PV Plant Performance Ratio (PR) Measurements and Limitations of Acceptance Test PR Amiram Roth-Deblon Regional Managing Director Asia Pacific juwi Renewable Energies Private Limited (Singapore) 06.06.2012

PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

1

PV Plant Performance Ratio (PR)Measurements and Limitationsof Acceptance Test PR

Amiram Roth-DeblonRegional Managing Director Asia Pacificjuwi Renewable Energies Private Limited (Singapore)06.06.2012

Page 2: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

Contents

1. juwi at a glance

2. Definitions: Solar Power Plant Performance

3. How to monitor PV plant performance

2

Page 3: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

3

Renewable Energy Projects –We Make it Happen

Page 4: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

4

juwi at a Glance

Established1996, privately owned by 2 founders

Workforce> 1,750 employees

Revenueapprox. 800 Mil. € in 2010approx. 1 billion € in 2011

Headquartes of the juwi group in Wörrstadt, Germany

Number of Renewable Power Plantsapprox. 2,000 installations

Total Capacityapprox. 1,900 megawatts

Total Investment (since 1996)approx. 4.0 billion €

Annual Energy Outputapprox. 3.5 billion kilowatt-hoursCorresponds to the annual electricitydemand of one million households

Annual Reduction of Emissionsapprox. 2.5 billion kg of CO2

Page 5: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

5

Our Vision

Hydro

Pow

er

Geotherm

alEnergy

Bioenergy

Solar

Energy

Wind

Energy

Electrom

obility

Green

Buildings

Work together to implement renewable energieseconomically and reliably with passion.

100% Renewable Energies

Energy EfficiencyClean Power Production

Research & Development Cooperations

Page 6: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

6

Our Services: It‘s all about the project

Consulting &Acquisition

Planning DevelopmentFinancing &Sales

Construction Management

Page 7: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

7

Offices, Projects and New Markets

Headquarters in Germany

Western EuropeFrance, Great Britain

Southern EuropeItaly, Spain, Greece

Eastern EuropeCzech Republic, Poland, Bulgaria

AmericasUSA, Costa Rica, Chile

AsiaIndia, Singapore

AfricaSouth Africa

Page 8: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

8

Selected ReferencesLieberose, Brandenburg, GermanyFree-field / 71 megawatts

Blue Wing, Texas, USAFree-field / 16 megawatts

Torreilles, Pyrenees, FranceFree-field / 12 megawatts

Rajkot, Gujarat, IndiaFree-field / 10 megawatts

Goodyear, Phillipsburg, GermanyRooftop / 7.4 megawatts

Selected References: Solar Energy

Goodyear Rooftop, Phillipsbrug Germany (7.4MW)

Former military area in Brandenburg, Germany (71 MW)

Page 9: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

Selected References: Solar Energy

Selected ReferencesRajasthan, IndiaFree-field / 5.3 megawatts

Drachevo, BulgariaFree-field / 3.5 megawatts

Tambo Real, ChileFree-field / 1.2 megawatts

Covered Market, Verona, ItalyRooftop / 1.67 megawatts

Mont Jali, Kigali, Rwanda (Africa)Free-field / 250 kilowatts

Rajkot, Gujarat, India (10 MW)

Surendranagar, Gujarat, India (2.5 MW)

Page 10: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

2. Definitions: Solar Power PlantPerformance

10

Page 11: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

Monitoring unit

Measurement ofPV plant parameters

Measurement ofmeteorological

parameters

How to monitor PV plant performance

Calculation ofperformanceindicators

Reference YieldFinal YieldSpecific YieldPerformanceRatioAvailability

Page 12: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

12

PV plant performance indicators - I

Page 13: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

13

PV plant performance indicators - II

Further generic performance indicators

AvAvAvAv : Availability [%]Real operation time / theoretical maximum operation time

CUFCUFCUFCUF : Capacity Utilization Factor [%]ETU / theoretical maximum energy with continuous operation at nominal capacity

Page 14: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

What is the Performance Ratio?

PR =Actual Yield

Ideal Yield

PR =

X

Page 15: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

Where are the losses in the PV plant?

LV AC-Cable HV AC-CableDC-Cable

EIN (theoretical) Eout (real)

PR = Quality Factor

Losses

Page 16: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

16

PR – The Ultimate PV Performance indicator

The Performance of any PV power plant, anywhere, is ultimately defined bythe PR

Now the question arises:How do we determine the PR as precisely as possible….

Any investor or bank wants a simple and reliable method to determine the PR

A rule of thumb would be:Use a simple formula with as few parameters as possibleMeasure as precise as possible

Page 17: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

17

Details of PR Calculation

Page 18: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

18

PR DeterminationTwo parameters are the key

Page 19: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

19

3. How to monitor PV plant performance

Page 20: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

20

How can these values be measured?How precise are these measurements?

Yf or ETU (Real Yield) is always available� just read the utility meter� Simple and precise (0.2% to 2%)� Can be done remotely

gPV (Global Irradiation in the module plane)� needs meteorological sensors or satellite data� Subject to various limitations� Much less precise (2% to 15%)

Page 21: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

PR: Pyranometer vs. Satellite

Pyranometer & External Weather-Station Satellite

Satellite

What are the PROs & CONs?

Local External

High Accuracy Independent source

Short Intervals No soiling-problems

Measuring in module-plane No calibration of sensors

No gaps

Page 22: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

22

Rules for Solar irradiation measurements

Some fundamental rules are:Do not use Crystalline Irradiation sensors(only for auxiliary data or small systems, not precise enough for Power plants)

Pyranometers are the best choice but:− Use the best ones available (CMP 11, Secondary class, Calibrated)− Use at least two, to minimise measurement errors− Make sure the sensor is installed and used properly− Soiling will have a significant effect

Install a powerful monitoring systemIndependent of inverters (i.e. skytron energy or similar)

Engage a professional Operation and Maintenance provider− As backup, use independently provided satellite data and a calculated PR

Page 23: PV Plant Performance Ratio (PR) Measurements and ...file.siam2web.com/ubmentech/downpresent/StreamA... · m o b i l i t y G r e e n B u i l d i n g s Work together to implement renewable

23

Thank You Very Much forYour Attention!

Contact:Amiram Roth-Deblonjuwi Renewable Energies Private Limited20 Havelock Road, # 02-25 Central Square,Singapore 059765Tel. +65 64 28 86 70 Mob. +65 84 98 74 66Fax. +49. (0)6732. 96 [email protected]