PUTNAM PLAZA REDESIGNCOMMUNITY MEETING #1SEPTEMBER 15, 2014community meeting #2December 3, 2014
PUTNAM PLAZAWORKSHOP #2 DECEMBER 03, 2014
Most Desired Elements•Wellshadedarea
•Plantingsasbufferfromtrafficbutallowviewsintoplaza
•Smoothandeasilywalkablepaving
•Spaceforgreenmarket
•Futureconcessionkiosk(9’x12’)
•Openpavedflexiblespace
•Permanentseating/permanenttable
•Movabletablesandchairs
•Emergencyaccesstostorefronts
•Bikeracks
•Drinkingfountain
•Trash/recyclingbins
PUTNAM PLAZAWORKSHOP #2 DECEMBER 03, 2014
SewerLineClearance
GasLine
EmergencyAccessLane
SubwayLimitLine
ExistingTrees
ElectricityLine
WaterMainLineClearance
10 200
N
Site Constraints
PUTNAM PLAZAWORKSHOP #2 DECEMBER 03, 2014
Gra
nd A
ve
Cam
brid
ge
Pl
Fulton St
StandardDOTSidewalk
FixedSeatingwithBacks
Planter
MovableTables&Chairs
FutureKiosk
ColoredConcrete
LightPoles/ShadeSupport
Signage
BusStop
1
1
1
1
1
2
2
2
3
3
4
4
5
5
6
6
7
8
9
9
8
7
7
7
7
Site Plan - Option 1
10 200
N
PUTNAM PLAZAWORKSHOP #2 DECEMBER 03, 2014
venDor space-farmers market
-arts & crafts-flea markets
market layout
performance space anD viewing area
-movie night-concert
-outDoor theater
event layout
fiXeD seating layout
potential public art location
**
20 400
N
Option 1
PUTNAM PLAZAWORKSHOP #2 DECEMBER 03, 2014
Option 1
PUTNAM PLAZAWORKSHOP #2 DECEMBER 03, 2014
StandardDOTSidewalk
FixedPlanterSeatwallwithBacks
MovableTables&Chairs
FutureKiosk
ColoredConcrete
LightPoles/ShadeSupport
BusStop
1
1
11
2
22
2
3
3
4
4
5
5
6
7
6
6
6
6
7
6
Gra
nd A
ve
Fulton St
10 200
N
Cam
brid
ge
Pl
Site Plan - Option 2
PUTNAM PLAZAWORKSHOP #2 DECEMBER 03, 2014
venDor space-farmers market
-arts & crafts-flea markets
market layout
performance space anD viewing area
-movie night-concert
-outDoor theater
event layout
fiXeD seating layout
potential public art location
**
20 400
N
Option 2
PUTNAM PLAZAWORKSHOP #2 DECEMBER 03, 2014
Option 2
PUTNAM PLAZAWORKSHOP #2 DECEMBER 03, 2014
Fulton St
1
1
1
22
2
4
5
StandardDOTSidewalk
FixedPlanterSeatwallwithBacks
PlanterwithCurb
MovableTables&Chairs
FutureKiosk
ColoredConcrete
LightPoles/ShadeSupport
Signage
BusStop
1
2
3
3
3
3
4
5
6
6
6
6
7
8
7
7
7
777
8
9
9
10 200
N
Cam
brid
ge
Pl
Site Plan - Option 3
PUTNAM PLAZAWORKSHOP #2 DECEMBER 03, 2014
venDor space-farmers market
-arts & crafts-flea markets
market layout
performance space anD viewing area
-movie night-concert
-outDoor theater
event layout
fiXeD seating layout
potential public art location
**
20 400
N
Option 3
PUTNAM PLAZAWORKSHOP #2 DECEMBER 03, 2014
Option 3
PUTNAM PLAZAWORKSHOP #2 DECEMBER 03, 2014
option 1 option 2 option 3
Shade Structure
PUTNAM PLAZAWORKSHOP #2 DECEMBER 03, 2014
EXISTING TREECommon Name: eastern redbudBotanical Name: cercis canadensis
Attributes:- low branched tree limits pedestrian circulation- provides limited usable shade- blocks sight lines into plaza
PROPOSED TREE - OPTION 2Common Name: Japanese ZelkovaBotanical Name: Zelkova serrata
Attributes:- High branches allow pedestrian circulation to flow under the tree- high branches and wider projected crown will provide more usable shade- high branches allow sight lines into plaza; enhanching security
PROPOSED TREE - OPTION 1Common Name: honey locustBotanical Name: gleditsia triancanthos var. inermis
Attributes:- High branches allow pedestrian circulation to flow under the tree- high branches and wider projected crown will provide more usable shade- high branches allow sight lines into plaza; enhanching security
Existing Small Tree and Possible Replacement
PUTNAM PLAZAWORKSHOP #2 DECEMBER 03, 2014
Public Arts
Corona Plaza, Queensperformance in collaboration with the Queens museum of art
Hunts Point Avenue ruby walks, sharon De la cruz
Archer Avenue humps and bumps, bro lab
Willoughby Plaza, Brooklynveteran’s artwork exhibit on Dot’s temporary art Display cases
PUTNAM PLAZAWORKSHOP #2 DECEMBER 03, 2014
PROJECT TiMElinE / nEXT STEPS
June 2010
Fall 2010
January 2011
Winter/Spring 2011
May 2011
June 2011
Summer 2011
Spring 2012
September 2014
December 2014
December 2015
Summer 2016
2017
FABstartedpreliminaryconversationswithcommunitystakeholders
FABapproachedDOTaboutproject
DOTagreedtoinvestigateimplementationofaplazawithinterimmaterials
FurthercommunityoutreachbyFAB
CommunityWorkshopforinterimmaterialsplaza
CB2endorsedproposedinterimmaterialsplazadesign
Plazawithinterimmaterialsinstalled
FAB’sapplicationforacapitalconstructionplazaacceptedbyNYCDOT
CommunityWorkshop#1
CommunityWorkshop#2
Designcompletion(projected)
Constructionstart(projected)
Constructioncompletion(projected)