18
Process to Export Test Plans from Excel into Quality Center 1. Install and Configure the Microsoft Excel Add-In. The Microsoft Excel Add-In can be accessed from the main QC login page. Go to qcenter.oit.umn.edu/qcbin/start_a.htm and select the hyperlink for the “Add-ins Page” on the far left. /home/website/convert/temp/convert_html/54e803554a7959397d8b4cd2/document.doc 1

qctestexcelinstr

  • Upload
    mvnaga

  • View
    43

  • Download
    3

Embed Size (px)

Citation preview

Page 1: qctestexcelinstr

Process to Export Test Plans from Excel into Quality Center

1. Install and Configure the Microsoft Excel Add-In.

The Microsoft Excel Add-In can be accessed from the main QC login page. Go to qcenter.oit.umn.edu/qcbin/start_a.htm and select the hyperlink for the “Add-ins Page” on the far left.

/tt/file_convert/54e803554a7959397d8b4cd2/document.doc 1

Page 2: qctestexcelinstr

From the Add-ins page, select the hyperlink for “More Mercury Quality Center Add-ins”

Then select the hyperlink for the Microsoft Excel Add-in:

/tt/file_convert/54e803554a7959397d8b4cd2/document.doc 2

Page 3: qctestexcelinstr

Click on the link for the “Mercury Quality Center 8.2 SP1 Microsoft Excel Add-in Guide”, and follow the instructions in Chapter 1 to download, install, and configure the Microsoft Excel Add-In:

Once the add-in has been installed, you will see “Export to Quality Center” as an additional option in the Excel Tools menu drop-down:

/tt/file_convert/54e803554a7959397d8b4cd2/document.doc 3

Page 4: qctestexcelinstr

2. Create or modify the Excel spreadsheet.

Create or modify a test plan spreadsheet in Excel, using a template similar to the following:

Some of the columns will only be used in the upload/import into Quality Center, and may be hidden, if you prefer, to facilitate updating the test plan steps:

Unhide any hidden columns and complete the additional information needed to load the test plan into Quality Center: Subject (Folder Name), test name (Manual Test Plan Name), Designer (Owner), and Status.

/tt/file_convert/54e803554a7959397d8b4cd2/document.doc 4

Page 5: qctestexcelinstr

Note the following:

- The Subject (Folder Name) should include all folders and subfolders needed to place the test plan correctly into the intended Quality Center folder structure, separating subfolders with a forward slash (\). The subfolders do ** not ** need to have been created first in Quality Center, but if they are, the folder / sub-folder names in the Excel spreadsheet must match the QC folder names exactly.

- The Test Name (Manual Test Plan Name) should be the intended test plan name in Quality Center.

- Designer should be your x.500 ID

- Status should be “Imported”.

- Step Name should be a sequential step label in the QC format: Step 1, Step 2 . . .

The information specified in the Subject column of the spreadsheet is used to create or find the correct folder path in Quality Center.

The information in the Test Name column of the spreadsheet is used to create the Test Plan name in Quality Center:

/tt/file_convert/54e803554a7959397d8b4cd2/document.doc 5

Page 6: qctestexcelinstr

Map and export the data from the Excel spreadsheet to Quality Center.

a) From the Excel spreadsheet:Select the data to be exported, without the column headings.

b) Choose Tools >Export to Quality Center. The QC Export Wizard dialog box (Step 1 of 8) opens:

Enter http://qcenter.oit.umn.edu/qcbin/ in the dialog box.

/tt/file_convert/54e803554a7959397d8b4cd2/document.doc 6

Page 7: qctestexcelinstr

c) Click Next. The QC Export Wizard Step 2 of 8 dialog box opens:

Select the domain and project name to which the test plan is to be loaded.

d) Click Next. The QC Export Wizard Step 3 of 8 dialog box opens:

Enter your User Name and Password.

/tt/file_convert/54e803554a7959397d8b4cd2/document.doc 7

Page 8: qctestexcelinstr

e) Click Next. The QC Export Wizard Step 4 of 8 dialog box opens:

Select the radio button labeled “Tests”.

f) Click Next. The QC Export Wizard Step 5 of 8 dialog box opens:

Enter ”Default Test Plan Mapping” in the new map name field (or select it from the “Select a map” drop-down list).

/tt/file_convert/54e803554a7959397d8b4cd2/document.doc 8

Page 9: qctestexcelinstr

g) Click Next. The QC Export Wizard Step 6 of 8 dialog box opens:

This is the page where you will identify the standard mapping of QC fields to your Excel spreadsheet columns, typically as follows:

Subject Column ATest Name Column BDesigner Column CStatus Column DStep Name (Design Steps) Column EDescription (Design Steps) Column FExpected (Design Steps) Column G

NOTE: The QC fields highlighted in red are required.

For each field to be populated in Quality Center, select the QC field on the left and click the “>” pushbutton to move it into the list on the right. You will be prompted to identify the corresponding Microsoft Excel Column:

/tt/file_convert/54e803554a7959397d8b4cd2/document.doc 9

Page 10: qctestexcelinstr

h) Click Next. The QC Export Wizard Step 7 of 8 dialog box opens, with a message to please wait while QC is being synchronized.

When the upload is completed successfully, the QC Export Wizard Step 8 of 8 dialog box will open, with a message that your export has been successfully completed:

Click the “Finish” pushbutton and you will be returned to the Excel spreadsheet.

/tt/file_convert/54e803554a7959397d8b4cd2/document.doc 10

Page 11: qctestexcelinstr

If the test plan upload was not successful, a dialog box will open that displays the error(s):

Click the “Launch Notepad” pushbutton to view or copy the entire error message:

/tt/file_convert/54e803554a7959397d8b4cd2/document.doc 11

Page 12: qctestexcelinstr

i) Test plans that have been successfully uploaded will now be accessible in Quality Center (if you are already logged into QC and you have the test plan view open, you may need to refresh your folder list).

/tt/file_convert/54e803554a7959397d8b4cd2/document.doc 12

Page 13: qctestexcelinstr

Populating Requirements, Test Plans, and Defects in Quality Centerfrom an Excel Spreadsheet

Utilizing the Microsoft Excel Add-In for Quality Center, the following data fields can be populated from an Excel Spreadsheet:

Requirements Test Plans Defects Author Creation date Actual Fix Time Description Description Assigned To ITG Request ID Description (Design Steps) Closed in Version*Name Designer Description Path Estimated DevTime *Detected By Priority Execution Status Detected in Build Product Expected (Design Steps) *Detected on Date Reviewed Status Estimated Fix Time Type Step Name (Design Steps) Fixed in Build

*Subject ITG Request ID Template ModID*Test Name PeopleSoft Instance Type Planned Closing Version

Priority*Severity Status Subject*Summary Testing Project

The asterisked fields are required.

/tt/file_convert/54e803554a7959397d8b4cd2/document.doc 13

Page 14: qctestexcelinstr

The Application Life Cycle ManagementThe application life cycle management process with Quality Center involvesthe following phases:Specify Releases. Develop a release-cycle management plan.Specify Requirements. Analyze your application and determine yourrequirements.Plan Tests. Create a test plan, based on your requirements.Execute Tests. Create test sets and perform test runs.Track Defects. Report defects detected in your application and track repairprogress.Throughout each phase, you can analyze data by generating detailed reportsand graphs.SpecifyRequirementsPlanTestsExecuteTestsTrackDefectsSpecifyReleases

Specify Releases. Develop a release-cycle management plan.Specify Requirements. Analyze your application and determine yourrequirements.Plan Tests. Create a test plan, based on your requirements.Execute Tests. Create test sets and perform test runs.Track Defects. Report defects detected in your application and track repairprogress.Throughout each phase, you can analyze data by generating detailed reportsand graphs.

/tt/file_convert/54e803554a7959397d8b4cd2/document.doc 14

Page 15: qctestexcelinstr

/tt/file_convert/54e803554a7959397d8b4cd2/document.doc 15