PIPING MATERIALS SERVICE INDEX
CLASS RATING PIPE MATERIAL VALVE BODY
TRIM C.A
(mm)
DESIGN TEMPERATURE
RANGE () SERVICE RT(%) PWHT
A1A 150 RF CS CS 13 Cr/HF 1.6 -29 TO 427
ATMOSPHERIC VENT, BLOWDOWN, BOILER FEED WATER, CONTINUOUS BLOWDOWN, DECOKING AIR, DILUTION STEAM, FUEL GAS, LOW PRESSURE STEAM (SUPERHEATED), MEDIUM PRESSURE STEAM, NITROGEN, NON-CONTAMINATED DRAIN, PROCESS,PROCESS WATER SAFETY VALVE TO ATMOSPHERE, STEAM CONDENSATE, WASTE WATER
5% >20mm
A1D 150 RF CS CS 13 Cr 1.6 -29 TO 427
CHEMICAL INJECTION, DILUTION STEAM, FUEL GAS, FLUX LIGHT OIL, FUEL OIL, HYDROGEN GAS, LOW PRESSURE STEAM (SUPERHEATED), METHANOL, NITROGEN, OILY DRAIN, OILY WATER DRAIN, PROCESS, PURGE OIL, PROCESS WATER, PLANT AIR AND PROCESS AIR, PYROLYSIS GASOLINE HYDROGENATION, UNIT DRAIN, QUENCH OIL, QUENCH WATER, SUPER HIGH PRESSURE STEAM, WASH OIL, WASTE WATER, WET LIQUID DRAIN
5% >20mm
A1DX 150 RF CS CS 13 Cr 1.6 -29 TO 427 PROCESS (SOUR SERVICE, NACE MR0103) 5% All
A1E 150 RF CS CS 13 Cr 3.2 -29 TO 316 HYDROGEN GAS 5% >20mm
A1F 150 RF CS ALLOY 20 ALLOY 20 3.2
-29 TO 65 (Note 327) ACID 5% >20mm
A1K 150 RF CS CS 13 Cr 3.2 -29 TO 260 PROCESS, WET FLARE, WET LIQUID DRAIN 5% >20mm
* Note 327 : Sulfuric Acid lines to be insulated to maintain the surface temperature at below 50
from the solar heat as per NACE RP0391.
3
3
JG Summit
Petrochemical Corporation
JG SUMMIT NAPHTHA CRACKER PROJECT
PIPING MATERIAL SPECIFICATION
JOB NO. 071061 REV. NO. 3
DOC.NO. JGSNCP-PI-ES-002 PAGE NO. 3 / 7
Appendix-B
PIPING MATERIALS SERVICE INDEX
CLASS RATING PIPE MATERIAL VALVE BODY
TRIM C.A
(mm)
DESIGN TEMPERATURE
RANGE () SERVICE RT(%) PWHT
A1NR 150 RF CS
(STRESS RELIEVED)
CS MONEL 3.2 -29 TO 110
CAUSTIC, CHEMICAL DRAIN, OILY DRAIN, PROCESS, PROCESS WATER, WASTE WATER
5% All
A1P 150 RF CS CS 13 Cr/HF 3.2 -29 TO 427 DILUTION STEAM, FUEL GAS, MEDIUM PRESSURE STEAM, PROCESS, QUENCH OIL
5% >20mm
A1PX 150 RF CS CS 13 Cr/HF 3.2 -29 TO 427 PROCESS (SOUR SERVICE, NACE MR0103) 5% All
A1PA 150 RF CS CS 13 Cr/HF 3.2 -29 TO 427
(FULL VACUUM) PROCESS 5% >20mm
A2A 150 RF L.T.C.S. (IMPACT TESTED)
L.T.C.S. 316 SS 1.6 -46 TO 260 PROCESS 5% >20mm
A6A 150 RF LINED C.S. (PVDF) ALLOY 20 ALLOY 20 0.0 -29 TO 93 CHEMICAL INJECTION 5% >20mm
A21A 150 RF 304 SS 316 SS 316 SS 0.0 -29 TO 204 CAUSTIC, DEMINERALIZED WATER 5% No
A21B 150 RF 304 SS 316 SS 316 SS 0.0 -29 TO 204 BIOCIDE SOLUTION, CORROSION INHIBITOR DISPERSANT, HYDROCARBON, PHOSPHATE
5% No
A21C 150 RF 304 SS 316 SS 304 SS 0.0 -29 TO 204 HYDRAZINE 5% No
A21D 150 RF 304 SS 316 SS 316 SS 0.0 -29 TO 204 LUBE AND SEAL OIL (HIGH AND LOW PRESS.) 5% No
A21K 150 RF 304 SS
(IMPACT TESTED)
316 SS 316 SS 0.0 -101 TO 250
CRYOGENIC LIQUID DRAIN, DRY FLARE, PROCESS
5% No
A21KX 150 RF 304 SS
(IMPACT TESTED)
316 SS 316 SS 0.0 -101 TO 250
PROCESS (SOUR SERVICE, NACE MR0103) 5% No
3
JG Summit
Petrochemical Corporation
JG SUMMIT NAPHTHA CRACKER PROJECT
PIPING MATERIAL SPECIFICATION
JOB NO. 071061 REV. NO. 3
DOC.NO. JGSNCP-PI-ES-002 PAGE NO. 4 / 7
Appendix-B
PIPING MATERIALS SERVICE INDEX
CLASS RATING PIPE MATERIAL VALVE BODY
TRIM C.A
(mm)
DESIGN TEMPERATURE
RANGE () SERVICE RT(%) PWHT
A21L 150 RF 304 SS
(IMPACT TESTED)
316 SS 316 SS 0.0 -196 TO 204
CRYOGENIC LIQUID DRAIN, DRY FLARE, METHANOL, PROCESS, TERTIARY PEFPIGERANT
5% No
A54A 150 RF 1 Cr 1 Cr 13 Cr/HF 1.6 -29 TO 538 HYDROCARBON, HYDROCARBON (HIGH TEMP.) 5% >13mm
B1A 300 RF CS CS 13 Cr/HF 1.6 -29 TO 427
ATMOSPHERIC VENT, BOILER FEED WATER, CONTINUOUS BLOWDOWN, COOLING WATER RETURN, COOLING WATER SUPPLY, INTERMEDIATE COOLING WATER, LOW PRESSURE STEAM (DESUPERHEATED), LOW PRESSURE STEAM (SUPERHEATED), MEDIUM PRESSURE STEAM, PROCESS WATER, SAFETY VALVE TO ATMOSPHERE, STEAM CONDENSATE
5% >20mm
B1D 300 RF CS CS 13 Cr 1.6 -29 TO 427
BOILER FEED WATER, CHEMICAL INJECTION, COOLING WATER RETURN, COOLING WATER SUPPLY, CRYOGENIC LIQUID DRAIN, FLUX LIGHT OIL, FUEL OIL, HYDROGEN GAS, MEDIUM PRESSURE STEAM, METHANOL, NITROGEN, OILY DRAIN, PROCESS, PURGE OIL, PYROLY GASOLINE HYDROGENATION UNIT DRAIN, QUENCH OIL, QUENCH WATER, TERTIARY REFRIGERANT, WET LIQUID DRAIN
5% >20mm
B1DX 300 RF CS CS 13 Cr 1.6 -29 TO 427 PROCESS (SOUR SERVICE, NACE MR0103) 5% All
B1E 300 RF CS CS 13 Cr 3.2 -29 TO 427
HYDROGEN GAS, LOW PRESSURE STEAM (DESUPERHEATED), PROCESS, PLANT AIR AND PROCESS AIR, SAFETY VALVE TO ATMOSPHERE, STEAM CONDENSATE
5% >20mm
JG Summit
Petrochemical Corporation
JG SUMMIT NAPHTHA CRACKER PROJECT
PIPING MATERIAL SPECIFICATION
JOB NO. 071061 REV. NO. 3
DOC.NO. JGSNCP-PI-ES-002 PAGE NO. 5 / 7
Appendix-B
PIPING MATERIALS SERVICE INDEX
CLASS RATING PIPE MATERIAL VALVE BODY
TRIM C.A
(mm)
DESIGN TEMPERATURE
RANGE () SERVICE RT(%) PWHT
B1NR 300 RF CS
(STRESS RELIEVED)
CS MONEL 3.2 -29 TO 120 CAUSTIC 5% All
B2A 300 RF L.T.C.S. (IMPACT TESTED)
L.T.C.S. 316 SS 1.6 -46 TO 316
CRYOGENIC LIQUID DRAIN, METHANOL PROCESS, TERTIARY REFRIGERANT
5% >20mm
B21D 300 RF 304 SS 316 SS 316 SS 0.0 -29 TO 204 CAUSTIC, LUBE OIL, SEAL OIL 5% No
B21K 300 RF 304 SS
(IMPACT TESTED)
316 SS 316 SS 0.0 -101 TO 300
CRYOGENIC LIQUID DRAIN, HYDROGEN GAS, LOW PRESSURE STEAM (DESUPERHEATED), PROCESS, TERTIARY REFRIGERANT
5% No
B21KX 300 RF 304 SS
(IMPACT TESTED)
316 SS 316 SS 0.0 -101 TO 300
PROCESS (SOUR SERVICE, NACE MR0103) 5% No
B21L 300 RF 304 SS
(IMPACT TESTED)
316 SS 316 SS 0.0 -196 TO 204
CRYOGENIC LIQUID DRAIN, PROCESS, TERTIARY REFRIGERANT
5% No
B54F 300 RF 1 Cr 1 Cr 13 Cr/HF 3.2 -29 TO 538 PROCESS 10% >13mm
D1A 600 RF CS CS 13 Cr/HF 1.6 -29 TO 427 BOILER FEED WATER, HIGH PRESSURE STEAM, HIGH PRESSURE CONDENSATE
10% >20mm
D1D 600 RF CS CS 13 CR 1.6 -29 TO 427 PROCESS 10% >20mm
D1E 600 RF CS CS 13 CR 3.2 -29 TO 204 HYDROGEN 10% >20mm
D2A 600 RF L.T.C.S. (IMPACT TESTED)
L.T.C.S. 316 SS 1.6 -46 TO 316 PROCESS 10% >20mm
D21D 600 RF 304 SS 316 SS 316 SS 0.0 -29 TO 204 LUBE OIL, SEAL OIL 10% No
JG Summit
Petrochemical Corporation
JG SUMMIT NAPHTHA CRACKER PROJECT
PIPING MATERIAL SPECIFICATION
JOB NO. 071061 REV. NO. 3
DOC.NO. JGSNCP-PI-ES-002 PAGE NO. 6 / 7
Appendix-B
PIPING MATERIALS SERVICE INDEX
CLASS RATING PIPE MATERIAL VALVE BODY
TRIM C.A
(mm)
DESIGN TEMPERATURE
RANGE () SERVICE RT(%) PWHT
D21K 600 RF 304 SS
(IMPACT TESTED)
316 SS 316 SS 0.0 -101 TO 204 TERTIARY REFRIGERANT 10% No
D21L 600 RF 304 SS
(IMPACT TESTED)
316 SS 316 SS 0.0 -196 TO 204 CRYOGENIC LIQUID DRAIN 10% No
D54E 600 RF 1 Cr 1 Cr 13 Cr/HF 3.2 -29 TO 538 HYDROGEN GAS 10% >13mm
D54EH 600 RF 1 Cr 1 Cr 13 Cr/HF 3.2 -29 TO 538 HYDROGEN GAS (HYDROGEN SERVICE) 100% All
E2A 900 RTJ L.T.C.S. (IMPACT TESTED)
L.T.C.S. 316 SS 1.6 -46 TO 316
LIQUID DRAIN , PROPYLENE REFRIGERANT, TERTIARY REFRIGERANT
10% >20mm
E21K 900 RTJ 304 SS
(IMPACT TESTED)
316 SS 316 SS 0.0 -101 TO 204
DRY FLARE, HYDROCARBON (LOW TEMP.), LIQUID DRAIN
10% No
F1A 1500 BW CS CS
13 Cr/FHF 1.6 -29 TO 427 BOILER FEED WATER 100% >20mm
F1AS 1500 BW CS
(ASME Sec. I)CS
13 Cr/FHF 1.6 -29 TO 427
BLOWDOWN BOILER FEED WATER, CONTINUOUS BLOWDOWN, SUPER HIGH PRESSURE STEAM
100% 19mm
F21B 1500 SW 304 SS 316 SS 316 SS 0.0 -29 TO 371 PHOSPHATE INJECTION 100% No
F54AS 1500 BW 1 Cr
(ASME Sec. I)1 Cr
13 Cr/FHF 1.6 -29 TO 538 DESUPERHEATED STEAM 100% 13mm
G54A 2500 BW 1 Cr 1 Cr
13 Cr/FHF 1.6 -29 TO 550 SUPER HIGH PRESSURE STEAM 100% >13mm
G54AS 2500 BW 1 CR
(ASME Sec. I)1 Cr
13 Cr/FHF 1.6 -29 TO 550 DESUPERHEATED STEAM 100% 13mm
G56A 2500 BW 2 Cr-1Mo 2 Cr-1 Mo
Trim No.5/FHF 1.6 -29 TO 550 SUPER HIGH PRESSURE STEAM 100% >13mm
G56AS 2500 BW 2 Cr-1 Mo
(ASME Sec. I)2 Cr-1 Mo
Trim No.5/FHF 1.6 -29 TO 550 SUPER HIGH PRESSURE STEAM 100% 13mm
JG Summit
Petrochemical Corporation
JG SUMMIT NAPHTHA CRACKER PROJECT
PIPING MATERIAL SPECIFICATION
JOB NO. 071061 REV. NO. 3
DOC.NO. JGSNCP-PI-ES-002 PAGE NO. 7 / 7
Appendix-B
PIPING MATERIALS SERVICE INDEX
CLASS RATING PIPE MATERIAL VALVE BODY
TRIM C.A
(mm)
DESIGN TEMPERATURE
RANGE () SERVICE RT(%) PWHT
H1A20 150 RF CS CS 13 Cr/HF 1.6 -10 TO 121
COOLING WATER RETURN, COOLING WATER SUPPLY, DECOKING AIR, DESALINATED WATER, INTERMEDIATE COOLING WATER, PLANT AIR AND PROCESS AIR, SAFETY VALVE TO ATMOSPHERE, UTILITY WATER, WASTE WATER
No >20mm
H1C20 150 RF CS CS 13 Cr/HF 1.6 -10 TO 60 FIRE WATER(UPSTREAM OF DELUGE VALVE) (AG) No >20mm
H1CU20 150 RF CS CS 13 Cr/HF 1.6 -10 TO 60 FIRE WATER (UG) No >20mm
H1D20 150 RF CS CS 13 Cr/HF 1.6 -10 TO 121
COOLING WATER RETURN (UG), COOLING WATER SUPPLY (UG), INTERMEDIATE COOLING WATER (UG) NON-CONTAMINATED-SEWER, OILY DRAIN/CASING DRAIN, OILY WATER DRAIN
No >20mm
H3A20 150 RF CS GALVANIZEDCS
316 SS 1.6 -10 TO 121 INSTRUMENT AIR, POTABLE WATER No >20mm
H3B20 150 RF CS GALVANIZEDCS
13 Cr/HF 1.6 -10 TO 60 FIRE WATER(DOWNSTREAM OF DELUGE VALVE) (AG) No >20mm
H61B 150 FF RTRP DUPLEX (S31803) DUPLEX (S31803)
0.0 -10 TO 65
CHEMICAL INJECTION, NEUTRALIZED WATER, PLANT AIR, PRESSURE AIR, SEA WATER RETURN, SEA WATER SUPPLY, WASTE SEA WATER, WASTE WATER
No No
H61BU 150 FF RTRP DUPLEX (S31803) DUPLEX (S31803)
0.0 -10 TO 65
CHEMICAL INJECTION (UG), NEUTRALIZED WATER (UG), PLANT AIR (UG), PRESSURE AIR (UG) , SEA WATER RETURN (UG), SEA WATER SUPPLY (UG), WASTE SEA WATER (UG), WASTE WATER (UG)
No No
H71B 150 FF HDPE
BRONZE BRONZE 0.0 0 TO 40
FIRE WATER (UG), CHEMICAL DRAIN (UG) No No
J1C20 300 RF CS GALVANIZEDCS
13 Cr/HF 1.6 -10 TO 200 CO2 GAS, FM-200 GAS 5% >20mm
JGSNCP-PI-ES-002 Piping Material Specification (Rev.3) 75JGSNCP-PI-ES-002 Piping Material Specification (Rev.3) 76JGSNCP-PI-ES-002 Piping Material Specification (Rev.3) 77JGSNCP-PI-ES-002 Piping Material Specification (Rev.3) 78JGSNCP-PI-ES-002 Piping Material Specification (Rev.3) 79JGSNCP-PI-ES-002 Piping Material Specification (Rev.3) 80