FloWell Treatment Post-Job Report
Cust omer: Falcon Oil&Gas Well: TasW-4
Objective: Clean tubing and inhibit w ax buildup
Treatment date: June 22, 2012
Report date: June 24, 2012 Well information
Bottom depth, m 4307.74 Ft. (plugged dept h)
Casing ID, inches 6.275 Perforation interval, Ft . 3800-3838 Ft ., 3861-3871Ft ., 3970-3983Ft .
Tubing end dept h, Ft. 3969.82Ft. Tubing OD, in. 2.44 in. Pum p type PCP Canam TWIST ER 27-E-12 Job setup The well is produc ing via m anifold, both tubing and annulus connected t o it. It is very convenient
from FloWell job point of view – easy to inject treatment fluid and rearrange valves for close loop circulation.
Fig.1. PC Pump driven well connected
to the m anifold. Annulus connected
directly w ith pipe to the m anifold.
Tubing is connected via hose+pipe .
Fig.2 . Manifold block. Allows for flowing to
the pit or separator. Valve looking to the
right is the FloWell oil injection point
Job sequence of events
1. Stop PC pump.
2. Check annulus fluid level – 2315.99 Ft.
3. Pre-job meeting clarifying job objectives and procedures, safety aspects and concerns.
4. Line up tank trailer and pumptruck at the oil tank to transfer 2641 gals of crude oil into the tank
trailer, as in Fig.3 below.
5.
Fig.3.
Transferring
crude oil into
the tank
trailer.
6. Line up tank trailer and pumptruck at the manifold and mix 55gal FloWell in 2641 gals of crude
oil for 20 minutes.
7. Connect pumptruck to the manifold injection point and pump 2641 gals of crude mixed with 55 gals
of FloWell oil into the annulus
8. Rearrange manifold valves to make a connected close loop “Tubing-Annulus”
9. Turn on the PC pump
10. Run close loop for 24 hours to achieve 2 complete cycles.
11. Pressure at the manifold gradually rose from zero to 19bar after 24hrs close loop circulation.
Update – (this will be added to over the coming days / weeks)
“Hi Dauren, Thank you for that ! It ’s appreciated “.
Are there any ear ly results to report as yet? Did anything exciting happen? Production increases or
anything ?”
Dauren Tukenov –Chief Application Engineer – “Hi, There is some production Increase from 15 to 25
barrels per day”
That is a 40% Increase !! More to come soon ..... but a great start ....watch this space !!!