Pukor 11-049e Priced Gsec Pdvsa Gas-mega-project 11058a-In-12(p)

Embed Size (px)

DESCRIPTION

latest records

Citation preview

  • 31 Mandai Estate, #07-07 Innovation Place, Tower 4, Immedia, Singapore 729933 Web Site Add. : www.em-pumps.com

    Tel : (65)-6281 0667, (65)-6281 9180 Fax: (65)-6281 0908 E-mail : [email protected]

    Date:Our Ref: Our Offer No. : PUKOR 11-049 E

    Address : GS E&C

    Attn : [email protected]

    Tel No. :Fax No. : ???E-MAIL:

    June 7, 2011

    Dear Sirs,

    Our Offer No. : PUKOR 11-049 E

    Project : PDVSA Gas Mega Project (Bidding) / V Fractionation Train At JoseRE :

    RFQ. No. : 11058A-IN-12(P)

    BUDGET PRICED PROPOSAL

    ENSIVAL MORET ASIA

    Yours faithfully,ENSIVAL MORET ASIA

    We thank you for your inquiry on the above subject reference and we are pleased to enclose herewith our Priced Proposal.

    - Priced Proposal

    Trust the above is in order and meet your requirement. Please feel free to contact us if you have any clarification and we hereby looking forward to your favorable reply, we remain.

    Please find the following document in each set of proposal.

    - Pump Performance Curves

  • 31 Mandai Estate, #07-07 Innovation Place, Tower 4, Immedia, Singapore 729933 Web Site Add. : www.em-pumps.comTel : (65)-6281 0667, (65)-6281 9180 Fax: (65)-6281 0908 E-mail : [email protected]

    To : GS E&C Project : PDVSA Gas Mega Project (Bidding) / V Fractionation Train At Jose

    Attn : ??? RFQ. No. : 11058A-IN-12(P)

    [email protected] Our Offer No. : PUKOR 11-049 E

    Fax : ???

    (EURO) (EURO) (EURO) (EURO) (EURO) (EURO) (EURO) (EURO) (EURO)

    1 D3.22.0408/09 PRE 40-26 2 54,595 5,388 Included 59,983 950 200 NA 1,350 360 900 500 128,4862 D3.23.1105/06 300 VEC 305-35-3 2 170,031 227,778 Included 397,809 1,800 250 NA 6,250 360 900 500 815,7383 D3.23.1109 PRE 100-20 1 26,135 11,747 Included 37,882 950 200 NA 2,200 360 900 500 42,9924 D3.23.1110/11 250 VEC 270-45-1 2 128,695 26,961 Included 155,656 950 250 NA 4,150 360 900 500 325,5325 D3.23.1107/08 PRE 25-16 2 37,430 2,564 Included 39,994 950 200 NA 1,350 360 900 500 88,5086 D3.23.3503/04/05 250 VE 270-31-2-IN 3 127,028 153,175 Included 280,203 1,200 250 500 4,150 360 900 500 864,1897 D3-23-5101/02 MNVC 104 B -IN 2 85,319 6,296 Included 91,615 950 250 NA 1,350 360 900 500 191,8508 D3.22.3301/02 PRE 25-16 2 52,744 1,888 Included 54,632 950 200 NA 1,350 360 900 500 117,7849 D3.23.3305/06 PRE 25-16A 2 52,744 1,666 Included 54,410 950 200 NA 1,350 360 900 500 117,34010 D3.22.0401/02 MNVC 120-IN 2 202,930 20,440 Included 223,370 950 250 NA 2,200 360 900 500 457,06011 D3.22.0406/07 PRE 40-32 2 30,184 6,083 Included 36,267 950 200 NA 1,350 360 900 500 81,05412 D3.22.0404/05 PRE 40-32 2 30,184 6,083 Included 36,267 950 200 NA 1,350 360 900 500 81,05413 D3.22.0501/02 NO QUOTE 0 7,022 0 Included 7,022 950 200 NA 0 360 900 500 0

    EUR 15,246

    Total Quantity of Pumps : 24 Grand Total (EUR) : 3,326,833

    EUR 1,332EUR 2,172

    Commissioning spare parts (Detail refer to separate page enclosed in our quotation)

    Date : 07-Jun-2011

    W

    i

    t

    n

    e

    s

    s

    e

    d

    H

    y

    d

    r

    o

    .

    T

    e

    s

    t

    W

    i

    t

    n

    e

    s

    s

    e

    d

    N

    P

    S

    H

    T

    e

    s

    t

    Total Price (with test and certificates)

    W

    i

    t

    n

    e

    s

    s

    e

    d

    P

    u

    m

    p

    P

    e

    r

    f

    .

    T

    e

    s

    t

    (

    Q

    ,

    H

    ,

    P

    &

    E

    f

    f

    )

    P

    M

    I

    (

    P

    o

    s

    i

    t

    i

    v

    e

    M

    a

    t

    e

    r

    i

    a

    l

    I

    d

    e

    n

    t

    i

    f

    i

    c

    a

    t

    i

    o

    n

    )

    Extra-Prices (on complete package) --->

    Model

    Bare Shaft Pump

    Qty

    ENSIVAL MORET ASIA

    W

    i

    t

    n

    e

    s

    s

    e

    d

    m

    e

    c

    h

    a

    n

    i

    c

    a

    l

    r

    u

    n

    n

    i

    n

    g

    t

    e

    s

    t

    (

    4

    h

    r

    s

    )

    M

    a

    t

    e

    r

    i

    a

    l

    c

    e

    r

    t

    i

    f

    i

    c

    a

    t

    e

    s

    3

    .

    1

    (

    C

    a

    s

    i

    n

    g

    ,

    I

    m

    p

    e

    l

    l

    e

    r

    a

    n

    d

    s

    h

    a

    f

    t

    )

    Motor

    Unit Price (EURO)

    Base-Plate & Coupling

    QUOTATION SUMMARY TABLE

    Sub-total (Per Set)

    Item No.

    N

    D

    E

    (

    L

    i

    q

    u

    i

    d

    p

    e

    n

    e

    t

    r

    a

    n

    t

    t

    e

    s

    t

    f

    o

    r

    p

    r

    e

    s

    s

    u

    r

    e

    p

    a

    r

    t

    s

    )

    OPTION Prices ---> Thrid Party Inspection = "TPI" (LLOYD'S, SGS, Bureau Veritas, AIB Vincotte, ...) per COMPLETE DAYThrid Party Inspection = "TPI" (LLOYD'S, SGS, Bureau Veritas, AIB Vincotte, ...) per HALF DAY

    PUKOR 11-049E_GSEC_PDVSA_Gas-Mega-Project_11058A-IN-12(P) 6/7/2011

  • 31 Mandai Estate, #07-07 Innovation Place, Tower 4, Immedia, Singapore 729933 Web Site Add. : www.em-pumps.comTel : (65)-6281 0667, (65)-6281 9180 Fax: (65)-6281 0908 E-mail : [email protected]

    To : GS E&C Project : PDVSA Gas Mega Project (Bidding) / V Fractionation Train At Jose

    Attn : ??? RFQ. No. : 11058A-IN-12(P)

    [email protected] Our Offer No. : PUKOR 11-049 E

    Fax : ???

    S/N

    o.

    Item

    Pum

    p

    Qty

    of p

    um

    ps

    Qty Unit PriceTotal Price

    1 D3.22.0408/09 PRE 40-26 2 2 290 5802 D3.23.1105/06 300 VEC 305-35-3 2 2 1,222 2,4443 D3.23.1109 PRE 100-20 1 1 270 2704 D3.23.1110/11 250 VEC 270-45-1 2 2 618 1,2365 D3.23.1107/08 PRE 25-16 2 2 230 4606 D3.23.3503/04/05 250 VE 270-31-2-IN 3 3 804 2,4127 D3-23-5101/02 MNVC 104 B -IN 2 2 902 1,8048 D3.22.3301/02 PRE 25-16 2 2 230 4609 D3.23.3305/06 PRE 25-16A 2 2 230 46010 D3.22.0401/02 MNVC 120-IN 2 2 1,880 3,76011 D3.22.0406/07 PRE 40-32 2 2 340 68012 D3.22.0404/05 PRE 40-32 2 2 340 680

    Grand Total Price :

    Date : 07-Jun-2011

    15,246

    ENSIVAL MORET ASIA

    15,246

    SPARE PARTS QUOTATION

    Erection, Pre-Commissioning, Commissioning & Start-Up Spare Parts (Unit prices in EUR) (Prices are only valid in case of global order with pumps)

    Set of Gasket & O-Rings for pump

    PUKOR 11-049E_GSEC_PDVSA_Gas-Mega-Project_11058A-IN-12(P) 6/7/2011

  • 31 Mandai Estate, #07-07 Innovation Place, Tower 4, Immedia, Singapore 729933 Web Site Add. : www.em-pumps.com

    Tel : (65)-6281 0667, (65)-6281 9180 Fax: (65)-6281 0908 E-mail : [email protected]

    85 dB(A)

    To : GS E&C Project : PDVSA Gas Mega Project (Bidding) / V Fractionation Train At Jose

    Attn : ??? RFQ. No. : 11058A-IN-12(P)

    [email protected] Our Offer No. : PUKOR 11-049 E

    Fax : ???

    PumpElectric motor

    Steam turbine

    Reducer

    kw rpm dB(A) dB(A) dB(A) dB(A) dB(A)

    1 D3.22.0408/09 PRE 40-26 2 21.0 3,600 75.6 77.0 NA NA 79.42 D3.23.1105/06 300 VEC 305-35-3 2 700.0 1,800 82.0 82.0 NA NA 85.03 D3.23.1109 PRE 100-20 1 63.0 3,600 81.5 81.0 NA NA 84.34 D3.23.1110/11 250 VEC 270-45-1 2 125.0 1,200 78.7 78.0 NA NA 81.45 D3.23.1107/08 PRE 25-16 2 8.6 3,600 71.7 75.0 NA NA 76.76 D3.23.3503/04/05 250 VE 270-31-2-IN 3 260.0 1,800 82.0 82.0 NA NA 85.07 D3-23-5101/02 MNVC 104 B -IN 2 25.0 3,600 75.8 77.0 NA NA 79.58 D3.22.3301/02 PRE 25-16 2 4.6 3,600 69.1 73.0 NA NA 74.59 D3.23.3305/06 PRE 25-16A 2 3.5 3,600 67.1 72.0 NA NA 73.210 D3.22.0401/02 MNVC 120-IN 2 125.0 3,600 82.0 82.0 NA NA 85.011 D3.22.0406/07 PRE 40-32 2 25.0 3,600 73.0 77.0 NA NA 78.512 D3.22.0404/05 PRE 40-32 2 25.0 3,600 73.3 77.0 NA NA 78.5

    Total Quantity of Pumps : 24

    Motor speed

    Date : 07-Jun-2011

    QUOTATION SUMMARY TABLE - NOISE of each MOTOR-PUMP UNIT // Customer request : MAX

    ENSIVAL MORET ASIA

    NOISE of each componentGLOBAL UNIT

    NOISE @ 1m (calculated)

    Item No. Model QtyMotor Power

    PUKOR 11-049E_GSEC_PDVSA_Gas-Mega-Project_11058A-IN-12(P) 6/7/2011

  • 31 Mandai Estate, #07-07 Innovation Place, Tower 4, Immedia, Singapore 729933 Web Site Add. : www.em-pumps.comTel : (65)-6281 0667, (65)-6281 9180 Fax: (65)-6281 0908 E-mail : [email protected]

    To : GS E&C Project : PDVSA Gas Mega Project (Bidding) / V Fractionation Train At Jose

    Attn : ??? RFQ. No. : 11058A-IN-12(P)

    [email protected] Our Offer No. : PUKOR 11-049 E

    Fax : ???

    1

    1

    0

    %

    1

    1

    0

    %

    R

    a

    t

    e

    d

    1

    2

    0

    %

    B

    E

    P

    1

    2

    0

    %

    0

    .

    5

    o

    f

    B

    E

    P

    f

    l

    o

    w

    >

    0

    .

    0

    ExnA IIT3 Class 1, Group D, Div 2 --> ExnA IIT3 Class 1, Group D, Div 2 --> ExnA IIT3Volt/Ph/Hz 460 10% / 3 / 60 2% 4160 10% / 3 / 60 2% 460 10% / 3 / 60 2%

    Offer PriceBareshaft pump EUR 54,595 170,031 26,135Motor EUR 5,388 227,778 11,747Baseplate & coupling EUR Included Included IncludedSub Total: Set(s) EUR 59,983 397,809 37,882Grand Total EUR 119,966 795,618 37,882

    Testing Per Pump UnitEUR 950 1,800 950EUR 200 250 200EUR NA NA NAEUR 1,350 6,250 2,200EUR 360 360 360EUR 900 900 900EUR 500 500 500

    ShaftWear Ring(s)ImpellerCasing

    Required Mechanical Design PressureRequired Mechanical Design temperature

    Material Code

    Coupling & SpacerAPI Flushing PlanMech. Seal Material CodeMechanical Seal/PackingShaft Sleeve

    Witnessed NPSH Test

    Witnessed Hydro. Test

    Witnessed Pump Perf. Test (Q,H,P & Eff)

    PMI (Positive Material Identification)

    NDE (Liquid penetrant test for pressure parts)

    Material certificates 3.1 (Casing, Impeller and shaft)

    Witnessed mechanical running test (4 hrs)

    ENSIVAL MORET ASIA

    PUKOR 11-049E_GSEC_PDVSA_Gas-Mega-Project_11058A-IN-12(P) 6/7/2011

  • 31 Mandai Estate, #07-07 Innovation Place, Tower 4, Immedia, Singapore 729933 Web Site Add. : www.em-pumps.comTel : (65)-6281 0667, (65)-6281 9180 Fax: (65)-6281 0908 E-mail : [email protected]

    QUOTATION

    To : GS E&C Project : PDVSA Gas Mega Project (Bidding) / V Fractionation Train At Jose

    Attn : ??? RFQ. No. : 11058A-IN-12(P)

    [email protected] Our Offer No. : PUKOR 11-049 E

    Fax : ??? Date : 07-Jun-2011

    Description 4 5 6

    Position No. D3.23.1110/11 D3.23.1107/08 D3.23.3503/04/05Quantity Required 2 2 3Make ENSIVAL MORET ENSIVAL MORET ENSIVAL MORETPump Model 250 VEC 270-45-1 PRE 25-16 250 VE 270-31-2-INConstruction VS6 - Vert., Double casing (CAN), Diffuser OH2 - Centerline-supported VS1 - Vertical, Single casing, diffuserDesign Code API 610 10th API 610 10th API 610 10thSuction Flange Size " 20.00 '' 2.00 '' 16.00 ''Discharge Flange Size " 10.00 '' 1.00 '' 10.00 ''Flanges Class (Suction / Discharge) ANSI 300# RF ANSI 300# RF ANSI 300# RFPump Length mm 1000 -- 3725

    Criticality Rating

    Operating Data With Inducer

    Product HOT OIL HOT OIL WATEROther information on liquid (H2S, ) - PUROLUB 32 -Temperature min oC 21 67 40Temperature MAX oC 145 293 40MAX Specific Gravity kg/dm3 0.7 0.85 1MAX Vapour Pressure PSIA 0 0 TBAMAX Vapour Pressure barA 0.00 0.00 TBAMAX Viscosity cP. 66.8 66.8 TBARated Capacity m3/hr 806.5 17.9 1271.0Min. Flow m3/hr 280 6 400Nom. Head @ Discharge flange m 32.3 37.6 55.4Nom. Head @ Hydraulic Cell m 32.3 37.6 55.4Nom. Speed rpm 1180 3580 1780Efficiency % 65.48 28.13 81.34Impeller Size Duty (minimum) mm 415 130 310Impeller Size Duty (RATED) mm 447 151 338Impeller Size Duty (MAXIMUM) mm 480 169 360Impeller Type CLOSED IMPELLER CLOSED IMPELLER CLOSED IMPELLERNPSH Available @ suction flange m 54.3 31.5 4NPSH Available @ impeller axis m 54.3 31.5 4NPSH Required @ impeller axis m 3.9 1.8 5.5BHP at Duty kw 75.8 5.6 235.7BHP for SG = 1 (Water) kw 108.3 6.5 235.7

    (Bar G) NS NS NSC 216 Degre C 293 Degre C 40 Degre C

    S-6 S-1 A-8- - -

    Dual Cartridge Seal Dual Cartridge Seal Single Cartridge SealBDPIN / 3CW-FB / C2A3A2353A- BTAIN / 2CW-CS / C2A2A23- BSTFN / 1CW-FX / C2A1A1161-

    23 / 53A / - 23 / / - 11 / 61 / -METASTREAM TSK-S METASTREAM TSK-S METASTREAM TSK-S

    End of curve power with d liquid 89.0 7.0 240.0

    Motor/Engine/Steam Turbine IEC IEC IECType TEFC TEFC TEFCModel/Frame Size 315 S 132 S 400 LRated Power @ 40C kw 125 8.6 260Speed rpm 1200 3600 1800Class/Protection Class 1, Group D, Div 2 --> ExnA IIT3 Class 1, Group D, Div 2 --> ExnA IIT3 Class 1, Group D, Div 2 --> ExnA IIT3Volt/Ph/Hz 460 10% / 3 / 60 2% 460 10% / 3 / 60 2% 4160 10% / 3 / 60 2%

    Offer PriceBareshaft pump EUR 128,695 37,430 127,028Motor EUR 26,961 2,564 153,175Baseplate & coupling EUR Included Included IncludedSub Total: Set(s) EUR 155,656 39,994 280,203Grand Total EUR 311,312 79,988 840,609

    Testing Per Pump UnitEUR 950 950 1,200EUR 250 200 250EUR NA NA 500EUR 4,150 1,350 4,150EUR 360 360 360EUR 900 900 900EUR 500 500 500

    ENSIVAL MORET ASIA

    Material Code

    Coupling & SpacerAPI Flushing PlanMech. Seal Material CodeMechanical Seal/PackingShaft SleeveShaftWear Ring(s)Impeller

    PMI (Positive Material Identification)

    Witnessed Pump Perf. Test (Q,H,P & Eff)

    Witnessed Hydro. Test

    Witnessed NPSH Test

    Witnessed mechanical running test (4 hrs)

    Required Mechanical Design PressureRequired Mechanical Design temperature

    Material certificates 3.1 (Casing, Impeller and shaft)

    NDE (Liquid penetrant test for pressure parts)

    Casing

    PUKOR 11-049E_GSEC_PDVSA_Gas-Mega-Project_11058A-IN-12(P) 6/7/2011

  • 31 Mandai Estate, #07-07 Innovation Place, Tower 4, Immedia, Singapore 729933 Web Site Add. : www.em-pumps.comTel : (65)-6281 0667, (65)-6281 9180 Fax: (65)-6281 0908 E-mail : [email protected]

    QUOTATION

    To : GS E&C Project : PDVSA Gas Mega Project (Bidding) / V Fractionation Train At Jose

    Attn : ??? RFQ. No. : 11058A-IN-12(P)

    [email protected] Our Offer No. : PUKOR 11-049 E

    Fax : ??? Date : 07-Jun-2011

    Description 7 8 9

    Position No. D3-23-5101/02 D3.22.3301/02 D3.23.3305/06Quantity Required 2 2 2Make ENSIVAL MORET ENSIVAL MORET ENSIVAL MORETPump Model MNVC 104 B -IN PRE 25-16 PRE 25-16AConstruction VS6 - Vert., Double casing (CAN), Diffuser OH2 - Centerline-supported OH2 - Centerline-supportedDesign Code API 610 10th API 610 10th API 610 10thSuction Flange Size " 4.00 '' 2.00 '' 2.00 ''Discharge Flange Size " 2.00 '' 1.00 '' 1.00 ''Flanges Class (Suction / Discharge) ANSI 300# RF ANSI 300# RF ANSI 300# RFPump Length mm 2000 -- --

    Criticality Rating

    Operating Data With Inducer

    Product CONDENSATE HC HCOther information on liquid (H2S, ) - - -Temperature min oC 32.2 40 40Temperature MAX oC 167 40 40MAX Specific Gravity kg/dm3 1 0.75 0.64MAX Vapour Pressure PSIA 19.7 TBA TBAMAX Vapour Pressure barA 1.36 TBA TBAMAX Viscosity cP. 1 TBA TBARated Capacity m3/hr 10.0 16.5 10.0Min. Flow m3/hr 8 6 5Nom. Head @ Discharge flange m 169.2 28.8 30Nom. Head @ Hydraulic Cell m 169.2 28.8 30Nom. Speed rpm 3580 3580 3580Efficiency % 36.75 35.61 24.66Impeller Size Duty (minimum) mm 147 130 130Impeller Size Duty (RATED) mm 148 134 134Impeller Size Duty (MAXIMUM) mm 164 169 169Impeller Type CLOSED IMPELLER CLOSED IMPELLER CLOSED IMPELLERNPSH Available @ suction flange m 1.83 4 4NPSH Available @ impeller axis m 2.83 4 4NPSH Required @ impeller axis m 1.6 1.8 1.4BHP at Duty kw 12.5 2.7 2.1BHP for SG = 1 (Water) kw 12.5 3.6 3.3

    (Bar G) NS NS NSC 232 Degre C 40 Degre C 40 Degre C

    S-1 A-8 A-8- - -

    Single Cartridge Seal Dual Cartridge Seal Dual Cartridge SealBSTIN / 1CW-FX / C2A1A1361- BDPIN / 3CW-FB / C2A3A-53B- BDPIN / 3CW-FB / C2A3A-53B-

    13 / 61 / - - / 53B / - - / 53B / -METASTREAM TSK-S METASTREAM TSK-S METASTREAM TSK-S

    End of curve power with d liquid 21.0 3.6 3.0

    Motor/Engine/Steam Turbine IEC IEC IECType TEFC TEFC TEFCModel/Frame Size 180 M 112 M 100 LRated Power @ 40C kw 25 4.6 3.5Speed rpm 3600 3600 3600Class/Protection Class 1, Group D, Div 2 --> ExnA IIT3 Class 1, Group D, Div 2 --> ExnA IIT3 Class 1, Group D, Div 2 --> ExnA IIT3Volt/Ph/Hz 460 10% / 3 / 60 2% 460 10% / 3 / 60 2% 460 10% / 3 / 60 2%

    Offer PriceBareshaft pump EUR 85,319 52,744 52,744Motor EUR 6,296 1,888 1,666Baseplate & coupling EUR Included Included IncludedSub Total: Set(s) EUR 91,615 54,632 54,410Grand Total EUR 183,230 109,264 108,820

    Testing Per Pump UnitEUR 950 950 950EUR 250 200 200EUR NA NA NAEUR 1,350 1,350 1,350EUR 360 360 360EUR 900 900 900EUR 500 500 500

    ENSIVAL MORET ASIA

    Material Code

    Coupling & SpacerAPI Flushing PlanMech. Seal Material CodeMechanical Seal/PackingShaft SleeveShaftWear Ring(s)Impeller

    PMI (Positive Material Identification)

    Witnessed Pump Perf. Test (Q,H,P & Eff)

    Witnessed Hydro. Test

    Witnessed NPSH Test

    Witnessed mechanical running test (4 hrs)

    Required Mechanical Design PressureRequired Mechanical Design temperature

    Material certificates 3.1 (Casing, Impeller and shaft)

    NDE (Liquid penetrant test for pressure parts)

    Casing

    PUKOR 11-049E_GSEC_PDVSA_Gas-Mega-Project_11058A-IN-12(P) 6/7/2011

  • 31 Mandai Estate, #07-07 Innovation Place, Tower 4, Immedia, Singapore 729933 Web Site Add. : www.em-pumps.comTel : (65)-6281 0667, (65)-6281 9180 Fax: (65)-6281 0908 E-mail : [email protected]

    QUOTATION

    To : GS E&C Project : PDVSA Gas Mega Project (Bidding) / V Fractionation Train At Jose

    Attn : ??? RFQ. No. : 11058A-IN-12(P)

    [email protected] Our Offer No. : PUKOR 11-049 E

    Fax : ??? Date : 07-Jun-2011

    Description 10 11 12

    Position No. D3.22.0401/02 D3.22.0406/07 D3.22.0404/05Quantity Required 2 2 2Make ENSIVAL MORET ENSIVAL MORET ENSIVAL MORETPump Model MNVC 120-IN PRE 40-32 PRE 40-32Construction VS6 - Vert., Double casing (CAN), Diffuser OH2 - Centerline-supported OH2 - Centerline-supportedDesign Code API 610 10th API 610 10th API 610 10thSuction Flange Size " 4.00 '' 3.00 '' 3.00 ''Discharge Flange Size " 2.00 '' 1.50 '' 1.50 ''Flanges Class (Suction / Discharge) ANSI 600# RF ANSI 300# RF ANSI 300# RFPump Length mm 2200 -- --

    Criticality Rating

    Operating Data With Inducer With Orifice With Orifice

    Product HC HC HCOther information on liquid (H2S, ) - - -Temperature min oC 40 40 40Temperature MAX oC 40 40 40MAX Specific Gravity kg/dm3 0.61 0.7 0.7MAX Vapour Pressure PSIA TBA TBA TBAMAX Vapour Pressure barA TBA TBA TBAMAX Viscosity cP. TBA TBA TBARated Capacity m3/hr 36.3 6.4 6.4Min. Flow m3/hr 12 6 6Nom. Head @ Discharge flange m 992.4 145.5 152Nom. Head @ Hydraulic Cell m 992.4 145.5 152Nom. Speed rpm 3580 3580 3580Efficiency % 62.59 13.26 12.65Impeller Size Duty (minimum) mm 140 260 260Impeller Size Duty (RATED) mm 161 265 270Impeller Size Duty (MAXIMUM) mm 164 320 320Impeller Type CLOSED IMPELLER CLOSED IMPELLER CLOSED IMPELLERNPSH Available @ suction flange m 4 4 4NPSH Available @ impeller axis m 4 4 4NPSH Required @ impeller axis m 1.4 2.4 2.4BHP at Duty kw 95.6 13.4 14.7BHP for SG = 1 (Water) kw 156.7 19.1 20.9

    (Bar G) NS NS NSC 40 Degre C 40 Degre C 40 Degre C

    A-8 A-8 A-8- - -

    Dual Cartridge Seal Single Cartridge Seal Single Cartridge SealBDPIN / 3CW-FB / C2A3A-53B- BSTIN / 1CW-FX / C2A1A1161- BSTIN / 1CW-FX / C2A1A1161-

    - / 53B / - 11 / 61 / - 11 / 61 / -METASTREAM TSK-S METASTREAM TSK-S METASTREAM TSK-S

    End of curve power with d liquid 123.0 22.0 23.0

    Motor/Engine/Steam Turbine IEC IEC IECType TEFC TEFC TEFCModel/Frame Size 315 S 180 M 180 MRated Power @ 40C kw 125 25 25Speed rpm 3600 3600 3600Class/Protection Class 1, Group D, Div 2 --> ExnA IIT3 Class 1, Group D, Div 2 --> ExnA IIT3 Class 1, Group D, Div 2 --> ExnA IIT3Volt/Ph/Hz 460 10% / 3 / 60 2% 460 10% / 3 / 60 2% 460 10% / 3 / 60 2%

    Offer PriceBareshaft pump EUR 202,930 30,184 30,184Motor EUR 20,440 6,083 6,083Baseplate & coupling EUR Included Included IncludedSub Total: Set(s) EUR 223,370 36,267 36,267Grand Total EUR 446,740 72,534 72,534

    Testing Per Pump UnitEUR 950 950 950EUR 250 200 200EUR NA NA NAEUR 2,200 1,350 1,350EUR 360 360 360EUR 900 900 900EUR 500 500 500

    ENSIVAL MORET ASIA

    Material Code

    Coupling & SpacerAPI Flushing PlanMech. Seal Material CodeMechanical Seal/PackingShaft SleeveShaftWear Ring(s)Impeller

    PMI (Positive Material Identification)

    Witnessed Pump Perf. Test (Q,H,P & Eff)

    Witnessed Hydro. Test

    Witnessed NPSH Test

    Witnessed mechanical running test (4 hrs)

    Required Mechanical Design PressureRequired Mechanical Design temperature

    Material certificates 3.1 (Casing, Impeller and shaft)

    NDE (Liquid penetrant test for pressure parts)

    Casing

    PUKOR 11-049E_GSEC_PDVSA_Gas-Mega-Project_11058A-IN-12(P) 6/7/2011

  • 31 Mandai Estate, #07-07 Innovation Place, Tower 4, Immedia, Singapore 729933 Web Site Add. : www.em-pumps.comTel : (65)-6281 0667, (65)-6281 9180 Fax: (65)-6281 0908 E-mail : [email protected]

    QUOTATION

    To : GS E&C Project : PDVSA Gas Mega Project (Bidding) / V Fractionation Train At Jose

    Attn : ??? RFQ. No. : 11058A-IN-12(P)

    [email protected] Our Offer No. : PUKOR 11-049 E

    Fax : ??? Date : 07-Jun-2011

    Description 13 14 15

    Position No. D3.22.0501/02Quantity Required 0Make ENSIVAL MORET ENSIVAL MORET ENSIVAL MORETPump Model NO QUOTEConstruction OH2 - Centerline-supported OH2 - Centerline-supported OH2 - Centerline-supportedDesign Code API 610 10th API 610 10th API 610 10thSuction Flange Size "Discharge Flange Size "Flanges Class (Suction / Discharge) ANSI 300# RF ANSI 300# RF ANSI 300# RFPump Length mm -- -- --

    Criticality Rating

    Operating Data

    Product HCOther information on liquid (H2S, ) -Temperature min oCTemperature MAX oCMAX Specific Gravity kg/dm3 0.45MAX Vapour Pressure PSIAMAX Vapour Pressure barA 0.00 0.00 0.00MAX Viscosity cP.Rated Capacity m3/hr 428.0Min. Flow m3/hrNom. Head @ Discharge flange m 877Nom. Head @ Hydraulic Cell m 877 0 0Nom. Speed rpmEfficiency %Impeller Size Duty (minimum) mmImpeller Size Duty (RATED) mmImpeller Size Duty (MAXIMUM) mmImpeller Type CLOSED IMPELLER CLOSED IMPELLER CLOSED IMPELLERNPSH Available @ suction flange m 4NPSH Available @ impeller axis m 4 0 0NPSH Required @ impeller axis mBHP at Duty kw #DIV/0! #DIV/0! #DIV/0!BHP for SG = 1 (Water) kw #DIV/0! #DIV/0! #DIV/0!

    (Bar G) NS NS NSC

    A-8- - -

    ????0 / 0 / 0000

    0 / 0 / 0METASTREAM TSK-S METASTREAM TSK-S METASTREAM TSK-S

    End of curve power with d liquid 0.5 0.0 0.0

    Motor/Engine/Steam Turbine IEC IEC IECType TEFC TEFC TEFCModel/Frame SizeRated Power @ 40C kwSpeed rpm 720 720 720Class/ProtectionVolt/Ph/Hz 460 10% / 3 / 60 2% 460 10% / 3 / 60 2% 460 10% / 3 / 60 2%

    Offer PriceBareshaft pump EUR 7,022 7,022 7,022Motor EUR 0 0 0Baseplate & coupling EUR Included Included IncludedSub Total: Set(s) EUR 7,022 7,022 7,022Grand Total EUR 0 0 0

    Testing Per Pump UnitEUR 950 950 950EUR 200 200 200EUR NA 500 500EUR 0 0 0EUR 360 360 360EUR 900 900 900EUR 500 500 500

    ENSIVAL MORET ASIA

    Material Code

    Coupling & SpacerAPI Flushing PlanMech. Seal Material CodeMechanical Seal/PackingShaft SleeveShaftWear Ring(s)Impeller

    PMI (Positive Material Identification)

    Witnessed Pump Perf. Test (Q,H,P & Eff)

    Witnessed Hydro. Test

    Witnessed NPSH Test

    Witnessed mechanical running test (4 hrs)

    Required Mechanical Design PressureRequired Mechanical Design temperature

    Material certificates 3.1 (Casing, Impeller and shaft)

    NDE (Liquid penetrant test for pressure parts)

    Casing

    OUT OF OUR MANUFACTURING RANGE

    PUKOR 11-049E_GSEC_PDVSA_Gas-Mega-Project_11058A-IN-12(P) 6/7/2011

  • 31 Mandai Estate, #07-07 Innovation Place, Tower 4, Immedia, Singapore 729933 Web Site Add. : www.em-pumps.comTel : (65)-6281 0667, (65)-6281 9180 Fax: (65)-6281 0908 E-mail : [email protected]

    To : GS E&C Project : PDVSA Gas Mega Project (Bidding) / V Fractionation Train At Jose

    Attn : ??? RFQ. No. : 11058A-IN-12(P)

    [email protected] Our Offer No. : PUKOR 11-049 E

    Fax : ??? Date : 07-Jun-2011

    Delivery Time 52-58 Weeks, Upon received of confirmed order, FOB Belgium. Excluded August Holiday (3 weeks).

    Price Price quoted in EURO, FOB Antwerp, Belgium. Freight and site delivery (with all possibles local taxes) are not in our quoted prices

    Packing Seaworthy Packing incudedValidity Up to October 5, 2011

    Terms of Payment

    - 15% at the order (against bank guarantee) by TT - 15% at the arrival of main foundries in our factory by TT - 70% at Ex-works (or FOB) delivery at sight against an irrevocable letter of credit opened at the effective date of the order and confirmed by a first class european Bank. At that time opening of a guarantee bond of 10% available up to the end of the guarantee period.

    Warranty12 months after commissioning ; latest 18 months after FOB delivery date - (which ever comesfirst); normal wear excluded from warranty

    Supplier ListMechanical seal Burgmann / John CraneSeal pot Burgmann / John CraneElectric motor LV ABB / Siemens / HHI .Electric motor MV ABB / Siemens / Schorch / HHI .Coupling Metastream (John-Crane)ARV NASteam Turbine NA

    TERMS AND CONDITIONS

    ENSIVAL MORET ASIA

    Goods labeled with "AL not equal to N" are subject to European or Belgium export authorization when being exported out of the EU. Goods labeled with "ECCN not equal to N" are subject to US reexport authorization. Even without a label, or with label "AL:N" or "ECCN:N", authorization may be required due to the final whereabouts and purpose for which the goods are to be used

    This offer (contract, order confirmation) or fulfilment of contract is subject to the provison that required export licenses have been granted or that there are no other impediments arising from Belgian, European or other export regulations.

    PUKOR 11-049E_GSEC_PDVSA_Gas-Mega-Project_11058A-IN-12(P) 6/7/2011

  • 31 Mandai Estate, #07-07 Innovation Place, Tower 4, Immedia, Singapore 729933 Web Site Add. : www.em-pumps.comTel : (65)-6281 0667, (65)-6281 9180 Fax: (65)-6281 0908 E-mail : [email protected]

    To : GS E&C Project : PDVSA Gas Mega Project (Bidding) / V Fractionation Train At Jose

    Attn : ??? RFQ. No. : 11058A-IN-12(P)

    [email protected] Our Offer No. : PUKOR 11-049 E

    Fax : ??? Date : 07-Jun-2011

    Item Request on datasheet Remarks / DeviationsD3.22.0408/09 - -

    D3.23.1105/06 Pump type requested VS6 We quoted as per your request and we also added in our documentation an alternative solutionin OH2 pump type for your consideration

    D3.23.1109 - -

    D3.23.1110/11 Pump type requested VS6 We quoted as per your request and we also added in our documentation an alternative solutionin OH2 pump type for your consideration

    D3.23.1107/08 - -

    D3.23.3503/04/05 NPSH available = 4 m on customer datasheet NPSH a not suficient for VS1 pump selection with this big flow. Please increase your NPSHa

    D3-23-5101/02 - -D3.22.3301/02 - -D3.23.3305/06 - -D3.22.0401/02 - -D3.22.0406/07 - -D3.22.0404/05 - -D3.22.0501/02 - -

    Remarks about each individual customer datasheets :

    ENSIVAL MORET ASIA

    GENERAL REMARKS :- Thrid Party Inspection is not included in our prices ; the cost of TPI (LLOYD'S, SGS, Bureau Veritas, AIB Vincotte, ...) is given as optional price on the our price summary sheet (at the beginning of our proposal)

    REMARKS AND DEVIATIONS ABOUT OUR QUOTATION / YOUR SPECIFICATIONS / YOUR INQUIRY :

    - At 50 Hz when contractual site frequency is 60 Hz - With Shop Motor when Job motor power do not cover the power required for test with water (due to SG of actual pumped liquid is

  • ENSIVAL MORET ASIA

    To : GS E&C Project : PDVSA Gas Mega Project (Bidding) / V Fractionation Train At Jose

    Attn : ??? RFQ. No. : 11058A-IN-12(P)

    [email protected] Our Offer No. : PUKOR 11-049 EFax : ??? Date : 07-Jun-2011

    Speficication Name / Number Considered, Applicable or not to our scope ?, ..Specification for API Centrifugal Pumps DB1010701PW016MD08001 (Rev 0 Dated 11/01/2009) Considered; Remarks stated below

    Typical Datasheet for MV motor

    Location "Egypt"? ; Utilization voltage 4000 V10% ? ; Frequency 60 Hz 2% OK ; Ambient temperature Max +33C? / 37.1C ? OKMotor quoted are as per IEC only (NEMA not considered!)Please note that your pump process datasheets specify a max ambient temperature of +42.2C (108F)

    Typical Datasheet for LV motor

    Location "Egypt"? ; Voltage 460 V 10% OK ; Frequency 60 Hz 2% OK ; Ambient temperature Max +33C? / 37.1C ? OKMotor quoted are as per IEC only (NEMA not considered!)Please note that your pump process datasheets specify a max ambient temperature of +42.2C (108F)

    Electrical Specification for Induction motorsDB1010701PWOI3ED10002 (rev 0 dated 08/FEB/2010)

    LV motor Voltage 480 V 10% ? --> we considered 460 V 10% as stated on each datasheetMV motor Voltage 4160 V 10% OKWe considered MV motor is applicable for motor 150 kw (200 Hp) and aboveFrequency 60 Hz 5% ? --> we considered 60 Hz 2% as stated on typical motor datasheet Absolute Max ambient temperature = + 40C OKNational standard / International stanrdards / PDVSA Standards referred in this specification are not in our hands and have not been consideredMotor quoted are as per IEC only (NEMA not considered!)

    Instrument with Equipment Packages SpecificationsDB1010701PWOI3ID07002 (rev 0 dated 22/NOV/2009)

    11.4: junction box - Eexi - NEMA 4X - IP66 - 12" x 12" x 8" - 2x 24 terminals !! --> we will use reduced size box due to only 2 connections on the seal system

    Spec for shaft sealing for centrifugal pumpsS030473102BM84302 (rev 0 dated 31/OCT/2006)

    6.1.2.23: throttle prefered for dual=> if impossible please explain --> throttle bushing not always possible on OH2 - BD or BT seals due to axial place6,1,6,4: sleeve 12Cr + colmonoy coating --> colmonoy old coating replaced by CrO2 coating (much better)8.1.3: inspection by buyer before shipment - disassembly / removal of seal for safe shipment --> pump are shipped with the mechanical seal installed

    Surface preparation and Specifications for PaintingDB1010701PWOI3MD08024 (rev 0 dated 16/DEC/2009) Noted ; No Comments

    - Para 5.3.9: radially split case pumps are required for all services: OK, noted and confirmed- Para 5.12.4: All pump components shall be Charpy V-notch tested to qualify for minimum auto-refrigeration temperature of the pumpage at maximum allowable working pressure. Auto refrigeration is assumed to take place at full pump pressure due to leakage of pumpage through normal sealed or valved connection, or through unforseen cracks or openings; ASME VIII Division 1 requirement shall apply with regard to impact testing: we considered this requirement as applicable for all the items where the minimum liquid temperature on customer datasheet is < 0C.- Para 6.2.12: Shaft alignment kit (including mounting brackets) IS NOT PART OF OUR SCOPE- Para 2.7.5: Special tools such as Hydraulic kit for coupling removal, bearing puller, alignment bracket, laser type alignment kit, : all this not quoted and not included in our scope of supply.

    LIST OF APPLICABLE SPECIFICATION

    Tel : (65)-6281 0667, (65)-6281 9180 Fax: (65)-6281 0908 E-mail : [email protected]

    31 Mandai Estate, #07-07 Innovation Place, Tower 4, Immedia, Singapore 729933 Web Site Add. : www.em-pumps.com

    - Para 5.3.6: Suction pressure regions shall be designed for the same pressure as the discharge pressure; Vertical can pump shall have its can, bowls, columns and discharge head rated for the same value of MAWP; This requirement shall apply to multistage horizontal pumps too --> refer to our remark on pressure summary table in our quotation

    - Para 5.1.32: stuffing box is for cartridge mechanical seal OR for packing rings; Not possible to be suitable for both without modification.

    Remarks about your Specification Specification for API Centrifugal Pumps DB1010701PW016MD08001 (Rev 0 Dated 11/01/2009) :

    - Para 1.2.7: PDVSA-SN-252 "Equipement Noise Control": Specification not received --> Not considered- Para 1.3.2: cathodic Protection sacrificial anodes inside pump casing and other cathodic protection system IS NOT PART OF OUR SCOPE OF SUPPLY- Para 1.3.2: One set of pump/driver Mechanical Alignment kit IS NOT PART OF OUR SCOPE OF SUPPLY

  • 31 Mandai Estate, #07-07 Innovation Place, Tower 4, Immedia, Singapore 729933 Web Site Add. : www.em-pumps.comTel : (65)-6281 0667, (65)-6281 9180 Fax: (65)-6281 0908 E-mail : [email protected]

    To : GS E&C Project : PDVSA Gas Mega Project (Bidding) / V Fractionation Train At JoseAttn : ??? RFQ. No. : 11058A-IN-12(P)

    [email protected] Our Offer No. : PUKOR 11-049 EFax : ???

    5.12.3.1

    5.8.25.8.105.12.3.17.3.3.38.3.6.28.3.6.38.3.8.2.38.3.10.2

    We offer standard driver as the pump has its own thrust bearing.Sound level test will be performed during shop performance test. Only global noise level check can be done. Noise measurement in our test floor are made according to ISO 3746Impellers are not axially individually secured

    Date : 07-Jun-2011

    Horizontal Overhung pumps type PRE (Code OH2)

    Sound level test will be performed during shop performance test. Only global noise level check can be done. Noise measurement in our test floor are made according to ISO 3746

    COMMENTS / REMARKS / DEVIATION TO API610 10th EDITION

    Non pressure parts (such as baseplates) are welded to our standard

    ENSIVAL MORET ASIA

    Line shaft is OPEN

    First impeller is overhung.Our pump has its own thrust bearing and is equiped with a FLEXIBLE coupling --> 8.3.8.2.3 not applicable

    Non pressure parts (such as motor bracket) are welded to our standardThe pump will be tested at 50 Hz. Not all intermediate section are installed (depending on pump length)Pump has its own thrust bearing.

    Vertical pumps type VN / VE (Code VS1) ---------- VNC / VEC / MNVC (Code VS6)Mechanical seal cannot be removed without disturbing the driver due to the fact that pumps is fitted with its own thrust bearingPumps are shipped with seal installed because the pump has its own thrust bearing

    Page 17 of 19

  • General Conditions of SalesFor the companies in the ENSIVAL-MORET Group

    1 General. The present general conditions apply to contractual relationships between the Supplier, every company in the ENSIVAL-MORET Group, and the client company hereinafter referred to as the Client. They form the legal basis of the contracts.

    2 Formation of the contract. Unless otherwise specified, the offer is valid for one month. The contract is not considered complete until acceptance in writing (order confirmation) of the order by the Supplier.

    3 Scope of the contract. The contract will be strictly limited to the goods and services expressly mentioned by the Parties using the data provided by the Client. The Supplier reserves the right to replace the goods being the object of the contract by goods of equivalent specification on condition that this does not result in either an increase in the price or a change in the quality for the Client. The Supplier reserves the right to contract out all or part of the work, goods and services, objects of the contract.

    4 Documents. The information, photographs, weights, prices and drawings shown in the catalogues, brochures and price lists are given for reference only and are not contractual; the Supplier reserves the right to make any modifications.

    5 Termination of the contract. The order expresses the consent of the Client in an irrevocable way; thus he cannot cancel it unless there is express and prior agreement by the Supplier. In this case, the Client indemnifies the Supplier for all the costs following this cancellation which cannot be less than 30% of the cancelled amount. The Supplier is not obliged to take back the new material which will be returned to him.

    6 Modification of the contract. Any modification of the contract asked for by the Client is subject to the express acceptance by the Supplier and will be made in an amendment to the contract. In this case, the Client compensates the Supplier for all the costs incurred and for all the direct and indirect consequences following from this (such as costs of additional quantities asked for, stock replacement, logistics costs, and checks).

    7 Ownership of the work, plans and documents. The Supplier retains the complete intellectual property rights for his work, plans and documents. Any reproduction requires the prior, written agreement of the Supplier. If the work done at the request of the Client or the documents provided to the Client is/are not followed by an order for the products, the costs incurred for these will be invoiced to the Client and the documents must be returned. All the intellectual property rights and the know-how incorporated in the documents handed over, the products delivered and the services rendered remain the exclusive property of the Supplier. Any cession of the rights for intellectual property or know-how must be the object of a contract with the Supplier.

    8 Prices. The prices, fixed at the time of acceptance of the order, are understood as excluding taxes, excluding costs for customs, transport, insurance, standard packaging and ex-works. In the case of an event outside his control endangering the stability of the contract, the Supplier reserves the right to revise his prices according to the modalities predetermined by the parties (in particular in the case of variation in the cost of raw materials, modification of customs duties, changes in the exchange rates, evolution of legislation).

    9. Payment conditions. 9.1 Payment terms and modalities. Unless expressly agreed otherwise, payments are due on the 30th day following the date of supply. The contractually agreed payment dates cannot be changed unilaterally by the Client whatever the pretext including litigation. Unless specifically agreed, the advance payments are made without discount.9.2 Payment arrears. In compliance with the European Directive 2000/35 EC of 29 June 2000, every late payment gives rise to the application of late payment interest at the rate of seven percent above the most recent European Central Bank lending rate. Any payment arrears or deterioration of the financial situation of the Client recorded by a financial institution results in forfeiture of the contractual terms and the total of all amounts becoming payable immediately. If the Supplier makes use of one and/or the other of these provisions, this does not affect implementation of the retention of title clause stipulated in Article 14. In the case of payment arrears, the Supplier has a right of lien on the manufactured products and connected supplies.9.3 Offsets. The Client is forbidden to make any offset or retention and also generally prohibited to invoice the Supplier for any amount which has not expressly been recognized by the latter.10. Delivery lead times. The lead time for making the material available, before receipt, runs from the time when the following conditions are satisfied:1) Receipt of all the information necessary for proper performance of the contract. 2) Receipt of possible payments on account due with the order and/or the opening of the Letter of Credit.Unless otherwise stipulated, the delivery dates are for reference only. A delivery delay does not cause cancellation, even partial, of the contract.

    Page 18 of 19 Gen. Cond. of Sales

  • 11 Technical acceptance, trials, inspections, certificates. The Client is obliged to perform detailed verification of the product on receipt. If there are no complaints within a period of 4 days, the product is considered as in compliance with the contract. Costs for all acceptance operations, checks, trials and certificates requested by the Client are borne by the Client. These additional activities take place in the factory or onsite according to the discretion of the Supplier. If the Client, having been informed of the date of these activities, is not present, a report is communicated to him and its reception is considered to have taken place.

    12 Packaging, delivery, transport, insurance, customs. The agreed terms of delivery are interpreted as compliant with INCOTERMS in force on the date of the conclusion of the contract. If no specific delivery condition has been agreed, the delivery is made ex-works. In the absence of any special request from the Client, the packaging requirement is at the complete discretion of the Supplier. The packaging is always at the cost of the Client and is not taken back by the Supplier. The Client is responsible for damage which may occur to or be caused by the products starting from their availability. In the case where the Client does not accept delivery and without needing to give notice, the Client bears all the costs and risks of storing the goods.

    13 Installation, commissioning. Unless otherwise agreed, these are performed by the Client at his exclusive responsibility and according to the regulations.

    14 Retention of title clause. The Supplier retains the complete title to the property comprising the object of the contract until complete and effective payment of the main and incidental prices. Failure to make payment on any of the due dates gives rise to a claim for the property.

    15 Guarantee. Unless otherwise stipulated and without prejudice to guarantee legislation, the Supplier guarantees the products for 12 months starting from the availability of the products in the premises of the Supplier. It only covers repair of the materials recognized as defective which have been returned to the workshops of the Supplier. The guarantee does not apply: - to the elements which are subject to wear and tear by the nature of their materials or function, - in the case of deterioration or accidents arising from

    improper installation or use, non-observance of installation, usage and maintenance instructions, defective supervision, storage or maintenance, modification to or interference with the original product by the Client.

    It does not apply in the case of non-payment by the Client and he cannot benefit from this for suspending or deferring his payments.

    16 Liability. The civil liability of the Supplier with the exception of personal injury and gross negligence is limited to the amount of the sums mentioned in the title of the contract. The Supplier expressly excludes any other liability with respect to indirect property damage and/or direct and indirect intangible damage and the compensation of any financial loss arising in particular from a loss of profit, deprivation of a right, interruption of a service rendered by a person or property insofar as such limitations or exclusions comply with and do not contradict the legal regulations in force.

    17 Force majeure. None of the parties to the present contract can be held liable for his delay or default in performing his obligations under the contract if this delay or default is caused directly or indirectly by force majeure in a sense wider than the French jurisprudence such as: occurrence of a natural disaster, earthquake, storm, fire, flooding, conflicts, war, industrial dispute, complete or partial strike, injunction by the public authorities (import prohibition, embargo), industrial accidents, transport accidents, machine breakdowns, explosion, failures by suppliers. Each party immediately informs the other party of the incidence of a case of force majeure which it is aware of and which in his opinion can affect the performance of the contract.

    18 Resolutory clause. If payment is not made within the 8 days following the date of sending notice of default by registered letter, the Supplier is entitled to terminate the contract. He is also entitled to obtain compensation for the complete loss incurred. If events of force majeure such as those described in Article 17 make performance of the contract impossible within a reasonable period, each of the parties is entitled to withdraw from the contract by simple, written notification to the other party without having to ask for the termination before a court of law. The termination of the contract for whatever reason does not affect the debts already incurred between the parties.

    19 Disputes. In the case of any legal disputes relating to a supply or its settlement and irrespective of the accepted conditions of sale and payment, even in the case of a guarantee claim, or the plurality of defendants and except with amicable agreement, the bankruptcy court for the registered office of the Supplier will have exclusive jurisdiction for deciding the issue. The law in the country of the supplier is exclusively applicable.

    Page 19 of 19 Gen. Cond. of Sales

  • ENSIVAL MORET BELGIUM S.A. Bois-la-Dame 4, Z.I. des Plenesses, 4890 THIMISTER-CLERMONT BELGIUM Tel 32 (0)87 46 81 11 Fax 32 (0)87 46 81 00 URL : http://www.ensival-moret.com / e-mail : [email protected] R.C. Verviers: 71510 T.V.A.: BE 467.613.838

    - Page 1 of 7 - THIMISTER-CLERMONT, the 10th Jan 2011.

    GENERAL CONDITIONS FOR THE PROVISION OF TECHNICAL PERSONNEL ABROAD

    1.-Scope of application

    1.1. These conditions shall apply to the provision of technical personnel for carrying out work in the customer's country. 1.2. The customer's country shall be deemed to be the country where the work is to be carried out.

    2.-Obligations of the customer

    2.1 Notification

    The customer shall give adequate notice to the contractor of the date on which the contractor's personnel is expected on the site.

    2.2 Preparations

    In order that the work may be started immediately on arrival of the personnel and may be prosecuted without unnecessary hindrance, all the equipment and tools required for the work and provided by the customer shall be available on the working site in advance and all other preparations shall be complete. Any foundations required for the works shall be perfectly dry and in accordance with the requirements specified by the contractor.

    2.3 Lodging

    The customer shall provide the personnel with suitable furnished and air-conditioned single rooms with proper washing facilities in the vicinity of the working site.

    2.4 Interpreters

    The customer shall ensure that competent interpreters are available free of charge to the contractor's personnel at the site during the work, unless the language used at site is the French language.

    2.5 Accident prevention

    The customer shall take all necessary and all legally prescribed measures for accident prevention.

  • ENSIVAL MORET BELGIUM S.A. Bois-la-Dame 4, Z.I. des Plenesses, 4890 THIMISTER-CLERMONT BELGIUM Tel 32 (0)87 46 81 11 Fax 32 (0)87 46 81 00 URL : http://www.ensival-moret.com / e-mail : [email protected] R.C. Verviers: 71510 T.V.A.: BE 467.613.838

    - Page 2 of 7 - THIMISTER-CLERMONT, the 10th Jan 2011.

    3.-Prices and Charges

    3.1 We make our qualified field servicemen available to the customer. Works, repairs and overhauls are carried out always without previous estimate to the best of our clients' interests and at the clients' own risk, and without any responsibility on our part as to duration of the work.

    3.2 The services of our field servicemen are invoiced in Euros according to the basic rate of EUR. 135.00 per each normal working hour. Overtime hours are invoiced with a supplement of 50 %. In the event of work on a Sunday or a holiday, the working hours will be billed with a supplement of 100 %. By holidays shall be understood all days which are customarily free in the visited country. If they are workfree, they will be invoiced at the normal rate. This rate is to be increased by 25 % in case of work under dangerous, unhealthy conditions as also in case of work in the mine, alongside the pit or by night. The remuneration shall be due for 30 days in case of illness.

    3.3 Invoicing method

    The normal week consists of 36 hours spread over the first five working days, provided the working hours occur between 6 a.m. and 6 p.m. and do not exceed 7.2 hours per day. Overtime hours are counted day by day. The hours are considered as overtime hours when they pass beyond either the daily limit of 7.2 hours or the conventional limit of 36 hours a week. The travelling hours will be invoiced at the normal rate of EUR. 135.00 per hour. If the daily journey between home base and working site or between working site and canteen requires more than 15 minutes in each direction, any time in excess of such 15 minutes shall be charged as working time. In case of work on a Sunday or a holiday a minimal rate of 5 effective working hours shall be charged.

    3.4 Travelling expenses and holiday

    All travelling expenses incurred in connection with the contract shall be borne by the customer. By travelling expenses are to be understood:

    a.- fares for journeys by rail at the first class rate b.- fares for journeys by car at the rate of EUR. 0.65 per km c.- fares for journeys by air at the prevailing rate, either in first class or in tourist class

    depending on availability and on the nature of the journey. If our personnel should be obliged by local conditions to travel between their home base and the working site or between the working site and the canteen, and the customer does not provide free transport, the expenses for such local travel shall be borne by the customer. In addition to all charges for lodging, food and drinks, we require for our qualified servicemen a weekly premium for working abroad of EUR. 505.00

    For all work performances lasting more than 3 consecutive months, each member of our personnel shall, at the end of each period of 3 months, be entitled to a journey to the country of the contractor and back at the client's costs. The daily allowance shall be payable during the period of travel but not during the period spent in the contractor's country.

  • ENSIVAL MORET BELGIUM S.A. Bois-la-Dame 4, Z.I. des Plenesses, 4890 THIMISTER-CLERMONT BELGIUM Tel 32 (0)87 46 81 11 Fax 32 (0)87 46 81 00 URL : http://www.ensival-moret.com / e-mail : [email protected] R.C. Verviers: 71510 T.V.A.: BE 467.613.838

    - Page 3 of 7 - THIMISTER-CLERMONT, the 10th Jan 2011.

    3.5 Miscellaneous expenses

    All expenses such as telefax, telex, phone and the like required for the work shall be borne by the customer.

    3.6 Waiting time

    Any waiting time for which the contractor or his personnel are not responsible shall be charged to the customer as normal working time. In the particular case of service assignments against a lump sum price, the wages, travelling expenses, accommmodation expenses etc. relating to any time wasted by our personnel under such circumstances shall be borne by the customer.

    3.7 Carriage, freight and customs duties as well as insurance dues in connection with personnel effects, instruments and tools required for the contract shall be borne by the customer.

    3.8 Checking

    Upon completion of the work or at the end of each week our field servicemen are required to submit to the client for signature a wage sheet on which are shown the hours they worked. These documents shall be used for the establishment of the invoices.

    3.9 Charges for tools and contractor's equipment

    At the request of the contractor, the customer shall give all necessary assistance with the customs formalities required for the import and re-export of the contractor's tools and equipment free of all duties and taxes.

    3.10 Taxes and dues The contractor shall be entitled to recover from the customer any taxes or dues levied in the customer's country on the contractor or his personnel in respect of obligations performed there by the contractor. In the event that any taxes or dues are claimed from the contractor on the price of supplies in respect of these obligations, such taxes and dues shall be borne by the customer.

    4.- Accident, illness and death

    4.1 Medical treatment

    In the event of accident or illness necessitating medical attention or hospital treatment, the customer shall, at his own expense, during the stay of the sick or injured person in the country where the work is to be done, provide the necessary medical attention and hospital treatment and procure the necessary medicaments, whether or not the accident or illness occurs in the course of work or during his off-time. Medical attention and hospital treatment shall be the best available.

  • ENSIVAL MORET BELGIUM S.A. Bois-la-Dame 4, Z.I. des Plenesses, 4890 THIMISTER-CLERMONT BELGIUM Tel 32 (0)87 46 81 11 Fax 32 (0)87 46 81 00 URL : http://www.ensival-moret.com / e-mail : [email protected] R.C. Verviers: 71510 T.V.A.: BE 467.613.838

    - Page 4 of 7 - THIMISTER-CLERMONT, the 10th Jan 2011.

    4.2 Repatriation

    The customer shall, at his own expense in the most suitable and quickest way, send the said person home if this is advisable on medical grounds, or if the customer so decides and this is medically possible. If in any case the said person is sent home at his own request, the cost of sending him home shall not be borne by the customer.

    In the event of death of a member of the contractor's personnel the customer shall assume the same obligation in respect of the transportation of the deceased and the payment of the relevant costs.

    4.3 Substitution

    In the event of death, or if by reason of illness or accident a member of the personnel is unavailable or unfit for work for more than 4 weeks, the contractor shall with all reasonable speed and at his own expense provide a substitute.

    4.4 Reimbursement

    The expenses paid by the customer in pursuance of the present article and reimbursed either by the Belgian National Social Security Office ("Office National de Scurit Sociale O.N.S.S.") or by Compulsory Insurance ("Assurance Loi") shall be reimbursed to the customer.

    5.-Interruption of work

    5.1 If the work is interrupted for a cause for which the contractor is not responsible:

    a) The customer is entitled to require the contractor to withdraw his personnel, in which case the customer shall pay the expenses associated with their withdrawal and return to the site.

    b) The contractor is entitled to recall his personnel if the interruption exceeds a reasonable period, in which case also the customer shall pay the expenses under a).

    5.2 If the contractor's personnel is withdrawn or recalled, the contract is not thereby terminated and its performance is merely suspended until the customer has required the return of the contractor's personnel to the site by giving a previous notice.

  • ENSIVAL MORET BELGIUM S.A. Bois-la-Dame 4, Z.I. des Plenesses, 4890 THIMISTER-CLERMONT BELGIUM Tel 32 (0)87 46 81 11 Fax 32 (0)87 46 81 00 URL : http://www.ensival-moret.com / e-mail : [email protected] R.C. Verviers: 71510 T.V.A.: BE 467.613.838

    - Page 5 of 7 - THIMISTER-CLERMONT, the 10th Jan 2011.

    6.-Accounting and Payment:

    6.1 The contractor shall make out invoices relating to the preceding month or to such other period as may be agreed. Such invoices shall be sent to the customer not later than 30 days after the expiration of the month or other agreed period.

    6.2 Unless otherwise agreed, payment shall be made in full within 30 days after the date of the invoice to the account of the contractor at the bank stated in the contract. Payment shall be made in Euro (Belgian currency). The rate of exchange shall be that prevailing on the date of payment. Nevertheless, in the case of late payment, the contractor shall be entitled to choose between the rate prevailing at the end of the above mentioned period of 30 days and the date of actual payment. He shall in any case be entitled to interest on the sum overdue, to which he shall become immediately entitled without further notice on expiry of the said period of 30 days. The rate of interest shall be 2 percent above the official discount rate of the contractor's country, without prejudice to the right of the contractor to claim additional compensation when this rate does not cover the loss actually suffered by him. The customer shall not be entitled to set off any sums due or alleged to be due to him from the contractor.

    7.-Price revision clause:

    The hours rates and the premiums shall be adjusted according to the basic wage modifications of the class 4 issued by AGORIA. These modifications are combined with the social charges modifications also issued by the AGORIA OFFICE BELGIUM.

    8.-Permits:

    The customer shall take any necessary steps to secure that the personnel, in good time, obtain visas and any official entry, exit or working permits required in the country where the work is to be carried out, as well as to ensure that the personnel have access to the working site.

    9.-Local laws and regulations: Safety Regulations

    9.1 The customer shall to the best of his ability assist the contractor to obtain the necessary information concerning the local laws and regulations applicable to the work.

    9.2 1) The customer shall notify the contractor in full of safety regulations which the customer imposes on his own employees and the contractor shall secure the observance of such safety regulations by his own personnel.

    2) If breaches of these regulations by the contractor's personnel come to the notice of the customer, he must inform the contractor in writing forthwith. The customer may take such measures as are necessary for the avoidance of danger resulting from such breaches, and may, in particular, forbid persons guilty thereof entry to the site.

    3) The contractor shall inform the customer of any special dangers which the execution of the work may entail.

  • ENSIVAL MORET BELGIUM S.A. Bois-la-Dame 4, Z.I. des Plenesses, 4890 THIMISTER-CLERMONT BELGIUM Tel 32 (0)87 46 81 11 Fax 32 (0)87 46 81 00 URL : http://www.ensival-moret.com / e-mail : [email protected] R.C. Verviers: 71510 T.V.A.: BE 467.613.838

    - Page 6 of 7 - THIMISTER-CLERMONT, the 10th Jan 2011.

    10.- Working conditions

    10.1 Unless otherwise agreed, the contract is made under the following conditions:

    1) The work shall not be carried out in unhealthy or dangerous surroundings.

    2) The customer shall make available to the contractor's personnel suitable board in the neighbourhood of the site and shall provide access to adequate medical services. 3) All necessary hoisting devices, scaffolding and other equipment, fuel power, lubricants, cleaning agents, consumable stores and water shall be provided, free of charge, by the customer in good time. 4) The customer shall provide the contractor (free of charge, unless otherwise agreed) with closed or guarded premises on or near the site as a protection against theft and deterioration of the contractor's tools and equipment and of the clothing of the contractor's personnel. Any departure from the conditions mentioned in this paragraph shall attract a reasonable extra charge.

    10.2 If the circumstances resulting from such departure are such that it would be unreasonable to require the contractor to proceed with the work, the contractor may, without prejudice to his rights under the contract, refuse to do so.

    11.-Additional Labour

    Upon the contractor's requirement in good time, the customer shall make available to the contractor, free of charge, such skilled and unskilled labour as may be found necessary even if not provided for in the contract. The persons made available by the customer under this clause shall provide their own tools. The contractor shall not be under any liability either towards such additional labour or for their acts and omissions.

    12.-Work outside the contract.

    The customer shall not be entitled to use the contractor's personnel on any work unconnected with the subject matter of the contract without the previous consent of the contractor. Where the contractor so consents, he shall not be under any liability in respect of such work and the customer shall be responsible for the safety of the contractor's personnel while employed on such work.

  • ENSIVAL MORET BELGIUM S.A. Bois-la-Dame 4, Z.I. des Plenesses, 4890 THIMISTER-CLERMONT BELGIUM Tel 32 (0)87 46 81 11 Fax 32 (0)87 46 81 00 URL : http://www.ensival-moret.com / e-mail : [email protected] R.C. Verviers: 71510 T.V.A.: BE 467.613.838

    - Page 7 of 7 - THIMISTER-CLERMONT, the 10th Jan 2011.

    13.-Contractor's liability 13.1. The contractor shall be liable for loss and damage suffered by the customer by reason of the negligence or lack of diligence of the contractor or his personnel provided however that he has failed to choose suitable personnel for the work or to provide them in due time.

    13.2 The contractor's liability shall not extend to loss or damage which the contractor could not reasonably have foreseen at the time of making the contract.

    13.3 The contractor's liability shall not extend to losses due to service interruptions or loss of profit.

    14.-Law applicable The contract shall be governed by the Belgian law.

    15.-Arbitration Any dispute arising out of or in connection with this agreement shall be settled without recourse to the courts in accordance with the rules of conciliation and arbitration in the International chamber of Commerce by one or more arbitrators designated in conformity with those rules, the award being final and binding. The arbitrator or arbitrators shall have power to rule on their own competence and on the validity of the agreement to submit to arbitration.

    REMARK: This document draws largely from "THE CONDITIONS FOR THE PROVISION OF TECHNICAL PERSONNEL ABROAD" issued by "ORGALIME" (organisation for linking the European metallic industries). Brussels - January 1970.

    NOTE: Services of our field servicemen including traveling hours are invoiced as follows:

    HOUR ORDINARY ...................................................................... EUR : 135.00 HOUR OVERTIME ....................................................................... EUR : 202.50 HOUR ON SUNDAYS AND HOLIDAYS ............................... EUR : 270.00 HOTEL & ACCOMODATIONS: by customer