Purchase and Installation of Districtwide Wireless Request for Proposal (RFP) Number 2014/2015-02
Project ReviewRequest for Proposal (RFP) Number 2014/2015-02
Agenda• Goals of the Project
• Wireless Products
• District Standard Products
• Representative Photos
• Questions
• Site Walks
Wireless Network Project Goals
• Laying the Foundation
• Capacity for the Future
• 1 Access Point Per Room
• 4 Ports in Every Ceiling
•Outside Area Coverage
Wireless Products
• When a particular brand or brand and model number are named in connection with any item, it is named as a standard of quality and utility only.
• Six month wireless Evaluation.Factor Weight
Price of the eligible products and services
40%
Vendor Support/Past Performance (References)
20%
Technology Requirements 10%
Functionality and Usability 30%
District Standard Products
• Required.
• In use throughout the District.
• Listed on Page 31 of RFP.
• Changes require pre-approval.
Representative Photos
Carpenter Line 12 / Page 8
Gallatin Lines 13,14 / Page 9
Gauldin Line 19 / Page 10
Imperial Line 14 / Page 11
Lewis Line 14 / Page 12
Old River 12-20 / Page 14-15
Rio San Gabriel Line 12/ Page 17
Williams Line 14/ Page 20
Wendy LoPour Doty Line 12/ Page 21
Griffiths Line 12/ Page 22
Mary R. Stauffer Line 17/ Page 23
Mary R. Stauffer Line 15,16 / Page 23
Proposed Site Visits• Old River
• Stauffer
• Williams
• Columbus
• Any requests?
Questions?