 SAP Field Services WBS / Title Acceptance Assigned Potential Impact Weight Total Impact for Q-Gate Comment Prior to using the Q-Gate assesment sheets make sure to add / remove / modify the key deliverables to properly reflect your individual project WBS and key deliverables. This should be done during the Phase Startup process rather than late in the phase. During the actual Q-Gate assessment process go over each deliverable and assess whether it is accepted, accepted with exceptions (note the exceptions in the Comments field) or not accepted (note the action plan to produce acceptable deliverable in the Comments field). Then based on the assessment assign (1) Green, (2) Yellow or (3) Red rating in column C. The impact rating numbers (column D) are provided to help you gauge importance of each deliverbal on scale from 1 to 5 (very high impact on project schedule, cost or risk). You may modify them based on individual project, client needs as each project may assign specific deliverables its own impact rating in comparison with other deliverables. Please note that the impact rating is designed to indicate level of impact for each deliverable in relation to other deliverables. It is not an exact figure derived from mathematical formula, but rather a reflection of importance of each deliverable and impact of not completing the deliverable at the time of Q-Gate. WBS number of the deliverable in the ASAP Implementation Roadmap and title of the deliverable or key activity. Q-Gate Instructions For deliverables that are not acceptable note your comments and describe the action plan to fix the deliverable so it can be accepted. Note the level of acceptance of each deliverable in the Q-Gate, using the 1-3 numerical scale, 1 -  Accepted (Green), 2 - Accept ed with exceptions (Yellow), 3 - Not acceptad (Red) This number shows potential impact of not completing the deliverable by the time of the Q-Gate. The impact can be between number 1 and 5 where 1 is low impact and 5 represents very high impact. Total impact of the deliverable on the Q-Gate is calculated as either full impact for deliverables rated as Red and 2/3 of potential impact for deliverables ranked Yellow. The potential impact of deliverables with 0 impact are completed to the satisfaction of the reviewer. Other deliverables may be fully or partially completed, but are not meeting the acceptance criteria.   Consider the following questions when identifying risks in a Q-Gate Q-Gate is a tool to help the team reduce risk on a project. A Q-Gate can be Red, Yelllow or Green. It is Green, when all items on the Q-Gate list have been completed to the satisfaction of the client and team. A Q-Gate is Yellow when even though an item has not been completed, but this may or may not impact the  project. A Yellow Q-Gate designates higer Risk. A Red Q-Gate get the color red, when one or more items have not been completed to the satisfaction of the client. SAP does not recommend moving forward with the project 'till all items are green. Please make sure that the entire team is aware of the importance of a Q- Gate and how, project run the elevated risks if all items are not green. Please do not limit yourself to these topics, they are provided as general memory joggers. You may have a lifecycle that is different than these. Be sure to list the PM Process for the lesson you are documenting. Project Management Process Initiating Phase How well was the project vision understood by team members? Was the Project Sponsor involved as early as they needed to be? Was there sufficient upper management support for the project to continue? Were success criteria determined and understood? Planning Phase Was the project schedule useful and accurate? Were contractors and other vendors brought in early/late, just in time? Did the project team adhere to the schedule? Was the skill set of the team members sufficient? Executing/Monitoring/Controlling Phase Were there many defects that were tracked back to new requirements? Did the change control process adequately address changes to the project? Was reporting done timely and accurately? Was the process for change clearly understood by all team members? Closing Phase What could have been improved during the project? What went well on the project? Q-Gate Leading Questions  

Q-Gate Assessment Document

Embed Size (px)

Citation preview

Page 1: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 1/16

 

WBS / Title

Prior to using the Q-Gate assesment sheets make sure to add / remove / modify the key deliverab

individual project WBS and key deliverables. This should be done during the Phase Startup proce

phase.

During the actual Q-Gate assessment process go over each deliverable and assess whether it is a

exceptions (note the exceptions in the Comments field) or not accepted (note the action plan to pr

deliverable in the Comments field). Then based on the assessment assign (1) Green, (2) Yellow o

The impact rating numbers (column D) are provided to help you gauge importance of each deliver

(very high impact on project schedule, cost or risk). You may modify them based on individual proj

project may assign specific deliverables its own impact rating in comparison with other deliverable

impact rating is designed to indicate level of impact for each deliverable in relation to other deliver

figure derived from mathematical formula, but rather a reflection of importance of each deliverable

completing the deliverable at the time of Q-Gate.

WBS number of the deliverable in the ASAP Implementation Roadma

or key activity.

Q-Gate Instructions

 

Page 2: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 2/16

 

Consider the following questions when identifying risks in a

Q-Gate is a tool to help the team reduce risk on a project. A Q-Gate can be Red, Yelllow or Green. It is Gre

completed to the satisfaction of the client and team. A Q-Gate is Yellow when even though an item has not project. A Yellow Q-Gate designates higer Risk. A Red Q-Gate get the color red, when one or more items h

client. SAP does not recommend moving forward with the project 'till all items are green. Please make sure

Gate and how, project run the elevated risks if all items are not green. Please do not limit yourself to these

You may have a lifecycle that is different than these. Be sure to list the PM Process for the lesson you are

Project Management Process

Initiating PhaseHow well was the project vision understood by team members?

Was the Project Sponsor involved as early as they needed to be?

Was there sufficient upper management support for the project to continue?

Were success criteria determined and understood?

Planning PhaseWas the project schedule useful and accurate?

Were contractors and other vendors brought in early/late, just in time?

Did the project team adhere to the schedule?

Was the skill set of the team members sufficient?

Q-Gate Leading Questions

Page 3: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 3/16

 

   W   B   S

1 Project PreparationProject Management

1.1.1 Phase Startup1.1.1.1 Phase Resources Allocation

1.1.1.2 Detailed Phase Schedule

1.1.1.3 Phase Kickoff Meeting

1.1.1.4 Handoff Checklist from Pre-project activities

1.1.2 Project Initiation

1.2.1 Project Strategic Framework

1 1 2 1 Business Case

   T   i   t   l  e

 

Page 4: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 4/16

 

1.1.4.5 Risk Register

1.1.4.6 Deliverable Acceptance Documents

1.1.4.7 Team Member Evaluations/Appraisals

1.1.4.8 Communications Matrix (updated)

1.1.4.9 Status Reports

1.1.4.10 Contractual Changes

1.1.5 Phase Sign-Off  

1.1.5.1 Closed Contracts

1.1.5.2 Lessons Learned Log

1.1.5.3 Phase Completion Check (internal)

1.1.5.5 Phase Sign-Off DocumentOrganization Change Management

1.5.1 Change Charter

1.5.2 Initial Stakeholder Mapping and Business Readiness Assessment

1.5.3.1 Sponsorship Strategy

1.5.3.2 OCM Organization and Change Agent Network

1.5.4.1 Communication Plan

1.5.4.2 Initial Announcement

1.5.5.1 Organizational Alignment Strategy

1.5.5.2 Social Contract

1.5.6 Project Team Change Management

Training1.8.1.1 Project Team Training Plan

1.8.1.2 Trained Project Team (Level 1, Methodology and Organization Change Managem

1.8.2 Preliminary End-User Training and Documentation Strategy

Business Process Requirements, Design, Configuration and Testing

1.4.1 Business Scenario and Process Inventory

Lifecycle Data Management

Page 5: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 5/16

 

   W   B   S

2 Business BlueprintProject Management

2.1.1 Phase Startup

2.1.1.1 Phase Resources Allocation

2.1.1.2 Detailed Phase Schedule2.1.1.3 Phase Kickoff Meeting

2.1.2 E/M/C Results

2.1.2.2 Requests for Change

2.1.2.3 Change Log

2.1.2.4 Issue Log

2.1.2.5 Risk Register

   T   i   t   l  e

Q

2 3 2 E d U T i i d D t ti St t

Page 6: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 6/16

2.3.2 End-User Training and Documentation Strategy

Technical Solution Management

2.8.1 Authorization Requirements and Design

2.8.2 System Authentication Concept

2.10.1 Technical and Integration Design

2.10.2 Development Environment

2.10.3 System Administration Procedures

2.10.4 Support Procedures

2.10.5 Project IMG

Business Process Requirements, Design, Configuration and Testing

2.4.1 Business Organizational Structure2.4.2 General Settings & Master Data

2.4.3.1 Business Scenario Workshop Schedules

2.4.3.2 Business Scenario Overview

2.6.1.1 Business Process Workshop Schedules

2.6.1.2 Scenario #1

2.4.3.4.1 Scenario Requirements

2.6.1.2.1 Process #1

2.6.1.2.1.1 Business Process Requirements Documents

2.6.1.2.1.2 Business Process Models

2.6.1.2.1.3 Development Requirements

2.6.1.2.1.3.1 Forms Requirements2.6.1.2.1.3.2 Reporting Requirements

2.6.1.2.1.3.3 Interface Requirements

2.6.1.2.1.3.4 Enhancement Requirements

2.6.1.2.1.3.5 Workflow Requirements

2.6.1.2.1.3.6 Miscellaneous Development Requirements

2.6.1.2.2 Process #2 (to n) 

Page 7: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 7/16

   W   B   S

3 RealizationProgram, Project, Risk and Quality Management

3.1.1 Phase Startup

3.1.1.1 Phase Resources Allocation

3.1.1.2 Detailed Phase Schedule

3.1.1.3 Phase Kickoff Meeting

3.1.2 E/M/C Results

3.1.2.2 Requests for Change

3.1.2.3 Change Log

3 1 2 4 Issue Log

   T   i   t   l  e

 

Page 8: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 8/16

   W   B   S

3 RealizationProgram, Project, Risk and Quality Management

3.1.2 E/M/C Results

3.1.2.2 Requests for Change3.1.2.3 Change Log

3.1.2.4 Issue Log

3.1.2.5 Risk Register

3.1.2.6 Deliverable Acceptance documents

3.1.2.7 Team Member Evaluations/Appraisals

3.1.2.8 Communications Matrix (updated)

   T   i   t   l  e

 

3 12 2 5 1 6 2 3 Test Results of Reports

Page 9: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 9/16

3.12.2.5.1.6.2.3 Test Results of Reports

3.12.2.5.1.6.2.4 Documented Reports De

3.12.2.5.1.6.3 Interface Program (n)

3.12.2.5.1.6.3.1 Technical Specifications

3.12.2.5.1.6.3.2 Created Interfaces

3.12.2.5.1.6.3.3 Test Results of Interfaces

3.12.2.5.1.6.3.4 Documented Interfaces D

3.12.2.5.1.6.4 Enhancement Program (n)

3.12.2.5.1.6.4.1 Technical Specifications

3.12.2.5.1.6.4.2 Created Enhancements

3.12.2.5.1.6.4.3 Test Results of Enhance3.12.2.5.1.6.4.4 Documented Enhanceme

3.12.2.5.1.6.5 Workflow (n)

3.12.2.5.1.6.5.1 Specifications for Workflo

3.12.2.5.1.6.5.2 Developed Workflows

3.12.2.5.1.6.5.3 Test Results of Workflow

3.12.2.5.1.6.5.4 Documented Workflows

3.12.2.5.1.6.6 Miscellaneous Development (n)

3.12.2.5.1.6.6.1 Specifications for Miscell

3.12.2.5.1.6.6.2 Created Miscellaneous D

3.12.2.5.1.6.6.3 Test Results of Miscellan3.12.2.5.1.6.6.4 Documented Miscellaneo

3.12.2.5.2 Process #2 (to n)

3.12.2.6 Configured and Tested Scenario #2 (to n)

3.12.2.8 Migrated Configuration and Development to QA for Cycle n

3.12.2.9 Cycle Test Results/Updated Configuration Test Cases for Cycle n

3.12.2.10 Confirmation of Configuration and Development for Cycle n

3 12 3 R li ti f th E t i D t W h 

Page 10: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 10/16

   W   B   S

3 RealizationProgram, Project, Risk and Quality Management

3.1.2 E/M/C Results

3.1.2.2 Requests for Change3.1.2.3 Change Log

3.1.2.4 Issue Log

3.1.2.5 Risk Register

3.1.2.6 Deliverable Acceptance documents

3.1.2.7 Team Member Evaluations/Appraisals

3.1.2.8 Communications Matrix (updated)

   T   i   t   l  e

 

3 14 2 1 Integration Test Results - Cycle 1

Page 11: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 11/16

3.14.2.1 Integration Test Results - Cycle 1

3.14.2.1.1 Tested Scenario #1

3.14.2.1.2 Tested Scenario n

3.14.2.2 Functional User Acceptance Test Results - Cycle 2

3.14.2.2.1 User Acceptance of Scenario #1

3.14.2.2.2 User Acceptance of Scenario n

3.14.2.3 Preliminary Portal Performance Test Report

3.14.2.4 Portal User Acceptance Report

3.14.2.5 Resolved Integration Test Issues

3.14.2.6 Final Integration Test Sign-Off

Technical Solution Management3.9.1.1 Preliminary Production Support Pla

3.11.1 System User Roles and Authorizations

3.11.2 System Authentication

3.16.1 Production Infrastructure Ready

3.16.1.1 Data Center Ready for Production

3.16.1.2 Updated IT Infrastructure Document

3.16.2 Production Environment Design & Setup

3.17.1 Preparation for Performance Test

3.17.2 Performance-Test Plan

3.17.3 Test Environment and Test Scripts

3.17.4 System Test Plans

3.17.4.1 Failure Test Plan

3.17.4.2 System Administration Test Plan

3.17.4.3 Printing and Faxing Test Pla

3.17.4.4 Disaster Recovery Test Plan

3.17.4.5 Regression Test Plan

3 17 4 6 Backup-and-Restore Test Plan 

Page 12: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 12/16

   W   B   S

4 Final PreparationProgram, Project, Risk and Quality Management

4.1.1 Phase Startup

4.1.1.1 Phase Resources Allocation

4.1.1.2 Detailed Phase Schedule

4.1.1.3 Phase Kickoff Meeting

4.1.2 E/M /C Results

4.1.2.2 Requests for Change

4.1.2.3 Change Log

4.1.2.4 Issue Log

4.1.2.5 Risk Register

   T   i   t   l  e

 

4 8 2 Production Cutover Sign-Off

Page 13: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 13/16

4.8.2 Production Cutover Sign OffTechnical Solution Management

4.5.1 Established Functional and Technical Production Support

4.5.1.1 User Support Implemented

4.5.1.2 Solution Management Procedures

4.5.1.3 Monitoring Procedures

4.5.1.4 Systems and Application Handover to Support Organization

4.5.1.5 Complete IT Infrastructure Document

4.5.1.6 Change Management Document for Production

4.5.1.7 Refined Production Support Plan

4.5.1.8 Established Help Desk Organization

4.5.1.9 Reorganized Production Support Team

4.5.1.10 Long-Term Support Strategy

4.5.2 Approved Performance Tests

4.5.3 Approved System Tests

4.5.3.1 Failure Test Results

4.5.3.2 System Administration Test Result

4.5.3.3 Printing and Faxing Test Result

4.5.3.4 Disaster Recovery Test Result

4.5.3.6 Backup-and-Restore Test Results

4.5.3.7 Connectivity Test Result

4.5.4 Production Software LoadedSAP Services

4.1.4.3 PM Review Service Report

4.6 SAP Solution Management Optimization

4.7 SAP Operations Readiness Assessment

Possible impact  / Tota

 

Page 14: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 14/16

   W   B   S

   T   i   t   l  e

5  Go Live and SupportProgram, Project, Risk and Quality Management

5.1.1 Phase Startup

5.1.1.1 Phase Resources Allocation

5.1.1.2 Detailed Phase Schedule

5.1.1.3 Phase Kickoff Meeting

5.1.2 E/M /C Results

5.1.2.2 Requests for Change

5.1.2.3 Change Log

5.1.2.4 Issue Log

5.1.2.5 Risk Register

5 1 2 6 Deliverable Acceptance Documents 

5.1.4.2 PM Review Service Report

Page 15: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 15/16

5.1.4.2 PM Review Service Report5.6.1 SAP GoingLive Check: Verification Session

5.7 SAP EarlyWatch Check

Possible impact

 

Page 16: Q-Gate Assessment Document

5/12/2018 Q-Gate Assessment Document - slidepdf.com

http://slidepdf.com/reader/full/q-gate-assessment-document 16/16

Purpose

CPI/Project Number

Customer Number

Program Manager 

SAP Service Partner(s)

Attach individual Q-Gate assessment sheet here:

Project Sponsor Project Manager (Custome

Project Manager (SAP) Project Manager (Service P

Q

The Q-Gate Sign off is used by the Project Manager, The Project Team and the Client to

next phase of the project. This document should be updated and signed before moving

(go/acceptable/completed) category. The Q-Gates are either Red (stop), Yellow (caution

Project Identification

Project Name

Customer Name