting.
So, it can be seen that relaxing, and the transportation of the relaxed fabric is crucial in the
manufacturing of stretch fabrics.
Below is an example of a relaxing rack that can be moved to the cutting room after the fabric has
been relaxed for 24 hours.
12
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
Below is an example of relaxing racks that are static and cannot be moved around. These rolls
need to be picked up by hand and taken to the cutting table tops which stretches the fabric.
6.0 QUALITY CONTROL IN THE CUTTING SECTION Good sewing begins with good cutting. If the cutting of garment pieces is bad then it will result
in sewing defects, excessive repairs and slower production. The quality control in the cutting
section can be split into 4 distinct areas -
- Fabric
- Spreading
- Cutting
- Cutting Accuracy, Numbering and Bundling
13
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
6.1 Fabric All fabrics that are delivered to the cutting room from the warehouse should be correct for
colour, handfeel and quality. However, even in the best of vendors, mistakes can be made
which can prove very costly for a company, especially when you consider that 50 - 60% of the
cost of a garment is fabric.
A Master Cut Sheet (REF M.C.S) is prepared by the cutting room manager prior to any
spreading and cutting taking place. This is the plan for the spreading and cutting of a particular
style by colour. All the Cutting Room Spreading and Cutting Reports (REF C.R.S.C.R) are
taken from this Master Cut Sheet (REF M.C.S).
6.2 Spreading Spreading can begin as soon as the fabric has been approved by the fabric manager, and subject
to relaxing, if it is a stretch fabric.
The cutting room manager will issue a Cutting Room Spreading and Cutting Report (REF
C.R.S.C.R) for every lay that an order may have.
Every spreading and cutting report will have a swatch of the correct fabric attached to it for
colour, handfeel and quality. These attached fabric swatches are the second check. They are to
make sure that the fabric about to be spread is the correct one.
The spreading personnel are totally responsible for the spreading of the correct fabric (colour,
handfeel and width) to the required marker length and ply height. The fact that the quality
control department have passed the fabric does not necessarily mean that it is correct - a mistake
may have occurred. Making the spreading personnel accountable for the fabric about to be
spread (with correct actual swatches) will ensure better control. They will not be able to point a
finger at someone else, should a problem occur after it is spread.
At the beginning and end of the spreading operation the spreading personnel write down the
time they started and finished that particular lay as well as their names. It will now be possible
to calculate the time it took to spread that particular lay should an incentive scheme be
introduced into the cutting room at a later date. It can also be checked to see which spreading
operators are taking too long to spread a lay. The signed and dated report is then given back to
the cutting room manager.
As soon as the spreading is finished the quality control inspector will then be asked to double
check it again before cutting can commence. This will be the third fabric check before cutting
commences. This inspection will also ensure the following;
i) Fabric - the fabric is the correct type (colour, handlfeel,
width)
ii) Number - the lay has the correct number of plies of fabric in it of plies
- (both ends of the lay should be counted).
iii) Length - the lay is the correct length according to the marker. Of marker
iv) Ends - what wastage of fabric has occurred with either too much or too little
fabric being laid up for a particular marker.
v) Correct - the marker is the correct one for that particular lay. Marker
vi) Ratio’s - the marker being used has the correct ratio of garments as well as the
correct number of pieces.
vii) Tension - the tension must be checked during spreading - especially on knit
fabrics (minimum 24 hours relaxing of fabric before cutting can take
place).
14
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
viii) Narrow - check the far edge of the lay (the one opposite the fabrics
vertical edge - magic eye) for any narrow fabrics. All the plies
should extend past the marker width.
ix) Remnants - the left over fabric must not be longer than the
shortest splice length (and should be numbered with
the roll number as well as the length / yardage).
x) Splices - check that fabric is not laid up too short (1/2”) or too
long (1 ½”) at the splices.
xi) Pattern - the patterns which the quality controller receives checking from the
pattern department must be compared to the paper or fabric marker
to ensure that the marker patterns are correct.
Any defective work found by an inspector will be noted down on the Cutting Room Spreading
and Cutting Report (REF C.R.S.C.R) and brought to the attention of both the head of quality
control and the cutting room manager. The supervisors need to sign the spreading report to say
that they have been advised about the problem at the time it happened.
The quality control inspector will sign, date and advise the time the inspection took place on the
Cutting Room Spreading and Cutting Report (REF C.R.S.C.R) and give it back to the cutting
manager. As soon as these reports are signed and approved the cutting room manager can issue
the Cutting Room Spreading and Cutting Report (REF C.R.S.C.R) to the cutter to perform the
next operation.
6.3 Cutting Once the go ahead has been received from the quality control inspector and the cutting room
manager, the cutting can take place.
The cutting room manager will issue the Cutting Room Spreading and Cutting Report (REF
C.R.S.C.R) for every lay that an order may have. Every Cutting Room Spreading and Cutting
Report (REF C.R.S.C.R) will have a swatch of the correct fabric attached to it for handfeel as
well as for colour. These attached fabric swatches are the second cutting room check
undertaken so far - not including the independent inspection by the quality control department.
These swatches are to make sure that the fabric about to be cut is the correct one.
The cutting personnel are totally responsible for what they cut. They must ensure that the fabric
(colour, handfeel, width), as well as the required marker length and ply height are correct. The
fact that the spreading personnel as well as the quality control department have passed the fabric
does not necessarily mean that it is correct - a mistake may have occurred. Making the cutting
personnel accountable for the fabric about to be cut (with correct actual swatches) will ensure
better control. They will not be able to point a finger at someone else, should a problem occur
after it is cut.
At the beginning and end of the cutting operation the cutting personnel write down the time they
started and finished that particular lay as well as their names.
It will now be possible to calculate the time it took to cut that particular lay should an incentive
scheme be introduced into the cutting room at a later date. It can also be checked to see which
cutting operators are taking too long to cut the lay. The signed and dated report is then given
back to the cutting room manager.
As soon as the cutting is finished the numbering people will take over and individually number
each of the cut pieces. The reason why it is first numbered before inspecting the quality of the
cutting is so that the top plies do not get mixed up with the bottom ones. The quality control
inspector (as will be discussed later) has to inspect the top, middle and bottom plies of the lay.
They may turn a bundle over and forget to turn it back again so making the top ply now the
bottom and visa versa.
15
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
6.4 Cutting Accuracy, Numbering and Bundling As soon as the numbering people have finished numbering the garment pieces the quality
control inspector will take over. They have to inspect the cutting accuracy and quality of the cut
pieces as well as the numbering of the pieces.
A Quality Control Cutting and Numbering Report (REF Q.C.C.N.R) for every lay will be issued
by the cutting room manager. This report will have the actual fabric swatches attached to it.
This report is then given to the quality control inspector for their verification.
The quality control inspector will check the cut and numbered pieces, before bundling, for the
following;
i) Accurate - cutters must split the line formed on the paper cutting marker. Any
variations over 1/16” (for woven) and
1/8” (for knits) must be noted.
ii) Ragged - cutters must push the cutting knife smoothly and cutting
evenly when cutting. If not then jagged edges will be found on the
cut pieces.
iii) Matching - the top, middle and bottom plies must be checked against an original
paper pattern to ensure that all the cut pieces are the same. If not
then the cutting is substandard and requires attention. A maximum
tolerance of 1/8” is allowed between the cut piece and the pattern
piece for knits and 1/16” for woven. Any more and it should be
classified as a reject.
iv) Numbers - the stickers which have been attached must have the correct number
and be accurately positioned on each piece. If they are not accurately
positioned then the sewers may stitch through the middle of the
sticker or have to remove it and then re-attach it. If this occurs then
the stickers will be difficult to remove after the garment has been
made and may cause rejected garments.
v) Notches / - All notches must be checked using the quality drill holes
control inspectors paper pattern to ensure that they are in the correct
position. NO DRILL HOLES ARE TO BE USED.
Any defective work found by an inspector will be noted down on the Quality Control Cutting
and Numbering Report (REF Q.C.C.N.R) and brought to the attention of both the head of quality
control and the cutting room manager. The supervisors need to sign the Quality Control Cutting
and Numbering Report (REF Q.C.C.N.R) to say that they have been advised by the quality
control inspectors about the problem at the time it happened.
The quality control inspector will sign, date and advise the time the inspection took place on
their Quality Control Cutting and Numbering Report (REF Q.C.C.N.R). As soon as these
reports are signed then the cutting room manager can allow the garment pieces to be bundled up
ready for production.
As soon as the garment pieces are put into bundles, but before they are passed to production for
stitching, a random quality check will be carried out on them. This is to ensure that the pieces in
any particular bundle are correct for;
- bundle ticket, order number & cut piece numbers,
- colour, shade of fabric,
- size of cut pieces and
- quantity of cut pieces
The quality control inspector will record all findings (good, bad and comments) on the Quality
16
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
Control Cutting and Numbering Report (REF Q.C.C.N.R) and advise the cutting room manager
and head of quality control.
7.0 QUALITY CONTROL IN THE SEWING SECTION Good sewing begins with good cutting. If the cutting of garment pieces is bad then it will result
in sewing defects, excessive repairs and slower production. The quality control in the sewing
section can be split into 4 distinct areas –
- Roving In-Line Quality Control Inspection
- Static In-Line Quality Control Inspection
- 100% End-of-Line Quality Control Inspection
- End-of-Line Quality Control Audits
7.1 Roving In-Line Quality Control Inspection Roving in-line quality control inspection allows for the monitoring of quality on each of the
processes and operations on a garment, within the manufacturing cycle, a certain number of
times per day. All quality issues need to be inspected within the bundle i.e;
- correct measurements,
- correct stitch tension and stitches per inch (SPI),
- correct size and colour of thread,
- correct stitch width and formation,
- correct seam width,
- correct type of seam,
- correct fabric type and colour,
- correct accessory, trim type and colour and
- correct position etc.
These repeated inspections will identify potential quality faults at the source, as they happen.
They will also highlight poorly skilled operators, supervisors and quality control inspectors.
However, before they can carry out any inspections they need to have all the information
regarding the operations they will be checking. This information will come from the spec packs
(PDM / PLM) that American Eagle Outfitters has sent. This is in addition to all the comments
that were passed back to the vendor both before bulk was approved to start and after the samples
have been made.
Roving in-line quality control inspections will provide the necessary information to minimise the
recurrence of any such problems from happening again on that particular style or model in the
future.
There should be 1 roving in-line inspector for a maximum of every 35 - 40 sewing machine /
marking / pressing operators. Each roving in-line inspector will check each operator a minimum
of 5 times randomly per day in a 10 hour shift (more times if the working hours are longer). The
checking of operators must be undertaken randomly. No pattern of movement must emerge for
operators to know when an inspector is coming to inspect their work.
If the Quality Control Roving In-line Inspection Report (REF. Q.C.R.I.L.I.R) does not state the
exact time that the inspectors checked each operator then how does anyone know if they
checked the operators randomly or in sequence? So without any actual times on their reports
they could check sequentially along the sewing line – see Sewing Line (A) – Sequential
Checking below. At the start of the 1st day the roving in-line inspector goes to operator number 1
and then 2, 3, 4, 5, 6 etc. On the 2nd day the roving in-line inspector goes to operator 1 and then
2, 3, 4, 5, 6 etc. These are both sequential along the sewing line and without any times written
down, no one can check.
SEWING LINE (A) – SEQUENTIAL CHECKING
17
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
14 SEWING MACHINES
IINN--LLIINNEE IINNSSPPEECCTTOORRSS
RROOUUTTEE 8.00 / Start 8.00 / Start
1
14 10.10/ 10.10
8.10 / 8.10 2
13 10.00/ 10.00
8.20 / 8.20 3
12 9.50 / 9.50
8.30 / 8.30 4
11 9.40 / 9.40
8.40 / 8.40 5
10 9.30 / 9.30
8.50 / 8.50 6
9 9.20 / 9.20
9.00 / 9.00 7
8 9.10 / 9.10
If the roving in-line inspectors go along the sewing line sequentially, then the operators will
know the approximate time that they are coming for the inspection. This could mean that they
sew better quality garments just before each visit which may mean that the amount of defects
found will be a lot less than if the inspections were done randomly. After the roving in-line
inspectors have inspected the garments and moved off to the next operation (sequentially down
the line), the sewing operators could increase their speed of sewing and so increase the number
of defects being stitched. This is until they see the roving in-line inspector coming back along
the sewing line sequentially, when they will slow their sewing speed down, and sew good
quality garments.
This sequential way of checking will give a bigger degree of difference of information between
the roving in-line inspections and the 100% end-of-line inspections than if the inspections were
carried out randomly.
If the roving in-line inspector’s write down the exact time that they checked each operator on
their reports (REF. Q.C.R.I.L.I.R) then it is possible to see that they went along the line
randomly and not sequentially – see Sewing Line (B) – Random Checking below. At the start of
the 1st day the roving in-line inspector goes to operator number 1 before moving onto operator
number 12, 6, 8, 3, 14 etc. On the 2nd day the roving in-line inspector goes to operator number 5
before moving onto operator number 10, 2, 13, 7, 9 etc. In this way the operators will not know
exactly when the roving in-line inspector will visit them next. This will keep the operators on
their toes producing better quality garments all day, every day - month after month. It will also
give more accurate results of what is actually happening in the sewing lines.
18
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
SEWING LINE (B) – RANDOM CHECKING
14 SEWING MACHINES
IINN--LLIINNEE
IINNSSPPEECCTTOORRSS RROOUUTTEE
8.00 / Start 1
14 8.50
8.20 2
13 8.30
8.40 3
12 8.10
4
11
8.00 / Start 5
10 8.10
8.20 6
9 8.50
8.40 7
8 8.30
Bundles which are inspected from an operator must be completed or have pieces which have
been individually finished if the production system is single pieces. Each bundle being
inspected will have 5 pieces checked in that bundle i.e. a bundle that has 18 pieces in it will have
5 pieces inspected.
The pieces chosen for inspection must be picked at random, from within the bundle. They could
be the 1st, 3rd, 10th, 14th and 18th pieces on the first bundle and the 2nd, 5th, 9th, 15th and 17th pieces
on the second bundle.
The roving in-line inspectors must not always take pieces either from the top half or the bottom
half of any bundle otherwise the operators will become aware of this and ensure that the top or
bottom half of the bundle is of a better quality than the balance of the bundle.
Random means random. All operations should have an approved, signed and dated, counter standard attached to the
machine for that operation. The roving in-line QC inspectors as well as the operators have a
standard to follow.
The roving in-line inspectors also need to check, and make sure, that the stitch tension, stitch
balance, as well as the stitches per inch (SPI) for all sewing operations, are correct. They can
19
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
write this information on the same report (REF. Q.C.R.I.L.I.R) that they write the quantities
checked etc. If there are any discrepancies then the operator must be stopped immediately and
the stitches per inch (SPI) changed to the correct one. If there is a problem with the stitch
tension then again the operator is stopped until the mechanic can be found to rectify the
problem. Once the problem is solved then the mechanic can sign the roving in-line inspectors
report.
If 1 or more (of these inspected pieces from the 5 pieces checked from the bundle) is incorrect
then the inspector will write down their findings on the Quality Control Roving In-line
Inspection Report (REF. Q.C.R.I.L.I.R). The roving in-line inspectors will fill in the types of
defects using the Defect Code references (REF D.C) as well as the quantity of each type of these
defects. These defect code references will allow the supervisors and management to see what is
happening, when it is happening and if the types of defects are being reduced over the course of
the day, week and month. If they are being reduced then the system is working. If they are not
being reduced then the supervisors and management are not doing their jobs properly.
When the roving in-line inspectors find a defect they will get hold of the line supervisor and
advise them of the problems that they have found while checking that particular bundle. They
will give the defective pieces to the supervisor. The supervisor will then sign the Quality Control
Roving In-line Inspection Report (REF. Q.C.R.I.L.I.R) to prove that they have had this problem
brought to their attention, and have received the defective pieces, in case they decide to deny
this fact at a later date. The roving in-line inspector will now move onto the next operator
(randomly) for further inspections.
The roving in-line inspectors are not there to un-pick the mistakes that the operators have made
(see Quality Systems at the beginning of the manual).
The supervisor should then decide why that operator is having so many quality problems and
eliminate them so that they do not occur again.
After the supervisor has re-trained or re-instructed the operator, had the machine repaired etc.
then the operator can start sewing again but only after first repairing all the incorrectly stitched
garments which were found in the rejected bundle.
That operator should not produce anymore poor quality garments again. If they do then it could
mean that –
- they may not be a good sewer and maybe should not be on that particular job
- they may not have been correctly shown how to do the job at the beginning
- the supervisor may not be doing their job correctly in re-training or re-instructing the
operators
- the mechanics may not doing their job correctly
- the cutting may be of poor quality
This statistical quality control system allows all personnel to be monitored. A library can be
built up as to which operator is best suited to a particular operation. Then if anyone is absent or
leaves, the management know which are the most versatile operators for each operation and can
plan their work flow or production accordingly.
A daily quality control graph (REF.Q.C.G) can be produced for each operator per month so that
every line supervisor can quickly see who the best performers of quality are. The management
do not have to rely on the supervisors “critical analysis based on experience but no hard
evidence” ie:
The conversation between a manager and two supervisors would go something like this if no
hard physical evidence (signed and dated) was available -
20
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
Conversation 1
Manager - “How is the quality going?”
Supervisor 1- “Fine”
Manager - “Then why did we get 12% rejects yesterday from your section?”
Supervisor 1- “That isn’t my section - it couldn’t be. All my machinists are very
good. It must be from
supervisor’s 2 section”.
or Conversation 2
Manager - “How is the quality going?”
Supervisor 2- “Fine”
Manager - “Then why did we get 12% rejects yesterday from your section?”
Supervisor 2- “That isn’t my section - it couldn’t be. All my machinists are very
good. It must be from supervisor’s 1 section”.
or
Conversation 3
Manager - “How is the quality going?”
Supervisor- “Fine”
Manager - “Then why did we get 12% rejects yesterday from your section?”
Supervisor- “No one told me about any quality problems”.
Manager - “The inspectors told me that they told you all the problems that were
found on the line”.
Supervisor- “If they had told me then I would have solved all the problems.”
Inspector- “I did tell you all the problems yesterday.”
Supervisor- “No you didn’t. If you had then I would have solved the problems”
Sound familiar? Who is the manager supposed to believe? Without timely, accurate
information they can’t believe anyone or make an informed decision on what action to take.
Supervisors cannot remember what quality was produced by each operator yesterday, let alone
last week, if no written information is available. A closely monitored inspection system that
deals in facts and not “experience” is essential.
With the right system in place the work-in-progress will all be of good quality, as the roving in-
line inspectors are checking the operations as they are being stitched and informing the
supervisors about any quality issues as they happen. The garments do not wait to reach a
particular point for action to be taken, as is the case with static in-line quality control inspection
or 100% end-of-line quality control inspection.
7.2 Static In-Line Quality Control Inspection Static in-line quality control inspection means that pre-determined control points are set up
within the manufacturing cycle. These will vary depending on the product but will generally
cover a number of consecutive operations.
Having determined the control points a daily static in-line quality control inspection report is
prepared for each control point e.g. fronts, backs, sleeves, etc. This report is the same as the
100% end-line inspection report, but with different operations listed on it – Quality Control
Static / End Line Inspection Report (REF. Q.C.S.E.L.I.R).
These inspection reports allow the following to be assessed -
- the quality of the garments for that section or line
- the ability of the end-of-line quality control staff (when comparing roving, static in-line
21
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
and end-of-line inspection report sheets)
- the ability of the static in-line quality control staff (when comparing roving, static in-
line and end-of-line inspection report sheets)
- the ability of the supervisors on that section or line (when comparing how often a
sewing operator is having problems).
- the ability of the management (when comparing the performances of the lines).
These reports are filled in and totalled up every 2 hours. After every 2 hours the total output as
well as the types and totals of defects, plus the percentages, can be seen. The supervisors, as well
as the roving in-line inspectors need to come and review these reports every 2 hours. Once
reviewed, they will sign at the bottom of those 2 hours. By signing, the management will know if
these personnel are doing their jobs correctly or not. These cannot be signed at the end of the
day. They must be signed every 2 hours during the day.
This process achieves a 100% inspection rate. This sounds very impressive but unfortunately
there is always work-in-progress. Most factories have many hours of work-in-progress waiting
between operations as well as at the static in-line quality control points.
If the static in-line quality control inspector finds a quality problem it may mean that the next
few hours will be spent un-picking and repairing all that work-in progress.
Each static in-line quality control inspector should have an approved, signed and dated,
standard. This is placed on the same table top where they will be checking garments. It is easier
to review a garment when it is on the same plane as the garments being inspected. Hanging them
up is no good as the static in-line quality control inspectors will not use them. They will also
look different as the light is catching them at a different angle to the garment being checked flat
on the table top.
A lot of factories rely on this static in-line quality control method as their safe guard to better
quality. Whilst it is better than no quality control at all, it is not very efficient. The garments are
inspected hours after they have been stitched and not while they are being stitched as is the case
with the roving in-line quality control.
This inspection system could be used if a particular operation is having quality issues to help
eliminate any problems later on down the lines.
7.3 100% End-of-Line Quality Control Inspection Once the garment has passed through the roving and static in-line quality control systems the
quality of the finished garments at the end of the line should have been greatly improved.
However, this will only be the case if the inspections have been taken randomly and the
management is having meaningful meetings to rectify the quality problems. Repairs and rejects
should have been significantly reduced so allowing the end-of-line inspectors more time to
check each garment thoroughly for fabric, measurement and stitching defects.
The 100% end-of-line inspectors will inspect 100% of all garments passing through them for
both fabric and stitching problems. These inspectors will also measure a percentage of garments
per size, per colour per day according to the official size specification.
Each end-of-line quality control inspector should have 2 approved, signed and dated, standards
placed on either side of the table top (see photo below). One is the front and one is the back.
These are placed on the same table top where they will be checking garments. It is easier to
review a garment when it is on the same plane as the garments being inspected. Hanging them
22
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
up is no good as the end-of-line quality control inspectors will not use them. They will also look
different as the light is catching them at a different angle to the garment being checked flat on
the table top.
Many times you see a sample hanging up at the end of the line with paperwork all over it. These
will never be used by the end-of-line quality control inspectors or anyone else as no one can see
them (see photo below).
The 100% end-of-line inspectors will fill in a Quality Control Static / End Line Inspection
Report (REF. Q.C.S.E.L.I.R) on every garment that is inspected per day, good or bad.
These inspection reports allow the following to be assessed -
23
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
- the quality of the garments for that section or line
- the ability of the end-of-line quality control staff (when comparing roving, static in-line
and end-of-line inspection report sheets)
- the ability of the in-line quality control staff (when comparing roving, static in-line and
end-of-line inspection report sheets)
- the ability of the supervisors on that section or line (when comparing how often a
sewing operator is having problems).
- the ability of the management (when comparing the performances of the lines).
These reports are filled in and totalled up every 2 hours. After every 2 hours the total output as
well as the types and totals of defects, plus the percentages, can be seen. The supervisors, as well
as the roving in-line inspectors need to come and review these reports every 2 hours. Once
reviewed, they will sign at the bottom of those 2 hours. By signing, the management will know if
these personnel are doing their jobs correctly or not. These cannot be signed at the end of the
day. They must be signed every 2 hours during the day.
In addition to ensuring that the product coming off the line is within the standards set by
American Eagle Outfitters, it is also important to ensure that the makeup details are exactly as
per the Green Tag garment.
It must be noted that everything that a 100% end-of-line inspector states is good normally ends
up being shipped to the customer. This, however, may not be the case. If an end-of-line
inspector is finding 15% defective garments per day then there is a chance that they will be
passing a similar percentage of 15% of poor quality garments onto the next stage that will end up
in cartons. No 100% end-of-line inspector is 100% perfect, but no additional checks are
normally done on these 100% end-of-line inspectors. So who needs to be checking these 100%
end-of-line inspectors to ensure that the pieces that they state are good, and are passing onto the
next stage, are indeed correct That is where the end-of-line quality control auditors come in.
7.4 End-of-Line Quality Control Audits End-of-line quality control auditors are very necessary in any manufacturing environment. They
will carry out audits on the 100% end-of-line inspectors good / passed garments. Their
paperwork is based on the style, the line making the garments and the work orders.
Every bundle that the 100% end-of-line inspector says is good needs to be checked by the end-
of-line auditors. These end-of-line auditors will check 20% of every bundle that have been
passed as good by the 100% end-of-line inspectors eg. the 100% end-of-line inspectors pass 10
garments, the end-of-line auditors will check 2 garments from this bundle (randomly 20%).
If the end-of-line auditors find any defects within the bundle they will write down what they find
on the Quality Control Auditors Inspection Report (REF Q.C.A.I.R) and give the whole bundle
back to the quality control supervisor who is in charge of the 100% end-of-line inspector who
passed these defective pieces (the Sewing Operation Breakdown code (REF S.O.B) as well as
the Defect Code (REF D.C) will be written down). The quality control supervisor will sign the
Quality Control Auditors Inspection Report (REF Q.C.A.I.R) to say that they have been advised
about the problem. The quality control supervisor will pass this bundle back to the 100% end-
of-line inspector who carried out the inspection on that bundle and get them to re-check the
whole bundle again. The supervisor will also find out why the 100% end-of-line inspector
missed these defects.
The auditor will then start checking another bundle. If they find a good bundle then a green
sticker (the size of a thumb nail with an identification number on it) is attached to the bundle
ticket. This will show the person who is moving the bundles to the next operation (measuring,
washing, pressing etc.) that the quality of that bundle is good and it can be transported. If there
is no sticker then the bundle will be passed back to the quality control supervisor for re-
24
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
inspection.
This report will advise which end-of-line inspectors are passing a lot of defective garments and
the percentages of those defects. If this is happening then a corrective action plan can be put
into place.
8.0 QUALITY CONTROL IN THE FINISHING SECTION Once the garments have finished being audited in the sewing section, and have been passed,
they can then be moved to the next operations.
8.1 Washing, Pressing, Folding & Packing, Quality Control Inspection Washing, pressing, folding and packing of garments have similar inspections carried out on
them as the end-of-line auditors (REF Q.C.A.I.R – 1).
Here again, measurements (see section 8.2 – Measuring for Quality) as well as quality need to
be properly inspected.
Silver tag standard samples need to be readily accessible to ensure that the handfeel of the
garments, after wash, is exactly what American Eagle Outfitters is looking for.
8.2 Measuring for Quality Measurements probably lead to some of the biggest problems in the garment industry. However,
most vendors are not measuring garments anywhere along the production cycle so it is hardly
surprising that problems are found. If they are then they will measure only a few pieces per size
per colour per PO.
In today’s marketplace this is totally unacceptable.
Vendors need to buy into the measurement process.
Before and after wash measurement charts are required for any washed products. Without this
information it is impossible for the production or quality control personnel to carry out their
duties correctly.
Once these have been implemented then measuring points need to be added to both in-line
quality control, end-of-line quality control as well as after wash and after pressing. These areas
need to be decided upon by the vendors.
For American Eagle Outfitters every garment (100%) needs to have the critical measurements
checked, after wash, to ensure that the measurements are correct before they are packed and
shipped.
Everyday 10 pieces, per style, per size, per colour have to have all the measurement points
which are on the PDM / PLM measured. These measurements also need to be recorded on a
daily basis and be available to American Eagle Outfitters QA personnel for checking.
This needs to be done in both the production lines as well as in the finishing section. Before
wash measurements are taken after the garments have finished being stitched and then after
wash measurements are taken after the garments have finished being washed. All these
measurements need to be recorded. The balance must have the critical measurements taken.
The out of tolerance garments need to be recorded together with the total quantity of garments
25
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
actually being measured. This is done on the Quality Control Measurement Report – Static /
End-of-Line (REF Q.C.M.R). In this way a percentage of defective garments can be recorded.
This is useful information for the pattern makers, as they may not be adding the correct
shrinkage allowances onto the paper patterns, so causing these measurement discrepancies.
Measurement problems may also be occurring due to sewing operators trimming off too much
fabric when stitching. Either way, an action plan needs to be implemented to ensure garments
measure correctly.
All tape measures need to be calibrated 4 times a year (ie every 3 months). The date that they are
calibrated, together with the name of the person who calibrated them, needs to be stuck onto
each tape measure so that QA / QC can constantly check that the measuring tapes are correct..
9.0 Quality Control Personnel The training, movement and meetings of quality control personnel within the factory are critical
to the company’s success. These all revolve around the SOP that the factory implements.
9.1 Movement of Quality Control Personnel All Q.C inspectors, whether they are in the cutting room, roving in-line, static in-line, 100%
end-of-line, measuring, pressing, 100% finishing, packing, auditing etc., should be moved from
section to section, line to line, department to department every month etc. so that –
- they can learn all the processes that go into the
construction of a garment and get a better understanding
of the whole quality process.
- they do not become too friendly with the operators that
they are checking so being biased into passing rejected or
substandard garments.
- if any shortages or absentees of personnel occur then
the gaps can easily be filled with experienced personnel.
An excel spreadsheet should be used to control this. This will show where each quality control
person has been in the past (by section, line etc.) and where they are going to be in the future (by
section, line etc.).
9.2 Training People in Quality It is very important for everyone who is associated with quality (QC, production and
management) to be properly trained (see American Eagle Outfitters Multi Skilled QC
Training Program). Once trained then a monitoring system needs to be set up to see which
personnel are able to find quality problems or not.
9.2.1 Training procedures How can you quantify who is a good inspector and who is not? This is what every factory
should be asking themselves. We know that factories will show QC personnel slides or
garments and have discussions and meetings on quality issues about the types of defects or
construction issues. But how do the management know who is actually effective in finding
these defects and who is not?
When a QC manager is asked this question they will say that they know because they walk
around the factory and see who is doing a good job as well as review the QC reports. However,
what constitutes a “good job”? Reviewing the QC reports only shows what has been found to be
defective and not what has been missed. As you can see this is totally unacceptable and
inadequate. Gut feelings or instincts have no place in managing a modern company, only
26
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
information and facts do.
So what procedure can be put into place to ensure everyone knows who is able to find defects or
who needs additional training based on facts and not gut feelings?
Bundles of defective garments need to be collected and kept in bundles of 10 pieces. These will
be individually numbered in bundles e.g. bundle 1 will have garments numbered from 1 to 10.
Bundle 2 will have garments numbered from 11 to 20, and so on. The defective garments can
have single or multiple defects on them.
These could be anything from dirt, measurements, stitching defects to construction or fabric
defects. There can also be some good garments in each bundle as well. When these defective
garments have been collected, a qualified QC inspector will thoroughly check each garment.
Every defect they find will be noted down in a book for garment 1 to 10 under bundle number 1.
Bundle 2 will have a new page in the book and then have all the defects written down for each
garment.
So, for example, you may have the first bundle of 10 garments with 30 defects in total.
The training then takes place. If it is decided, by the industrial engineering department, that
each garment normally takes the end-of-line QC inspectors 2 minutes to inspect, then the same
time will be used in the training exercise.
This means that bundle number 1 with 10 garments in it will take 20 minutes to check all the
pieces. The first person who will take the test is then given the bundle. They have 20 minutes
to check all the garments.
They need to fill in a report for these 10 inspected garments. The number of the first garment
checked is written down together with all the defects that they find for that garment. The same
happens for the next 9 pieces. After 20 minutes, whether they have finished inspecting all 10
pieces or not, they are stopped and the answers are marked. This person may have found 15
defects in all 10 garments. This means that they found 50% of all defects (15/30). They will
then be shown the other 50% of the defects that they did not find. In this way they will see what
they missed and so become more aware of the types of defects that they should be finding. How
often should a person who only finds 50% of all the defects be tested? A question should first be
asked – Is the factory happy with a QC inspector only finding 50% of the defects in the
garments passing through the sections? Obviously the answer is no. So if this is the case then
these people need to be tested every day until their percentages start to improve on a constant
basis eg. 1st day they find 50%, 2nd day they find 55%, 3rd day they find 60%. This is good as
they are steadily improving. However, this is not always the case. The person may find 50% on
the 1st day, 50% on the 2nd day and 50% on the 3rd day. In this case there are 2 scenarios which
may be at play;
Scenario 1. The person may have problems with their eyesight. So their eyes need to be tested
etc. Once their eyesight is corrected then they take the tests again eg 1st day they find 50%, 2nd
day they find 55%, 3rd day they find 60%. So in this case the correction helped and they can now
see and carry it out correctly.
Scenario 2. They may just not be good enough to be a QC inspector in which case they will be
transferred to another job.
If they are only finding 50% of the defects in the test bundles then they will be finding a similar
proportion of defects when they are on the production sewing or pressing lines. This means that
those percentages will be passing along the production cycle. Obviously these percentages will
not pass any AQL inspections.
27
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
An excel spreadsheet – Quality Control Training Report (REF Q.C.T.R) - is kept for everyone
who takes this test. Each person is tested a minimum of 2 times per month once they get to a
rate that is deemed satisfactory by the factory management. By doing this a chart will build up
of who are the most effective QC inspectors and those who need additional training. This is
actual data and can then be viewed by management into planning who does what and where they
are going to be placed to do it.
Who needs to be tested in this way? All QC inspectors (fabric, cutting, in-line, end-line,
auditors, washing, pressing, packing, pre-final, final) as well as all production supervisors,
managers etc. need to be trained in this way.
With this type of training it will be found that over the months each person will be finding more
defects in the production sections. Obviously when an inspector takes these tests they are given
different bundles each time they take the test.
An additional piece of information to know is that when an inspector is checking a garment they
will waste a lot of time if they have to write down what the actual defect was as well as where
they found it (i.e. the location of the defect and the sewing operation). This information is vital
if the vendor is to find the source of the defect and then be able to stop it from happening again.
Therefore a Defect Code (REF D.C) and a Sewing Operation Breakdown (REF S.O.B – Knits,
Pants & Shirts) needs to be drawn up and used by all QC inspectors during production as well as
during the bundle testing.
9.3 Meetings for Quality and Co-operation between Departments Daily meetings should be held by line between the Q.C personnel, production line supervisors,
floor managers and QC managers to ensure that all quality issues are thoroughly discussed and
addressed each day. This will help to reduce the percentage of rejected garments in production.
These meetings should be looking at the roving in-line inspection reports, static in-line
inspection reports, 100% end-of-line inspection reports, end-of-line audit reports, the washing,
pressing, folding audit reports, 100% finishing reports and the pre-final and final audit reports.
This will allow everyone to see;
- which sewing operators are not performing,
- which roving in-line inspectors are not performing,
- which static in-line inspectors are not performing,
- which 100% end-of-line inspectors are not performing,
- which end-of-line auditors are not performing,
- which production supervisors are not performing,
- which mechanics are not performing,
- which washing inspectors are not performing,
- which pressing operators are not performing,
- which folding operators are not performing,
- which packing operators are not performing,
- which daily packed carton AQL auditors are not performing and
- which final packed carton AQL auditors are not performing.
Once these non performers have been targeted then they can be re-trained and easily monitored
to ensure they perform better. In this way quality will definitely improve.
These meetings, held by line, should take no longer than 15 minutes per line. These should be
set at the same time everyday for each line. In this way it will also be a discipline for the people
having this meeting to ensure that they are ready and waiting at the time specified, in an office,
to hold this meeting.
Each person in the meeting will have an exercise book to write down who is a poor performer,
or which operation is having problems etc. The management will then be able to see what was
28
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
discussed and what, if any action, is taking place. Results should be pretty dramatic at the
beginning, provided that the meetings are held and conducted constructively and correctly.
Action needs to be taken by the production personnel, as well as management, to ensure poor
performers are looked at very closely and re-trained to perform at the required level.
If this action does not take place at production or management level then no results will be seen.
THIS PART IS THE MOST IMPORTANT PART OF THE PROCESS. There is no point in
going to all the trouble of identifying the trouble spots and areas only for management to do
nothing about them.
9.3.1 Better understanding between management, production and quality personnel – 2
hourly checks It must be made clear that there must be one goal for all to achieve within an organisation, and
that is making a quality product first time, and on time.
There must be more cooperation between production, quality and management. To facilitate
this, the following procedures also need to be implemented and maintained.
The roving in-line inspectors and static in-line inspectors need to go and look at the same line’s
or section’s 100% end-of-line inspectors report every 2 hours (REF Q.C.S.E.L.I.R). This is to
ensure that they see what defects are being found at the end of the line. They need to review this
report and see if they are also finding the same defects in-line. If not then they need to be
paying more attention to those operations that are having defects found at the end-of-line. They
need to sign this report when they check it. This needs to happen every 2 hours during the day.
The same needs to happen with the production supervisor for that sewing line as well. They
need to go and review the static in-line and 100% end-of-line inspectors report every 2 hours.
This is to ensure that they see what defects are being found in the line as well as at the end of the
line. They then need to go and see why those operations are having high defect rates. They
need to sign this report when they check it. This needs to happen every 2 hours during the day.
In this way, both the in-line inspectors and production supervisors know what defects are being
found at the end of the production line and have, by signing these reports, acknowledged what
they have seen. If they are good and have been trained correctly, the defects should start to
disappear and quality should dramatically improve.
It is up to the QC and production managers to ensure that these signatures are not all done at 5
pm, but every 2 hours during the day.
This means that the management have to go around the factory during the day to check that the
production supervisors and in-line inspectors are carrying out their jobs correctly.
When the managers visit these areas they also need to sign these reports under the hour that they
were there. The QC manager also has to check the in-line reports as well and sign those adding
the time that they were there.
Having this happen ensures that no one can say that they didn’t know a problem was occurring.
This will prove who can do their jobs effectively or who cannot.
There is written signed proof to this fact.
10.0 AUDITING PRODUCTION FOR QUALITY Having established a framework of systems and procedures for inspecting quality within the
factories, checks now need to be made to monitor compliance of these practices both within the
factory as well as within any sub-contracting factories that may be used ie embroidery, printing
etc.
10.1 Garment pre-production
29
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
The pre-production garment meeting is extremely important. This meeting is between all the
factory personnel and the agent who is handling this order, if not direct business. All issues
from fabric and accessories to the way the garment is to be stitched, washed, packed and shipped
should be discussed at this meeting with the merchandisers as well as the production and quality
personnel. It is at this meeting that any issues such as potential difficulties or areas that need
special attention during production need to be discussed and sorted out. An example of this is
the Denim Pre-production Meeting in the Appendix (REF D.P-P.M).
10.2 Nature of Audits Whilst any audit is of a post-mortem nature, it is a valuable exercise in -
- highlighting practices not in conformance with specified procedures (feedback and
correction),
- generating pointers for further staff education and training,
- staff performance appraisal,
- demonstrating a commitment to improving quality of operations,
- demonstrating team participation and
- proposing changes and up-dates for the quality assurance requirements.
10.3 Acceptable Quality Level Auditing (AQL) This section describes how an audit by a visiting quality control inspector or the factories own
auditing inspector should be carried out during production in a manufacturing unit using an
A.Q.L system (REF A.Q.L). An A.Q.L system utilises the concept of acceptance inspection.
This can be defined as the process of measuring, examining, gauging or otherwise comparing
the item to acceptable requirements, resulting in a decision whether the item or lot is acceptable.
The key components of acceptance inspection are the sampling plans to be used, and the type of
A.Q.L to be adopted. A.Q.L is the maximum percentage proportion of defective units that, for
the purposes of acceptance sampling, can be considered a satisfactory average quality.
Whilst the use of A.Q.L is debatable, experience has shown that the vendor is generally well
protected if the samples drawn from inspection are properly examined and are representative of
the bulk from which they are drawn.
The two key parameters are therefore -
- random sampling of the lot tendered for inspection,
- accurate and precise examination and reporting of non conformance to requirements.
Sampling procedures will vary according to timing of inspection. As noted earlier in the
manual, a prime function of assurance is to assist the vendor in controlling their quality. Stage
inspection visits are therefore a very important part of the process of verifying whether or not
the production or assembly process is under control.
The following sampling procedures will apply -
- In-Line Inspection – Double sampling plan, Normal Severity Level – AQL 2.5 using
American Eagle Outfitters – Garment Inspection Manual – prepared by ITS.
- Final Inspection - Double sampling plan, Normal Severity Level – AQL 2.5 using
American Eagle Outfitters – Garment Inspection Manual – prepared by ITS.
The most important time for any vendor to see how their production is progressing in a factory is
when it first starts being cut and sewn. Many companies seem to put more value in inspecting an
order that is already 80% finished in export cartons than making sure that the start-up of
production is correct.
In-line, pre-final and final inspection audits all need to be carried out for every style and order.
30
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
All details that are found when inspecting the garments need to be recorded.
Each Quality Control Garment Inspection Report (REF Q.C.G.I.R) is made up of 4 sections.
These are used for any pilot, in-line, washing, pre-final or final inspection for an order.
The first page (REF Q.C.G.I.R 1) is where it states the A.Q.L level to be used, how many pieces
need to be inspected, the pass or failure rate of this A.Q.L as well as a place to report what is
actually found during the inspection of the garments on that particular day.
The second page (REF Q.C.G.I.R 2) is a checklist which the inspector must fill in to ensure that
nothing is forgotten when the inspection is carried out i.e.;
- fabric details,
- accessory details,
- label details,
- construction / make up details and
- packing / marking / carton details
The third page (REF Q.C.G.I.R 3) is the measurement report for that order. This is where the
inspector records the actual measurements for the production that they inspected.
The fourth page (REF Q.C.G.I.R 4) is the washing and handfeel report for that order. This is
where the inspector records the actual wash effects for the garments being processed as
compared to the standard.
Copies of these finished reports will be given to the vendor being audited.
The quality assurance staff should be informed about the objective of an audit.
Subsequent audits should address issues previously noted, to gauge how and where the
improvements have been made.
10.4 In-line Audit Inspection and Production Status Reports The in-line audit is the most important inspection procedure that can be performed on any
orders. If any factory cuts and makes the garments in the correct way at the start of production
then 95% of the battle to get a good shipment is just about taken care of.
As soon as the go-ahead for cutting is given then there still should not be any make up or
production issues outstanding.
It is at this stage that the agents audit inspectors should return to the factory to check on the
early progress of the garment. Some of the early questions that need answers are;
- How has it been cut?
- Has it been cut in the correct ratio?
- Are the rest of the markers / ratios correct?
- Has it been cut correctly?
- How are the cut pieces being loaded onto the line?
- Are they in ratio - by colour and size - or not?
- Is the stitching detail correct?
- Are the measurements correct as per the size spec?
- Does the garment look the same as the Green Tag sample?
Daily monitoring and communicating with the factory for total cut, total loaded onto the line,
total finished off the line, total washed, total packed and boxed and total shipped figures are
required by PO to plan the next quality control inspection. This report is the Production Status
Report (REF P.S.R).
31
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
Once production and sewing begins then every sewing operation should be looked at in detail
until finished garments start to come off the line. These garments should then be carefully
inspected for make up details as well as measurements. Particular attention must also be paid to
all the sizes and not just the first ones that come off the line.
If the garments coming off the line at this point in time are correct, according to all the
specifications (size and make up), then it can be assumed that the majority of the production will
more than likely be accurate than if the first inspection had taken place when 80% of the
production had been finished and in export cartons. All items checked during in-line inspection
must be written down on the garment inspection report (REF Q.C.G.I.R 1 / 2 / 3 / 4).
10.5 Corrective Action Plan If any issues are found by American Eagle Outfitters, their agents or the vendor during the in-
line inspection audit (see 10.4 - In-line audit inspection) then some solutions need to be found by
the vendor so that they don’t happen again. A corrective action plan – daily and weekly - (REF
D.C.A.P and W.C.A.P) needs to be undertaken to ensure that a complete record is kept of these
issues together with the vendors undertaking as to when and how the problems will be solved.
These also show how these issues are progressing as well as the vendor’s amount of commitment
to ensuring these issues don’t happen again.
The Daily Corrective Action Plan (REF D.C.A.P) is used by all production and quality control
personnel on the sewing lines during the week. All the issues that were found when an audit was
done are noted down onto this report. These are then issued to the production and quality control
personnel. They will monitor these points as well as carry out their normal day to day functions.
The supervisors and management will review these Daily Corrective Action Plans (REF
D.C.A.P) at the daily meeting that are held between the quality control and production personnel
on a daily basis (see 9.3 - Meetings for Quality and Co-operation between Departments). If any
additional issues have been found that are not on the daily corrective action plan, then they will
be added at these meetings. Again, these will be monitored daily until they have been rectified
and do not happen again.
A Weekly Corrective Action Plan (REF W.C.A.P) that covers the month is also filled out and
monitored on a weekly basis by management as well as at the daily meetings mentioned above.
The amount of defects being made within the factory will be greatly reduced by constantly
monitoring these issues and taking action to solve them.
10.6 Pre-final Audit Inspection A pre-final audit is any check done on finished stock before 100% of the order is in the cartons.
All items checked during a pre-final inspection must be written down on the Quality Control
Garment Inspection Report (REF Q.C.G.I.R 1 / 2 / 3 / 4).
When should these inspections be taken? There is little use carrying out a pre-final inspection
when 80% of the garments have been finished and packed because if a problem is found then all
these garments will need to be unpacked, re-inspected and then re-pressed, re-packed and made
ready for another pre-final inspection.
It is much better if daily pre-final inspections are carried out. So, for example, 20 cartons have
been packed on Monday. These need to be audited on Tuesday in a pre-final AQL 2.5
inspection to check if they are correct or not. If they are correct and are passed then they can be
put into the main warehouse, noting down their carton numbers. The same happens on
Wednesday and Thursday. However, the pre-final audit on Friday fails. These 20 cartons need
32
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
to be unpacked, re-inspected, re-pressed and then re-packed.
Once finished packing another pre-final inspection will be carried out to check if the re-work
was successful or not. When 100% of the garments have been packed, it can be safely assumed
that the final audit will pass the inspection – provided that the auditors have been correctly
trained to carry out pre-final and final inspections in the first place.
This is by far the safest way of getting good quality garments ready for an internal or external
audit and shipment. If these pre-final audits have been carried out everyday until each PO is
finished then when the internal QC inspectors come to carry out the final audit, the shipment
should pass. It is very dangerous for the factory that waits until a big percentage has been
finished and packed before a pre-final inspection is carried out, as can be seen from the above
explanation.
10.7 Final Audit Inspection A final audit inspection MUST be carried out only after 100% of the PO / order number is
finished. The sample size must be drawn from randomly selected export cartons. This finished
stock, however, must be in the correct colour, size and order ratio for the final audit to take
place. Again all items checked during final inspection must be written down on the garment
inspection report (see American Eagle Outfitters – Garment Inspection Manual – prepared
by ITS).
All sizes need to be measured for all measurements and an additional 10% of final audited
garments need to be measured for critical measurements (see American Eagle Outfitters –
Garment Inspection Manual – prepared by ITS).
So for example, if there are 5 sizes (XS, S, M, L, XL) and 5 colours (Blue, Green, White, Black,
Red) then 5 garments will need to have full measurements taken. These could be XS – Blue, S –
Green, M – White, L – Black, XL – Red. An additional 50 pieces (10% of the audit lot size of
500 garments) will then need to have their critical measurements taken.
The total measurement defects that are allowed are based on the AQL being used for that sample
size. So for 315 pieces in a double sampling plan, 11 measurement points or less would mean a
pass. 12 to 15 would mean it would go to a second audit of an additional 315 pieces. 26 points
or less would mean the shipment passed, while 27 points would mean it failed.
American Eagle Outfitters AQL inspection level is 2.5 Double Sampling so it would be
advisable for the factory making the orders to use AQL 1.5 in their own inspections.
In this way, if their internal audits pass the inspection at AQL 1.5 then when an outside
inspector comes to take a final inspection at AQL 2.5, it should easily pass.
Keep defect samples aside to explain about them to the factory production personnel. Discuss
and encourage areas for quality improvement. Record these also.
The findings must be represented factually and lot disposition noted according to whether the
defects are inside or outside the A.Q.L limits. The factory representatives should be asked to
acknowledge the results by signing the report.
In the event of disagreement, the area of disagreement must be noted by the quality assurance
staff on the inspection report. The head of quality control, technical design and production must
be immediately notified so that timely follow-up action can be made to settle the issue.
The inspection reports are to be submitted to the head of technical design not later than one day
after the inspection has taken place.
All findings are to be documented at the time of inspection.
33
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
Avoid general terms such as "lighter colour". Take samples to illustrate such items.
10.8 Inspection Findings Review Procedure and Release Authority Levels The inspection report will be submitted to the head of quality assurance as well as the factory
manager for review and assessment of findings and samples.
Sign-off will be made, if the inspection is a final one, and the report will be given to the factory
manager and quality control manager. These reports will be kept in the appropriate Style Files.
In the event of a "reject" verdict, the factory may request the opportunity to rework and repair
the lot, and request another inspection.
In the event of a re-inspection, special attention should be taken to ensure that any re-working
has not introduced other aspects of non-conformance (e.g. dirt, packing defects etc.).
Should re-inspection lead to a "reject" verdict, any decision as to further reworking and re-
inspection must be taken by American Eagle Outfitters.
Through any of the above decision-making levels, time is of the essence and must be respected.
10.9 Traceability Measures All Style Files must be reviewed prior to any inspection visit. The inspector should check for
availability and clarity of American Eagle Outfitters specific requirements, availability of
reference samples, test reports, colour swatches, print and embroidery details, wash effects,
performance requirements, size specifications, pre-production details etc.
Clear identification of notification of any changes must be traceable to a person.
This review is the last step on the line before the actual inspection visit, and is therefore critical
for any clarification and or briefing on any points.
Reports generated by the quality assurance team must be traceable to specific individuals. Any
samples pulled from production need to be clearly identified and cross-referenced to the style
file, signed and dated.
Where any factory test equipment is used, the factory must be able to demonstrate that the
equipment is maintained and calibrated so as to provide precise measurement.
11.0 PRODUCTION CONTROL FOR QUALITY Production control doesn’t only mean the way an employee cuts, stitches or inspects a garment.
Production control can come in many different formats from attachments used on a sewing
machine to help the operator stitch faster with more accuracy, to the time it takes for a machine
to be repaired. Both of these are production controls and as was stated at the beginning of the
manual in quality systems - “a system under control will assure quality”.
Two further areas need to be studied in more detail as production controls. These are metal
contamination in garments (needle procedure and metal detection) and the management’s ability
to monitor a mechanics ability to repair sewing machines quickly, efficiently and cost
effectively.
11.1 Metal Contamination in Garments Any metal piece that finishes up in a garment could potentially end up in a lawsuit against the
company who sold or manufactured that particular garment e.g.;
A needle is found in a women’s jacket after the women was scratched by it. She take
the company who supplied the garment to court or they go to the press about it. The
bad publicity will hurt sales and image and the court action could result in a big
34
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
damages claim.
Either way, it is bad for American Eagle Outfitters as well as the vendor who made the
garment. How can this be avoided?
11.2 Needle Procedure It is common when looking around any sewing floor or production area to find either whole or
parts of needles lying all over the sewing floor or on the sewing machines, if they don’t have
any needle procedure in place. All it takes is for a garment to fall onto the floor to become
contaminated with needle pieces. Normally most sewing operators will have a stock of needles
in their possession. This is so that they can replace the needle with another one should it break.
The first action that any company can take is to ensure that no needles or parts of needles find
their way into any garments. The way this can be implemented is by having a Needle procedure
(REF N.P) within the organization.
A needle procedure file is located on each sewing line or sewing floor. One person has the
responsibility to look after this file. They will have a stock of varying types of needles that are
required for that sewing line or sewing floor.
These needles are kept in a box that can be locked and in fact should be kept locked at all times.
As soon as all the needles have been cleared from the factory floor (i.e. located in drawers, on
the floor, in the oil sumps of sewing machines, stuck into cones of thread etc.) new ones can be
issued to the machinists. There should now be no needles anywhere in the production facility
apart from the ones in the machines being used.
When an operator breaks their needle they must find every piece of that broken needle. Once
they have found all the pieces of the needle it can be taken, by the supervisor, to the person who
has the needle procedure file. This person will literally stick this needle into the file, ensuring
that they have all the parts of this broken needle. They will fill in the following details beside it:
- the date and time the needle was brought in for a replacement,
- which sewing section the machine is on,
- what type of sewing machine is it,
- the operators name and number,
- a space for the broken needle so that it can be taped to the page,
- the supervisors signature and
- the needle number which has just been issued as a replacement.
If, however, the operator cannot find all the parts of the needle then the garment that is being
stitched is examined for the missing part. If this missing part still cannot be found then all the
garments in the area of that machine are picked up and examined by putting them through a
metal detector. The sewing floor is also checked. Once the part is found then the procedure
mentioned above is carried out so that a new needle can be obtained and production can
proceed.
This procedure ensures that no needles, or parts of needles are found anywhere in a production
facility except in the machines that are currently being used to sew. It also acts as a check
against the theft of needles - one needle in, one needle out.
11.3 Metal Detection
35
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
A metal detector should be located in the finishing section and all garments must pass through it
before they are sent for packing. This will ensure that all packed garments are free from foreign
metal parts and contaminants.
If the metal detectors alarm sounds then the garment passing through it must be taken away and
checked for foreign contaminants. If found, it can then be passed through the metal detector
again for safety as there may have been more than one piece of metal in that garment.
If all the pieces of a sewing needle cannot be found on the factory floor then the garments which
were picked up in the same area as the machine are sent to the metal detector. All these
garments, at whatever stage of construction, are passed through the machine. If they pass they
can then go back for stitching. If not, then the contaminant will first be removed before sending
it back for finishing.
The question may be asked about the inspection of garments which have metal already attached
to them e.g. zips, eyelets, press studs etc. Non-ferrous metal accessories will allow the garment
to be passed through the metal detector without the alarm sounding. If a needle point or piece of
metal is in one these garments then the alarm will sound. The correct type of metal detector has
to be purchased however.
A book is located next to the metal detector and all screening failures are noted in it. The metal
detector must also be calibrated every hour – 9 positions - to ensure that it is in proper working
order – and these findings are recorded.
A card (the same size as a credit card which has a very small piece of metal – 1.2mm size -
inserted into it) is passed through the machine. If it passes through without being detected then
the sensitivity of the machine is increased. Once checked, the machine can carry on with
production. The machine must be checked hourly. These tests are also catalogued at the back
of the metal detector book. American Eagle Outfitters requires the metal detection machines to
be set at 1.2mm of metal sensitivity.
11.4 Mechanics Repair Book How often has a machinist been heard saying “the mechanic has already been here 2 or 3 times
today to repair my machine” or “the mechanic has said that the machine is fine so I must stop
complaining”? Frequently I am sure.
How do companies know how efficient their mechanics are? How can a control be placed on
them to ensure greater effective use of their skill and time?
The answer is simple - a Mechanics Repair Book (REF M.R.B). This book is placed at the end
of the sewing line or in the middle of the sewing floor. This is filled in by the supervisors. It
also allows for an orderly repair schedule to take place, instead of the supervisors vying for the
mechanics attention to repair their machines first. Obviously, strategically placed or specialised
machinery will take preference in the queue when repairing machines.
If a machine is having a problem of any sort then the worker will immediately inform the
supervisor. The supervisor will then go to the mechanics repair book and fill in the details on
the next free line of the book. The details that are filled in are as follows;
- the date and time when this problem was reported,
- which line is the machine on,
- which machine is it (number and type),
- which operator is using it and
- what the problem is.
There are a further 3 columns. One is for the mechanics signature, one is for the supervisors
signature and the other is for the time that the machine was repaired and any comments relevant
to that repair.
36
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
This book allows the mechanic to be checked in the following ways;
- how long is it taking to repair the machines?
- which mechanic repairs machines faster and why should this be? Is this good
or bad? An answer to this can be found if necessary.
It also allows the following to be asked about the machines;
- is it always the same machines breaking down or not?
- what are the main breakdowns being repaired?
- can these breakdowns be overcome so that they don’t happen as frequently?
- maybe it’s always the same operator who is having breakdowns with the
machines (could be the same machine or different ones). If so, why? Can the
problem be solved?
- do the same spare parts need replacing on machines frequently?
The supervisor must be informed, by the mechanic, when a machine has been repaired.
Together they will go to the repaired machine and check that the operator is happy about the
repair. If the operator is happy then they will both go to the mechanics repair book and both will
sign it as well as state the time the machine was repaired.
11.5 Special Machinery Control Report The Quality Control Special Machinery Report (REF Q.C.S.M.R) is to ensure that any special
items of equipment are regularly checked to confirm satisfactory operation and quality.
This control will focus on the following areas -
a) Fusing machines (see American Eagle Outfitters “Technical Guidelines and
Specification for the Fusing of Interlinings” for more information,
b) Button sewing machines,
c) Buttonhole machines,
d) Press fastener machines,
e) Eyelet machines and
f) Metal detectors
In each case the required standards must be available on each piece of equipment detailing all
the necessary specifications required. There should also be an approved, signed and dated,
mock-up of the garment being done on that machine.
Tests must be done on every machine 4 times per day. Each test must be done using a mock-up
which is made up of exactly the same fabrics and method of manufacturing as the bulk
production ie if the bulk has 6 layers of a certain fabric then the mock up must also have 6 layers
of the same fabric. Once the part has been attached to the mock up, it is then labelled with the
machine number, operator number, date and time that this part was attached. This is required in
case a quality issue is found later on in the production cycle.
When a machine is found to have a quality problem immediate corrective action must be taken
and a record of that action recorded. Any work produced since the previously passed control
recording must be re-inspected.
If this control was not there and a problem was found in a garment during an audit then all
garments finished through that machine and still in the factory would have to be re-checked and
repaired. This may be many thousands of garments which would be very time consuming and
costly to re-process again. They may even have to be airfreighted because of the delay that was
caused by re-inspecting all the stock.
12.0 PRODUCT TESTING FOR QUALITY This section refers to the development and maintenance of clear and complete documented
instructions and procedures that are necessary in communicating a customer’s Quality
37
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
Assurance working requirements.
12.1 Sampling Procedures for Product Testing In the event that instructions call for test samples to be taken from the production line, it is
necessary that precise details are available as to what exactly is to be tested -
e.g. components - assembled product and also the test procedures to be followed -
e.g. customer specific guidelines and regulations.
The number of samples required for testing, and the distribution of final test reports also need to
be specified.
Samples must be taken by the customer’s / agents quality assurance inspectors. Samples
presented to the inspector by the factory are not acceptable - traceability and authenticity being
in question.
Samples should be taken from production in duplicate sets (two pieces) whenever possible. One
is for laboratory purposes and one is for merchandising reference. Such samples should be
clearly tagged and labelled (signed, dated etc.) using the coloured sample tags used by the
customer or agent.
If quality assurance takes the test samples, it must be clearly defined who will be responsible for
having the tests carried out on them. Is to be the responsibility of the quality assurance,
merchandising or purchasing departments?
American Eagle Outfitters uses Bureau Veritas Consumer Products Services, Inc. –
Softlines – Quality Assurance Manual as their accredited laboratory.
13.0 RESPONSIBILITY FOR QUALITY Ultimately the vendors are totally responsible for the quality of merchandise being supplied to
American Eagle Outfitters.
During the introduction of any new quality control procedures the agreed responsibilities apply to
all suppliers.
1) In-Line Process Control After initial introduction the quality controllers will
work more closely with their own
production personnel as well as with the
customers / agents quality assurance
personnel.
2) Pre-final & Final Inspection Daily and at 100%
3) Presentation Inspection As per Green Tag sample
4) Special Machinery Control This will apply to buttonsew, buttonhole, rivets,
snaps, fusing machines, needle procedures
and metal detectors etc.
5) Warehouse Audit Factory management should carry out
warehouse audits as well as quality
assurance personnel.
6) Samples, Visual Aids These should be introduced at certain key areas by
the suppliers production and quality
assurance personnel.
14.0 APPENDIX 1) REF F.I.R - Knits
2) REF F.I.R – Woven
38
Vendor Compliance Manual, Version 1.25, September 2016
AMERICAN EAGLE
OUTFITTERS
Confidential and Proprietary AEO Business Information. Do not Disclose. Subject to Legal Action if Disclosed Without AEO Authorization
3) REF D.F.I.R
4) REF W.F.I.R
5) REF M.F.I.R
6) REF M.C.S
7) REF C.R.S.C.R
8) REF Q.C.C.N.R
9) REF Q.C.R.I.L.R
10) REF D.C
11) REF Q.C.G
12) REF Q.C.S.E.L.I.R
13) REF Q.C.A.I.R
14) REF S.O.B - Knits
15) REF S.O.B - Pants
16) REF S.O.B - Shirts
17) REF Q.C.A.I.R – 1
18) REF Q.C.M.R
19) REF Q.C.T.R
20) REF D.P-P.M
21) REF A.Q.L
22) REF Q.C.G.I.R 1
23) REF Q.C.G.I.R 2
24) REF Q.C.G.I.R 3
25) REF Q.C.G.I.R 4
26) REF D.C.A.P
27) REF W.C.A.P
28) REF N.P
29) REF M.R.B
30) REF Q.C.S.M.R