List of electric materials for "American PX" 1 Cable 4 x 6 mm² 40 m 2 Disconector 4P C32 400V 2 pcs 3 Diferential interupter 4P 32A 400V 300mA 2 pcs 4 AC Split system Reversibile 12000 BTU 4 pcs 5 Socket external shucko 6 pcs 6 Fluoroscent light assebly double 2x36 W,IP165 2 pcs 7 Cable 3 x 2.5 mm² 20 m 8 Cable 3 x 1.5 mm² 20 m 9 Diferential interupter 4P 16A 400V 30mA 1 pcs 10 Disconector C-16 10KA IEC 947-2 230V 6 pcs 11 Cable 4 x 4 mm² 20 m 12 Tube pvc for cables 10 m 13 Light switch 1 pcs 14 flexible hose for cable Ф50 50 m - Labor work: Digging a ditch up to 40 meters and underground installation of cab Closing windows, removing of old AC window units and patch the hole Cable installation and connection, prepare the building inside for Floor reinforcement of the building. Installation of Air condition

DocumentPX

Embed Size (px)

DESCRIPTION

list

Citation preview

Sheet1List of electric materials for "American PX"1Cable 4 x 6 mm40m2Disconector 4P C32 400V2pcs3Diferential interupter 4P 32A 400V 300mA2pcs4AC Split system Reversibile 12000 BTU4pcs5Socket external shucko6pcs6Fluoroscent light assebly double 2x36 W,IP1652pcs7Cable 3 x 2.5 mm20m8Cable 3 x 1.5 mm20m9Diferential interupter 4P 16A 400V 30mA1pcs10Disconector C-16 10KA IEC 947-2 230V6pcs11Cable 4 x 4 mm20m12Tube pvc for cables10m13Light switch1pcs14flexible hose for cable 5050m

-Labor work:Digging a ditch up to 40 meters and underground installation of cableClosing windows, removing of old AC window units and patch the holes.Cable installation and connection, prepare the building inside for rewiring in the PX and the container.Floor reinforcement of the building.Installation of Air condition

Sheet2

Sheet3