2
FloWell Treatment Post-Job Report Customer: Falcon Oil&Gas We ll: TasW-4 Objective: Clean tubing and inhibit wax buildup Treatment date: June 22, 2012 Report date: June 24, 2012 Well information Bottom depth, m 4307.74 Ft. (plugged depth) Casing ID, inches 6.275 Perforation interval, Ft. 3800-3838 Ft., 3861-3871Ft., 3970-3983Ft. Tubing end depth, Ft. 3969.82Ft. Tubing OD, in. 2.44 in. Pump type PCP Canam TWISTER 27-E-12 Job setup The well is producing via manifold, both tubing and annulus connected to it. It is very convenient from FloWell job point of view easy to inject treatment fluid and rearrange valves for close loop circulation. Fig.1. PC Pump driven well connected to the manifold. Annulus connected directly with pipe to the manifold. Tubing is connected via hose+pipe. Fig.2. Manifold block. Allows for flowing to the pit or separator. Valve looking to the right is the FloWell oil injection point

Qsusa Field Results 27th June 2012

Embed Size (px)

Citation preview

Page 1: Qsusa Field Results   27th June 2012

FloWell Treatment Post-Job Report

Cust omer: Falcon Oil&Gas Well: TasW-4

Objective: Clean tubing and inhibit w ax buildup

Treatment date: June 22, 2012

Report date: June 24, 2012 Well information

Bottom depth, m 4307.74 Ft. (plugged dept h)

Casing ID, inches 6.275 Perforation interval, Ft . 3800-3838 Ft ., 3861-3871Ft ., 3970-3983Ft .

Tubing end dept h, Ft. 3969.82Ft. Tubing OD, in. 2.44 in. Pum p type PCP Canam TWIST ER 27-E-12 Job setup The well is produc ing via m anifold, both tubing and annulus connected t o it. It is very convenient

from FloWell job point of view – easy to inject treatment fluid and rearrange valves for close loop circulation.

Fig.1. PC Pump driven well connected

to the m anifold. Annulus connected

directly w ith pipe to the m anifold.

Tubing is connected via hose+pipe .

Fig.2 . Manifold block. Allows for flowing to

the pit or separator. Valve looking to the

right is the FloWell oil injection point

Page 2: Qsusa Field Results   27th June 2012

Job sequence of events

1. Stop PC pump.

2. Check annulus fluid level – 2315.99 Ft.

3. Pre-job meeting clarifying job objectives and procedures, safety aspects and concerns.

4. Line up tank trailer and pumptruck at the oil tank to transfer 2641 gals of crude oil into the tank

trailer, as in Fig.3 below.

5.

Fig.3.

Transferring

crude oil into

the tank

trailer.

6. Line up tank trailer and pumptruck at the manifold and mix 55gal FloWell in 2641 gals of crude

oil for 20 minutes.

7. Connect pumptruck to the manifold injection point and pump 2641 gals of crude mixed with 55 gals

of FloWell oil into the annulus

8. Rearrange manifold valves to make a connected close loop “Tubing-Annulus”

9. Turn on the PC pump

10. Run close loop for 24 hours to achieve 2 complete cycles.

11. Pressure at the manifold gradually rose from zero to 19bar after 24hrs close loop circulation.

Update – (this will be added to over the coming days / weeks)

“Hi Dauren, Thank you for that ! It ’s appreciated “.

Are there any ear ly results to report as yet? Did anything exciting happen? Production increases or

anything ?”

Dauren Tukenov –Chief Application Engineer – “Hi, There is some production Increase from 15 to 25

barrels per day”

That is a 40% Increase !! More to come soon ..... but a great start ....watch this space !!!

w ww.quicksilverusa.org