UALITY ASSURANCE PROGRAM
BECHTEL POWER CORPORATION
DIABLO CANYON PROJECT
ualit Assurance To ical Re ortThe Bechtel Quality Assurance Program Plan for useby the Bechtel Power Corporation during ProjectCompletion Management of the Pacific Gas and ElectricDiablo Canyon Project is described in the NRC-approvedBechtel Topical Report BQ-TOP-l, Rev. 3A, Bechtelualit Assurance Pro ram for Nuclear Power Plants.
Sco e of Res onsibilitThis section describes Bechtel responsibilities forproviding quality-related services in ProjectCompletion Management to Pacific Gas and ElectricCo. on the Diablo Canyon Project. Bechtel ProjectCompletion responsibilities may consist of designengineering, procurement services,
construction'ompletion,and preoperational testing.
00
Design engineering services include:o Management of design completiono Preparation of design document and design changes
Preparation of licensing submittalsCoordination of design verification activitiesperformed by non-Bechtel entities at the requestof PGsE.
Procurement services include preparation of procurementdocuments and changes for use in subsequent procurementactions by PGGE. In this case, supplier evaluation,control and auditing of suppliers remains a PGGE respon-sibility. Bechtel may undertake purchasing through theBechtel organization if so requested by PGsE, in accord-ance with requirements of this Program.
-Construction completion management will be performed byBechtel. Construction completion services'ay includedirect construction activities performed by Bechtel and/or construction management of contractors.
cpy ago&f8( 820b2$ 05000275 ...
'ypggQQQGW pQ'p „"'-~
) '.p
PGGE and Bechtel provide personnel to form an integ-rated project team, working under the direction ofBechtel's Project Completion Manager, to provide theabove services. PGGE, procedures may be used, amendedas necessary to comply with this Quality AssuranceProgram description.
Project Unique Modifications to BQ-TOP-l, Rev. 3A
o Introduction Page 3 — Replace Regulatory Guide1.58 (August 1973) with Regulatory Guide 1.58,Rev. 1 (September 1980).
o Introduction Page 3 — Add Regulatory Guide 1.146"Qualification of Quality Assurance Program AuditPersonnel for Nuclear Power Plants (Rev. 0, 1978)".
o Introduction Page 3 - Replace. ANSI StandardN45.2.12 - 1974 with:Regulatory Guide 1.144 "Auditing of Quality AssurancePrograms for Nuclear Power Plants (Revision 1,September 1980).
o Introduction Page 5 — Add to the list of terms anddefinitions as follows:
,21: ,Project Guidance Providing advice or counselon matters concerned with project functions oractivities. This may include establishing generalrequirements or policies, but not specific proceduresor instructions.
o Section 1 ORGANIZATION Subsection 1.5.4 Page 11Replace the first paragraph of Subsection 1.5.4 withAttachment l.
o Section 1 ORGANIZATION Subsection 1.6 Page 13Add as first paragraph to Subsection 1.6 the Attach-ment 2.
o Section 1 ORGANIZATION Subsection 1.6.2 Page 15Revise item (2) and add item (9) per Attachment 3.
0 Section 1 ORGANIZATION Subsection 1.6.3 Page 16Replace the third paragraph of Subsection 1.6.3 withAttachment 4.
0 Section 1 ORGANIZATION Subsection 1.6.3 Page 17Add as last paragraph to Subsection 1.6.3 the Attach-ment 5.
0 Section 1 ORGANIZATION Subsection 1.6.4 Page 17Replace Subsection 1.6.4 with Attachment 6.
„o„. Section 2 QUALITY ASSURANCE PROGRAM (Subparagraphs2 and 4), Page 23 — Change Regulatory Guide 1.58(August 1973) to Regulatory Guide 1.58 Rev. 1(September 1980).
o Section 2 QUALITY ASSURANCE PROGRAM (Subparagraph 3)Page 23 — Change ANSI N45.2.12 to ANSI N45.2.23.
o Section 2 QUALITY ASSURANCE PROGRAM Subsection 2.9Page 26 — Replace Subsection 2.9 with Attachment 7.
o Section ll TEST CONTROL — Page 47Replace the third paragraph of Section ll withAttachment 8.
o Section 17 QUALITY ASSURANCE RECORDS - PAGE 54Add to the second paragraph as follows:
The PGGE "Records Management System" maybe used for retention of records in accordancewith these criteria.
o Change "Project Procurement Manager" to "ProjectMaterials Coordinator" throughout.
o Change "Field Construction Manager" to"Construction Superintendent" throughout.
Table 1 "Bechtel Quality Program Documents" Page 57 and 58Add to Table 1 the Project Documents shown onAttachment 9.
ReplaceFig. 9withFig. 15
Diablo Canyon Project Team Organization Attachment 10.
ReplaceFig. 10withFig. 16
Diablo Canyon Project Engineering OrganizationAttachment 11.
ReplaceFig. 11withFig. 17
Diablo Canyon Project Construction OrganizationAttachment 12.
AppendixA
Bechtel Position on QA NRC Regulatory Guides andANSI standards:
o Delete 5th paragraph (A-7) on page A-1; deletepages A-7 through A-13 entirely.
o Replace ANSI N45.2.12-1974, Draft 3, Rev. 4, Feb-ruary 22, 1974 with Regulatory Guide 1.144, Rev. 1September 1980; replace pages A-22 and A-23 withAttachment 13.
i '
L
ATTACHMENT 1
Division Construction
Managers of,Division Construction provide technicaland administrative direction to the ConstructionDepartment personnel. Managers of Division Construc-tion are assisted by the Chief Construction QualityControl Engineer.
The PGGE Manager Station Construction providestechnical direction for construction activities ofthe integrated project team.
I
tl
ATTACHMENT 2.
The Project Completion Manager (Fig. 15) is the seniorproject representative assigned to the Diablo CanyonProject (Units 1 s 2). The Project Completion Managerreports to the Manager, Division Project Operations andreceives project direction from the PGGE Senior VicePresident for Facility Development. He receivestechnical and administrative direction from the BechtelDivision Project Operations Manager. The Project Com-pletion Manager is responsible for providing overallproject direction to assure consistent and coordinatedapplication of Bechtel policies and skills for thebenefit of the project. The Project Completion Manager'Management Team includes other managers to coordinateactivities in engineering, licensing, and the qualityprogram, and to provide guidance to other projectmanagerial personnel.
An Assistant Project Completion Manager at the projectsite reports to the Project Completion Manager and actsas his representative relative to construction activitiesat the site.
l.
ATTACHHEHT- 3~
2) Assure that drawings, specifications, procedures, and instruc-tions produced conform to project requirements, owner orBechtel standards, applicable industry standards, regulatoryagency requirements, and the design bases as defined inSafety Analysis Reports.
9) Handle and process open items generated by the IndependentDesign Verification Program (IDVP), including interface withIDVP consultants.
)
I
ATTA'CHMENT*'4
The project construction organization includes Superin-tendents who are in direct charge of the crafts (onproject for which Bechtel* is assigned direct con-struction responsibility); Field Engineers who performfield engineering, provide technical guidance andmonitoring of construction work; field procurementpersonnel under the Senior Field Procurement Repre-sentative who a'e responsible for purchase of field-procured items and control of materials prior torelease for construction; Startup personnel underthe Resident Startup Engineer who are responsible forpreoperational and, startup testing; and ConstructionQuality Control Engineers (assigned by and administra-tively and technically responsible to the ChiefConstruction Quality Control Engineer) who are respon-sible for the Bechtel field quality control program,including performance of all quality verificationinspection performed by Bechtel. Construction QualityControl activities are coordinated by the Project .'.Superintendent;:'
I
TTA'CHMENT 5
The Resident Startup Engineer is responsible forthe development of a preoperational and startuptesting program, the preparation of specificpreoperational and startup test procedures, and thescheduling and direction of their implementation.
ATTACHMENT 5
Project Procurement
The PGGE Manager Materials is responsible for PGsEProcurement activities performed for the Diablo Canyonproject.The Manager, Division Procurement, is responsible forProcurement activities performed by Bechtel for theDiablo Canyon Project when so requested by PGaE.
The Project Materials Coordinator provides projectdirection for assigned procurement activities atthe project level and project coordination to ProjectSupplier Quality Supervisors. He receives Technicaland Administrative direction from the PGGE ManagerMaterials and project direction from the ProjectManager.
Project Supplier Quality Supervisors report to theDivision Supplier Quality Manager for technical andadministrative direction. The functions of the ProjectSupplier Quality Supervisors'elative to Bechtelprocurements are:
1) Coordinate project procurement surveillance in-spection activities with project engineering andProcurement Supplier Quality.
2) Comment on technical specifications prior toissurance for bids.
3) Initiate supplier surveys, Supplier Quality Assign-ments, and coordinate suppliex audits with ProcurementSupplier Quality.
4) Review and accept procurement surveillance inspectionreports.
5) Give project direction on project Supplier Qualityassignments to the Bechtel Supplier Quality Repre-sentative.
Field procurement sexvices are provided by theConstruction organization or are obtained through thePxoject Materials Coordinator for items procured byPGGE.
1
tl
I
m
ATTACHMENT 7
2.9 PREOPERATIONAL TESTING AND PLANT TURNOVER
The Quality Program described in this report coversdesign, 'procuremen't and construction activities.Construction activities include peroperational testingphase activities performed by the Start-up group ofthe Diablo 'Canyon Project Construction Organization.
J
i.k
P'
ATTACHMENT 8
Preoperational and startup testing is performed bythe Startup group of the Diablo Canyon Constructionorganization under the direction of the ResidentStartup Engineer. Written procedures or checklistsare employed and test results are recorded, reviewed,approved and retained. Quality Control performssurveillance inspection over preoperational andstartup testing.
I
ATTACIIl'1FÃZ 9
DIM3LO CANYON NUCf F2B PRMECT
QUALITY PROGRAM DOCUMENTS
DOCUMFI'VS
DIAI)LO CANYONNI)Cf.FEB QUALITYASSlIBANCI'. MANUAL
(NQAM)
DIABLO CANYON *CONSTRUCTIONQUALITY CONTROLPROCEDURES
DIABU) CANYON *CONS I'ICCTIO'IPBOCI DUBI'S (QUALITYPIIÃiBAM BF.LATF..D )
ORIGINATINGAUZIlORITY
PRCOECZ QhENGINEER
PROJECTCONSTR. QCENGINEER
FIELD CONSTIKC-TION SUPEBIWZFN-DENT
REVXEN FOR QA POLICY ANDPROGRAM RFQUIRFAFNTS
SFPD QA MANAGER (BECHTEL)
PROJECT QA ENGINEER(BECHTEL)
PRG3ECZ QA ENGINEER
AUTHORIZINGAPPROVAL
SFPD QA, MANAGER
(BECHTEL)PROJECT MANAGER
DIVISION CHIEFQC ENGINEER(BECHTEL)
CHIEr cONSTRUcZIONENGINEER
(BECHTEL)
CCÃZENTS
QUALITY PRCGIKM POLICY.l3ASED ON DIV.rSXON POLICYAS CONZAINED IN SE'PD
STANDARD NQAM
QUALITY CONTROLPROCEDURES
RESPONSI13ILITI ES AND
PRACZICE FOlk CONSTRUC-
ZION SITE ACrIVXZXIX
PGE E IMPINEfRXNG *IIAIIUhr.
VICE PRESIDFJVZ,DCiINEI.JEINGi(PGaE)
PR03ECT QA ENGINEER VICE PRESIDEtlZ,ENGINEERING(PGGE)
PRCCEDIJREE POR CONDUCTXliC
PROJECT ENGINEERINGACZIVXTII&
PBCOFCZ PGINEFBINGINSTRUCTIONS
PRCOECT F2'IGINFI',R - PRCOECT QA EKCTINEER PRCQECZ ENGINES SUPPLFHENTS TO PGSF.
ENGINEERING MANUAL,NiIGK NECISSAIRY
Bl'.CARDS MhhIAGIPIEI'rZSYS'1'81 HAND30CK
( 1%>* I'.)
soprBvxsoR,RECOILS IIANAGE-Mrvz
PRCQECT QA ENGINES(0ECHTEL)
MANAGER QUALITYASSURANCE DEPT.
RECOROS WenaEWmr
PROCEDURES I.'Olk RECORDS
l 1ANAGEMENT SYSTIM
DIAI3f0 CANYON
PROJECT PROCEDUREOMANUAL
PROJECT COMPLE-TION MANAGER
PRMECZ QA ENGINEER PROJECT COMPLE,TION MANAGER
PROCF33URES COVERINGINTERFACES BETWEENTHE PROJECT TEAM ANDEXTERNAL ENTITIES
* MAY REPLACE THE CORRESPONDING STANDARD DOCUMENTS LISTED IN TABLE 1.
r
'tl.mg
r"
k
I
I
4
AT".ACHMENT10
DIABLO CANYON
OTVIMONOUAUTY
ASSURANCEMANACKA
t.o. & f.MANACERNUCLEAR
PLANTOPERATIONS
MANACERDIVISON
fNCINEKRINC
PRO JECT TEAMORGANIZATIOI4
MANACKR MANA AMANAGER MANACEA t C. & E. MANACKA
tc&E
DIVISION MANAGER DIVISIONOPKAATIONS STA»ON CONSTAUCTION SEA VICKS MATERIALS PROCUREKIENT
CONSTRUCTION
COAPORATESERVICKS I
M&OSMCR.c&SMSA.
TECHNICAlSoltOAT ToFUNC'TIDNAL
CROVIS
DUALITYASSURANCEMANAGEA
~RolECTS
DUALITYKNCINEERINCSUtfAVI$0R
MANACEAOF
KNCINfERINO
E NO!NET&INCMANACtA
MANACKMKNT
I PRolf CT
MANACKRt&olKCT
CONSTAUCTION ROM!ASTRA»ONSU!toAT CROUP
MANACERSUttlIEAOF PROCUREMENT
MANACtROUAllTY ~ SUPPLIER
DUALITY
PROJKCTCOMPLETICN
MANACKR
) eo s ee s eo s e ~ ee s ee s ee s ee s ~ s ee s ee ~ ~
PROIKCTMANACKMENTTEAM
DUALITY LICENSINC KNCINKERINCMANACfMKNT MANACfMENT MANACEMEN'I
APM
~ cess seo eo ~ eeoee ~ ceo eeowoe seeseeoees ~ ~ eeoeeosI I
Ieww)ewe eeee)ee ee ~ soseee)m sss ammmmmeeLmqm eeeee ww% e)e&wwwe oo e) w ee e)
PAOIECTDUALITY
ASSURANCEKNCHIEER
~ROIKCTOtt AA»ONS
COORDINATOR
PROJECTLICKNQNCfNtilN KEN
PR DIECTtNCINEEA
UNIT I
PROTECTKNCINEEA
VNITT
CONSTRUCTIONSUPERINTENDENT
ASST.PROTECT
COMtlKTIONMANACKA
PROTECTADMINISTRATOR
COST ANOSCHEDULE
SVPEAVISOA
tROIECTMATERIALS
COORDINATOR
Iewweeeeee)ewe lace cess)wmwwweee) los&Woe J ~ ~ ee o ee o ee o y
OAKSFIELD
HOME OFFICE
PROTECTDUALITY ww~w OUAlITY
KNCINEt&
APESYSTEMS
AtESKIQHC
VERIFICATION PROTECT
SUtfRINIlNCKNI
PROJECTCONSTRUCTION
OCE
~AolKCTSUPPLIERDUALITY
SUPERVISOR
LECENO +
ee ee l% w ee
ee O ee ~ ee o e~ S ~ SSMS ~ S ~ SSS ~ S
TECHNICAL&ADMINISTRATIVEDIRECTION
PROTECT OHIECTION
PROJECT COORDINATION
TECHNICALDIRECTION
AOM!VISTA&IIVKOIRECTID'I 0DLY
PRO!KCT CU:OANLK
TH5 CHAAT IS INTENOEO To REFLECT REPORTINCRELATIONSHIPS ANO NOT Nt CKSSAAILVLfvtLS OFAKstoNS!SillTY. SKNIORITY OF POSITIONS.ORWORNIHC RELATIOHQIIPS.
AN EXCEPTION TO THE ABOVE LEGEND IS THAT ADMINISTRATIVEDIRECTION IS ALWAYS
PROVIDED BY THE PARENT ORGANIZATION(PG&E OR BECHTEL)FICURE 1$
I
ATTACHMENT11
DIABLOCANYON PROJECT
PRO JECT ENGlNEERING ORGANIzATION
MANAGER,DIVISION
ENGINEEAING
MANAGER OFENGINEERING
THIS CHART IS INTENDED TO REFLECT AEPOATINGRELATIONSHIPS AND NOT NECESSARILY LEVELS OFRESPONSIBILITY, SENIORITY OF POSITIONS, 0 RWORKING RELATIONSHIPS.
CHIEF PLANTDESIGN ENGR.
COGNI2ANTENGR. MANAGER
CHIEF NUCLEAR/ENVIRONMENTAL
ENGINEER
QUALITYENGR.
SUPERVISOR
CHIEFCIV.ISTRUCT.
ENGINEER
CHIEFELECTRICALENGINEER
CHIEFMECHANICAL
ENGINEER
CHIEF CONTROLSYSTEMSENGINEER
MANAGEMENT
PAOJECT
PROJECTENGINEER
PROJECTQUALITYENGINEER
APEQUAuTY
APE SEISMIC APE4YSTEMS I
WWWWW WWWPIWW WW
VERIFICATIONCOORDINATOR
LEGEND
TECHNICALSL~ ADMINISTRATIVEDIRECTION «+
W W PAOJECT DIRECTION
HVACGROUPSUPV.«
gMWW Wpwww ag$
CIV.ISTRUCT. PI.ANT DESIGN lGROUP SUPV.«
GROUPs GROUP «gm
LI&&&&&&IhfhR&Wm %% W W SE &&KR
ELECTAICALGAOUP «SUPV,
MECHANICALGROUPSUP V.
CONTROLSYSTEMS
GROUP SUPV.
MNN wle as as ga w w w wA~
«RECEIVES TECHNICALREVIEW AND APPROVALOF SELECTED DOCUMENTS AND DESIGNS FROM THE PG&E DISCIPLINE CHIEF ENGINEER.««AN EXCEPTION TO THE ABOVE LEGEND IS TflATADMINISTRATIVEDIRECTION IS ALWAYS
PROVIDED BY THE PARENT ORGANIZATION (PG&E OR BECHTEL)FIGURE Ie
G I00303-.02'.
ATTACHMENT12
PRQ JECT CQNSTRUCTIQR QMANlZATIQNCODESR
STANDARDS
NATERIALSb OUAUTYSERVICES
DIVISIONSfR VICES
~ s ~ a ~ a ~ a ~ s s ~ s ~ s a a sa a ~ a ~ s ~ s ~ s ~ s ~ a s s a s s ~ s ~ s ~ s a s s As a 1 s a s a a a a a a s a s s s V
\
s
s
NAIVAGfMfHT
s s s a s s a s s s s s s s s s a s s s s a s s a a a a a s s e s s s s ~ s a a s s ~ s ~ s s s s s ~ a ~ s a s s s s s s s e ~ s ~ a s ~ s ~ s ~ s ~ s Ig
MANAGER.DIVISION
coIvsTRIIcnolv
COGNIEANTMAHACEROF
CONSTRUCTION
CHIEF CONSTRUCTIONOUAUTYCOIVTROL
ENGINEER „
COHSTRUCnOHMANAGER/SERVICES
CHIEF CONSTR UC nOHENCINEER
PROIEC T
PROIECTcoMPLEnON
MANAGER
s4+I ~
tWsssaassaaaasaasssasas
PROIECTNAIIAGEMENTTEAM
PROIECTOUALITV LICENSIIVG END INEERI NANAGER
ANACEMEH AIVACEMEIV MANAGEMENAPM
~ ASSIS TANTPROIECT COMPLfnON
NAHIGER
OFFSITE
OIVSITE
CONSnlUCTIOIVSUPERINTEHDfNT
PROIECTSUPERIH TfNDENT
GENSUPT.,
coHsTRUcnoN'UALI
TVCONTRO!.
PRO/ECTSE RVICES
LEGEND
TECHNICAL~~ oaas jilkas NscasTECHNICALCUIDAHCE is ~ a ~ a ~ a ~ a ~ a ~
PROIE CTDLRECTION
PRO/ECT COOROLHAnON
UNITISTAITUP
RESIDENTSTAR TUPENGINEER
UIVITSSTARTUP
FIELD EIVGINEERS
CIVIL/STRUCTURAL
MECHA RICA L
ELECTRICAL
CONTRACTORS
CONSTRUCTIONCOORDINATOR (Sl
OC ENCINEE4 TECHHICIA
CIVIL/STRUCTURAL
MECHANIC L
fLfCTRICAL
INSTRUMENT "
VVELDIHG
01003S2$ 01
Figure 17
ATTACHMENT 13
Regulatory Guide 1.144 (ANSI N45.2.12-1977, Auditing ofQuality Assurance Programs for Nuclear Power Plants)
The requirements of the referenced standard as modified andinterpreted by the regulatory position will be applied tothe Bechtel quality program for safety-related items except asmodified or interpreted below:
1) Reference:, Standard Sections 4.3.2.4 and 4.5.i(Investigation).As an equivalent alternative to the requirements for the auditedorganization to investigate any adverse audit finding to de-termine and schedule appropriate corrective action, Bechtel'sauditing organization may determine the investigatory actionand corrective action including action to prevent recurrencepertinent to adverse audit finding. These actions are agreedto by the audited o'rganization. Further, in Section 4.5.1,as equivalent alternative to the 30-day response time, aresponse time appropriate to the finding is agreed to by theaudited and auditing organizations.
2) Reference: Regulatory Section C.7, Standard Section 5.2(Audit Records). Audit records shall include documents asdefined in the standard and other documents if necessary tosupport audit findings.