MEAS. SHEET 1 OF 62 SUMMARY SHEET AS PER NEW DETAILS SR. NO. PARTICULARS UNIT QTY. 1. Concrete Work Footing to Plinth floor Cuft 264.06 Plinth to First floor Cuft 283.75 First to Second floor Cuft 215.00 Second to Third floor Cuft 177.50 Third to Fourth floor Cuft 140.00 Fourth to Terrace floor Cuft 135.63 Above Terrace floor Cuft TOTAL Cuft 1215.94 TOTAL Cum 34.46 2. Reinforcement Work $ 12mm bars Footing to Plinth floor Rft 2632.00 Plinth to First floor Rft 2444.00 First to Second floor Rft 2054.00 Second to Third floor Rft 1638.00 Third to Fourth floor Rft 1612.00 Fourth to Terrace floor Rft 1222.00 Above Terrace floor Rft 0.00 TOTAL Rft 11602.00 3537.20 0.89 Rmt Kg / Rmt 8mm bars Footing to Plinth floor Rft 4321.00 Plinth to First floor Rft 4023.00 First to Second floor Rft 3618.00 Second to Third floor Rft 3213.00 Third to Fourth floor Rft 1656.00 Fourth to Terrace floor Rft 1624.50 Above Terrace floor Rft 0.00 TOTAL Rft 18455.50 5626.68 0.40 Rmt Kg / Rmt TOTAL Kg. ROUNDUP QTY.

Qty. ion Sheet

Embed Size (px)

Citation preview

Page 1: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 1/62

MEAS. SHEET 1 OF 62

SUMMARY SHEET AS PER NEW DETAILS

SR. NO. PARTICULARS UNIT QTY.

1. Concrete WorkFooting to Plinth floor Cuft 264.06

Plinth to First floor Cuft 283.75

First to Second floor Cuft 215.00

Second to Third floor Cuft 177.50

Third to Fourth floor Cuft 140.00

Fourth to Terrace floor Cuft 135.63

Above Terrace floor Cuft

TOTAL Cuft 1215.94

TOTAL Cum 34.46

2. Reinforcement Work

$ 12mm bars

Footing to Plinth floor Rft 2632.00

Plinth to First floor Rft 2444.00

First to Second floor Rft 2054.00

Second to Third floor Rft 1638.00

Third to Fourth floor Rft 1612.00

Fourth to Terrace floor Rft 1222.00

Above Terrace floor Rft 0.00

TOTAL Rft 11602.003537.20 0.89

Rmt Kg / Rmt

8mm bars

Footing to Plinth floor Rft 4321.00

Plinth to First floor Rft 4023.00

First to Second floor Rft 3618.00

Second to Third floor Rft 3213.00

Third to Fourth floor Rft 1656.00

Fourth to Terrace floor Rft 1624.50

Above Terrace floor Rft 0.00

TOTAL Rft 18455.505626.68 0.40

Rmt Kg / Rmt

TOTAL Kg.

ROUNDUPQTY.

Page 2: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 2/62

MEAS. SHEET 2 OF 62

MEASUREMENT SHEET

SR. NO. PARTICULARS NO. L B H

1. RCC COLUMNS

$ Footing to Plinth floor  

C1, C7 and C14 3.0 1.00 1.83 9.00

C2, C5, C9, C13 and C15 5.0 1.00 1.83 9.25C3, C4, C6, C8, C10 and C16 6.0 1.00 1.83 9.50

C11 1.0 1.00 1.83 9.25

C12 1.0 0.75 1.17 9.50

TOTAL

$ Plinth to First floor  

C1, C7 and C14 3.0 1.00 1.83 10.00

C2, C5, C9, C13 and C15 5.0 1.00 1.83 10.00

C3, C4, C6, C8, C10 and C16 6.0 1.00 1.83 10.00

C11 1.0 1.00 1.83 10.00

C12 1.0 0.75 1.17 10.00

TOTAL

$ First to Second floor  

C1, C7 and C14 3.0 0.75 1.83 10.00

C2, C5, C9, C13 and C15 5.0 0.75 1.83 10.00

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.83 10.00

C11 1.0 0.75 1.83 10.00

C12 1.0 0.75 1.17 10.00

TOTAL

$ Second to Third floor  

C1, C7 and C14 3.0 0.75 1.50 10.00

C2, C5, C9, C13 and C15 5.0 0.75 1.50 10.00

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.50 10.00

C11 1.0 0.75 1.50 10.00

C12 1.0 0.75 1.17 10.00

TOTAL

$ Third to Fourth floor  

C1, C7 and C14 3.0 0.75 1.17 10.00

C2, C5, C9, C13 and C15 5.0 0.75 1.17 10.00

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.17 10.00

C11 1.0 0.75 1.17 10.00

C12 1.0 0.75 1.17 10.00

TOTAL

$ Fourth to Terrace floor  

Page 3: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 3/62

MEAS. SHEET 3 OF 62

C1, C7 and C14 3.0 0.75 1.17 10.00

C2, C5, C9, C13 and C15 5.0 0.75 1.17 10.00

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.17 10.00

C11 1.0 0.75 1.00 10.00

C12 1.0 0.75 0.75 10.00

TOTAL

2. REINFORCEMENT WORK

$ Footing to Plinth floor  

C1, C7 and C14 3.0 1.00 1.83 14.00

Main Rein (12mm - 12 Nos) 36.0 14.00

Stirrups (8mm @ 6" c/c) 174.0 4.75

C2, C5, C9, C13 and C15 5.0 1.00 1.83 14.00

Main Rein (12mm - 12 Nos) 60.0 14.00

Stirrups (8mm @ 6" c/c) 290.0 4.75

C3, C4, C6, C8, C10 and C16 6.0 1.00 1.83 14.00

Main Rein (12mm - 12 Nos) 72.0 14.00

Stirrups (8mm @ 6" c/c) 348.0 4.75

C11 1.0 1.00 1.83 14.00

Main Rein (12mm - 12 Nos) 12.0 14.00

Stirrups (8mm @ 6" c/c) 58.0 4.75

C12 1.0 0.75 1.17 14.00

Main Rein (12mm - 8 Nos) 8.0 14.00

Stirrups (8mm @ 6" c/c) 58.0 3.25

$ Plinth to First floor  

C1, C7 and C14 3.0 1.00 1.83 13.00

Main Rein (12mm - 12 Nos) 36.0 13.00

Stirrups (8mm @ 6" c/c) 162.0 4.75

C2, C5, C9, C13 and C15 5.0 1.00 1.83 13.00

Main Rein (12mm - 12 Nos) 60.0 13.00

Stirrups (8mm @ 6" c/c) 270.0 4.75

C3, C4, C6, C8, C10 and C16 6.0 1.00 1.83 13.00

Main Rein (12mm - 12 Nos) 72.0 13.00

Stirrups (8mm @ 6" c/c) 324.0 4.75

C11 1.0 1.00 1.83 13.00

Main Rein (12mm - 12 Nos) 12.0 13.00

Stirrups (8mm @ 6" c/c) 54.0 4.75

C12 1.0 0.75 1.17 13.00

Main Rein (12mm - 8 Nos) 8.0 13.00

Stirrups (8mm @ 6" c/c) 54.0 3.25

Page 4: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 4/62

MEAS. SHEET 4 OF 62

$ First to Second floor  

C1, C7 and C14 3.0 0.75 1.83 13.00

Main Rein (12mm - 10 Nos) 30.0 13.00

Stirrups (8mm @ 6" c/c) 162.0 4.25

C2, C5, C9, C13 and C15 5.0 0.75 1.83 13.00

Main Rein (12mm - 10 Nos) 50.0 13.00Stirrups (8mm @ 6" c/c) 270.0 4.25

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.83 13.00

Main Rein (12mm - 10 Nos) 60.0 13.00

Stirrups (8mm @ 6" c/c) 324.0 4.25

C11 1.0 0.75 1.83 13.00

Main Rein (12mm - 10 Nos) 10.0 13.00

Stirrups (8mm @ 6" c/c) 54.0 4.25

C12 1.0 0.75 1.17 13.00

Main Rein (12mm - 8 Nos) 8.0 13.00

Stirrups (8mm @ 6" c/c) 54.0 3.25

$ Second to Third floor  

C1, C7 and C14 3.0 0.75 1.50 13.00

Main Rein (12mm - 8 Nos) 24.0 13.00

Stirrups (8mm @ 6" c/c) 162.0 3.75

C2, C5, C9, C13 and C15 5.0 0.75 1.50 13.00Main Rein (12mm - 8 Nos) 40.0 13.00

Stirrups (8mm @ 6" c/c) 270.0 3.75

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.50 13.00

Main Rein (12mm - 8 Nos) 48.0 13.00

Stirrups (8mm @ 6" c/c) 324.0 3.75

C11 1.0 0.75 1.50 13.00

Main Rein (12mm - 8 Nos) 8.0 13.00

Stirrups (8mm @ 6" c/c) 54.0 3.75

C12 1.0 0.75 1.17 13.00Main Rein (12mm - 6 Nos) 6.0 13.00

Stirrups (8mm @ 6" c/c) 54.0 3.25

$ Third to Fourth floor  

C1, C7 and C14 3.0 0.75 1.17 13.00

Main Rein (12mm - 8 Nos) 24.0 13.00

Stirrups (8mm @ 6" c/c) 81.0 3.83

C2, C5, C9, C13 and C15 5.0 0.75 1.17 13.00

Main Rein (12mm - 8 Nos) 40.0 13.00

Stirrups (8mm @ 6" c/c) 135.0 3.83

Page 5: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 5/62

MEAS. SHEET 5 OF 62

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.17 13.00

Main Rein (12mm - 8 Nos) 48.0 13.00

Stirrups (8mm @ 6" c/c) 162.0 3.83

C11 1.0 0.75 1.17 13.00

Main Rein (12mm - 6 Nos) 6.0 13.00

Stirrups (8mm @ 6" c/c) 27.0 3.83

C12 1.0 0.75 1.17 13.00

Main Rein (12mm - 6 Nos) 6.0 13.00

Stirrups (8mm @ 6" c/c) 27.0 3.83

$ Fourth to Terrace floor  

C1, C7 and C14 3.0 0.75 1.17 13.00

Main Rein (12mm - 6 Nos) 18.0 13.00

Stirrups (8mm @ 6" c/c) 81.0 3.83

C2, C5, C9, C13 and C15 5.0 0.75 1.17 13.00

Main Rein (12mm - 6 Nos) 30.0 13.00

Stirrups (8mm @ 6" c/c) 135.0 3.83

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.17 13.00

Main Rein (12mm - 6 Nos) 36.0 13.00

Stirrups (8mm @ 6" c/c) 162.0 3.83

C11 1.0 0.75 1.00 13.00

Main Rein (12mm - 6 Nos) 6.0 13.00Stirrups (8mm @ 6" c/c) 27.0 3.50

C12 1.0 0.75 0.75 13.00

Main Rein (12mm - 4 Nos) 4.0 13.00

Stirrups (8mm @ 6" c/c) 27.0 3.00

Page 6: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 6/62

MEAS. SHEET 6 OF 62

2. BACKFILLING

2.1 Backfilling in foundation and plinth

Qty. is same as per Excavation 1.0 283.75 Cuft

ded for Masonry of Foundations -1.0 1278.81 Cuft

ded for PCC -1.0 336.75 Cuft

ded for RCC Footings -1.0 107.30 Cuft

ded for RCC Columns upto plinth -1.0 18.00 Cuft

Backfilling in Plinth

At Staff room 1.0 28.00 20.00 1.71

At Staircase 1.0 7.25 25.25 1.71

At Verandah 1.0 29.50 4.50 1.71

TOTAL

2.2 Backfilling at Cantilever area

$ Ground floor plan

Wall at Cantilever slab 2.0 4.92 3.75 1.50

2.0 7.92 3.75 1.50

1.0 8.00 3.75 1.50

$ First floor plan

Qty. is same as per Ground floor plan 1.0 189.38 Cuft

TOTAL

3. ANTI-TERMITE TREATMENT

Anti-termite treatment 1.0 37.50 26.00

TOTAL

4. PCC WORK

Below Masonry foundations

Hor. Walls of Room + Staircase 2.0 37.50 3.00 0.50

Ver. Walls of Room + Staircase 3.0 20.00 3.00 0.50

Hor. Walls of Verandah 1.0 37.50 3.00 0.50

Ver. Walls of Verandah 2.0 4.00 3.00 0.50

Below RCC Footings 4.0 5.67 5.67 0.33

Below masonry steps 1.0 13.25 5.25 0.33

TOTAL

5. RCC WORK

5.1 RCC Footings

Footings 4.0 1.50 0.75

Nos. D d

For bottom part 4.0 5.00 5.00 0.75For trapezodial part 4.0 25.00 1.40 0.75

A1 A2 h

Page 7: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 7/62

MEAS. SHEET 7 OF 62

TOTAL

5.2 RCC Ground beams

At RCC columns

Hor. Beams 2.0 18.08 0.75 1.00Ver. Beams 3.0 4.50 0.75 1.00

TOTAL

5.3 RCC copings

Masonry walls

Hor. Walls 2.0 37.50 0.75 0.50

Ver. Walls 3.0 20.00 0.75 0.50

Walls of VerandahHor. Walls 1.0 37.50 0.75 0.50

Ver. Walls 2.0 4.00 0.75 0.50

Ded. for Ground beams

Hor. Beams -2.0 18.08 0.75 0.50

Ver. Beams -3.0 4.50 0.75 0.50

TOTAL

5.4 RCC Grade Slab

At Staff room 1.0 28.00 20.00 0.29At Staircase 1.0 7.25 25.25 0.29

At Verandah 1.0 29.50 4.50 0.29

TOTAL

5.5 RCC Columns

5.5.1 RCC Columns from footing upto plinth

RCC Columns 3.0 0.79 Area 6.17

1.0 0.75 0.75 6.17

TOTAL

5.5.2 RCC Columns from plinth to Terrace floor 

$ From plinth to First floor 

RCC Columns 3.0 0.79 Area 8.00

3.0 0.20 Area 4.42

1.0 0.75 0.75 12.42

$ From First to Terrace floor RCC Columns 3.0 0.79 Area 8.00

3.0 0.20 Area 4.42

Page 8: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 8/62

MEAS. SHEET 8 OF 62

1.0 0.75 0.75 12.42

TOTAL

5.5.3 RCC Columns above Terrace floor 

RCC Columns 3.0 0.79 Area 3.00

1.0 0.75 0.75 3.00

TOTAL

5.6 RCC Lintels

$ Ground floor  

On all masonry walls

Hor. Walls 2.0 37.50 0.75 0.42

Ver. Walls 3.0 20.00 0.75 0.42

ded for 7' 3" long opening -1.0 7.25 0.75 0.42

For 7' 3" long opening 1.0 7.25 0.75 0.75

$ First floor  

Qty. is same as per Ground floor 1.0 44.00 117.33

Cuft Sqft

TOTAL

5.7 RCC floor slab

RCC slab at First floor level 1.0 25.75 24.50 0.42

RCC slab at Terrace floor level 1.0 975.00 Sqft 0.42

ded for cutout -1.0 7.25 8.33 0.42

TOTAL

5.8 RCC floor beams

$ RCC floor beams at First floor level

RCC floor beams

Hor. beams 2.0 37.50 0.75 2.00

Ver. beams 6.0 20.00 0.75 2.00

Ver. beams at Verandah 6.0 4.50 0.75 1.21

$ RCC floor beams at Terrace floor level

1.0 316.97 1011.75

Cuft Sqft

TOTAL

5.9 RCC staircase

$ From Ground to First floor level

Qty. is same as per RCC floor beams at First floor level

Page 9: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 9/62

MEAS. SHEET 9 OF 62

Mid landing 1.0 7.25 3.83 0.50

Floor landing 1.0 99.50 Area 0.50

Flight 01

Waist slab 1.0 13.87 3.50 0.50

Steps 14.0 3.50 0.83 0.50

Flight 02Waist slab 1.0 7.07 3.50 0.50

Steps 9.0 3.50 0.83 0.50

TOTAL

6. REINFORCEMENT WORK

RCC Footings 1.0 107.30 1.42

Cuft Kg / Cuft

RCC Ground beams 1.0 37.25 2.27

Cuft Kg / Cuft

RCC copings 1.0 49.06 1.42

Cuft Kg / Cuft

RCC Grade Slab 1.0 255.45 0.99

Cuft Kg / Cuft

RCC Columns 1.0 83.63 3.12

Cuft Kg / Cuft

RCC Lintels 1.0 88.00 1.42

Cuft Kg / Cuft

RCC floor slab 1.0 643.94 1.42

Cuft Kg / Cuft

RCC floor beams 1.0 633.94 2.55

Cuft Kg / CuftRCC staircase 1.0 117.07 1.42

Cuft Kg / Cuft

TOTAL

7. MASONRY WORK

7.1 Masonry for foundation work upto OGL

27" Thick (1st Step)

Hor. Walls 2.0 37.50 2.25 0.58

Ver. Walls 3.0 20.00 2.25 0.58Walls of Verandah

Hor. Walls 1.0 22.50 2.25 0.58

Ver. Walls 2.0 4.50 2.25 0.58

23" Thick (2nd Step)

Hor. Walls 2.0 37.50 1.92 0.58

Ver. Walls 3.0 20.00 1.92 0.58

Walls of Verandah

Hor. Walls 1.0 22.50 1.92 0.58

Ver. Walls 2.0 4.50 1.92 0.58

18" Thick (3rd Step)

Hor. Walls 2.0 37.50 1.50 0.58

Ver. Walls 3.0 20.00 1.50 0.58

Walls of Verandah

Hor. Walls 1.0 22.50 1.50 0.58

Page 10: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 10/62

MEAS. SHEET 10 OF 62

Ver. Walls 2.0 4.50 1.50 0.58

14" Thick (4th Step)

Hor. Walls 2.0 37.50 1.17 3.75

Ver. Walls 3.0 20.00 1.17 3.75

Walls of Verandah

Hor. Walls 1.0 22.50 1.17 3.75

Ver. Walls 2.0 4.50 1.17 3.75

TOTAL

7.2 9" thick Masonry work

7.2.1 From OGL upto plinth

Hor. Walls 2.0 37.50 0.75 2.00

Ver. Walls 3.0 20.00 0.75 2.00

Walls of Verandah

Hor. Walls 1.0 37.50 0.75 2.00

Ver. Walls 2.0 4.50 0.75 2.00

Hor. Wall of Server room 1.0 7.25 0.75 2.00

TOTAL

7.2.2 Floor levels (above plinth)

$ Ground floor level

Hor. Walls 2.0 37.50 0.75 10.42

ded of windows -12.0 2.50 0.75 4.00

-1.0 4.00 0.75 4.00

ded of opening -1.0 7.25 0.75 7.00

Ver. Walls 3.0 20.00 0.75 10.42

ded of doors -1.0 4.00 0.75 7.00

-1.0 3.00 0.75 7.00

ded of windows -2.0 4.00 0.75 4.00

Wall at Cantilever slab 2.0 4.92 0.75 1.50

2.0 7.92 0.75 1.50

1.0 8.00 0.75 1.50

$ First floor level

Qty. is same as per Ground floor level 1.0 891.75 Cuft

TOTAL

7.2.3 Terrace floor level

Staircase cabin 0.0 7.25 0.75 8.00

0.0 21.50 0.75 8.00

ded of door 0.0 3.00 0.75 7.00

ded of windows 0.0 2.50 0.75 4.00

Perapet wall 1.0 54.00 0.75 3.00

TOTAL

Page 11: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 11/62

MEAS. SHEET 11 OF 62

7.3 Half brick masonry work

7.3.1 Ground floor level (above plinth)

Hor. Wall of Server room 1.0 7.25 7.00

TOTAL

7.3.2 Terrace floor level

Perapet wall 1.0 29.50 3.00

TOTAL

7.4 Masonry steps

1st Step (Bottom side) 1.0 12.00 5.00 1.25

2nd Step 1.0 10.00 4.00 0.50

3rd Step 1.0 8.00 3.00 0.50

4th Step 1.0 6.00 2.00 0.50

TOTAL

8. PLASTERING WORK

8.1 Internal wall plsater  

$ Ground floor level

Staff room 1.0 96.00 12.00

ded of doors -0.5 4.00 7.00

-0.5 3.00 7.00

ded of windows -6.0 2.50 4.00

-1.0 4.00 4.00

Staircase 1.0 65.00 12.00

ded of doors -0.5 4.00 7.00

-0.5 3.00 7.00

ded of opening -1.0 7.25 7.00

addition of jambs and soffits 1.0 21.25 0.75

ded of window -0.5 4.00 4.00

Ver. Wall of Server room (on both faces) 2.0 7.25 7.00

$ First floor level

Qty. is same as per Ground floor level 1.0 1865.69 Sqft

TOTAL

8.1.2 Terrace floor level

Staircase cabin 0.0 65.00 8.00

ded of door 0.0 3.00 7.00

ded of windows 0.0 2.50 4.00

Internal side of Perapet wall 1.0 54.00 3.75

1.0 28.00 4.88

Page 12: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 12/62

Page 13: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 13/62

MEAS. SHEET 13 OF 62

Server room 1.0 21.42

ded of door -1.0 3.00

$ First floor level

Qty. is same as per Ground floor level 1.0 107.42 Rft

TOTAL

9.3 2.5" thick IPS flooring

$ Ground floor level

Verandah + Stair floor area 1.0 294.96 Area

$ First floor level

Balcony 1.0 240.35 Area

TOTAL

10. JOINERY AND METAL WORK

10.1 Wooden panel doors

Main door 2.0 4.00 7.00

Server room door 1.0 3.00 7.00

Staircase cabin door 1.0 3.00 7.00

TOTAL

10.2 Metal windows

Metal windows 24.0 2.50 4.006.0 4.00 4.00

Staircase cabin windows 2.0 2.50 4.00

TOTAL

10.3 MS railing at Staircase

$ Ground floor level

Flight 01 1.0 11.98

Mid landing 1.0 0.75

Flight 02 1.0 6.17

Floor landing 1.0 0.75

$ First floor level

Flight 01 1.0 11.98

Mid landing 1.0 0.75

Flight 02 1.0 6.17

Floor landing 1.0 3.75

Balcony railing 1.0 46.50

TOTAL

11. WATERPROOFING WORK

Page 14: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 14/62

MEAS. SHEET 14 OF 62

11.1 Terrace waterproofing work

At main terrace 1.0 28.00 25.25

TOTAL

11.2 Crystalline waterproofing work

$ Ground floor planAt sunk slab above Verandah

On floor 2.0 4.92 3.75

2.0 7.92 3.75

1.0 8.00 3.75

On wall 2.0 17.33 1.50

2.0 23.33 1.50

1.0 23.50 1.50

$ First floor plan

Qty. is same as per Ground floor plan 1.0 283.50 Sqft

TOTAL

12. PAINTING WORK

12.1 Internal wall painting

Qty. is same as per Internal wall plaster 1.0 4070.38 Sqft

TOTAL

12.2 Internal ceiling paintingQty. is same as per Internal ceiling plaster 1.0 2166.68 Sqft

TOTAL

12.3 External wall painting

Qty. is same as per External wall plaster 1.0 3360.50 Sqft

TOTAL

13. MISCELLANEOUS WORK

13.1 GI sheets

GI sheets at Staircase cabin 1.0 7.25 8.33

TOTAL

14. ELECTRICAL AND COMMUNICATION WORK

15. PLUMBING WORK

Page 15: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 15/62

MEAS. SHEET 15 OF 62

Page 16: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 16/62

MEAS. SHEET 16 OF 62

 

3144.17

2222.88

5367.06

Page 17: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 17/62

MEAS. SHEET 17 OF 62

 

QTY.

49.50

84.79104.50

16.96

8.31

264.06

Cuft

55.00

91.67

110.00

18.33

8.75

283.75

Cuft

41.25

68.75

82.50

13.75

8.75

215.00

Cuft

33.75

56.25

67.50

11.25

8.75

177.50

Cuft

26.25

43.75

52.50

8.75

8.75

140.00

Cuft

Page 18: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 18/62

MEAS. SHEET 18 OF 62

26.25

43.75

52.50

7.50

5.63

135.63

Cuft

504.00

826.50

840.00

1377.50

1008.00

1653.00

168.00

275.50

112.00

188.50

468.00

769.50

780.00

1282.50

936.00

1539.00

156.00

256.50

104.00

175.50

Page 19: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 19/62

MEAS. SHEET 19 OF 62

390.00

688.50

650.001147.50

780.00

1377.00

130.00

229.50

104.00

175.50

312.00

607.50

520.00

1012.50

624.00

1215.00

104.00

202.50

78.00

175.50

312.00

310.50

520.00

517.50

Page 20: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 20/62

MEAS. SHEET 20 OF 62

624.00

621.00

78.00

103.50

78.00

103.50

234.00

310.50

390.00

517.50

468.00

621.00

78.0094.50

52.00

81.00

Page 21: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 21/62

MEAS. SHEET 21 OF 62

283.75

-1278.81

-336.75

-107.30

-18.00

956.67

312.73

226.78

39.06

Cuft

55.31

89.06

45.00

189.38

378.75

Cuft

975.00

975.00

Sqft

112.50

90.00

56.25

12.00

42.81

23.19

336.75

Cuft

75.0032.30

Page 22: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 22/62

MEAS. SHEET 22 OF 62

107.30

Cuft

27.1310.13

37.25

Cuft

28.13

22.50

14.06

3.00

-13.56

-5.06

49.06

Cuft

163.3353.39

38.72

255.45

Cuft

14.53

3.47

18.00

Cuft

18.85

2.60

6.98

18.85

2.60

Page 23: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 23/62

MEAS. SHEET 23 OF 62

6.98

56.87

Cuft

7.07

1.69

8.76

Cuft

23.44

18.75

-2.27

4.08

44.00

88.00

Cuft

262.86

406.25

-25.17

643.94

Cuft

112.50

180.00

24.47

316.97

633.94

Cuft

Page 24: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 24/62

MEAS. SHEET 24 OF 62

13.90

49.75

24.27

10.21

12.38

6.56

117.07

Cuft

152.04

Kg

84.45

Kg

69.52

Kg

253.36

Kg

260.68

Kg

124.69

Kg

912.42

Kg

1616.84

Kg165.87

Kg

3639.88

Kg

98.44

78.75

29.53

11.81

83.85

67.08

25.16

10.06

65.63

52.50

19.69

Page 25: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 25/62

MEAS. SHEET 25 OF 62

7.88

328.13

262.50

98.44

39.38

1278.81

Cuft

112.50

90.00

56.25

13.50

10.88

283.13

Cuft

585.94

-90.00

-12.00

-38.06

468.75

-21.00

-15.75

-24.00

11.06

17.81

9.00

891.75

1783.50

Cuft

0.00

0.00

0.00

0.00

121.50

121.50

Cuft

Page 26: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 26/62

MEAS. SHEET 26 OF 62

50.75

50.75

Sqft

88.50

88.50

Sqft

75.00

20.00

12.00

6.00

113.00

Cuft

1152.00

-14.00

-10.50

-60.00

-16.00

780.00

-14.00

-10.50

-50.75

15.94

-8.00

101.50

1865.69

3731.38

Sqft

0.00

0.00

0.00

202.50

136.50

Page 27: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 27/62

MEAS. SHEET 27 OF 62

339.00

Sqft

560.00

48.54

27.79

24.76

99.50

132.75

190.00

1083.34

2166.68

Sqft

3683.00

-60.00

-48.00

-750.00

556.00

-10.50

-10.00

3360.50

Sqft

560.00

3.00

23.86

2.25

589.11

1178.23

Sqft

96.00-4.00

-3.00

Page 28: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 28/62

MEAS. SHEET 28 OF 62

21.42

-3.00

107.42

214.83Rft

294.96

240.35

535.31

Sqft

56.00

21.00

21.00

98.00

Sqft

240.0096.00

20.00

356.00

Sqft

11.98

0.75

6.17

0.75

11.98

0.75

6.17

3.75

46.50

88.80

Rft

Page 29: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 29/62

MEAS. SHEET 29 OF 62

707.00

707.00

Sqft

36.88

59.38

30.00

52.00

70.00

35.25

283.50

567.00

Sqft

4070.38

4070.38

Sqft

2166.68

2166.68

Sqft

3360.50

3360.50

Sqft

60.42

60.42

Sqft

Page 30: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 30/62

MEAS. SHEET 30 OF 62

Page 31: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 31/62

MEAS. SHEET 31 OF 62

SUMMARY SHEET AS PER OLD DETAILS

SR. NO. PARTICULARS UNIT QTY.

1. Concrete Work

Footing to Plinth floor Cuft 220.33Plinth to First floor Cuft 236.67

First to Second floor Cuft 177.50

Second to Third floor Cuft 140.00

Third to Fourth floor Cuft 138.75

Fourth to Terrace floor Cuft 135.63

Above Terrace floor Cuft

TOTAL Cuft 1048.88

TOTAL Cum 29.72

2. Reinforcement Work

$ 16mm bars

Footing to Plinth floor Rft 1036.00

Plinth to First floor Rft 962.00

First to Second floor Rft 572.00

Second to Third floor Rft 312.00

Third to Fourth floor Rft 0.00

Fourth to Terrace floor Rft 0.00

Above Terrace floor Rft 0.00

TOTAL Rft 2882.00

878.66 1.58Rmt Kg / Rmt

$ 12mm bars

Footing to Plinth floor Rft 1092.00

Plinth to First floor Rft 1014.00

First to Second floor Rft 1248.00

Second to Third floor Rft 1352.00

Third to Fourth floor Rft 1638.00

Fourth to Terrace floor Rft 1222.00

Above Terrace floor Rft 0.00

TOTAL Rft 7566.00

2306.71 0.89Rmt Kg / Rmt

8mm bars

Footing to Plinth floor Rft 3915.00

Plinth to First floor Rft 3645.00

First to Second floor Rft 3213.00

Second to Third floor Rft 2808.00

Third to Fourth floor Rft 1647.00

Fourth to Terrace floor Rft 1624.50

Above Terrace floor Rft 0.00

TOTAL Rft 16852.50

5137.96 0.40

Rmt Kg / Rmt

ROUNDUPQTY.

Page 32: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 32/62

MEAS. SHEET 32 OF 62

TOTAL Kg.

Page 33: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 33/62

MEAS. SHEET 33 OF 62

MEASUREMENT SHEET

SR. NO. PARTICULARS NO. L B H

1. RCC COLUMNS

$ Footing to Plinth floor  

C1, C7 and C14 3.0 1.00 1.50 9.00

C2, C5, C9, C13 and C15 5.0 1.00 1.50 9.25C3, C4, C6, C8, C10 and C16 6.0 1.00 1.50 9.50

C11 1.0 1.00 1.50 9.25

C12 1.0 1.00 1.17 9.50

TOTAL

$ Plinth to First floor  

C1, C7 and C14 3.0 1.00 1.50 10.00

C2, C5, C9, C13 and C15 5.0 1.00 1.50 10.00

C3, C4, C6, C8, C10 and C16 6.0 1.00 1.50 10.00

C11 1.0 1.00 1.50 10.00

C12 1.0 1.00 1.17 10.00

TOTAL

$ First to Second floor  

C1, C7 and C14 3.0 0.75 1.50 10.00

C2, C5, C9, C13 and C15 5.0 0.75 1.50 10.00

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.50 10.00

C11 1.0 0.75 1.50 10.00

C12 1.0 0.75 1.17 10.00

TOTAL

$ Second to Third floor  

C1, C7 and C14 3.0 0.75 1.17 10.00

C2, C5, C9, C13 and C15 5.0 0.75 1.17 10.00

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.17 10.00

C11 1.0 0.75 1.17 10.00

C12 1.0 0.75 1.17 10.00

TOTAL

$ Third to Fourth floor  

C1, C7 and C14 3.0 0.75 1.17 10.00

C2, C5, C9, C13 and C15 5.0 0.75 1.17 10.00

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.17 10.00

C11 1.0 0.75 1.17 10.00

C12 1.0 0.75 1.00 10.00

TOTAL

$ Fourth to Terrace floor  

Page 34: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 34/62

MEAS. SHEET 34 OF 62

C1, C7 and C14 3.0 0.75 1.17 10.00

C2, C5, C9, C13 and C15 5.0 0.75 1.17 10.00

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.17 10.00

C11 1.0 0.75 1.00 10.00

C12 1.0 0.75 0.75 10.00

TOTAL

2. REINFORCEMENT WORK

$ Footing to Plinth floor  

C1, C7 and C14 3.0 1.00 1.50 14.00

Main Rein (16mm - 8 Nos) 24.0 14.00

Stirrups (8mm @ 6" c/c) 174.0 4.25

C2, C5, C9, C13 and C15 5.0 1.00 1.50 14.00

Main Rein (16mm - 10 Nos) 50.0 14.00

Stirrups (8mm @ 6" c/c) 290.0 4.25

C3, C4, C6, C8, C10 and C16 6.0 1.00 1.50 14.00

Main Rein (12mm - 10 Nos) 60.0 14.00

Stirrups (8mm @ 6" c/c) 348.0 4.25

C11 1.0 1.00 1.50 14.00

Main Rein (12mm - 10 Nos) 10.0 14.00

Stirrups (8mm @ 6" c/c) 58.0 4.25

C12 1.0 1.00 1.17 14.00

Main Rein (12mm - 8 Nos) 8.0 14.00

Stirrups (8mm @ 6" c/c) 58.0 3.75

$ Plinth to First floor  

C1, C7 and C14 3.0 1.00 1.50 13.00

Main Rein (16mm - 8 Nos) 24.0 13.00

Stirrups (8mm @ 6" c/c) 162.0 4.25

C2, C5, C9, C13 and C15 5.0 1.00 1.50 13.00

Main Rein (16mm - 10 Nos) 50.0 13.00

Stirrups (8mm @ 6" c/c) 270.0 4.25

C3, C4, C6, C8, C10 and C16 6.0 1.00 1.50 13.00

Main Rein (12mm - 10 Nos) 60.0 13.00

Stirrups (8mm @ 6" c/c) 324.0 4.25

C11 1.0 1.00 1.50 13.00

Main Rein (12mm - 10 Nos) 10.0 13.00

Stirrups (8mm @ 6" c/c) 54.0 4.25

C12 1.0 1.00 1.17 13.00

Main Rein (12mm - 8 Nos) 8.0 13.00

Stirrups (8mm @ 6" c/c) 54.0 3.75

Page 35: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 35/62

MEAS. SHEET 35 OF 62

$ First to Second floor  

C1, C7 and C14 3.0 0.75 1.50 13.00

Main Rein (16mm - 8 Nos) 24.0 13.00

Stirrups (8mm @ 6" c/c) 162.0 3.75

C2, C5, C9, C13 and C15 5.0 0.75 1.50 13.00

Main Rein (16mm - 4 Nos) 20.0 13.00Main Rein (12mm - 6 Nos) 30.0 13.00

Stirrups (8mm @ 6" c/c) 270.0 3.75

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.50 13.00

Main Rein (12mm - 8 Nos) 48.0 13.00

Stirrups (8mm @ 6" c/c) 324.0 3.75

C11 1.0 0.75 1.50 13.00

Main Rein (12mm - 10 Nos) 10.0 13.00

Stirrups (8mm @ 6" c/c) 54.0 3.75

C12 1.0 0.75 1.17 13.00

Main Rein (12mm - 8 Nos) 8.0 13.00

Stirrups (8mm @ 6" c/c) 54.0 3.25

$ Second to Third floor  

C1, C7 and C14 3.0 0.75 1.17 13.00

Main Rein (16mm - 8 Nos) 24.0 13.00

Stirrups (8mm @ 6" c/c) 162.0 3.25

C2, C5, C9, C13 and C15 5.0 0.75 1.17 13.00

Main Rein (12mm - 8 Nos) 40.0 13.00

Stirrups (8mm @ 6" c/c) 270.0 3.25

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.17 13.00

Main Rein (12mm - 8 Nos) 48.0 13.00

Stirrups (8mm @ 6" c/c) 324.0 3.25

C11 1.0 0.75 1.17 13.00

Main Rein (12mm - 10 Nos) 10.0 13.00

Stirrups (8mm @ 6" c/c) 54.0 3.25

C12 1.0 0.75 1.17 13.00

Main Rein (12mm - 6 Nos) 6.0 13.00

Stirrups (8mm @ 6" c/c) 54.0 3.25

$ Third to Fourth floor  

C1, C7 and C14 3.0 0.75 1.17 13.00

Main Rein (12mm - 8 Nos) 24.0 13.00

Stirrups (8mm @ 6" c/c) 81.0 3.83

C2, C5, C9, C13 and C15 5.0 0.75 1.17 13.00

Main Rein (12mm - 8 Nos) 40.0 13.00

Page 36: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 36/62

MEAS. SHEET 36 OF 62

Stirrups (8mm @ 6" c/c) 135.0 3.83

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.17 13.00

Main Rein (12mm - 8 Nos) 48.0 13.00

Stirrups (8mm @ 6" c/c) 162.0 3.83

C11 1.0 0.75 1.17 13.00

Main Rein (12mm - 8 Nos) 8.0 13.00Stirrups (8mm @ 6" c/c) 27.0 3.83

C12 1.0 0.75 1.00 13.00

Main Rein (12mm - 6 Nos) 6.0 13.00

Stirrups (8mm @ 6" c/c) 27.0 3.50

$ Fourth to Terrace floor  

C1, C7 and C14 3.0 0.75 1.17 13.00

Main Rein (12mm - 6 Nos) 18.0 13.00

Stirrups (8mm @ 6" c/c) 81.0 3.83

C2, C5, C9, C13 and C15 5.0 0.75 1.17 13.00

Main Rein (12mm - 6 Nos) 30.0 13.00

Stirrups (8mm @ 6" c/c) 135.0 3.83

C3, C4, C6, C8, C10 and C16 6.0 0.75 1.17 13.00

Main Rein (12mm - 6 Nos) 36.0 13.00

Stirrups (8mm @ 6" c/c) 162.0 3.83

C11 1.0 0.75 1.00 13.00Main Rein (12mm - 6 Nos) 6.0 13.00

Stirrups (8mm @ 6" c/c) 27.0 3.50

C12 1.0 0.75 0.75 13.00

Main Rein (12mm - 4 Nos) 4.0 13.00

Stirrups (8mm @ 6" c/c) 27.0 3.00

Page 37: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 37/62

MEAS. SHEET 37 OF 62

2. BACKFILLING

2.1 Backfilling in foundation and plinth

Qty. is same as per Excavation 1.0 236.67 Cuft

ded for Masonry of Foundations -1.0 1278.81 Cuft

ded for PCC -1.0 336.75 Cuft

ded for RCC Footings -1.0 107.30 Cuft

ded for RCC Columns upto plinth -1.0 18.00 Cuft

Backfilling in Plinth

At Staff room 1.0 28.00 20.00 1.71

At Staircase 1.0 7.25 25.25 1.71

At Verandah 1.0 29.50 4.50 1.71

TOTAL

2.2 Backfilling at Cantilever area

$ Ground floor plan

Wall at Cantilever slab 2.0 4.92 3.75 1.50

2.0 7.92 3.75 1.50

1.0 8.00 3.75 1.50

$ First floor plan

Qty. is same as per Ground floor plan 1.0 189.38 Cuft

TOTAL

3. ANTI-TERMITE TREATMENT

Anti-termite treatment 1.0 37.50 26.00

TOTAL

4. PCC WORK

Below Masonry foundations

Hor. Walls of Room + Staircase 2.0 37.50 3.00 0.50

Ver. Walls of Room + Staircase 3.0 20.00 3.00 0.50

Hor. Walls of Verandah 1.0 37.50 3.00 0.50

Ver. Walls of Verandah 2.0 4.00 3.00 0.50

Below RCC Footings 4.0 5.67 5.67 0.33

Below masonry steps 1.0 13.25 5.25 0.33

TOTAL

5. RCC WORK

5.1 RCC Footings

Footings 4.0 1.50 0.75

Nos. D d

For bottom part 4.0 5.00 5.00 0.75

For trapezodial part 4.0 25.00 1.40 0.75

Page 38: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 38/62

MEAS. SHEET 38 OF 62

A1 A2 h

TOTAL

5.2 RCC Ground beams

At RCC columnsHor. Beams 2.0 18.08 0.75 1.00

Ver. Beams 3.0 4.50 0.75 1.00

TOTAL

5.3 RCC copings

Masonry walls

Hor. Walls 2.0 37.50 0.75 0.50

Ver. Walls 3.0 20.00 0.75 0.50

Walls of Verandah

Hor. Walls 1.0 37.50 0.75 0.50

Ver. Walls 2.0 4.00 0.75 0.50

Ded. for Ground beams

Hor. Beams -2.0 18.08 0.75 0.50

Ver. Beams -3.0 4.50 0.75 0.50

TOTAL

5.4 RCC Grade SlabAt Staff room 1.0 28.00 20.00 0.29

At Staircase 1.0 7.25 25.25 0.29

At Verandah 1.0 29.50 4.50 0.29

TOTAL

5.5 RCC Columns

5.5.1 RCC Columns from footing upto plinth

RCC Columns 3.0 0.79 Area 6.17

1.0 0.75 0.75 6.17

TOTAL

5.5.2 RCC Columns from plinth to Terrace floor 

$ From plinth to First floor 

RCC Columns 3.0 0.79 Area 8.00

3.0 0.20 Area 4.42

1.0 0.75 0.75 12.42

$ From First to Terrace floor 

RCC Columns 3.0 0.79 Area 8.00

Page 39: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 39/62

MEAS. SHEET 39 OF 62

3.0 0.20 Area 4.42

1.0 0.75 0.75 12.42

TOTAL

5.5.3 RCC Columns above Terrace floor 

RCC Columns 3.0 0.79 Area 3.001.0 0.75 0.75 3.00

TOTAL

5.6 RCC Lintels

$ Ground floor  

On all masonry walls

Hor. Walls 2.0 37.50 0.75 0.42

Ver. Walls 3.0 20.00 0.75 0.42

ded for 7' 3" long opening -1.0 7.25 0.75 0.42

For 7' 3" long opening 1.0 7.25 0.75 0.75

$ First floor  

Qty. is same as per Ground floor 1.0 44.00 117.33

Cuft Sqft

TOTAL

5.7 RCC floor slab

RCC slab at First floor level 1.0 25.75 24.50 0.42

RCC slab at Terrace floor level 1.0 975.00 Sqft 0.42

ded for cutout -1.0 7.25 8.33 0.42

TOTAL

5.8 RCC floor beams

$ RCC floor beams at First floor level

RCC floor beams

Hor. beams 2.0 37.50 0.75 2.00

Ver. beams 6.0 20.00 0.75 2.00

Ver. beams at Verandah 6.0 4.50 0.75 1.21

$ RCC floor beams at Terrace floor level

1.0 316.97 1011.75

Cuft Sqft

TOTAL

5.9 RCC staircase

Qty. is same as per RCC floor beams at First floor level

Page 40: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 40/62

MEAS. SHEET 40 OF 62

$ From Ground to First floor level

Mid landing 1.0 7.25 3.83 0.50

Floor landing 1.0 99.50 Area 0.50

Flight 01

Waist slab 1.0 13.87 3.50 0.50

Steps 14.0 3.50 0.83 0.50

Flight 02

Waist slab 1.0 7.07 3.50 0.50

Steps 9.0 3.50 0.83 0.50

TOTAL

6. REINFORCEMENT WORK

RCC Footings 1.0 107.30 1.42

Cuft Kg / Cuft

RCC Ground beams 1.0 37.25 2.27

Cuft Kg / Cuft

RCC copings 1.0 49.06 1.42

Cuft Kg / Cuft

RCC Grade Slab 1.0 255.45 0.99

Cuft Kg / Cuft

RCC Columns 1.0 83.63 3.12

Cuft Kg / Cuft

RCC Lintels 1.0 88.00 1.42

Cuft Kg / Cuft

RCC floor slab 1.0 643.94 1.42

Cuft Kg / Cuft

RCC floor beams 1.0 633.94 2.55Cuft Kg / Cuft

RCC staircase 1.0 117.07 1.42

Cuft Kg / Cuft

TOTAL

7. MASONRY WORK

7.1 Masonry for foundation work upto OGL

27" Thick (1st Step)

Hor. Walls 2.0 37.50 2.25 0.58Ver. Walls 3.0 20.00 2.25 0.58

Walls of Verandah

Hor. Walls 1.0 22.50 2.25 0.58

Ver. Walls 2.0 4.50 2.25 0.58

23" Thick (2nd Step)

Hor. Walls 2.0 37.50 1.92 0.58

Ver. Walls 3.0 20.00 1.92 0.58

Walls of Verandah

Hor. Walls 1.0 22.50 1.92 0.58

Ver. Walls 2.0 4.50 1.92 0.58

18" Thick (3rd Step)

Hor. Walls 2.0 37.50 1.50 0.58

Ver. Walls 3.0 20.00 1.50 0.58

Walls of Verandah

Page 41: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 41/62

MEAS. SHEET 41 OF 62

Hor. Walls 1.0 22.50 1.50 0.58

Ver. Walls 2.0 4.50 1.50 0.58

14" Thick (4th Step)

Hor. Walls 2.0 37.50 1.17 3.75

Ver. Walls 3.0 20.00 1.17 3.75

Walls of Verandah

Hor. Walls 1.0 22.50 1.17 3.75

Ver. Walls 2.0 4.50 1.17 3.75

TOTAL

7.2 9" thick Masonry work

7.2.1 From OGL upto plinth

Hor. Walls 2.0 37.50 0.75 2.00

Ver. Walls 3.0 20.00 0.75 2.00

Walls of Verandah

Hor. Walls 1.0 37.50 0.75 2.00

Ver. Walls 2.0 4.50 0.75 2.00

Hor. Wall of Server room 1.0 7.25 0.75 2.00

TOTAL

7.2.2 Floor levels (above plinth)

$ Ground floor level

Hor. Walls 2.0 37.50 0.75 10.42

ded of windows -12.0 2.50 0.75 4.00

-1.0 4.00 0.75 4.00

ded of opening -1.0 7.25 0.75 7.00

Ver. Walls 3.0 20.00 0.75 10.42

ded of doors -1.0 4.00 0.75 7.00

-1.0 3.00 0.75 7.00

ded of windows -2.0 4.00 0.75 4.00

Wall at Cantilever slab 2.0 4.92 0.75 1.50

2.0 7.92 0.75 1.50

1.0 8.00 0.75 1.50

$ First floor level

Qty. is same as per Ground floor level 1.0 891.75 Cuft

TOTAL

7.2.3 Terrace floor level

Staircase cabin 0.0 7.25 0.75 8.00

0.0 21.50 0.75 8.00

ded of door 0.0 3.00 0.75 7.00

ded of windows 0.0 2.50 0.75 4.00

Perapet wall 1.0 54.00 0.75 3.00

TOTAL

Page 42: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 42/62

MEAS. SHEET 42 OF 62

7.3 Half brick masonry work

7.3.1 Ground floor level (above plinth)

Hor. Wall of Server room 1.0 7.25 7.00

TOTAL

7.3.2 Terrace floor level

Perapet wall 1.0 29.50 3.00

TOTAL

7.4 Masonry steps

1st Step (Bottom side) 1.0 12.00 5.00 1.25

2nd Step 1.0 10.00 4.00 0.50

3rd Step 1.0 8.00 3.00 0.50

4th Step 1.0 6.00 2.00 0.50

TOTAL

8. PLASTERING WORK

8.1 Internal wall plsater  

$ Ground floor level

Staff room 1.0 96.00 12.00

ded of doors -0.5 4.00 7.00

-0.5 3.00 7.00

ded of windows -6.0 2.50 4.00

-1.0 4.00 4.00

Staircase 1.0 65.00 12.00

ded of doors -0.5 4.00 7.00

-0.5 3.00 7.00

ded of opening -1.0 7.25 7.00

addition of jambs and soffits 1.0 21.25 0.75

ded of window -0.5 4.00 4.00

Ver. Wall of Server room (on both faces) 2.0 7.25 7.00

$ First floor level

Qty. is same as per Ground floor level 1.0 1865.69 Sqft

TOTAL

8.1.2 Terrace floor level

Staircase cabin 0.0 65.00 8.00

ded of door 0.0 3.00 7.00

ded of windows 0.0 2.50 4.00

Internal side of Perapet wall 1.0 54.00 3.75

1.0 28.00 4.88

Page 43: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 43/62

MEAS. SHEET 43 OF 62

TOTAL

8.2 Internal ceiling plsater 

$ Ground floor level

Staff room 1.0 28.00 20.00

StaircaseBelow Flight 01 1.0 13.87 3.50

Below mid landing 1.0 7.25 3.83

Below Flight 02 1.0 7.07 3.50

Below floor landing 1.0 99.50 Area

Verandah 1.0 29.50 4.50

On sides of beams 6.0 20.00 1.58

$ First floor level

Qty. is same as per Ground floor level 1.0 1083.34 Sqft

TOTAL

8.3 External wall plsater  

External periphery 1.0 127.00 29.00

ded of windows -6.0 2.50 4.00

-3.0 4.00 4.00

ded of opening at Verandah side -2.0 37.50 10.00

Staircase cabin external periphery 1.0 69.50 8.00

ded of door -0.5 3.00 7.00

ded of windows -1.0 2.50 4.00

TOTAL

9. INTERNAL FINISHES WORK

9.1 Mosaic tiles flooring

$ Ground floor level

Staff room 1.0 28.00 20.00

addition of door sill 1.0 4.00 0.75

Server room 1.0 7.25 3.29

addition of door sill 1.0 3.00 0.75

$ First floor level

Qty. is same as per Ground floor level 1.0 589.11 Sqft

TOTAL

9.2 3" high Mosaic tiles skirting

$ Ground floor level

Staff room 1.0 96.00ded of door -1.0 4.00

-1.0 3.00

Page 44: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 44/62

MEAS. SHEET 44 OF 62

Server room 1.0 21.42

ded of door -1.0 3.00

$ First floor level

Qty. is same as per Ground floor level 1.0 107.42 Rft

TOTAL

9.3 2.5" thick IPS flooring

$ Ground floor level

Verandah + Stair floor area 1.0 294.96 Area

$ First floor level

Balcony 1.0 240.35 Area

TOTAL

10. JOINERY AND METAL WORK

10.1 Wooden panel doors

Main door 2.0 4.00 7.00

Server room door 1.0 3.00 7.00

Staircase cabin door 1.0 3.00 7.00

TOTAL

10.2 Metal windows

Metal windows 24.0 2.50 4.006.0 4.00 4.00

Staircase cabin windows 2.0 2.50 4.00

TOTAL

10.3 MS railing at Staircase

$ Ground floor level

Flight 01 1.0 11.98

Mid landing 1.0 0.75

Flight 02 1.0 6.17

Floor landing 1.0 0.75

$ First floor level

Flight 01 1.0 11.98

Mid landing 1.0 0.75

Flight 02 1.0 6.17

Floor landing 1.0 3.75

Balcony railing 1.0 46.50

TOTAL

11. WATERPROOFING WORK

Page 45: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 45/62

MEAS. SHEET 45 OF 62

11.1 Terrace waterproofing work

At main terrace 1.0 28.00 25.25

TOTAL

11.2 Crystalline waterproofing work

$ Ground floor planAt sunk slab above Verandah

On floor 2.0 4.92 3.75

2.0 7.92 3.75

1.0 8.00 3.75

On wall 2.0 17.33 1.50

2.0 23.33 1.50

1.0 23.50 1.50

$ First floor plan

Qty. is same as per Ground floor plan 1.0 283.50 Sqft

TOTAL

12. PAINTING WORK

12.1 Internal wall painting

Qty. is same as per Internal wall plaster 1.0 4070.38 Sqft

TOTAL

12.2 Internal ceiling paintingQty. is same as per Internal ceiling plaster 1.0 2166.68 Sqft

TOTAL

12.3 External wall painting

Qty. is same as per External wall plaster 1.0 3360.50 Sqft

TOTAL

13. MISCELLANEOUS WORK

13.1 GI sheets

GI sheets at Staircase cabin 1.0 7.25 8.33

TOTAL

14. ELECTRICAL AND COMMUNICATION WORK

15. PLUMBING WORK

Page 46: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 46/62

MEAS. SHEET 46 OF 62

Page 47: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 47/62

MEAS. SHEET 47 OF 62

 

1388.50

2050.41

2029.81

Page 48: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 48/62

MEAS. SHEET 48 OF 62

5468.71

Page 49: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 49/62

MEAS. SHEET 49 OF 62

 

QTY.

40.50

69.3885.50

13.88

11.08

220.33

Cuft

45.00

75.00

90.00

15.00

11.67

236.67

Cuft

33.75

56.25

67.50

11.25

8.75

177.50

Cuft

26.25

43.75

52.50

8.75

8.75

140.00

Cuft

26.25

43.75

52.50

8.75

7.50

138.75

Cuft

Page 50: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 50/62

MEAS. SHEET 50 OF 62

26.25

43.75

52.50

7.50

5.63

135.63

Cuft

336.00

739.50

700.00

1232.50

840.00

1479.00

140.00

246.50

112.00

217.50

312.00

688.50

650.00

1147.50

780.00

1377.00

130.00

229.50

104.00

202.50

Page 51: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 51/62

MEAS. SHEET 51 OF 62

312.00

607.50

260.00390.00

1012.50

624.00

1215.00

130.00

202.50

104.00

175.50

312.00

526.50

520.00

877.50

624.00

1053.00

130.00

175.50

78.00

175.50

312.00

310.50

520.00

Page 52: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 52/62

MEAS. SHEET 52 OF 62

517.50

624.00

621.00

104.00103.50

78.00

94.50

234.00

310.50

390.00

517.50

468.00

621.00

78.00

94.50

52.00

81.00

Page 53: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 53/62

MEAS. SHEET 53 OF 62

236.67

-1278.81

-336.75

-107.30

-18.00

956.67

312.73

226.78

-8.02

Cuft

55.31

89.06

45.00

189.38

378.75

Cuft

975.00

975.00

Sqft

112.50

90.00

56.25

12.00

42.81

23.19

336.75

Cuft

75.00

32.30

Page 54: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 54/62

MEAS. SHEET 54 OF 62

107.30

Cuft

27.13

10.13

37.25

Cuft

28.13

22.50

14.06

3.00

-13.56

-5.06

49.06

Cuft

163.33

53.39

38.72

255.45

Cuft

14.53

3.47

18.00

Cuft

18.85

2.60

6.98

18.85

Page 55: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 55/62

MEAS. SHEET 55 OF 62

2.60

6.98

56.87

Cuft

7.071.69

8.76

Cuft

23.44

18.75

-2.27

4.08

44.00

88.00

Cuft

262.86

406.25

-25.17

643.94

Cuft

112.50

180.00

24.47

316.97

633.94

Cuft

Page 56: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 56/62

MEAS. SHEET 56 OF 62

13.90

49.75

24.27

10.21

12.38

6.56

117.07

Cuft

152.04

Kg

84.45

Kg

69.52

Kg

253.36

Kg

260.68

Kg

124.69

Kg

912.42

Kg

1616.84Kg

165.87

Kg

3639.88

Kg

98.4478.75

29.53

11.81

83.85

67.08

25.16

10.06

65.63

52.50

Page 57: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 57/62

MEAS. SHEET 57 OF 62

19.69

7.88

328.13

262.50

98.44

39.38

1278.81

Cuft

112.50

90.00

56.25

13.50

10.88

283.13

Cuft

585.94

-90.00

-12.00

-38.06

468.75

-21.00

-15.75

-24.00

11.06

17.81

9.00

891.75

1783.50

Cuft

0.00

0.00

0.00

0.00

121.50

121.50

Cuft

Page 58: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 58/62

MEAS. SHEET 58 OF 62

50.75

50.75

Sqft

88.50

88.50

Sqft

75.00

20.00

12.00

6.00

113.00

Cuft

1152.00

-14.00

-10.50

-60.00

-16.00

780.00

-14.00

-10.50

-50.75

15.94

-8.00

101.50

1865.69

3731.38

Sqft

0.00

0.00

0.00

202.50

136.50

Page 59: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 59/62

MEAS. SHEET 59 OF 62

339.00

Sqft

560.00

48.54

27.79

24.76

99.50

132.75

190.00

1083.34

2166.68

Sqft

3683.00

-60.00

-48.00

-750.00

556.00

-10.50

-10.00

3360.50

Sqft

560.00

3.00

23.86

2.25

589.11

1178.23

Sqft

96.00-4.00

-3.00

Page 60: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 60/62

MEAS. SHEET 60 OF 62

21.42

-3.00

107.42

214.83Rft

294.96

240.35

535.31

Sqft

56.00

21.00

21.00

98.00

Sqft

240.0096.00

20.00

356.00

Sqft

11.98

0.75

6.17

0.75

11.98

0.75

6.17

3.75

46.50

88.80

Rft

Page 61: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 61/62

MEAS. SHEET 61 OF 62

707.00

707.00

Sqft

36.88

59.38

30.00

52.00

70.00

35.25

283.50

567.00

Sqft

4070.38

4070.38

Sqft

2166.68

2166.68

Sqft

3360.50

3360.50

Sqft

60.42

60.42

Sqft

Page 62: Qty. ion Sheet

8/7/2019 Qty. ion Sheet

http://slidepdf.com/reader/full/qty-ion-sheet 62/62